Stocks/KEEL.TO

KEEL.TO

Bitfarms Ltd.v3 4.0/10 · 2026-11-26
Financial Services·Financial - Capital Markets
2.05 CAD
$1.2B market cap
v3 Rating
4.0/103.0–5.5
Setup
4.0/102.5–5.5
Fair Value
1.70 CAD0.60 CAD–3.80 CAD-17%
DCF (10%)
1.20 CAD-41%
Base IRR
-5%-30%–+25%
Visibility
wide±94%
Wall Street
(5 buy)
Rating
Revenue (TTM)
$110.3M
Owner Earnings
-C$150M
Next-Yr Owner Earnings
-C$1.1B
Growth
+50.0% × 4y
P / Next-Yr OE
--
Net Debt
C$370M

Bitfarms Ltd. is a North American enterprise primarily involved in the extraction of various cryptocurrencies. The firm operates its own server facilities, primarily dedicated to validating transactions within the Bitcoin Blockchain and generating revenue through block rewards and transaction fees. Beyond its core mining operations, Bitfarms also extends electrician services to both commercial and residential clients in Quebec, Canada. Furthermore, it offers hosting solutions for cryptocurrency mining equipment owned by other entities. Established in 2017, the company's main office is situated in Toronto, Canada.

2-Year Price History

$1.97-36.5%
$2.0$4.0$6.0$8.0Initial target $1.70 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
4.03.0–5.5
Setup
4.02.5–5.5
Fair value (CAD)
1.700.60 – 3.80
Upside vs 2.05
-17%
DCF (10%)
1.200.40 – 3.50-41%
Base IRR
-5%-30% – 25%
Visibility
very widerange ±94%
Sentiment
2/10
Flow
5/10
2026-11-26 · claude-opus-5-5 · priced at 1.97

Keel (ex-Bitfarms) is a pre-revenue AI data-center developer: it has exited bitcoin mining, holds ~US$780M of cash against ~US$1.05B of out-of-the-money converts, and owns 478 MW of secured 2027-28 grid power (Moses Lake 18 MW under construction, Sharon 110 MW, Panther Creek 350 MW) plus a ~2 GW expansion pipeline, but has signed no lease. The stock (C$1.97 close 2026-11-25, the low of its 1-year range, down ~75% from June) fell after the rate spike, the AI-sector sell-off, Pennsylvania's August executive order that pushed permits back by months, and management dropping its 3-leases-by-year-end goal. The bull case is that scarce near-term PJM power is worth US$2-4M+/MW once leased and the equity trades at an EV of ~US$2.4M per gross secured MW; the problem is that leases are unsigned, the build (~US$10-12M/MW) must be financed with project debt and probably equity at today's expensive rates, cash burns ~US$100M/yr of SG&A, and US$1.05B of converts sit ahead of shareholders. A probability-weighted unlevered DCF at 10% (about 250 IT MW built by 2029, ~13x exit on NOI) gives about C$1.2/share, below the price; fair value with the option value of the power is about C$1.7. Rating 4.0: no clear mispricing, the market is pricing real lease and financing risk; pass until a lease with investment-grade credit and its financing are announced. Setup 4.0: the first lease (Moses Lake, any time, no date given) is a catalyst, but there is no variant perception beyond 'the sector is hated'.

Flow: No buyback; management says no external debt or equity is needed before a lease, but it flagged a possible ATM or credit line in May and project equity will likely need new shares once leases are signed (2027). The US$1.05B of converts (conversion ~US$6-7.41) are far out of the money, so there is no conversion selling; there are capped-call and convert-arbitrage hedges.

A deep dive would have to establish: Will Keel sign investment-grade leases at Sharon and Panther Creek in 2027 at yields on cost that still clear today's project-financing rates without heavy equity dilution?

