IGO.AX
IGO Limitedv3 4.8/10 · 2026-10-16IGO Limited is an Australian exploration and mining firm dedicated to discovering, developing, and operating mineral assets essential for clean energy technologies. The company holds outright ownership and management of several key Western Australian operations, including the Nova nickel-copper-cobalt mine, situated northeast of Norseman in the Great Western Woodlands; the Cosmos nickel mine, located north of Leinster; and the Forrestania nickel mine, positioned east of Perth. Furthermore, IGO strategically invests in lithium mining ventures and fully controls a downstream processing facility at Kwinana, Western Australia, which refines lithium into battery-grade hydroxide. Its comprehensive portfolio also encompasses a range of other exploration and development projects, such as Fraser Range, Kimberley, Paterson, Copper Coast, Frontier, Raptor, and Western Gawler. Established in 2000 and headquartered in Perth, Australia, the company previously operated under the name Independence Group NL before adopting IGO Limited in January 2020.
2-Year Price History
Valuation v3 Opus worker · 2026-10-16
IGO is now essentially a holding company for a 24.99% look-through stake in Greenbushes, the world's biggest and cheapest hard-rock lithium mine. It holds the stake through TLEA, a joint venture controlled 51% by Tianqi. Around that stake sit A$470M of IGO-level cash and listed securities, a 49% share of the cash-burning Kwinana hydroxide refinery (written down to zero), and a Nova nickel mine that closes this quarter and is being sold for A$7M. The stock closed at A$5.44 on 16 Oct 2026 (the pack's A$5.50 was stale). That is down from a 2026 high of about A$10 and from A$7.14 after April's Greenbushes guidance cut. Two things drove the fall. Spot SC6 spodumene has roughly halved from its May peak of about US$3,000/t to about US$1,500-1,700/t: CATL's Jianxiawo mine is heading for a restart, and Bald Hill, Finniss and other Australian mines are coming back on. Greenbushes has also kept disappointing on grade, recoveries, safety (a WorkSafe improvement notice) and the much-delayed life-of-mine review (SOR). My model runs Greenbushes at 1.6-1.8Mt a year, a long-run SC6 price of about US$1,400-1,450/t, AUD/USD at 0.70, and Kwinana shut or sold within about two years. On that basis IGO's look-through free cash flow is about A$230-335M a year, and a 10% DCF gives about A$5.0/share. The share price therefore implies a long-run SC6 price of about US$1,500/t, close to today's spot. Each US$100/t on the long-run price is worth about A$0.59/share. Rating 4.8/10: fairly priced, a pure lithium-price bet with Tianqi-controlled cash leakage on top, and no margin of safety at today's spot. Research rating 5.5/10: lithium moves violently enough that a 40%+ rebound inside a year is plausible. The SOR outcome, a Kwinana exit and the restart of TLEA dividends are concrete catalysts that work could pin down, but the main driver, the lithium price, cannot be researched away.
A deep dive would have to establish: Does the Greenbushes SOR (product grade, recoveries, pit design, capex) lift sustainable volume toward 2Mt at sub-A$450/t, and will Tianqi agree a Kwinana exit that lets TLEA distribute Greenbushes cash to IGO? And at what long-run SC6 price does that make A$5.44 cheap?
Research (expand)
What the company does
IGO Limited (ASX: IGO; 757.3M shares) is a Perth miner that has largely become a lithium holding company. Its main asset is a 49% stake in Tianqi Lithium Energy Australia (TLEA). Tianqi owns the other 51% and controls it. TLEA in turn owns:
- 51% of Windfield/Talison, which owns Greenbushes. That gives IGO a 24.99% look-through stake in the world's largest and highest-grade hard-rock lithium mine. Albemarle owns the other 49% and operates the marketing side.
- 100% of the Kwinana lithium hydroxide refinery (IGO 49%). Train 1 was fully impaired in FY25 and Train 2 was abandoned in January 2025.
The rest of the group is small:
- Nova (nickel-copper-cobalt) produced A$228M of free cash flow in FY26. Mining ends in the Dec-2026 quarter, and the operation is being sold to Global Lithium for A$7M.
- Cosmos is in care and maintenance.
- Copper and lithium exploration, plus the BioHeap leaching technology.
What it earns today
FY26 (to June 2026):
- Statutory NPAT A$145M; underlying NPAT A$109M; underlying EBITDA A$286M.
