MTZ
MasTec, Inc.v3 6.5/10 · 2026-10-30MasTec, Inc. is a leading infrastructure construction firm that delivers a comprehensive suite of services, encompassing engineering, construction, installation, maintenance, and enhancement. The company primarily serves the communications, energy, utility, and broader infrastructure sectors throughout the United States and Canada. Its operations are structured across distinct segments: Communications, Clean Energy and Infrastructure, Oil and Gas, Power Delivery, and Other. MasTec's construction activities involve building intricate underground and overhead distribution systems, essential for wireless and fiber-optic communication networks, as well as electrical grids. The company also develops clean energy infrastructure, including renewable energy facilities; pipelines for natural gas and other products, alongside extensive electrical and gas transmission and distribution systems. Furthermore, it specializes in heavy industrial plants, compressor and pumping stations, water and wastewater treatment facilities, and critical water and sewer pipelines, among other civil engineering projects. Additionally, the company manages the installation of power generation assets, buried and aerial fiber optic cabling, and smart home automation and energy management solutions. Beyond initial construction, MasTec offers comprehensive maintenance and upgrade solutions. These services range from routine upkeep of client networks and facilities (such as communications, power generation, pipeline, and electrical grids) to emergency restoration following natural disasters or accidents, and planned overhauls or system replacements. Its diverse clientele encompasses public and private energy providers, pipeline operators, various wireless and wireline/fiber service providers, broadband companies, install-to-the-home specialists, and governmental entities. Established in 1929, MasTec, Inc. maintains its headquarters in Coral Gables, Florida.
2-Year Price History
Valuation v3 Opus worker · 2026-10-30
MasTec (MTZ, $186.06 close on 2026-10-30, up 4.6% on the day after the Q3 print; 80.3M shares, market cap about $14.9B, EV about $18.6B) is a large North American infrastructure contractor. It builds power delivery (transmission, distribution, substations, and now data-center electrical through the $1.2B Superior acquisition), clean energy and civil (renewables, gas-fired generation, water, turnkey data centers), oil and gas pipelines, and communications networks. The stock has fallen 58% from its June high of about $437 to near the bottom of its one-year range, while the business has kept setting records. Q3 revenue was $5.15B (+30%), adjusted EBITDA $486M (+30%), and backlog a record $24.5B (+$7B year on year, 1.6x book-to-bill, 1.3x organic). FY26 guidance was only trimmed, to $18.3B revenue, $1.565-1.600B EBITDA and $8.92-9.30 adjusted EPS. What broke the stock was a de-rating from about 35x to about 16x forward earnings, driven by: a Communications slump (wireless pause, carrier reorganizations, the SpaceX fourth-carrier question); 60-day permitting delays on Pipeline that cut Q3 segment margin to 10% from 18-20%; contagion from Primoris' renewables blow-up; and a broader cooling of AI-capex excitement. On our numbers the stock is no longer expensive but not obviously cheap. It trades at about 16x 2027 consensus adjusted EPS (about $12), about 12.5x management's 2028 path (about $15 organic, plus Superior), and about 9.5x 2027E EBITDA. Real free cash flow, however, has lagged earnings badly. 2025 operating cash flow was only $546M, YTD 2026 is $388M, unbilled contract assets rose $710M this year, and unapproved change orders and claims climbed to $334M from $229M. Our DCF (unlevered FCF of $0.76B to $1.45B over 2027-31, 16x terminal FCF, 10% discount rate, net debt $3.7B) gives about $187, roughly today's price. The upside comes from a re-rating if Q4 cash flow and 2027 guidance prove the earnings are real: 16-18x a credible $15 of 2028 EPS gets to $240-270. Rating 6.5: a quality, well-positioned grid, data-center and gas-infrastructure franchise at a sensible GARP price, with a good covered-call setup (ATM IV about 70% against a backlog-backed earnings stream), but not a 40%-undervalued bargain on cash flow. Research rating 8: the gap between consensus targets (about $360) and the price is huge, and the open questions (working-capital quality, fixed-price risk in CE&I, the Q4 cash test, 2027 guidance in February) are concrete and resolvable within months.
A deep dive would have to establish: Whether MasTec's record backlog is converting into real cash (Q4 operating cash flow above $600M, unapproved change orders of $334M and contract assets collected rather than written down) at margins that support about $12 of 2027 and about $15 of 2028 adjusted EPS without a Primoris-style fixed-price blow-up in CE&I or gas generation.
Research (expand)
What the company does
MasTec is one of the three or four largest specialty infrastructure contractors in North America, with about 42,000 employees. After Superior, the business has four segments (Q3 2026 revenue and EBITDA margin):
- Power Delivery ($1.84B, 13.2%; backlog $8.9B): transmission (Greenlink and a second large project), distribution and MSA work for utilities, substations, and since July 2026 Superior Group's inside-electrical work for data centers and mission-critical facilities. Legacy Power Delivery alone grew more than 20% with double-digit margins, and the segment's organic book-to-bill was above 1.5x.
- Clean Energy & Infrastructure ($1.83B, 8.2%; backlog $8.3B): utility-scale solar and wind, civil and water (McKee), industrial, the fast-growing turnkey data-center 'general buildings' business (about $1.2B in 2026, up from about $0.3B, with 2.2x book-to-bill), and simple-cycle and reciprocating gas generation. Gas generation already has more than $1B under limited notice to proceed that is not yet in backlog.
- Pipeline Infrastructure ($0.72B, 10.4%; backlog $2.3B): long-haul gas pipelines. Prior record segment EBITDA was $634M. Management expects about $2.5B of revenue in 2026, about $3B in 2027 and record levels by 2028, with customers discussing work into the 2030s.
- Communications ($0.81B, 6.7%; backlog $5.1B): wireline/fiber, wireless and install work for carriers and hyperscalers. It is now under 15% of revenue, guided flat for 2027 with about 200bp of self-help margin improvement, plus 2,100 miles of new hyperscaler fiber awards starting mid-2027.
The investment case
1. The business is at record levels while the stock has crashed. Backlog is $24.5B (+40% year on year), Q3 revenue and EBITDA rose 30%, Power Delivery EBITDA rose 132%, and management expects another record backlog in Q4. Management says it is 'very comfortable with current consensus expectations for 2027' (about $12 of adjusted EPS). The stock fell from about $437 to $186, a 58% drawdown, while 2027 EPS estimates fell only high-single digits.
2. Positioning in the three hottest US infrastructure markets: grid and transmission, data-center power (Superior plus turnkey plus gas generation), and natural-gas pipelines. Jose Mas argues that labor, not money or politics, is the binding constraint on data centers. A 42,000-person self-perform workforce is a real moat in a labor-short market.
