ITRG
Integra Resources Corp.v3 6.0/10 · 2026-11-10Integra Resources Corp. is a mineral resource firm that specializes in acquiring, exploring, and developing mining properties throughout the Americas. The core of its operations centers on advancing the DeLamar Project, which includes the DeLamar and Florida Mountain gold and silver deposits. Situated in Owyhee County, southwestern Idaho, this project spans approximately 8,673 hectares. Its extensive land package comprises 790 unpatented lode, placer, and millsite claims, alongside 16 tax parcels. Established in 1997, the company initially operated as Mag Copper Limited before rebranding to Integra Resources Corp. in August 2017. Integra's corporate headquarters are located in Vancouver, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-11-10
Integra is a US gold company with one producing mine and one key development project. Florida Canyon in Nevada is a low-grade heap leach with high costs: 2026 AISC guidance is $3,300-3,500/oz, active mining ends in 2033 and residual leaching runs to about 2035. DeLamar in Idaho is a large heap leach in permitting: $389M capex, about 106koz AuEq a year, feasibility AISC about $1,480/oz, with the record of decision due H2 2027 and construction starting in 2028. At $2.18 (442M market cap, about 85M net cash, EV about 357M) the market is paying roughly the value of Florida Canyon and very little for DeLamar. The pitch's DCF of $4.50 (fair value $3.60) does not survive testing intact, but it survives as a modest long. The challenger is right on three of its five objections and partly right on a fourth. (1) The pitch's 5.5x terminal multiple was applied to Florida Canyon cash that runs out about two years after 2031. (2) DeLamar's 2030 should be a ramp-up year, not a full year, because construction is now targeted for H2 2028. (3) The dilution the pitch assumed cannot fund a roughly $200M-plus build gap. On (4), Florida Canyon's record of missing cost guidance does justify a slower fall in AISC. The challenger goes too far in holding AISC at $3,300 for the whole mine life, because 2026 carries most of the roughly $87M Central Pit pre-strip, which ends this year. Redone at a flat $4,000 gold price, with Florida Canyon AISC easing from about $3,000 in 2027 to about $2,400, DeLamar costs about 15% above the feasibility study, a 2030 ramp and mixed debt and equity funding, the DCF gives about $3.80 a share. About 85% of that is the 2031 terminal value, which sits on DeLamar being permitted, financed and built. Each $500/oz move in gold moves the value by about $1.50-1.80. Fair value is $3.20 (about 45% upside), which sits below the DCF because of permit, financing and execution risk. The stock is at the bottom of its one-year range ($2.00-4.62), but that fall is a rational response to a high-cost mine's operating leverage and to dilution, not capitulation. Rating 6.0: cheap if DeLamar gets built, with a real but not deep cushion. The Q3 results due 11 November and the 2027 project-financing terms are the next tests.
A deep dive would have to establish: Does Florida Canyon's 2027 AISC actually fall well below $3,000 with recoveries back above 55% (Q3 results on 11 November, and 2027 guidance), and can DeLamar's roughly $200M+ funding gap be filled mostly with unhedged or lightly hedged debt rather than equity near $2?
Research (expand)
What the company does
Integra is a Vancouver-headquartered, US-focused gold company. It has one producing asset and two development assets.
- Florida Canyon (Nevada, producing): heap leach on very low-grade oxide ore (about 0.25 g/t, 52-58% recovery). Integra bought it in November 2024 for about $68M. The June/July 2026 feasibility study raised reserves 74% to about 1.19Moz. The plan has active mining through 2033 (Central Pit 2026-28, Radio Tower 2028-30, Jasperoid 2030-33), then about 2 years of residual leaching. It averages about 82koz a year, with a LOM mine-site AISC of $2,331/oz, about $770-800M of LOM after-tax FCF and a 5% NPV of $601M. That NPV uses a declining price deck that reaches $3,600 from 2030. Sustaining capex over the LOM is about $267M, including about $87M of Central Pit pre-strip that finishes in 2026. Growth capex is about $92M. Production through Q3 2026 is 46.7koz. Q3 was 17.7koz, with recovery down to 52.5% as more uncrushed (run-of-mine) ore went onto the pads.
- DeLamar (Idaho, permitting): oxide gold-silver heap leach. Pre-production capex is $389M, including $42M of owner's costs and bonding. It is designed for about 106koz AuEq a year over a 10-year life plus residual leaching, at an FS AISC of about $1,480/oz AuEq. The FS NPV5 is $774M at $3,000 gold. The project is under FAST-41: the BLM notice of intent came on 29 May 2026 and the ROD and final EIS are targeted for H2 2027. Construction is targeted to start in 2028 (one source says Q3 2028). Ausenco is doing detailed engineering, and GenCap was hired in October 2026 to structure project financing in 2027.
