ITM Power Plcv3 4.5/10 · 2026-10-20ITM Power Plc, established in 2001 and headquartered in Sheffield, UK, is a specialist in hydrogen energy solutions. The company focuses on the development, production, and sale of sophisticated hydrogen systems, catering to energy storage, transportation, and various industrial sectors. Its operational reach extends across the United Kingdom, Germany, other European countries, and the United States. A key product is HGas, which serves power-to-gas applications, clean fuel initiatives, and industrial hydrogen processes. Furthermore, ITM Power actively designs and constructs prototype products, and supplies both electrolysis technology and advanced hydrogen storage solutions.
2-Year Price History
Valuation v3 Opus worker · 2026-10-20
ITM Power (Sheffield, PEM electrolysers) has been turned around under CEO Dennis Schulz. FY26 (year to April 2026, reported very late on 19 Oct 2026 after a first-year BDO audit) brought record revenue of £43.6m (+68%). The gross loss fell to £6.1m from £23.7m and adjusted EBITDA loss narrowed to £20.2m. Year-end cash was £215.6m, helped by a £40m Great British Energy subscription at about 55.5p, and there is no debt beyond £14m of leases. 83% of the £144m backlog is now profitable. Even so, this is still a cash-burning business. Real free cash flow is about -£28m a year: operating cash flow was -£24m, a few million of maintenance capex comes on top, and the improvement in profit came partly from releasing provisions. The backlog was flat, so order intake was only about the size of revenue (~£43m). FY27 guidance is £50-60m revenue, a £17-20m EBITDA loss and £170-180m cash. In April-May 2026 the Rheinmetall Giga PtX tie-up pushed the stock from ~63p to ~200p (the CTO sold 873k shares at ~157p). It has since fallen back to 86p (latest close, 20 Oct 2026; market cap ~£595m on 691.4m shares; EV ~£400m), with about a third of the market cap in cash. My DCF assumes EBITDA breakeven in FY28-29, revenue rising to ~£280m by FY31 and FCF of ~£27m in year 5 valued at 22x. That gives about 80p, roughly today's price. The upside comes from options the base case does not fully pay for: FID on the 150MW Hydropulse own-and-operate deal (targeted 2027), a Rheinmetall pilot, Chronos, and UK HAR2 awards. The cash-rich balance sheet limits the downside and management looks credible. But hydrogen FIDs keep slipping, so a 10x-FCF exit within 3-4 years is not visible, and this is not a 50%-in-a-year value setup. Rating 4.5 (fairly priced, speculative growth with a cash cushion). Research 5: the open question, whether large orders turn into profit, gets answered by events in 2027 (Hydropulse FID, Stablegrid/Uniper orders), not by more desk work today.
A deep dive would have to establish: Whether ITM can turn its selections (Hydropulse 150MW, Stablegrid 710MW, Uniper 120MW, Rheinmetall) into firm, profitable orders that lift revenue above £100m and reach EBITDA breakeven by FY28 without equity dilution, given that Hydropulse needs project financing.
Research (expand)
Units: per-share values (price, dcf_value, fair_value) are in pence (GBp), the unit the stock quotes in on the LSE. Aggregate money figures (market cap, EV, FCF, net debt) are in £ millions.
What the company does
ITM Power designs and makes PEM (proton exchange membrane) electrolysers in Sheffield. It owns its stack IP (the TRIDENT stack now; the 2MW CHRONOS stack in development) and its manufacturing, including an 'autostacker' robot line rated at more than 2 GW a year of stacks. Its products run from containerised NEPTUNE units (up to ~60MW) and POSEIDON modules to ALPHA 50, a full-scope 50MW plant priced at about €50m. Reference plants include RWE Lingen 1 (100MW, operating; the largest PEM electrolyser in the world), Lingen 2 (100MW, in commissioning), Shell REFHYNE II (100MW) and Linde Leuna. Hydropulse is a new build-own-operate subsidiary that sells hydrogen to industrial users under long-term offtake contracts. The FY26 customer base was Germany- and EU-led, and refineries meeting RED III RFNBO quotas are the main source of demand.
