Keel Infrastructure Corp.v3 4.5/10 · 2026-10-18Keel Infrastructure Corp. operates as a digital infrastructure and energy company that develops and owns data centers and energy infrastructure for computing workloads, including AI in North America. The company was founded in 2017 and is headquartered in New York, New York.
2-Year Price History
Valuation v3 Opus worker · 2026-10-18
Keel Infrastructure (ex-Bitfarms) is a former bitcoin miner that has shut its US mining and is trying to become an AI/HPC data-center landlord. It has about 480 MW of secured utility power across Moses Lake WA (18 MW, first revenue targeted for 2027 after a slip of a couple of months), Sharon PA (110 MW, possibly built in one phase) and Panther Creek PA (350 MW ESA, environmental permits delayed, year-end-2027 RFS), plus a 96 MW Sherbrooke, Quebec project and more than 2 GW of early applications. No lease has been signed. At the Q2 call management backed away from its target of three leases in 2026. The stock has fallen from about $5.93 at the June convert to $2.31 (Oct 16 close; the pack's $2.57 is stale), hit by the missing leases, hotter CPI repricing AI data-center debt, and a KBW Market Perform at $3. At $2.31 the market cap is about $1.43B on 617.6M shares. Net debt is about $0.3B: $1,046M of 1.25-1.375% converts due 2031/32 against roughly $740M of cash plus BTC. EV is about $1.74B, or roughly $3.6M per secured utility MW. Cash SG&A of about $100M a year produces no revenue until 2027. A 10% equity DCF that gives credit for most of the three sites at hyperscaler-style economics (about $1.6M NOI per IT MW, 80% project debt) comes out near $1.6 a share, below the price. The price only works if you pay sell-side NAV cap rates (6-7%) and add option value for the 2 GW pipeline. That gets my fair value to about $2.6, a modest discount wrapped in binary lease risk, a stretched financing chain (the equity slices of the builds use up nearly all the cash) and a bitcoin-company heritage that the mandate excludes. Rating 4.5: not a buy until a lease with investment-grade credit support is signed, and even then the converts and corporate overhead cap the per-share upside. Research rating 5: a signed Sharon or Panther Creek lease could rerate the stock fast (21% of float is short, IV is about 100%), and that is a resolvable question, but it is a sector lottery ticket rather than a compounding business.
A deep dive would have to establish: Whether Keel signs an investment-grade-backed lease at Sharon or Panther Creek in the next 6 months at a yield on cost (about 14%+) and project-financing terms that fund the build without new equity, given the $1.05B of converts and about $100M a year of SG&A ahead of shareholders.
Research (expand)
What the company does
Keel Infrastructure Corp. (NASDAQ/TSX: KEEL) is the renamed, US-redomiciled Bitfarms Ltd. During 2026 it exited Latin America and shut its US bitcoin mining (Moses Lake in April-June, plus the Pennsylvania sites). It now develops powered land into AI/HPC data centers to lease to hyperscalers, AI labs and GPU clouds. Some Canadian mining continues (about 2-3 BTC a day), and the company says it will sell its remaining ~1,861 BTC (Aug 7) during 2026.
Secured portfolio (about 480 MW of utility power):
- Moses Lake, WA: 18 MW. Mining equipment removed, Vertiv modules and backup generation delivered (PowerSecure deal on Sept 9). Likely a modified-gross lease. First revenue in 2027, a couple of months later than earlier guidance. The 10 MW expansion option was given up.
- Sharon, PA: zoned in April, land development approved in Q2. Management is weighing one 110 MW phase instead of 30 MW followed by 80 MW. Marketed as uncontracted 2027 power in PJM on triple-net terms with investment-grade credit support.
- Panther Creek, PA: 350 MW ESA with PPL and conditional land-development approval. Environmental (DEP) permits are running several months late. Targeted RFS is year-end 2027.
- Pipeline: Sherbrooke, QC, a 96 MW consolidation of three legacy PPAs (city and utility approved, provincial approval pending, land purchase closing in Q1 2027). Scrubgrass, PA: a 750 MW load study plus up to 550 MW of on-site CCGT, still at an early stage. About 2 GW of new PA ESA applications, with an update due Dec/Jan.
Financials (primary: Q2 10-Q and 8-K, Aug 10 2026)
- Q2 revenue $30.4M (down 50% y/y). Gross loss $86.8M. Operating loss $140.8M (including $63M of accelerated depreciation). Continuing-ops loss $64M ($0.11/sh). Adjusted EBITDA -$23.7M (H1 -$40.4M). H1 operating cash flow -$117.6M, H1 capex $53.4M.
- Balance sheet at June 30: cash $715.5M, BTC $132.4M, PP&E $287M, long-term debt $1,019M (carrying value), equity $329M. The Macquarie facility was repaid in February.
- Debt: $588M 1.375% converts due Jan 2031 (conversion price $6.86, capped call to $11.88) and $458M 1.25% converts due Jan 2032 (conversion price $7.41, cap $11.86). Both are far out of the money, so treat them as debt.