- Nevada North (Wildcat and Mountain View): exploration drilling began in August 2026. Treated as an option, not modeled.
The investment case
At $2.18 the EV is about $357M, which is roughly what Florida Canyon's remaining cash flow is worth at about $4,000 gold, so DeLamar is valued at very little. The bull case is that 2026 is a bridge year. Record mining rates, a heavy pre-strip that ends this year, and higher Central Pit grades should bring Florida Canyon costs down. Florida Canyon's cash plus some debt then build DeLamar, which would be a lower-cost US mine and turn Integra into a producer of about 180-190koz a year by 2031. The bear case is also real. Florida Canyon has missed cost guidance every year. Its main cost lever, cheap uncrushed ore, is the cause of the recovery dip. And the DeLamar build must be financed from a $2 share price or with project debt that will probably require hedging.
What it earns today
In 2026E, about 72koz at a realized price of about $4,350 gives about $310M of revenue. A mine-site AISC of about $3,400 leaves about $65-70M. Less corporate costs and SBC (about $13M), exploration and cash taxes (about $10M), unlevered owner earnings are about $40M, a yield of about 9% on the market cap and about 11% on EV. EBITDA is about $95M, and only about 40-45% of it reaches owners because sustaining capex and pre-strip are so heavy. 2026 AISC includes most of the $87M pre-strip, so a normalized year is better: about $60-80M at $4,000 gold and $2,800-3,000 AISC. The COO's own timetable, given on the Q2 call, is to get back to $2,300-2,400 AISC over 3-4 years, not in 2027. The only 2027 marker is 'materially below $3,000', and the 777 fleet replacement sits inside 2027 sustaining capex.
Five-year FCF (unlevered, after SBC, including the DeLamar build; $4,000 gold flat)
Assumptions: Florida Canyon AISC of about $3,000 in 2027, $2,800 in 2028 and about $2,400 from 2030. Corporate costs and exploration about $25M a year. DeLamar early works in 2027 (partly funded by the February 2026 raise), with the main build spent mostly in 2028-29. First gold in mid-2030 and a ramp of about 40koz that year. 106koz AuEq in 2031 at about $1,700 AISC, about 15% over the FS.
- 2027: -25
- 2028: -60
- 2029: -150
- 2030: +120 (DeLamar ramp year; the pitch had +190)
- 2031: +265 (Florida Canyon about $80M + DeLamar about $210M after tax - corporate about $25M; the pitch had +277)
In 2031 Integra would be a two-mine producer with a depleting Florida Canyon, two years of mining left there, and DeLamar with about 8 years left. That makes it a depleting miner, not a compounder. The terminal value is split by asset. DeLamar is valued at about 6x its roughly $190M average after-tax FCF, which is about $1.15B. That is a little above its 8-year annuity value, to credit likely life extensions. Florida Canyon's tail (about 80, 80, 40 and 15, less about $30M of reclamation) is worth about $160M at end-2031. Corporate costs capitalize to about -$150M. The 2031 terminal value is therefore about $1.16B, against the pitch's single 5.5x on $277M (about $1.52B). Confidence in the shape is moderate and in the level is low: each $500/oz of gold moves year-5 FCF by about $75M.
Fair value and multiples
PV of 2027-31 FCF is about $60M and PV of the terminal is about $720M, for an EV-PV of about $780M. Adding about $85M of net cash gives equity of about $865M. The 2027-29 deficit of about $235M, plus the Q4 2026 capex catch-up, a minimum cash balance and an overrun reserve, leaves an external gap of about $200M. All-equity funding at about $2.50 adds about 80M shares and gives about $3.60 a share. All debt gives about $4.00 on 216.5M fully diluted shares. A mixed base gives a DCF of about $3.80. At $3,500 gold with a DeLamar slip the DCF is about $2.00, around today's price. At $4,500 gold it is about $5.50-5.80. On multiples: EV/EBITDA is about 3.8x 2026E, P/E about 9-10x on adjusted EPS of about $0.24, and the owner-earnings yield is about 9%. There is no dividend or buyback. The base-case IRR from $2.18 is about 17% a year. Fair value is $3.20, below the DCF because about 85% of the value is a 2031 business that still needs a permit, about $200M of financing and a build by a team that has missed every cost guide so far.
