Stocks/IES.L

IES.L

Invinity Energy Systems plcv3 3.0/10 · 2026-10-20
Utilities·Renewable Utilities
9.60 GBp
56M GBP market cap
v3 Rating
3.0/102.0–4.5
Setup
4.5/103.0–6.0
Fair Value
10.00 GBp3.00 GBp–28.00 GBp+4%
DCF (10%)
10.00 GBp+4%
Base IRR
-35%-85%–+60%
Visibility
wide±125%
Rating
Revenue (TTM)
8.2M GBP
Owner Earnings
-£24M
Next-Yr Owner Earnings
-£22M
Growth
+45.0% × 7y
P / Next-Yr OE
--
Net Debt
-£27M

Invinity Energy Systems plc, founded in 2006 and based in Saint Helier, United Kingdom, is a prominent manufacturer and global supplier of vanadium flow batteries (VFBs). These batteries provide essential energy storage solutions across various international markets, including the UK, Canada, the United States, Australia, and China. Beyond battery production, the company also engages in the development of electricity grids and delivers associated grid services. Its energy storage systems serve a broad range of clients, from utility companies and project developers to commercial and industrial enterprises, as well as off-grid and microgrid applications.

2-Year Price History

$10.70-36.1%
$10$15$20$25$30$35Initial target $10.00 · 2026-10-20volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-20

Rating
3.02.0–4.5
Setup
4.53.0–6.0
Fair value (GBp)
10.003.00 – 28.00
Upside vs 9.60
+4%
DCF (10%)
10.001.00 – 35.00+4%
Base IRR
-35%-85% – 60%
Visibility
very widerange ±125%
Sentiment
3/10
2026-10-20 · claude-opus-5-5 · priced at 17.70

Invinity makes vanadium flow batteries (VFBs) in Scotland and Canada. It has a real product: 2,000+ batteries in the field, 11 GWh dispatched, and customers who like it (the CEC-funded Viejas microgrid passed 1 GWh delivered). It has never made money. FY25 customer revenue was £8.2m with a -35% gross margin, the net loss was £24.1m and real FCF was about -£25m. H1 2026 revenue was only £1.7m and cash had fallen to £10.5m by June. The 2026 story was supposed to be the UK LDES cap-and-floor scheme, where 21 projects (16.7 GWh) bid with Invinity kit. In June Ofgem's minded-to list picked just one of them. The shares fell from 35p in May to 17.7p, the last close on 16 Oct; they have been suspended since 19 Oct. Today (20 Oct) the company launched a deeply discounted rescue raise: a £10m placing at 10p, 43.5% below that close, plus a National Wealth Fund (NWF) subscription of £10-12.5m and a retail offer of up to £5m. That lifts the share count from 569.5m to about 830m, roughly 46% dilution. It is the third raise in three years, after 23p in 2023 and 19.5p in 2025. The 17.7p quote is therefore stale: shares should reopen around 22 Oct near the 10p issue price. The upside is real optionality. FlexBase has selected Invinity for a 1.5 GWh battery (2.1 GWh with expansion) at an AI-datacentre campus in Switzerland, worth an estimated £250m+ if it converts to a fulfilment contract from mid-2027. That compares with a post-money EV of only about £55m at 10p. Unit costs are also down about 62%, and there is US tax-credit manufacturing. My base DCF still has cash burn running through 2028, a likely further raise, and FCF of only about £8m by 2031. At 15-20x that gives about 8-11p a share, so fair value is about 10p. Rating 3.0: at the 17.7p quote the stock is about 45% above what institutions just paid. It is pre-profit, serially dilutive and not in our buy box, and there are no options for covered calls. Research rating 4.5: there is binary upside at about 10p if FlexBase signs and the order book converts, but that is mostly unresolvable before mid-2027.

A deep dive would have to establish: Will FlexBase's 1.5-2.1 GWh selection convert into a firm, prepaid fulfilment contract at a positive gross margin in 2027, and can Endurium reach the 20%+ gross margin needed to stop the cash burn before another dilutive raise?

Owner earnings, TTM
-£24M-£30M – -£18M
Realistic peak profit
£15M-£5M – £50M
Growth rate
45.0%15.0% – 80.0%
Years of growth
73 – 12
Market cap
£101M£90M – £112M
EV
£95M£84M – £106M
Net debt
-£27M-£32M – -£20M
Capital return / cap
-45.0%-48.0% – -35.0%
P/E
-4.2×-6.0× – -3.0×
EV/EBITDA
-4.6×-6.0× – -3.5×
FCF yield
-24.0%-30.0% – -18.0%
Projected FCF, base case (GBP millions)
Y1-£22M-£32M – -£12M
Y2-£15M-£30M – £5M
Y3-£6M-£28M – £20M
Y4£2M-£25M – £35M
Y5£8M-£20M – £50M
Competition: Lithium-ion (98% of storage, with 8-18 hour Li-ion now winning UK cap-and-floor awards) and cheaper Chinese VFB makers led by Rongke Power, plus Sumitomo, CellCube, Eos, ESS and Form Energy in long-duration storage; Invinity's edge is track record and bankability, not cost.
Governance: No fraud, but a record of serial deeply-discounted dilutive raises (23p in 2023, 19.5p in 2025, 10p in Oct 2026, about 46% dilution this round) and repeatedly slipped revenue timing; state-backed NWF and Indian/Chinese strategic partners on the register.
Research (expand)