- Liquidity on Aug 7 was $819M ($698M cash plus $121M BTC). Management says this funds development to lease signing and cash SG&A (about $100M a year) through 2028. My estimate for mid-October, after SG&A and long-lead deposits, is about $740M of cash plus BTC.
- Shares: 617,573,212 (Aug 7). Insiders hold about 9.5%. CEO Gagnon bought about $325k at $3.33 in August and COO Wilson about $200k.
Today vs maturity
- Today: run-rate operating earnings are negative, about -$90M to -$100M a year (corporate SG&A with almost no revenue).
- At maturity: assume roughly 280 IT MW leased across the three sites by 2030 at about $1.8M revenue and $1.6M NOI per MW (in line with the APLD, WULF and Galaxy neocloud deals), built at about $10.5M per MW and 80% project-financed at about 7.5%. That gives NOI of about $450M. After project interest of about $175M, SG&A of about $85M and convert coupons of about $14M, levered equity FCF is about $150-170M a year. Building it out uses roughly $600M of equity, which is nearly all the cash, so any slip, cost overrun or worse lease terms means new equity or another convert.
Fair value and multiples
- At $2.31: market cap about $1.43B, EV about $1.74B, or about $3.6M per secured utility MW. Leased peers trade at much higher EV per MW, and unleased powered land at about $1-3M per MW.
- 10% equity DCF (base), 2027-2031 equity FCF of about -280, -300, -75, +150, +163 ($M) with a 3% terminal. Converts are counted between face value and the present value of the liability. Result: about $1.6 a share. Full success (about 370 IT MW) gives about $3. A no-lease or slow-lease case gives below $1, because cash is burned and the $1.05B of converts stays senior.
- Sell-side NAVs ($4-10, average about $5-6) capitalize stabilized NOI at 6-7% and add pipeline value. KBW ($3, Market Perform) says the price already reflects Moses Lake and Sharon deals and that further upside depends on Panther Creek NTP.
- Blend: fair value about $2.6 (range $1.0-5.5). That is about 12% upside, which is not the 40% discount we want, especially with the risk spread this wide.
- P/E, EV/EBITDA and FCF yield are all negative and not meaningful until 2029-2030.
Risks and competition
- Binary leasing: no signed lease after 18 months of marketing, and the 2026 three-lease goal was dropped.
- Funding chain: project debt for a small developer depends on investment-grade tenant credit, and AI data-center credit just repriced on the hot September CPI. Hyperscaler capex fatigue and lease cancellations elsewhere in the sector make this worse.
- Permitting: Panther Creek's DEP approvals are delayed. PA politics are mostly favorable (Shapiro GRID standards), but national scrutiny is rising.
- Overhead and dilution: SG&A of about $100M a year is large for a company with no revenue, and the $1.05B of converts sits ahead of the equity.
- Competition: about 2.2 GW of pipeline is small next to IREN, CIFR, WULF, Galaxy, APLD, Core Scientific and the hyperscalers' own builds. All are chasing the same 2027 power windows and are better capitalized or already leased.
- Mandate and governance flags: the company has bitcoin-mining heritage and still mines and holds BTC. Bitfarms had a 2024 board fight with Riot and fired its CEO that year (litigation followed). There is no fraud history and the board has since been refreshed.
Sentiment: 3/10
The stock is down about 60% from the June convert pricing and has had three-plus weeks of declines. 118M shares are short (about 21% of float, 3.8 days to cover) and ATM IV is about 100%. Retail has given up on the 'imminent deal' story. The sell-side is still mostly Buy, but KBW is at $3 and Cantor cut its target. Small insider buys around $3.33 have not stopped the fall. A signed lease would likely set off a sharp short-covering rally, which is the only near-term upside path. This is not a covered-call setup: IV is rich, but there are no earnings to give the stock a valuation floor.