Management, risks and competition
CEO George Salamis is a founder and serial builder. COO Lafleur came from SilverCrest. The CEO bought shares at C$2.99 in July 2026. Dilution has been heavy, most recently a $61M raise at $3.40 in February 2026. The Beedie convertible was converted in December 2025, so there is no corporate debt beyond equipment financing. Management talks openly about M&A to fill the production gap. Risks: Florida Canyon recovery and cost slippage, DeLamar permit timing, financing terms (project debt usually comes with mandatory gold hedges, which cap upside), capex inflation, and gold falling from about $4,050-4,100 spot (it touched about $3,870 on 30 October). Gold is a commodity, so cost position and jurisdiction are the only edges. DeLamar would be a lower-cost asset in a good US jurisdiction, which makes Integra a plausible takeout once it is permitted.
Sentiment: 3/10
The stock is 7% of the way up its one-year range ($2.00-4.62) and down 50% from its February close of $4.34, below the $3.40 deal price. Beedie cut its stake from 11.1% to 7.8%, and Hillsdale exited and partly re-entered. Short interest is small (about 4.7M shares, 3 days to cover). Sell-side ratings are uniformly Buy, with an average target of about $5.75. The decline mostly reflects what lower gold and higher AISC do to a fourth-quartile mine, plus the overhang from the February deal, not panic.
Thesis test
1. Terminal multiple on Florida Canyon cash (challenger right). Florida Canyon's active mining ends in 2033, so 5.5x on its 2031 FCF overstated the terminal value. Valuing its tail separately (about $160M at end-2031 against about $440M implied) cuts about $0.55-0.60 a share.
2. Florida Canyon cost record (challenger partly right). The guidance misses are real ($2,693 against $2,450-2,550 in 2025; $3,300-3,500 against $2,750-2,950 in 2026). The COO's own path to $2,300-2,400 takes 3-4 years, so the pitch's $2,900 for 2027 is optimistic. But the challenger's $3,300 for the whole LOM ignores that most of the roughly $87M Central Pit pre-strip, which inflates 2026 AISC, ends this year. I used $3,000 easing to $2,400, and a 15% (not 25%) DeLamar overrun.
3. Dilution cannot fund the build (challenger right). The pitch's $4.50 implies only about 20M new shares against a gap of about $200-250M. I modeled mixed funding, which takes about $0.25-0.40 off the all-debt value. There is no term sheet yet, and hedging is likely.
4. DeLamar full year in 2030 (challenger right). With the ROD in H2 2027 and construction starting in 2028 (possibly Q3), 2030 is a ramp year. I cut 2030 FCF from +190 to +120 and pushed more of the build spend into 2029.
5. 'Capitulation' (challenger mostly right). The 50% fall matches the cut in per-ounce margin and the overhang from the deal. Being at the bottom of the range still helps the entry, but there is no sentiment-rebound value to add.
Conclusion: the DCF falls from $4.50 to about $3.80 and fair value from $3.60 to $3.20. That is less of a cut than the challenger's $2.70-3.20, because its cost and funding haircuts stacked worst cases. The long survives as a modest, gold-dependent bet on DeLamar getting built, not a mispricing with a hard floor. At $3,500 gold the stock is roughly fairly priced. Rating 6.0.
- /Users/gregwo/stocks2/data/analysisv3/context/ITRG.md (2026Q2 call transcript, price history, 13D/G filings, short interest)
- /Users/gregwo/stocks2/data/analysisv3/ITRG/pitch/2026-11-10.md
- /Users/gregwo/stocks2/data/analysisv3/ITRG/2026-11-10.challenge.md
- https://integraresources.com/news/florida-canyon-feasibility-study-delivers-substantial-increase-in-mineral-reserve-gold-production-over-an-8-year-mine-life-and-us0-8-billion-in-after-tax-free-cash-flow-provides-operational-update/
- https://www.cruxinvestor.com/posts/how-integra-plans-to-fund-delamar-nevada-north-from-florida-canyons-cash-flow
- https://www.cruxinvestor.com/posts/integra-has-funded-delamars-early-works-2-events-in-2027-test-the-re-rating
- https://www.cruxinvestor.com/posts/integras-recovery-dip-sets-up-a-gold-price-grade-test-for-2027
- https://www.barchart.com/story/news/36679707/integra-delivers-robust-feasibility-study-for-delamar-gold-silver-heap-leach-project-highlighting-improved-economics-and-reduced-development-risk
- https://www.sec.gov/Archives/edgar/data/0001722387/000172238726000011/mda-q226.htm
- https://www.kitco.com/gold-price-today-south-africa/
| date | price | rating | research | fair value | DCF | base IRR | sentiment |
|---|---|---|---|---|---|---|---|
