NDA.DE
Aurubis AGv3 4.5/10 · 2026-11-26Headquartered in Hamburg, Germany, Aurubis AG specializes in the advanced processing of metal concentrates and diverse recycling materials. The company's operations leverage a broad array of inputs, encompassing various scrap metals, both organic and inorganic metal-bearing recycled substances, and industrial residues. Aurubis manufactures an extensive range of semi-finished copper products, including wire rods, specialized wires, custom shapes, bars, profiles, and rolled goods for industrial and architectural applications. Beyond copper, it extracts and produces a diverse portfolio of other valuable metals such as gold, silver, lead, lead-bismuth alloy, lead-antimony litharge, tellurium in metallic form, and tellurium dioxide. A significant part of its business involves the comprehensive recycling of copper, copper scrap, various alloy scraps, other general recycling materials, precious metals, and additional non-ferrous metals. The company also generates important by-products like sulfuric acid, iron-silicate, smelter intermediates, and selenium. These multifaceted processes transform purchased copper and copper alloy scrap, electronic waste, and industrial residues into numerous valuable products. Established in 1866, the company, initially known as Norddeutsche Affinerie AG, formally adopted its current name, Aurubis AG, in April 2009.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
Aurubis, Europe's largest copper smelter and recycler, has halved from its €216 May peak to about €110 (finanztrends quote of 26 Nov; pack close €107.10 on 25 Nov) as copper, gold and silver came off September records, the Richmond (US) recycling smelter slipped a year and had its €170m EBITDA target cut, and 2027 concentrate TC/RCs look set at zero or below. FY25/26 will close near the top of guidance (operating EBT ~€520m, EBITDA ~€800m), but that is a peak-ish year: record metal prices, €180m of sulfuric acid, a Pirdop-shutdown-free base. On normalised earnings (operating EBT ~€400-450m, maintenance capex ~€300m) the business makes about €280-330m of unlevered owner earnings, and a cyclical, capital-intensive processor growing slowly deserves 10-12x free cash flow in year 5. That DCF gives about €90 a share against €110: the sell-off took out the bubble, not the value. Upside routes exist (sulfuric acid recontracting at much higher 2027 prices, the €260m project EBITDA uplift, capex falling from ~€600m, a working-capital release), but the market sees them too. Rating 4.5: fairly to slightly richly priced, a pass. Setup 3.0: no variant perception beyond 'it fell a lot'; the 2 Dec annual report and FY26/27 guide are the next tell.
Flow: No buyback and no issuance; Salzgitter holds ~30% and is not known to be selling; Goldman's reported position fell from ~11% to ~6.5% on 6 Nov 2026, but that is mostly derivatives/lending rather than an owner exiting. Nothing notable either way.
A deep dive would have to establish: Do normalised earnings after zero/negative 2027 TC/RCs, lower metal prices and a slow Richmond still justify ~€5bn of EV, or was FY25/26 a cyclical peak?
Research (expand)
What it does. Aurubis (Hamburg) smelts copper concentrate (Hamburg, Pirdop in Bulgaria), recycles scrap and e-waste (Lünen, Olen, Beerse, Hamburg CRH, now Richmond, Georgia), and sells cathode, wire rod, shapes and by-products (sulfuric acid, gold, silver, minor metals). Earnings come from treatment/refining charges (21% of 9M gross margin), metal result (43%, metal recovered above paid content, plus price) and products/premiums (36%).
What the market believes. The stock ran from €74 to €216 (Jan-May 2026) on record copper/precious prices, the sulfuric acid squeeze and an 'electrification/AI copper' bid, then fell back to ~€110 as metals sold off in Oct-Nov, Richmond was pushed out a year and cut to 'low triple-digit' €m EBITDA, and Deutsche Bank/BNP cut targets (€169, €114). The market now prices it at roughly book (~€4.6-4.9bn equity) and ~6.5x peak EBITDA. I don't see a mispricing: the 2026 surge was the anomaly, and today's price sits about where the business's normal earnings put it.
What it earns. FY25/26 (Sep YE) guidance: operating EBITDA €700-800m, EBT at the top of €425-525m. Through-cycle EBT was €350-530m in FY22-25. Normalised: EBIT ~€430m, 25% tax → ~€320m, +D&A ~€270m, less maintenance capex ~€300m → owner earnings ~€290m (no meaningful SBC). Headwinds: CY2027 concentrate TC/RCs at or below zero (2026 benchmark $0; spot -$300s), metal prices off the highs, Richmond EBITDA only breakeven in FY26/27. Tailwinds: sulfuric acid recontracting (only ~85% hedged at old prices this year), Pirdop tankhouse (+120kt cathode), CRH, capex below €600m and falling.