- Share of TLEA profit A$207M.
- Underlying free cash flow A$134M, which was almost all Nova (A$228M).
- No TLEA dividend reached IGO.
- Net cash A$387M plus A$99M of listed securities. The A$300M revolving facility is undrawn.
- Final dividend 5c fully franked (A$38M, about 0.9% yield).
Greenbushes FY26 (100% basis):
- 1.41Mt of concentrate.
- Revenue A$2.86bn and EBITDA A$2.10bn (73% margin).
- Realised price US$1,443/t; the June quarter alone was US$2,286/t at an 80% margin.
- Cash cost A$415/t.
- Windfield paid a A$390M dividend in the June quarter.
FY27 guidance:
| Asset | Measure | Guidance |
|---|---|---|
| Greenbushes | Production | 1.55-1.75Mt |
| Greenbushes | Cash cost | A$380-440/t |
| Greenbushes | Capex | A$250-300M |
| Kwinana | LiOH production | 9-11kt |
| Kwinana | Conversion cost | A$16-18k/t |
| Kwinana | Sustaining/improvement capex (expensed) | A$75-90M |
Kwinana lost A$167M of EBITDA in FY26 (100% basis).
Run-rate look-through owner earnings at spot SC6 of about US$1,500/t and AUD/USD of 0.70: about A$230M a year. This is my estimate, not a company figure. It is built from:
- IGO's 24.99% of Greenbushes after-tax free cash flow: about A$380M.
- Minus 49% of Kwinana's burn: about A$80-100M.
- Minus corporate costs and exploration: about A$95M.
- Plus interest on cash.
This cash only reaches IGO if TLEA distributes it. TLEA is Tianqi-controlled, held about A$423M at June, and has paid IGO nothing since FY24.
What it could earn at maturity
The best case is Greenbushes at 1.9-2.0Mt with CGP3 at nameplate, recoveries fixed, and possibly a lower-grade product (5.5% instead of 6%) that recovers more contained lithium, which the SOR is studying. Add Kwinana closed or sold.
- At US$1,600/t SC6: IGO look-through NPAT of about A$420M.
- At US$2,500+/t (another price spike): A$700M+.
Greenbushes reserves support more than 20 years of mining, so this is a long-lived royalty-like stream on a very volatile commodity.
Fair value and multiples
DCF (10%, FY27-31 plus terminal, AUD/USD 0.70):
- SC6 assumptions: about US$1,600/t realised in FY27, because the September quarter still caught US$2,000+ prices; then US$1,400/t in FY28-29 and US$1,450/t in FY30-31.
- Greenbushes volume: 1.60 → 1.80Mt.
- Kwinana costs IGO A$100M in FY27 and A$90M in FY28 (including exit costs), then A$20M a year.
- Terminal value: 0% growth.
- IGO free cash flow: about A$270M / 230M / 310M / 335M / 335M.
- PV of explicit years about A$1.16bn plus PV of terminal about A$2.08bn.
- Add IGO cash and securities (about A$470M) and about A$100M as IGO's usable share of TLEA cash.
- Result: about A$3.8bn, or A$5.0/share.
Sensitivity: each US$100/t on the long-run SC6 price moves value by about A$0.59/share. The current share price of A$5.44 therefore implies about US$1,500/t long-run, which is roughly today's spot. Bear case (US$1,100/t, trapped cash): about A$3.3. Bull case (US$2,000/t): about A$8.3+.
Multiples at A$5.44:
- Market cap about A$4.12bn; EV at IGO level about A$3.65bn.
- About 18x run-rate look-through earnings at spot, or about 15x FY27e (which still includes the high September-quarter prices).
- About 7x look-through EBITDA.
- About 7% look-through free cash flow yield. The cash IGO actually receives is far lower until TLEA pays out.
Brokers: Macquarie (Outperform, A$9.00, 8 Oct, though it now prefers PLS) and Canaccord (Buy, A$8.75) use much richer price decks. Older targets from MS, Citi and UBS sat at A$4.50-5.45.
My fair value: about A$5.3 (range A$3.6-8.5). That is the DCF plus a little option value for lithium's habit of spiking.
Risks and competition
Lithium price. This is the dominant risk. Spot SC6 has roughly halved since May and Chinese carbonate is near CNY100k/t. Supply is returning:
- CATL's Jianxiawo is back in environmental approval.
