Stocks/MUX

MUX

McEwen Mining Inc.v3 6.3/10 · 2026-11-03
Basic Materials·Other Precious Metals
$9.93
$582M market cap
v3 Rating
6.3/104.5–7.8
Setup
7.5/106.0–9.0
Fair Value
$18.50$10.00–$30.00+86%
DCF (10%)
$22.00+122%
Base IRR
+19%-8%–+38%
Visibility
wide±54%
Wall Street
$29.67 target(3 analysts last year)(7 buy)
Rating
Revenue (TTM)
$241.6M
Owner Earnings
$80M
Next-Yr Owner Earnings
-$25M
Growth
+18.0% × 4y
P / Next-Yr OE
--
Net Debt
$0M

McEwen Mining Inc. (MUX) is primarily engaged in the discovery, development, extraction, and sale of gold and silver deposits across the United States, Canada, Mexico, and Argentina. The company also conducts exploration for copper reserves. Its portfolio includes full ownership of several key assets: the Gold Bar mine in Eureka County, Nevada; the Black Fox gold mine located in Ontario, Canada; the El Gallo Project and the Fenix silver-gold project, both situated in Sinaloa, Mexico; and the Los Azules copper deposit in San Juan, Argentina. McEwen Mining also possesses a broad array of exploration properties spanning Nevada, Canada, Mexico, and Argentina. Furthermore, the company holds a 49% stake in the San José mine, which is located in Argentina. Initially incorporated in 1979, the enterprise was formerly recognized as US Gold Corporation before adopting the name McEwen Mining Inc. in January 2012. Its corporate headquarters are located in Toronto, Canada.

2-Year Price History

$13.64+53.1%
$10$15$20$25Initial target $18.50 · 2026-11-03volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-03

Rating
6.34.5–7.8
Setup
7.56.0–9.0
Fair value (USD)
18.5010.00 – 30.00
Upside vs 9.93
+86%
DCF (10%)
22.0010.00 – 36.00+122%
Base IRR
19%-8% – 38%
Visibility
widerange ±54%
Sentiment
3/10
2026-11-03 · claude-opus-5-5 · priced at 13.64

McEwen Inc. (MUX, $13.64 at the 2026-11-03 close, a new 52-week low and down 53% from the $29 February peak) is three things in one: a small, badly run but growing gold business (Fox Complex in Timmins, Gold Bar in Nevada, about 55k GEO a year at all-in sustaining cost (AISC) near $3,000 in 2026); a 49% stake in Hochschild's San Jose mine in Argentina (60-65k attributable GEO, $58M of dividends already received in 2026); and a 46.3% stake in McEwen Copper (Los Azules, a 205ktpa heap-leach SX-EW copper project with RIGI protection, last private round $35/share, so MUX's stake is worth about $533M or $8.30 per share) plus a 1.25% NSR royalty on Los Azules. Gold has fallen about 30% from its January high to roughly $3,900 after a margin-call-driven October. Junior miners have capitulated, and MUX also cut Gold Bar guidance (carbonaceous ore) and keeps missing its own plans. At about $873M market cap and roughly zero net debt (once the $50M of Discovery shares from the Fuller/Paymaster sale and marketable securities are counted, and the $110M convert is treated as debt because its capped call offsets dilution up to $17.30), the market values everything other than the copper stake at only about $340M. For that you get San Jose (about $45M a year of attributable FCF), the NSR (about $130M risked) and a gold platform earning about $35M a year of unlevered owner earnings at $3,900 gold, with a funded path to about 140k GEO by 2031 on our haircut assumptions (management says 250-300k). Sum-of-parts gives about $19-20 per share and our DCF (10%, 8x year-5 FCF, copper stake at the private-round value) about $22, so fair value is about $18.5, roughly 35% upside, with a base IRR near 19%. Sentiment is near hated (3/10): price at the bottom of its range, short interest about 17% of shares (partly convert-arbitrage hedges), and analysts still at Buy with $21.50-31 targets that have been cut. Rating 6.3: cheap with real catalysts (Q3 results on Nov 4, Stock mine start, the McEwen Copper IPO/FID, San Jose dividends resuming in 2027). It falls short of a high-conviction buy because of the gold-price dependence, MUX's long record of operational misses, the Argentina double exposure, and related-party dealings with the controlling founder. Research rating 7.5: the open questions are concrete and resolvable within months.

A deep dive would have to establish: Whether the McEwen Copper IPO/FID will mark MUX's 46.3% stake at or above the $35 private-round value without heavy dilution, while Gold Bar's recovery fix and the Stock mine ramp actually lift 100%-owned output to 70k+ GEO in 2027 at sub-$2,800 AISC.

Owner earnings, TTM
$80M$40M – $125M
Realistic peak profit
$170M$90M – $330M
Growth rate
18.0%5.0% – 30.0%
Years of growth
42 – 6
Market cap
$873M$840M – $905M
EV
$875M$830M – $930M
Net debt
$0M-$40M – $45M
Capital return / cap
0.0%0.0% – 1.0%
P/E
28.0×12.0× – 80.0×
EV/EBITDA
11.0×6.0× – 18.0×
FCF yield
8.0%3.0% – 13.0%
Projected FCF, base case (USD millions)
Y1-$25M-$90M – $30M
Y2$5M-$60M – $70M
Y3$60M-$10M – $140M
Y4$125M$30M – $230M
Y5$160M$50M – $290M
Competition: Gold is a price-taker market where MUX's sub-scale, ~$3,000-AISC mines are higher-cost than peers, while Los Azules is a scarce, permitted, RIGI-protected Tier-1 copper development backed by Rio Tinto and Stellantis.
Governance: Controlling founder Rob McEwen sits on both sides of several deals (Canadian Gold Corp acquisition and subscription receipts, an $85M warrant-bearing loan to McEwen Copper, a 13% direct stake in McEwen Copper), and MUX has a long history of dilution and missed guidance; these are conflicts to monitor, not fraud.
Research (expand)