Owner earnings, TTM
-C$150M-C$200M – -C$110M
Realistic peak profit
C$650MC$200M – C$1.3B
Growth rate
50.0%0.0% – 150.0%
Years of growth
42 – 6
Market cap
C$1.2BC$1.1B – C$1.3B
EV
C$1.6BC$1.4B – C$1.8B
Net debt
C$370MC$300M – C$450M
Capital return / cap
0.0%0.0% – 0.0%
P/E
-10.0×-15.0× – -6.0×
EV/EBITDA
-10.0×-14.0× – -7.0×
FCF yield
-10.0%-15.0% – -7.0%
Projected FCF, base case (CAD millions)
Y1-C$1.1B-C$1.8B – -C$150M
Y2-C$1.8B-C$2.8B – -C$150M
Y3-C$850M-C$1.5B – -C$150M
Y4C$300M-C$150M – C$700M
Y5C$470M-C$150M – C$1.0B
Competition: It competes with converted-miner developers (IREN, Cipher, TeraWulf, Hut 8, Core Scientific, Galaxy) and large developers for the same hyperscaler and neocloud tenants, and many of them have already signed leases.
Governance: None obvious, but there is a history of missed timelines (the 3-lease goal) and management now declines to give lease timing guidance.
Research (expand)

What it does

Keel Infrastructure (formerly Bitfarms, redomiciled to the US on 2026-04-01, Nasdaq/TSX: KEEL) is turning former bitcoin-mining power positions into leased HPC/AI data centers. It plans powered shell / colocation only, no GPUs. Secured power: Moses Lake WA 18 MW (permitted, under construction, funded from the balance sheet, first energization 2027); Sharon PA 110 MW (FirstEnergy ESA, last DEP permit in draft); Panther Creek PA 350 MW (PPL ESA, 3 DEP permits pending, could grow to 500 MW+); Scrubgrass PA (up to 1.3 GW in load study, update in Q1 2027); Sherbrooke, Quebec, 96 MW awaiting ministerial approval; and Allentown (75 MW shell) in diligence. What is left of the mining is a few BTC/day in Quebec.

The investment case

What the market believes: a developer with no leases and no revenue, hit by rising rates (project debt costs more), a sector crash and data-center politics. Management missed its own 3-leases-by-2026 goal and now refuses to give timing. Their argument: power for 2027-28 is the bottleneck, hyperscaler demand exceeds supply, every delayed project elsewhere makes their megawatts scarcer, no permit has been denied, and no tenant has walked away. I can't find a variant view: the market sees the same facts and discounts lease timing, financing costs and dilution. The stock is cheap per MW only if leases come at good yields soon.

What it earns today

Nothing real. Q3 2026 revenue US$28M (legacy mining), adjusted EBITDA -US$27M, cash SG&A ~US$24M/quarter. Unlevered owner earnings ≈ -C$150M/yr. Pre-lease capital commitments are US$380M through 2028 (about half for Moses Lake). Liquidity is US$780M plus US$53M restricted. Converts: US$588M 2031 and US$458M 1.25% 2032 (conversion ~US$7.41, far out of the money), so treat them as debt. Net debt ≈ C$370M; market cap ≈ C$1.22B (~620M shares); EV ≈ C$1.6B.

Five-year FCF (CAD M, base, unlevered)

2027 -1,100; 2028 -1,800; 2029 -850; 2030 +300; 2031 +470: about 250 IT MW leased and built at ~US$11M/MW, with NOI ~US$1.4-1.5M/IT MW. Year 5 is a stabilised, leased infrastructure landlord with 10-15 year leases, worth ~13x NOI (C$6.2B EV) before project debt. Discounted at 10% that gives ~C$1.1B EV, less net debt, ≈ C$1.2/share. Bull case (all 478 MW leased to investment-grade tenants in 2027, Panther expansion): C$3.5+. Bear case (no leases, cash burned, power sold as powered land at ~US$1M/MW): C$0.4-0.8. I am not confident which year-5 company this will be; the ranges are very wide.

Fair value and multiples

Fair value ≈ C$1.7 (DCF plus the option value of scarce PJM power and the Scrubgrass pipeline, less the dilution needed to fund project equity). There is no P/E or EV/EBITDA; EV is ~US$2.4M per gross secured MW, against US$4-6M that management quotes for leased peers.

Management, risks, competition

CEO Ben Gagnon and CFO Jonathan Mir communicate clearly, with stage-gated capex and no speculative builds; they named the leasing miss plainly. Risks: no lease, or leases priced below cost of capital; PA DEP backlog and politics (state Senate flipped); Moses Lake leases at small size to a weaker neocloud; equity issued for project equity; the convert overhang. Competition: IREN, Cipher, TeraWulf, Hut 8, Core Scientific, Galaxy and the big developers, all chasing the same tenants, many already leased.