| 2026-11-03 | 2.00 | 6.5 | 7.5 | 3.60 | 4.50 | 25% | 3 |
| 2026-11-10 | 2.18 | 6.0 | 6.5 | 3.20 | 3.80 | 17% | 3 |
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 259+18% | 244+704% | 30.4 | 0.00 | 0.00 |
| Gross profit | 85.9+23% | 82.4 | 5.84 | -2.09 | -1.96 |
| Operating expenses | 25.0+45% | 15.4-29% | 21.6-21% | 27.5+52% | 18.1 |
| ▸Adj EBITDA | 87.2+31% | 83.1 | -13.0 | -27.5 | -18.1 |
| ▸Adj OCF | 62.6+96% | 49.5 | -20.2 | -27.5 | -18.9 |
| CapEx | -72.8 | -43.2 | -0.93 | -4.12 | -0.22 |
| Adj FCF | -10.2-402% | 6.26 | -21.1 | -31.6 | -19.1 |
| Interest expense | 2.35 | 4.70 | 2.19 | 1.68 | 0.65 |
| ▸Adj net income | 49.7+57% | 43.6 | -18.1 | -30.5 | -20.4 |
| ▸Owner's earnings | 40.0 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 78.2100% | 66.6100% | 57.8100% | -3.69 | -25.4 | -17.1 |
| FCF (OCF−capex) | -31.9-41% | 1.142% | 27.047% | -11.0 | -30.8 | -18.1 |
| Net income | -23.6-30% | 37.056% | -2.23-4% | -9.50 | -29.2 | -19.7 |
| ▸Capital returned | -105-135% | -47.1-71% | 8.6415% | -25.1 | -23.6 | -18.0 |
| Buybacks | -118 | -58.7 | -0.56 | -22.8 | -25.8 | -10.4 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 10.6 | 1.37 | 4.70 | 2.19 | 1.68 | 0.65 |
| Debt paid down | 2.47 | 10.3 | 4.50 | -4.55 | 0.53 | -8.28 |
| ▸Reinvestment | 106135% | 65.298% | 48.684% | -12.0 | 4.52 | -0.49 |
| Capex (PP&E) | 106 | 57.9 | 43.2 | 0.93 | 4.12 | 0.22 |
| Intangibles & M&A | -20.4 | -0.01 | -0.02 | -20.5 | 0.17 | 0.00 |
| Leases signed (net Δ) | 19.9 | 7.34 | 5.40 | 7.63 | 0.23 | -0.71 |
| Retained / other | 104133% | 49.675% | 23.040% | 36.8 | -5.73 | 0.52 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 3.9 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 415 | 310 | 237 | 82.4 | 61.4 |
| ▸Liabilities (total) | 130 | 126 | 107 | 41.9 | 40.1 |
| Net debt (incl. leases) | -90.4 | -41.5 | -27.1 | 2.47 | -3.13 |
| Net debt / Adj EBITDA | -1.04 | -0.50 | -- | -- | -- |
| Net debt / Adj FCF | -- | -6.63 | -- | -- | -- |
| Adj EBITDA / interest | 37.2 | 17.7 | -5.95 | -16.4 | -27.8 |
| Shares outstanding | 203 | 169 | 169 | 68.9 | 31.9 |
| Dilution (YoY) | +7.9% | +92.9% | +145.0% | +115.9% | +28.3% |
| Employees | 305 | 0.00 | 329 | 41.0 | 39.0 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 33.2%+1.2 | 33.8%+14.5 | 19.3% | -- | -- |
| Adj EBITDA margin | 33.7%+3.2 | 34.1%+77.0 | -43.0% | -- | -- |
| Adj OCF margin | 24.2%+9.6 | 20.3%+86.7 | -66.4% | -- | -- |
| Adj FCF margin | -3.9%-5.5 | 2.6%+72.1 | -69.5% | -- | -- |
| Net income margin | 12.1%+6.1 | -0.9%+30.4 | -31.3% | -- | -- |
| Adj NI margin | 19.2%+4.7 | 17.9%+77.4 | -59.5% | -- | -- |
| ROIC (adj, after-tax) | 14.2% | 21.1% | -8.0% | -45.2% | -46.4% |
| Cost of debt | 8.0% | 18.7% | 13.5% | 13.2% | 8.7% |
Earnings Calls
Earnings Call · 2026 Q2
Integra Resources characterized the second quarter of 2026 as a pivotal period, with the company’s operating, financial and development outlook strengthened by progress at Florida Canyon, DeLamar and Nevada North. Florida Canyon remains Integra’s primary cash-generating asset. The mine achieved record throughput of 87,900 total tons per day in the quarter, supported by integration of new trucks and a shovel into the existing fleet and by shorter haul distances. Ore mined totaled 4.4 million tons, waste mined was 3.6 million tons, and the quarterly strip ratio was 0.81. Gold recovery averaged 57.8%, producing 16,400 ounces and allowing the company to sell 15,800 ounces. Financial performance improved materially. Revenue was $70.8 million, cost of sales was $47.4 million and mine operating earnings were $23.4 million, representing a 33% operating margin. Operating cash flow rose to $22.8 million, or $0.11 per share, versus $16.3 million in the prior-year period. Adjusted earnings were $13.1 million, or $0.06 per share, and free cash flow was $9.3 million, compared with $2.1 million in Q2 2025. Integra ended the quarter with $111.1 million of cash and $146.5 million of working capital. Except for mobile-equipment financing, the company has been debt-free since December 2025. Florida Canyon’s quarterly mine-site AISC was $3,370 per ounce sold, at the low end of revised guidance, while cash costs were $2,500 per ounce. Costs were affected by higher mining, hauling and stacking rates, price-sensitive royalties and excise taxes resulting from stronger gold prices, and elevated diesel and explosives costs. Full-year production guidance remains 70,000-75,000 ounces. However, 2026 mine-site AISC guidance was revised to $3,300-$3,500 per ounce, total