What the company does

McEwen Inc. (formerly McEwen Mining / US Gold) is a Toronto-run, NYSE/TSX-listed precious-metals producer controlled by founder Rob McEwen (16% of MUX, 8.2M shares, $1 salary; he also owns 13% of McEwen Copper directly and lent it $85M). Assets:

  • Fox Complex, Timmins (100%): Froome/Froome West (depleting, ends Q4/26), the new Stock mine (pre-commercial production Q4/26, commercial Q1/27) and Grey Fox (June 2026 PFS: $181M initial capex, Fox mine life to 2041, about 87koz/yr from 2028, post-tax NPV5 $282M at $3,000 gold and $841M at $4,500). Fuller and the 60% Paymaster JV were just sold to Discovery for $55M ($5M cash + $50M Discovery shares).
  • Gold Bar Complex, Nevada (100%): heap leach. 2026 guidance was cut to 30-33k GEO (from 39-43k) with AISC of $2,900-3,200 after carbonaceous preg-robbing ore and an assay-lab outage. The hub-and-spoke plan adds Windfall/Lookout Mountain/Trinity Ridge, with permits about two years away.
  • El Gallo/Fenix, Mexico; Tartan, Manitoba (acquired via Canadian Gold Corp, a Rob McEwen-linked deal): small and development-stage.
  • San Jose, Argentina (49%, operated by Hochschild): 31.6k attributable GEO in H1/26, AISC guidance $2,300-2,500, about three years of reserves that historically get rolled forward each year. $58.2M of dividends received in 2026; about $130M of cash at the JV; no more dividends this year because of Argentine central bank rules, resuming in 2027.
  • McEwen Copper (46.3%): Los Azules, San Juan. FS Oct 2025: $3.2B capex, 205ktpa Cu for years 1-5 then 148ktpa, C1 $1.71/lb, 21-year life (+33 years with Nuton), after-tax NPV8 $2.9B at $4.35 Cu and about $8.3B at the current ~$6.6 Cu. RIGI approved. Partners: Stellantis 18.2%, Rio Tinto/Nuton 17.2%. A $240M term loan was closed in Aug 2026 (Sprott $112M, Rob McEwen $85M). Plan: about a $300M IPO in late 2026, $4B financing package (60/40 debt/equity, mostly ECAs), FID mid-2027, first cathode Q4 2029. MUX also holds a 1.25% NSR on Los Azules and a 27% stake in Paragon (PhotonAssay labs).

The investment case

The pitch in management's own deck is "world-class copper, gold for free": the copper stake at the last private round ($35 x 32.9M shares x 46.3% = $533M) is about 61% of the market cap. The thesis is a sum-of-parts discount bought during a sector capitulation. Gold had its worst October since 2008 (-6.6% to about $3,875, about 30% off the January peak, with margin-call liquidation and Fed-hike odds; GDXJ fell almost 10% in one week). MUX fell from $29 to $13.64, with an extra stock-specific leg after the Q2 Gold Bar miss. Copper itself remains near records (about $6.6/lb), so Los Azules' value has not deteriorated. Catalysts within 12 months: Q3 results (Nov 4), Stock reaching commercial production (Q1/27), the McEwen Copper IPO pricing (it would mark the stake to market), Los Azules FID and ECA financing (mid-2027), San Jose dividends resuming (2027), and closing the Discovery share sale.

What it earns today (unlevered owner earnings, gold about $3,900, silver about $48)

  • 100%-owned mines: about 55k GEO in 2026 at about $3,000 AISC gives a margin of about $50M. Less corporate G&A not in site AISC (about $10M), the maintenance share of exploration (about $10M; most of the $45M/yr expensed exploration and the $16M/yr of advanced-project spending is growth and is added back), cash taxes (small; tax pools) and SBC (about $3M): about $30-35M. Management's own chart shows 2026 FCF of $31M at $4,000 gold *after* expensing all exploration, which is consistent once growth exploration is added back, if anything better than our figure. H1/26 actual: $133M of revenue at $4,749/GEO against $66M of production costs.
  • San Jose 49%: about 62k GEO x (about $3,900 - $2,400 AISC) = about $93M pre-tax; after Argentine taxes and duties about $45M/yr of distributable cash, lumpy and subject to FX/central-bank timing.
  • Total about $80M/yr (90% range $40-125M; gold price is the main swing, at about $130M of FCF per $1,000/oz at full build-out). Adjusted EBITDA at $3,900 gold runs about $80M a year (H1/26 was $67M at $4,750). About 100% of EBITDA reaches owners before growth spend, because sustaining capex sits inside AISC and the EBITDA definition already includes San Jose. After about $7M of interest (5.25% on the $110M convert plus the $20M term loan), the owner yield on the $873M market cap is about 8%. Reported GAAP FCF after growth capex (about $100M of 2026 project capex) is negative and will stay so through 2027.

Five-year FCF (before interest, after all growth capex, San Jose dividends in, no MUX funding of McEwen Copper; gold flat at $3,900)

Our production path is deliberately well below management's 2030 vision of 250-300k GEO including San Jose: 100%-owned output of about 70k (2027), 90k (2028), 110k (2029), 130k (2030) and 140k (2031), with AISC easing from about $2,800 to about $2,600 as Stock/Grey Fox scale.

  • 2027: -$25M (about $49M ops OE + $45M San Jose - about $120M growth capex: Grey Fox, Stock, Gold Bar spokes, Tartan)
  • 2028: +$5M
  • 2029: +$60M
  • 2030: +$125M (first small NSR receipts if Los Azules is on time)
  • 2031: +$160M (about $130M ops, about $25M San Jose, about $30M NSR, less about $25M growth capex)

That is four or five years of 15-25% production growth, then a plateau. The 2027-28 funding gap (about $20M cumulative) is covered by net cash, the $13.5M McEwen Copper loan sale and the Discovery shares. The convert matures in 2030.

