Stocks/MARA

MARA

Marathon Digital Holdings, Inc.v3 4.5/10 · 2026-11-08
Financial Services·Financial - Capital Markets
$5.59
$2.2B market cap
v3 Rating
4.5/103.5–5.5
Setup
6.0/104.0–8.0
Fair Value
$6.00$1.75–$15.00+7%
DCF (10%)
$4.75-15%
Base IRR
+6%-40%–+45%
Visibility
wide±110%
Wall Street
$12.60 target(5 analysts last quarter)(9 buy, 11 hold, 2 sell)
Rating
Revenue (TTM)
$716.0M
Owner Earnings
-$120M
Next-Yr Owner Earnings
-$300M
Growth
+15.0% × 7y
P / Next-Yr OE
--
Net Debt
$970M

Marathon Digital Holdings, Inc. is a technology firm specializing in digital assets. Its core business involves mining cryptocurrencies, with a strategic focus on developing the blockchain ecosystem and generating new digital assets primarily within the United States. By the close of 2021, the company held roughly 8,115 bitcoins, 4,794 of which were managed within an investment fund. Founded in 2010, the company, headquartered in Las Vegas, Nevada, adopted its current name in February 2021, having previously been known as Marathon Patent Group, Inc.

2-Year Price History

$6.35-69.9%
$10$15$20$25Initial target $6.00 · 2026-10-16volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-08

Rating
4.53.5–5.5
Setup
6.04.0–8.0
Fair value (USD)
6.001.75 – 15.00
Upside vs 5.59
+7%
DCF (10%)
4.751.00 – 13.00-15%
Base IRR
6%-40% – 45%
Visibility
very widerange ±110%
Sentiment
3/10
2026-11-08 · · priced at 6.35

MARA is the biggest listed bitcoin miner (70 EH/s, ~34k BTC on the balance sheet) trying to re-label itself an AI-power landlord: 4.8 GW of 'power portfolio' pro forma, a 50/50 development JV with Starwood, the just-FERC-approved $1.5bn Long Ridge 505 MW PJM gas plant (+$144m EBITDA, 70% contracted), rights to 2 GW at Matagorda TX contingent on ERCOT Batch Zero, and Exaion/Vertebra/HUM as small change. The stock is in genuine capitulation — $6.35, 2% of the way up its 3-year range, down 55% while bitcoin ROSE ~30% from the June low — with ~112m shares short (~29% of the count) and puts at 113% IV. The problem is what the cash actually does: Q2 adjusted EBITDA stripped of bitcoin marks was roughly nil, purchased energy ran $38.7k/BTC against an all-in cost near $60k, underlying G&A is ~$176m a year before SBC, and holding 70 EH/s against rising difficulty is a $200-250m/yr fleet-replacement treadmill that is maintenance capex, not growth — Thiel said out loud that Matagorda exists so they 'do not lose that hash rate' when hosting rolls off. So unlevered owner earnings today are negative (I model about -$120m), against ~$4.0bn of debt post-close, 54% of the bitcoin pledged to Coinbase/Two Prime at 7.56% with liquidation rights, $48m of notes due Dec 2026, $291.6m puttable June 2027, a $785m Barclays bridge to term out, up to $600m of Matagorda milestones and a $138.8m unaccrued Ho judgment. My base DCF is ~$4.75/share and a conservative sum-of-parts (bitcoin + cash + Long Ridge at cost + ~1 GW of owned sites at $1-1.5m/MW, less debt and three years of burn) is ~$5-6, so at $6.35 you are paying full price for the assets and getting the lease option thrown in. That option is real and dated — Thiel promised at least two AI/HPC leases by year-end and Riot just signed 910 MW triple-net at ~$2m/MW/yr (~$28bn), which is why I will not short a hated laggard with 29% short interest into a December Batch Zero decision and an Investor Day. But a cash-burning, bitcoin-collateralised, serially diluted (100m shares in 2022 to 385m now, $1.5bn of ATM still authorised) miner run by the former Marathon Patent Group is exactly the kind of name we are told to avoid. Rating 4.5 (fairly priced at best, pass the long, do not short here); research rating 6.0 — if the deep dive could establish that even 300-500 MW of MARA's land is genuinely hyperscaler-leasable on Riot terms, the equity is worth multiples of this, and that question gets answered within weeks.

A deep dive would have to establish: Is any meaningful slice of MARA's 4.8 GW — specifically Hannibal/Long Ridge and Matagorda — actually leasable to a hyperscaler or frontier lab on Riot-Corsicana terms (fiber, water, interconnection date, tenant credit), and what does the bitcoin fleet really cost in maintenance capex to keep 70 EH/s alive?

Owner earnings, TTM
-$120M-$450M – $60M
Realistic peak profit
$500M$100M – $1.2B
Growth rate
15.0%-10.0% – 40.0%
Years of growth
72 – 15
Market cap
$2.4B$2.3B – $2.6B
EV
$3.4B$2.9B – $4.1B
Net debt
$970M$500M – $1.6B
Capital return / cap
0.0%0.0% – 0.0%
P/E
-20.0×-40.0× – -11.0×
EV/EBITDA
23.0×12.0× – 60.0×
FCF yield
-5.0%-18.0% – 2.0%
Projected FCF, base case (USD millions)
Y1-$300M-$700M – $0M
Y2-$150M-$600M – $150M
Y3$50M-$400M – $400M
Y4$200M-$300M – $800M
Y5$300M-$250M – $1.2B
Competition: Competes for the same hyperscaler and frontier-AI leases as Riot, TeraWulf, Cipher, IREN, Galaxy, Hut 8, Crusoe and incumbent colo developers — nearly all of which have already signed leases while MARA, with the largest claimed power portfolio, has signed none.
Governance: Yes: former patent-licensing shell (Marathon Patent Group) turned bitcoin miner, share count ~100m to ~385m in four years with $1.5bn of ATM still authorised, three strategy relabels in five quarters, 54% of the bitcoin treasury pledged to lenders with liquidation rights, and a $138.8m Ho judgment on appeal that is not accrued.
Research (expand)

What the company does

MARA Holdings (formerly Marathon Digital, before that Marathon Patent Group) is the largest listed bitcoin miner by hashrate: 70.3 EH/s energized in Q2 2026 across 19 data centres on four continents, ~70% owned/operated and ~30% third-party hosted (hosting contracts expire from Q3 2027 through Q1 2028). It mined 2,422 BTC in Q2 2026 (26.6/day, 5.9% of network rewards) and held 35,577 BTC at 30 June, ~35-36k through Q3, with roughly 2,600 BTC moved to exchanges/Galaxy in October — call it ~34k BTC today (~$2.6bn at $76k).

