Stocks/MRL.MC

MRL.MC

MERLIN Properties SOCIMI, S.A.v3 5.2/10 · 2026-11-26
Real Estate·REIT - Diversified
11.79 EUR
7.0B EUR market cap
1.9% div yield
v3 Rating
5.2/104.0–6.3
Setup
4.5/103.5–5.5
Fair Value
12.50 EUR9.50 EUR–15.50 EUR+6%
DCF (10%)
11.00 EUR-7%
Base IRR
+10%+3%–+16%
Visibility
moderate±24%
Wall Street
(1 buy)
Rating
Revenue (TTM)
579.6M EUR
Owner Earnings
€430M
Next-Yr Owner Earnings
-€840M
Growth
+15.0% × 5y
P / Next-Yr OE
--
Net Debt
€3.7B

MERLIN Properties SOCIMI, SA stands as a leading real estate firm traded on Spain's benchmark IBEX-35 stock index. Structured as a publicly listed SOCIMI, its core business involves the strategic acquisition, proactive management, operational oversight, and targeted divestment of premium commercial properties. These assets, categorized within the Core and Core Plus investment segments, are predominantly situated in Spain, with a more limited presence in Portugal. The company specializes in real estate across the office, retail, and logistics sectors.

2-Year Price History

$10.98+11.1%
$9.0$10$11$12$13$14$15Initial target $12.50 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.24.0–6.3
Setup
4.53.5–5.5
Fair value (EUR)
12.509.50 – 15.50
Upside vs 11.79
+6%
DCF (10%)
11.007.50 – 16.00-7%
Base IRR
10%3% – 16%
Visibility
moderaterange ±24%
Sentiment
4/10
Flow
4/10
2026-11-26 · claude-opus-5-5 · priced at 10.98

MERLIN is Spain's largest REIT (offices, shopping centres, logistics, about EUR 10bn of mature property) and is turning itself into the main Iberian AI data centre developer: 724 MW in three phases, 160-180 MW pre-let at about EUR 130/kW/month, mostly to neoclouds. The stock has fallen from EUR 15.3 in June to EUR 10.98 (the close on 25 Nov 2026, a 52-week low), which is 32% below the Q3 NTA of EUR 16.13. That is happening while the business keeps executing: FY26 FFO guidance was raised to EUR 0.58, shopping centres are growing 6% like-for-like, and the data centre phases are pre-letting ahead of plan. The market's worries are real ones. 85% of the signed data centre tenants are neoclouds such as CoreWeave, whose credit is weakening, and Jefferies downgraded on that in August. Phase III still needs roughly EUR 1.4-1.5bn of equity, and the next tranche is expected to be a convertible; issuing at a third below NAV takes value from today's holders. On top of that there is a 10-15% promote to an external partner and sector-wide fear about AI capex. Our DCF is unlevered free cash flow at 10%, with five years of heavy negative FCF while EUR 4-5bn of data centre capex goes in, then a terminal value of about 18x on roughly EUR 1bn of stabilised FCF. It lands at about EUR 11 per share, which is the price. The discount to NAV looks large, but it is about what a 10% hurdle and the coming dilution justify. Rating 5.2: fairly priced with a wide spread of outcomes, a pass. Setup 4.5: the market's fear has a real basis, and the next data points (FY26 results and NTA in late February 2027, Lisbon lease conversion, the convertible) cut both ways.

Flow: Heavy issuance ahead: about EUR 1.4-1.5bn of further equity (roughly 20% of the market cap at EUR 11) is planned for 2026-28 to fund Phase III, most likely starting with a convertible bond in late 2026 or 2027, after the EUR 768m placement in March 2026. There is no buyback; Santander and Nortia have so far subscribed pro rata.

A deep dive would have to establish: Will the neocloud tenants (85% of signed data-centre capacity) pay through their 10-year leases, and can MERLIN fund Phase III without issuing much more equity below NAV?