Investment case
Bull: (1) The turnaround is real. Factory acceptance test (FAT) pass rates went from under 50% to 99%. The backlog has gone from 100% loss-making (Jan 2023) to 83% profitable. The gross loss fell from £23.7m to £6.1m. (2) The balance sheet is a weapon in a consolidating market: £215.6m cash at April 2026, essentially no debt, plus a £46.5m DESNZ grant that funds a 1GW Chronos line, so competitors' distress helps ITM. (3) Scale credibility: only a handful of suppliers can deliver 100MW+ plants, and ITM now has two of Europe's largest. (4) Optionality: the Hydropulse 150MW EU-refinery heads of terms (10-year offtake, FID targeted 2027, operations 2029; it would be ITM's largest contract ever), supplier selections for Uniper Humber 120MW, Stablegrid 710MW and an Asian project over 300MW, the 150MW RWE capacity reservation, and Rheinmetall Giga PtX (hundreds of plants of up to 50MW each for NATO synthetic fuels). Bear: (1) FIDs keep slipping. Order intake in FY26 was only about the size of revenue, so the backlog stood still at £144m. (2) Part of the FY26 EBITDA beat came from releasing provisions, not from operations. (3) FY27 is still loss-making (EBITDA -£17m to -£20m) and burns about £40m of cash. (4) Hydropulse turns an asset-light, cash-neutral equipment seller into a capital-heavy project owner that needs project debt or customer prepayments. (5) UK HAR1/HAR2 support is slow, and the US is effectively closed.
What it earns today (real free cash flow)
FY26: adjusted EBITDA -£20.2m, share-based pay £1.7m (counted as a cost), D&A £8.7m, operating loss -£31.0m, pre-tax loss -£24.8m after £7.4m of interest income. Operating cash flow was -£24.0m, and working capital was roughly neutral (inventory -£9.7m, receivables -£4.9m, payables +£11.7m). Capex was £13.3m (£9.5m PPE, £3.8m intangibles), mostly growth (autostacker, Chronos). I treat about £4-5m as maintenance or recurring capitalised development. Real FCF before interest is about -£28m (range -£36m to -£20m). Cash also has to cover £25.4m of provisions (£9.5m for loss-making contracts) that will be spent, and £68.2m of deferred income (customer prepayments) that unwinds as projects deliver.
Five-year FCF projection (FY27-FY31, £m, pre-interest, growth capex excluded, SBC included)
Revenue path: £55m, £100m (consensus ~£109m; Morgan Stanley bull case £169m), £160m, £220m, £280m. EBITDA path: -£18m, -£3m, +£12m, +£25m, +£38m.
- FY27: -26 (range -35 to -18)
- FY28: -12 (-30 to 0)
- FY29: +3 (-25 to +20)
- FY30: +15 (-20 to +40)
- FY31: +27 (-20 to +60)
What it looks like in five years: in the base case, a young but now profitable industrial-equipment and services company growing 15-25% a year, with recurring Hydropulse income starting in 2029. That is a growth company in a still-young market, not a corpse, and the cash cushion makes a corpse outcome unlikely before 2029. I have low confidence in the mid-point. The order book covers about 2.5 years of today's revenue, but the step-up to £100m+ needs FIDs that have not happened yet.