Since late 2025 management has been repositioning the company as a power/digital-infrastructure owner ("electrons are the new oil", "profit per megawatt hour"):

  • Long Ridge (Hannibal, OH): $1.5bn EV for a 505 MW combined-cycle gas plant plus 1,600+ contiguous powered acres adjacent to MARA's existing campus. FERC cleared it 4 November 2026; closing "in coming weeks". Contributes ~$144m annualized EBITDA with ~70% of output contracted. Funded non-dilutively: ~$900m of assumed Long Ridge notes plus $600m of new bitcoin-backed borrowings (Coinbase + Two Prime, 7.56% blended), with a $785m Barclays bridge in support.
  • Starwood Digital Ventures JV: MARA contributes powered land, Starwood does EPC and tenant sourcing; MARA retains up to 50%. ~1 GW near-term IT capacity targeted, pathway to 2.5 GW+. MARA funds approved pre-development costs ($136.3m approved so far) and must sell the land rights to Starwood if it declines to proceed after a qualified lease.
  • Matagorda County, TX: rights to 1,200+ acres / up to 2 GW, max $600m price paid in milestones, the first $150m conditional on ERCOT Batch Zero approval. Multiple transmission lines already reach the site; no utility upgrades required, per Thiel.
  • Exaion (64% of the EDF subsidiary), Vertebra AI (power/load management) and HUM (hashrate-under-management): revenue in the low eight figures each at best. Immaterial today.

The investment case, such as it is

The bull case is simple arithmetic on comps. Riot just signed a 15-year, 910 critical-MW triple-net powered land lease with a frontier AI lab at Corsicana: ~$28bn total value, ~$1.8bn average annual rent (~$2.0m per IT MW per year) at ~99% NOI margin, on land Riot already owned. Riot has now contracted 1,151 MW and ~$38bn of data-centre revenue and the stock re-rated accordingly. MARA says it has 4.8 GW pro forma and "at least two" leases coming by year-end. If even 300-500 MW of MARA's land gets leased on remotely similar terms, the annuity is worth several times the entire $2.4bn market cap. The market plainly does not believe it: since 30 June bitcoin has risen from $58.5k to ~$76k while MARA has fallen from $13.89 to $6.35, and Riot/Hut 8/IREN have ripped. MARA is being treated as the one miner whose land nobody wants.

The bear case is the cash flow. Strip the bitcoin marks out of Q2 2026 and adjusted EBITDA of -$360.9m was essentially -$361m of mark-to-market and roughly nothing of operations. Purchased energy at owned sites was $38,700 per BTC (4c/kWh) and all-in cost to mine was close to $60k against a ~$72k average realized price; difficulty keeps rising. Underlying G&A ex-SBC is ~$44m a quarter (~$176m a year) after the 15% RIF, and SBC is a real cost on top. Then the treadmill: 70 EH/s of modern ASICs is roughly $0.9-1.0bn of hardware on a four-year life, so ~$230m a year of pure fleet replacement is *maintenance* capex, and MARA has to add hashrate just to hold its 5.9% share. Management's own words give the game away — Matagorda's purpose is partly "to not lose that hash rate when the hosting contracts come off". That is maintenance spend dressed as a growth story.

What it earns today (real unlevered owner earnings)

Pro forma for Long Ridge, at ~$76k bitcoin and current difficulty:

| | $m / yr |

|---|---|

| Mining revenue (~9,700 BTC + other) | ~700 |

| Energy / hosting cost | ~(420) |

| Long Ridge EBITDA | +144 |

| Underlying G&A ex-SBC | (176) |

| Stock-based compensation (a real cost) | (110) |

| Cash taxes (NOL shelter) | ~0 |

| EBITDA-equivalent | ~140 |

| Maintenance capex: fleet replacement + Long Ridge sustaining | (250) |

| Unlevered owner earnings | ~(110) to (130) |

So the honest answer is that MARA's unlevered owner earnings are negative at today's bitcoin price, and that is *before* ~$140m+ of cash interest (bitcoin-backed debt at 7.56%, Long Ridge notes, bridge), the $136m of JV pre-development funding, and the $600m of Matagorda milestones. The converts are mostly zero-coupon, which flatters cash interest but not the 2027 puts. The bitcoin treasury is the funding source: they sold 23,093 BTC for ~$1.63bn in H1 2026 to retire ~$1.0bn of converts and fund the pivot. That is a melting asset base paying for an option, which is exactly how these companies end up back at the ATM.

Projected free cash flow (after SBC and reinvestment, before interest)

Base case: bitcoin drifts $76k → $100k over five years, difficulty keeps pace so mining margins stay thin, hosting rolls off and own-site economics improve, Long Ridge closes and grows with PJM capacity pricing, one modest lease (not a Riot-scale one) is signed in 2027 and first JV revenue lands 2029.

| Year | FCF ($m) | note |

|---|---|---|

| 2027 | (300) | fleet capex, Matagorda milestones, JV pre-dev, no lease revenue |

| 2028 | (150) | hosting rolls off, Long Ridge full year, still pre-revenue on JV |

| 2029 | +50 | first ~150 MW of JV capacity contributes |

| 2030 | +200 | ~350 MW JV share |

| 2031 | +300 | ~500 MW JV share, mining a residual |

What it is in five years: in the base case, a mid-size independent power/data-centre owner — Long Ridge plus a half-gigawatt of JV campuses plus a shrunken, optimised mining fleet used as an interruptible load bank — generating ~$300m of before-interest FCF with contracted 15-year leases underneath it. That deserves a 13-15x multiple, so ~$4.0-4.5bn of enterprise value. Discounting the five years plus the terminal at 10% and deducting ~$1.0bn of net debt (debt ~$4.0bn pro forma, less ~$0.4bn cash and ~$2.6bn of bitcoin treated as quasi-cash because they are actively selling it) gives roughly $4.75 a share. Confidence: low. The spread of outcomes here is the widest I have modelled — a single Riot-style lease on Matagorda or Hannibal is worth $8-15 a share on its own, while bitcoin at $50k with 54% of the treasury pledged under liquidation-right facilities is a solvency event.

Fair value and the multiples we are paying

Market cap ~$2.44bn (385m shares at $6.35). Pro forma debt ~$4.0bn; cash ~$0.4bn; bitcoin ~$2.6bn; so net debt ~$1.0bn and EV ~$3.4bn. Against pro forma operating EBITDA of maybe $140-200m that is ~20-25x EV/EBITDA, and against negative owner earnings the P/OE and FCF yield are meaningless (FCF yield ~-5%). Conversion of EBITDA to owners is *worse than nil* once the ASIC treadmill is counted — this is the opposite of a cheap multiple hiding good cash.