Owner earnings, TTM
€430M€380M – €480M
Realistic peak profit
€1.1B€800M – €1.3B
Growth rate
15.0%6.0% – 22.0%
Years of growth
53 – 7
Market cap
€6.8B€6.7B – €6.9B
EV
€11B€10B – €11B
Net debt
€3.7B€3.3B – €4.3B
Capital return / cap
4.0%3.5% – 4.5%
P/E
18.9×17.5× – 20.0×
EV/EBITDA
21.4×19.0× – 23.0×
FCF yield
5.2%4.5% – 5.8%
Projected FCF, base case (EUR millions)
Y1-€840M-€1.1B – -€600M
Y2-€700M-€1.0B – -€450M
Y3-€260M-€650M – €100M
Y4€390M€0M – €650M
Y5€830M€450M – €1.1B
Competition: In Iberian data centres it competes with Equinix, Digital Realty/Interxion, Start Campus (Sines), Solaria/Edged and hyperscaler self-builds; it has an edge in secured grid power, but tenants can shop for capacity across Europe.
Governance: An external technology partner takes a 10-15% promote on data-centre profit (EUR 101m accrued for Phase I), and equity has been issued repeatedly at or below NAV.
Research (expand)

What it does

MERLIN Properties is an IBEX-35 SOCIMI (Spanish REIT). It owns about EUR 6.7bn of offices (mainly Madrid and Lisbon; Barcelona is weak, with Torre Glories empty after Meta left), EUR 2.2bn of dominant shopping centres, EUR 1.4bn of logistics, and a fast-growing data centre platform. Phase I (64 MW) is fully let at a 15.8% gross yield on cost. Phase II is 254 MW: Bilbao Arasur 1 and 2 are fully pre-let, and Lisbon is in heads of terms. Phase III is 406 MW of a EUR 4.5bn plan.

The investment case and what the market thinks

The bull case: Iberia has spare grid power while the rest of Europe does not, and MERLIN already holds the power and the permits. It is letting capacity faster than it can build, at rents above plan (EUR 132-135/kW/month against the EUR 122.5 it underwrote). On management's numbers, data centres become about 65% of revenue once Phase III is in service, the NTA keeps compounding, and the stock at 0.68x NTA would be a bargain. The market sees it differently. None of the 22 banks covering the stock rate it a buy (Merca2, August). The pre-let tenants are about 85% neoclouds whose credit is deteriorating (CoreWeave is B+ with a wide CDS). About EUR 1.4-1.5bn of new equity is still to come, through a convertible and further raises, and it would be issued below NAV. A partner takes 10-15% of the data centre profit as a promote. Traditional property yields are likely to drift up, which management itself expects. I do not think the market is wrong about these risks. The NAV discount is the price of the dilution and of the counterparty risk.

What it earns

FY26 FFO is guided at EUR 0.58 per share × about 620m shares, so roughly EUR 360m. Adding back about EUR 130m of net interest gives EBITDA of about EUR 490m. Less about EUR 60m of maintenance capex, and with essentially no cash tax under the SOCIMI regime, unlevered owner earnings come to about EUR 430m. Growth capex of EUR 1.0-1.3bn a year makes free cash flow deeply negative until 2029.

Five-year FCF (unlevered, after growth capex, EUR m)

Projected FCF by year: 2027 about -840; 2028 about -700; 2029 about -260; 2030 about +390; 2031 about +830. Stabilised EBITDA should reach about EUR 1.1-1.2bn once some 600 MW is operating, at EUR 1.56m of gross rent per MW per year, about 11% net yield on cost, and after the promote.

Year 5 and value

In year 5 it should be neither a corpse nor a star: a property-and-infrastructure landlord growing perhaps 3-5% a year with 10-year contracts and 2-3% rent escalators. Its data centre M&E (batteries and gensets) needs replacing in 10-15 years, which is real maintenance capex. I give it 16-20x stabilised FCF, a 5-6% yield. The DCF works out as: PV of the five years of FCF about EUR -0.76bn, plus a terminal value of 18x EUR 1bn = EUR 18bn, worth EUR 11.2bn today, less net debt of about EUR 3.6bn. That leaves equity of about EUR 6.8bn, or about EUR 11 per share. The range is wide (EUR 7.5-16) because it hinges on neocloud defaults and the terminal cap rate. At today's price we pay 19x FFO, about 21x EV/EBITDA, and 0.68x NTA. My fair value is about EUR 12.5, giving some credit to the NAV and to the lettings being proven.

Management, risks, competition

Ismael Clemente is candid (he names delays, red tape and the weakness in Barcelona's 22@ district), keeps a debt-conscious culture (LTV 24.5%, cap 32-35%), has paid about EUR 2.5bn of dividends since 2014, and has two anchor holders (Santander and Nortia). The risks:

  • A neocloud default on a full-building lease.
  • Dilutive equity issued below NAV.
  • Equipment bottlenecks and higher costs.
  • Permitting delays at Getafe, Tres Cantos and Navalmoral.
  • Office yield expansion.
  • The promote leaking value to a related-style partner.