- Bald Hill, Finniss, Ngungaju, Pioneer Dome and Mt Marion have restarted.
- Zimbabwe exports have recovered.
- PLS has just announced a A$1.9bn Pilgangoora expansion.
Demand concerns include EU caps on Chinese hybrid imports, lower oil, and talk of sodium-ion.
Greenbushes execution:
- FY26 guidance was cut by about 13% in April.
- Grade fell and recoveries are still weak.
- Safety TRIFR deteriorated and WorkSafe issued a psychosocial improvement notice, with Talison's review due 20 November.
- The SOR has slipped past its September timing with no new date.
- SOR capex (pit-wall steepening, underground) could raise spending.
Structure and governance:
- IGO is a 49% minority holder in a JV that Tianqi controls, and Tianqi has its own balance-sheet pressures.
- Disclosure is limited, and Greenbushes cash can be trapped to fund Kwinana.
- Kwinana has no profitable pathway. Closure or sale needs Tianqi's agreement, and remediation costs are unknown.
People and portfolio:
- The CFO role is interim and the board has turned over heavily.
- Nova's cash flow ends in FY27.
- Management wants copper or lithium M&A, which is a capital-allocation risk at the bottom of the cycle.
Competition: Greenbushes is first-quartile cost (about A$415/t versus peers at A$600-900/t). It stays profitable through the cycle, but it cannot set price. Pricing is set by Chinese lepidolite, African DSO, Australian restarts and South American brines.
How investors feel: 3.5/10
The stock is down about 34% YTD and about 46% from its 2026 high, and down about 17% in the past month alone. Lithium is in a "carnage" phase in ASX coverage, Greenbushes has disappointed for over a year, and the Kwinana saga and opaque JV frustrate analysts (repeated Q&A pushback on transparency). It is not completely hated: the net cash, the asset quality, and Macquarie and Canaccord buy ratings give it a floor of support, and it is still treated as the quality ASX lithium name.
- https://www.investsmart.com.au/security/asx/igo/igo-limited/share-price (close A$5.44, 16 Oct 2026)
- https://announcements.asx.com.au/asxpdf/20260827/pdf/0738wn6jzgy3zt.pdf (IGO FY26 Financial Results, 27 Aug 2026)
- https://announcements.asx.com.au/asxpdf/20260827/pdf/0738wqctcjj8s2.pdf (IGO FY26 Results Presentation)
- https://announcements.asx.com.au/asxpdf/20260728/pdf/0723kt2mn6mjyh.pdf (IGO 4Q26 Results Presentation, FY27 guidance)
- https://thebull.com.au/news/igo-shares-dive-as-guidance-cut-overshadows-strong-cash-flow/ (Apr 2026 guidance cut)
- https://finance.yahoo.com/markets/commodities/articles/igo-shares-fall-14-greenbushes-145507836.html
- https://kalkinemedia.com/au/stocks/lithium/why-is-igo-slipping-as-greenbushes-faces-scrutiny-asxigo (WorkSafe notice, Oct 2026)
- https://lithiumchart.com/spodumene-price (Benchmark SC6 US$2,254/t 2 Sep 2026)
- https://www.abc.net.au/news/2026-10-16/pilgangoora-lithium-mine-expansion-announcement/107276432 (SC6 ~US$1,505/t mid-Oct; PLS expansion)
- https://www.spglobal.com/energy/en/pricing-benchmarks/assessments/metals/australia-lithium-spodumene-price-explained (Platts SC6 FOB Aus US$1,695/t 9 Oct)
- https://www.miningweekly.com/article/chinese-lithium-prices-tumble-to-nearly-10-month-low-on-demand-concerns-2026-10-12
- https://tradingeconomics.com/commodity/lithium (carbonate CNY102k/t 16 Oct)
- https://www.marketindex.com.au/news/lithium-carnage-why-pls-has-halved-in-four-months-as-peers-minres-igo-and-liontown-tumble
- https://fnarena.com/index.php/analysis-data/consensus-forecasts/stock-analysis/?code=IGO (Macquarie A$9.00, Canaccord A$8.75)
- https://www.morningstar.com.au/stocks/lithiums-latest-drop-what-it-means-asx-investors
- Context pack /Users/gregwo/stocks2/data/analysisv3/context/IGO.AX.md (FY26 results call summary + Q&A)