Sentiment: 2/10

Hated: down ~75% from June, at its 1-year low, sector down 50%+, and the lease goal missed. Sell-side targets (US$4.5-10) are stale.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue110-59%229+19%193+32%146+3%142
Gross profit-138-18.9-32.4-21.5-304%10.5
Operating expenses78.7-28%78.3+4%75.2+50%50.0-83%295
▸Adj EBITDA-69.425.4-24%33.4+152%13.2-212
▸Adj OCF-218-243-19811.4+53%7.50
CapEx-145-120-340-71.3-195
Adj FCF-363-363-538-59.9-187
Interest expense19.911.81.7411.916.3
▸Adj net income-213-105-89.3-82.1-283

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-278-103-74.074.4100%-7.36-168
FCF (OCF−capex)-1354-259-347-530-713%-47.7-170
Net income-880-273-211-54.1-73%-104-239
▸Capital returned-1418-324-740-283-381%-63.0-7.68
Buybacks-547-7.28-86.6-290-109-54.1
Dividends0.000.000.000.000.000.00
Interest paid54.412.711.81.7411.916.3
Debt paid down-926-330-6654.6734.230.1
▸Reinvestment80436.498.0346465%69.3255
Capex (PP&E)82710112034071.3195
Intangibles & M&A-21.8-62.5-15.00.000.0055.7
Leases signed (net Δ)-1.12-1.85-7.535.99-2.014.29
Retained / other140140419-245-330%27.2-201

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 70 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Financial company: debt/deposit flows are business growth, not flattery — weight the Buybacks + Dividends lines instead.

Balance SheetTTM2025202420232022
▸Assets (total)13781296668379343
▸Liabilities (total)110473659.684.087.7
Net debt (incl. leases)218110-123-96.029.6
Net debt / Adj EBITDA--4.35-3.69-7.25--
Net debt / Adj FCF----------
Adj EBITDA / interest-3.492.1619.21.11-13.0
Shares outstanding618557408301211
Dilution (YoY)+10.9%+36.4%+35.6%+42.9%+8.8%
Employees170--------
MarginsTTM2025202420232022
Gross margin-124.7%-121.9-8.3%+8.5-16.8%-2.1-14.7%-22.17.4%
Adj EBITDA margin-62.9%-65.711.1%-6.217.3%+8.39.1%+157.6-148.6%
Adj OCF margin-197.9%-73.2-105.8%-3.0-102.9%-110.77.8%+2.65.3%
Adj FCF margin-329.4%-148.8-158.4%+120.7-279.1%-238.2-40.9%+90.7-131.6%
Net income margin-306.3%-258.0-91.9%-63.8-28.0%+42.8-70.8%+97.0-167.8%
Adj NI margin-193.1%-141.6-45.8%+0.5-46.3%+9.8-56.1%+142.5-198.6%
ROIC (adj, after-tax)-13.1%-6.2%-13.5%-18.0%-70.0%
Cost of debt2.4%5.5%--41.3%14.9%

Earnings Calls

11 calls

Earnings Call · 2026 Q3

2026-11-05

Keel Infrastructure reported Q3 2026 results amid a difficult macro backdrop of surging rates, selective debt markets, weak equity valuations in the sector, and political scrutiny of data centers. CEO Ben Gagnon said the company held its course: Moses Lake received all approvals and broke ground, Pennsylvania sites are down to final state environmental permits with no application denied, and the expansion load study update at Panther Creek and Scrubgrass slipped to Q1 2027. The key miss is leasing. The May goal of three leases by year-end will not be met, because Pennsylvania's executive order making grid standards mandatory for data centers (backup power moved toward battery-based solutions, data centers removed from DEP fast-track permitting) pushed permitting and commercial timelines back by months. No prospective customer has walked away, and management will no longer give lease timing guidance, stressing it will not sign a wrong 15-year lease just to hit a date and that leases will be priced at prevailing costs, including financing, on a yield-on-cost basis. Management argued demand is strong and supply of 2027-28 power is shrinking. The four largest hyperscalers are on track for over $800 billion of CapEx, with a roughly $1.8 trillion backlog at three of them, and all say capacity is short. Keel's ESA power schedules are unchanged, with Sharon and Panther Creek substations expected to be energized in 2027. Gagnon highlighted the "Keel standard" for communities: a community benefit agreement (first in negotiation with Nesquehoning), a formal resident concern process, and baseline community assessments, backed by 20+ town halls and local school and food pantry support. Site updates: Moses Lake (under 4% of near-term megawatts) is fully balance-sheet funded, lease-ready and likely suited to a fast-growing AI/cloud tenant with private credit financing. Sharon (110 MW) has one remaining permit in draft. Panther Creek (350 MW, potential 500+) has one permit in draft and two in technical review, with focus on investment-grade tenants or wraps. Expansion options include Scrubgrass (up to 1.3 GW), Quebec (96 MW awaiting ministerial approval), and a potential Allentown acquisition of a power shell with 75 MW of 2027 PPL power. Total expansion pipeline is about 2 GW excluding Allentown. Financially, Q3 revenue was $28 million versus $68 million a year ago after exiting U.S. Bitcoin mining. Operating loss was $8 million, and loss from continuing operations was $62 million ($0.10 per share), driven by a $55 million noncash capped call loss. Adjusted EBITDA was negative $27 million. Cash SG&A averaged $24 million per quarter. Keel sold 2,520 Bitcoin for $192 million and holds nominal Bitcoin. Liquidity was about $780 million of unrestricted cash as of November 4, plus $53 million restricted. Pre-lease capital commitments total $380 million through 2028, and management sees no need for external financing before a lease, using a three stage-gate funding framework and recycling Moses Lake financing proceeds into Sharon and Panther Creek equity.