- https://www.sec.gov/Archives/edgar/data/0001812477/000181247726000023/keel-20260630.htm
- https://www.sec.gov/Archives/edgar/data/0001812477/000181247726000021/a202689finalprkeelq22026ea.htm
- https://www.sec.gov/Archives/edgar/data/0001812477/000121390026067042/ea029411501ex99-1.htm
- https://www.sec.gov/Archives/edgar/data/1812477/000121390025101210/ea026207101ex99-1_bitfarms.htm
- /Users/gregwo/stocks2/data/analysisv3/context/KEEL.md
- /Users/gregwo/stocks2/data/transcripts/KEEL_2026Q2.json
- https://www.marketbeat.com/stocks/NASDAQ/KEEL/
- https://www.heygotrade.com/en/us-stock/keel/
- https://stockstotrade.com/news/keel-infrastructure-corp-keel-news-2026_10_16/
- https://www.timothysykes.com/news/keel-infrastructure-corp-keel-news-2026_10_16/
- https://www.stocktitan.net/news/KEEL/
- https://finance.yahoo.com/markets/stocks/articles/kbw-maintains-3-price-target-133742321.html
- https://www.insidertrades.com/alerts/nasdaq-keel-insider-buying-and-selling-2026-08-22/
- https://www.quiverquant.com/news/Why+Keel+Infrastructure+Stock+Fell+13.7%25+Today
- https://247wallst.com/investing/2026/10/08/cipher-digital-tumbles-6-as-data-center-names-sell-off-with-yields-higher-terawulf-falls-5-applied-digital-pulls-back/
- https://thecurrencyanalytics.com/bitcoin/bitcoin-miners-lose-12-as-inflation-shock-slams-21-of-23-ai-infrastructure-stocks-303666
- https://www.connectcre.ca/stories/keel-swinging-data-centre-related-deals-in-quebec/
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 110-59% | 229+19% | 193+32% | 146+3% | 142 |
| Gross profit | -138 | -18.9 | -32.4 | -21.5-304% | 10.5 |
| Operating expenses | 154+40% | 131+74% | 75.2+50% | 50.0-83% | 295 |
| ▸Adj EBITDA | -241 | -27.0-182% | 32.9+148% | 13.2 | -212 |
| ▸Adj OCF | -232 | -243 | -195 | 11.3-38% | 18.3 |
| CapEx | -145 | -120 | -340 | -71.3 | -195 |
| Adj FCF | -378 | -363 | -535 | -60.0 | -177 |
| Interest expense | 15.7 | 8.62 | 1.73 | 11.9 | 16.3 |
| ▸Adj net income | -358 | -228 | -89.0 | -82.1 | -283 |
| ▸Owner's earnings | -350 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -295 | -144 | -27.0 | 51.2100% | -7.36 | -168 |
| FCF (OCF−capex) | -1344 | -260 | -347 | -530 | -47.7 | -159 |
| Net income | -954 | -273 | -285 | -54.1-106% | -104 | -239 |
| ▸Capital returned | -1382 | -285 | -743 | -283-553% | -63.0 | -7.68 |
| Buybacks | -505 | 34.5 | -86.6 | -290 | -109 | -54.1 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 50.4 | 11.8 | 8.62 | 1.73 | 11.9 | 16.3 |
| Debt paid down | -927 | -331 | -665 | 4.67 | 34.2 | 30.1 |
| ▸Reinvestment | 809 | 99.2 | 98.0 | 346676% | 66.7 | 199 |
| Capex (PP&E) | 828 | 101 | 120 | 340 | 71.3 | 195 |
| Intangibles & M&A | -17.6 | 0.00 | -15.0 | 0.00 | -2.62 | 0.00 |
| Leases signed (net Δ) | -1.12 | -1.85 | -7.53 | 5.99 | -2.01 | 4.29 |
| Retained / other | 106 | 36.2 | 419 | -245-479% | 29.8 | -135 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 84 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 1378 | 1296 | 668 | 379 | 343 |
| ▸Liabilities (total) | 1104 | 736 | 59.6 | 84.0 | 87.7 |
| Net debt (incl. leases) | 218 | 110 | -123 | -96.0 | 29.6 |
| Net debt / Adj EBITDA | -- | -- | -3.75 | -7.25 | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -15.4 | -3.13 | 19.1 | 1.11 | -13.0 |
| Shares outstanding | 618 | 479 | 479 | 479 | 479 |
| Dilution (YoY) | +10.9% | +15.1% | +43.5% | +49.0% | +15.8% |
| Employees | 274 | 274 | 197 | 274 | 0.00 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | -124.7%-121.9 | -8.3%+8.5 | -16.8%-2.1 | -14.7%-22.1 | 7.4% |
| Adj EBITDA margin | -218.7%-221.2 | -11.8%-28.8 | 17.1%+8.0 | 9.1%+157.6 | -148.6% |
| Adj OCF margin | -210.6%-85.9 | -105.8%-4.8 | -101.1%-108.8 | 7.8%-5.1 | 12.9% |
| Adj FCF margin | -342.2%-161.6 | -158.4%+118.9 | -277.3%-236.3 | -41.0%+83.0 | -124.0% |
| Net income margin | -373.3%-325.0 | -124.1%-96.1 | -28.0%+42.8 | -70.8%+97.0 | -167.8% |
| Adj NI margin | -324.4%-272.9 | -99.5%-53.4 | -46.1%+10.0 | -56.1%+142.5 | -198.6% |
| ROIC (adj, after-tax) | -17.6% | -9.5% | -13.5% | -18.0% | -70.0% |
| Cost of debt | 1.9% | 4.0% | -- | 41.3% | 14.9% |
Revenue Breakdown
Revenue Segments
| Energy Service | $21.1M | NEW |
| UNITED STATES | $19.4M | NEW |
| CANADA | $17.6M | NEW |
Earnings Calls
Earnings Call · 2026 Q2