Projected unlevered FCF (€m, after all capex): FY27 250, FY28 320, FY29 370, FY30 400, FY31 420. Working capital swings by hundreds of millions with metal prices and is ignored in the base.
Year 5. 'Neither': a cyclical, capital-intensive smelter/recycler with a real niche (complex feed, Copper Mark, European supply security), but no pricing power on concentrates against Chinese capacity. ~2-4% growth → 10-12x FCF, terminal ~€4.6bn. DCF at 10%: PV FCF ~€1.3bn + PV terminal ~€2.9bn = EV ~€4.2bn, less net debt incl. pensions ~€0.4bn → ~€3.8bn, ~€88/share (43.7m shares). Generous case (FCF €480m, 13x) ~€115; bear (zero TCs plus metals down further, 9x) ~€60.
Multiples at €110. Market cap ~€4.8bn, EV ~€5.2bn; ~12x FY26 EPS (~€9), ~16x normalised; EV/EBITDA 6.5x peak, ~7.5x normal; ~6% normalised FCF yield; dividend €1.60 (1.5%).
Management and risks. CEO Toralf Haag and CFO Steffen Hoffmann are candid (they named the Richmond problems and gave numbers), after the 2023 metal theft/fraud scandal and the old Richmond overspend. Risks: Chinese smelter overcapacity keeping TCs negative for years, a second US project at sub-hurdle returns (they said they might do one anyway: Richmond's ~€825m capital employed on ~€100-150m EBITDA misses the 15% ROCE target), metal price falls, German energy costs. Salzgitter holds ~30%.
Sentiment: 4/10. Sharp drawdown and target cuts, but no capitulation; analysts mostly Hold.
- /Users/gregwo/stocks2/data/analysisv3/context/NDA.DE.md (Q3 2025/26 call, 6 Aug 2026)
- https://www.aurubis.com/en/media/press-releases/press-releases-2026/Aurubis-moves-full-year-guidance-to-upper-end-of-forecast-range-after-notably-improved-Q3
- https://www.finanztrends.de/news/aurubis-aktie-geschaeftsbericht-am-2-dezember-erwartet/
- https://www.kitco.com/news/off-the-wire/2026-10-16/antofagasta-nets-its-highest-ever-copper-treatment-charges-auction
- https://www.crugroup.com/en/communities/thought-leadership/2026/Mid-year-settlements-signal-a-further-shift-towards-copper-concentrates-index-pricing/
- https://news.metal.com/newscontent/HPSJFB5W7OIYMM4YPU4ZEOJU7MTVWGRUBNTCQ2A-lme-copper-hits-four-month-low-as-ai-selloff-and-china-weakness-weigh
- https://www.stock-world.de/aurubis-aktie-banken-melden-erhebliche-positionen/
Financials — Adjusted
Adjusted · TTM 2026-Q3 · EUR
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 22159+23% | 18234+6% | 17204+0% | 17178-7% | 18521 |
| Gross profit | 1551-21% | 1740+23% | 1412+18% | 1200-34% | 1806 |
| Operating expenses | 229-80% | 1009+13% | 893-14% | 1040+18% | 878 |
| ▸Adj EBITDA | 1590+51% | 964+32% | 731+93% | 379-67% | 1148 |
| ▸Adj OCF | 1594+61% | 888+33% | 670+34% | 500-42% | 858 |
| CapEx | -545 | -758 | -847 | -625 | -347 |
| Adj FCF | 1049+676% | 130 | -177 | -124-124% | 511 |
| Interest expense | 25.0 | 23.0 | 36.1 | 23.7 | 17.1 |
| ▸Adj net income | 972+59% | 539+37% | 394+204% | 130-81% | 700 |
| ▸Owner's earnings | 500 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 5037100% | 1466100% | 976100% | 771100% | 408100% | 1417100% |
| FCF (OCF−capex) | -883-18% | -372-25% | -83.0-9% | -316-41% | -52.3-13% | -59.2-4% |
| Net income | 276555% | 95465% | 53955% | 41654% | 14135% | 71550% |
| ▸Capital returned | 66713% | 16711% | -67.0-7% | 4.481% | 20250% | 36125% |
| Buybacks | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Dividends | 347 | 70.0 | 66.0 | 61.4 | 79.4 | 70.1 |