Financials — Adjusted
Adjusted · TTM 2026-Q4 · AUD
| TTM & Fiscal-Year P&L | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Revenue | 442-15% | 442-15% | 517-35% | 796-24% | 1050 |
| Gross profit | -74.9-306% | -74.9-306% | 36.3 | -131-164% | 206 |
| Operating expenses | 54.3-66% | 54.3-66% | 160+290% | 41.0-29% | 57.4 |
| ▸Adj EBITDA | 57.3-74% | 57.3-74% | 217+333% | 50.2-88% | 436 |
| ▸Adj OCF | 132+333% | 132+333% | 30.6-97% | 879-34% | 1334 |
| CapEx | -1.10 | -1.10 | -5.20 | -198 | -338 |
| Adj FCF | 131+417% | 131+417% | 25.4-96% | 681-32% | 996 |
| Interest expense | 8.50 | 8.50 | 11.5 | 20.0 | 44.0 |
| ▸Adj net income | -120 | -120 | -630-295% | 323-80% | 1586 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026
| Where the Cash Went | Total | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -976 | 57.3100% | -36.1 | -405 | -592 |
| FCF (OCF−capex) | 1904 | 131229% | 32.7 | 692 | 1049 |
| Net income | -257 | 145254% | -955 | 2.80 | 549 |
| ▸Capital returned | 2479 | 12.422% | 225 | 1291 | 951 |
| Buybacks | 34.8 | 3.90 | 4.50 | 13.1 | 13.3 |
| Dividends | 879 | 0.00 | 197 | 538 | 144 |
| Interest paid | 84.0 | 8.50 | 11.5 | 20.0 | 44.0 |
| Debt paid down | 1482 | 0.00 | 11.6 | 720 | 750 |
| ▸Reinvestment | 427 | -35.6-62% | -12.4 | 173 | 303 |
| Capex (PP&E) | 543 | 1.10 | 5.20 | 198 | 338 |
| Intangibles & M&A | -59.7 | -6.80 | -0.30 | 0.00 | -52.6 |
| Leases signed (net Δ) | -55.9 | -29.9 | -17.3 | -25.5 | 16.8 |
| Retained / other | -431 | 134234% | -180 | -579 | 194 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 29 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Assets (total) | 2447 | 2447 | 2356 | 3567 | 4738 |
| ▸Liabilities (total) | 207 | 207 | 264 | 358 | 948 |
| Net debt (incl. leases) | -469 | -469 | -312 | -482 | -406 |
| Net debt / Adj EBITDA | -8.18 | -8.18 | -1.44 | -9.60 | -0.93 |
| Net debt / Adj FCF | -3.57 | -3.57 | -12.3 | -0.71 | -0.41 |
| Adj EBITDA / interest | 6.74 | 6.74 | 18.9 | 2.51 | 9.90 |
| Shares outstanding | 757 | 761 | 756 | 756 | 756 |
| Dilution (YoY) | +0.7% | +0.7% | -0.0% | +0.0% | -0.5% |
| Employees | 244 | -- | -- | -- | -- |
| Margins | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Gross margin | -16.9%-24.0 | -16.9%-24.0 | 7.0%+23.5 | -16.4%-36.1 | 19.6% |
| Adj EBITDA margin | 13.0%-29.0 | 13.0%-29.0 | 42.0%+35.7 | 6.3%-35.2 | 41.5% |
| Adj OCF margin | 29.9%+24.0 | 29.9%+24.0 | 5.9%-104.5 | 110.4%-16.7 | 127.1% |
| Adj FCF margin | 29.7%+24.8 | 29.7%+24.8 | 4.9%-80.6 | 85.5%-9.3 | 94.8% |
| Net income margin | 32.9%+217.4 | 32.9%+217.4 | -184.5%-184.9 | 0.3%-51.9 | 52.3% |
| Adj NI margin | -27.1%+94.7 | -27.1%+94.7 | -121.8%-162.3 | 40.5%-110.6 | 151.1% |
| ROIC (adj, after-tax) | -5.7% | -5.7% | -4.6% | -4.2% | 2.8% |
| Cost of debt | -- | -- | -- | -- | 7.4% |
Earnings Calls
Earnings Call · 2026 Q4
IGO's FY26 full-year results presentation was led by Managing Director and CEO Ivan Vella, with Interim CFO Ian Rowe covering the financials. Vella framed FY26 as a year in which IGO became safer, simpler, more disciplined and better positioned for growth. Safety performance improved markedly over the year, with psychosocial safety highlighted as an emerging focus. Greenbushes safety deteriorated during the year and is now the Board's top priority. The Nova operation, which is approaching end of mine life, performed strongly and beat expectations, and its partner Barminco was recognized for a 365-day run without a recordable injury. Rowe reported total revenue of $463 million, down 12% on FY25 mainly due to the Forrestania divestment. Underlying EBITDA was $286 million and statutory net profit after tax was $145 million, both up