Keel Infrastructure’s management said the company is executing against the strategy presented 18 months ago: exit Latin American operations and Bitcoin mining, become a U.S.-focused HPC and AI infrastructure company, rebuild the balance sheet, and monetize scarce power capacity as demand rises. CEO Benjamin Gagnon said Keel has advanced permitting, leasing, expansion capacity and construction readiness across its three priority sites, and that the company is negotiating from a position of strength because its portfolio offers near-term power, attractive locations and room to scale. Moses Lake in Washington is the most advanced project and is expected to be Keel’s first fully permitted, energized and revenue-generating HPC facility in 2027. The Bitcoin operation has been removed, site development is underway, and critical long-lead equipment—including the first Vertiv modules and backup-generation equipment—has been delivered or is being manufactured. Management said customer interest includes leading AI companies, GPU clouds and enterprises seeking power quickly. Because those customers value speed and operations, Keel may use modified-gross leases rather than traditional triple-net structures, while retaining operational control and tailoring credit support. At Sharon, Keel secured full zoning in April and received land-development approval during the quarter. Remaining environmental permits are progressing, and the company is examining a simpler, consolidated design that could combine the initial 30-megawatt phase and 80-megawatt expansion into a single 110-megawatt deployment. Sharon is being marketed as rare, uncontracted 2027 power in PJM, with potential triple-net structures and investment-grade credit support. Panther Creek has 350 megawatts of secured utility capacity with PPL, conditional land-development approval and refined designs for higher-density deployments. Its final environmental approvals are taking several months longer than anticipated, but management said the delay does not alter the ESA power schedule, project economics, commercial momentum or the earliest 2027 RFS date. The company said demand across the portfolio exceeds available capacity, with hyperscalers, AI companies, GPU clouds and enterprises involved in negotiations. Keel is also pursuing expansion capacity. Pennsylvania applications cover almost 2 gigawatts, and management is increasingly confident that additional ESAs can be secured, with an investor update expected as early as December or January. In Sherbrooke, Quebec, local and utility approvals were obtained for a proposed new 96-megawatt HPC and AI data center, subject to provincial approval. The project would consolidate three legacy Bitcoin power purchase agreements. Management views Quebec as a capacity-constrained, data-sovereignty-driven market capable of supporting premium pricing, though organic expansion at gigawatt scale would be difficult. Scrubgrass remains an early-stage, greater-than-1-gigawatt pipeline opportunity focused on utility studies and potential 550-megawatt on-site CCGT generation; detailed data center permitting has not begun. Financially, Q2 revenue declined to $30 million from $61 million year over year, primarily due to lower Bitcoin prices and the Moses Lake mining shutdown. Operating loss was $141 million, including $63 million of accelerated depreciation tied to mining-rig shutdowns, while adjusted EBITDA was negative $24 million versus positive $7 million. Continuing-operations loss was $64 million, or $0.11 per share, compared with $13 million of income a year earlier. Cash SG&A averaged $23 million per quarter in the first half, with full-year cash SG&A tracking around $100 million, reflecting senior hires needed for commercialization and development. Keel sold 1,085 Bitcoin for $75 million between April 1 and August 7 and held 1,861 Bitcoin at August 7. Management intends to liquidate its Bitcoin holdings in 2026 and assumes no Bitcoin cash contribution in its liquidity forecasts, despite limited Canadian production continuing. A June convertible-note offering was upsized to $458 million, increasing liquidity to $819 million as of August 7 from $533 million in early May. Management believes liquidity funds site development through lease signing, expansion opportunities and cash SG&A through 2028. Project-level high-yield debt markets remain viable, particularly when leases have investment-grade offtake or credit support. The company said its primary risks are broader macroeconomic and capital-market conditions, including rates, financing depth and risk sentiment, while supply-chain execution continues to be actively managed.
