Stocks/IGO.AX

IGO.AX

IGO Limitedv3 4.8/10 · 2026-10-16
Basic Materials·Industrial Materials
4.77 AUD
3.6B AUD market cap
v3 Rating
4.8/103.5–6.5
Setup
5.5/104.0–7.0
Fair Value
5.30 AUD3.60 AUD–8.50 AUD+11%
DCF (10%)
5.00 AUD+5%
Base IRR
+9%-6%–+22%
Visibility
wide±46%
Wall Street
(1 buy)
Rating
Revenue (TTM)
442.0M AUD
Owner Earnings
A$230M
Next-Yr Owner Earnings
A$270M
Growth
+5.0% × 4y
P / Next-Yr OE
13.4x
Net Debt
-A$460M

IGO Limited is an Australian exploration and mining firm dedicated to discovering, developing, and operating mineral assets essential for clean energy technologies. The company holds outright ownership and management of several key Western Australian operations, including the Nova nickel-copper-cobalt mine, situated northeast of Norseman in the Great Western Woodlands; the Cosmos nickel mine, located north of Leinster; and the Forrestania nickel mine, positioned east of Perth. Furthermore, IGO strategically invests in lithium mining ventures and fully controls a downstream processing facility at Kwinana, Western Australia, which refines lithium into battery-grade hydroxide. Its comprehensive portfolio also encompasses a range of other exploration and development projects, such as Fraser Range, Kimberley, Paterson, Copper Coast, Frontier, Raptor, and Western Gawler. Established in 2000 and headquartered in Perth, Australia, the company previously operated under the name Independence Group NL before adopting IGO Limited in January 2020.

2-Year Price History

$4.98-6.0%
$4.0$5.0$6.0$7.0$8.0$9.0Initial target $5.30 · 2026-10-16volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-16

Rating
4.83.5–6.5
Setup
5.54.0–7.0
Fair value (AUD)
5.303.60 – 8.50
Upside vs 4.77
+11%
DCF (10%)
5.003.30 – 8.30+5%
Base IRR
9%-6% – 22%
Visibility
widerange ±46%
Sentiment
4/10
2026-10-16 · claude-opus-5-5 · priced at 5.44

IGO is now essentially a holding company for a 24.99% look-through stake in Greenbushes, the world's biggest and cheapest hard-rock lithium mine. It holds the stake through TLEA, a joint venture controlled 51% by Tianqi. Around that stake sit A$470M of IGO-level cash and listed securities, a 49% share of the cash-burning Kwinana hydroxide refinery (written down to zero), and a Nova nickel mine that closes this quarter and is being sold for A$7M. The stock closed at A$5.44 on 16 Oct 2026 (the pack's A$5.50 was stale). That is down from a 2026 high of about A$10 and from A$7.14 after April's Greenbushes guidance cut. Two things drove the fall. Spot SC6 spodumene has roughly halved from its May peak of about US$3,000/t to about US$1,500-1,700/t: CATL's Jianxiawo mine is heading for a restart, and Bald Hill, Finniss and other Australian mines are coming back on. Greenbushes has also kept disappointing on grade, recoveries, safety (a WorkSafe improvement notice) and the much-delayed life-of-mine review (SOR). My model runs Greenbushes at 1.6-1.8Mt a year, a long-run SC6 price of about US$1,400-1,450/t, AUD/USD at 0.70, and Kwinana shut or sold within about two years. On that basis IGO's look-through free cash flow is about A$230-335M a year, and a 10% DCF gives about A$5.0/share. The share price therefore implies a long-run SC6 price of about US$1,500/t, close to today's spot. Each US$100/t on the long-run price is worth about A$0.59/share. Rating 4.8/10: fairly priced, a pure lithium-price bet with Tianqi-controlled cash leakage on top, and no margin of safety at today's spot. Research rating 5.5/10: lithium moves violently enough that a 40%+ rebound inside a year is plausible. The SOR outcome, a Kwinana exit and the restart of TLEA dividends are concrete catalysts that work could pin down, but the main driver, the lithium price, cannot be researched away.