Competitors in Iberian data centres include Equinix, Digital Realty/Interxion, Edged, Solaria, Start Campus in Sines, and hyperscalers' own builds.

Sentiment

Sentiment is 4/10. The stock has fallen 28% since July and sits at a one-year low. No bank rates it a buy, and AI-capex and neocloud-credit fear dominate. It is not hated, though: FFO keeps beating and the dividend is intact.

Financials — Adjusted

Adjusted · TTM 2026-Q2 · EUR

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue580+11%539+7%506+9%465+6%439
Gross profit495+10%483+11%434+3%421+8%390
Operating expenses-428-807%-414-808%58.5-67%175+187%61.0
▸Adj EBITDA929+135%903+138%380+53%248-25%331
▸Adj OCF-23.5-13.6-112%1131.67-0.91
CapEx0.000.000.000.000.00
Adj FCF-23.5-13.6-112%1131.67-0.91
Interest expense112106130127103
▸Adj net income748+188%765+195%259+117%120-73%438
▸Owner's earnings300--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA1822100%690100%518100%431100%35.7100%147100%
FCF (OCF−capex)1317%0.000%0.000%12629%3.089%2.011%
Net income1828100%57984%786152%28466%-83.5-234%263179%
▸Capital returned54330%72.210%10620%13431%127357%10370%
Buybacks0.030.000.000.030.000.00
Dividends3.940.000.003.940.000.00
Interest paid53972.2106130127103
Debt paid down0.000.000.000.000.000.00
▸Reinvestment62.53%0.000%0.000%0.000%0.000%62.542%
Capex (PP&E)0.000.000.000.000.000.00
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)62.5--------62.5
Retained / other1277%0.000%0.000%12228%3.089%2.011%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 31 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)1558614269134591206512051
▸Liabilities (total)62996194595855265202
Net debt (incl. leases)34273847336140633819
Net debt / Adj EBITDA3.694.268.8516.411.5
Net debt / Adj FCF----29.82427--
Adj EBITDA / interest8.328.552.921.943.20
Shares outstanding619563562621466
Dilution (YoY)+10.2%+0.1%-9.4%+33.3%-1.7%
Employees282--------
MarginsTTM2025202420232022
Gross margin85.3%-1.189.7%+3.985.8%-4.890.6%+1.888.8%
Adj EBITDA margin160.2%+84.4167.5%+92.475.1%+21.853.3%-22.075.3%
Adj OCF margin-4.1%-3.8-2.5%-24.822.3%+21.90.4%+0.6-0.2%
Adj FCF margin-4.1%-3.8-2.5%-24.822.3%+21.90.4%+0.6-0.2%
Net income margin147.0%+19.5145.9%+89.856.1%+74.0-18.0%-77.959.9%
Adj NI margin129.1%+79.1141.9%+90.751.3%+25.525.7%-74.199.9%
ROIC (adj, after-tax)6.0%6.6%2.9%1.8%2.9%
Cost of debt2.2%2.1%2.6%2.9%2.3%

Earnings Calls

9 calls

Earnings Call · 2026 Q2

2026-07-28

MERLIN Properties reported robust financial and operating results for the first half of 2026, marked by steady growth in traditional real estate and an aggressive acceleration of its data center expansion, known as the Mega Plan. The company achieved 3.3% like-for-like rental growth across its traditional portfolio, maintaining an overall occupancy rate of 94.7%. Shopping centers were the standout performer, delivering 6.4% like-for-like growth driven by strong tenant sales and high footfall. Logistics and office segments remained resilient, though offices faced some release spread challenges in peripheral areas, and logistics saw minor occupancy fluctuations. Financially, total revenue increased by 11.7% to over 300 million euros, while Funds From Operations (FFO) grew by 8% to 180 million euros. Consequently, management raised its full-year FFO guidance to 0.55 euros per share, up from the initial 0.53 euros estimate. The firm's balance sheet was significantly strengthened following a 768 million euro capital increase, bringing the loan-to-value (LTV) ratio down to a conservative 24.5% with 2.6 billion euros in liquidity, effectively covering all immediate debt maturities. The most significant developments occurred within the data center segment. MERLIN has commercialized 160 MW of IT capacity to date and now anticipates exceeding its initial annual target of 200 MW, potentially reaching 340 MW by year-end. Phase 1 (64 MW) is now fully let and operational or nearing completion. Phase 2 projects in Bilbao and Lisbon are progressing rapidly, with leasing activity significantly ahead of original expectations as the company shifts to a predominantly pre-let development model. Notably, Phase 3 construction has been accelerated, with delivery dates for buildings in Lisbon moved forward by approximately two years to 2029 to meet intense market demand. Management noted that the demand environment is shifting; while hyperscalers remain important, there is a surge in demand from "neocloud" providers and corporate entities looking to secure capacity for AI model training and inferencing. Looking ahead, CEO Ismael Clemente highlighted that the data center cycle appears decoupled from general GDP trends, fueled by the rapid adoption of AI. The company is prioritizing the construction of high-specification, flexible facilities to ensure long-term adaptability as computing technologies evolve. To fund the remainder of Phase 3, MERLIN plans to utilize a combination of capital recycling and financial instruments, specifically considering convertible bonds to minimize immediate shareholder dilution. Despite a slight yield expansion in traditional assets due to the interest rate environment, the company's valuation remains supported by the massive value creation within the data center portfolio, where Phase 1 has already accrued a 101 million euro promote fee for the developer partner. Management remains focused on maintaining a disciplined risk profile while capturing the unique growth opportunities in the Iberian digital infrastructure market.