▸How are data center tenants assessing the changing U.S. political and regulatory environment, and could it affect their deployment timelines?Gareth Gacetta · Cantor
▸How much of Keel’s roughly 480 megawatts of secured pipeline is exposed to the application process and potential regulatory changes?Gareth Gacetta · Cantor
▸Can Keel use alternative backup-power technologies or a parallel permitting process to mitigate environmental-permitting delays, particularly for diesel or natural-gas generation?Gregory Lewis · BTIG
▸What does converting Sherbrooke’s existing power arrangements into HPC and AI capacity mean for Keel’s marketing opportunity?Gregory Lewis · BTIG
▸Is Keel still targeting three lease announcements in 2026, and how has demand changed over the past 90 days, particularly with Panther Creek’s permitting timeline?Logan Hennen · Northland Capital Markets
▸What is the current status of Scrubgrass and the demand outlook for its 2028-and-later power?Logan Hennen · Northland Capital Markets
▸What is the expected Sharon RFS cadence, and is Keel still planning an initial 30 megawatts followed by an 80-megawatt expansion?Michael Donovan · Compass Point
▸Is the additional 10 megawatts at Moses Lake still an available expansion option?Michael Donovan · Compass Point
▸Have political headwinds increased the environmental-permitting standards, and how does Keel assess the probability of approval compared with prior quarters?Bill Papanastasiou · Chardan
▸What conditions are attached to Panther Creek’s conditional land-development approval?Bill Papanastasiou · Chardan
▸How developed is the sovereign AI opportunity in Quebec, and how can Keel capitalize on it?Bill Papanastasiou · Chardan
▸How significant is the August 20 DEP meeting for Panther Creek, and what decisions or milestones are expected?Stephen Glagola · KBW
▸How much does Keel’s view of the long-term AI model and competitive landscape influence its choice of prospective tenants or AI labs?Stephen Glagola · KBW
▸What are Keel’s biggest remaining risks, and what further supply-chain or other mitigation is possible?Nick Chiles · B. Riley Securities
▸What is Keel’s expected development CapEx, and what development-cost or yield-on-cost hurdle will it require for lease signings?Nick Chiles · B. Riley Securities
▸With the U.S. Bitcoin sites decommissioned, should investors assume Bitcoin revenue is effectively zero for the rest of 2026?Nick Chiles · B. Riley Securities
▸How might Panther Creek’s relative delay affect the timing of lease announcements, including whether a tenant wants all three sites and which site could sign first?Martin Toner · ATB
▸Has the RFS timing within 2027 changed for any of the three sites?Martin Toner · ATB
▸Where would Keel most like to add resources or expand its pipeline, and which geographies are currently preferred?Brian Dobson · Clear Street
▸Could the increased scrutiny from governors in New York and Texas spread to other energy regions, and would that favor established players such as Keel?Brian Dobson · Clear Street
SEC Filing Findings
SEC Filing — material findings
2026-08-10 · depth 9/10risk 6Litigation▸Putative securities class action (In re Bitfarms Securities Litigation) alleging false/misleading statements under Sections 10(b) and 20(a); class period Mar 2023–Dec 2024; loss cannot be estimated and no provision recorded.
Putative securities class action (In re Bitfarms Securities Litigation) alleging false/misleading statements under Sections 10(b) and 20(a); class period Mar 2023–Dec 2024; loss cannot be estimated and no provision recorded.
risk 6Liquidity/Covenants▸Large future credit-support requirements for Panther Creek utility agreement: $60.8M letter of credit due by Jan 31, 2027 contingent on utility upgrades, plus estimated $82.9M total credit support before construction; restricted cash of ~$53M already pledged, reducing available liquidity.
Large future credit-support requirements for Panther Creek utility agreement: $60.8M letter of credit due by Jan 31, 2027 contingent on utility upgrades, plus estimated $82.9M total credit support before construction; restricted cash of ~$53M already pledged, reducing available liquidity.
risk 6Dilution▸$458M 1.25% convertible notes due 2032 with conversion price ~$7.41 (about 25% premium to $5.93 reference); up to ~100.6M potential conversion shares excluded from diluted EPS, and conversion rate can rise to 168.6340 shares per $1,000 principal. Capped calls cover only up to a $11.86 cap and are equity-classified; cash settlement optionality is at Company discretion.
$458M 1.25% convertible notes due 2032 with conversion price ~$7.41 (about 25% premium to $5.93 reference); up to ~100.6M potential conversion shares excluded from diluted EPS, and conversion rate can rise to 168.6340 shares per $1,000 principal. Capped calls cover only up to a $11.86 cap and are equity-classified; cash settlement optionality is at Company discretion.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $1.00 | $0.99/$1.28 | 115 | $0.01/$0.02 | 2,974 |
| $2.00 | $0.32/$0.48 | 531 | $0.22/$0.27 | 385 |