What MUX looks like in 5 years

If it executes even half of plan, it becomes a 130-150k GEO mid-tier gold producer in Ontario and Nevada with 10-15 year mine lives, a copper royalty paying about $30-40M a year, and a minority stake in a producing Tier-1 copper mine. That is a valuable, modestly growing income stream, not a corpse. The main bear case is not obsolescence but a lower gold price combined with MUX's chronic execution slippage. San Jose may also be fading by then. Confidence in the projection is low to moderate. Gold price alone moves 2031 FCF by about ±$130M per $1,000/oz, and MUX has missed guidance in most years.

Fair value and multiples

  • Sum of parts (64M diluted shares; the convert is treated as debt because the capped call neutralises dilution below $17.30): McEwen Copper stake $550M (roughly the private-round mark; the deck's 0.45x P/NAV at $5 Cu says $0.9B, but $1.6B of equity still has to be raised) + NSR $130M (risked for FID and timing) + San Jose $200M (about 4 years x $45M plus a share of JV cash) + 100%-owned ops and pipeline $380M (Fox PFS NPV interpolated at $3,900 and discounted at 10% with an execution haircut, plus Gold Bar, Tartan and Fenix, less capitalised corporate G&A) + Paragon $14M, with net debt about 0 = about $1.27B, about $19.5-20 per share.
  • DCF: PV of 2027-31 FCF about $215M + PV of terminal value (8x 2031 FCF of $160M = $1.3B, which is about $805M today) + copper stake $550M + Paragon $14M - net debt 0 = about $1.58B. That is about $23.7 per share before dilution above the cap; about $22 after. At $3,400 gold it is about $15; at $4,500, about $32.
  • Fair value $18.5 (range $10-30). We sit below the DCF because MUX's history argues for an execution discount, and because the copper-stake mark can only be crystallised through an IPO in a risk-off tape that could price below $35. Base IRR about 19%: a year-5 equity value of about $35/share comes from the terminal value, cumulative FCF, and a copper stake of about $750M after dilution.
  • Multiples paid: EV about $875M; EV/EBITDA about 11x headline, but only about 2-3x for the gold + San Jose business once the copper stake and NSR (about $680M) are stripped out. GAAP P/E about 25-35x forward, because expensed exploration and McEwen Copper equity losses depress EPS. Owner-earnings yield about 8%. No dividend or buyback.
  • Peers: MUX's own peer chart shows EV/2026E GEO of about $10k vs a $22.7k peer average (Torex, Hochschild, Endeavour Silver, Wesdome, Discovery, G Mining). At today's price it is lower still.

Management, governance, risks, competition

  • Management: Rob McEwen (Goldcorp founder) is heavily invested (about $293M cost basis across MUX and McEwen Copper) and takes $1 a year. But MUX's long-term record is poor: years of dilution, a 2022 reverse split, and repeated Gold Bar and Fox misses (he called 2025's miss "inexcusable", and Q2/26 brought another cut). The capital-allocation language is good. Related-party flags: the Canadian Gold Corp acquisition from a Rob-controlled company (analysts questioned the 50:1 ratio), subscription receipts that could have forced a $31M cash payment to him if shareholders had not approved them, and his $85M loan to McEwen Copper with warrants. These are conflicts to monitor, not fraud.
  • Risks: (1) gold and silver prices, with operating leverage on about $2,700-3,000 AISC; (2) execution at Gold Bar (carbonaceous ore) and the Froome-to-Stock handoff in Q4/26-Q1/27; (3) Argentina exposure twice over (San Jose dividends need central-bank and audited-surplus approval; Los Azules depends on RIGI surviving the 2027 election); (4) dilution of the McEwen Copper stake through the $1.6B equity raise (Rob says "as small as possible"; MUX has "no obligations" to fund); (5) San Jose's short reserve life; (6) diesel costs, at about $100/oz of AISC per $1/gal.
  • Competition: gold is a price-taker commodity. MUX's mines are sub-scale and higher-cost than peers like Wesdome or Torex. Los Azules is a genuinely scarce asset: a permitted, RIGI-protected Tier-1 copper development with Rio Tinto and Stellantis already on the register.

Sentiment: 3/10 (near hated, with sector capitulation)

The price is at the bottom of its 1-year range ($13.64 vs $29.05), down about 25% in October alone. Only about 10% of gold miners are above their 200-day average, and silver is down 18% in October. Short interest is 10.6M shares (about 17% of shares). Much of that is likely delta hedging of the $110M convert (9.8M conversion shares), so true bearish conviction is lower, but forced deleveraging of convert-arb and generalist holders adds supply. Analysts remain uniformly Buy (about 6 covering: Roth $31 cut from $35, H.C. Wainwright $28 cut from $29.50; consensus about $25.50, low $21.50), but targets are drifting down and retail is tired of guidance misses. This is blood on the ground for the sector, but not yet a washed-out single name: analysts have not capitulated. Covered calls: implied volatility is high (about 68% ATM), but earnings are not predictable at a floor, so this is a partial fit only. Selling $20 December/March calls against a position at a 52-week low captures rich premium near our fair value.

What a deep dive must answer

Where will the McEwen Copper IPO price relative to $35, and how much stake dilution follows? Do the Gold Bar recovery fixes and the Stock ramp put 2027 100%-owned output at 70k+ GEO? Will San Jose distributions resume on schedule?

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue242+45%198+13%174+5%166+51%110
Gross profit66.6+192%39.9+29%30.9+68%18.4-0.54
Operating expenses74.4+59%54.9-33%81.5-55%180+90%94.9
▸Adj EBITDA39.8+787%13.6-19.7-132-75.9
▸Adj OCF89.1+941%9.89-29%14.0-22.9-67.3
CapEx-67.1-44.6-43.1-26.1-24.2
Adj FCF22.1-34.8-29.1-49.0-91.5
Interest expense4.464.664.591.457.79
▸Adj net income5.157.82-52.1-137-104
▸Owner's earnings28.0--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-15.360.1100%43.1100%18.2100%-73.9-62.8
FCF (OCF−capex)-221-16.9-28%-37.8-88%-13.6-75%-65.7-86.6
Net income-28.76.3311%34.480%-43.7-239%55.3-81.1
▸Capital returned-116-27.0-45%-76.0-176%5.8332%14.7-33.7
Buybacks-68.9-32.76.10-0.00-13.4-28.9
Dividends2.250.002.250.000.000.00
Interest paid23.04.464.664.591.457.79
Debt paid down-72.61.16-89.01.2326.6-12.7
▸Reinvestment19357.896%44.5103%42.5233%24.523.9
Capex (PP&E)19557.444.643.126.124.2
Intangibles & M&A-1.930.000.00-1.930.000.00
Leases signed (net Δ)-0.260.37-0.101.29-1.59-0.24
Retained / other-79.414.624%42.9100%-12.9-71%-78.9-45.1