Analyst Q&A (19)
▸
What is the progress on getting electricity to Phase 4 in Navalmoral? Also, can you provide color on tenant discussions, competition, and construction costs?
Jonathan · Goldman Sachs
Navalmoral has 29MW of electricity granted; construction on a 20MW IT building should start by September once environmental assessments clear. Demand is diversifying to include Chinese firms and AI model companies. Costs are stable but equipment bottlenecks are leading to strategic pre-purchasing of transformers and gensets.
▸
Are you seeing corporate demand from Chinese models that need to be run on data centers?
Jonathan · Goldman Sachs
Recent Chinese demand includes cloud services like Alibaba and TikTok, though we haven't seen specific Chinese model makers yet.
▸
What changed in Bilbao-Arasur 1 to move from advanced negotiations to a full pre-let? Also, is the Lisbon project part of the Portuguese gigafactory?
Marios
Visibility improved as construction progressed and equipment was procured, reducing risk for both parties. For Lisbon, we are trying to make the private deal compatible with the public gigafactory project via capacity assignments for future power increases.
▸
Is the 101 million euro promote fee based on total exit value or will more be accrued?
Marios
The fee is based on value creation over 10 years and is calculated quarterly on an IRR basis. As time passes, the percentage may decrease as the IRR flattens, but it remains tied to the overall profitability and market maturity at the exit date (2031).
▸
How does being only partially funded affect your ability to sign leases for Phase 3? Also, how sustainable is the shopping center performance?
Florent Laroche · ODDO
We are exploring funding avenues, including convertible bonds, to complete Phase 3 funding. Shopping center performance is supported by population growth and low household debt in Spain; low occupancy costs (10.8%) provide room to manage potential future slowdowns.
▸
What is the tenant split for current pre-lets and are you prioritizing certain types to minimize counterparty risk?
Ana Escalante · Morgan Stanley
Neoclouds currently represent a significant portion (45%) because they take capacity quickly as they sign their own clients. Hyperscalers are growing (5-10%), and AI model specialists are the third rising category. We diversify by adding more buildings and campuses to the portfolio.
▸
How much of the embedded revaluation will be given away as promote fees for Phase 2 and 3?
Ana Escalante · Morgan Stanley
A good rule of thumb is between 10% and 15% of the total profit over time, depending on how much the market matures and appreciates the assets by the end of the 10-year investment period.
▸
What is the lowest quarterly ICR level you are willing to accept during the data center rollout?
Paul May · Barclays
We currently sit at 3.7x and have a 2.5x covenant; we don't expect to go below 3x. We prioritize low LTV (target <35%) and net debt to EBITDA (target <10x) over specific ICR targets.
▸
What proportion of revenue is exposed to neoclouds, and how do you view their credit quality and contract terms?
Paul May · Barclays
Approximately 45% of the 340MW target is neoclouds. Credit quality is managed by ensuring they have final clients signed and access to equity/debt markets. Contracts are typically 10-year mandatory terms with consumer-price indexing.
▸
Does the reported yield on cost include the promote fee cost?
Paul May · Barclays
The yield on cost was originally reported on a gross basis. Going forward, investors should calculate the promote impact separately as it begins to accrue.
▸
What are the lease terms for the new Arasur lease and are they meeting expectations?
Thomas Rothaeusler · Deutsche Bank
The lease is for 10 years with 2-3% annual escalators. Pricing is exceeding our initial projections of 122.5 euros per megawatt per month despite client negotiating power.
▸
Is the single large building in Zaragoza-WIND intended for a hyperscaler, and what is the timeline?
Thomas Rothaeusler · Deutsche Bank
Yes, it is hyperscaler-ready with technical specs for large-scale GPU synchronization. Construction is expected to start in summer 2027 with a late 2029 delivery.
▸
What are the revaluation expectations for the end of the year?
Thomas Rothaeusler · Deutsche Bank
Revaluations will depend on converting bookings to full leases and moving land to 'work in progress' status once construction licenses are received, which reduces the discount rates applied by appraisers.
▸
Should advanced negotiations in Lisbon be interpreted as a pre-let?
Veronique Meertens · Kempen
They are currently based on a head of terms and technical documentation. Once we sign the full format lease agreement, they will be classified as a pre-let.
▸
What is the strategy for provisioning the promote fee going forward?
Veronique Meertens · Kempen
We provision based on auditor requirements, modeling 10-year cash flows with a hypothetical exit each year. The promote amount fluctuates based on the timing and IRR of the project.
▸
What is the trigger for the next capital increase given the share price performance?
Stephanie Dossmann · Jefferies
We are likely to use a convertible bond for the next funding round to delay dilution and execute at a higher conversion price closer to NAV.
▸
Are you seeing a major shift in M&E needs for Phase 3? Also, what is the plan for Torre Glories following Meta's exit?
Michael Finn · Green Street
We continue to build high-quality 'Rolls-Royce' specs with N+1 redundancy and large white rooms for flexibility. Torre Glories is an iconic asset; despite 22@ market weakness, we expect it to recover occupancy through 2027.
▸
What is the breakdown of the 180MW currently pre-let? When will we see guidance on data center equipment depreciation?
Marc Mozzi · Bank of America
Current pre-lets are roughly 85% neocloud and 15% hyperscaler. Depreciation is already occurring: buildings over 30 years, equipment over 15-20 years, and batteries over 10 years.
▸
What sort of pricing or coupon should we expect on the next convertible bond?
Marc Mozzi · Bank of America
We haven't finalized terms, but we prefer a shorter maturity to make it more equity-like, with a premium that targets our projected NAV in three years to ensure conversion.