3. The near-term problems look like timing, not lost work. The pipeline jobs that slipped about 60 days have now started and fill most of H1 2027. Communications is shrinking as a share of the mix. Q4 guidance implies EBITDA of $411-446M, up 22-32% year on year.
4. Capital return is turning on. The CFO explicitly said the current equity valuation 'presents an opportunity' for buybacks. Only about $150M remains on the authorization, so a new, larger program is a plausible catalyst once leverage falls below 2x at year-end.
The bear case: MasTec has a history of over-promising and then cutting (2023 clean energy and IEA integration), and 2026 repeats some of that. Pipeline guidance was raised and then cut, Communications was cut twice, and CE&I disclosed reduced productivity on some projects. More of the business is now fixed-price project work (MSA mix is about one-third of revenue, down from about two-thirds), and the Primoris renewables blow-up shows how fast fixed-price execution can go wrong.
What it earns today (real free cash flow)
- 2026 guidance: adjusted EBITDA about $1.58B, of which SBC (excluded from adjusted EBITDA) is about $42M; GAAP net income $498-524M; adjusted EPS $9.11 at the midpoint (this excludes $205M of intangible amortization and SBC).
- Cash flow has lagged badly. Operating cash flow was $1.1B in 2024 and $546M in 2025, and it is $388M YTD 2026 after a $710M increase in contract assets. Management still guides to more than $1B for 2026, which needs about $610M in Q4 against $373M in Q4 2025. We haircut this to about $900-950M.
- Spend on equipment: gross capex was $276M YTD, less $46M of asset-sale proceeds, plus $112M of finance-lease principal (MasTec funds much of its fleet through finance leases, so these are capex in substance). Depreciation runs about $350M a year. We treat about $420M a year as maintenance and the rest as growth fleet for Pipeline and transmission.
- Real FCF (levered, after SBC, growth capex added back, growth working capital still deducted): about $550-650M for 2026, a 4.4% yield on the $14.9B market cap. Before growth working capital, owner earnings are about $850-950M. Unapproved change orders and claims recognized in revenue have risen to $334M from $229M at year-end. Collection of these is a key thing to watch.
Five-year projection (unlevered FCF, after SBC, capex and working capital)
Assumptions: revenue goes from $18.3B to about $21.5B, $24B, $26B, $27.5B and $29B. EBITDA goes from $1.58B to $1.95B, $2.3B, $2.5B, $2.65B and $2.8B, consistent with management's 2028 Investor Day target of $2.2B organic EBITDA and $15+ EPS, plus Superior, with a modest haircut. Capex plus leases are about 2.3% of revenue, working capital about 10% of incremental revenue, and tax 25%.
- 2027: about $755M
- 2028: about $1,050M
- 2029: about $1,210M
- 2030: about $1,350M
- 2031: about $1,450M
Implied adjusted EPS is about $11.8 in 2027 and about $15 in 2028. What it looks like in five years: a $28-30B, 9-10% EBITDA-margin contractor whose earnings are anchored by utility MSAs, data-center service and maintenance, and a long pipeline cycle. It will be a bigger, still-growing business, not a corpse, but cyclical and project-lumpy, likely growing about 5-8% by 2031. Confidence is moderate. Backlog gives good 2027 visibility, but 2029-31 depends on how long the AI and power capex cycle lasts and on bid discipline.
Fair value and the multiples we are paying
- Category: a mid-single-digit grower with durable but cyclical cash flows. We apply 16x terminal FCF, the middle of the 10-18x band, nudged up for the multi-year power and gas cycle.
- DCF: the PV of 2027-31 FCF is about $4.3B, and the PV of terminal value (16x of $1.45B = $23.2B) is about $14.4B. EV is about $18.7B; less net debt of $3.69B (Q3, including finance leases; year-end should be about $0.3-0.4B lower), equity is about $15.0B, or about $187 per share. At 12x terminal the value is about $142; at 20x, about $232.
- Base IRR from $186: about 10% a year. Upside to the mid-teens comes from a 18-20x exit or from buybacks at these prices.
- Multiples paid: 20x 2026 adjusted EPS and about 32x GAAP EPS; about 15.5-16x 2027 consensus adjusted EPS; about 12.5x 2028 path EPS. EV/EBITDA is 11.8x 2026 guidance and about 9.5x 2027E. Peers: Quanta trades at roughly 30x and has fallen only about 23% from its high; Primoris is impaired.
- Fair value about $210. This blends the DCF ($187) with a 16x-2028-EPS peer view discounted one year (about $220-230), less a haircut for weak cash conversion and the growing claims balance. A one-year bull case of about $270 (+45%) needs clean Q4 cash flow, 2027 guidance at or above $12 EPS, and pipeline margins back to about 18%. The bear case of about $125-140 comes from a further CE&I or pipeline execution miss or an AI-capex air pocket, with EPS falling to $9-10 at 13-14x.
- Covered calls: ATM IV is 68-76% on a name whose 2027 earnings are largely backed by backlog and that trades near the bottom of its one-year range ($164-441). Selling calls against a position here is attractive.
Management, risks and competition
- Management: The Mas family (Jorge Mas, chairman; Jose Mas, CEO) has run MasTec for decades and built it largely through M&A (IEA, Henkels & McCoy, Superior). They are good dealmakers and operators in good markets, but have a pattern of optimistic guidance followed by cuts. Capital return has been modest. There have been no buybacks in 2026 so far, about $77M in 2025, and no dividend. Insiders have been net sellers this year (small director sales at about $325 in March), and we found no open-market insider buying on the decline. Leverage is 2.5x reported (Q3, partial-quarter Superior), pro forma about 2.1x, with a target below 2x by year-end. It is elevated but not dangerous, with $1.6B of liquidity and 10-year notes priced at 5.85%. The 2015 audit-committee review of percentage-of-completion accounting is historical, but it is relevant given today's rising unbilled balances and claims.
- Risks: fixed-price execution on large renewables, gas-generation and turnkey data-center jobs (the Primoris precedent); working capital and claims ($334M of unapproved change orders, contract assets up $710M YTD); permitting delays on Pipeline; Communications customer disruption (carrier reorganizations, a fourth carrier) and DSO deterioration; an AI or data-center capex slowdown; renewables policy after the One Big Beautiful Bill Act; and labor availability. Mix shift to construction-management turnkey contracts carries lower headline margins.
- Competition: Quanta (the largest and best-run, dominant in transmission), Primoris, Dycom (communications), MYR Group, EMCOR, Pike and regional contractors, plus pipeline peers (Price Gregory/Quanta, Michels, Precision Pipeline). The moat is scale, a self-perform craft workforce, safety records and long MSA relationships. Pricing power is improving as labor tightens, but this is still a bid business.