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 8.3 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)975820665660529
▸Liabilities (total)302274170157172
Net debt (incl. leases)69.756.127.217.525.5
Net debt / Adj EBITDA1.754.11------
Net debt / Adj FCF3.16--------
Adj EBITDA / interest8.922.92-4.29-90.6-9.75
Shares outstanding61.455.553.149.449.4
Dilution (YoY)+13.4%+4.6%+7.3%-1.2%+4.4%
Employees18641495424575520
MarginsTTM2025202420232022
Gross margin27.6%+13.920.2%+2.417.7%+6.711.1%+11.5-0.5%
Adj EBITDA margin16.5%+13.86.9%+18.2-11.3%+67.9-79.2%-10.5-68.7%
Adj OCF margin36.9%+31.85.0%-3.08.0%+21.8-13.8%+47.2-61.0%
Adj FCF margin9.1%+32.7-17.6%-0.9-16.7%+12.8-29.4%+53.4-82.9%
Net income margin18.4%+25.617.4%+42.5-25.0%-58.333.3%+106.7-73.4%
Adj NI margin2.1%+18.34.0%+33.8-29.9%+52.5-82.3%+11.9-94.2%
ROIC (adj, after-tax)-1.0%-2.2%-7.4%-19.3%-19.4%
Cost of debt3.5%3.6%11.0%3.0%11.7%

Revenue Breakdown

Revenue Segments

By Product (2025-Q4)
United States Reportable Segment$37.4M-48%
Canada Reportable Segment$22.8M-53%
Mexico Reportable Segment$4.5M+1292%
By Geography (2026-Q1)
UNITED STATES$37.7M+68%
CANADA$25.3M+90%
MEXICO$11.0MNEW

Earnings Calls

11 updates

Earnings Call · 2026 Q2

2026-08-06

McEwen’s second-quarter 2026 call combined an unusually candid assessment of near-term execution with a strong emphasis on long-term asset value. Chairman Rob McEwen conceded that production was below plan and costs were too high, arguing that explanations alone do not create shareholder value. The principal operational setback occurred at Gold Bar, where more carbonaceous material than anticipated reduced gold recoveries through preg-robbing. Management is expanding metallurgical testing, improving geological models, changing mine sequencing and blending, and evaluating processing modifications. The company believes the problem is understood and addressable, but acknowledged that recovery improvements will take time. Gold Bar’s revised outlook does not appear to include a major increase in model conservatism. The orebody model is continuously updated using blast-hole samples and geological mapping, although carbonaceous zones can be missed by the drilling used in the original resource model. Q2 also involved moving more waste than expected to access ore. Management expects AISC to decline from its second-quarter level as recovered ounces improve, because Gold Bar’s largely fixed costs are currently being spread over fewer ounces. Fuel prices are an additional pressure: the increase in U.S. diesel prices from about $3.75 per gallon in 2025 to approximately $4.75 in 2026 has added an estimated $100 per ounce to AISC, and another dollar per gallon could have a similar effect. The company continues to pursue a longer-term Gold Bar hub-and-spoke strategy. Permitting for nearby deposits is roughly two years away and requires water-well studies, while Eureka exploration could eventually contribute materially to the targeted 90,000–100,000 ounces of annual production. At the Fox Complex, ongoing work at Grey Fox, Stock, Whiskey Jack and other targets supports management’s view that the asset can evolve into a mining district, with exploration replacing depletion and extending mine life. Los Azules is the company’s primary strategic growth asset. Approximately 27% of the FID work program was complete by June, with completion targeted for the fourth quarter. Major packages for the SX-EW, sulfuric-acid and crushing facilities have been awarded to Metso, and vendor information is accelerating engineering. New geotechnical data permits consolidation of the pit design from eight sectors to four and reduces the flatter-slope area by approximately 22%, potentially increasing mineable ore and lowering stripping. Exploration targets beyond the current resource, including Franca, Lonita and Austral, are expected to be drill tested beginning in September and could extend the initial 22-year mine life. Los Azules financing discussions are broadening. The company is considering approximately $4 billion of total funding, including working capital, interest and contingency, with an indicative 60% debt and 40% equity mix. ECAs could provide most of the debt, complemented by IFC, other development institutions and commercial lenders. Equity may include existing partners, a new partner, a later-2026 IPO and specialist mining funds. McEwen has no funding obligation at the McEwen Copper level and intends to minimize dilution. The company also expects to retain the Los Azules NSR until production, while potentially building a royalty portfolio for a future IPO or spin-out. San José held roughly $130 million of cash and investments, but no further dividend is expected in 2026. Management closed by reiterating four priorities: improve operations, grow resources, advance Los Azules and allocate capital with discipline.