Sum of the parts as a cross-check: bitcoin $2.6bn + cash $0.4bn + Long Ridge at cost $1.5bn (arguably $1.5-2.0bn given PJM power scarcity) + ~1 GW of owned US sites and the ASIC fleet at $1.3-1.6bn + Matagorda option net of milestones ~$0.2bn + Exaion/tech $0.15bn = ~$6.2-6.9bn, less $4.0bn of debt, less the $0.14bn judgment, less ~$0.6bn of NPV'd corporate burn before leases arrive = $1.5-2.2bn, or $4-5.75 a share. I set fair value $6.00 — modestly above the DCF to credit the 3+ GW of pipeline optionality and the dated lease catalyst, which is the only reason to own this at all. Against $6.35, there is no margin of safety; the base-case IRR is mid-single-digit.

One honest positive: with ATM IV at 83% on calls and 113% on puts, and a roughly asset-backed floor somewhere in the $4-5 area, this is a defensible covered-call or cash-secured-put underlying for someone who wants the lease lottery ticket cheaply. It is not a stock to own outright.

Management, risks, competition

Management is the central objection. This entity was Marathon Patent Group, a patent-licensing shell, before it became a bitcoin miner in 2021; share count has gone from roughly 100m to 385m in four years and there is still ~$1.5bn of ATM capacity authorised. To their credit, 2026 funding has been genuinely non-dilutive (no ATM shares in H1, converts bought back at a discount, Long Ridge funded with bitcoin-backed debt and assumed notes) and the 15% RIF was the right call. But the strategy has changed labels three times in five quarters — bitcoin treasury, then "AI inference at the edge", then "powered land landlord" — and the vocabulary (Vertebra, HUM, Slipstream, sovereign cloud) outruns the revenue by an order of magnitude. Thiel sold 27,505 shares at $6.79 on 2 November under a 10b5-1 plan; small and pre-planned, so not a signal, but not helpful either.

Specific risks, several of them flagged in our 10-Q scan: 54% of bitcoin pledged with Coinbase/Two Prime holding liquidation rights on a collateral shortfall (reflexive — a bitcoin drop forces selling into the drop); $291.6m of June 2031 notes reclassified current on a June 2027 holder put, $48.1m December 2026 notes and a $150m facility against $421m of cash at 30 June; up to $600m of Matagorda milestones where the filing concedes MARA may have to pay "material amounts of consideration" and still be unable to use the site if ERCOT says no; a $75m Long Ridge termination fee (moot now FERC has cleared); obligation to sell powered land rights to Starwood if MARA walks after a qualified lease; and a $138.8m Ho judgment on appeal to the Ninth Circuit that is not accrued.

Competition is the real tell: MARA competes for the same hyperscaler and frontier-lab leases as Riot, TeraWulf, Cipher, IREN, Galaxy, Hut 8, Crusoe and the incumbent colo developers — and most of those have already signed, while MARA, with the largest claimed portfolio, has signed nothing. Either its sites are harder to lease (fiber, water, interconnection timing, remoteness) or it is simply behind. A deep dive has to answer that.

How investors feel: 3/10

This is close to capitulation on the equity inside a theme that is itself cracking. The stock is 2% of the way up its three-year range, down from $31 in 2024 and $18 as recently as October 2025; it fell ~45% in the last two months while bitcoin rose. Short interest is ~112m shares (~29% of the count, up 11% in the first half of October) at only 2-3 days to cover, and the options market has puts at 113% IV versus calls at 83% — everyone is hedged or short. Sell-side is split and stale: the published consensus is still "Buy" with a $18-24 target (which is ~3x the price and not credible), while JPMorgan went to Underweight/$11 in September and Morgan Stanley cut to Underweight/$10 on 9 October; Needham is holding. The tell is the divergence: analysts are anchored to a sum-of-parts, the market is pricing dilution and solvency. Q3 prints after the close on 9 November (consensus ~-$0.33 EPS on ~$176m revenue, -30% YoY), Batch Zero is a December decision, and the promised leases and an Investor Day are both supposed to land before year-end. That is a lot of dated news in six weeks on a name with 29% short interest, which is why the right posture is to watch it rather than to be short it — and why, as a bitcoin-collateralised, cash-burning serial diluter, it is not a long for us either.

Sources
Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-10-168.334.06.56.003.70-7%3
2026-11-086.354.56.06.004.756%3

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue716-22%907+38%656+69%388+229%118
Gross profit-525-200%335+270%90.6-15.3-33.7
Operating expenses132481-216-22.6-103%647
▸Adj EBITDA140-80%4154.90-84%29.9-717
▸Adj OCF-1078-309-765-93.0-136
CapEx-430-407-253-27.6-41.1
Adj FCF-1509-716-1018-121-177
Interest expense30.848.413.010.315.0
▸Adj net income-432-251%-81.2-135%235-18.9-675
▸Owner's earnings-850--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA1077100%660100%-5471057100%539100%-632
FCF (OCF−capex)-3639-338%-1156-175%-1210-930-88%-125-23%-218
Net income-2377-221%-1235-187%-131154151%33362%-705
▸Capital returned-4927-458%1634247%-1666-3951-374%-548-102%-396
Buybacks-3382-9.94-569-1833-608-361
Dividends0.000.000.000.000.000.00
Interest paid10517.948.413.010.315.0
Debt paid down-16501626-1146-213150.0-49.3
▸Reinvestment3027281%34853%7081342127%43080%199
Capex (PP&E)99526640725327.641.1
Intangibles & M&A197367.32821062403158
Leases signed (net Δ)59.215.118.326.6-0.81--
Retained / other-580-54%-2839-430%2221972187%29.86%34.9

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 493 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Financial company: debt/deposit flows are business growth, not flattery — weight the Buybacks + Dividends lines instead.

Balance SheetTTM2025202420232022
▸Assets (total)56777287680119911195
▸Liabilities (total)322638102665375809
Net debt (incl. leases)213330982082-31.1680
Net debt / Adj EBITDA15.27.46425-1.04--
Net debt / Adj FCF----------
Adj EBITDA / interest4.558.580.382.89-47.8
Shares outstanding386379340243146
Dilution (YoY)+4.3%+11.5%+40.1%+66.8%+41.7%
Employees17126615260.060.0
MarginsTTM2025202420232022
Gross margin-73.3%-130.337.0%+23.213.8%+17.8-4.0%+24.6-28.6%
Adj EBITDA margin19.6%-57.545.8%+45.00.8%-7.07.7%+616.2-608.5%
Adj OCF margin-150.6%-100.8-34.0%+82.5-116.5%-92.5-24.0%+91.5-115.5%
Adj FCF margin-210.7%-113.9-78.9%+76.2-155.1%-124.0-31.1%+119.2-150.4%
Net income margin-411.2%-512.0-144.6%-227.082.5%-3.485.9%+684.2-598.4%
Adj NI margin-60.3%-91.5-9.0%-44.735.7%+40.6-4.9%+568.0-572.9%
ROIC (adj, after-tax)-9.6%-4.0%-5.6%-7.3%-53.7%
Cost of debt1.1%1.5%1.4%1.9%2.0%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Hosting Services$1.1M-6%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-06