Analyst Coverage

Analyst Coverage
Analyst Ratings
1
Buy: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q1129M138M84M$0.15$0.15 – $0.151
2019 Q2123M137M90M$0.16$0.16 – $0.161
2019 Q3126M154M96M$0.17$0.17 – $0.171
2019 Q4135M156M101M$0.18$0.18 – $0.181
2020 Q1126M133M79M$0.14$0.14 – $0.141
2020 Q299M104M51M$0.09$0.09 – $0.091
2020 Q3109M105M62M$0.11$0.11 – $0.111
2020 Q4119M131M73M$0.13$0.13 – $0.131
2021 Q1106M120M73M$0.13$0.13 – $0.131
2021 Q2123M132M73M$0.13$0.13 – $0.131
2021 Q3118M134M90M$0.16$0.16 – $0.161
2021 Q4121M154M84M$0.15$0.15 – $0.151
2022 Q1119M135M84M$0.15$0.15 – $0.151
2022 Q2108M133M79M$0.14$0.14 – $0.141
2022 Q3107M109M79M$0.14$0.14 – $0.141
2022 Q4108M141M84M$0.15$0.15 – $0.151
2023 Q1118M127M84M$0.15$0.15 – $0.151
2023 Q2117M139M84M$0.15$0.15 – $0.151
2023 Q3113M128M79M$0.14$0.14 – $0.141
2023 Q4114M156M84M$0.15$0.15 – $0.151
2024 Q1122M128M79M$0.14$0.14 – $0.141
2024 Q2126M154M93M$0.15$0.15 – $0.151
2024 Q3124M114M87M$0.14$0.14 – $0.141
2024 Q4125M169M81M$0.13$0.13 – $0.131
2025 Q1133M131M87M$0.14$0.14 – $0.141
2025 Q2134M157M87M$0.14$0.14 – $0.141
2025 Q3135M121M87M$0.14$0.14 – $0.141
2025 Q4138M125M74M$0.12$0.12 – $0.121
2026 Q1149M148M93M$0.15$0.15 – $0.151
2026 Q2151M147M81M$0.13$0.13 – $0.131
2026 Q3153M145M87M$0.14$0.14 – $0.141
2026 Q4150M137M81M$0.13$0.13 – $0.131
2027 Q1164M137M81M$0.13$0.13 – $0.131
2027 Q2178M161M99M$0.16$0.16 – $0.161
v2 analysis (legacy, 2026-07-29) — for comparison onlyclick to expand