What the company does

Invinity Energy Systems (AIM: IES; Jersey-incorporated) formed in 2020 from the merger of redT and Avalon. It designs and makes vanadium flow batteries for stationary storage: the containerised ENDURIUM product (replacing the older VS3) and site-integrated systems such as the FlexBase design. Manufacturing is in Bathgate and Motherwell (Scotland) and Vancouver, with steel enclosures and tanks sourced from Suzhou Baojia in China. A US factory is due in late 2026/2027 to capture IRA domestic-content credits. Licensing and royalty partners include Atri (India), C&D Group/UESNT (China) and Everdura (Taiwan). About 180 staff. The installed base is 2,000+ modules, ~100 projects in 17 countries and 11 GWh dispatched. Customers include the CEC-funded California projects (Viejas casino microgrid, Rincon, Soboba), PNNL, Chappice Lake (Alberta), the Energy Superhub Oxford, the Hungarian portfolio and Copwood (20.7 MWh, the largest VFB in Europe, waiting on a grid connection with commissioning targeted by end-2026). The pitch: unlimited cycling, no degradation, a 30-year life, no thermal runaway, and 99% recyclable electrolyte.

The investment case (bull)

  • FlexBase TZL (Laufenburg, Switzerland): Invinity was selected to design a 1.5 GWh VFB (phased to 2.1 GWh) for a 500 MW AI datacentre and technology campus. The preliminary design review is complete, the engineering phase runs through 2026-27, and fulfilment starts in 2027-28 with delivery in 2028-30. At ~$250/kWh that is ~£250-300m of revenue, against a post-money EV of ~£55m at the 10p issue price. It is not yet a firm order.
  • Cost-down: Endurium unit cost is down 62% from launch to Q1-2027 pre-production, and the company targets a further ~56% by 2030. Product margin went from -83% in H1-25 to +1.8% in H1-26, and warranty costs fell from £0.9m to £0.2m.
  • Orders and pipeline: orders roughly tripled (34.2 MWh in H1, 77 MWh secured for 2026 including a 43 MWh Dairyland Power order). Revenue already contracted is £11m for 2026, £25m for 2027 and £5m for 2028. The unrisked pipeline is 12.8 GWh, mostly North America and datacentres.
  • Policy and backers: the NWF (UK state) owns about 19-20% and is cornerstoning this raise. The US offers stacked credits (30% ITC, 10% domestic content, $45/kWh 45X), and cap-and-floor window 2 is due in 2027.

What it earns today (real free cash flow)

  • FY25: revenue £8.2m plus £9.1m of DESNZ grants for Copwood. Gross loss £2.9m, opex £21.9m (employee costs £14.4m), adjusted EBITDA -£20.6m, net loss £24.1m. Operating cash flow -£17.2m, investing -£9.5m (Copwood and manufacturing). Year-end cash £28.8m, no debt.
  • H1-26: revenue and grants £1.7m, gross loss £0.7m, net loss £12.1m. Operating cash flow -£12.9m, investing -£5.0m. Cash £10.5m at 30 June.
  • Real FCF: about -£24m a year (range -£30m to -£18m). I treat most capex as maintenance-like, because the factories and the US line are needed just to stay in the game, and I count SBC as a cost. There are no owner earnings to add back: this is a cash-burning venture, not a disguised compounder.

Financing event (today)

Shares were suspended on 19 Oct under a Capital Access Window. On 20 Oct the company announced a minimum £20m raise at 10p (43.5% below the 17.7p close), with a maximum of about £27.5m:

  • a £10m placing (100m shares, oversubscribed);
  • an NWF subscription matching the placing and retail shares, capped at 125m shares (£10-12.5m);
  • a WRAP retail offer of up to £5m (50m shares).

Use of proceeds: £10m for cost-down and product development, £8m for working capital, £2m for UK/US capacity. Management says this funds working capital into H1-2028. Shares go from 569.5m to about 770-845m (I use ~830m), and the deal needs GM approval. The previous chair, Neil O'Brien, is putting in £50k. This is the third raise at a falling price (23p in 2023, 19.5p in 2025, 10p now).

Five-year FCF projection (base, £m, before interest)

2027: -22 | 2028: -15 | 2029: -6 | 2030: +2 | 2031: +8.

The base case assumes:

  • revenue of roughly £30m in 2027;
  • £60-80m in 2028-29 as FlexBase fulfilment and US-built product ramp;
  • £120m+ by 2031 at a 20-25% gross margin, against an opex base of about £28-30m.

Cumulative burn of ~£45m (plus ~£4m in Q4-26) exceeds the ~£28m pro-forma cash. Another raise of £15-25m is likely in 2028 unless FlexBase brings customer prepayments.

In five years: if FlexBase converts and costs hit target, this is a young, still fast-growing storage OEM with £150m+ revenue and modest but rising FCF. That is a growing income stream, but a thin-margin hardware one. If FlexBase stalls and lithium keeps getting cheaper (Chinese Li-ion at well under $100/kWh vs Chinese VFBs at ~$270/kWh), it stays a sub-scale grant-dependent company that keeps raising money. That is a corpse, held up only by state shareholders. Confidence in the base is low: the 90% range on 2031 FCF runs from -£20m to +£50m.