How investors and analysts feel: 3.5/10
The stock is hated by the tape. It is down 58% from its high, had a 13-session losing streak (-25%) into earnings, and fell 18.5% on Q2 results; short interest is about 4.6-5.4M shares (about 6% of the float). Wall Street is still nominally bullish: about 21 analysts are at Buy or Strong Buy with an average target of about $360. October cuts include Goldman to $274, Citi to $308, JPMorgan to $303, Stifel to $305, TD Cowen to $320, KeyBanc to $320, Barclays $320, Piper $313 (Neutral) and Truist $380, while Argus sits at $196. Even the lowest Street targets are about 50% above the price, which suggests the sell-side has not capitulated on numbers, only on multiples. Retail sentiment has flipped from AI-infrastructure darling to 'broken story'. Several things would change the mood: a large new buyback, Q4 operating cash flow above $600M, 2027 guidance in February at or above consensus, and gas-generation and data-center awards converting into backlog.
- https://www.sec.gov/Archives/edgar/data/0000015615/000001561526000127/mtz930268-kex991.htm
- /Users/gregwo/stocks2/data/edgar_filings/MTZ/10-Q_2026-10-29_0000015615-26-000125.html
- /Users/gregwo/stocks2/data/edgar_filings/MTZ/8-K_2026-08-10_0001193125-26-342507_EX99-1.html
- /Users/gregwo/stocks2/data/analysisv3/context/MTZ.md
- https://stockanalysis.com/stocks/mtz/
- https://www.investing.com/news/earnings/mastec-falls-3-as-earnings-miss-offsets-revenue-beat-4985419
- https://in.investing.com/news/stock-market-news/mastec-in-the-spotlight-can-data-centers-offset-pipeline-woes-93CH-5665164
- https://www.investing.com/news/analyst-ratings/td-cowen-cuts-mastec-stock-price-target-on-pipeline-delays-93CH-4931564
- https://www.investing.com/news/company-news/mastec-q2-2026-slides-record-backlog-amid-185-stock-decline-93CH-4828745
- https://www.trefis.com/stock/mtz/articles/620302/mastec-stock-extends-a-13-day-losing-streak-to-a-25-loss/2026-10-24
- https://www.businesswire.com/news/home/20260226145812/en/MasTec-Reports-Fourth-Quarter-and-Full-Year-2025-Financial-Results-and-Provides-Initial-2026-Guidance
- https://finance.yahoo.com/markets/stocks/articles/sharply-reduced-earnings-outlook-sends-141316243.html
- https://www.trefis.com/stock/pwr/articles/619972/is-quanta-stocks-fall-like-the-ones-before-it/2026-10-22
- https://www.wallstreetzen.com/stocks/us/nyse/mtz/stock-forecast
- https://www.stocktitan.net/sec-filings/MTZ/form-4-mastec-inc-insider-trading-activity-e153fec548a8.html
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 17294+26% | 14299+16% | 12303+3% | 11996+23% | 9778 |
| Gross profit | 1970+15% | 1682+25% | 1351+43% | 944+11% | 847 |
| Operating expenses | 1119+8% | 924+1% | 914+44% | 635+37% | 464 |
| ▸Adj EBITDA | 1377+23% | 1184+26% | 943+3% | 912+2% | 890 |
| ▸Adj OCF | 1018+27% | 906+40% | 648+72% | 378-23% | 491 |
| CapEx | -356 | -260 | -149 | -193 | -263 |
| Adj FCF | 662+15% | 646+30% | 499+170% | 185-19% | 228 |
| Interest expense | 197 | 173 | 193 | 234 | 112 |
| ▸Adj net income | 468+15% | 468+202% | 155+44% | 108-59% | 261 |
| ▸Owner's earnings | 550 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 4554100% | 1072100% | 1115100% | 951100% | 753100% | 663100% |
| FCF (OCF−capex) | 195443% | 11210% | 28626% | 973102% | 49466% | 88.913% |
| Net income | 89620% | 35033% | 39936% | 16317% | -49.9-7% | 33.45% |
| ▸Capital returned | 1323% | -1484-138% | 35632% | 1175124% | 53471% | -449-68% |
| Buybacks | 159 | 0.00 | 77.3 | 0.00 | 0.00 | 81.3 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 865 | 152 | 173 | 193 | 234 | 112 |
| Debt paid down | -892 | -1636 | 105 | 982 | 299 | -642 |
| ▸Reinvestment | 385285% | 1766165% | 60454% | 18720% | 37750% | 918139% |
| Capex (PP&E) | 1141 | 276 | 260 | 149 | 193 | 263 |
| Intangibles & M&A | 2447 | 1634 | 71.0 | 61.5 | 44.0 | 636 |
| Leases signed (net Δ) | 264 | -144 | 273 | -23.2 | 140 | 18.8 |
| Retained / other | 2415% | 11411% | 31.93% | -70.6-7% | 15120% | 14.32% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 173 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 14137 | 10126 | 8975 | 9374 | 9293 |
| ▸Liabilities (total) | 9938 | 6791 | 5988 | 6652 | 6552 |
| Net debt (incl. leases) | 4223 | 2403 | 2232 | 2966 | 3144 |
| Net debt / Adj EBITDA | 3.07 | 2.03 | 2.37 | 3.25 | 3.53 |
| Net debt / Adj FCF | 6.38 | 3.72 | 4.47 | 16.1 | 13.8 |
| Adj EBITDA / interest | 6.99 | 6.85 | 4.88 | 3.89 | 7.93 |
| Shares outstanding | 80.3 | 76.4 | 76.4 | 76.4 | 76.4 |
| Dilution (YoY) | +1.8% | -0.4% | +1.0% | +0.7% | +5.0% |
| Employees | 32000 | 36000 | 33000 | 34000 | 32000 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 11.4%-1.1 | 11.8%+0.8 | 11.0%+3.1 | 7.9%-0.8 | 8.7% |
| Adj EBITDA margin | 8.0%-0.2 | 8.3%+0.6 | 7.7%+0.0 | 7.6%-1.5 | 9.1% |
| Adj OCF margin | 5.9%+0.1 | 6.3%+1.1 | 5.3%+2.1 | 3.1%-1.9 | 5.0% |
| Adj FCF margin | 3.8%-0.3 | 4.5%+0.5 | 4.1%+2.5 | 1.5%-0.8 | 2.3% |
| Net income margin | 2.9%+0.4 | 2.8%+1.5 | 1.3%+1.7 | -0.4%-0.8 | 0.3% |
| Adj NI margin | 2.7%-0.3 | 3.3%+2.0 | 1.3%+0.4 | 0.9%-1.8 | 2.7% |
| ROIC (adj, after-tax) | 8.1% | 10.1% | 6.0% | 3.9% | 4.8% |
| Cost of debt | 5.7% | 6.4% | 6.7% | 6.6% | 4.2% |
Revenue Breakdown