A deep dive would have to establish: Does the Greenbushes SOR (product grade, recoveries, pit design, capex) lift sustainable volume toward 2Mt at sub-A$450/t, and will Tianqi agree a Kwinana exit that lets TLEA distribute Greenbushes cash to IGO? And at what long-run SC6 price does that make A$5.44 cheap?

Owner earnings, TTM
A$230MA$130M – A$330M
Realistic peak profit
A$420MA$250M – A$750M
Growth rate
5.0%-5.0% – 15.0%
Years of growth
42 – 7
Market cap
A$4.1BA$4.1B – A$4.2B
EV
A$3.7BA$3.6B – A$3.8B
Net debt
-A$460M-A$520M – -A$380M
Capital return / cap
0.9%0.8% – 1.1%
P/E
17.0×12.0× – 28.0×
EV/EBITDA
7.0×5.0× – 11.0×
FCF yield
6.8%3.0% – 11.0%
Projected FCF, base case (AUD millions)
Y1A$270MA$130M – A$400M
Y2A$230MA$60M – A$450M
Y3A$310MA$100M – A$550M
Y4A$335MA$100M – A$600M
Y5A$335MA$100M – A$620M
Competition: Greenbushes is the lowest-cost hard-rock spodumene mine. It competes on price with PLS (expanding Pilgangoora), Mineral Resources, Liontown, restarting Australian mines, Chinese lepidolite (CATL Jianxiawo), African supply and South American brines, none of which IGO can influence.
Governance: IGO is a 49% minority in Tianqi-controlled TLEA, which has opaque disclosure and Greenbushes cash trapped behind the loss-making Kwinana refinery. The CFO is interim, the board has turned over heavily, and Greenbushes has a WorkSafe psychosocial improvement notice.
Research (expand)
What the company does

IGO Limited (ASX: IGO; 757.3M shares) is a Perth miner that has largely become a lithium holding company. Its main asset is a 49% stake in Tianqi Lithium Energy Australia (TLEA). Tianqi owns the other 51% and controls it. TLEA in turn owns:

  • 51% of Windfield/Talison, which owns Greenbushes. That gives IGO a 24.99% look-through stake in the world's largest and highest-grade hard-rock lithium mine. Albemarle owns the other 49% and operates the marketing side.
  • 100% of the Kwinana lithium hydroxide refinery (IGO 49%). Train 1 was fully impaired in FY25 and Train 2 was abandoned in January 2025.

The rest of the group is small:

  • Nova (nickel-copper-cobalt) produced A$228M of free cash flow in FY26. Mining ends in the Dec-2026 quarter, and the operation is being sold to Global Lithium for A$7M.
  • Cosmos is in care and maintenance.
  • Copper and lithium exploration, plus the BioHeap leaching technology.
What it earns today

FY26 (to June 2026):

  • Statutory NPAT A$145M; underlying NPAT A$109M; underlying EBITDA A$286M.
  • Share of TLEA profit A$207M.
  • Underlying free cash flow A$134M, which was almost all Nova (A$228M).
  • No TLEA dividend reached IGO.
  • Net cash A$387M plus A$99M of listed securities. The A$300M revolving facility is undrawn.
  • Final dividend 5c fully franked (A$38M, about 0.9% yield).

Greenbushes FY26 (100% basis):

  • 1.41Mt of concentrate.
  • Revenue A$2.86bn and EBITDA A$2.10bn (73% margin).
  • Realised price US$1,443/t; the June quarter alone was US$2,286/t at an 80% margin.
  • Cash cost A$415/t.
  • Windfield paid a A$390M dividend in the June quarter.

FY27 guidance:

| Asset | Measure | Guidance |

|---|---|---|

| Greenbushes | Production | 1.55-1.75Mt |

| Greenbushes | Cash cost | A$380-440/t |

| Greenbushes | Capex | A$250-300M |

| Kwinana | LiOH production | 9-11kt |

| Kwinana | Conversion cost | A$16-18k/t |

| Kwinana | Sustaining/improvement capex (expensed) | A$75-90M |

Kwinana lost A$167M of EBITDA in FY26 (100% basis).