Fair value and multiples

  • At the 17.7p quote (pre-raise share count): market cap ~£101m, EV ~£95m (est. ~£6m cash in mid-October). P/E -4x, EV/EBITDA negative (EBITDA -£20.6m), FCF yield about -24%, EV/sales ~11x FY25 customer revenue.
  • At 10p post-raise: market cap ~£83m, pro-forma net cash ~£28m, EV ~£55m.
  • DCF (10%, 5 years plus a year-5 multiple): PV of FCF is -£30.6m and the Q4-26 burn is -£4m.

- At 20x (growth category) on £8m, the terminal value is £160m (PV £99m), giving equity ~£93m, or ~11p a share on 830m shares.

- At 15x the result is ~8p.

- Midpoint dcf_value ≈ 10p (range 1-35p).

  • Fair value ≈ 10p, matching the price institutions and the NWF just paid. The bull case (FlexBase signed, a cap-and-floor reversal or window-2 wins, US data-centre orders, 2031 FCF of £25m+ at 20-25x) is worth ~30p+. The bear case is further dilution toward 2-4p.
  • Against the 17.7p quote: about -45% and a base IRR of roughly -35%. Against the likely ~10-11p reopen, roughly fair with high-variance optionality.
  • Not a buyout candidate: there is no EBITDA. Not a covered-call setup: there are no listed options.

Management, risks and competition

  • Management: CEO Jonathan Marren (ex-CFO, CEO since the September 2024 profit warning), CFO Adam Howard, CCO Matt Harper. They talk sensibly about refusing negative-margin business (unlike Eos) and have delivered cost-down ahead of plan. But revenue timing has repeatedly slipped (Everdura and LDES in 2024, Copwood's grid connection in 2026). The 2025 guidance of £8-13m year-end cash was beaten only because of the 19.5p raise, and the cap-and-floor outcome was badly misjudged. Volker Beckers becomes chair after the raise.
  • Governance: no fraud. The issue is serial dilution at ever-lower prices, and the strategic shareholders include Atri (India) and Chinese partners.
  • Risks:

- FlexBase is a selection, not a firm order, and it hinges on a single customer and on Swiss and Laufenburg permitting.

- Lithium-ion cost deflation and 8-18-hour Li-ion winning cap-and-floor (11 of 16 window-1 projects).

- Chinese VFB makers (Rongke Power dominates at ~RMB1.9/Wh), plus Sumitomo Electric, CellCube, VRB Energy and Stryten, and other long-duration tech (Eos zinc, Form Energy iron-air, ESS iron flow).

- Vanadium price spikes.

- Going-concern risk if the GM fails.

- US tariff and policy risk on IRA credits.

  • Moat: track record and bankability (an insurance wrap and project-finance lenders are close). That is meaningful in a market where most flow-battery start-ups have failed, but it is not a durable cost moat.

How investors feel: 2.5 / 10 (hated)

  • The stock round-tripped from 35p (May, pre-cap-and-floor hype) to 17.7p after Ofgem picked only one Invinity project, and a raise at 10p now sets a lower anchor.
  • Retail (a heavy LSE bulletin-board following) is angry about dilution and the Sunday Times cap-and-floor saga.
  • Broker coverage is thin and stale: Canaccord Genuity rated it Buy with targets of 40-60p before the raise, and consensus targets of ~40-87p are now irrelevant and will be cut.
  • Positives: the NWF backed the deal and the placing was oversubscribed.
  • This is not forced selling of a quality asset, though. It is a pre-revenue-scale company re-pricing its equity to fund the burn.
Sources

Financials — Adjusted

Adjusted · TTM 2025-Q4 · GBP

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue8.18+63%8.18+63%5.01-77%22.0+647%2.94
Gross profit-4.08-4.08-3.51-4.41-1.59
Operating expenses21.2+3%21.2+3%20.5+13%18.2-10%20.3
▸Adj EBITDA-23.9-23.9-22.7-21.2-20.5
▸Adj OCF-20.8-20.8-19.8-20.2-16.6
CapEx-15.4-15.4-1.30-1.04-0.71
Adj FCF-36.2-36.2-21.1-21.2-17.3
Interest expense0.150.150.101.230.07
▸Adj net income-24.1-24.1-22.8-23.1-21.9
▸Owner's earnings-24.0--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025

Where the Cash WentTotal2025202420232022
▸Claimed: EBITDA-83.4-21.8-21.3-20.5-19.8
FCF (OCF−capex)-102-32.7-26.2-20.4-22.6
Net income-88.6-24.1-22.8-23.2-18.5
▸Capital returned-104-24.0-57.3-21.4-1.10
Buybacks-105-24.2-57.4-22.7-1.17
Dividends0.000.000.000.000.00
Interest paid1.550.150.101.230.07
Debt paid down0.000.000.000.000.00
▸Reinvestment19.715.71.440.831.65
Capex (PP&E)18.515.41.301.040.71
Intangibles & M&A-0.060.000.00-0.060.00
Leases signed (net Δ)1.230.300.14-0.150.94
Retained / other3.56-8.5031.22.34-21.5