| $3.00 | $0.09/$0.13 | 3,892 | $0.90/$1.07 | 618 |
| $4.00 | --/$0.03 | 3,894 | $1.75/$2.01 | 215 |
| $5.00 | --/$0.01 | 2,865 | $2.60/$3.25 | 22 |
| $6.00 | --/$0.02 | 1,488 | $3.70/$4.25 | 17 |
| $7.00 | --/$0.03 | 189 | $4.55/$5.25 | 2 |
| $8.00 | --/$0.23 | 88 | $5.55/$6.25 | 0 |
Short Interest
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $252M | $5.74 | +$252M | +$252M | — | $6.70T |
| Situational Awareness LP | $152M | $5.74 | +$152M | +$152M | — | $20.17B |
| Monarch Alternative Capital LP | $151M | $5.74 | +$151M | +$151M | — | $516M |
| JANE STREET GROUP, LLCMM | $133M | $5.74 | +$133M | +$133M | — | $156.23B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $113M | $5.74 | +$89.6M | +$113M | — | $1.87T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $79.5M | $5.74 | +$79.5M | +$79.5M | — | $4.68T |
| STATE STREET CORPPassive | $78.1M | $5.74 | +$78.1M | +$78.1M | — | $3.38T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $75.2M | $5.74 | +$75.2M | +$75.2M | — | $2.22T |
| MORGAN STANLEY | $72.8M | $5.74 | +$72.8M | +$72.8M | — | $1.88T |
| Invesco Ltd. | $66.8M | $5.74 | +$66.8M | +$66.8M | — | $1.26T |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2024 Q2 | 45M | -16M | -65M | $-0.11 | $-0.16 – $-0.06 | 1 |
| 2024 Q3 | 46M | -19M | -48M | $-0.08 | $-0.11 – $-0.06 | 1 |
| 2024 Q4 | 56M | 0M | -25M | $-0.04 | $-0.05 – $-0.03 | 1 |
| 2025 Q1 | 64M | 13M | -17M | $-0.03 | $-0.04 – $-0.02 | 1 |
| 2025 Q2 | 83M | 28M | -11M | $-0.02 | $-0.02 – $-0.01 | 2 |
| 2025 Q3 | 87M | 22M | -13M | $-0.02 | $-0.03 – $-0.01 | 2 |
| 2025 Q4 | 63M | 3M | -23M | $-0.04 | $-0.05 – $-0.03 | 1 |
| 2026 Q1 | 35M | -5M | -38M | $-0.06 | $-0.16 – $-0.02 | 3 |
| 2026 Q2 | 31M | 44M | -42M | $-0.07 | $-0.11 – $-0.04 | 3 |
| 2026 Q3 | 19M | 31M | -55M | $-0.09 | $-0.11 – $-0.03 | 4 |
| 2026 Q4 | 21M | 38M | -43M | $-0.07 | $-0.09 – $-0.05 | 4 |
| 2027 Q1 | 23M | 39M | -40M | $-0.06 | $-0.08 – $-0.03 | 4 |
| 2027 Q2 | 23M | 34M | -42M | $-0.07 | $-0.08 – $-0.05 | 1 |
| 2027 Q3 | 23M | 33M | -40M | $-0.06 | $-0.08 – $-0.04 | 1 |
| 2027 Q4 | 24M | 31M | -39M | $-0.06 | $-0.08 – $-0.04 | 1 |
| 2028 Q1 | 36M | 37M | -32M | $-0.05 | $-0.06 – $-0.03 | 2 |
| 2028 Q2 | 61M | 49M | -19M | $-0.03 | $-0.04 – $-0.02 | 2 |
| 2028 Q3 | 92M | 61M | -7M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2028 Q4 | 120M | 66M | -4M | $-0.01 | $-0.01 – $0.00 | 2 |
| 2029 Q1 | 146M | 47M | -25M | $-0.04 | $-0.05 – $-0.03 | 1 |
| 2029 Q2 | 161M | 50M | -25M | $-0.04 | $-0.05 – $-0.03 | 1 |
| 2029 Q3 | 176M | 47M | -31M | $-0.05 | $-0.06 – $-0.03 | 1 |
| 2029 Q4 | 190M | 51M | -31M | $-0.05 | $-0.06 – $-0.03 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-11-12 | BUY | Freedman Amy | director | 15,000 | $1.94 | $29K | $213K |
| 2026-11-10 | BUY | Freedman Amy | director | 25,000 | $1.88 | $47K | $178K |
| 2026-11-09 | BUY | Hofmeister Edith | director | 15,000 | $1.89 | $28K | $482K |
| 2026-08-21 | BUY | Gagnon Benjamin | director, officer: Chief Executive Officer | 38,888 | $3.33 | $129K | $4.62M |
| 2026-08-20 | BUY | WILSON LIAM DANIEL | officer: Chief Operating Officer | 30,769 | $3.25 | $100K | $328K |
| 2026-08-17 | BUY | WILSON LIAM DANIEL | officer: Chief Operating Officer | 26,472 | $3.78 | $100K | $265K |
| 2026-08-13 | BUY | Gagnon Benjamin | director, officer: Chief Executive Officer | 58,888 | $3.33 | $196K | $4.49M |
v2 analysis (legacy, 2026-08-11) — for comparison onlyclick to expand
Thesis
Keel Infrastructure (formerly Bitfarms) has completed its pivot from Bitcoin mining to a pure-play North American HPC/AI data-center developer, backed by a 2.2GW power pipeline (~480-650MW secured) across Pennsylvania (Panther Creek, Sharon), Washington (Moses Lake) and Quebec (Sherbrooke). The company is pre-revenue on the infrastructure side — legacy mining revenue is being wound down and will approach zero by year-end 2026 — while it funds development with a large war chest ($819M liquidity post the upsized $458M June convert) rather than operating cash flow. The next 18-24 months are about converting secured power and permits into signed, investment-grade leases; management targets three lease signings in 2026 and first revenue (Moses Lake) in 2027. Execution has been directionally on track (zoning/land approvals at Sharon, conditional approval at Panther Creek) but Panther Creek's environmental permitting has already slipped by several months, illustrating the real risk that large-scale industrial development in the U.S. runs behind schedule. This is now essentially an option on power-asset monetization, not an earnings story — current financials (deeply negative EBITDA, OCF, and NI, and heavy historical dilution) are irrelevant to steady-state economics and should not be extrapolated as "the business."
Trade Signal
Short: at $3.35 the stock still trades ~50% above the analyst's probability-weighted fair value ($2.22/sh) for a pre-revenue HPC developer with zero signed leases, rising dilution, and a track record of permitting slippage — but crowded short interest (18%, rising) and high volatility argue against pressing the short too hard.