Revenue Segments
| Clean Energy and Infrastructure | $1.3B | +45% |
| Communications | $802.1M | +18% |
| Pipeline Infrastructure | $682.5M | +91% |
| Non-US | $54.0M | NEW |
Earnings Calls
Earnings Call · 2026 Q3
MasTec reported record Q3 2026 results: revenue of $5.152 billion (+30% YoY), adjusted EBITDA of $486 million (+30%), adjusted EPS of $2.96 (+19%) and record backlog of $24.5 billion (up over $7 billion YoY and $3 billion sequentially). Total book-to-bill was 1.6x, with organic book-to-bill of 1.3x. Management expects another record backlog at year-end 2026 and said it remains comfortable with current consensus for 2027. Power Delivery was the standout: revenue +65%, EBITDA +132%, backlog up more than $2.5 billion sequentially (about $1.8 billion from Superior, the rest organic), organic book-to-bill above 1.5x and 12 straight quarters of backlog growth. Legacy Power Delivery grew revenue over 20% with double-digit EBITDA margins, and Superior is performing ahead of acquisition expectations. Clean Energy and Infrastructure revenue rose 34% and EBITDA about 30%, with a 1.3x book-to-bill. Segment revenue reached $1.825 billion, with roughly $1.9 billion expected in Q4. General buildings revenue grew over 4x to just above $1.2 billion annualized, with a 2.2x book-to-bill. Management highlighted accelerating demand for gas generation (simple cycle and reciprocating engines), with limited notices to proceed on over $1 billion of projects not yet in backlog, and for turnkey data centers, where more large awards are expected in 2026. Pipeline Infrastructure was hit by roughly 60-day, permitting-driven project start delays that hurt Q3 and Q4. Backlog grew 26% to about $2.3 billion (1.7x book-to-bill). Management said the work shifts into 2027, margins dipped partly because crews were idle or on lower-margin work, Q4 guidance uses a base and upside case, and the outlook is about $3 billion of 2027 revenue and record EBITDA (above $634 million) by 2028. Over 1,000 miles of new pipeline projects were announced recently. Communications remains weak because of uncertainty over a potential fourth wireless carrier, customer reorganizations and delayed spending. It is now under 15% of revenue. Management is cutting costs, closing some offices opened for expected growth and using a consultant, targeting a couple hundred basis points of margin improvement in 2027, and guided to a flattish 2027 with better margins. Upside could come from 2,100 miles of hyperscaler fiber awards (construction starting mid-2027), BEAD projects and wireless developments, including a potential SpaceX scenario. Cash flow from operations was $267 million in Q3 ($388 million year to date), with over $1 billion expected for 2026. Net leverage was 2.5x, expected below 2x by year-end. Liquidity is $1.6 billion. Management plans to pursue both M&A and share repurchases. The workforce is over 42,000, including 3,500 from Superior. Growth in 2027 margins is expected from mix, Superior synergies, self-perform in general buildings and Communications initiatives.
▸What prompted the ~200 bps Communications margin self-help, and is it cost-driven or a willingness to shrink for better margins? Also, which of gas generation, Pipeline, Power Delivery/Superior is most meaningful for 2027, and can they offset Communications weakness?Jamie Cook · Truist Securities
▸How is MasTec adding resources and capex for legacy Power Delivery growth, similar to Pipeline?Sangita Jain
▸What is the makeup of CEI backlog among renewables, civil and general buildings, and how does burn differ for modeling?Sangita Jain
▸Does MasTec have the assets in place for 2027 growth or need acquisitions?Liam Burke · B. Riley Securities
▸Are the large carriers' fiber purchase announcements consistent with the long-haul fiber rollout?Liam Burke · B. Riley Securities
▸What are the top two or three catalysts for upside surprise a year from now?Alex Rygiel · Texas Capital Securities
▸How important is replicating the MSA model with new customers and end markets?Alex Rygiel · Texas Capital Securities
▸What is the timing of high-voltage transmission bookings and how are resources being prepared?Steven Fisher · UBS
▸What risks and terms come with the CEI opportunities, and what explains reduced productivity noted in the 10-Q?Steven Fisher · UBS
▸What margin uplift can bundled data center awards (Superior electrical, Power Delivery, civil) bring, and are there plans to capture more scope through M&A?Dimple Gosai · Piper Sandler
▸How much Pipeline revenue and EBITDA shifted from 2026 to 2027, how will 2027 projects stay on schedule, and are customers paying for idle crews?Manish Somaiya · Cantor Fitzgerald
▸What is the timing/cadence for realizing Pipeline awards and how far out does visibility extend given 1,000+ new miles announced?Julien Dumoulin-Smith · Jefferies
▸How should we frame CEI growth in 2027 and 2028 given the sector isn't growing as fast?Julien Dumoulin-Smith · Jefferies
▸Can hyperscaler-focused communications work grow significantly in 2027 to offset traditional CapEx weakness, and what about SpaceX?Andy Kaplowitz · Citigroup
▸How is Superior integrating and how is the 2027 opportunity versus initial expectations?Andy Kaplowitz · Citigroup