Run-rate look-through owner earnings at spot SC6 of about US$1,500/t and AUD/USD of 0.70: about A$230M a year. This is my estimate, not a company figure. It is built from:

  • IGO's 24.99% of Greenbushes after-tax free cash flow: about A$380M.
  • Minus 49% of Kwinana's burn: about A$80-100M.
  • Minus corporate costs and exploration: about A$95M.
  • Plus interest on cash.

This cash only reaches IGO if TLEA distributes it. TLEA is Tianqi-controlled, held about A$423M at June, and has paid IGO nothing since FY24.

What it could earn at maturity

The best case is Greenbushes at 1.9-2.0Mt with CGP3 at nameplate, recoveries fixed, and possibly a lower-grade product (5.5% instead of 6%) that recovers more contained lithium, which the SOR is studying. Add Kwinana closed or sold.

  • At US$1,600/t SC6: IGO look-through NPAT of about A$420M.
  • At US$2,500+/t (another price spike): A$700M+.

Greenbushes reserves support more than 20 years of mining, so this is a long-lived royalty-like stream on a very volatile commodity.

Fair value and multiples

DCF (10%, FY27-31 plus terminal, AUD/USD 0.70):

  • SC6 assumptions: about US$1,600/t realised in FY27, because the September quarter still caught US$2,000+ prices; then US$1,400/t in FY28-29 and US$1,450/t in FY30-31.
  • Greenbushes volume: 1.60 → 1.80Mt.
  • Kwinana costs IGO A$100M in FY27 and A$90M in FY28 (including exit costs), then A$20M a year.
  • Terminal value: 0% growth.
  • IGO free cash flow: about A$270M / 230M / 310M / 335M / 335M.
  • PV of explicit years about A$1.16bn plus PV of terminal about A$2.08bn.
  • Add IGO cash and securities (about A$470M) and about A$100M as IGO's usable share of TLEA cash.
  • Result: about A$3.8bn, or A$5.0/share.

Sensitivity: each US$100/t on the long-run SC6 price moves value by about A$0.59/share. The current share price of A$5.44 therefore implies about US$1,500/t long-run, which is roughly today's spot. Bear case (US$1,100/t, trapped cash): about A$3.3. Bull case (US$2,000/t): about A$8.3+.

Multiples at A$5.44:

  • Market cap about A$4.12bn; EV at IGO level about A$3.65bn.
  • About 18x run-rate look-through earnings at spot, or about 15x FY27e (which still includes the high September-quarter prices).
  • About 7x look-through EBITDA.
  • About 7% look-through free cash flow yield. The cash IGO actually receives is far lower until TLEA pays out.

Brokers: Macquarie (Outperform, A$9.00, 8 Oct, though it now prefers PLS) and Canaccord (Buy, A$8.75) use much richer price decks. Older targets from MS, Citi and UBS sat at A$4.50-5.45.

My fair value: about A$5.3 (range A$3.6-8.5). That is the DCF plus a little option value for lithium's habit of spiking.

Risks and competition

Lithium price. This is the dominant risk. Spot SC6 has roughly halved since May and Chinese carbonate is near CNY100k/t. Supply is returning:

  • CATL's Jianxiawo is back in environmental approval.
  • Bald Hill, Finniss, Ngungaju, Pioneer Dome and Mt Marion have restarted.
  • Zimbabwe exports have recovered.
  • PLS has just announced a A$1.9bn Pilgangoora expansion.

Demand concerns include EU caps on Chinese hybrid imports, lower oil, and talk of sodium-ion.