cash costs to $2,300-$2,500 per ounce, and non-sustaining growth capital to $16.5-$18.5 million. The capital increase primarily reflects moving Phase IIIc heap-leach pad construction forward from 2027 into 2026. The updated Florida Canyon technical report represents the central strategic development. Proven and probable reserves increased 74%, from approximately 685,000 ounces to nearly 1.2 million ounces, despite mining depletion. The oxide measured and indicated resource grew 128%, and the oxide inferred resource rose 57%. Active mine life now stands at eight years, followed by two years of residual leaching, while average annual production increased approximately 17% to 82,000 ounces. The plan estimates 685,000 payable ounces, life-of-mine AISC of about $2,330 per ounce, approximately $600 million of after-tax NPV and roughly $770 million of after-tax free cash flow, averaging $99 million annually. Management believes this cash flow can self-fund Florida Canyon’s expansion and contribute to DeLamar’s preproduction capital. DeLamar’s federal permitting process formally began with the Bureau of Land Management’s May 29 notice of intent. Public scoping and stakeholder engagement concluded June 29, and BLM is reviewing submitted comments. Ausenco is leading detailed engineering and procurement through the first quarter of 2027, with long-lead procurement beginning in the second half of 2026. On-site repair and readiness work includes truck-shop refurbishment, communications infrastructure and crushing optimization. Integra also entered an agreement with the Shoshone-Paiute Tribes to collaborate on project-related processes and initiatives. At Nevada North, Wildcat received its exploration decision documentation and reclamation permit, enabling a substantially expanded exploration and hydrogeological drilling program. Drilling is scheduled to begin in August 2026, with advanced economic studies continuing. Across all three projects, Integra expects results from a 50,000-meter drilling campaign. Management is also evaluating potential western U.S. acquisitions to bridge the gap between Florida Canyon and DeLamar, though it emphasized that suitable assets are uncommon. Near-term priorities include accelerating Florida Canyon’s heap-leach expansion, advancing DeLamar permitting and site readiness, continuing Nevada North studies and exploration, and using Florida Canyon’s cash generation to build a multi-asset, U.S.-focused intermediate precious-metals producer.
▸What are the company’s expectations for Florida Canyon’s cash costs and all-in sustaining costs in 2027 and beyond, and what factors could move costs toward either end of the range?Heiko Ihle · H.C. Wainwright
▸What were the implications of the reportable spill at Florida Canyon, including whether it could lead to increased reclamation bonding, agency action, or other consequences?Heiko Ihle · H.C. Wainwright
▸Given more stable gold prices, is Integra considering acquiring a development asset that could bridge the gap between Florida Canyon’s production and DeLamar’s permitting and development timeline?Joseph Reagor · ROTH Capital Partners
▸Is the company still comfortable with its full-year production guidance despite the slow start to 2026?Joseph Reagor · ROTH Capital Partners
▸How should investors reconcile the different sustaining and non-sustaining CapEx figures, where current year-to-date spending appears below the original run rate, and how much spending is expected in the second half and by quarter?Brian MacArthur · Raymond James
Short Interest
Cash Runway
Institutional Ownership
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2025 Q1 | 77M | 23M | 15M | $0.07 | $0.03 – $0.10 | 3 |
| 2025 Q2 | 38M | 23M | 15M | $0.07 | $0.05 – $0.09 | 3 |
| 2025 Q3 | 38M | 49M | 34M | $0.16 | $0.09 – $0.27 | 2 |
| 2025 Q4 | 54M | 19M | 11M | $0.05 | $0.02 – $0.07 | 5 |
| 2026 Q1 | 60M | 28M | 17M | $0.08 | $0.06 – $0.10 | 5 |
| 2026 Q2 | 84M | 31M | 18M | $0.09 | $0.07 – $0.10 | 4 |
| 2026 Q3 | 71M | 22M | 10M | $0.05 | $0.04 – $0.06 | 5 |
| 2026 Q4 | 78M | 24M | 12M | $0.06 | $0.03 – $0.08 | 3 |
| 2027 Q1 | 93M | 38M | 23M | $0.11 | $0.09 – $0.12 | 2 |
| 2027 Q2 | 94M | 38M | 24M | $0.11 | $0.10 – $0.12 | 1 |
| 2027 Q3 | 97M | 39M | 25M | $0.12 | $0.11 – $0.13 | 1 |
| 2027 Q4 | 97M | 34M | 21M | $0.10 | $0.09 – $0.11 | 1 |
| 2028 Q1 | 97M | — | 0M | $0.00 | $0.00 – $0.00 | 1 |
| 2028 Q2 | 97M | — | 0M | $0.00 | $0.00 – $0.00 | 1 |
| 2028 Q3 | 97M | — | 0M | $0.00 | $0.00 – $0.00 | 1 |
| 2028 Q4 | 97M | — | 0M | $0.00 | $0.00 – $0.00 | 1 |