Fair value and multiples
DCF at 10%: PV of FY27-31 FCF is about -£4m. The terminal value is 22x year-5 FCF of £27m, about £594m, worth about £369m today. EV is therefore about £365m. Adding net cash of about £190m (£215.6m cash less £14m leases, minus a haircut for provisions that will be spent and growth capex net of the grant) gives equity of about £555m, or ~80p per share on 691.4m shares. Bull case (FY31 revenue ~£400m, 15% EBITDA margin, FCF ~£50m at 25x): ~140-150p. Bear case (FIDs stall, losses continue, cash falls to ~£100m): ~35p. I put fair value at 85p mid, adding a little Hydropulse/Rheinmetall option value. At 86p: market cap ~£595m, EV ~£400m, EV/sales ~9x trailing and ~7x FY27. EBITDA and FCF are negative (FCF yield about -4.7%), so P/E and EV/EBITDA are not meaningful; the JSON gives the negative trailing ratios. Base IRR is about 6% a year (the year-5 equity of ~£790m is ~114p). This is not a covered-call floor setup: implied volatility is high (beta ~2.8), but earnings are neither predictable nor at a valuation floor. There is no capital return; dilution is the more likely direction, given the AGM authority to issue shares (cut to £23m nominal) and possible Hydropulse equity needs.
Management, risks and competition
CEO Dennis Schulz (since Jan 2023) has delivered what he promised: profitable bidding, beating guidance, cash ending the year higher than it started. CFO Amy Grey and CTO Simon Bourne come across as credible and conservative; they withhold the Chronos launch date to protect TRIDENT sales. Flags: (1) the CTO exercised 1.33m options at 32p and sold 873k shares at ~157p in May 2026, near the top of the Rheinmetall spike; (2) FY26 results were very late because of the switch to BDO and a change of audit partner, which is unusual but explained; (3) Great British Energy (the UK state) is now a shareholder that has not yet named its board member, which brings both policy alignment and political risk. Competition: alkaline makers (thyssenkrupp nucera, Nel, Sunfire, Chinese suppliers in what Schulz calls a 'bloodbath' below cost) and PEM rivals (Siemens Energy, Plug, Nel PEM, Elogen). Peers are retrenching: nucera's green-hydrogen sales are halving and it has stopped SOEC stack production. Consolidation favours ITM's balance sheet, but demand is limited by end-customer economics, policy subsidies and RED III enforcement, not by electrolyser supply.
How investors feel (sentiment 4.5/10)
Analysts are cautiously positive. Investing.com shows 6 Buys with an average target of ~133p. Targets: Berenberg Buy (raised 110p to 200p after Rheinmetall, reiterated Buy 14 Oct 2026), Morgan Stanley Buy 170p (April 2026, expects FY28 EBITDA breakeven, a year ahead of consensus), Peel Hunt Hold 92p (8 Oct 2026), UBS long-time Hold with a low target, Jefferies Buy. Retail and momentum money that piled in at 150-210p has been hurt: the stock is down ~60% from its peak and fell on the results despite the EPS beat. So the mood is disappointment and fatigue, not outright hatred. There is no obvious forced seller, but holders who bought the Rheinmetall spike may keep supplying stock on any rally.
- /Users/gregwo/stocks2/data/analysisv3/context/ITM.L.md (FY26 results call transcript, 19 Oct 2026)
- https://www.investegate.co.uk/announcement/rns/itm-power--itm/preliminary-results/9828264
- https://mugglehead.com/itm-power-annual-revenue-loss-cash-backlog/
- https://www.ajbell.co.uk/news/articles/itm-power-shares-rise-improves-annual-bottom-line-guidance
- https://uk.investing.com/equities/itm-power-plc
- https://in.investing.com/news/stock-market-news/earnings-call-transcript-itm-power-posts-fy-2026-eps-beat-as-losses-narrow-93CH-5639810
- https://www.boerse-express.com/news/articles/itm-power-cto-verkauft-873000-aktien-902676
- https://www.ajbell.co.uk/news/articles/itm-power-shares-jump-strikes-deal-rheinmetall-nato-work