| Interest paid | 120 | 20.0 | 23.0 | 36.1 | 23.7 | 17.1 |
| Debt paid down | 200 | 77.0 | -156 | -93.0 | 98.8 | 274 |
| ▸Reinvestment | 280456% | 36125% | 76378% | 846110% | 619152% | 21415% |
| Capex (PP&E) | 2920 | 343 | 758 | 847 | 625 | 347 |
| Intangibles & M&A | -113 | -3.00 | 23.0 | -0.27 | -0.33 | -132 |
| Leases signed (net Δ) | -2.67 | 21.0 | -17.8 | -0.26 | -5.27 | -0.32 |
| Retained / other | -1317-26% | -516-35% | -16.0-2% | -284-37% | -230-56% | -270-19% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 0.9 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 10878 | 8974 | 7846 | 7260 | 7447 |
| ▸Liabilities (total) | 4964 | 3960 | 3290 | 3015 | 3189 |
| Net debt (incl. leases) | 686 | 222 | 19.0 | -347 | -439 |
| Net debt / Adj EBITDA | 0.43 | 0.23 | 0.03 | -0.91 | -0.38 |
| Net debt / Adj FCF | 0.65 | 1.71 | -- | -- | -0.86 |
| Adj EBITDA / interest | 63.6 | 41.9 | 20.3 | 16.0 | 67.0 |
| Shares outstanding | 43.7 | 43.7 | 43.8 | 43.7 | 39.1 |
| Dilution (YoY) | +0.0% | -0.3% | +0.3% | +11.5% | -10.5% |
| Employees | 7000 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 7.0%-3.9 | 9.5%+1.3 | 8.2%+1.2 | 7.0%-2.8 | 9.8% |
| Adj EBITDA margin | 7.2%+1.3 | 5.3%+1.0 | 4.3%+2.0 | 2.2%-4.0 | 6.2% |
| Adj OCF margin | 7.2%+1.7 | 4.9%+1.0 | 3.9%+1.0 | 2.9%-1.7 | 4.6% |
| Adj FCF margin | 4.7%+4.0 | 0.7%+1.7 | -1.0%-0.3 | -0.7%-3.5 | 2.8% |
| Net income margin | 4.5%+1.1 | 3.0%+0.5 | 2.4%+1.6 | 0.8%-3.0 | 3.9% |
| Adj NI margin | 4.4%+1.0 | 3.0%+0.7 | 2.3%+1.5 | 0.8%-3.0 | 3.8% |
| ROIC (adj, after-tax) | 14.8% | 9.8% | 8.4% | 3.0% | 15.5% |
| Cost of debt | 4.2% | 4.5% | 10.9% | 10.5% | 5.7% |
Earnings Calls
Earnings Call · 2026 Q3
Aurubis reported a substantially improved first nine months of fiscal 2025-26, with operating EBT increasing 31% year over year to EUR 374 million and operating EBITDA reaching EUR 570 million. Third-quarter operating EBT rose 23% sequentially to EUR 149 million, marking another step-up in profitability. Group revenue increased 29% to EUR 17.8 billion, mainly reflecting stronger copper and precious-metal prices and solid operating performance. Operating ROCE improved for the third consecutive quarter to 9.4%, although the figure remained restrained by higher capital employed and temporary working-capital requirements. The earnings mix demonstrates the value of Aurubis’ multimetal model. Higher metal results, recycling activities, sulfuric acid and copper products offset the continuing deterioration in concentrate treatment and refining charges. Metal earnings increased to 43% of group gross margin from 37% a year earlier, while TC/RCs and recycling refining charges declined to 21% from 27%. Products and premiums remained broadly stable at 36%. Sulfuric acid was especially supportive in Q3, as Chinese export restrictions and Middle East shipping disruptions pushed prices higher. Around 85% of current-year sulfuric acid sales are already contracted, limiting immediate spot exposure, but management expects a small double-digit million-euro Q4 benefit and estimates a full-year contribution of roughly EUR 180 million. The Recycling segment generated EUR 589 million of gross margin, up EUR 87 million, with operating EBITDA rising to EUR 162 million and EBT to EUR 87 million. CSP gross margin exceeded EUR 1.1 billion, while operating EBITDA increased to EUR 461 million and EBT to EUR 355 