Stock ripped from ~$2 in April to $6.66 high in June on the Bitcoin-to-AI/HPC pivot narrative, Russell 3000 add, and convert financing news, then corrected -50% off highs on reports of Panther Creek permitting delays and cost overruns, and dropped another -12% on the Q2 print (revenue halved, wider losses, -$64M continuing-ops loss) even though liquidity rose to $819M. The initial June euphoria was a durable repricing of a real strategic pivot, but the run-up outpaced the fact that zero HPC leases are signed; the recent pullback is the market catching up to execution risk, not an overreaction — it's a partial, still-incomplete correction of a name that got ahead of itself.
Consensus is split: Wall Street analysts are broadly bullish (Buy consensus, avg target $5.93, Citizens at $10) betting on hyperscale lease signings by year-end, while retail is 'Bullish' on Stocktwits chasing the AI-pivot story, but Reddit flags the 84x forward P/E and heavy dilution. Short interest has climbed steadily from 12% to 18% of float over the last 4 months (3.3 days to cover) — a rising, increasingly crowded bear bet against a name still loved by momentum/retail flow (45% retail order flow). The market is torn between a hyperscale-infrastructure re-rating story and a cash-burning pre-revenue shell with a convert overhang; sentiment is stale relative to the fact that no lease has actually been signed yet.
The real inflection — investment-grade HPC lease signings at Moses Lake, Sharon or Panther Creek — has not happened yet and is management-guided toward 2027 energization/revenue. Consensus analyst estimates already bake in essentially zero revenue through 2028 (avg estimates near flat, EPS ~breakeven), so the market isn't pricing an imminent step-up, but it's also not pricing the downside risk of further slippage (Panther Creek environmental approvals already late). Any real lease signing would be a positive surprise; continued delay is the more probable near-term path given the track record.
- ▲Dec 2026-Jan 2027 · Pennsylvania ESA/expansion investor update — Management guided this as a potential positive catalyst on ~2GW of PA applications
- ▲H2 2026-2027 · First lease signing at Moses Lake/Sharon/Panther Creek — The single biggest re-rating trigger; zero signed to date, market watching closely
- •Nov 2026 / Feb 2027 · Q3/Q4 earnings prints — Cash burn, SG&A run-rate (~$100M/yr) and further Bitcoin liquidation will be scrutinized
- ▼ongoing, next 12mo · Convertible note overhang / potential further dilutive financing — $458M June convert plus history of +51% cumulative dilution; more raises likely needed to fund development
- •H2 2026 · Panther Creek final environmental approvals — Already running several months late; further slippage would confirm bear case
Heavy net dilution: share count up ~51% cumulative during the transition, TTM dilution 9%, and a large convertible note overhang ($458M June raise) that will likely convert into more equity as the stock rises, capping upside. No buyback, no dividend. Cash SG&A running ~$100M/yr funded from liquidity rather than operations. Short interest rising (12%→18% of float) adds two-way flow risk (squeeze potential on good news, but growing structural bear conviction).
No hard floor — negative FCF (-222% margin), no tangible asset backstop beyond undeveloped land/power capacity valued speculatively, and net debt is growing via converts. The $819M liquidity buffer funds development through 2028 but is a melting ice cube, not support. Above the price, the convert overhang and likely future dilutive raises act as a soft ceiling on any rally, and a controlling incentive to raise more capital into strength.
Real buyers exist here — momentum funds, thematic AI-infrastructure ETFs, and retail (45% of order flow) who are excited by the pivot story and Russell 3000 inclusion; analysts are actively promoting it with high targets. But it's a 'show-me' story trading at 84x forward estimates with zero signed HPC revenue, extreme volatility (134% ann.), and crowded short interest — it's buyable as a momentum/story trade, not as a value or income holding, and non-committal on capital return (no dividend/buyback) makes it unattractive to value-oriented long-term holders.
Fear dominates: paying 13x sales and ~13x fair-value-implied multiple for a pre-revenue infrastructure developer with a track record of blowing through permitting timelines and diluting shareholders feels like chasing a story rather than owning a business, even after the recent drawdown.
Valuation
The quarter largely confirmed the previously disclosed transition trajectory: revenue decline from Bitcoin wind-down was expected, and the $819M liquidity figure mainly reflects the June convert that had already been announced. The incrementally new items are (1) explicit confirmation that Panther Creek's final environmental approvals are running several months behind prior expectations (though management maintains the 2027 RFS target is unaffected), (2) Moses Lake's RFS slipping by 'a couple months,' (3) the decision to relinquish the extra 10MW option at Moses Lake, and (4) management declining to reaffirm the specific target of three lease signings in 2026, softening prior guidance into vaguer language ('highly optimistic' without timing commitment).