significantly. The main driver of the statutory result was IGO's share of net profit from TLEA of $207 million, compared with a $642 million loss in FY25. That swing reflected stronger spodumene prices, improved Greenbushes earnings and the absence of the prior-year Kwinana impairment. Underlying free cash flow was $134 million, up 176%, with Nova contributing $128 million. Nova free cash flow rose 63% year on year. Exploration spending fell to $28 million, and underlying corporate costs were about $50 million, with the remainder of the $58 million total being nonrecurring transaction and disposal costs. Care and maintenance at Cosmos fell from $16 million to $13 million after dewatering ceased. IGO closed the year with $387 million of cash, no drawn debt and a $300 million undrawn corporate facility. The Board declared a final fully franked dividend of $0.05 per share, or $38 million, payable in late September. This equates to about 30% of underlying free cash flow, the midpoint of the target payout range, and marks the recommencement of capital returns. Management stated that the payout reflects a balanced approach given the portfolio is in transition, and that the capital management framework would be revisited in the future. On operations, the CGP3 plant at Greenbushes has recovered from a fire and ramped up well, having surpassed its pre-fire performance and approaching nameplate capacity. Vella said no unusual issues had emerged and that repairs were working as expected. Recoveries across the site remain a challenge, and the other plants have improved. Kwinana's structural challenges remain unchanged. IGO continues constructive discussions with its partner TLC, which shares the same JV as Greenbushes, to find an optimal pathway, but no decision has been made and management declined to give a timeline. The Greenbushes strategic options review (SOR) has involved roughly 15 to 20 months of technical work, including pit slope and underground studies, plant recovery work and economic modeling. Management has not yet provided a timetable, and previously indicated September, for the final outcome. Feed grade management was discussed at length. Management said the mine is back in the high-grade core and that plants are being fed deliberately, with CGP1 taking higher grades and CGP2 and CGP3 closer to reserve grade. Management also addressed product grade. It said the industry's 5 to 5.5 percent concentrate grades are the norm, and that Greenbushes is one of very few operations able to produce 6 percent product, but that lowering grade could meaningfully increase contained metal recovered. This is being considered within the broader SOR. Looking ahead to FY27, Vella set out two priorities. The first is optimizing and maximizing value from the existing portfolio, which includes completing Nova's final mining and handover to Global Lithium Resources, delivering the Greenbushes SOR, finalizing the CGP3 ramp-up, and managing Kwinana with a focus on cash. The second is growth. This includes a global view of opportunities, targeted exploration focused on copper and lithium under John Kilroe's leadership, and BioHeap technology trials aimed at copper. Management said it remains highly disciplined and selective in M&A, and that the default route for lithium growth is through the TLEA joint venture with Tianqi, with independent action possible if warranted. On lithium market dynamics, Vella argued that demand is strong and maturing while new supply is not yet financed, and that IGO's situation is unique because complementing a world-class asset like Greenbushes is very difficult. Vella closed the call early and said the next quarterly update would come at the end of October.