- https://www.hl.co.uk/shares/stock-market-news/share-tips/stockbroker-tips/berenberg-hikes-target-price-on-itm-power
- https://www.boerse-global.de/itm-power-fy28-ebitda-breakeven-erwartet/783475
- https://www.ad-hoc-news.de/boerse/news/unternehmensnachrichten/itm-power-rewrites-equity-authorisation-ahead-of-shareholder-vote-with-annual-figures-due-monday/70354684
- https://www.hl.co.uk/shares/stock-market-news/aim-and-small-cap-news/aim-bulletin/itm-power-signs-heads-of-terms-for-150m-mw-green-hydrogen-project
- https://www.marketbeat.com/instant-alerts/itm-power-lonitm-price-target-raised-to-gbx-80-2026-08-05/
- https://quartr.com/events/thyssenkrupp-nucera-ag-co-nch2-q3-2026_FG5tClYW
- https://www.hydrogeninsight.com/electrolysers/thyssenkrupp-nucera-sees-electrolyser-sales-for-green-hydrogen-projects-halve-amid-continued-slowdown/2-1-1941912
Financials — Adjusted
Adjusted · TTM 2026-Q4 · GBP
| TTM & Fiscal-Year P&L | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Revenue | 43.6+68% | 43.6+68% | 26.0+58% | 16.5+216% | 5.23 |
| Gross profit | -14.8 | -14.8 | -27.5 | -19.1 | -96.5 |
| Operating expenses | 17.5-42% | 17.5-42% | 30.1+59% | 19.0+96% | 9.66 |
| ▸Adj EBITDA | -23.6 | -23.6 | -50.3 | -33.2 | -102 |
| ▸Adj OCF | -14.1 | -14.1 | -39.1 | -26.1 | -91.3 |
| CapEx | -9.47 | -9.47 | -8.55 | -13.7 | -15.1 |
| Adj FCF | -23.6 | -23.6 | -47.6 | -39.9 | -106 |
| Interest expense | 1.23 | 1.23 | 0.98 | 0.64 | 0.54 |
| ▸Adj net income | -26.3 | -26.3 | -48.6 | -26.6 | -102 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026
| Where the Cash Went | Total | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -190 | -19.0 | -42.5 | -31.7 | -97.0 |
| FCF (OCF−capex) | -192 | -26.1 | -18.4 | -64.3 | -83.1 |
| Net income | -199 | -25.0 | -45.5 | -27.2 | -101 |
| ▸Capital returned | -35.6 | -38.9 | 1.25 | 1.29 | 0.71 |
| Buybacks | -40.2 | -40.1 | -0.12 | 0.00 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 3.40 | 1.23 | 0.98 | 0.64 | 0.54 |
| Debt paid down | 1.19 | 0.00 | 0.38 | 0.65 | 0.17 |
| ▸Reinvestment | 52.6 | 10.1 | 8.04 | 18.6 | 15.8 |
| Capex (PP&E) | 46.9 | 9.47 | 8.55 | 13.7 | 15.1 |
| Intangibles & M&A | -0.15 | 0.00 | -0.13 | -0.02 | 0.00 |
| Leases signed (net Δ) | 5.83 | 0.65 | -0.37 | 4.89 | 0.66 |
| Retained / other | -153 | 14.0 | -18.6 | -64.9 | -83.3 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 2.3 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Assets (total) | 372 | 372 | 342 | 382 | 402 |
| ▸Liabilities (total) | 132 | 132 | 118 | 113 | 107 |
| Net debt (incl. leases) | -202 | -202 | -194 | -218 | -276 |
| Net debt / Adj EBITDA | -- | -- | -- | -- | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -19.2 | -19.2 | -51.0 | -51.7 | -189 |
| Shares outstanding | 690 | 690 | 617 | 617 | 616 |
| Dilution (YoY) | +11.8% | +11.8% | +0.0% | +0.1% | +4.4% |
| Employees | 359 | -- | -- | -- | -- |
| Margins | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Gross margin | -33.9%+71.9 | -33.9%+71.8 | -105.8%+9.6 | -115.4%+1730.4 | -1845.8% |
| Adj EBITDA margin | -54.1%+138.9 | -54.1%+139.0 | -193.1%+8.2 | -201.2%+1753.8 | -1955.0% |
| Adj OCF margin | -32.4%+117.6 | -32.4%+117.6 | -150.0%+8.2 | -158.2%+1587.9 | -1746.1% |
| Adj FCF margin | -54.1%+128.7 | -54.1%+128.7 | -182.8%+58.6 | -241.4%+1793.7 | -2035.2% |
| Net income margin | -57.3%+117.5 | -57.3%+117.5 | -174.8%-9.9 | -164.9%+1770.5 | -1935.4% |
| Adj NI margin | -60.4%+126.4 | -60.4%+126.4 | -186.7%-25.6 | -161.1%+1791.4 | -1952.5% |
| ROIC (adj, after-tax) | -10.1% | -10.1% | -19.2% | -10.7% | -27.6% |
| Cost of debt | 8.6% | 8.6% | 7.4% | -- | -- |
Earnings Calls
Earnings Call · 2026 Q4