▸Given the lower MSA mix, larger projects and higher unbilled/unapproved change orders, how much visibility and lumpiness should we expect in cash flow conversion?Justin Hauke · Baird
▸What drove the wireline project execution issues and margin weakness in Communications?Justin Hauke · Baird
▸How large is the buildings business, how much will it contribute to 2027 growth, and could its lower margin hold back CEI margin progression?Marc Bianchi · TD Cowen
SEC Filing Findings
SEC Filing — material findings
2026-10-29 · depth 9/10Nothing material flagged — a clean filing.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $175.00 | $10.90/$13.30 | 18 | $18.00/$20.20 | 40 |
| $180.00 | $8.90/$10.90 | 1,546 | $21.20/$23.70 | 186 |
| $185.00 | $7.20/$9.50 | 79 | $24.30/$26.30 | 80 |
| $190.00 | $6.20/$7.50 | 55 | $27.90/$30.00 | 309 |
| $195.00 | $4.90/$7.00 | 21 | $31.30/$34.30 | 37 |
| $200.00 | $4.10/$5.20 | 208 | $35.30/$37.80 | 93 |
| $210.00 | $2.85/$3.90 | 373 | $43.50/$46.60 | 21 |
| $220.00 | $2.00/$2.90 | 441 | $52.50/$55.50 | 18 |
Short Interest
Web Traffic
Executive Compensation (2003.0-2005.0)
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $3.18B | $143.00 | +$137M | −$219M | — | $6.70T |
| PECONIC PARTNERS LLC | $1.53B | $260.57 | +$41.6M | +$1.53B | — | $7.52B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $1.18B | $322.66 | +$11.5M | +$1.18B | — | $4.68T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $1.17B | $323.15 | +$17.5M | +$1.17B | — | $2.22T |
| STATE STREET CORPPassive | $934M | $236.78 | +$156M | +$154M | — | $3.38T |
| Hill City Capital, LP | $897M | $79.90 | +$0 | +$0 | — | $4.28B |
| JPMORGAN CHASE & CO | $567M | $308.47 | +$464M | +$403M | — | $1.71T |
| LONE PINE CAPITAL LLC | $560M | $321.74 | −$77.3M | +$560M | — | $16.36B |
| BANK OF AMERICA CORP /DE/ | $556M | $179.67 | +$2.4M | +$280M | — | $1.54T |
| FIRST TRUST ADVISORS LP | $553M | $154.90 | −$34.6M | +$273M | — | $169.76B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
| Ticker | Name | Co-holders | Score |
|---|---|---|---|
| LGN | Legence Corp. Class A Common stock | 4 | 55.79× |
| GVA | Granite Construction Incorporated | 3 | 45.64× |
| DY | Dycom Industries, Inc. | 5 | 41.84× |
| Q | Qnity Electronics, Inc. | 4 | 31.88× |
| CRS | Carpenter Technology Corporation | 7 | 23.91× |
| HUT | Hut 8 Corp. | 5 | 23.24× |
| KNX | Knight-Swift Transportation Holdings Inc. | 3 | 22.82× |
| FSLR | First Solar, Inc. | 3 | 15.69× |
| EME | EMCOR Group, Inc. | 3 | 14.77× |
| STM | STMicroelectronics N.V. | 3 | 14.77× |
| CIEN | Ciena Corporation | 4 | 14.24× |
| HWM | Howmet Aerospace Inc. | 5 | 12.13× |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2005 Q2 | 118M | 11M | 1M | $0.01 | $0.01 – $0.01 | 20 |
| 2005 Q3 | 211M | 18M | 7M | $0.11 | $0.09 – $0.13 | 13 |
| 2006 Q1 | 182M | 4M | -3M | $0.04 | $0.03 – $0.05 | 7 |
| 2006 Q2 | 232M | -17M | -24M | $0.18 | $0.14 – $0.22 | 19 |
| 2006 Q3 | 277M | -2M | -8M | $0.26 | $0.21 – $0.31 | 13 |
| 2007 Q1 | 219M | 6M | 2M | $0.09 | $0.07 – $0.11 | 20 |
| 2007 Q2 | 246M | 28M | 15M | $0.22 | $0.18 – $0.26 | 16 |
| 2007 Q3 | 282M | -27M | -34M | $0.20 | $0.16 – $0.24 | 17 |
| 2007 Q4 | 255M | 17M | 7M | $0.13 | $0.10 – $0.16 | 12 |
| 2008 Q1 | 262M | 18M | 8M | $0.12 | $0.10 – $0.14 | 12 |
| 2008 Q2 | 279M | 30M | 14M | $0.19 | $0.15 – $0.23 | 20 |
| 2008 Q3 | 354M | 41M | 21M | $0.28 | $0.22 – $0.34 | 7 |
| 2009 Q1 | 321M | 38M | 11M | $0.14 | $0.11 – $0.17 | 18 |
| 2009 Q2 | 357M | 41M | 17M | $0.21 | $0.17 – $0.25 | 16 |
| 2009 Q3 | 383M | 52M | 21M | $0.25 | $0.20 – $0.30 | 8 |
| 2009 Q4 | 451M | 48M | 16M | $0.18 | $0.14 – $0.22 | 19 |
| 2010 Q1 | 360M | 29M | 6M | $0.06 | $0.05 – $0.07 | 14 |
| 2010 Q2 | 413M | 45M | 12M | $0.12 | $0.10 – $0.14 | 14 |
| 2010 Q3 | 506M | 61M | 23M | $0.21 | $0.17 – $0.25 | 8 |
| 2010 Q4 | 614M | 66M | 31M | $0.30 | $0.24 – $0.36 | 11 |
| 2011 Q1 | 571M | 50M | 19M | $0.22 | $0.18 – $0.26 | 8 |
| 2011 Q2 | 678M | 83M | 40M | $0.25 | $0.20 – $0.30 | 19 |
| 2011 Q3 | 865M | 74M | 32M | $0.36 | $0.29 – $0.43 | 11 |
| 2011 Q4 | 723M | 42M | 8M | $0.13 | $0.10 – $0.16 | 16 |
| 2012 Q1 | 733M | 49M | 13M | $0.15 | $0.12 – $0.18 | 14 |
| 2012 Q2 | 939M | 71M | 28M | $0.33 | $0.26 – $0.40 | 7 |
| 2012 Q3 | 1.0B | 69M | 26M | $0.51 | $0.41 – $0.61 | 20 |
| 2012 Q4 | 912M | 96M | 36M | $0.44 | $0.35 – $0.53 | 18 |
| 2013 Q1 | 851M | 63M | 17M | $0.23 | $0.18 – $0.28 | 7 |
| 2013 Q2 | 894M | 90M | 32M | $0.39 | $0.31 – $0.47 | 19 |
| 2013 Q3 | 1.2B | 101M | 45M | $0.59 | $0.47 – $0.71 | 7 |
| 2013 Q4 | 1.1B | 103M | 40M | $0.49 | $0.39 – $0.59 | 14 |
| 2014 Q1 | 918M | 65M | 15M | $0.19 | $0.15 – $0.23 | 12 |
| 2014 Q2 | 1.1B | 92M | 32M | $0.40 | $0.32 – $0.48 | 12 |
| 2014 Q3 | 1.3B | 115M | 44M | $0.54 | $0.43 – $0.65 | 13 |
| 2014 Q4 | 1.2B | 72M | 21M | $0.36 | $0.29 – $0.43 | 17 |
| 2015 Q1 | 1.5B | 44M | -9M | $0.26 | $0.21 – $0.31 | 15 |
| 2015 Q2 | 1.6B | 51M | -5M | $0.20 | $0.16 – $0.24 | 19 |
| 2015 Q3 | 1.4B | 66M | 9M | $0.40 | $0.32 – $0.48 | 18 |
| 2015 Q4 | 954M | -17M | -71M | $0.11 | $0.09 – $0.13 | 18 |
| 2016 Q1 | 974M | 44M | -7M | $-0.05 | $-0.06 – $-0.04 | 14 |