Analyst Q&A (9)
▸
What is the permitting timeline for the deposits surrounding Gold Bar, and when could ore from those satellite properties begin contributing to the planned 90,000–100,000 ounces of annual production?
Jake Sekelsky · Alliance Global Partners
Permitting for the surrounding Gold Bar deposits is expected to take about two years, including required water-well studies. Exploration results from the Eureka properties could make a meaningful contribution to the targeted production level.
▸
How does McEwen view the Los Azules NSR strategically, including whether it will remain in the portfolio or be monetized or spun out over time?
Jake Sekelsky · Alliance Global Partners
Management is currently inclined to retain the NSR within McEwen until Los Azules reaches production, avoiding additional general and administrative costs and potential tax complications. The company is building a broader royalty portfolio and may eventually consider an IPO or spin-out, which could receive a higher valuation than the operating company.
▸
How much cash and investments did the San José JV have at the end of Q2, and should investors expect additional distributions during the rest of 2026?
Mike Kozak · Cantor Fitzgerald
San José held approximately $130 million in U.S. cash and investments at the end of Q2. No further dividend is expected in 2026 because of central-bank requirements and the need to distribute from audited surplus earnings; dividends could resume next year.
▸
What is the rationale, potential size and status of the enhanced Finnvera financing proposal for Los Azules, and what milestones are needed before it becomes definitive?
Mike Kozak · Cantor Fitzgerald
Finnvera became involved because Metso, a major supplier of crushing, conveying, SX-EW and other mining equipment, is headquartered in Finland. McEwen has engaged multiple ECAs and views their financing as attractive because of competitive pricing, long tenors and political support. Potential commitments may range from roughly $200 million to more than $500 million per ECA, depending on equipment and engineering sourced from each country; Société Générale is helping coordinate the overall package.
▸
Is the revised Gold Bar guidance based only on known reconciliation problems, or does it include additional conservatism for potentially unidentified carbonaceous material? How localized is the issue and what assumptions underpin the outlook?
Don DeMarco · National Bank
The Gold Bar model is continuously updated using blast-hole samples taken roughly every 12–14 feet. Management has not materially increased the model's conservatism, but Q2 encountered more waste and carbonaceous material than expected. The company is increasing overall mining and waste movement and using ongoing geological sampling and bench mapping to improve ore control, while acknowledging some carbonaceous zones are difficult to predict.
▸
What major work streams remain in the Los Azules FID program, and which milestones are most likely to drive greater market recognition of the project's value?
Don DeMarco · National Bank
About 27% of the FID work program was complete by June, with completion still targeted for Q4. Major packages for the SX-EW plant, sulfuric-acid plant and crushing system have been awarded to Metso, and engineering is advancing with vendor data. New geotechnical information should allow a more efficient pit design, reducing the flatter-angle zone by about 22%, increasing mineable ore and reducing stripping. Exploration targets including Franca, Lonita and Austral are planned for drilling beginning in September, potentially extending the asset beyond its initial 22-year life.
▸
How does management expect to structure Los Azules financing among debt, equity, ECAs, project-finance lenders and a potential IPO, and what funding obligation or dilution tolerance does McEwen have at the McEwen Copper level?
Jeremy Hoy · Canaccord Genuity
Los Azules is targeting approximately $4 billion of total financing, against roughly $3.2 billion of feasibility-study CapEx plus working capital, interest and contingency. Management currently envisions approximately 60% debt and 40% equity, with 80%–85% of the debt potentially supplied by ECAs and the balance from project finance involving IFC, other development institutions and commercial banks. The equity portion could include existing and new partners, an IPO expected later in 2026, and specialized mining funds. McEwen intends to minimize dilution and retain as large an ownership stake as possible; it has no contractual funding obligation at the McEwen Copper level.
▸
Why has all-in sustaining cost risen so substantially?
Terry DeVries
The primary reason for elevated AISC was lower-than-expected Gold Bar production, since the operation has a relatively fixed cost base and fewer ounces increased cost per ounce. AISC is expected to decline as recoveries and production improve in the second half. McEwen is mainly exposed to U.S. diesel prices at Gold Bar: the increase from roughly $3.75 per gallon in 2025 to $4.75 so far in 2026 has added about $100 per ounce to AISC, and another $1 per gallon increase could add approximately $100 per ounce more.
▸
What would be the effect on AISC of a $10 move in crude oil prices?
Terry DeVries
McEwen is not broadly or directly exposed to crude oil prices, but Gold Bar uses fossil fuels and is exposed to U.S. diesel prices. Management estimates that each additional $1 per gallon increase in diesel would add close to $100 per ounce to overall AISC.

SEC Filing Findings

SEC Filing — material findings

2026-08-05 · depth 9/10
risk 6Dilution
▸

$110M 5.25% convertible notes due 2030 carry an initial conversion price of about $11.25 (about 12.7M underlying shares, roughly 21% of basic shares). The Level 1 fair value of $211.6M versus a $106.8M carrying amount shows the conversion option is deep in the money. The capped call only offsets dilution up to a $17.3 per-share cap.

“which is equivalent to an initial conversion price of approximately $ 11.25 per share”

Options

Chain Snapshot (daily)

Call IV (ATM)95%
Put IV (ATM)50%
ATM Spread6.2%
Call $OI (near money)$328K
Put $OI (near money)$429K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$14.0
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$10.00$4.20/$5.400--/$0.250
$11.00$3.70/$4.405$0.05/$0.354
$12.00$2.40/$4.600$0.05/$0.800
$13.00$1.10/$2.800$0.20/$2.650
$14.00$1.25/$2.103$0.55/$1.652
$15.00$1.10/$1.6021$0.85/$2.0011
$16.00$0.30/$1.156$0.85/$2.602
$17.00$0.40/$0.953$2.30/$3.400
Snapshot: 2026-11-04

Short Interest

Short % of Float18.8%
Short Shares9.7M
Days to Cover11.6
Change (vs Prior)-0.1%
Short % Float History
18.80%+2.80pp
16.0%18.0%20.0%22.0%24.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2023.0-2025.0)

Direct Pay$6.2M
Incentive & Other$4.0M
Total Compensation$10.2M
% of Revenue1.7%

Cash Runway

20.1months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$86.1M$16.52+$50.7M+$69.6M—$6.70T
STATE STREET CORPPassive$77.1M$14.68+$16.2M+$48.5M—$3.38T
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$37.2M$12.07−$1.4M+$11.5M—$83.85B
VAN ECK ASSOCIATES CORP$27.5M$3.95−$901K−$3.6M—$164.08B
Tidal Investments LLC$26.8M$12.40+$2.1M+$11.5M—$41.21B
GEODE CAPITAL MANAGEMENT, LLCPassive$26.0M$13.59+$15.1M+$16.8M—$1.87T
DIMENSIONAL FUND ADVISORS LPPassive$24.7M$10.26+$1.7M+$1.7M—$551.30B
TWO SIGMA INVESTMENTS, LP$18.5M$15.21−$5.1M+$11.3M—$128.44B
BANK OF MONTREAL /CAN/$16.0M$18.11+$3.6M+$15.2M—$268.37B
BNP PARIBAS FINANCIAL MARKETS$15.7M$16.12−$4.1M+$11.9M—$189.47B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