ITM Power's capital markets update covered its financial year 2026 results (year ended April 30, 2026), strategic progress, and guidance for FY 2027. Dennis Schulz opened by highlighting record revenue of GBP 43.6 million, up 68% year on year and more than 700% over three years, with cash higher at year end than at the start. The contracted backlog held at GBP 144 million (versus GBP 145.1 million a year earlier), and 83% of it now consists of profitable contracts, up from 60% in April 2025 and 100% loss-making in January 2023. Management said the company is focused on technology leadership, project execution, and capital preservation. The Alpha 50 scalable 50 MW plant was launched in October 2025, and the Hydropulse build-own-operate model was introduced in 2025. On the market, management said energy security concerns linked to the Ukraine and Middle East conflicts strengthen the case for electrolytic hydrogen. Refineries are the biggest near-term demand driver, supported by RED III targets, while defense-related synthetic fuels are a less mature but growing segment. Mobility demand has declined, and demand from industry and fertilizer is flat but is expected to recover. Recent wins include a NEPTUNE V project with Westnetz, a NEPTUNE II project with a Spanish cement producer, a Poseidon contract with MorGen, a NEPTUNE V contract with Octopus Energy Generation, a supplier selection for Uniper's 120 MW Humber project, a project larger than 300 MW with a confidential Asian customer, two projects totaling 710 MW with Stablegrid, and a 150 MW capacity reservation with RWE. On execution, RWE's 100 MW Lingen plant is operational, and the second 100 MW plant on the same site was 60 MW complete at the time of the update. Other flagship projects include Linde's Leuna project and Shell's 100 MW REFHYNE II. The first NEPTUNE V customer, Goodrof, saw the unit exceed contractual efficiency and hydrogen production rates during factory acceptance testing. The Hydropulse project is a 150 MW heads of terms agreement with a European Union oil refinery, with a planned 10-year operational contract. The customer would provide land and utilities, reducing ITM's electricity price exposure. A joint FEED study is underway, FID is targeted for 2027, and hydrogen production is targeted to start in 2029. Financing discussions are progressing. If it reaches FID, it would be by far ITM's largest contract. The Rheinmetall collaboration, called Giga PtX, aims to build a distributed network of modular Power-to-X plants producing drop-in diesel, jet, and marine fuel compatible with NATO equipment. The initial focus is the U.K. and Germany, and discussions with both governments are ongoing. No pilot timing was given, and the model could be an equipment sale or a Hydropulse-style arrangement. Simon Bourne presented the Chronos program. It is supported by GBP 86.5 million of government support, consisting of a GBP 40 million equity investment from Great British Energy and a GBP 45.5 million grant from DESNZ. The funding will underpin validation and a manufacturing line in Sheffield with 1 GW per year capacity, alongside the existing TRIDENT line. Chronos has more than 20,000 hours of operation at component, cell, and short stack level. Management is not guiding to a commercial release date, in order to avoid cannibalizing TRIDENT sales. Amy Grey presented the financials. Equipment sales were GBP 40.7 million, with GBP 2.9 million from services and spares. Revenue recognition is shifting toward percentage of completion for NEPTUNE, Poseidon, and Alpha projects. Of equipment sales, GBP 36.8 million came from legacy point-in-time contracts, and GBP 3.9 million came from percentage of completion contracts. Gross loss narrowed to GBP 6.1 million from GBP 23.7 million, partly due to releasing provisions on Lingen One and Two. Adjusted EBITDA loss improved to GBP 20.2 million from GBP 33 million. Cash ended at GBP 215.6 million, up GBP 8.6 million, after the GBE investment, which brought net proceeds of GBP 39.2 million. Capital expenditure was GBP 13.2 million. FY 2027 guidance calls for revenue of GBP 50 million to GBP 60 million, with about two-thirds from profitable contracts and about one-third from legacy