million despite lower TC/RC contributions. Concentrate throughput reached 1.9 million tonnes and sulfuric acid sales 1.8 million tonnes. Cash generation was the principal temporary weakness. Nine-month net cash flow was negative EUR 28 million versus positive EUR 357 million last year, and Q3 free cash flow before dividends was negative EUR 365 million. Management attributed this to inventory buildup for the phased Pirdop tankhouse commissioning, seasonal finished-goods stocks, higher metal prices and strategic-project requirements. It expects substantial reversal by year-end through destocking, copper-product sales and lower intermediate inventories. Cash CapEx is now expected below EUR 600 million, and the company maintained its target of at least breakeven free cash flow before dividends. Strategic execution was mixed. Complex Recycling Hamburg was commissioned on schedule and is exceeding initial targets. Pirdop’s tankhouse expansion is close to commissioning and should add 120,000 tonnes of annual cathode production. Richmond has experienced technical ramp-up problems and must process a somewhat less favorable feed mix than originally assumed. Phase 1 ramp-up is now expected in fiscal 2026-27 and Phase 2 in fiscal 2027-28; its mid-term EBITDA profile shifts out one year and will be below the prior target, although still in the triple-digit million-euro range. Management remains confident in the group’s EUR 260 million mid-term EBITDA improvement ambition, continues to see strong U.S. copper and recycling demand, and is evaluating future growth opportunities, potentially supported by U.S. government incentives. Full-year guidance remains unchanged at EUR 700 million-EUR 800 million EBITDA and EUR 425 million-EUR 525 million EBT, with EBT expected near the upper end.
▸Why does guidance imply roughly flat Q4 EBT despite higher sulfuric acid earnings, metal prices, the completed Lunen standstill and mostly contracted TC/RCs?Bastian Synagowitz · Deutsche Bank
▸What is driving the structural reduction or delay in Richmond’s outlook, what is the expected EBITDA contribution next year, and has the D&A schedule changed?Bastian Synagowitz · Deutsche Bank
▸Does the revised Richmond target imply EBITDA below the former roughly EUR 170 million target, and what lasting headwinds explain the reduction?Bastian Synagowitz · Deutsche Bank
▸If Richmond cannot achieve the group’s 15% ROCE objective under current assumptions, does that undermine the rationale for another U.S. recycling smelter or further U.S. growth?Bastian Synagowitz · Deutsche Bank
▸Would another U.S. recycling project only make sense with government subsidies or other support?Bastian Synagowitz · Deutsche Bank
▸What is Richmond’s current capital employed, and what will it be at full ramp-up?Jason Fairclough · Bank of America
▸Why should Richmond remain materially more profitable than other recycling operations if the revised contribution is around EUR 120 million, or roughly EUR 1,700 per tonne of blister?Jason Fairclough · Bank of America
▸Is the lower profitability caused by higher operating costs, lower blister production, or both?Jason Fairclough · Bank of America
▸Does the change imply less pressure than expected, or is the issue that Richmond must use a less favorable alternative feed mix?Jason Fairclough · Bank of America