▸ How the cases moved
Bear probability nudges up slightly (0.32→0.35) and bear equity value is roughly unchanged given cash burn was already expected; base case probability/value essentially unchanged (0.45, ~$1,500M) since the core 2027 delivery thesis is intact; bull case probability trimmed slightly (0.22→0.20) reflecting reduced confidence that all three sites hit 2026 lease-signing targets, given management's retreat from specific timing guidance.
Panther Creek and/or Sharon permitting delays continue to slip, no investment-grade leases are signed within the 2-year window, and capital markets sour on unproven AI infra developers amid a broader risk-off shift. Keel needs additional dilutive financing to fund SG&A and carrying costs on undeveloped land, and the market re-rates the pipeline as speculative optionality with little near-term monetization, while net debt has grown via the 2026 converts and further raises.
▸ Valuation
~480MW secured pipeline at a distressed/no-lease value of ~$1.5M/MW = $720M EV − ~$1,000M projected net debt/negative-value adjustment for continued burn and dilution = $150M equity (heavily diluted, near-worthless legacy shares)
One or two of the three priority leases (most likely Moses Lake, plus Sharon) get signed over the next 12-18 months with investment-grade or credit-supported tenants; Panther Creek continues but stays a few quarters behind. First contracted HPC revenue begins ramping in 2027-2028 but remains a small fraction of eventual capacity. The market credits Keel with a meaningfully de-risked, partially-contracted power portfolio (~500-550MW blended secured/contracted) at a moderate per-MW value reflecting real but incomplete commercialization, funded increasingly by project-level debt rather than pure corporate dilution.
▸ Valuation
~550MW blended secured/contracted capacity at $4M/MW = $2,200M EV − ~$700M net debt (project debt raised, corporate cash partially spent) = $1,500M equity
All three priority sites (Panther Creek, Sharon, Moses Lake) sign leases with hyperscaler/AI-lab tenants on favorable modified-gross or triple-net terms with strong credit support; Sherbrooke also converts to HPC; expansion ESAs in Pennsylvania materialize. Keel is re-rated as a legitimate scarce-power infrastructure platform comparable to premium data-center developers, financed increasingly with non-recourse project debt, preserving equity value. Construction proceeds on schedule for 2027 RFS dates.
▸ Valuation
~750MW secured+contracted capacity at $7M/MW = $5,250M EV − ~$500M net debt (largely project-financed) = $4,750M equity
▸ Target Rationale
I discount modestly below the probability-weighted model value because of (1) demonstrated execution slippage already visible at Panther Creek despite management's reassurances, (2) a track record of heavy shareholder dilution during the transition (share count +51% cumulative, plus a large convertible note overhang that will likely convert into more equity), and (3) genuine uncertainty in per-MW value assumptions for a company with zero signed HPC leases to date — the entire base and bull cases depend on milestones that have not yet occurred. The target reflects a fair, execution-risk-adjusted value rather than the optimistic pipeline math alone.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-07-07Company news
Keel Infrastructure (formerly Bitfarms) recently finalized its transition from a Bitcoin miner to a pure-play AI and High-Performance Computing (HPC) data center developer. Key developments include a U.S. redomiciliation and rebranding completed in April 2026. On July 6, 2026, Keel appointed Ganesh Aiyer, formerly of Digital Realty, as President to lead commercial and pipeline expansion. In June, the company closed a $458 million convertible senior notes offering to fund its 2.2-gigawatt development pipeline. This capital is earmarked for flagship projects at Panther Creek, Sharon, and Moses Lake. Concurrently, Keel secured its first landmark government-backed megaproject contract and was officially added to the Russell 3000 Index on June 29, 2026 (Sources: Stock Titan, Trefis, SEC filings).
Thesis findings
The bull case centers on Keel’s massive 2.2 GW power pipeline, of which 648 MW is already secured. By pivoting from volatile crypto revenues to long-term AI infrastructure leases, management aims to unlock institutional financing unavailable to miners. Proponents point to the company’s $533 million liquidity runway and the exit from Latin American assets as evidence of a disciplined North American strategy. Conversely, the bear case highlights significant operational execution risk. In Q1 2026, Keel reported a $145.4 million net loss on just $37 million in revenue, representing a steep burn rate. Recent reports of cost overruns and delays on its primary transportation project further fuel concerns that the company lacks a proven track record in large-scale data center construction (Sources: Simply Wall St, Zacks, Reddit).
Market opinion (price-aware)
The market currently views KEEL as a high-risk "show-me" story, with sentiment shifting from euphoria to caution. After peaking near $7.37 in June, the stock recently corrected to the $4.50–$5.00 range following reports of project delays. Despite this 35% drawdown, Wall Street remains largely constructive; Citizens initiated coverage with a $10.00 price target, while Alliance Global and H.C. Wainwright set targets at $8.00 and $5.50, respectively. Retail sentiment on Stocktwits remains "Bullish" on the AI pivot, but Reddit discussions express frustration over the 84x forward P/E ratio and dilutive convertible notes. With a $3.04B market cap, the consensus view is that the name is "ignored" by value investors but "loved" by momentum traders betting on hyperscale lease signatures by year-end (Sources: Benzinga, GuruFocus, TradingView).