Greenbushes execution:

  • FY26 guidance was cut by about 13% in April.
  • Grade fell and recoveries are still weak.
  • Safety TRIFR deteriorated and WorkSafe issued a psychosocial improvement notice, with Talison's review due 20 November.
  • The SOR has slipped past its September timing with no new date.
  • SOR capex (pit-wall steepening, underground) could raise spending.

Structure and governance:

  • IGO is a 49% minority holder in a JV that Tianqi controls, and Tianqi has its own balance-sheet pressures.
  • Disclosure is limited, and Greenbushes cash can be trapped to fund Kwinana.
  • Kwinana has no profitable pathway. Closure or sale needs Tianqi's agreement, and remediation costs are unknown.

People and portfolio:

  • The CFO role is interim and the board has turned over heavily.
  • Nova's cash flow ends in FY27.
  • Management wants copper or lithium M&A, which is a capital-allocation risk at the bottom of the cycle.

Competition: Greenbushes is first-quartile cost (about A$415/t versus peers at A$600-900/t). It stays profitable through the cycle, but it cannot set price. Pricing is set by Chinese lepidolite, African DSO, Australian restarts and South American brines.

How investors feel: 3.5/10

The stock is down about 34% YTD and about 46% from its 2026 high, and down about 17% in the past month alone. Lithium is in a "carnage" phase in ASX coverage, Greenbushes has disappointed for over a year, and the Kwinana saga and opaque JV frustrate analysts (repeated Q&A pushback on transparency). It is not completely hated: the net cash, the asset quality, and Macquarie and Canaccord buy ratings give it a floor of support, and it is still treated as the quality ASX lithium name.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue442-15%442-15%517-35%796-24%1050
Gross profit-74.9-306%-74.9-306%36.3-131-164%206
Operating expenses54.3-66%54.3-66%160+290%41.0-29%57.4
▸Adj EBITDA57.3-74%57.3-74%217+333%50.2-88%436
▸Adj OCF132+333%132+333%30.6-97%879-34%1334
CapEx-1.10-1.10-5.20-198-338
Adj FCF131+417%131+417%25.4-96%681-32%996
Interest expense8.508.5011.520.044.0
▸Adj net income-120-120-630-295%323-80%1586

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA-97657.3100%-36.1-405-592
FCF (OCF−capex)1904131229%32.76921049
Net income-257145254%-9552.80549
▸Capital returned247912.422%2251291951
Buybacks34.83.904.5013.113.3
Dividends8790.00197538144
Interest paid84.08.5011.520.044.0
Debt paid down14820.0011.6720750
▸Reinvestment427-35.6-62%-12.4173303
Capex (PP&E)5431.105.20198338
Intangibles & M&A-59.7-6.80-0.300.00-52.6
Leases signed (net Δ)-55.9-29.9-17.3-25.516.8
Retained / other-431134234%-180-579194

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 29 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)24472447235635674738
▸Liabilities (total)207207264358948
Net debt (incl. leases)-469-469-312-482-406
Net debt / Adj EBITDA-8.18-8.18-1.44-9.60-0.93
Net debt / Adj FCF-3.57-3.57-12.3-0.71-0.41
Adj EBITDA / interest6.746.7418.92.519.90
Shares outstanding757761756756756
Dilution (YoY)+0.7%+0.7%-0.0%+0.0%-0.5%
Employees244--------
MarginsTTM2026202520242023
Gross margin-16.9%-24.0-16.9%-24.07.0%+23.5-16.4%-36.119.6%
Adj EBITDA margin13.0%-29.013.0%-29.042.0%+35.76.3%-35.241.5%
Adj OCF margin29.9%+24.029.9%+24.05.9%-104.5110.4%-16.7127.1%
Adj FCF margin29.7%+24.829.7%+24.84.9%-80.685.5%-9.394.8%
Net income margin32.9%+217.432.9%+217.4-184.5%-184.90.3%-51.952.3%
Adj NI margin-27.1%+94.7-27.1%+94.7-121.8%-162.340.5%-110.6151.1%
ROIC (adj, after-tax)-5.7%-5.7%-4.6%-4.2%2.8%
Cost of debt--------7.4%