| 2029 Q1 | 90M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q2 | 90M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q3 | 90M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q4 | 90M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2030 Q1 | 131M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2030 Q2 | 185M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2030 Q3 | 221M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2030 Q4 | 221M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
v2 analysis (legacy, 2026-08-16) — for comparison onlyclick to expand
Thesis
Integra has made a credible transition from developer to producer through Florida Canyon, and the latest reserve update materially improves the mine's strategic value. The balance sheet is unusually strong for a junior/intermediate precious-metals company, with approximately $111M of cash and limited conventional debt. The key question is not whether Florida Canyon generates revenue—it does—but whether the mine can convert that revenue into durable free cash flow after sustaining capital, heap-leach expansion, fleet replacement, leases, and other commitments. The near-term trajectory is constructive operationally but capital intensive. Q2 production and operating cash flow were solid, and throughput improved, yet AISC remains very high and management expects a heavy second-half capital program. DeLamar is progressing through formal federal permitting, but its ultimate value depends on a multi-year permitting, financing, construction, and execution chain. Nevada North and possible acquisitions add upside but should not be capitalized aggressively today. The resulting valuation has meaningful upside if costs normalize and DeLamar is de-risked, but also a wide downside range if high costs persist or capital allocation becomes more aggressive.
Trade Signal
No trade, with a mild negative bias: Integra has improving assets and meaningful gold/DeLamar upside, but at $2.78 the stock already exceeds conservative fair value while high costs, negative free cash flow and dilution weaken the risk-reward.
The stock rallied from roughly $2.04-$2.16 in late July to $2.78 by August 14, with most of the move occurring in early August before and around the August 12 earnings release. The recent leg appears driven by gold/resource-sector strength and anticipation of, then confirmation from, improved Florida Canyon operations, reserve growth and DeLamar progress; the latest earnings reaction itself was only about +4% from $2.66 to $2.78. Over a broader window, the stock is still 40% below its 52-week high after a sharp decline from $4.62 in February through March, followed by a long drift and recovery. The recent rebound is somewhat fast, but it is not an obvious panic reversal or missed-news dislocation. Given the premium to conservative fair value and high-cost cash-flow risk, the move looks closer to a justified partial repricing than a temporary oversold opportunity.
The market is constructive but not euphoric. Sell-side coverage is unanimously positive and published targets imply substantial upside, while recent price strength suggests growing enthusiasm around gold, Florida Canyon's reserve expansion and DeLamar permitting. Retail participation is elevated at roughly 37%, and short interest has risen from below 1% to 2.5%, indicating increasing debate rather than a heavily crowded short. The prevailing bullish narrative may be stale on one point—the latest reserve and operating improvements—but it already capitalizes much of the expected turnaround. There is little evidence of forced institutional capitulation or a truly hated stock.
There is a real operational inflection, but it is not clearly underappreciated. Florida Canyon's reserve base and mine life have improved materially, and management expects production and AISC to improve after the 2026 bridge year. DeLamar permitting is also progressing on a defined FAST-41 timetable. However, analyst consensus is already constructive, the average 1-year target is $6.10, and the stock has risen 66% over the past year and 28% in the past month. The market appears to anticipate much of the 2027-28 improvement; the undiscounted bull case is not a sufficiently unexpected catalyst at today's price.
- ▲August 2026 · Nevada North exploration and hydrogeological drilling begins — Drilling results could add resource credibility and improve the value of the undeveloped portfolio, though the asset is not yet a near-term cash-flow driver.