Thesis

MERLIN is a diversified Iberian REIT (offices, logistics, shopping centers) in the middle of a multi-year pivot into hyperscale data centers ("Mega"→"Giga"). Traditional assets are performing well — high occupancy (94-96%), positive rental spreads across offices/logistics/shopping centers, and a resilient core FFO base (€326.7M FY25, +5.1% YoY). The real story is the €4.5bn Phase III DC buildout (targeting 730MW by 2031, up from Phase I's 64MW now 100% leased at a 15.8% yield on cost). This is funded by a mix of debt (LTV still low at ~28.9%) and dilutive equity raises (March 2026: €767M raise, ~10% new shares, well-subscribed by core holders at no discount — a vote of confidence, not distress). 2026 guidance is deliberately flat on EPS/DPS as financial costs rise ahead of DC stabilization (targeted 2027+). Grid-capacity and permitting bottlenecks in Iberia are a real constraint but also a moat — MERLIN's early-secured power positions are scarce, and recent RD-L 7/2026 and Portugal's PNCD both favor incumbents with secured capacity over speculative new entrants. Barcelona office softness (oversupply) is offset by Madrid tightness and an emerging office-to-residential conversion pipeline that recycles obsolete stock into value. Net: a well-capitalized, conservatively levered REIT self-funding an enormous, high-return growth project, with near-term earnings optically flat but NAV compounding via development gains.

Trade Signal

Trade rating
+0.8/10
No trade
Horizon
~9mo
Claude2026-07-29 · saw 14.50 EUR-18.7% since

MERLIN is fairly priced right at the analyst's ~9,000-9,400M fair value with a credible but already well-known DC growth story, modest ongoing dilution, and no clear mispricing catalyst — a slight long lean given NTA-anchored downside support and regulatory tailwinds, but not a real trade.

Temporary mispricing+1.0

Stock rallied from ~9.5 in early 2025 to ~15.5 by mid-2026 (+60%+) on the data center 'Mega-to-Giga' narrative, CMD guidance, strong pre-letting, and NTA approaching parity. Post Q4/FY25 earnings (7/28) the stock actually dipped slightly (-3%) despite record FFO, likely reflecting the March €767M equity raise (10% dilution) digesting and flat 2026 EPS/DPS guidance disappointing some. Overall the move looks like a fair, gradual repricing tracking real NAV growth and DC execution, not an overreaction — the small pullback around earnings looks like normal digestion of dilution/flat guidance rather than a panic that should reverse quickly.

Market view+4.0

Consensus is a clean 'Buy' (single analyst) and sentiment among institutional holders (Santander, Nortia) is constructive enough to backstop a large equity raise at no discount. Retail/market narrative has shifted decisively bullish on the DC transformation story, with the stock trading close to NTA for the first time — a sign the market is starting to price the growth story rather than discount it. Not euphoric, but clearly liked and increasingly crowded around the 'Iberian data center platform' thesis.

Inflectionwindow ~9mo+2.0

The DC platform is inflecting fast (9% of gross rents now toward 65-75% by 2032), but management itself is guiding 2026 EPS/DPS flat as financing costs rise ahead of Phase 3 capex, and consensus estimates already reflect fairly flat near-term EPS. The re-rating story is already partly priced in given the stock's approach to NTA. The genuine inflection (FFO growth reaccelerating, NTA compounding to €17-19) is more 2027-2028, and the market is aware of the plan (CMD, guidance) rather than being surprised.

Catalysts
  • ▲H2 2026 · Phase 2 (254MW) delivery updates / pre-letting news — Further hyperscaler leases at premium yields would validate replication of 15.8% yield on cost
  • •2026-Q4 report, Feb 2027 · 2026 full-year guidance confirmation (flat EPS/DPS) — Market already expects flat 2026 profitability; any beat/miss vs this baseline moves the stock
  • ▼H2 2026-2027 · Further equity/debt raises for Phase III capex — €4.5bn program will likely require more dilutive equity issuance, capping per-share NTA growth
  • ▲2026 · Grid/permitting decisions under RD-L 7/2026 and Portugal PNCD — Regulatory tailwinds could accelerate Phase 2/3 timelines, easing a key bear risk
  • •ongoing 2026 · Barcelona office market trajectory — Digestion crisis persists in secondary Barcelona offices; CBD/Grade A remains tight
Flow-3.0

Recent €767M equity raise added ~10% share count (dilution TTM 10%), a meaningful headwind to per-share value even as total NAV grows; more dilution likely for Phase III (€4.5bn through 2031). Partially offset by a 3% dividend yield and disciplined capital recycling (non-core disposals ~€129M) rather than pure balance-sheet funding. Net flow is modestly negative for per-share holders despite institutional support for the raises.