02.9M5.7M8.6M11.4M$3.26$7.55$12$16$202022-092023-062024-032024-122025-092026-06
hover the chart for per-quarter detailprice (right axis)
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.2.1MVAN ECK ASSOCIATES CORP1.5MTidal Investments LLC1.5MTWO SIGMA INVESTMENTS, LP1.0MUBS Group AG748KBNP PARIBAS FINANCIAL MARKETS865KMORGAN STANLEY764KBANK OF MONTREAL /CAN/883KFMR LLC609KSynergy Asset Management, LLC803K

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (3 analysts)$29.67+213.0%
Current Price$9.48
Analyst Ratings
7
Buy: 7Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2013 Q17M-39M-40M$0.72$0.58 – $0.8619
2013 Q210M-347M-347M$-0.27$-0.32 – $-0.229
2017 Q424M7M2M$0.10$0.08 – $0.1211
2018 Q217M-2M-6M$-0.11$-0.13 – $-0.0911
2018 Q313M-10M-15M$-0.22$-0.26 – $-0.1814
2018 Q418M-6M-12M$-0.22$-0.26 – $-0.1811
2019 Q123M-9M-13M$-0.35$-0.37 – $-0.337
2019 Q232M-8M-14M$-0.20$-0.21 – $-0.199
2019 Q335M6M-6M$-0.17$-0.18 – $-0.165
2019 Q436M-2M-12M$-0.20$-0.21 – $-0.195
2020 Q132M-2.0B-2.1B$-0.15$-0.16 – $-0.147
2020 Q218M-7M-13M$-0.35$-0.37 – $-0.339
2020 Q329M-3M-10M$-0.23$-0.25 – $-0.224
2020 Q429M-0M-9M$-0.15$-0.16 – $-0.145
2021 Q125M-2M-7M$-0.20$-0.21 – $-0.198
2021 Q239M1M-6M$-0.15$-0.16 – $-0.141
2021 Q338M5M-3M$-0.05$-0.05 – $-0.051
2021 Q435M6M-6M$-0.10$-0.11 – $-0.091
2022 Q128M-16M-21M$-0.25$-0.27 – $-0.231
2022 Q234M-0M-6M$-0.21$-0.22 – $-0.191
2022 Q336M-6M-12M$-0.24$-0.26 – $-0.231
2022 Q434M-5M-15M$-0.17$-0.18 – $-0.151
2023 Q130M-16M-23M$-0.26$-0.27 – $-0.241
2023 Q239M2M-6M$-0.66$-0.70 – $-0.621
2023 Q337M-5M-14M$-0.74$-0.77 – $-0.722
2023 Q447M-11M-18M$-0.20$-0.22 – $-0.191
2024 Q138M-17M-26M$-0.07$-0.07 – $-0.071
2024 Q242M-4M-14M$-0.23$-0.25 – $-0.221
2024 Q344M2M-8M$-0.10$-0.11 – $-0.101
2024 Q432M1M-7M$-0.11$-0.11 – $-0.111
2025 Q136M0M-7M$-0.12$-0.12 – $-0.121
2025 Q249M10M2M$0.03$0.03 – $0.031
2025 Q364M27M17M$0.28$0.15 – $0.392
2025 Q470M19M11M$0.17$0.17 – $0.181
2026 Q167M30M19M$0.32$0.31 – $0.321
2026 Q266M33M17M$0.28$0.27 – $0.281
2026 Q356M17M6M$0.10$0.10 – $0.101
2026 Q444M13M4M$0.07$0.07 – $0.071
2027 Q148M14M5M$0.08$0.08 – $0.081
2027 Q260M17M8M$0.12$0.12 – $0.131
2027 Q376M21M10M$0.17$0.17 – $0.171
2027 Q496M34M22M$0.36$0.36 – $0.371

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$18K
1 txn · 1 insider · 1,000 sh
Sells ($, 12mo)
$59K
1 txn · 1 insider · 3,275 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-06-29SELLBrissenden Richard W.director3,275$18.13$59K$327K
2026-06-05BUYKaszas Stephen Douglasdirector1,000$18.36$18K$30K
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand

Thesis

McEwen Mining has moved from a deeply loss-making, capital-consuming miner toward positive EBITDA, cash generation and improving margins. TTM revenue is up 48%, adjusted EBITDA is $64M, adjusted FCF is $32M and net debt is only $37M. However, the apparent turnaround is not yet fully proven: working capital contributed materially to cash generation, capex remains high, Gold Bar has suffered from unexpectedly carbonaceous ore and lower recoveries, and shares have continued to increase. The principal upside is the combination of Stock, Grey Fox, Gold Bar expansion and the Los Azules copper project. Los Azules could be transformative, but its value belongs primarily at the project level and is not yet equivalent to cash in McEwen Mining's hands. The proposed financing structure and lack of a contractual parent funding obligation reduce the risk of a catastrophic funding burden, while a future McEwen Copper IPO could provide a useful valuation reference. Still, execution, permitting, Argentina, project financing and dilution remain substantial risks. The base case assumes improving but uneven gold operations and a gradual conversion of project investment into owner earnings. The range is unusually wide because the company's value is split between currently operating mines and a large, financing-dependent copper development asset.

Trade Signal

Trade rating
+5.8/10
Buy
Horizon
~4mo
gpt-5.6-luna2026-08-07 · saw $19.19-48.3% since

Short MUX: at roughly $19 the stock materially exceeds the analyst's approximately $13 fair value while current FCF is negligible, dilution is high and the latest call leaves Gold Bar execution unresolved, although the copper IPO and high short interest warrant moderate sizing.