Mara’s second-quarter call centered on the company’s strategic evolution from a large-scale Bitcoin miner into an integrated digital-infrastructure platform built around power, land, and compute. CEO Frederick Thiel argued that power availability—not capital, chips, or model development—is becoming the critical bottleneck for AI infrastructure. Mara believes its decade-plus experience securing power, deploying and operating distributed compute, and managing energy-intensive assets gives it an advantage as customers seek energized, permitted capacity that can be delivered with greater speed and certainty. The company highlighted two transformational transactions. First, Mara advanced the Long Ridge acquisition, which remains subject to FERC approval expected before year-end and potentially sooner. Long Ridge would expand the Hannibal campus with adjacent land, contribute approximately $144 million of annualized EBITDA, and provide contracted cash flows, with more than 70% of its power output covered by long-term agreements. Second, after quarter-end, Mara acquired rights to approximately 1,200 acres in Matagorda County, Texas, with potential capacity of roughly 2 GW subject to ERCOT and interconnection approvals. Management expects these transactions, once completed and approved, to increase the power portfolio to approximately 4.8 GW—nearly 2.5 times its size at the beginning of the year. Mara is actively pursuing leases with hyperscalers, AI-native cloud companies, silicon vendors, and enterprises, and reiterated its expectation of signing at least two leases before year-end. The company said tenant demand is exceeding initial expectations, particularly through its Starwood partnership. Starwood contributes development, engineering, procurement, and construction capabilities, while its capital-light structure allows Mara to scale without overextending its balance sheet. Management stressed that the objective is to build durable, long-term customer relationships rather than simply sign initial tenants. Exaion provides a complementary sovereign-AI and private-cloud offering, especially for European enterprises and public-sector customers requiring data residency, regulatory control, security, and resilience. Exaion’s revenue is expected to be in the low-eight-digit range this year and should grow as it expands beyond EDF. HUM has secured contractual revenue and is expected to become an eight-digit annual business, although it will not be material to consolidated revenue in the near term. Vertebra AI, developed from Mara’s internal power-management experience, can optimize variable energy resources, improve compute utilization, and support data-center commissioning. Bitcoin mining remains strategically important as a cash-flow source, a temporary power offtake while AI facilities are developed, and a source of operating expertise. Q2 revenue declined to $175 million from $239 million as a 28% decline in average Bitcoin price more than offset higher production. Mara mined 2,420 Bitcoin, held 35,600 Bitcoin at quarter-end, and increased energized hash rate 22% year over year to 70.3 EH/s. Daily cost per petahash improved 4% to $27.70, although energy cost per Bitcoin rose because of higher network difficulty. The company reported a $611 million net loss, including a $343 million unrealized digital-asset mark-to-market loss, and negative adjusted EBITDA of $361 million. Liquidity remained substantial, with $1.21 billion of cash and approximately $2.5 billion of cash plus Bitcoin. Mara added $600 million of Bitcoin-backed borrowings at a weighted average 7.56% cost and refinanced an existing $150 million facility, using nondilutive financing to fund Long Ridge while retaining Bitcoin exposure. Following the transaction, approximately 54% of Bitcoin holdings will be pledged as collateral. Management’s second-half focus is execution: close Long Ridge, advance approvals and development at Matagorda, sign leases, expand Exaion, commercialize technology initiatives, and make the platform’s earnings potential visible in financial results.

Analyst Q&A (10)
▸
What is the expected timing for closing the Long Ridge transaction, and are there federal, state, or local approval hurdles that could delay it?
Gregory Lewis · BTIG
Management said it had received no feedback yet but did not expect approval to be blocked. FERC approval is expected before year-end and likely much sooner.
▸
Is the Hannibal/HPC opportunity effectively in a holding pattern until Long Ridge closes and the required land is secured?
Gregory Lewis · BTIG
Lease signing is effectively waiting on the transaction closing, but discussions are progressing at roughly the same pace as if the deal were already completed. Mara is working with prospective tenants on designs, fiber, permits, and other details, and expects no major impediment beyond closing.
▸
Are the Texas audit and batch-study developments increasing interest or repricing energized sites, and how does Mara view Matagorda’s position in the ERCOT queue?
Paul Golding · Macquarie
Demand is broad across multiple sites and tenants, with Matagorda particularly attractive. Management expects the Texas audit to eliminate speculative queue requests. Because Matagorda already has multiple transmission lines, requires no utility infrastructure upgrades, and is near generation in a major market, Mara is confident it will progress through the queue as the audit proceeds.
▸
Can management provide more detail on Matagorda’s milestone-payment structure and how it is tied to regulatory approval?
Paul Golding · Macquarie
The transaction includes contingencies because batch-zero approval was not certain when it was negotiated. Mara can wait until batch-zero, but there is a terminal date by which it must close or walk away. Management characterized the structure as favorable to Mara, aligning both parties’ interests as the project develops.
▸
Could a future Matagorda transaction be developed through the Starwood partnership and its capital support?
Paul Golding · Macquarie
Any qualifying deal could potentially be included in the Starwood partnership, although the assets specifically allocated at signing were those already in Mara’s portfolio at that time.
▸
How should investors think about the revenue opportunity and diversification potential from Exaion, EDF-related activities, and HUM?
Christopher Brendler · Rosenblatt
HUM now has contracted revenue but will not be material in the near term; management views it as an eight-digit annual business that provides mining pools greater payout certainty. Exaion is expected to generate low-eight-digit revenue this year and grow as it diversifies beyond EDF. Management is bullish on sovereign, private-cloud, and open-source-model demand, which supports Exaion’s long-term opportunity.
▸
As Mara approaches its first Starwood transaction, have expectations for pricing, demand, timing, or economics changed from the framework previously discussed?
Christopher Brendler · Rosenblatt
Demand has exceeded initial expectations, and Starwood has brought high-quality tenant discussions. The parties are already working through build and design issues with several prospects. Management said the financial assumptions remain unchanged and expressed strong satisfaction with Starwood’s team and progress.
▸
What performance and economic thresholds must the TAE hybrid energy-storage prototype meet before broader deployment is justified?
Michael Donovan · Pointe
Vertebra is being used to follow variable generation from wind assets, match flexible compute to changing supply and demand, and integrate TAE’s storage technology. Management also sees mining combined with Vertebra as an alternative to load banks during data-center commissioning. These applications could drive meaningful utilization of the partnership.
▸
How can Mara monetize Slipstream and the Coldcard-related activity more fully over time?
Michael Donovan · Pointe
Slipstream is currently more of a Bitcoin-community utility than a revenue opportunity. The Mara Foundation uses it to support Bitcoin development and security, including quantum-resilience efforts. It could become monetizable if demand increases for nontraditional transaction payloads, but current demand is limited and management would not assign significant revenue to it.
▸
After adding Matagorda, how should investors think about the percentage of non-hosted capacity that Mara may evaluate for AI infrastructure?
Michael Donovan · Pointe
Approximately 30% of the current portfolio is hosted and the remainder is owned and operated; the previously cited 90% AI figure refers to roughly 90% of the non-hosted 70%. As hosted contracts expire, Matagorda can temporarily absorb mining operations while AI facilities are built. This would preserve hash rate, reduce mining costs, and monetize power during construction, with Matagorda capacity coming online gradually over roughly two years.