▸If U.S. tariffs are imposed, would Aurubis need to build a copper refinery, and would a 60,000-70,000 tonne facility be too small?Jason Fairclough · Bank of America
▸Could U.S. authorities object to valuable metals in Richmond’s blister being shipped to Europe, and how would Aurubis address concerns about exporting critical minerals?Jason Fairclough · Bank of America
▸What specifically changed in Richmond’s feed mix, and could policy developments increase Aurubis’ flexibility or improve the mix?Adahna Ekoku · Morgan Stanley
▸How much of the sulfuric acid business is contracted versus spot, and should the next fiscal year benefit from greater exposure to current high prices?Adahna Ekoku · Morgan Stanley
▸How large will the quarter-over-quarter sulfuric acid earnings increase be, and what is the expected full-year contribution?Adahna Ekoku · Morgan Stanley
▸Which projects are outperforming or contributing more than expected such that Aurubis can still achieve the EUR 260 million mid-term EBITDA improvement target despite Richmond’s reduction?Maxime Kogge · ODDO
▸Could the market shift broadly to index-based concentrate pricing, making it harder to secure the annual or multi-year contracts Aurubis has historically used?Maxime Kogge · ODDO
▸What share of Aurubis’ sulfuric acid sales goes to mining companies, and can those sales be used in concentrate negotiations?Maxime Kogge · ODDO
▸Is the lower Richmond EBITDA target primarily due to receiving less precious-metal content in the feed mix?Boris Bourdet · Kepler Cheuvreux
▸Could tighter U.S. restrictions on recycling-material exports leave better feed in the domestic market and improve Richmond’s metrics?Boris Bourdet · Kepler Cheuvreux
▸Given year-to-date free cash flow of negative EUR 365 million and CapEx below plan, does Aurubis still expect EUR 670 million of annual CapEx, and how will working capital reverse enough to reach breakeven free cash flow?Boris Bourdet · Kepler Cheuvreux
▸How much of gross margin currently comes from TC/RCs, and do contracts have a floor preventing negative commercial terms?Boris Bourdet · Kepler Cheuvreux
▸Will the roughly EUR 70 million of CapEx below the prior plan shift into next year, or is the reduction sustainable?Bastian Synagowitz · Deutsche Bank
▸If sulfuric acid spot prices remain high, is the approximately EUR 180 million contribution credible given production volumes and limited costs, or should investors apply a discount?Maxime Kogge · ODDO
Web Traffic
Cash Runway
Institutional Ownership
Ownership Over Time
Ownership composition
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2004 Q4 | 650M | — | 0M | $0.00 | $0.00 – $0.00 | 1 |
| 2005 Q2 | 715M | 100M | 20M | $0.45 | $0.44 – $0.47 | 2 |
| 2005 Q4 | 784M | 94M | 16M | $0.37 | $0.36 – $0.39 | 2 |
| 2006 Q4 | 1.5B | 98M | 21M | $0.47 | $0.46 – $0.49 | 2 |
| 2008 Q1 | 2.1B | 138M | 51M | $0.78 | $0.66 – $0.91 | 3 |
| 2008 Q2 | 2.4B | 163M | 71M | $1.25 | $1.04 – $1.48 | 4 |
| 2008 Q4 | 1.4B | 93M | 40M | $0.18 | $0.18 – $0.19 | 2 |
| 2009 Q4 | 2.1B | 115M | 63M | $0.53 | $0.43 – $0.64 | 3 |
| 2010 Q1 | 2.3B | 203M | 130M | $0.56 | $0.54 – $0.58 | 2 |
| 2010 Q2 | 2.2B | 105M | 52M | $0.60 | $0.49 – $0.72 | 3 |
| 2010 Q3 | 2.6B | 118M | 64M | $0.55 | $0.53 – $0.57 | 2 |
| 2011 Q1 | 3.2B | 147M | 85M | $2.27 | $2.21 – $2.36 | 2 |
| 2011 Q2 | 3.4B | 255M | 169M | $1.43 | $1.39 – $1.49 | 2 |
| 2011 Q3 | 3.1B | 153M | 72M | $0.00 | $0.00 – $0.00 | 0 |