Temporary mispricing-2.0

The major upward leg from roughly $8 in mid-2025 to the mid/high-$20s by early 2026 reflected the precious-metals rally, improving reported results, the turnaround narrative and growing Los Azules/IPO optionality. The stock then fell from about $28.35 in late February to $18 in June as momentum and commodity-related enthusiasm unwound, before rebounding to $19.71 immediately ahead of earnings. After the August 6 earnings call, it slipped only about 3% from $19.71 to $19.15 despite management acknowledging below-plan production, Gold Bar recovery problems and high costs. The recent move looks more like a partial but insufficient reaction to bad operating news than panic selling: the market has not fully marked down the execution risk. That gap can close on subsequent prints, although commodity beta and the copper IPO can cause sharp countertrend rallies.

Market view+2.0

The market appears constructive to bullish on the turnaround, high gold prices and the embedded Los Azules copper option. Sell-side consensus is Buy with a $23.70 average target, and the stock has risen 78% over one year despite falling 34% from its 52-week high. Bears focus on Gold Bar recovery failures, poor current cash conversion, high capex, financing risk and dilution. Positioning is conflicted: short interest has climbed to 24.6% of float with 14.2 days to cover, while call open interest exceeds put open interest. This is a crowded and volatile battleground rather than a universally loved stock; the bullish narrative may be stale because the latest earnings call confirmed execution problems.

Inflectionwindow ~3mo-2.5

The business has real medium-term positive optionality from Stock, Grey Fox and Los Azules, but the next visible inflection is mixed rather than clearly positive. Gold Bar is currently below plan with unresolved preg-robbing and high costs, while the analyst's base case assumes only gradual improvement. Stock production, Los Azules financing/FID and a copper IPO could improve appeal, but these are already central to the bullish market narrative. Consensus is constructive, with all seven listed recommendations being buys and a $23.70 average target, so the upside path is not undiscovered. Near-term evidence is more likely to test execution than reveal a surprise step-up.

Catalysts
  • ▲H2 2026 · Stock Mine initial production — Initial gold production is targeted for H2 2026; a successful ramp would improve production credibility and cash-flow expectations.
  • ▲Q4 2026 · Los Azules FID and financing update — FID and evidence of predominantly project-level debt/equity financing could reduce the discount on McEwen Mining's retained copper stake.
  • ▲Q4 2026 · McEwen Copper IPO — A late-2026 IPO could establish a public valuation for the copper asset and provide funding, though pricing and dilution remain uncertain.
  • ▲2026-09 · Los Azules exploration drilling — Drilling at Franca, Lonita and Austral beginning in September could expand the resource and support a higher strategic valuation.
  • ▼2026-11 · Q3 2026 earnings and Gold Bar operating update — The next print should show whether preg-robbing, recoveries and elevated AISC are improving; another miss would challenge the turnaround thesis.
  • ▼Late 2026 to 2027 · Additional financing or equity issuance — Funding the broader Los Azules capital structure could create parent-level dilution or expose a larger-than-expected funding obligation.
Flow-4.0

Net flow is unfavorable: trailing share dilution was approximately 11%, there is no buyback, insider activity is predominantly selling, and a major-holder sale is recorded. The planned Los Azules financing and IPO may fund the project but could still create equity supply. Short interest at 24.6% of float and 14.2 days to cover provides squeeze fuel, while call open interest is materially greater than put open interest.

Floor / Ceiling-2.0

There is some asset support from San José cash generation, the retained Los Azules stake, Fox/Grey Fox resources and positive commodity prices, but there is no hard net-cash or committed-bid floor. Current owner earnings and FCF do not support the price, and a rally could encounter dilution or selling from insiders and holders. The principal support is strategic asset value rather than near-term cash generation.

Buyability

Moderately buyable as a speculative precious-metals/copper growth story: strong gold and copper prices, Los Azules optionality and the planned McEwen Copper IPO can attract buyers. However, current valuation rests heavily on future execution, while operating losses, 11% trailing dilution and uncertain parent-level funding reduce the quality of the buyer base.

Fear vs Greedfear 7/10 (+2.0)greed 8/10 (+1.0)

Fear pulls stronger than greed at $19. The asset story is genuine, but the market is paying for a successful Stock ramp, Gold Bar recovery fix, favorable financing and a valuable copper IPO despite zero current FCF, unresolved operating problems and meaningful dilution. The main reason not to be aggressively short is the high commodity beta and substantial catalyst-driven squeeze risk.

Valuation

Our Target
$800M+38%
Market Should Pay
$680M+17%
target ×0.85 (fear discount)
Current Market Cap
$582MSlightly bearish
What Changed
transcript · 2026-08-06
-6%fair value on this information

The genuinely new information in the Q2 event is the severity and nature of the Gold Bar problem: lower recoveries from more carbonaceous ore, unexpectedly high waste movement and higher diesel costs are depressing production and AISC, while management acknowledged that the resource model has not been made materially more conservative. The call also clarified that no further San José dividend is expected in 2026 and that Los Azules is targeting roughly $4B of project financing with no contractual funding obligation at the McEwen Copper level. Progress on FID engineering and supplier awards is encouraging, but remains less immediate than the Gold Bar operational setback.

▸ How the cases moved

Versus the day before the Q2 call, the bear case rises from approximately $350M to $400M as Gold Bar's recovery problem appears more persistent and management has not materially increased model conservatism; bear probability rises from 0.25 to 0.30. The base case moves from approximately $850M to $825M as near-term production and cost risk offsets better cash generation and progress toward Stock and Los Azules financing; base probability rises from 0.50 to 0.52. The bull case rises from approximately $2,100M to $2,200M because 27% of the Los Azules FID work program is complete, major equipment packages have been awarded and the project financing architecture is becoming more concrete; bull probability falls slightly from 0.25 to 0.18 because the Gold Bar issue is more clearly an execution risk.

2-Year Plausible Outcomes
bear30%
$400M
rev -5%/yrOE $20M

Gold Bar recovery problems persist, diesel and mining costs remain elevated, and Stock contributes slowly. Los Azules is delayed or requires more parent-level dilution than expected. Gold and copper prices remain supportive enough to avoid insolvency, but owner earnings settle near maintenance levels and the market assigns a low-quality mining multiple.