SEC Filing Findings

SEC Filing — material findings

2026-08-06 · depth 9/10
risk 8Liquidity/Covenants
▸

Bitcoin-backed borrowings of $600M (Coinbase $300M+refi, Two Prime $300M) require ongoing collateral maintenance; failure triggers event of default and liquidation right over pledged bitcoin (18,750 BTC pledged). Roughly 54% of BTC holdings pledged post-transaction, so a BTC price drop creates margin-call/liquidation exposure.

“Failure to maintain sufficient collateral constitutes an event of default entitling Coinbase to exercise its remedies, including the right to liquidate pledged bitcoin.”
risk 7Liquidity/Covenants
▸

Near-term debt maturities: $291.6M June 2031 Notes reclassified current (holder put exercisable June 2027), $150M line of credit due within 12 months, $48.1M December 2026 Notes; cash of $421M is well below these obligations, and the filing says repayment may require asset sales or new financing.

“As of June 30, 2026, the Company has classified the $291.6 million remaining principal of the June 2031 Notes as a current liability on the Condensed Consolidated Balance Sheets, as the holders’ option to require the repurchase of the notes at a repurchased price equal to 100 % of the principal amount, becomes exercisable in June 2027.”
risk 7Hidden Liability
▸

Commitment to pay up to $600M for Matagorda Project Company via milestone payments, with additional shortfall payments; ERCOT audit directive may cause MARA to pay material consideration while unable to use the site. Not in prior summary.

“Alternatively, if certain conditions are met, but others are not met, MARA may be required to pay material amounts of consideration to the seller for the Project Company while being unable to use the site for its intended purpose.”
risk 6Liquidity/Covenants
▸

Long Ridge acquisition carries a $75M termination fee if not closed by November 30, 2026 (extendable to June 30, 2027), and Barclays bridge financing of $785M is required to fund part of the deal.

“If the acquisition is not consummated by November 30, 2026 (which deadline may be extended to June 30, 2027 if certain regulatory conditions have not been satisfied by such date), we could be required to pay the sellers a termination fee of $75.0 million”
risk 6Hidden Liability
▸

Starwood JV: MARA must fund all approved pre-development costs ($136.3M approved aggregate) and, if it declines to proceed after a qualified lease, is contractually obligated to sell powered land rights to Starwood.

“Under the Strategic Agreement, the Company is responsible for funding all approved pursuit costs during the pre-development phase, with $ 136.3 million approved in the aggregate across all sites.”
risk 6Litigation
▸

Ho v. MARA $138.8M judgment (plus post-judgment interest) remains on appeal to Ninth Circuit; the company has not paid and has a surety bond; the balance sheet does not accrue the award.

“The Company has not paid any portion of the award.”

Options

Chain Snapshot (daily)

Call IV (ATM)83%
Put IV (ATM)113%
ATM Spread0.14%
Call $OI (near money)$6.7M
Put $OI (near money)$44.6M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$7.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$4.00$2.95/$2.99709$0.07/$0.083,536
$5.00$2.10/$2.141,785$0.22/$0.233,656
$6.00$1.41/$1.45881$0.52/$0.537,042
$7.00$0.91/$0.921,966$1.00/$1.0111,348
$8.00$0.57/$0.586,335$1.65/$1.6811,391
$9.00$0.35/$0.363,525$2.43/$2.468,891
$10.00$0.22/$0.2314,300$3.25/$3.3510,910
$11.00$0.14/$0.158,668$4.20/$4.307,921
Snapshot: 2026-11-04

Short Interest

Short % of Float29.8%
Short Shares112.9M
Days to Cover3.2
Change (vs Prior)+0.9%
Short % Float History
29.80%+4.00pp
25.0%26.0%27.0%28.0%29.0%30.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2023.0-2025.0)

Direct Pay$393.9M
Incentive & Other$22.2M
Total Compensation$416.1M
% of Revenue18.6%

Cash Runway

7.3months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$890M$15.62+$60.0M+$128M—$6.70T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$381M$8.36+$13.3M+$381M—$2.22T
VANGUARD CAPITAL MANAGEMENT LLCPassive$230M$8.23+$2.7M+$230M—$4.68T
STATE STREET CORPPassive$221M$15.90+$9.5M+$34.0M—$3.38T
GEODE CAPITAL MANAGEMENT, LLCPassive$188M$15.35+$7.7M+$28.5M—$1.87T
D. E. Shaw & Co., Inc.$144M$15.62+$126M+$144M—$153.37B
Marex Group plc$110M$16.14−$5.0M+$35.8M—$13.45B
MORGAN STANLEY$94.0M$12.67+$21.5M+$33.0M—$1.88T
BANK OF AMERICA CORP /DE/$84.7M$13.49+$14.0M+$80.1M—$1.54T
UBS Group AG$77.5M$16.93−$28.4M−$4.8M—$627.66B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

015.1M30.2M45.3M60.3M$3.42$9.55$16$22$282021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
UBS Group AG5.6MMarex Group plc8.0MMORGAN STANLEY6.8MD. E. Shaw & Co., Inc.10.4MTWO SIGMA ADVISERS, LP—AMERICAN CENTURY COMPANIES INC342KVOLORIDGE INVESTMENT MANAGEMENT, LLC—GOLDMAN SACHS GROUP INC5.0MBANK OF AMERICA CORP /DE/6.1MCHARLES SCHWAB INVESTMENT MANAGEMENT INC4.7M