Analyst Q&A (18)
▸
How have lease structures and terms with tenants evolved over the last 90 to 180 days?
Mike Grondahl · Northland
Terms vary by site, but tension is building at all three as projects advance and market supply shrinks. Tenant sensitivities focus on permits, community and financing; Keel is selective with financeable counterparties, and terms are getting more competitive.
▸
Can you rank the three sites by demand?
Mike Grondahl · Northland
It depends on scale. The largest buyers focus on Panther Creek and Sharon; neoclouds and emerging companies/labs prioritize Moses Lake or Sharon depending on scale and time to power. Moses Lake likely goes to an emerging company, while only a few buyers can take Panther Creek's scale.
▸
What does pre-lease CapEx to get sites through Stage 2 look like over the next 12 months?
Gregory Lewis · BTIG
Commitments total about $380 million through 2028; about half is finishing Moses Lake and most of the rest is substation and fiber work at Sharon and Panther Creek. Stage 1 costs are very modest, and Stages 1 and 2 are small versus total construction cost, with careful allocation at longer-term projects like Scrubgrass.
▸
After the detailed load study, what is the process for final approval of the extra capacity at Panther Creek?
Gregory Lewis · BTIG
The load study confirms engineering, financial requirements and delivery timing, followed by roughly a three-month ESA negotiation covering the power delivery schedule, deposits, letters of credit and infrastructure funding.
▸
What is the expected timing of remaining permits at Sharon and Panther Creek, and are they closing conditions for tenant contracts?
Michael Colonnese · H.C. Wainwright
Sharon's last permit is in draft, meaning extensive review and likely approval pending a window. Panther Creek has one in draft and two in technical review with no red flags, but timing is hard to guide given the DEP backlog. Keel was far advanced before the executive order, so impact is minimal.
▸
Where does hash rate stand and what is the outlook for winding down mining?
Michael Colonnese · H.C. Wainwright
About 5-6 exahash, all in Quebec, producing a couple of Bitcoin a day with marginally positive free cash flow and excluded from liquidity planning. It will keep running without further investment until conversion of the Quebec sites is confirmed.
▸
How will Baie-Comeau, now at 30 MW contracted, be developed for HPC, what approvals are needed, and how does the timeline compare with Sherbrooke?
Michael Donovan · Compass Point
Keel is following the Sherbrooke playbook, which is first, with local approvals done and ministerial sign-off pending. Baie-Comeau would replicate it later, and Keel gained rights to an additional 8 MW at no cost; it may be a slightly more compelling site.
▸
Would you consider a powered land lease or focus on delivering the full facility?
Michael Donovan · Compass Point
Yes, open to powered land, powered shell, colo or cloud models, each suiting different customers; Keel has chosen not to pursue full compute.
▸
What has held back a Moses Lake lease given permitting was done in September, and should it come before year-end or in Q1 2027?
Brian Kinstlinger · Alliance Global Partners
Management will not guide on lease timing. Balance-sheet funding lets construction continue, de-risking the site and keeping competitive tension high, and management is highly confident of a very good deal.
▸
Is Moses Lake fully lease-ready?
Brian Kinstlinger · Alliance Global Partners
Yes, no further permits or engineering are needed for a lease, and multiple counterparties are in extensive technical diligence and negotiations.
▸
How is the team navigating long lead time equipment supply chains?
Bill Papanastasiou · Chardan Capital Markets
All long lead power connection equipment is secured at all three sites, and Moses Lake equipment is contracted with much already received. For Sharon and Panther Creek data center equipment, Keel commits to manufacturing slots rather than purchases to limit capital and preserve flexibility, keeping leasing as the critical path.
▸
Are you seeing more demand in Canada given Anthropic's entry and other deployments, and how will frontier lab exposure develop?
Bill Papanastasiou · Chardan Capital Markets
Canada is a very different, much smaller market with fewer frontier labs. Data sovereignty legislation and tight supply create premium compute pricing, and the opportunity may be greater with major Canadian corporations and government than with frontier labs.
▸
Would you enter exclusivity with a tenant, or prefer signing a lease, possibly with expansion options or ROFR at Panther Creek?
Nick Giles · B. Riley Securities
Keel prefers no exclusivity or limited exclusivity to maintain competitive tension, as seen at Moses Lake, though that may not always be possible with the biggest players.
▸
How do electricity costs at your sites factor into tenant discussions?
Nick Giles · B. Riley Securities
Rarely discussed; power costs are small relative to GPU margins and tenants focus on time to power and deployment risk. Cost sensitivity would emerge only when supply overtakes demand, and current cost focus is on financing.
▸
How are customers reacting to rising build and financing costs, and will they be passed through or will yields improve?
Brian Dobson · Clear Street
Costs per megawatt vary widely, from about $5 million to $20 million. Projects are judged on yield on cost, and cost changes are reflected in lease economics, a natural hedge. The key risk is signing a lease before costs are contracted, which Keel avoids by timing the lease and procurement together.
▸
Do your comments preclude signing a lease before year-end?
Martin Toner · ATB Cormark
No guidance either way; tension is as high as ever, progress is daily, and updates will come when appropriate.
▸
Will the flipped Pennsylvania state Senate lead to data center legislation and affect timelines?
Martin Toner · ATB Cormark
Management avoids commenting on politics but noted Governor Shapiro won and supports data centers with strict guardrails. Data centers will stay political, but Keel's standard aligns with the grid standards and it has received positive feedback from officials.
▸
Can politicians act to prevent the remaining Panther Creek or Sharon permits?
Martin Toner · ATB Cormark
Management doesn't see how, as the permits are technical rather than political; it still has high confidence in closing them out and expects no further action in coming weeks.