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 0.6 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)81.081.075.642.053.1
▸Liabilities (total)14.614.69.898.1618.7
Net debt (incl. leases)-26.8-26.8-33.7-3.46-3.43
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-162-162-216-17.2-316
Shares outstanding570499344194120
Dilution (YoY)+44.9%+44.9%+77.4%+62.1%+28.9%
Employees140--------
MarginsTTM2025202420232022
Gross margin-49.9%+20.1-49.9%+20.1-70.0%-50.0-20.0%+34.0-54.0%
Adj EBITDA margin-291.9%+160.2-291.9%+160.2-452.1%-355.8-96.3%+601.5-697.9%
Adj OCF margin-254.1%+141.3-254.1%+141.3-395.4%-303.6-91.8%+472.6-564.4%
Adj FCF margin-442.9%-21.5-442.9%-21.5-421.4%-324.9-96.5%+491.9-588.5%
Net income margin-294.5%+160.1-294.5%+160.1-454.6%-349.2-105.3%+524.3-629.6%
Adj NI margin-294.1%+160.6-294.1%+160.7-454.7%-349.7-105.0%+638.8-743.8%
ROIC (adj, after-tax)-29.1%-29.1%-28.2%-50.5%-47.9%
Cost of debt----------

Earnings Calls

4 calls

Earnings Call · 2026 Q2

2026-09-22

Invinity Energy Systems plc held an interim results investor presentation led by CEO Jonathan Marren, with CFO Adam Howard and commercial director Matt Harper. Management positioned the company as a provider of flexible energy storage based on vanadium flow battery technology. The core pitch is unlimited cycling, no degradation, a 30-year life, no thermal runaway risk, and a mechanical design that allows components to be repaired or replaced, which they likened to a pumped hydro system in a box. Management argued that flow batteries are proven technology, first patented in the 1880s and advanced by NASA in the 1970s, and that the company has been commercializing its product since its 2020 merger. The company says it has about 2,000 batteries installed and has dispatched 11 GWh of power, up from 10 GWh recently announced. Flagship projects include FlexBase in Switzerland, a 2.5-hour, 1.5 GWh system for an AI data center, which management said is larger than the average electricity load of the city of Zurich. Copwood in the UK is expected to be the largest flow battery project in Europe, and Spencer Energy in Australia is a long-running desert asset. Financially, customer orders signed in the first half rose threefold year on year to just over 30 MWh, and the order book is just under 80 MWh excluding FlexBase. Project and grant income rose to GBP 1.7 million from GBP 0.8 million. Gross loss fell 60 percent, warranty costs dropped from GBP 0.9 million to GBP 0.2 million, and the net loss narrowed by GBP 1.5 million to GBP 12 million. Cash at period end was GBP 10 million, with GBP 40 million of inventory expected to unwind into revenue, roughly half in the second half of the year and the rest early next year. Management said the product cost has fallen about 60 to 66 percent over the VS3 product's life, with Endurium designed to reduce cost further, and suggested a further 50 percent reduction through to 2030. Management said that about 60 to 70 work streams are underway. Management outlined a pipeline split into order book, framework agreements and development projects, totalling just under 13 GWh on a risked basis. Most pipeline volume is expected in North America over 2026 to 2028, driven by US incentives including the investment tax credit, production tax credit and local manufacturing incentives. The company's segmentation identifies three priority markets: standalone co-located long duration storage, commercial and industrial sites with existing cogeneration, and AI data center buffering. Management cited a 15 percent cost advantage on inference workloads and 12 percent on training workloads versus incumbents, in a market it estimates at GBP 45 billion. Management described the UK cap and floor long duration storage round as a major disappointment. The company said its technology scored similarly to others on price and financials, that scoring was opaque and based on outdated data, and that it is lobbying government and pushing for a fairer process and a potential further round. The company is building a US factory with a stack production line, targeted to be running by the end of the year, with a site selection nearly complete. It is also maintaining its UK manufacturing base in Bathgate and Motherwell. On corporate matters, management said there are no plans to move the listing to the US at present, though a future US listing may make sense at the right scale. The National Wealth Fund is a major shareholder, and London liquidity remains the priority. In Q&A, management was asked about cash runway, which is supported by balance sheet cash and inventory unwinding into the 12-month going concern period. Other questions covered the pipeline composition, FlexBase's repeatability and engineering stage gates, rest-of-world opportunities including China and India, UK manufacturing scale-up with a six-month lead time, admin overhead growth linked to R&D investment and loss of Gamesa recoveries, and revenue recognition, with over 95 percent recognized on delivery. Competition is mainly lithium, which holds about 98 percent of the market. Management also said customers are not delaying purchases in anticipation of lower prices because they need power solutions immediately. On bankability, the company is moving to project finance-backed commercial projects above 20 to 30 MWh, with insurance wraps under discussion. Copwood was expected to be fully commissioned by year end, pending a substation connection and a commissioning test in late November. Vanadium supply is being secured from secondary sources, and management expects prices to stay near current levels. Finally, management said it is engaging with UK, Canadian and US governments, with Canada's pan-Canadian electrification program identified as a potential storage opportunity. Management closed by saying the trajectory is positive despite expected ups and downs.