Earnings Calls

11 calls

Earnings Call · 2026 Q4

2026-08-26

IGO's FY26 full-year results presentation was led by Managing Director and CEO Ivan Vella, with Interim CFO Ian Rowe covering the financials. Vella framed FY26 as a year in which IGO became safer, simpler, more disciplined and better positioned for growth. Safety performance improved markedly over the year, with psychosocial safety highlighted as an emerging focus. Greenbushes safety deteriorated during the year and is now the Board's top priority. The Nova operation, which is approaching end of mine life, performed strongly and beat expectations, and its partner Barminco was recognized for a 365-day run without a recordable injury. Rowe reported total revenue of $463 million, down 12% on FY25 mainly due to the Forrestania divestment. Underlying EBITDA was $286 million and statutory net profit after tax was $145 million, both up significantly. The main driver of the statutory result was IGO's share of net profit from TLEA of $207 million, compared with a $642 million loss in FY25. That swing reflected stronger spodumene prices, improved Greenbushes earnings and the absence of the prior-year Kwinana impairment. Underlying free cash flow was $134 million, up 176%, with Nova contributing $128 million. Nova free cash flow rose 63% year on year. Exploration spending fell to $28 million, and underlying corporate costs were about $50 million, with the remainder of the $58 million total being nonrecurring transaction and disposal costs. Care and maintenance at Cosmos fell from $16 million to $13 million after dewatering ceased. IGO closed the year with $387 million of cash, no drawn debt and a $300 million undrawn corporate facility. The Board declared a final fully franked dividend of $0.05 per share, or $38 million, payable in late September. This equates to about 30% of underlying free cash flow, the midpoint of the target payout range, and marks the recommencement of capital returns. Management stated that the payout reflects a balanced approach given the portfolio is in transition, and that the capital management framework would be revisited in the future. On operations, the CGP3 plant at Greenbushes has recovered from a fire and ramped up well, having surpassed its pre-fire performance and approaching nameplate capacity. Vella said no unusual issues had emerged and that repairs were working as expected. Recoveries across the site remain a challenge, and the other plants have improved. Kwinana's structural challenges remain unchanged. IGO continues constructive discussions with its partner TLC, which shares the same JV as Greenbushes, to find an optimal pathway, but no decision has been made and management declined to give a timeline. The Greenbushes strategic options review (SOR) has involved roughly 15 to 20 months of technical work, including pit slope and underground studies, plant recovery work and economic modeling. Management has not yet provided a timetable, and previously indicated September, for the final outcome. Feed grade management was discussed at length. Management said the mine is back in the high-grade core and that plants are being fed deliberately, with CGP1 taking higher grades and CGP2 and CGP3 closer to reserve grade. Management also addressed product grade. It said the industry's 5 to 5.5 percent concentrate grades are the norm, and that Greenbushes is one of very few operations able to produce 6 percent product, but that lowering grade could meaningfully increase contained metal recovered. This is being considered within the broader SOR. Looking ahead to FY27, Vella set out two priorities. The first is optimizing and maximizing value from the existing portfolio, which includes completing Nova's final mining and handover to Global Lithium Resources, delivering the Greenbushes SOR, finalizing the CGP3 ramp-up, and managing Kwinana with a focus on cash. The second is growth. This includes a global view of opportunities, targeted exploration focused on copper and lithium under John Kilroe's leadership, and BioHeap technology trials aimed at copper. Management said it remains highly disciplined and selective in M&A, and that the default route for lithium growth is through the TLEA joint venture with Tianqi, with independent action possible if warranted. On lithium market dynamics, Vella argued that demand is strong and maturing while new supply is not yet financed, and that IGO's situation is unique because complementing a world-class asset like Greenbushes is very difficult. Vella closed the call early and said the next quarterly update would come at the end of October.