contracts. Adjusted EBITDA loss is expected to be GBP 17 million to GBP 20 million, and year-end cash is expected to be GBP 170 million to GBP 180 million, including initial Chronos capex. In the Q&A, management said Hydropulse would require two to three years of build-phase financing before customer receipts begin, and it is considering project financing or bringing forward customer receipts to fund the build. The project is expected to be profitable from the first day of operation. Management said Europe remains the most attractive region, with Germany the largest market, while the U.S. is challenging and the Chinese market is a price war. The U.K. HAR2 funding round has been slow, and the company called for faster awards. The DESNZ grant is fully awarded, and quarterly drawdowns begin in the coming weeks. Great British Energy is a supportive shareholder, and a board representative is still expected. Management also said large projects make order intake lumpier, but fewer competitors can deliver at that scale. The delayed FY 2026 results were attributed to a change of audit partner at BDO during the first-year audit. Management described data center applications as overhyped but worth pursuing in a structured way. Simon Bourne also said ITM is insourcing more manufacturing steps, including catalyst ink preparation, with more automation.
▸How much cash will the 150 MW Hydropulse deal use from ITM's balance sheet?
▸How do you see the competition between alkaline and PEM technology playing out?
▸Which world regions do you see as the most attractive for ITM going forward?
▸Given the EBITDA outcome relative to guidance for FY 2026, what factors significantly improved EBITDA performance?
▸How confident are you about converting the sales pipeline into contracts, and are there trends in product split or markets?
▸Why were the FY 2026 results released much later than in previous years?
▸What is the Horizon timeline, and has FID been taken?
▸When do you expect to release Chronos commercially?
▸Regarding the Hydropulse announcement, when will the project be profitable?
▸What is the update on the U.K. Hydrogen Allocation Round 2 plans?
▸How does the DESNZ grant process work, and when does ITM expect to start drawing down?
▸How is the relationship with GBE developing now that they are a shareholder?
▸Could you provide a split of expected future revenue between point-in-time and percentage of completion recognition?
▸When do you expect the first pilot projects with Rheinmetall to be announced?
▸Do you think green hydrogen will play a significant role in data centers and fuel cells?
▸Could you give an example of technology brought in-house recently or planned for the future, given ITM's focus on IP?
Web Traffic
Institutional Ownership
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2024 Q4 | 16M | -16M | -20M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2025 Q2 | 12M | -15M | -19M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2025 Q3 | 12M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2025 Q4 | 18M | -3M | -8M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2026 Q1 | 20M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2026 Q2 | 27M | -9M | -14M | $-0.02 | $-0.02 – $-0.02 | 1 |
| 2026 Q4 | 32M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2027 Q2 | 59M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- Government Funding for Chronos Scale-up (April 2026): ITM Power secured an £86.5 million funding package from the UK government. Great British Energy (GBE) made a £40 million strategic equity investment (acquiring a 10.4% stake), and the Department for Energy Security and Net Zero (DESNZ) committed a proposed £46.5 million grant. The capital will support a new £120 million, 1 GW automated manufacturing line for ITM's next-generation Chronos electrolyser stack at its Bessemer Park facility in Sheffield, with commercial operations targeted by 2028.