Analyst Q&A (17)
▸
Can you give more detail on how cash will be managed over the next 12 months, considering inventory, cash and customer receipts?
Cash runway depends on balance sheet cash and inventory of about GBP 40 million. Roughly half of the inventory unwinds in the second half for deliveries, and the remainder early next year. This supports the 12-month going concern assessment in the interim statements.
▸
When the company talks about the 11 GWh of frameworks, what types of customers are these, and where do they sit on the buyer spectrum?
The core renewable farm development business remains healthy. The big change is in data centers, with FlexBase phase two boosting the pipeline and growing interest from data center operators, builders and constructors.
▸
Is FlexBase a one-off project or the start of a repeatable offering?
Matt Harper said the focus is on delivering FlexBase correctly, but the aim is to turn portions of it into a repeatable offering for other sites and regions. Jonathan Marren said delivery is planned for 2029 to 2030, installation starts in about a year, and replication elsewhere is possible later.
▸
Where is demand outside North America, Europe and the UK? Is it China, India or elsewhere?
Management said it must focus on core markets given limited commercial bandwidth. China has deployed the most vanadium flow batteries, and management believes its pricing will be competitive and its performance better. India is very cost-conscious, and the company will only pursue selective, margin-accretive opportunities. European projects are significant, and Africa and elsewhere may come later.
▸
Can you give more detail on the FlexBase engineering process and what progress means toward a signed award?
Matt Harper said the project was awarded based on track record and the concept meeting the RFP requirements. Over the next year there will be sequential stage gates to deliver more evolved engineering designs and build the actual orders. Unlike past containerized products, individual components will be shipped for on-site integration.
▸
What is the company's view on the cap and floor outcome, as reported in The Sunday Times, and the chance of change?
Jonathan Marren said the company was very disappointed. Coverage has drawn strong support from stakeholders, and the company is lobbying government bodies. He argued that the UK offers weaker incentives than the US, EU and Japan, that scoring was harsh and used outdated data, and that the process lacked clarity. He cannot forecast a change, but the company is pushing for a fair outcome and focusing on this round, with the aim of creating 1,000 jobs in Scotland.
▸
Do we have the manufacturing scale in the UK to deliver FlexBase and other large projects?
Jonathan Marren said scaling takes about six months, typically the lead time for stack manufacturing. A stack line is on order for the US and will be commissioned quickly. The company would not currently absorb large overhead costs but can scale rapidly by retraining workers from oil and gas and recruiting apprentices and graduates. The facilities need a dry, enclosed, stable floor rather than specialist equipment.
▸
When will the company provide more detail on US manufacturing and its plans?
Matt Harper said the company is most of the way through selecting a site and is negotiating leasing contracts. An initial team is in place to help set up the facility. The final location will be announced once contract details are locked in.
▸
What explains the increase in admin overheads and the GBP 1.5 million movement in the bottom line?
Adam Howard said the movement is explained in note 4 of the accounts. Half is a comparator effect because Gamesa recoveries are no longer available after completing the joint development agreement. The other half is higher staff costs, reflecting investment to deliver the 60 percent cost reduction. The company is managing its admin budget judiciously.
▸
Is selling a battery a one-off sale or a maintenance contract, and how does revenue flow as projects are delivered?
Adam Howard said over 95 percent of revenue is recognized on delivery of the battery. There is also recurring revenue from long-term service agreements. Larger projects such as FlexBase will use percentage-of-completion accounting, which is common in the industry.
▸
Where is the main competition, in what format and in which markets?
Matt Harper said the main competition is lithium, which holds about 98 percent of the world market. Other flow battery companies are also present. For FlexBase, multiple global bidders, including lower-cost players from China and India, lacked the track record the company could offer. No competitor has credibly broken into the market in the way the company has.
▸
Is a move to the US or a US listing being considered, given the commercial focus?
Jonathan Marren said there are no plans to move. The company has met US investors who bought shares after meetings and recognizes that US capital markets may suit its pipeline in the future. London liquidity and listing remain the priority, with the National Wealth Fund as a major shareholder. A US listing may be possible once the company reaches the right size, but there is no announcement planned in the near future.
▸
Are customers delaying orders until product costs fall further?
Matt Harper said this is a concern but has not been seen in the pipeline. Customers are usually commercial and industrial businesses seeking immediate bill savings, or AI data centers that cannot connect to the grid without a power solution, so waiting is not an option.
▸
Are discussions with banks and others on project financing still ongoing, and where is bankability heading?
Adam Howard said the company has moved from smaller units to large commercial projects backed by project finance debt, typically above 20 to 30 MWh. Insurance wraps are needed to make lenders comfortable. Discussions have progressed materially and are expected to close within months. Copwood's operating status helps show insurers and lenders a working project of this scale.
▸
What is happening with Copwood, and when will it go live and begin generating revenue?
Jonathan Marren said delays are outside the company's control, with connection work by the network operator and the substation still pending. The company had hoped for connection in the first half of the year and advanced payments to secure equipment. Adam Howard said the project is fully delivered and awaiting the substation. It should be fully commissioned by year end, with a first commissioning test expected by late November.
▸
What is the company's approach to vanadium, including its view on cost reduction and security of supply?
Matt Harper said the company continues to find the best quality, lowest cost sources, with emerging supplies from secondary sources such as petrochemical and steel waste streams. New producers using advanced purification are emerging. Prices are likely to stay near current levels rather than the higher levels of the last decade, and the company is working with producers to secure low-cost offtake.
▸
How are engagements with UK, Canadian and other governments going, and are they building relationships and bearing fruit?
Jonathan Marren said local MPs and ministers have been supportive, and the company has received substantial UK government funding. The cap and floor result was disappointing and appeared to come from a single department. Matt Harper said Canada is prioritizing pan-Canadian electrification, a multi-billion-dollar grid investment program in which storage is a key component. No deals have been announced, but the company expects to win a good share.