▸ Valuation

20x $20M owner earnings = $400M equity value

base50%
$825M
rev +15%/yrOE $55M

Gold Bar recovery improves gradually but does not immediately reach plan, while Stock ramps during 2026-27 and Fox maintains a useful production base. Los Azules reaches FID and secures project financing without a material funding obligation at McEwen Mining, but the copper asset remains partly discounted until financing and the IPO are completed. Normalized owner earnings rise as current development spending converts into production.

▸ Valuation

15x $55M owner earnings = $825M equity value

bull20%
$2.2B
rev +30%/yrOE $110M

Gold Bar fixes the preg-robbing and ore-control issues, Stock ramps successfully, and Grey Fox extends the Fox Complex into a materially larger, lower-cost district. Los Azules completes FID, attracts substantial project-level debt and equity, and the McEwen Copper IPO establishes a high valuation for McEwen's retained stake without substantial parent dilution. Strong gold and copper prices support a premium growth-miner valuation and owner earnings exceed $100M.

▸ Valuation

20x $110M owner earnings = $2,200M equity value

▸ Target Rationale

The probability-weighted scenario value is $778M. I set the analytical target modestly higher at $800M because the arithmetic understates the strategic value of the retained Los Azules stake, the San José joint venture and the possibility of a McEwen Copper IPO establishing a separate market valuation. I do not assign full bull-case credit: Gold Bar execution is unresolved, owner earnings have not yet been demonstrated through a full normalized cycle, and dilution and project-financing risks justify retaining a substantial discount to the optimistic asset story.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now6/10
Trajectory7/10
Risk7/10
Governance5/10
Insolvency prob (2yr)4%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Grey Fox Pre-Feasibility Study (June 2026): McEwen released a highly favorable Pre-Feasibility Study (PFS) for its 100%-owned Grey Fox gold project near Timmins, Ontario. The study projects an average annual gold production of 87,000 ounces from 2028 through 2041, with peak production reaching 100,000 ounces in 2029. This extends the overall Fox Complex mine life by 15 years to 2041. The initial capital expenditure is estimated at $181 million, which is planned to be funded primarily through internal cash flows to minimize share dilution.
  • San José Mine Dividend Windfall (May 2026): McEwen announced that it received a massive $49.4 million dividend from the San José gold-silver mine in Argentina (operated by 51% partner Hochschild Mining, with McEwen holding a 49% interest). This brought total year-to-date dividends from the mine to $58.2 million, blowing past the company’s full-year guidance of $40 million to $50 million. The surplus cash provides a critical liquidity cushion to fund its near-term development pipeline.
  • Q1 2026 Financial Turnaround (May 2026): McEwen reported strong financial results for the first quarter of 2026. The company posted a net income of $33.4 million ($0.56 per share), representing a major turnaround from a net loss of $6.3 million ($0.12 per share) in Q1 2025. Cash and cash equivalents stood at $56.5 million as of March 31, 2026.
  • Consolidation of Nevada Assets (April 2026): McEwen closed its acquisition of Golden Lake Exploration Inc. via a statutory plan of arrangement. The transaction consolidates the Gold Bar Mine Complex in Nevada by incorporating Golden Lake's high-grade Jewel Ridge projects, which are adjacent to McEwen's recent discoveries.
  • Debt Mandate for Los Azules (May 2026): McEwen Copper appointed Societe Generale as its financial advisor to arrange a proposed $2.4 billion project debt package. This debt component forms the backbone of a targeted $4 billion capital structure to finance the development of the massive Los Azules copper project in Argentina.
▸ Thesis-test Findings
McEwen Copper IPO Valuation Filings

McEwen Copper is advancing its plans for a $300 million Initial Public Offering (IPO) targeted for late 2026 (primarily the fourth quarter), with the listing anticipated in either the United States or Canada. In terms of valuation, the most recent private financing rounds place the implied carrying value of McEwen Mining's 46.3% stake at $457 million, reflecting an implied total valuation of approximately $984 million for McEwen Copper. Management has highlighted that if copper prices remain favorable, the IPO shares could price higher than the $30 per share level established during private placements. This pending IPO acts as a powerful bull case catalyst, as it is expected to establish a public market reference price that could unlock substantial unrecognized value for McEwen Mining's shareholders while providing a portion of the equity required for the $4 billion Los Azules build.

Javier Milei Argentina RIGI Mining Approvals (Los Azules)

The regulatory environment under President Javier Milei has drastically de-risked the Los Azules project, building a highly favorable bull case. Los Azules was formally approved for Argentina’s Large Investment Incentive Regime (RIGI), validating a planned $2.7 billion investment phase. The RIGI designation secures a 30-year period of fiscal stability, free access to foreign currency, and a reduced corporate income tax rate of 25% (down from the standard 35%). Further strengthening the regulatory outlook, the Argentine Congress in April 2026 passed Milei’s controversial amendment to the "glacier law". This legislative overhaul authorizes mining in ecologically sensitive permafrost zones and shifts the power of environmental designations from federal scientific bodies to local provinces. Michael Meding, Managing Director of Los Azules, publicly supported the reform, noting that it provides the "legal certainty" and "clear definitions" necessary to proceed toward a Final Investment Decision (FID) by late 2026.

McEwen Mining Stock Mine Production Start Date

The Stock Mine development (part of the Fox Complex in Ontario) remains on track, with initial gold production scheduled to begin in the second half of 2026, followed by commercial production in 2027. McEwen has invested $39.4 million into Stock's underground development since last year, including $9.9 million during the first quarter of 2026. The start of production at Stock is a core short-term catalyst for the bull case, as it is designed as a low-cost ore source that benefits from zero royalty burdens, shorter haulage routes, and softer processing material. Its six-year initial mine life is expected to support McEwen’s broader goal of doubling total precious metals production to 250,000–300,000 gold equivalent ounces (GEOs) by 2030, generating strong internal cash flows to self-fund the subsequent Grey Fox development.