| 2016 Q2 | 787M | 69M | 12M | $0.11 | $0.09 – $0.13 | 18 |
| 2016 Q3 | 1.4B | 121M | 46M | $0.57 | $0.46 – $0.68 | 7 |
| 2016 Q4 | 1.0B | 108M | 38M | $0.38 | $0.30 – $0.46 | 11 |
| 2017 Q1 | 1.0B | 104M | 35M | $0.43 | $0.34 – $0.52 | 11 |
| 2017 Q2 | 1.2B | 112M | 37M | $0.30 | $0.24 – $0.36 | 19 |
| 2017 Q3 | 1.8B | 147M | 57M | $0.66 | $0.53 – $0.79 | 20 |
| 2017 Q4 | 1.3B | 230M | 117M | $0.27 | $0.22 – $0.32 | 8 |
| 2018 Q1 | 1.2B | 96M | 21M | $0.17 | $0.13 – $0.20 | 9 |
| 2018 Q2 | 1.6B | 184M | 80M | $1.02 | $0.82 – $1.22 | 14 |
| 2018 Q3 | 1.9B | 237M | 114M | $1.19 | $0.95 – $1.43 | 16 |
| 2018 Q4 | 1.9B | 123M | 32M | $1.05 | $0.84 – $1.26 | 8 |
| 2019 Q1 | 1.4B | 121M | 28M | $0.43 | $0.43 – $0.44 | 4 |
| 2019 Q2 | 1.8B | 182M | 75M | $1.12 | $1.11 – $1.14 | 5 |
| 2019 Q3 | 2.1B | 243M | 120M | $1.62 | $1.60 – $1.63 | 4 |
| 2019 Q4 | 1.7B | 217M | 98M | $1.26 | $1.24 – $1.27 | 6 |
| 2020 Q1 | 1.3B | 111M | 24M | $0.45 | $0.45 – $0.46 | 3 |
| 2020 Q2 | 1.5B | 147M | 46M | $0.82 | $0.81 – $0.83 | 4 |
| 2020 Q3 | 1.9B | 245M | 106M | $1.70 | $1.68 – $1.72 | 3 |
| 2020 Q4 | 1.8B | 252M | 108M | $1.67 | $1.65 – $1.69 | 5 |
| 2021 Q1 | 1.6B | 161M | 41M | $0.77 | $0.76 – $0.78 | 3 |
| 2021 Q2 | 2.1B | 223M | 73M | $1.24 | $1.22 – $1.25 | 8 |
| 2021 Q3 | 2.3B | 276M | 103M | $1.69 | $1.67 – $1.71 | 8 |
| 2021 Q4 | 1.9B | 223M | 73M | $1.29 | $1.28 – $1.31 | 4 |
| 2022 Q1 | 1.8B | 72M | -54M | $-0.13 | $-0.13 – $-0.13 | 5 |
| 2022 Q2 | 2.2B | 156M | 16M | $0.72 | $0.71 – $0.73 | 9 |
| 2022 Q3 | 2.5B | 305M | 113M | $1.28 | $1.28 – $1.28 | 9 |
| 2022 Q4 | 2.9B | 342M | 92M | $0.98 | $0.97 – $1.00 | 5 |
| 2023 Q1 | 2.4B | 142M | -60M | $-0.57 | $-0.57 – $-0.56 | 4 |
| 2023 Q2 | 3.0B | 233M | 20M | $0.85 | $0.84 – $0.86 | 8 |
| 2023 Q3 | 3.8B | 394M | 125M | $1.84 | $1.52 – $2.10 | 10 |
| 2023 Q4 | 3.3B | 354M | 102M | $0.45 | $0.42 – $0.47 | 8 |
| 2024 Q1 | 2.6B | 127M | -66M | $-0.41 | $-0.42 – $-0.40 | 9 |
| 2024 Q2 | 3.1B | 282M | 68M | $0.87 | $0.86 – $0.88 | 9 |
| 2024 Q3 | 3.4B | 298M | 97M | $1.23 | $1.17 – $1.28 | 14 |
| 2024 Q4 | 3.3B | 299M | 100M | $1.25 | $1.22 – $1.26 | 8 |
| 2025 Q1 | 2.7B | 185M | 27M | $0.34 | $0.25 – $0.45 | 8 |
| 2025 Q2 | 3.4B | 303M | 112M | $1.40 | $1.23 – $1.45 | 16 |
| 2025 Q3 | 3.9B | 410M | 185M | $2.32 | $2.28 – $2.41 | 11 |
| 2025 Q4 | 3.7B | 373M | 155M | $1.95 | $1.89 – $2.15 | 12 |
| 2026 Q1 | 3.5B | 276M | 79M | $0.99 | $0.91 – $1.02 | 11 |
| 2026 Q2 | 4.3B | 420M | 178M | $2.23 | $2.20 – $2.27 | 11 |
| 2026 Q3 | 4.9B | 561M | 235M | $2.95 | $2.85 – $3.02 | 12 |
| 2026 Q4 | 5.0B | 499M | 201M | $2.52 | $2.31 – $2.68 | 11 |
| 2027 Q1 | 4.7B | 435M | 159M | $1.99 | $1.52 – $2.60 | 6 |
| 2027 Q2 | 5.3B | 550M | 243M | $3.05 | $2.94 – $3.16 | 2 |
| 2027 Q3 | 5.9B | 653M | 318M | $3.99 | $3.84 – $4.13 | 2 |
| 2027 Q4 | 5.8B | 605M | 286M | $3.58 | $3.45 – $3.71 | 2 |
| 2028 Q1 | 5.3B | 527M | 232M | $2.90 | $2.80 – $3.01 | 5 |
| 2028 Q2 | 6.1B | 645M | 317M | $3.98 | $3.83 – $4.12 | 5 |
| 2028 Q3 | 6.6B | 769M | 407M | $5.10 | $4.91 – $5.28 | 5 |
| 2028 Q4 | 6.5B | 700M | 358M | $4.49 | $4.33 – $4.65 | 5 |
| 2029 Q1 | 5.6B | 567M | 265M | $3.32 | $3.20 – $3.44 | 2 |
| 2029 Q2 | 5.6B | 703M | 363M | $4.55 | $4.38 – $4.72 | 2 |
| 2029 Q3 | 5.7B | 888M | 497M | $6.22 | $6.00 – $6.45 | 2 |
| 2029 Q4 | 7.1B | 795M | 430M | $5.39 | $5.19 – $5.59 | 2 |
| 2030 Q1 | 5.8B | 604M | 295M | $3.70 | $3.57 – $3.84 | 2 |
| 2030 Q2 | 5.8B | 745M | 397M | $4.97 | $4.80 – $5.16 | 2 |
| 2030 Q3 | 5.9B | 938M | 536M | $6.71 | $6.47 – $6.96 | 2 |
| 2030 Q4 | 8.0B | 844M | 468M | $5.86 | $5.65 – $6.08 | 2 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-11-02 | SELL | Love Timothy Michael | officer: CAO | 366 | $198.52 | $73K | $1.97M |
| 2026-06-03 | SELL | Csiszar Ernst N | director | 6,500 | $371.17 | $2.41M | $4.01M |
| 2026-05-04 | SELL | Campbell C Robert | director | 3,000 | $417.00 | $1.25M | $12.78M |
| 2026-03-25 | SELL | Palomarez Javier Alberto | director | 950 | $325.43 | $309K | $3.45M |
| 2026-03-03 | SELL | Csiszar Ernst N | director | 6,500 | $300.40 | $1.95M | $5.18M |
v2 analysis (legacy, 2026-07-31) — for comparison onlyclick to expand
Thesis
MasTec is benefiting from an unusually favorable infrastructure backdrop: grid hardening, electrification, data-center power demand, renewables, natural gas infrastructure and fiber connectivity are all supporting record backlog. Revenue has grown rapidly, margins and leverage have improved, and Superior expands exposure to higher-value electrical and mission-critical work. The central question is whether backlog converts into durable cash earnings rather than another cycle of working-capital investment, acquisitions and lease commitments. The near-term picture is mixed. Q2 execution was strong and guidance increased, but Communications is being reset lower because wireless and wireline awards are delayed. The company also has ordinary-course change orders and claims under negotiation, and the Superior acquisition temporarily increases leverage. I expect continued growth, but use a moderate multiple because MasTec remains a project-based contractor with relatively low EBITDA and FCF margins, material execution risk, and imperfect earnings-to-cash conversion.