| 2011 Q4 | 3.0B | 90M | 36M | $2.65 | $2.57 – $2.75 | 2 |
| 2012 Q1 | 3.5B | 272M | 178M | $1.47 | $1.23 – $1.73 | 3 |
| 2012 Q2 | 3.5B | 252M | 136M | $1.02 | $0.70 – $1.26 | 4 |
| 2012 Q3 | 3.5B | 56M | 6M | $0.90 | $0.87 – $0.93 | 2 |
| 2012 Q4 | 4.0B | 163M | 93M | $0.20 | $0.20 – $0.21 | 2 |
| 2013 Q1 | 3.5B | 54M | 8M | $0.14 | $0.14 – $0.15 | 2 |
| 2013 Q3 | 3.0B | 67M | 7M | $0.66 | $0.64 – $0.68 | 2 |
| 2013 Q4 | 3.0B | 114M | 58M | $-0.04 | $-0.04 – $-0.04 | 3 |
| 2014 Q1 | 3.0B | -9M | -52M | $1.04 | $0.34 – $2.44 | 6 |
| 2014 Q2 | 2.9B | 9M | -34M | $0.69 | $0.47 – $0.91 | 5 |
| 2014 Q3 | 2.9B | 177M | 102M | $0.76 | $0.50 – $1.05 | 3 |
| 2014 Q4 | 2.9B | 83M | 29M | $0.91 | $0.53 – $1.32 | 3 |
| 2015 Q1 | 3.0B | 73M | 25M | $0.99 | $0.96 – $1.03 | 2 |
| 2015 Q2 | 2.9B | 171M | 101M | $1.10 | $0.73 – $1.39 | 4 |
| 2015 Q3 | 2.7B | 106M | 49M | $1.30 | $1.00 – $1.52 | 4 |
| 2015 Q4 | 2.5B | -5M | -44M | $0.77 | $0.54 – $1.30 | 5 |
| 2016 Q1 | 2.2B | 17M | -23M | $1.00 | $0.87 – $1.14 | 4 |
| 2016 Q2 | 2.3B | 112M | 56M | $0.65 | $0.58 – $0.77 | 5 |
| 2016 Q3 | 2.2B | 93M | 38M | $1.05 | $0.98 – $1.12 | 4 |
| 2016 Q4 | 2.5B | 113M | 58M | $0.28 | $0.22 – $0.37 | 4 |
| 2017 Q1 | 2.9B | 153M | 90M | $1.60 | $1.55 – $1.66 | 2 |
| 2017 Q2 | 2.7B | 190M | 120M | $1.58 | $1.53 – $1.64 | 2 |
| 2017 Q3 | 2.9B | 144M | 81M | $1.50 | $1.44 – $1.59 | 3 |
| 2017 Q4 | 3.0B | 126M | 70M | $1.47 | $1.43 – $1.53 | 2 |
| 2018 Q1 | 3.1B | 206M | 133M | $1.78 | $1.72 – $1.85 | 2 |
| 2018 Q2 | 2.9B | 93M | 46M | $1.90 | $1.84 – $1.97 | 2 |
| 2018 Q3 | 2.8B | 146M | 87M | $1.50 | $1.46 – $1.56 | 2 |
| 2018 Q4 | 2.7B | 62M | 21M | $0.89 | $0.86 – $0.92 | 2 |
| 2019 Q1 | 3.0B | 38M | 3M | $1.29 | $1.29 – $1.29 | 1 |
| 2019 Q2 | 2.7B | 171M | 105M | $0.42 | $0.42 – $0.42 | 1 |
| 2019 Q3 | 3.0B | 46M | -1M | $1.00 | $1.00 – $1.00 | 1 |
| 2019 Q4 | 2.8B | 136M | 75M | $0.60 | $0.60 – $0.60 | 1 |
| 2020 Q1 | 3.0B | 159M | 94M | $1.10 | $1.10 – $1.10 | 1 |
| 2020 Q2 | 3.2B | -12M | -55M | $0.65 | $0.65 – $0.65 | 1 |
| 2020 Q3 | 3.4B | 919M | 630M | $1.49 | $1.49 – $1.49 | 1 |
| 2020 Q4 | 3.6B | 130M | 62M | $1.41 | $1.41 – $1.41 | 1 |
| 2021 Q1 | 4.1B | 195M | 112M | $2.57 | $2.57 – $2.57 | 1 |
| 2021 Q2 | 4.5B | 201M | 115M | $2.64 | $2.64 – $2.64 | 1 |
| 2021 Q3 | 4.0B | 977M | 691M | $1.22 | $1.22 – $1.22 | 1 |
| 2022 Q1 | 4.9B | 273M | 173M | $3.96 | $3.96 – $3.96 | 1 |
| 2022 Q2 | 4.0B | 141M | 72M | $1.64 | $1.64 – $1.64 | 1 |
| 2022 Q3 | 4.1B | 1.0B | 715M | $0.94 | $0.94 – $0.94 | 1 |
| 2022 Q4 | 4.5B | 145M | 72M | $1.65 | $1.65 – $1.65 | 1 |
| 2023 Q1 | 4.3B | 215M | 125M | $2.87 | $2.87 – $2.87 | 1 |
| 2023 Q2 | 4.0B | 156M | 78M | $1.78 | $1.78 – $1.78 | 1 |
| 2023 Q3 | 4.1B | 65M | -15M | $-0.34 | $-0.34 – $-0.34 | 1 |
| 2023 Q4 | 4.0B | 163M | 82M | $1.88 | $1.88 – $1.88 | 1 |
| 2024 Q1 | 4.3B | 156M | 77M | $1.77 | $1.77 – $1.77 | 1 |
| 2024 Q2 | 4.4B | 158M | 78M | $1.78 | $1.78 – $1.78 | 1 |
| 2024 Q3 | 4.8B | 148M | 57M | $1.30 | $1.30 – $1.30 | 1 |
| 2024 Q4 | 4.6B | 185M | 95M | $2.19 | $2.19 – $2.19 | 1 |
| 2025 Q1 | 4.6B | 152M | 67M | $1.53 | $1.53 – $1.53 | 1 |
| 2025 Q2 | 4.6B | 109M | 39M | $0.90 | $0.90 – $0.90 | 2 |
| 2025 Q3 | 5.5B | 134M | 52M | $1.20 | $1.20 – $1.20 | 1 |
| 2025 Q4 | 5.2B | 164M | 75M | $1.71 | $1.61 – $1.81 | 2 |
| 2026 Q1 | 6.3B | 206M | 100M | $2.28 | $2.28 – $2.28 | 1 |