Analyst Q&A (17)
▸
Are there any planned maintenance or tie-in activities required with the CGP3 restart for this financial year?
Austin Yun · Macquarie
No. There is only normal maintenance and shutdown routines. No surprises, and all the changes made are working as expected.
▸
What is the minimum liquidity requirement at the TLEA level, given a $423 million cash balance and roughly $250 million of annual costs, and what is the status of discussions with the JV partner on distributing cash?
Austin Yun · Macquarie
Management cannot give forward guidance on dividends. The TLEA Board will discuss cash at its next meeting, and Windfield will also be reviewing its cash balance. Engagement with TLC is constructive and active, and both parties are working toward a pathway on Kwinana.
▸
Can CGP3 exit the quarter at nameplate, sustainably running 2.4 million tonnes of throughput, or are there post-fire rectification issues?
Daniel Morgan · Barrenjoey
Possibly, if another month of performance holds. The trajectory is very impressive and the repairs are complete and working well with no outstanding gremlins. Recoveries also need to be stabilized and optimized, and other plants have stepped up.
▸
Is the Windfield JV considering a change in product quality that could improve recoveries, or is it still an IGO wish list item?
Daniel Morgan · Barrenjoey
Yes, it is contemplated as part of the broader life-of-mine optimization. Producing 6 percent product is very difficult and only Greenbushes achieves it. Industry concentrates sit at 5 to 5.5 percent, and lowering grade can substantially increase concentrate volume and contained metal, with more metal going to customers rather than tailings. The team will recommend the best option.
▸
Is the step-up in TLEA current assets mainly due to a receivables build at Greenbushes, given timing of JV partner payments?
Hugo Nicolaci · Goldman Sachs
That is a reasonable conclusion, but there are a few other items in there as well.
▸
Are the current liabilities related to CGP3 capex yet to be paid, or are there other items such as deferred tax from growing profitability?
Hugo Nicolaci · Goldman Sachs
Some of it is tax, but it is not capex, so there is nothing related to CGP3 to unwind.
▸
Did TLEA make another cash sweep out of Windfield after the quarter, and is a TLEA sweep to IGO expected this quarter?
Hugo Nicolaci · Goldman Sachs
Sweeps happen quarterly, not monthly. There was no material movement that would have required reporting, and no sweep to IGO has happened yet this quarter.
▸
What milestones or decision points should investors expect over the next 12 months for Kwinana, given operating losses and capital requirements?
Thiago Ojea · Citi
The question was partly misdirected toward Greenbushes. Management described roughly 15 to 20 months of technical work on the SOR, including pit design, underground, plant recovery and throughput. The final schedule and economic modeling are in progress, and the results will be shared once they are ready.
▸
Follow-up: is the investment decision on Kwinana also part of the strategic review?
Thiago Ojea · Citi
Management continues to work constructively with TLC. Several pathways have not worked, and the current one appears promising, but clarity is not possible until it is complete. Both assets sit within the same JV, so the two need to be managed together.
▸
Why has grade declined over recent quarters? Is this structural to the deposit or due to Kapanga coming into the mine plan?
Tim Hoff · Canaccord
The mine is back in the core with high-grade ore. Feed is being disciplined and managed better than ever, and the plants are designed to run on this grade. There is nothing concerning, and the high grades are being deliberately blended and paced rather than processed all at once.
▸
Should reserve grade be the target going forward?
Tim Hoff · Canaccord
Yes. Each plant takes a different grade. CGP1 takes feed above 2 percent, while CGP2 and CGP3 run under 2 percent closer to reserve grade. Disciplined feed management along with a focus on throughput, asset health and recovery should produce better overall outcomes.
▸
Post Nova, is the 20 to 40 percent payout range still suitable, and could the payout be higher, such as 80 percent?
Levi Spry · UBS
Ian Rowe said the payout is the midpoint of the range, reflecting the strong FY26 result that was substantially supported by Nova. The Board took a balanced approach given the portfolio is in transition. Ivan Vella said the framework is not being updated now, and the future outlook will be considered when capital management is revisited.
▸
Going forward, rather than just FY26, how should the payout be thought about?
Levi Spry · UBS
The Board will consider the business outlook and future capital management decisions. The key message is discipline in allocating capital internally or to other opportunities, which shareholders should be confident in.
▸
Is the CGP3 guidance consistent with Albemarle expecting full run rate by year-end, or is there potential EBITDA upside if it is reached earlier?
Levi Spry · UBS
Guidance is the plan to reach nameplate by the end of the year. The ramp-up is making good progress and may be ahead of schedule, but management does not want to call it until it is achieved. Management is not providing a guidance update.
▸
Is there any updated timing on the SOR, since it was previously expected in September?
Levi Spry · UBS
The team has made significant progress, but management has asked for a structured plan for completing the work because of several factors affecting the timeline. Management will provide the timing when it can.
▸
For lithium growth opportunities, will you pursue them through the JV structure with TLC, or through an independent stand-alone approach?
Austin Yun · Macquarie
It depends on the specifics. The default position is to work through Tianqi via TLEA. If that does not make sense, each party can act alone, as has happened in past years.
▸
Lithium producers have benefited from the cycle while developers have not. Are you closer to pulling the trigger on an acquisition, or have there been advanced-stage discussions?
Ben Lyons · Jarden
No tangible deals to announce. Demand for lithium is strong and growing, while supply projects are not yet financed. Volatility means capital must be deployed carefully. IGO owns a world-class hard-rock asset and sees large upside there, so the focus is on the JV partners. Complementing Greenbushes with an asset of similar quality is very difficult, which sets IGO apart from peers.