Web Traffic

invinity.com
Web rank#931,493
Est. visits/mo598K
Web Rank History
#931,493+122,529
rankest. visits/mo
800k820k840k860k880k900k920k940k594K605K617K629K640K09-1509-2209-2910-0610-1311-03

Cash Runway

10.6months
CRITICAL

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2026 Q22M-11M-11M$-0.02$-0.02 – $-0.021
2026 Q41M—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-07-05) — for comparison onlyclick to expand

Thesis

Invinity is a pre-scale vanadium flow battery (VFB) manufacturer pivoting from legacy VS3 to the lower-cost ENDURIUM platform. Revenue remains tiny and lumpy (£2-8M/period) against a persistent £20-25M annual cash burn, funded almost entirely by equity issuance (shares outstanding have grown from 120M to ~499M in three years, +45% in the latest year alone). The 2025Q2 update shows the order book building (12 MWh signed vs 4 MWh prior year), losses narrowing ~10%, and a healthy ~£38-40M cash position giving runway into 2027. The equity story now rests on three real catalysts: UK LDES Cap & Floor allocations (21 of 77 shortlisted projects specify Invinity tech), international licensing deals in China/India that could generate high-margin royalty revenue without capital intensity, and large individual project wins (Gamesa/ABB Spain reference site performing well, plus reported GWh-scale Swiss and US steel-mill contracts in later disclosures). If Cap & Floor slots and the international license model convert, Invinity could become the reference non-lithium LDES supplier with a very different margin profile; if they don't, the company remains a serial equity-raiser burning cash against thin, uneconomic project revenue in a market where lithium-ion costs keep falling.

Trade Signal

Trade rating
+3.0/10
No trade
Horizon
~3mo
Claude2026-07-05 · saw 28.00 GBp-65.7% since

Modest buy: recent commercial wins (Swiss GWh project, US steel mill, Copwood completion) genuinely support the ~20-30% upside to the analyst's target, but chronic 45%/yr dilution, no cash floor, and the still-pending binary UK Cap & Floor decision keep this a small, catalyst-driven position rather than a high-conviction re-rate.

Temporary mispricing+1.5

The stock was flat/drifting in the mid-teens to £20 through early 2026, then exploded from ~£17.5 (early May) to a 52w high of £39.4 by early June (+125% in a month) on a cluster of concrete news: the Swiss FlexBase GWh-scale project selection, the Pacific Steel Group 32MWh US LDES-funded contract, completion of the flagship Copwood 20.7MWh hub, and mounting anticipation of the UK Cap & Floor 'Initial Decision List' (imminent as of June 2026). Since early June the stock has round-tripped back down to £28, a ~29% pullback from the high, suggesting the initial move overshot ahead of the binary Cap & Floor decision and is now partially normalizing/derisking into that event. Net effect vs. 6 months ago: real, durable operational progress (multiple marquee project wins, Bathgate automation validated, Endurium cost-down on track) has pushed the stock up materially, and that repricing looks largely justified rather than purely euphoric — but the run happened fast and the pullback shows the market is genuinely uncertain about the Cap & Floor outcome, the single biggest swing factor.

Market view+2.0

The market has swung from ignoring/left-for-dead (sub-£10 in 2024, chronic dilution, tiny lumpy revenue) to newly excited speculative interest as tangible commercial wins (Swiss GWh project, US steel mill, Copwood completion) validate the Endurium thesis. Retail-driven volatility is extreme (96% annualized vol, huge intraday swings, $140M/day turnover on a £135M cap — turnover far exceeds float value), pointing to speculative/retail positioning rather than institutional conviction. Bulls point to the pipeline (£234M 2028 revenue projection, China/India licensing optionality, Cap & Floor as multi-billion-pound TAM unlock); bears point to persistent 45%/yr dilution, -£24M owner earnings, 15% 2yr insolvency probability, and reliance on the company's own optimistic multi-year guidance. The current view is genuinely mixed/uncertain — priced for a binary Cap & Floor outcome rather than settled consensus either way.

Inflectionwindow ~2mo+4.5

Yes — multiple concrete proof points (Bathgate automation fully operational, Endurium 43% cost-down validated at Gamesa/ABB's Zaragoza site meeting all targets, Swiss GWh-scale and US LDES-funded contracts signed) mark a genuine step-change from 'promising pre-revenue R&D story' to 'commercially validated technology with a real order book,' something the market has only partially digested (share price already up 40% since last earnings, but pulled back 29% from the June high). The true inflection — whether Invinity secures a meaningful slice of the UK Cap & Floor Initial Decision List (imminent, Summer 2026 final awards) — is still pending and would be a major unexpected positive catalyst versus current consensus, which seems to be pricing partial/uncertain allocation.