- ▲Q3 2026 · Florida Canyon updated technical report / feasibility study — Expected reserve, mine-life and production updates could validate the 74% reserve increase and demonstrate whether the 2027-28 cost improvement is achievable.
- ▲November 2026 · Q3 2026 Florida Canyon earnings and operating update — The key watch items are production, recovery, AISC, free-cash-flow conversion and whether the 2026 bridge-year spending is tracking guidance.
- ▲H2 2026-Q1 2027 · DeLamar detailed engineering and long-lead procurement progress — Progress through Q1 2027 can reduce execution risk, but it is unlikely to create full project value before the federal permitting decision.
- ▲H2 2027 · DeLamar NEPA review and permitting milestones — The targeted final EIS and Record of Decision in H2 2027 are the major de-risking events, outside the normal 12-month trading window.
- •Ongoing over the next 12 months · Gold-price and sector-factor updates — With Florida Canyon AISC near $3,400/oz, the stock remains highly sensitive to gold prices, royalties, diesel and explosives costs.
Net flow is modestly negative. TTM dilution was approximately 8%, including the $61M bought-deal financing and the 517,103-share tribal equity grant. There is no buyback, and continued development, exploration, acquisitions or DeLamar financing may require additional shares or project-level capital. Short interest is only 2.5% of float with 1.6 days to cover, so there is limited squeeze fuel.
The $111M cash balance and limited conventional debt provide meaningful support, but not a hard floor: Florida Canyon requires sustaining and expansion capital, and cash can be consumed if costs remain elevated or DeLamar spending accelerates. At roughly $484M of EV, the market is already assigning substantial value to future cash generation and development optionality. There is no clear hard ceiling, but future equity issuance and project financing could cap upside or dilute shareholders as the stock rises.
Moderate but not compelling. Integra offers liquid U.S.-focused gold exposure, a strong cash balance, reserve growth and a credible DeLamar development path, so real buyers can own the story. However, Florida Canyon's very high current AISC, negative TTM free cash flow, mining volatility and recurring dilution make it difficult to underwrite as a durable cash-return compounder. The next buyer is likely a gold-bull or resource investor seeking operating leverage and DeLamar optionality, not a fundamental-quality investor.
Fear pulls slightly stronger than greed at $2.78. The company has genuine assets, cash and improving operational evidence, but the market is paying above the analyst's $475M fair value and well above the study's more conservative $389.5M market-value estimate. The attractive upside scenarios depend on lower costs, sustained gold prices, successful capital allocation and DeLamar execution, while the current business is still a high-cost producer with negative TTM free cash flow.
Valuation
The quarter newly demonstrated stronger throughput and operating cash flow, a large 74% increase in Florida Canyon proven and probable reserves, and a longer mine plan with materially higher planned production. It also made clear that 2026 AISC remains very high and that a substantial portion of capital spending is pushed into the second half. The unchanged production guidance is reassuring, but the cost and capital intensity are more consequential than the headline revenue growth.
▸ How the cases moved
Versus the day before the Q2 release, the base case improves modestly: Florida Canyon's operating performance, cash balance, and reserve expansion support a higher sustainable mine value, but the higher 2026 AISC guidance and accelerated Phase IIIc capital offset part of that improvement. The bull case probability rises from roughly 0.18 to 0.20 because reserves increased materially and DeLamar permitting is progressing; the bear probability remains broadly similar at 0.30 because cost and execution risks remain. The base equity value moves from approximately $630M to $660M, while bull value rises from approximately $1,080M to $1,150M and bear value is approximately unchanged.
Florida Canyon remains profitable but elevated AISC, heavy sustaining and expansion capital, weaker gold prices, or operating underperformance prevent meaningful free-cash-flow conversion. DeLamar permitting or construction timing slips, and the company remains a single-asset producer with substantial execution risk. The valuation reflects a low multiple on depressed sustainable EBITDA and available net cash, but assumes cash is partly consumed by the capital program.
▸ Valuation
5x $35M EBITDA = $175M EV − (-$40M net debt) = $215M equity
Florida Canyon meets roughly the lower-to-middle end of production guidance, with costs gradually improving toward the $2,300-$2,400 per ounce range after the 2026 bridge year. Cash generation funds sustaining capital and continued DeLamar permitting, while Nevada North remains an option rather than a value driver. DeLamar advances on schedule but is not yet fully de-risked or financed, warranting a moderate producer/developer multiple.
▸ Valuation
6x $100M EBITDA = $600M EV − (-$60M net debt) = $660M equity
Fleet and heap-leach investments lift Florida Canyon toward 80,000-90,000 ounces annually while AISC falls materially from the 2026 peak. Gold prices remain supportive, reserve growth extends mine life, and DeLamar receives a timely permit decision with construction financing increasingly credible. The market begins valuing Integra as an emerging multi-asset U.S. producer rather than a single high-cost mine.