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (5 analysts)$12.60+125.8%
Last Year (16 analysts)$12.25+119.5%
Current Price$5.58
Analyst Ratings
9
11
2
Buy: 9Hold: 11Sell: 2Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2014 Q23M1M-0M$-0.08$-0.10 – $-0.0614
2014 Q36M—14M$-0.36$-0.43 – $-0.2914
2015 Q11M-4M-7M$-0.14$-0.17 – $-0.1117
2015 Q21M-1M-5M$-0.32$-0.38 – $-0.2611
2015 Q37M-1M-4M$-0.30$-0.36 – $-0.2418
2016 Q12M-2M-4M$-0.88$-1.06 – $-0.7013
2016 Q235M10M8M$2.00$1.60 – $2.4016
2016 Q30M-2M-4M$-2.30$-2.76 – $-1.847
2017 Q10M-2M-3M$-1.76$-2.11 – $-1.4120
2017 Q21M-2M-3M$-2.88$-3.46 – $-2.3018
2020 Q43M-3M-4M$-0.01$-0.01 – $-0.016
2021 Q111M—83M$0.02$0.02 – $0.023
2021 Q234M-127M-130M$0.16$0.12 – $0.205
2021 Q367M-14M-18M$0.42$0.32 – $0.533
2021 Q461M—132M$0.35$0.26 – $0.436
2022 Q151M-16M-30M$0.23$0.17 – $0.284
2022 Q239M-1.2B-1.2B$-0.07$-0.09 – $-0.056
2022 Q323M6M-20M$-0.15$-0.19 – $-0.114
2022 Q439M-45M-58M$-0.15$-0.19 – $-0.127
2023 Q149M-15M-32M$-0.08$-0.11 – $-0.063
2023 Q283M16M-22M$-0.06$-0.07 – $-0.045
2023 Q3100M13M-40M$-0.11$-0.29 – $0.058
2023 Q4149M86M15M$0.04$-0.08 – $0.146
2024 Q1182M89M7M$0.02$-0.03 – $0.054
2024 Q2158M59M-48M$-0.13$-0.22 – $-0.035
2024 Q3140M-28M-129M$-0.34$-0.78 – $0.549
2024 Q4188M70M-67M$-0.13$-0.24 – $0.003
2025 Q1217M-98M-256M$-0.52$-0.68 – $-0.392
2025 Q2228M125M-37M$-0.07$-0.13 – $-0.022
2025 Q3252M180M12M$0.02$0.02 – $0.032
2025 Q4252M-302M-587M$-1.18$-1.57 – $-0.891
2026 Q1182M-558M-750M$-1.51$-2.78 – $-0.182
2026 Q2209M262M83M$0.17$0.13 – $0.221
2026 Q3183M-44M-194M$-0.39$-0.43 – $-0.352
2026 Q4192M-91M-238M$-0.48$-0.75 – $-0.332
2027 Q1215M27M-118M$-0.24$-0.31 – $-0.182
2027 Q2223M24M-119M$-0.24$-0.32 – $-0.181
2027 Q3228M22M-119M$-0.24$-0.32 – $-0.181
2027 Q4230M38M-101M$-0.20$-0.27 – $-0.151
2028 Q1231M-6M-144M$-0.29$-0.38 – $-0.221
2028 Q2179M-109M-244M$-0.49$-0.65 – $-0.371
2028 Q3177M-120M-252M$-0.51$-0.67 – $-0.381
2028 Q4180M-114M-244M$-0.49$-0.65 – $-0.371
2029 Q1181M-12M-139M$-0.28$-0.37 – $-0.211
2029 Q2183M-4M-129M$-0.26$-0.34 – $-0.201
2029 Q3184M3M-119M$-0.24$-0.32 – $-0.181
2029 Q4184M6M-114M$-0.23$-0.31 – $-0.171

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$7.23M
31 txns · 4 insiders · 660,497 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-11-02SELLThiel Frederick Gdirector, officer: Chief Executive Officer27,505$6.79$187K$28.18M
2026-10-19SELLKhan Salman Hassanofficer: Chief Financial Officer16,000$7.88$126K$4.22M
2026-10-01SELLThiel Frederick Gdirector, officer: Chief Executive Officer27,505$11.22$309K$47.32M
2026-09-18SELLNowaid Zabiofficer: General Counsel8,376$12.10$101K$10.77M
2026-09-17SELLKhan Salman Hassanofficer: Chief Financial Officer16,000$11.45$183K$6.32M
2026-09-17SELLThiel Frederick Gdirector, officer: Chief Executive Officer27,505$11.45$315K$49.33M
2026-08-21SELLNowaid Zabiofficer: General Counsel8,376$12.00$101K$10.79M
2026-08-17SELLKhan Salman Hassanofficer: Chief Financial Officer16,000$9.21$147K$3.47M
2026-08-17SELLThiel Frederick Gdirector, officer: Chief Executive Officer27,505$9.21$253K$39.93M
2026-07-20SELLNowaid Zabiofficer: General Counsel8,376$12.00$101K$11.21M
2026-07-17SELLKhan Salman Hassanofficer: Chief Financial Officer16,000$10.90$174K$4.28M
2026-07-17SELLThiel Frederick Gdirector, officer: Chief Executive Officer27,505$10.90$300K$48.74M
2026-06-22SELLMELLINGER DOUGLAS Kdirector7,000$16.00$112K$3.71M
2026-06-17SELLNowaid Zabiofficer: General Counsel7,000$14.25$100K$13.73M
2026-06-17SELLThiel Frederick Gdirector, officer: Chief Executive Officer27,505$14.25$392K$65.01M
2026-06-17SELLKhan Salman Hassanofficer: Chief Financial Officer16,000$14.25$228K$5.83M
2026-05-18SELLKhan Salman Hassanofficer: Chief Financial Officer16,000$12.00$192K$5.10M
2026-05-18SELLNowaid Zabiofficer: General Counsel8,250$12.00$99K$11.65M
2026-05-18SELLThiel Frederick Gdirector, officer: Chief Executive Officer27,505$12.00$330K$55.07M
2026-04-17SELLKhan Salman Hassanofficer: Chief Financial Officer16,000$11.68$187K$5.15M
v2 analysis (legacy, 2026-08-06) — for comparison onlyclick to expand

Thesis

MARA is attempting a high-risk transition from Bitcoin mining into a power-and-compute infrastructure platform. The strategic opportunity is credible: control of energized power, Long Ridge, Matagorda, Starwood's development partnership and Exaion could create a valuable pipeline at a time when AI data-center power is scarce. However, the current business is not yet earning its way into that valuation. TTM adjusted EBITDA and FCF are deeply negative, revenue has weakened, share dilution has been substantial, and the company is borrowing against a large Bitcoin treasury. The Q2 call improved the strategic narrative but did not provide the decisive evidence investors need: no binding hyperscale lease was announced, Long Ridge still requires approval, Matagorda remains subject to queue and regulatory processes, and management's AI economics remain largely prospective. The base case therefore assigns meaningful value to the power portfolio and Bitcoin assets but applies a restrained infrastructure multiple until contracted earnings are visible.