Catalysts
  • ▲Summer 2026 · Ofgem Cap & Floor Initial Decision List / final binding awards — Binary catalyst — Invinity-linked projects cover 16.7GWh across 21 shortlisted schemes; strong allocation could unlock billions in future revenue and re-rate the stock sharply, a miss would be a severe negative
  • •2026-09 to 2027-01 · H2/FY2026 trading update / results — Watch whether £14M 2026 revenue guidance and narrowing losses are on track; any slippage (as already seen with Hungarian project delays) would hurt credibility
  • ▲late 2026 · Copwood VFB Hub revenue generation begins — First revenue from Europe's largest VFB installation, tangible proof of commercial operation
  • ▼H2 2026-2027 · Further equity raise — Cash burn of ~£20-25M/yr against £38-40M cash (runway to 2027) implies another dilutive raise is likely, especially if stock stays elevated (opportunistic issuance)
  • ▲through 2027 · Swiss FlexBase GWh project design milestones — Engineering/design phase progress on the world's largest flow battery project would further validate scale credibility
  • ▲Q1 2027 · US Pacific Steel Group battery deliveries — First deliveries on largest VFB in North America; execution proof point
Flow-6.0

Chronic heavy dilution is the dominant flow dynamic: shares outstanding grew from 120M to ~499M in three years (+45% in the latest year alone), funding a persistent £20-25M annual cash burn via equity issuance rather than buybacks. No buyback, no dividend, no signs of insider buying disclosed. With ~£38-40M cash and burn continuing, another raise within 12-18 months is likely, especially opportunistically after the recent rally — this caps upside and is a structural headwind to per-share value even as enterprise value grows.

Floor / Ceiling-4.0

No hard floor: net cash (~£10-15M implied) is a small fraction of the £135M market cap, and the business is deeply loss-making with no tangible asset backing beyond that cash and a technology/order-book value the bear case pegs near £30M. There's no active buyback or committed acquirer. On the ceiling side, there's no explicit near-term overhang (no disclosed lockup), but the near-certainty of a future dilutive raise acts as a soft ceiling — any strong rally likely triggers opportunistic equity issuance that caps and slows the re-rate.

Buyability

This is buyable as a speculative growth/optionality name — it has genuine institutional and retail attention (high $ volume, marquee industrial customers like a steel mill and a Swiss AI data-center-linked GWh project), not a forgotten microcap. It's a story stock for growth/thematic (energy storage, grid, AI power demand) investors who can tolerate binary regulatory risk and dilution. It is NOT a value/income name — no capital returns, so investors buying it are underwriting the growth optionality and Cap & Floor outcome specifically, not a value re-rating.

Fear vs Greedfear 7/10 (-2.0)greed 6/10 (+3.0)

Slight greed, tempered by caution: the operational proof points (Zaragoza performance, Bathgate automation, marquee contract wins) are real and de-risk the technology, and the pullback from £39 to £28 gives a better entry ahead of the Cap & Floor decision. But the extreme volatility, near-certain future dilution, and reliance on the company's own optimistic multi-year revenue ramp keep me from being aggressively bullish — this is a binary-catalyst trade, not a clean mispricing.

Valuation

Our Target
150M GBP+166%
Market Should Pay
128M GBP+126%
target ×0.85 (fear discount)
Current Market Cap
56M GBPSlightly bearish
What Changed
transcript · 2025-10-10
+8%fair value on this information

The 2025Q2 results show signed ENDURIUM orders tripling YoY (12 MWh vs 4 MWh), operating loss narrowing ~10%, and cash runway extended into 2027 on a comfortable ~£38-40M balance — all somewhat better than the market may have priced after the disappointing 2024 delays. New color on the international license-model strategy (China/India partnerships) and confirmation that Invinity is the sole VFB provider to reach the next Cap & Floor stage with 21 of 77 shortlisted projects is incremental positive evidence of commercial traction not previously quantified.

▸ How the cases moved

Bull probability nudges up slightly (0.18->0.20) on Cap & Floor and international licensing progress; bear probability trims slightly (0.38->0.35) as near-term liquidity concerns ease with the confirmed runway to 2027; base case largely unchanged in value but modestly reinforced by order growth. No case's terminal equity value materially repriced by this single update — the big catalysts (final Cap & Floor awards, Swiss/US project conversions) remain pending.

2-Year Plausible Outcomes
bear35%
40M GBP
rev +15%/yrOE $-18M

Cap & Floor allocations disappoint for Invinity-linked projects, international licensing deals stall in negotiation, and lithium-ion cost declines continue to squeeze out non-subsidized VFB economics. Revenue stays under £15-20M by 2027, losses persist, and further heavy dilution (or a distressed strategic sale) erodes per-share value even as the entity survives nominally. Terminal value reflects a struggling, sub-scale manufacturer trading near net cash plus minimal going-concern value.

▸ Valuation

Distressed case valued near net cash + minimal enterprise value: ~£10M net cash (after further burn) + £30M residual technology/order-book value = £40M equity value

base45%
160M GBP
rev +60%/yrOE $-12M

Modest execution: a handful of Cap & Floor slots and steady project wins (Copwood, incremental US/Canada orders) push revenue toward management's own £14M (2026)/£49M (2027) guidance trajectory, though losses continue to narrow rather than disappear. Continued but more moderate dilution funds the ramp. Market applies a growth-stage revenue multiple reflecting real but unproven scaling.