Trade Signal
Short MTZ: exceptional execution and backlog do not justify a roughly 29x FY26 EPS and 1% FCF-yield valuation, leaving substantial downside if growth, margins, cash conversion or M&A execution merely normalize.
MTZ rose from $217 at year-end 2025 to a late-June peak near $429 as investors rewarded repeated beats, guidance raises, record backlog and the AI/grid/data-center infrastructure narrative. It then fell through July, including weakness around the Superior acquisition financing, communications timing concerns and pre-earnings de-risking. After Q2 results on July 31, the stock dropped from $324.44 to $267.11 despite a strong beat, higher FY26 guidance and record backlog. The earnings-day move looks like a meaningful multiple-compression overreaction relative to the reported business facts, but the earlier rally had also pushed valuation to an extreme. This is a partial temporary dislocation—not a clean oversold opportunity—because the stock remains materially above the study's fair value and at a very low FCF yield.
The prevailing view remains constructive to bullish: 32 of 36 analysts rate the stock Buy, the average target is $346, and the AI/data-center, grid and fiber narrative is widely accepted. The bear case has strengthened after the July drawdown and the Q2 communications guidance reduction, with short interest rising from roughly 1-2% a year ago to 7% of float. However, the stock is not hated or ignored; it is a crowded growth story undergoing a valuation reset. The market appears to have reacted sharply to the earnings print, but not necessarily to the longer-term backlog opportunity.
The operating inflection is genuine—record backlog, strong Power Delivery demand, data-center exposure, Superior's higher margins and expected 2026 EPS growth of 42%—but it is not undiscovered. Consensus is already overwhelmingly Buy, the average target is above the current price, and the stock's prior rally clearly capitalized the AI/grid narrative. The next positive inflection would require cash-flow conversion, sustained margins above 9%, successful Superior integration and communications recovery; those are validation points rather than an unpriced step-change.
- ▲late 2026 · Q3 2026 earnings and guidance update — Expected revenue and EBITDA growth, Superior contribution and communications margins will test whether the FY26 raise is durable.
- ▼Q3-Q4 2026 · Superior Group integration and leverage update — The $1.1B acquisition adds execution and balance-sheet risk; evidence of integration costs or weaker synergies could pressure the multiple.
- ▲Q4 2026 / early 2027 · FY26 cash-flow conversion and year-end leverage report — More than $1B of operating cash flow is expected, but working-capital conversion is currently weak; delivery could support the shares while a miss would expose the valuation.
- ▲H2 2026-H1 2027 · Greenlink West construction milestones — Progress toward the May 2027 in-service date would reduce regulatory and execution concerns around a major transmission project.
- ▲2027 · 2027 wireless spectrum and fiber/data-center award cycle — Delayed wireless work and hyperscaler connectivity awards are the main potential bridge from current communications weakness to renewed growth.
- ▼H2 2026-2027 · Utility rate-case and permitting decisions — Political resistance to utility bills, interconnection delays or a Greenlink North EIS remand could defer backlog conversion.
No reported buyback or insider buying; nine insider sales totaling approximately $11.1M occurred over the last year. Dilution is currently limited, but the Superior acquisition was financed with approximately $1.05B of new debt and raises leverage and potential future capital needs. Short interest has risen to about 7% of float, creating some squeeze risk after the sharp decline, while options positioning shows elevated volatility and somewhat greater put open interest.
There is no hard asset or net-cash floor: MasTec carries meaningful net debt and generates only modest current free cash flow. Backlog, essential infrastructure demand and expected cash generation provide some fundamental support, but the stock still depends heavily on continued earnings growth and a premium multiple. The main ceiling is valuation—at roughly 1.3x sales, 17.7x TTM EV/EBITDA and approximately 85x P/FCF, further upside requires sustained execution and continued multiple acceptance. Insider selling and acquisition-related leverage add overhead, but there is no mechanical cap.
MasTec is a real, liquid, institutionally owned infrastructure platform with credible secular demand from grid modernization, data centers, fiber and power construction. The next buyers would be infrastructure-growth and industrial investors, but at roughly 29x raised FY26 adjusted EPS and only a 1% FCF yield, valuation makes ownership difficult to underwrite despite the strong operating story.
Fear is stronger than greed at this price. The business is executing exceptionally well, but the market is valuing a cyclical contractor as if high growth, margin expansion, cash conversion and successful M&A are already secured. The post-earnings collapse reduces some risk, yet the remaining valuation still leaves little room for ordinary execution disappointments.
Valuation
The Q2 event newly showed a stronger-than-expected quarter, approximately $1.6B of raised FY26 adjusted EBITDA guidance, record $21.4B backlog, and an initial Superior contribution. It also quantified the Communications reset: delayed wireless and wireline awards will reduce second-half revenue, although management expects margin improvement. The broader infrastructure thesis and the Superior acquisition were already substantially known before this release.
▸ How the cases moved
Versus the day before the Q2 release, the bull case rises from roughly $16,500M to $17,900M and probability from 0.22 to 0.25, reflecting the guidance increase, record backlog and Superior's early contribution. The base case rises from about $12,000M to $13,200M and probability from 0.50 to 0.55 because execution and margins beat expectations. The bear case remains near $6,950M but probability falls from 0.28 to 0.20; Communications weakness and working-capital investment prevent a larger upward revision.