Floor / Ceiling+3.0

LTV is low (28.9%) and NTA is ~€15.36/share vs price ~14.5-14.85, so the stock trades close to tangible asset value with a REIT dividend (3% yield) providing some support — a reasonably credible floor near NAV. No hard ceiling is evident (no controlling seller flagged), but continued dilutive equity raises for Phase III capex act as a soft ceiling, since new shares get issued opportunistically into strength (the March raise had no discount, done at a firm price near highs).

Buyability

Yes — this is a liquid IBEX-35 SOCIMI with $20.5M/day trading volume, institutional sponsorship (Santander, Nortia), a real dividend, and a well-understood, buyer-friendly NAV/FFO growth story that generalist REIT and thematic (data center/AI infrastructure) investors can underwrite. Not a forced-seller or distressed situation.

Fear vs Greedfear 4/10 (-1.0)greed 6/10 (+1.0)

Neither strong fear nor strong greed — the stock has already run hard and sits almost exactly at both NTA and the analyst's fair value, with a well-flagged growth story that's now largely in consensus numbers; the risk/reward feels balanced rather than compelling in either direction.

Valuation

Our Target
9.0B EUR+28%
Market Should Pay
9.4B EUR+34%
target ×1.05 (greed premium)
Current Market Cap
7.0B EURBearish
What Changed
transcript · 2026-07-28
+3%fair value on this information

The specific 2026Q2 print itself is not detailed here, but the surrounding evidence (Q1 2026 revenue +11.2% YoY, steady 95% occupancy, successful €767M no-discount equity raise fully backed by core shareholders, and confirmation of the €4.5bn Phase III / 730MW roadmap from the March 2026 Capital Markets Day) had already been substantially disclosed and digested by the market before this quarterly report. The Q2 update appears to confirm continuation of the existing trajectory rather than reveal a new surprise — flat 2026 EPS/DPS guidance, DC pre-letting momentum, and grid-reform tailwinds were all previously flagged.

▸ How the cases moved

No material re-weighting versus the day before: base case NAV trajectory and probability essentially unchanged (still ~55%); bull case slightly reinforced by continued strong pre-letting momentum and favorable grid legislation, nudging bull probability marginally up (0.22→0.25) at the expense of bear (0.23→0.20), since execution risk on Phase 2/3 has, if anything, tracked better than feared. No change to bear-case equity value.

2-Year Plausible Outcomes
bear20%
8.4B EUR
rev +3%/yrOE $290M

Barcelona office digestion crisis deepens, grid/permitting delays push Phase 2/3 timelines out further, hyperscaler contract terms compress on competition from other European power-rich sites, and continued equity issuance dilutes shareholders faster than NAV grows. FFO stagnates near €320-340M, NTA growth stalls near €15/share, and the market applies a discount to NAV given execution fatigue and rising leverage/interest costs.

▸ Valuation

0.75x NTA(€15/sh) x 750M shares = €8,438M equity value (NAV-based, no separate net debt step)

base55%
11.6B EUR
rev +8%/yrOE $350M

DC Phase 2 (254MW) delivers largely on schedule with strong pre-letting (Arasur 2/Meta-type anchor tenants), traditional portfolio holds occupancy in the mid-90s with continued positive rental spreads, and Phase III proceeds with disciplined, partly equity-funded capex. FFO compounds ~5-6%/yr to ~€360-370M by 2028, NTA/share rises to ~€17 as development gains crystallize, dilution continues moderately (~680M shares), and the market pays roughly NAV given the low-leverage balance sheet and credible growth story.

▸ Valuation

1.0x NTA(€17/sh) x 680M shares = €11,560M equity value

bull25%
14.9B EUR
rev +13%/yrOE $420M

Grid-reform tailwinds (RD-L 7/2026, Portugal's PNCD) and scarcity of ready-to-build Iberian power capacity let MERLIN sign hyperscaler leases at premium yields well ahead of schedule; Phase 1 economics (15.8% yield on cost) are replicated across Phase 2/3, DC income share rises toward guided 65-75% of gross rents by 2032 with less dilution than feared (capital recycling from non-core disposals). NTA/share reaches ~€19 and the market re-rates the stock to a premium over NAV given best-in-class Iberian DC platform positioning.