Analyst Coverage

Analyst Coverage
Analyst Ratings
5
Buy: 5Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2024 Q245M-16M-65M$-0.11$-0.15 – $-0.071
2024 Q346M-19M-49M$-0.08$-0.13 – $-0.051
2024 Q456M0M-25M$-0.04$-0.06 – $-0.011
2025 Q165M13M-18M$-0.03$-0.04 – $-0.011
2025 Q283M28M-11M$-0.02$-0.02 – $0.002
2025 Q387M22M-13M$-0.02$-0.03 – $-0.012
2025 Q463M6M-23M$-0.04$-0.05 – $-0.011
2026 Q135M-5M-38M$-0.06$-0.11 – $-0.033
2026 Q231M45M-42M$-0.07$-0.10 – $-0.021
2026 Q319M-37M-54M$-0.09$-0.12 – $-0.031
2026 Q421M-26M-43M$-0.07$-0.10 – $-0.021
2027 Q123M-22M-40M$-0.06$-0.09 – $-0.021
2027 Q223M-24M-42M$-0.07$-0.09 – $-0.021
2027 Q323M-22M-40M$-0.06$-0.09 – $-0.021
2027 Q424M-21M-39M$-0.06$-0.09 – $-0.021
2028 Q136M-13M-32M$-0.05$-0.07 – $-0.011
2028 Q261M2M-19M$-0.03$-0.04 – $-0.011
2028 Q392M16M-7M$-0.01$-0.02 – $0.001
2028 Q4120M24M-4M$-0.01$-0.01 – $0.001
2029 Q1146M7M-25M$-0.04$-0.06 – $-0.011
2029 Q2161M12M-25M$-0.04$-0.06 – $-0.011
2029 Q3176M12M-31M$-0.05$-0.07 – $-0.011
2029 Q4190M17M-31M$-0.05$-0.07 – $-0.011