| 2026 Q2 | 6.2B | 214M | 104M | $2.39 | $2.32 – $2.45 | 2 |
| 2026 Q3 | 7.4B | 231M | 112M | $2.55 | $2.55 – $2.55 | 1 |
| 2026 Q4 | 7.1B | 240M | 113M | $2.59 | $2.59 – $2.59 | 1 |
| 2027 Q1 | 7.4B | 243M | 110M | $2.51 | $2.51 – $2.51 | 1 |
| 2027 Q2 | 7.3B | 249M | 108M | $2.48 | $2.48 – $2.48 | 1 |
| 2027 Q3 | 7.2B | 253M | 107M | $2.44 | $2.44 – $2.44 | 1 |
| 2027 Q4 | 7.1B | 270M | 115M | $2.64 | $2.64 – $2.64 | 1 |
| 2028 Q1 | 7.3B | 285M | 122M | $2.79 | $2.79 – $2.79 | 1 |
| 2028 Q2 | 7.2B | 289M | 121M | $2.77 | $2.77 – $2.77 | 1 |
| 2028 Q3 | 7.0B | 289M | 117M | $2.69 | $2.69 – $2.69 | 1 |
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand
Thesis
Aurubis is a strategically valuable European multimetal processor with meaningful exposure to copper, precious metals, recycling, sulfuric acid and copper products. Its diversification is increasingly important because primary copper concentrate TC/RCs are at exceptionally weak levels. The current earnings recovery is real, but not all of it is durable: metal prices, sulfuric acid and working-capital movements are cyclical, and the company has spent heavily for several years before producing consistently strong free cash flow. The central positive is that several projects are approaching contribution, including Pirdop and Complex Recycling Hamburg, while U.S. recycling has attractive strategic logic. The central negative is Richmond: management disclosed technical issues, less favorable feed economics, higher costs and a one-year delay to the prior EBITDA profile. That reduces confidence in the original growth case and raises questions about capital allocation discipline for future U.S. expansion. The most likely path is normalized earnings around EUR 500M with moderate growth and substantially better cash conversion than in the investment-heavy years, but with a valuation below a premium industrial compounder.
Trade Signal
Short, with Aurubis trading roughly 60–70% above the study's defensible fair value despite cyclical earnings, negative current cash flow and a delayed, lower-quality Richmond ramp.
The stock climbed from roughly €93.6 at the prior 52-week low to €219.2, driven by copper and recycling optimism, guidance upgrades, stronger operating earnings and expectations for Pirdop/Richmond. It then fell to €173.7 after the August 6 earnings release, down 9% from the pre-release price, as investors weighed negative free cash flow, working-capital intensity, weak primary-smelting economics and Richmond's delayed/reduced contribution. The post-earnings move does not look like a panic overshoot: the quarter was operationally strong, but the adverse cash-flow and execution details are real. The larger rally looks more like a durable repricing toward a favorable cyclical narrative than a temporary dislocation, and the stock remains materially above fundamental value.
The market appears constructive and has rewarded Aurubis for copper exposure, recycling growth, higher metal prices, sulfuric-acid strength and repeated guidance upgrades. The recent post-earnings decline shows investors are beginning to focus on negative cash flow, weak TC/RCs and Richmond execution. This is not a hated or heavily distressed stock; it is a formerly well-liked cyclical name undergoing a valuation and quality check. Positioning data are not supplied, so no strong short-squeeze or crowded-options conclusion is justified.