▸ Valuation
7.5x $140M EBITDA = $1,050M EV − (-$100M net debt) = $1,150M equity
▸ Target Rationale
The probability-weighted scenario value is approximately $500M after the requested two-year discount. I set the analytical target modestly below that at $475M because the arithmetic does not fully capture the credibility and execution discount attached to a high-cost single-asset producer, the recurring gap between adjusted earnings and free cash flow, the back-loaded capital program, and the possibility of additional equity issuance or acquisition spending. The strong net-cash position and improved Florida Canyon reserve base prevent a deeper discount.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- DeLamar Detailed Engineering Mandate (June 2, 2026): Integra appointed Ausenco Engineering USA South Inc. as the lead engineering partner to guide detailed engineering and project execution readiness for the DeLamar Project in Idaho. In addition, Ausenco has retained SLR Consulting to provide specialized heap leach engineering and metallurgical support.
- Historic Tribal Equity Agreement (May 13, 2026): Integra executed an agreement to grant 517,103 common shares (valued at US$1.5 million) to the Shoshone-Paiute Tribes. This equity grant makes the tribes direct partners with exposure to DeLamar’s long-term value creation. It solidifies a first-of-its-kind relationship agreement established in 2025 that covers baseline data collection, tribal monitoring, and collaborative mine-plan development.
- Q1 2026 Financial and Operational Results (May 11, 2026): Integra reported a strong first quarter for 2026, characterized by record-high total tonnes mined at the Florida Canyon Mine in Nevada. The results reflect extensive recent fleet reinvestments. The company maintained a highly robust liquidity profile, backed by cash holdings of approximately US$106 million and a total treasury exceeding US$110 million following a previously closed US$61 million bought-deal financing.
- Key Executive Appointments (May 26, 2026): Integra added three mining industry veterans to its senior leadership team: Scott Trebilcock as Senior Vice President of Corporate Development, Whitney Buhlin as Vice President of Human Resources, and Josh Serfass as Vice President of Business Development & Investor Relations.
▸ Thesis-test Findings
- DeLamar Project BLM Permitting Status and EIS Schedule: On May 29, 2026, the U.S. Bureau of Land Management (BLM) officially published the Notice of Intent (NOI) in the Federal Register, initiating the National Environmental Policy Act (NEPA) review and opening the 30-day public scoping period. DeLamar’s permitting is covered under the federal FAST-41 program, establishing a highly predictable 15-month NEPA timeline. The BLM schedule targets the final Environmental Impact Statement (EIS) and a Record of Decision (ROD) in the second half of 2027, with construction slated for Q3 2028. This milestone represents a highly favorable development for the bull case, drastically reducing permitting uncertainty.
- Florida Canyon Mine Gold Reserve Expansion Drilling Results 2026: On April 14, 2026, Integra released drilling results from its ongoing 2026 growth drilling program, which is targeting shallow oxide gold mineralization near current operations. Notable intercept highlights included 138 meters at 0.32 g/t Au and 128 meters at 0.36 g/t Au. These results represent the first phase of a broader 42,500-meter drilling campaign at Florida Canyon for 2026. They will feed into an updated Technical Report and Feasibility Study scheduled for Q3 2026, which aims to materially extend the mine’s current 5-to-6-year life, primarily by integrating these new oxide resources and assessing the addition of ~50 million tonnes of existing low-grade stockpiles. This confirms a robust bull case for organic mine life extension.
- Average Heap Leach AISC Cost Trends in Nevada Gold Mining Sector 2026: S&P Global's 2026 outlook projects that the wider gold mining sector's average AISC is declining by 5% to a range of $1,600 to $1,800 per ounce due to operational efficiencies. However, Nevada's heap leach costs are highly asset-dependent. While low-capex or highly optimized projects exhibit low projected AISC (e.g., Orla Mining’s South Railroad targets $1,505/oz and Solidus's Spring Valley targets $1,103/oz), operating mines in transition phases are experiencing elevated near-term costs. Integra’s Florida Canyon mine has guided 2026 AISC to a high $2,750 to $2,950 per ounce due to intensive front-loaded waste stripping to access the higher-grade Central pit, heap-leach pad expansions, and fleet renewals. While this is a near-term bear factor, management structures 2026 as a capital-intensive "bridge year," expecting costs to drop significantly in 2027 and 2028 as production expands to 80,000–90,000 ounces annually. This aligns with other regional heap leach projects, like Paramount's Sleeper project restart which projects a life-of-mine AISC of $2,407/oz.