- Rheinmetall Strategic Collaboration (April 2026): ITM Power partnered with German defense contractor Rheinmetall AG for its "Giga PtX" project. The initiative seeks to build a decentralized synthetic fuel production network across Europe to bolster NATO's sovereign fuel resilience. The project envisages the deployment of several hundred plants, each featuring up to 50 MW of electrolysis capacity.
- MorGen Energy 20 MW West Wales Project FID (March 2026): Trafigura’s subsidiary, MorGen Energy, reached a Final Investment Decision (FID) for its 20 MW West Wales Hydrogen project. ITM Power was officially confirmed as the electrolyser supplier, deploying its Poseidon core process module. ITM also secured a 10-year Long-Term Service Agreement (LTSA) for the project, which is scheduled for commissioning in 2028.
- FY26 Revenue Guidance Upgraded (February 2026): ITM Power raised its FY26 revenue guidance by over 10% to between £40 million and £43 million (up from the previous £35 million to £40 million range). Management attributed the revision to strong project execution and progressive revenue recognition via the percentage-of-completion (PoC) accounting method.
- Protium Strategic Partnership (June 2026): ITM and Protium Green Solutions entered a strategic partnership to develop and operate industrial green hydrogen projects in the UK. The collaboration will initially focus on Protium’s 15 MW Cromarty Hydrogen Project in the Scottish Highlands, with options for direct equipment procurement or deployment via ITM's build-own-operate subsidiary, Hydropulse.
---
▸ Thesis-test Findings
ITM Power CHRONOS next-gen stack commercial validation data
The next-generation 2.5 MW Chronos PEM stack was officially unveiled in April 2026. Prior to receiving £86.5 million in public/equity backing, Chronos was validated via "rigorous third-party technical and commercial due diligence". Data indicates that Chronos achieves a 10% improvement in energy efficiency, a 40% reduction in manufacturing cost, and over 50% reductions in part count, weight, and footprint compared to legacy Trident technology. It features a major scale-up in unit capacity (2.0–2.5 MW per stack compared to Trident's 670 kW) and leverages a validated 40% reduction in iridium loading (achieved in late 2024) to structurally lower raw material costs. This strongly supports the bull case for ITM's long-term margin profile and technical leadership.
RWE Lingen 2 electrolyser delivery schedule and commissioning
The GET H2 Nukleus project in Lingen, Germany, is progressing on schedule, delivering a solid milestone for the bull case on ITM's execution credibility. RWE commenced technical commissioning of the first 100 MW PEM line (Lingen 1) in December 2025, aiming for commercial operations in 2026. For Lingen 2, ITM Power confirmed in March 2026 that it had shipped the final batch of Trident stacks on schedule, completing the full 200 MW order. Installation of Lingen 2 is actively underway on-site, with RWE aiming to bring the full 300 MW (which includes 100 MW of alkaline capacity) online by 2027. Furthermore, the relationship is reinforced by RWE's late-2025 capacity reservation for an additional 150 MW of ITM’s Neptune V units.
European PEM electrolyser price trends vs Chinese competition 2026
European PEM CAPEX fell double-digits in 2025 to roughly €2,196/kW, and ex-factory prices for European PEM systems sit in the range of $1,000–$1,600/kW. However, Chinese PEM systems remain significantly cheaper at $700–$1,000/kW ex-factory, while legacy Chinese alkaline systems command a massive cost advantage at $300–$450/kW ex-factory. At the full-system level (including balance of plant and civil works), Western installations average $2,500/kW compared to only $600/kW in China. Chinese OEMs are conducting a global "capacity war," relying on mature domestic supply chains and R&D for Balance of Plant (BoP) components. While European developers still prefer European PEM stacks due to efficiency, grid-balancing performance, and local subsidy rules (such as EU Hydrogen Bank non-price criteria), the severe structural cost gap continues to present a strong long-term bear case challenge for Western manufacturers like ITM.