Analyst Coverage

Analyst Coverage
Analyst Ratings
1
Buy: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2012 Q4135M177M128M$0.17$0.16 – $0.182
2013 Q2133M165M117M$0.15$0.15 – $0.162
2013 Q4171M112M68M$0.09$0.09 – $0.093
2014 Q2231M82M28M$0.20$0.20 – $0.212
2014 Q4284M94M35M$0.22$0.22 – $0.232
2015 Q2254M91M31M$0.11$0.11 – $0.123
2015 Q4230M124M28M$0.08$0.08 – $0.082
2016 Q4231M84M29M$0.04$0.04 – $0.042
2017 Q2212M105M30M$0.04$0.04 – $0.043
2017 Q4353M55M-68M$-0.09$-0.09 – $-0.092
2019 Q2442M183M58M$0.13$0.13 – $0.143
2019 Q4484M298M132M$0.17$0.17 – $0.182
2020 Q2428M204M68M$0.09$0.09 – $0.093
2020 Q4413M225M79M$0.10$0.10 – $0.112
2021 Q2420M188M87M$0.11$0.11 – $0.122
2024 Q2499M—0M$0.00$0.00 – $0.000
2024 Q4275M4M-215M$-0.28$-0.28 – $-0.281
2025 Q1109M-2M-210M$-0.28$-0.28 – $-0.281
2025 Q2237M89M-45M$-0.06$-0.06 – $-0.061
2025 Q3233M—0M$0.00$0.00 – $0.000
2025 Q4198M68M-26M$-0.03$-0.03 – $-0.031
2026 Q1182M—0M$0.00$0.00 – $0.000
2026 Q2248M335M185M$0.24$0.24 – $0.241
2026 Q4191M332M185M$0.24$0.24 – $0.241
2027 Q2229M326M183M$0.24$0.24 – $0.241
2027 Q4214M—237M$0.31$0.31 – $0.311
2028 Q2201M312M176M$0.23$0.23 – $0.231
2028 Q42M—170M$0.22$0.22 – $0.221
2029 Q22M—190M$0.25$0.25 – $0.251
2029 Q4165M—280M$0.37$0.37 – $0.371
2030 Q2155M—322M$0.42$0.42 – $0.421
v2 analysis (legacy) — for comparison onlyclick to expand