▸Are there any planned maintenance or tie-in activities required with the CGP3 restart for this financial year?Austin Yun · Macquarie
▸What is the minimum liquidity requirement at the TLEA level, given a $423 million cash balance and roughly $250 million of annual costs, and what is the status of discussions with the JV partner on distributing cash?Austin Yun · Macquarie
▸Can CGP3 exit the quarter at nameplate, sustainably running 2.4 million tonnes of throughput, or are there post-fire rectification issues?Daniel Morgan · Barrenjoey
▸Is the Windfield JV considering a change in product quality that could improve recoveries, or is it still an IGO wish list item?Daniel Morgan · Barrenjoey
▸Is the step-up in TLEA current assets mainly due to a receivables build at Greenbushes, given timing of JV partner payments?Hugo Nicolaci · Goldman Sachs
▸Are the current liabilities related to CGP3 capex yet to be paid, or are there other items such as deferred tax from growing profitability?Hugo Nicolaci · Goldman Sachs
▸Did TLEA make another cash sweep out of Windfield after the quarter, and is a TLEA sweep to IGO expected this quarter?Hugo Nicolaci · Goldman Sachs
▸What milestones or decision points should investors expect over the next 12 months for Kwinana, given operating losses and capital requirements?Thiago Ojea · Citi
▸Follow-up: is the investment decision on Kwinana also part of the strategic review?Thiago Ojea · Citi
▸Why has grade declined over recent quarters? Is this structural to the deposit or due to Kapanga coming into the mine plan?Tim Hoff · Canaccord
▸Should reserve grade be the target going forward?Tim Hoff · Canaccord
▸Post Nova, is the 20 to 40 percent payout range still suitable, and could the payout be higher, such as 80 percent?Levi Spry · UBS
▸Going forward, rather than just FY26, how should the payout be thought about?Levi Spry · UBS
▸Is the CGP3 guidance consistent with Albemarle expecting full run rate by year-end, or is there potential EBITDA upside if it is reached earlier?Levi Spry · UBS
▸Is there any updated timing on the SOR, since it was previously expected in September?Levi Spry · UBS
▸For lithium growth opportunities, will you pursue them through the JV structure with TLC, or through an independent stand-alone approach?Austin Yun · Macquarie
▸Lithium producers have benefited from the cycle while developers have not. Are you closer to pulling the trigger on an acquisition, or have there been advanced-stage discussions?Ben Lyons · Jarden
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2012 Q4 | 135M | 177M | 128M | $0.17 | $0.16 – $0.18 | 2 |
| 2013 Q2 | 133M | 165M | 117M | $0.15 | $0.15 – $0.16 | 2 |
| 2013 Q4 | 171M | 112M | 68M | $0.09 | $0.09 – $0.09 | 3 |
| 2014 Q2 | 231M | 82M | 28M | $0.20 | $0.20 – $0.21 | 2 |
| 2014 Q4 | 284M | 94M | 35M | $0.22 | $0.22 – $0.23 | 2 |
| 2015 Q2 | 254M | 91M | 31M | $0.11 | $0.11 – $0.12 | 3 |
| 2015 Q4 | 230M | 124M | 28M | $0.08 | $0.08 – $0.08 | 2 |
| 2016 Q4 | 231M | 84M | 29M | $0.04 | $0.04 – $0.04 | 2 |
| 2017 Q2 | 212M | 105M | 30M | $0.04 | $0.04 – $0.04 | 3 |
| 2017 Q4 | 353M | 55M | -68M | $-0.09 | $-0.09 – $-0.09 | 2 |
| 2019 Q2 | 442M | 183M | 58M | $0.13 | $0.13 – $0.14 | 3 |
| 2019 Q4 | 484M | 298M | 132M | $0.17 | $0.17 – $0.18 | 2 |
| 2020 Q2 | 428M | 204M | 68M | $0.09 | $0.09 – $0.09 | 3 |
| 2020 Q4 | 413M | 225M | 79M | $0.10 | $0.10 – $0.11 | 2 |
| 2021 Q2 | 420M | 188M | 87M | $0.11 | $0.11 – $0.12 | 2 |
| 2024 Q2 | 499M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2024 Q4 | 275M | 4M | -215M | $-0.28 | $-0.28 – $-0.28 | 1 |
| 2025 Q1 | 109M | -2M | -210M | $-0.28 | $-0.28 – $-0.28 | 1 |
| 2025 Q2 | 237M | 89M | -45M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2025 Q3 | 233M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2025 Q4 | 198M | 68M | -26M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2026 Q1 | 182M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2026 Q2 | 248M | 335M | 185M | $0.24 | $0.24 – $0.24 | 1 |
| 2026 Q4 | 191M | 332M | 185M | $0.24 | $0.24 – $0.24 | 1 |
| 2027 Q2 | 229M | 326M | 183M | $0.24 | $0.24 – $0.24 | 1 |
| 2027 Q4 | 214M | — | 237M | $0.31 | $0.31 – $0.31 | 1 |
| 2028 Q2 | 201M | 312M | 176M | $0.23 | $0.23 – $0.23 | 1 |
| 2028 Q4 | 2M | — | 170M | $0.22 | $0.22 – $0.22 | 1 |
| 2029 Q2 | 2M | — | 190M | $0.25 | $0.25 – $0.25 | 1 |
| 2029 Q4 | 165M | — | 280M | $0.37 | $0.37 – $0.37 | 1 |
| 2030 Q2 | 155M | — | 322M | $0.42 | $0.42 – $0.42 | 1 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- Chemical Grade Plant 3 (CGP3) Fire Incident (June 2026): On June 9, 2026, a fire broke out at the newly commissioned CGP3 processing plant at the Greenbushes lithium operation. The fire was quickly extinguished with no injuries, and processing trains CGP1 and CGP2 remained unaffected and continued normal operations. IGO confirmed that its annual spodumene production guidance for FY26 remains unchanged immediately following the fire. However, a formal investigation has commenced, and a full damage assessment and recovery timeline are still being compiled.