Trade Signal

Trade rating
-0.8/10
No trade
Horizon
~5mo
gpt-5.6-luna2026-08-06 · saw $10.65-47.5% since

No trade: MARA's AI-power optionality is real, but the analyst's fair value is essentially equal to the current market cap and does not compensate for negative owner earnings, leverage, dilution and major regulatory and execution risks.

Temporary mispricing+1.0

MARA rose from roughly $8 in February to above $14 by late May as the Exaion/AI-infrastructure pivot, Long Ridge transaction and broader Bitcoin/AI enthusiasm were absorbed. It then declined to approximately $10.65–$11.24 through July and early August as Q1's large mark-to-market loss, weak operating cash economics, regulatory uncertainty around Long Ridge and general crypto volatility weighed on sentiment. The stock was unchanged around the Q2 earnings release, suggesting the print was largely anticipated. The move off the high is not an obvious panic overshoot: it is a partial, probably justified repricing of execution risk, with only modest temporary dislocation.

Market view-1.5

The market is mixed but highly speculative: analysts are broadly constructive, the stock remains a retail-heavy crypto/AI vehicle, and the average target is above the current price. Conversely, the stock is 51% below its 52-week high, nearly 30% of the float is short, insider selling is persistent, and investors are skeptical of the AI pivot, financing burden and negative cash flow. The market appears to recognize the optionality but is appropriately discounting execution risk; there is no clear stale consensus to exploit.

Inflectionwindow ~4mo+2.5

There is a potentially large strategic inflection if Long Ridge closes on favorable terms and Starwood signs binding hyperscaler leases. That would shift MARA from a loss-making miner toward contracted power and compute infrastructure. However, the evidence is not yet visible in earnings, MARA retains only 10%–50% of some project economics, and consensus estimates remain far below the study's $550M base-case EBITDA. The opportunity is therefore underappreciated in magnitude, but also not sufficiently de-risked to justify a strong positive score.

Catalysts
  • ▼2026-11 · Q3 2026 earnings and mining update — Another weak Bitcoin or mining-margin print could reinforce the bear case; evidence of improving production economics and cash generation would help.
  • ▲Late 2026 · FERC decision on Long Ridge acquisition — Approval with favorable treatment for behind-the-meter AI use would validate the power-platform thesis; restrictive conditions would impair economics.
  • ▲H2 2026 · Long Ridge transaction closing — Adds contracted power and approximately $144M of annualized EBITDA, but leverage and integration execution remain key risks.
  • ▲H2 2026 · First Starwood/hyperscaler lease announcements — Binding, high-quality leases are the clearest proof that MARA can monetize energized sites; delays would expose the story as largely optionality.
  • •H2 2026–2027 · Matagorda ERCOT and interconnection milestones — Progress toward roughly 2 GW of potential capacity could increase strategic value, while approval delays would defer or reduce the opportunity.
  • •2027-02 · Q4 2026 earnings and year-end guidance — The market will look for contracted AI revenue, improving EBITDA and reduced reliance on Bitcoin sales or collateralized borrowing.
Flow-4.0

Net flow is negative. Trailing dilution is approximately 8%, insider transactions show 36 sales and no purchases over the last year, and management is borrowing against Bitcoin. The repurchase of $1B of convertibles reduced some future dilution, but it does not offset ongoing SBC/capital needs. Nearly 30% short interest provides squeeze fuel but is not a durable positive flow signal.

Floor / Ceiling+1.0

The Bitcoin treasury and $1.21B of cash provide meaningful asset support, but more than half of the Bitcoin holdings are expected to be pledged and the business is consuming cash. Debt, legal exposure, volatile Bitcoin prices and potential dilution prevent this from being a hard floor. There is also no firm ceiling, but insider selling, high short interest and the need for future capital could create supply on strength.

Buyability

Moderate but highly speculative. MARA has strong liquidity, a large Bitcoin treasury and exposure to scarce power capacity, so crypto, AI-infrastructure and special-situations investors can buy it. However, negative owner earnings, 8% trailing dilution, pledged Bitcoin collateral and dependence on unproven hyperscaler leases make it difficult for fundamental long-only buyers to underwrite at scale.

Fear vs Greedfear 8/10 (+2.0)greed 8/10 (+3.0)

Fear pulls slightly stronger than greed. The AI-power opportunity is credible and could be valuable, but the current valuation already approximates the analyst's fair value while the present business has deeply negative owner earnings and depends on several binary execution and regulatory outcomes.

Valuation

Our Target
$4.0B+86%
Market Should Pay
$2.9B+34%
target ×0.72 (fear discount)
Current Market Cap
$2.2BSlightly bearish
What Changed
transcript · 2026-08-06
+6%fair value on this information

The genuinely new information was the Q2 update on the enlarged power portfolio, the approximately 2 GW Matagorda opportunity, progress toward Long Ridge approval, stronger-than-expected Starwood tenant demand and management's expectation of at least two leases before year-end. The negative information newly emphasized by the event was the depth of operating cash losses, the $600M Bitcoin-backed borrowing at approximately 7.56%, and the fact that no binding hyperscale lease has yet been signed. Bitcoin mark-to-market volatility and the broad AI-infrastructure strategy were already known before the call.

▸ How the cases moved

Before the Q2 event, I would have assigned approximately $2,000M bear, $5,200M base and $10,500M bull terminal equity values with probabilities of 0.35, 0.45 and 0.20. After the call, the bear value declines modestly because Q2 confirmed severe cash losses, higher Bitcoin-backed borrowing and continued regulatory dependence; the base value rises to $5,500M because management reported stronger-than-expected tenant demand, progress on Long Ridge and a potentially favorable Matagorda structure; the bull value rises to $11,000M because the power portfolio could reach approximately 4.8 GW and Starwood discussions appear active. Probabilities change only slightly: bear 0.37 -> 0.35, base 0.46 -> 0.45, bull 0.17 -> 0.20. The absence of a signed lease prevents a larger bull-probability increase.

2-Year Plausible Outcomes
bear35%
$1.8B
rev -10%/yrOE $150M

Bitcoin remains weak, mining economics deteriorate after the halving, and Long Ridge is delayed or constrained by FERC/PJM requirements. Starwood does not secure binding hyperscale leases, while debt service, collateralized Bitcoin borrowings, legal exposure and continued dilution consume much of the asset value. MARA remains primarily a volatile miner with limited free cash flow.

▸ Valuation

4x $650M EBITDA = $2,600M EV − $800M net debt = $1,800M equity

base45%
$5.5B
rev +20%/yrOE $550M

Long Ridge closes, but conversion to AI/HPC infrastructure takes longer than management suggests. A few leases or development commitments are signed through Starwood, producing contracted economics gradually, while Bitcoin mining remains a volatile bridge business. Lower-cost power and the Bitcoin treasury support value, but capex, interest, SBC and JV economics keep owner earnings well below EBITDA.