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Chemical Grade Plant 3 (CGP3) Fire Incident (June 2026): On June 9, 2026, a fire broke out at the newly commissioned CGP3 processing plant at the Greenbushes lithium operation. The fire was quickly extinguished with no injuries, and processing trains CGP1 and CGP2 remained unaffected and continued normal operations. IGO confirmed that its annual spodumene production guidance for FY26 remains unchanged immediately following the fire. However, a formal investigation has commenced, and a full damage assessment and recovery timeline are still being compiled.
  • Q3 2026 Financial Results and Guidance Downgrade (April 2026): IGO reported its 3Q26 results, presenting a tale of two operations. The Nova nickel-copper-cobalt mine recorded exceptionally strong operational output, lifting Group EBITDA to A$118.9 million (up from A$29.9 million in 2Q26) and boosting net cash to A$327 million. Conversely, Greenbushes underperformed due to lower ore grades, lower recoveries, and plant maintenance downtime, leading IGO to downgrade its FY26 spodumene production guidance from 1.5–1.7 million tonnes to 1.375–1.425 million tonnes. Consequently, unit cash cost guidance was raised from A$310–A$360 per tonne to A$380–A$420 per tonne. Nova is still expected to reach its end-of-mine life by December 2026.
  • Management and Board Changes (February & April 2026): In late April 2026, IGO announced the resignation of its Chief Financial Officer. Earlier in the year, Dean Jenkins was appointed as a Non-Executive Director to the IGO Board, bringing extensive corporate and industrial experience.
  • Completion of Forrestania Asset Sale (March 2026): IGO completed the transaction to divest its Forrestania nickel assets. This generated a A$31.9 million gain on sale and successfully removed associated rehabilitation liabilities from the company’s balance sheet.
▸ Thesis-test Findings
  • Greenbushes CGP3 commissioning updates 2026:

CGP3 achieved a major milestone by processing its first ore on schedule on December 18, 2025. Designed to add 500,000 tonnes per year of spodumene concentrate capacity, the plant was in a five-month ramp-up phase toward full capacity (initially expected mid-2026). It contributed roughly 33,000 tonnes of spodumene in the March 2026 quarter. However, its growth trajectory faces immediate headwinds following the June 9, 2026 fire. While FY26 guidance remains unchanged, the definitive schedule to reach nameplate capacity is highly dependent on the ongoing damage assessment. This represents a potential delay in unlocking the mine's lowest-cost incremental supply.

  • Tianqi Lithium Energy Australia dividend policy 2026:

Dividends from the TLEA joint venture (49% owned by IGO) remain suspended, creating a cash flow challenge for IGO as its cash-generating Nova mine nears its end of life. No dividends were paid to IGO or its JV partner from Windfield Holdings in the March 2026 quarter. TLEA’s cash flows are severely impacted by the Kwinana lithium hydroxide refinery, which remains deeply unprofitable (recording a 100%-basis EBITDA loss of A$71 million in 1H26) and has been fully impaired on IGO's balance sheet. Additionally, TLEA has experienced a notable build-up of lithium hydroxide inventory at Kwinana over recent months. Analysts project that any return to TLEA dividends will be modest and likely delayed until late 2026 (4Q26) at the earliest, with capital priority shifting to debt paydown or site capex.

  • Spodumene spot price forecasts 2026 2027:

Spodumene spot prices staged a sharp recovery in early 2026, surging from under US$1,000 per tonne to over US$2,000 per tonne due to aggressive destocking and policy changes surrounding Chinese battery export tax rebates. This rapid recovery prompted massive upward adjustments in analyst spot forecasts. UBS raised its spodumene price forecast by up to 74%, projecting prices of US$3,131 per tonne for 2026 and US$3,469 per tonne for 2027, driven by a tight global supply-demand balance and a doubling of lithium demand by 2030. Other financial firms have followed suit, with Canaccord Genuity upgrading its 2026 spodumene forecast to US$2,800 per tonne and Barrenjoey taking a highly bullish stance of US$3,250 per tonne. This aggressive pricing uptrend strongly supports the bull case for Greenbushes' high-margin cash generation capability.