▸ Valuation

1.15x NTA(€19/sh) x 680M shares = €14,858M equity value

▸ Target Rationale

I discount slightly below the probability-weighted model value because (a) the raw cash-flow data supplied has clear quality issues (zero OCF/CapEx lines, EBITDA inflated by revaluation gains) that make it harder to independently verify the pace of NAV accretion, (b) the capex program (€4.5bn through 2031) is large relative to the balance sheet and dependent on continued capital-markets access and grid/permitting cooperation that has already shown 6-12 month slippage at two sites, and (c) further equity dilution is likely to keep per-share NAV growth below headline NAV growth even if the underlying platform executes well.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now7/10
Trajectory7/10
Risk4/10
Governance7/10
Insolvency prob (2yr)1%
Outcome uncertainty5/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Successful €767 Million Capital Raise (March 2026): MERLIN Properties completed a major equity raise in late March 2026, issuing 56.3 million new shares (approximately 10% of its share capital) to secure €767 million in funding. Backed firmly by core institutional shareholders—including Banco Santander and Nortia Capital, who subscribed pro-rata to preserve their respective stakes—the transaction was executed through an accelerated bookbuild with no discount, indicating robust institutional demand. The proceeds are earmarked to fund Phase III of the company's high-growth data center platform.
  • "From Mega to Giga" Strategic Shift (March/June 2026): During its March 2026 Capital Markets Day, MERLIN detailed its plans to invest €4.5 billion in Phase III of its data center expansion through 2031, targeting 730 MW of total capacity. While data centers are modeled to generate up to 65% to 75% of MERLIN's annual gross rents by 2032 (up from ~9% in Q1 2026), CEO Ismael Clemente announced in a June 2026 interview that management intends to proactively limit this share to mitigate sector-concentration risk and maintain a diversified, cycle-resistant portfolio.
  • Strong Q1 2026 and FY2025 Financial Results (February/May 2026): In February, MERLIN reported strong FY2025 figures, with total revenues of €565 million, EBITDA of €416 million (+9.7% YoY), and FFO of €327 million (+5.1% YoY). Operating performance remained strong into Q1 2026; revenues increased 11.2% YoY to €153.4 million, driven by a 3.5% like-for-like rise in gross rents, while overall occupancy remained steady at 95%.
▸ Thesis-test Findings
Merlin Properties Project Mega data center pre-letting rates 2026

MERLIN’s execution on its data center initiative (the "MEGA" plan) continues to validate the bull case with exceptionally strong pre-letting velocity and low lease-up risk. Phase I (64 MW across Madrid, Barcelona, and the Basque Country) is now 100% leased and is scheduled to deliver €97 million in gross stabilized rents by 2027. Under Phase II (254 MW), construction is progressing, and the second data center building in the Basque Country (48 MW capacity) has already been fully pre-let to a major customer (previously identified as Meta) a year ahead of delivery—representing the largest data center lease ever signed in the Iberian Peninsula.

Spain and Portugal data center grid connection approvals 2026

While Iberian grid capacity remains a highly saturated bottleneck (with over 80% of Spanish grid nodes saturated), recent legislative updates provide a structural tailwind for established players. In Spain, Royal Decree-Law 7/2026 went into effect in late March 2026, establishing a monthly "capacity reservation charge" designed to penalize speculative hoarding of grid capacity, while fast-tracking "Strategic Investment Projects". Simultaneously, the Portuguese government approved its National Data Center Plan (PNCD) in March 2026, creating a single administrative point of contact and allowing the direct reallocation of unused grid capacity to data centers designated as projects of national interest. These reforms ease regulatory friction for scaled developers like MERLIN, who have secured physical power assets early.

Barcelona office vacancy rates and residential conversions 2026

Barcelona’s office market has shown a highly polarized but positive start to 2026, supporting MERLIN's focus on central assets. According to CBRE, Q1 2026 office take-up in Barcelona exceeded 85,000 square meters (+40% YoY), driven heavily by the 22@ tech district. While secondary and peripheral markets continue to experience high availability, vacancy in the Central Business District (CBD) has tightened to just 4.3% overall and drops to a critical 1.6% for Grade A assets, giving landlords significant pricing power. To clean up obsolete peripheral office space, Spain's wider real estate market is seeing a massive wave of office-to-residential adaptive reuse; nearly €500 million was invested in Spain in office-to-housing conversions during 2025, supported by the Barcelona City Council's aggressive push to permit and fund conversions to fight the local housing shortage. This structural shift naturally contracts secondary office supply while preserving the value of prime assets.