Communications remains weak through 2027, delayed awards do not fully return, and execution or claims issues pressure margins. Power Delivery and Clean Energy grow but at lower profitability, while Superior contributes less than expected and leverage remains elevated. EBITDA reaches roughly $1.25 billion, but only about $500 million converts to owner earnings after capex, working capital and lease requirements.
▸ Valuation
7x $1,250M EBITDA = $8,750M EV − $1,800M net debt = $6,950M equity
MasTec executes well across Power Delivery, Clean Energy and Infrastructure, Pipeline, and mission-critical construction. Communications improves from the second-half 2026 trough but does not immediately return to peak run rates. Superior integrates successfully and adds higher-margin work, while backlog supports continued growth. EBITDA reaches approximately $1.8 billion and normalized owner earnings about $850 million as working-capital investment moderates and FCF conversion improves.
▸ Valuation
8x $1,800M EBITDA = $14,400M EV − $1,200M net debt = $13,200M equity
The infrastructure cycle accelerates, with data centers, grid modernization, transmission, natural gas infrastructure and hyperscaler connectivity generating substantial new awards. Communications rebounds sharply in 2027, Superior produces planned synergies, and MasTec sustains margin expansion toward the high-single-digit or better EBITDA range. EBITDA reaches approximately $2.1 billion and owner earnings exceed $1 billion as cash conversion normalizes.
▸ Valuation
9x $2,100M EBITDA = $18,900M EV − $1,000M net debt = $17,900M equity
▸ Target Rationale
The probability-weighted scenario value is $10,500M discounted to today. I apply a modest analytical haircut to $9,800M because the acquisition increases near-term debt, cash conversion has been uneven, disputed change orders create downside risk, and the supplied quarterly data has an EBITDA inconsistency. This is an execution and cash-quality adjustment, not a sentiment discount.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- First Quarter 2026 Financial Results: MasTec announced record-breaking results for Q1 2026, reporting revenue of $3.8 billion (a 34% year-over-year increase). GAAP net income surged 465% to $69.7 million, and Adjusted EBITDA rose 73% year-over-year to $283.6 million, exceeding previous guidance expectations across all metrics.
- Record Backlog Growth: As of March 31, 2026, MasTec’s 18-month backlog reached an all-time high of $20.3 billion, representing an increase of $1.4 billion sequentially and $4.4 billion year-over-year. This momentum was primarily led by a 65% year-over-year surge in the Clean Energy and Infrastructure segment.
- Upwardly Revised FY 2026 Guidance: On the back of strong operational performance, MasTec raised its full-year 2026 outlook. The company now expects full-year revenue of $17.5 billion (up from $17 billion previously) and Adjusted EBITDA of $1.5 billion. Full-year Adjusted Diluted EPS guidance was increased to $8.79, representing 34% year-over-year growth.
- Turnkey Data Center Focus and Investor Day: At its Investor Day on May 12, 2026, management emphasized MasTec's transition into a turnkey partner for hyperscale and enterprise data center developers. The strategy spans civil site prep, high-voltage power delivery, backup generation, and fiber network integration, designed to mitigate execution risks for capital-flush tech operators.
▸ Thesis-test Findings
MasTec Greenlink transmission project execution and regulatory updates 2026
The $4.2 billion Greenlink Nevada transmission project, where MasTec’s subsidiary T&D Power is the general contractor, is showing strong execution progress on its primary leg despite minor regulatory adjustments. Greenlink West (a 350-mile, 525 kV line) is currently under active construction and is on track to be in service by May 2027. Regulatory overhangs from late 2025—which involved safety concerns from the Federal Aviation Administration (FAA) and Department of Defense (DOD) regarding restricted airspace near the Nevada Test and Training Range—were successfully negotiated in early 2026, allowing construction to resume under Bureau of Land Management (BLM) permits. Meanwhile, Greenlink North (a 235-mile, 525 kV line) is progressing through public planning. While it faced a conservationist remand in late 2025 that may require a supplemental Environmental Impact Statement (EIS) in 2026, the BLM has actively resolved routing conflicts (e.g., bypassing active mines and landfill sites) to keep the project on track for its target December 2028 in-service date. These updates support the bull case by showing that MasTec's largest near-term transmission contract is successfully navigating regulatory complexities and moving forward on its core schedule.
US utility capital expenditure trends and grid connection backlog 2026 2027
Macroeconomic data from mid-2026 indicates that US investor-owned utility capital expenditures are expanding at a record pace. Projections for 2026 utility CapEx point to a massive 17% year-over-year jump to between $227.8 billion and $238.8 billion, with long-term forecasts calling for $1.4 trillion in cumulative grid investments through 2030 (a 21% increase over prior five-year plans). This spending is heavily focused on infrastructure hardening and grid connection for AI data centers and renewables. However, the grid connection backlog remains a severe operational hurdle; interconnection queues extend "well beyond a decade" in some power markets, forcing data center developers to aggressively explore alternative on-site generation and microgrids. Furthermore, Fitch Ratings warned in June 2026 that rising retail utility bills are drawing intense political scrutiny ahead of the November 2026 gubernatorial elections, introducing risks that state regulators may push back against utility rate hikes. This environment presents a dual-sided thesis test: the sheer volume of capital deployment strongly favors MasTec’s Power Delivery segment (which grew Q1 revenue by 16% YoY), but connection backlog bottlenecks and political pushback against utility rate cases could act as moderate headwinds for client project timelines.
Hyperscaler fiber route buildouts and E&C contract awards 2026
Hyperscalers have triggered a massive wave of fiber route buildouts as AI clusters shift the industry bottleneck from "compute to connectivity". Combined 2026 CapEx from Amazon, Google, Meta, and Microsoft is projected at $635–$670 billion, with roughly $240 billion directly targeting physical infrastructure (power, cooling, and construction). Terrestrial fiber routing has become a primary beneficiary. In March 2026, Lumen Technologies disclosed that MasTec is one of its three core construction partners handling massive network builds to connect major data center hubs. MasTec is actively pulling dense, next-generation fiber (moving from 400-gig count to 800- and 1,600-strand count fiber) to satisfy hyperscaler demands. During its Q1 earnings call, MasTec highlighted that AI is creating a multi-year fiber capacity and low-latency route opportunity "measured in the tens of billions of dollars". Its Communications backlog reached $5.5 billion (up 20% YoY), and its new turnkey data center project awards are progressing ahead of schedule. This strongly confirms the bull thesis that MasTec is successfully positioning itself as a dominant, high-margin contractor for the high-priority physical buildouts of global hyperscalers.