▸ Valuation

8x $837.5M EBITDA = $6,700M EV − $1,200M net debt = $5,500M equity

bull20%
$11.0B
rev +40%/yrOE $950M

Long Ridge closes promptly and receives favorable treatment for behind-the-meter or data-center use; Matagorda progresses through the ERCOT queue; and Starwood signs multiple high-quality hyperscale leases. MARA becomes an asset-light power and digital-infrastructure platform with meaningful contracted cash flow, while mining monetizes interim capacity and Bitcoin appreciates. Scale, low-cost power and visible AI demand allow owner earnings to approach $1B annually by year two.

▸ Valuation

10x $1,200M EBITDA = $12,000M EV − $1,000M net debt = $11,000M equity

▸ Target Rationale

The probability-weighted terminal value discounted at 12% is $4,244M. I set the analytical target at $4,000M because the scenario math does not fully capture execution and financing frictions: Long Ridge remains pending, Matagorda's capacity is not yet assured, Starwood economics are shared with a minority or capped MARA ownership position, more than half of the Bitcoin treasury is expected to be pledged, and the company has a history of dilution and heavy cash consumption. This is a business-value adjustment, not a sentiment discount; sentiment is reflected separately in the fear-greed modifier.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now3/10
Trajectory6/10
Risk9/10
Governance4/10
Insolvency prob (2yr)12%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Exaion Acquisition Completed (February 2026): MARA finalized the acquisition of a 64% controlling stake in Exaion, a French computing infrastructure operator formerly owned by the French utility giant EDF, for $168 million in cash. To clear strict digital sovereignty reviews from the French Ministry of Economy, MARA partnered with French telecom billionaire Xavier Niel’s NJJ Capital, which took a 10% stake in MARA France. EDF remains a minority shareholder and a primary anchor customer. This acquisition pivots MARA into the European high-performance computing (HPC), secure cloud, and sovereign AI infrastructure market.
  • Shift in Bitcoin Treasury Strategy and Convertible Note Repurchase (March 2026): Breaking away from its historical strict "HODL" (accumulation) policy, MARA revised its digital asset management guidelines to permit strategic sales from its Bitcoin holdings to fund operations and its ongoing AI infrastructure pivot. Under this updated strategy, the company sold 15,133 Bitcoins to fund the repurchase of $1.0 billion of its 0.00% convertible senior notes due 2030 and 2031, successfully reinforcing its balance sheet and mitigating long-term shareholder dilution risk.
  • Nevada Securities Class Action Dismissed (March 2026): The U.S. District Court for the District of Nevada dismissed with prejudice a putative shareholder securities class action against MARA and four current/former executives. The lawsuit alleged that the company made false or misleading financial statements regarding historical accounting methods for Bitcoin asset impairments and its mining pool revenue recognition. The court agreed with MARA’s defense that the regulatory dialogue with the SEC did not support an inference of scienter (intent of wrongdoing).
  • Q1 2026 Earnings Miss (May 2026): MARA reported its Q1 2026 financial results, posting a larger-than-expected net loss of $1.3 billion and an EPS of -$3.31 compared to the analyst consensus estimate of a -$1.41 loss. The deep quarterly loss was heavily driven by non-cash Bitcoin revaluations due to underlying cryptocurrency price volatility.
▸ Thesis-test Findings
Long Ridge Energy PJM Interconnection Power Capacity Status

On April 30, 2026, MARA entered into a definitive agreement to acquire Long Ridge Energy & Power LLC from FTAI Infrastructure for $1.5 billion, including the assumption of existing debt. The deal centers on a highly efficient 505 MW combined-cycle gas power plant in Hannibal, Ohio, co-located with over 1,600 acres for an integrated digital infrastructure campus within the PJM Interconnection grid.

  • The Bull Case: The transaction secures an immediate 200 MW of low-cost operating power (<$15/MWh) that bypasses multi-year grid interconnection delays, with a pathway to expand the site to 600 gross MW for an AI campus. MARA also cleared a vital hurdle in May 2026 by securing consent from 8.750% senior note bondholders to waive a mandatory "Change of Control" buyout trigger, leaving the deal on track to close in the second half of 2026.
  • The Bear Case: Regulatory friction presents a bottleneck. In late May 2026, PJM’s Independent Market Monitor (Monitoring Analytics) filed comments with the Federal Energy Regulatory Commission (FERC) urging that any approval of the acquisition be strictly conditioned on keeping Long Ridge's full generation capacity active within the PJM wholesale market. Because PJM is facing severe capacity shortages and grid reliability issues, this regulatory push could limit MARA’s ability to pull the power "behind the meter" for off-grid, private AI data center use.
Starwood Digital Ventures AI Data Center Joint Venture Progress MARA

In February 2026, MARA announced a strategic partnership with Starwood Capital Group and its dedicated data center development arm, Starwood Digital Ventures (SDV).

  • The Bull Case: Under the joint agreement, select MARA-owned energized sites will be converted into next-generation enterprise and AI/HPC data centers. The structure is designed to be highly capital-efficient: SDV leads design, pre-development, and construction, while using its extensive relationship network to source hyperscale tenants. Once an executable lease with a qualifying hyperscaler is secured, the site is transferred to a joint venture in which MARA maintains a 10% to 50% equity stake. The platform aims to deploy 1 GW of near-term IT capacity with a path to over 2.5 GW.
  • The Bear Case: While this model preserves cash and shields MARA from near-term capital expenditure dilution, MARA sacrifices substantial project economics and control by capping its ownership in the joint venture at a maximum of 50%. Additionally, if Starwood secures a qualified lease and MARA chooses not to proceed with the joint venture, MARA is contractually obligated to sell its powered land rights to Starwood. Execution relies heavily on Starwood's ability to lock in these critical, binding hyperscaler contracts in an increasingly competitive power market.
MARA 111 million legal judgment appeal update

This query refers to the appeal of a unanimous $138 million (often cited as $138.78M) federal jury verdict won by plaintiff Michael Ho (co-founder of US Bitcoin Corp and CSO of Hut 8) in July 2024. The jury found MARA guilty of breaching a non-disclosure and non-circumvention agreement regarding proprietary energy supplier strategies.

  • The Bull Case: MARA is vigorously fighting the verdict. The appeal is actively proceeding before the U.S. Court of Appeals for the Ninth Circuit (Case No. 25-3547). MARA submitted its opening appeal brief in September 2025, challenging both the liability ruling and the legal basis for the calculated damages.
  • The Bear Case: In late November 2025, Michael Ho filed his answering brief, and MARA's optional reply brief was due on January 16, 2026, following a court-approved extension. As of mid-2026, the appeal remains actively pending with no final ruling, leaving the $138 million liability—accruing post-judgment interest at 4.96%—as a major, unresolved legal overhang on the balance sheet.