- Q3 2026 Financial Results and Guidance Downgrade (April 2026): IGO reported its 3Q26 results, presenting a tale of two operations. The Nova nickel-copper-cobalt mine recorded exceptionally strong operational output, lifting Group EBITDA to A$118.9 million (up from A$29.9 million in 2Q26) and boosting net cash to A$327 million. Conversely, Greenbushes underperformed due to lower ore grades, lower recoveries, and plant maintenance downtime, leading IGO to downgrade its FY26 spodumene production guidance from 1.5–1.7 million tonnes to 1.375–1.425 million tonnes. Consequently, unit cash cost guidance was raised from A$310–A$360 per tonne to A$380–A$420 per tonne. Nova is still expected to reach its end-of-mine life by December 2026.
- Management and Board Changes (February & April 2026): In late April 2026, IGO announced the resignation of its Chief Financial Officer. Earlier in the year, Dean Jenkins was appointed as a Non-Executive Director to the IGO Board, bringing extensive corporate and industrial experience.
- Completion of Forrestania Asset Sale (March 2026): IGO completed the transaction to divest its Forrestania nickel assets. This generated a A$31.9 million gain on sale and successfully removed associated rehabilitation liabilities from the company’s balance sheet.
▸ Thesis-test Findings
- Greenbushes CGP3 commissioning updates 2026:
CGP3 achieved a major milestone by processing its first ore on schedule on December 18, 2025. Designed to add 500,000 tonnes per year of spodumene concentrate capacity, the plant was in a five-month ramp-up phase toward full capacity (initially expected mid-2026). It contributed roughly 33,000 tonnes of spodumene in the March 2026 quarter. However, its growth trajectory faces immediate headwinds following the June 9, 2026 fire. While FY26 guidance remains unchanged, the definitive schedule to reach nameplate capacity is highly dependent on the ongoing damage assessment. This represents a potential delay in unlocking the mine's lowest-cost incremental supply.
- Tianqi Lithium Energy Australia dividend policy 2026:
Dividends from the TLEA joint venture (49% owned by IGO) remain suspended, creating a cash flow challenge for IGO as its cash-generating Nova mine nears its end of life. No dividends were paid to IGO or its JV partner from Windfield Holdings in the March 2026 quarter. TLEA’s cash flows are severely impacted by the Kwinana lithium hydroxide refinery, which remains deeply unprofitable (recording a 100%-basis EBITDA loss of A$71 million in 1H26) and has been fully impaired on IGO's balance sheet. Additionally, TLEA has experienced a notable build-up of lithium hydroxide inventory at Kwinana over recent months. Analysts project that any return to TLEA dividends will be modest and likely delayed until late 2026 (4Q26) at the earliest, with capital priority shifting to debt paydown or site capex.
- Spodumene spot price forecasts 2026 2027:
Spodumene spot prices staged a sharp recovery in early 2026, surging from under US$1,000 per tonne to over US$2,000 per tonne due to aggressive destocking and policy changes surrounding Chinese battery export tax rebates. This rapid recovery prompted massive upward adjustments in analyst spot forecasts. UBS raised its spodumene price forecast by up to 74%, projecting prices of US$3,131 per tonne for 2026 and US$3,469 per tonne for 2027, driven by a tight global supply-demand balance and a doubling of lithium demand by 2030. Other financial firms have followed suit, with Canaccord Genuity upgrading its 2026 spodumene forecast to US$2,800 per tonne and Barrenjoey taking a highly bullish stance of US$3,250 per tonne. This aggressive pricing uptrend strongly supports the bull case for Greenbushes' high-margin cash generation capability.