▸ Valuation

3x forward (2027) revenue of £49M = £147M EV; + net cash ~£15M = £162M equity value

bull20%
710M GBP
rev +150%/yrOE $5M

Invinity secures multiple UK Cap & Floor slots, the international China/India license model begins generating high-margin royalty revenue, and marquee projects (Swiss GWh-scale, US LDES-funded steel mill) de-risk the technology at scale, validating the path toward the company's own £234M 2028 revenue projection. Market re-rates Invinity as the reference non-lithium LDES platform, commanding a premium growth multiple similar to early-stage cleantech leaders.

▸ Valuation

5x a risk-adjusted forward (2028-pulled-forward) revenue base of ~£140M = £700M EV; + net cash ~£10M = £710M equity value

▸ Target Rationale

I discount the arithmetic model modestly for two reasons the scenario math doesn't fully capture: (1) chronic, heavy dilution (44.9% YoY share growth, four consecutive years of net capital raised rather than returned) is a persistent value leak to existing holders that the model's per-company equity values don't penalize directly, and (2) the base/bull cases lean on the company's own optimistic multi-year revenue projections and binary regulatory catalysts (Cap & Floor) whose timing and magnitude are genuinely uncertain. A target below the probability-weighted model reflects execution and dilution risk without denying the real optionality in the bull case.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now3/10
Trajectory7/10
Risk7/10
Governance4/10
Insolvency prob (2yr)15%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Landmark Swiss GWh-Scale Project Selection (May 2026): Invinity was selected by FlexBase Group to design a GWh-scale vanadium flow battery (VFB) system for the Technology Centre Laufenburg in Switzerland. Believed to be the world's largest flow battery, the project will feature an initial capacity of up to 1.5 GWh (expandable to 2.1 GWh) to support grid stabilization and renewable integration for an AI data center and technology campus. The engineering design phase will run through 2026 and 2027.
  • 32 MWh U.S. Steel Mill Project Sale (June 2026): Invinity secured a contract to sell a 32 MWh VFB system to Pacific Steel Group for the Mojave Micro Mill in Kern County, California. Funded by the California Energy Commission’s LDES Program, this is expected to be the largest VFB in North America. Battery deliveries are scheduled to commence in Q1 2027.
  • Copwood VFB Energy Hub Delivery Completed (May 2026): Invinity completed the delivery of its flagship 20.7 MWh Copwood VFB Energy Hub in East Sussex, UK (formerly the LoDES project). Paired with a 3 MWp solar array, it represents Europe's largest VFB installation and is scheduled to begin generating revenue by the end of 2026.
  • Trading and Commercial Projections (May/June 2026): In its FY2025 results and a May 2026 commercial update, Invinity projected revenues of £14 million in 2026, £49 million in 2027, and £234 million in 2028 (based on its backlog, near-term contracts, and risk-weighted pipeline). While two Hungarian projects are no longer expected to contribute to 2026 revenue, its Endurium cost-reduction program is tracking ahead of schedule. Additionally, the company secured a 2 MWh Endurium Enterprise sale to a tribal reservation in Wisconsin, funded by the U.S. Department of Energy.

---

▸ Thesis-test Findings
Invinity Energy Systems Bathgate automation progress 2025
  • Findings: In its September 2025 interim results, Invinity announced that its new semi-automated stack production line was fully operational at its Bathgate, Scotland facility. This automation upgrade is a structural pillar of its cost-reduction strategy, significantly scaling stack manufacturing capacity while driving down unit assembly costs. By January 2026, Invinity confirmed that the Bathgate stack manufacturing methodology is fully operational and capable of being replicated globally. The automation progress has supported a 43% reduction in Endurium's production costs compared to the previous VS3 generation, positioning the company to hit its target of a 66% total cost-per-kWh reduction.
UK LDES Cap and Floor allocation timeline and winning bids
  • Findings: The UK’s 25-year LDES Cap and Floor Scheme (Window 1) officially launched in April 2025. Following an initial screening of 171 applications, Ofgem shortlisted 77 eligible projects in September 2025 to proceed to the detailed Project Assessment stage. Proponents of 21 of these shortlisted projects (representing 16.7 GWh of potential storage capacity) have proposed using Invinity’s Endurium flow batteries. Ofgem and the National Energy System Operator (NESO) conducted detailed evaluations in late 2025 and early 2026. As of June 2026, Ofgem's "Initial Decision List" of projects to be offered a cap and floor is expected to be published imminently, with final binding regime awards scheduled for Summer 2026. Securing slots on the final list is a major binary catalyst that could unlock billions of pounds in future revenue for Invinity starting from 2028–2030.
Gamesa Electric ENDURIUM performance reports Spain
  • Findings: Invinity shipped its first 1.2 MWh Endurium system to joint development partner Gamesa Electric’s La Plana hybrid plant near Zaragoza, Spain, in December 2024. Fully commissioned in early January 2025, the facility serves as a vital field-testing and validation site. Performance data collected throughout 2025 was utilized to refine the Endurium cost-down roadmap. By mid-2025, Invinity's leadership reported that the Zaragoza system was outperforming operational expectations. In its June 2026 financial results announcement, Invinity confirmed that the first deployment at La Plana (under Gamesa Electric, now acquired by ABB Renewable Energy) has successfully met or exceeded all operational targets, providing essential field-level validation to attract multi-gigawatt utility opportunities globally.