The recent earnings path is better than it was a year ago, with operating EBT up 31% for nine months and guidance near the upper end. But much of that improvement is already reflected in the 83% one-year rally. The latest evidence is not a clean new inflection: free cash flow remains negative, TC/RCs are structurally weak, and Richmond's ramp has been delayed with lower-than-original economics. Pirdop and recycling can support earnings, but the study's bull case appears more optimistic than the current evidence and consensus risk profile warrants.
- ▼Late 2026 · FY 2025/26 results and cash-flow update — The key watch items are whether EBT lands near the upper end of guidance, inventories unwind, and free cash flow turns positive; a weak cash conversion could reinforce the valuation concern.
- ▲H2 2026 · Pirdop tankhouse expansion commissioning — The additional 120,000 tonnes of annual cathode capacity could support earnings, though execution and ramp costs matter.
- ▼H2 2026–H1 2027 · Richmond Phase 1 ramp update — Management has delayed the economics and pushed the ramp profile out; further shortfalls or remediation costs would challenge the premium valuation.
- ▼Late 2026 to early 2027 · FY 2026/27 outlook and Richmond contribution — The next annual outlook should clarify whether the promised EBITDA improvement is still credible or requires further downward revision.
- •H2 2026–2027 · Copper TC/RC and recycling-charge reset — Persistently depressed concentrate charges hurt primary smelting, while recycling margins may benefit; the mix is directionally favorable to Aurubis but highly cyclical.
Reported TTM dilution is approximately zero, but there is no evidence of a large active buyback or other powerful demand source. The low dividend yield provides limited support, while continued strategic capex and possible project funding needs constrain shareholder returns. No clear squeeze, tender, lockup, or major insider-buying catalyst is identified.
The balance sheet and diversified assets provide some downside support, and the business is not distressed. However, there is no hard floor near €174: free cash flow is currently negative, capex and working capital remain demanding, and the apparent earnings support depends partly on metal prices and sulfuric-acid conditions. The principal ceiling is valuation: the analyst's €4.5–4.7 billion equity value implies roughly €103–108 per share, with even the base case at about €137.
Aurubis is a real, strategically relevant European copper and recycling platform with identifiable industrial buyers, but at €173.7 the stock is difficult to get excited about: the price already discounts strong metals, recycling and project execution. A marginal buyer likely needs either a sustained copper/recycling earnings cycle or a materially lower entry price.
Fear pulls harder than greed at €174. The business is improving and financially viable, but the stock has already risen about 83% over one year and still trades well above the study's fair value after a strong earnings cycle. The main risk is not insolvency; it is paying a peak-ish multiple for cyclical earnings with execution problems still visible.
Valuation
The quarter newly disclosed that Richmond's ramp-up is technically more difficult than expected, requires a less favorable feed mix and will produce a lower mid-term EBITDA contribution with the prior profile shifted out by one year. The positive new information was lower-than-planned cash capex, continued confidence in year-end working-capital reversal and strong operating performance supported by recycling, sulfuric acid and metal earnings. Full-year guidance was maintained rather than raised.
▸ How the cases moved
The bear case rises modestly from EUR 2,400M to EUR 2,500M because lower-than-planned Richmond economics and continuing TC/RC pressure increase downside risk, while the bear probability rises from 0.22 to 0.25. The base case is broadly unchanged at EUR 6,000M, with probability moving from 0.56 to 0.55: the improved operating result and expected working-capital reversal offset the weaker Richmond outlook. The bull case falls from EUR 10,300M to EUR 9,800M because Richmond's Phase 1 profile is delayed, its eventual contribution is below the former target, and the feed mix is less attractive; bull probability falls from 0.22 to 0.20.
Copper concentrate TC/RC economics remain depressed, sulfuric-acid pricing normalizes, and Richmond requires further costly remediation while contributing little. Working capital fails to reverse fully and capex remains structurally high, leaving Aurubis with a lower-quality, cyclical earnings stream.
▸ Valuation
10x EUR 250M owner earnings = EUR 2,500M equity value
Aurubis delivers roughly stable-to-moderate revenue growth as strong recycling, copper products, sulfuric acid and completed projects offset weak primary-smelting TC/RCs. Pirdop and other projects ramp acceptably, Richmond reaches breakeven in fiscal 2026-27 but remains below its original ambition. Free cash flow normalizes as inventory unwinds, although the business remains cyclical.
▸ Valuation
12x EUR 500M owner earnings = EUR 6,000M equity value
Copper demand, U.S. scrap-retention policy and elevated recycling charges create a durable earnings step-up. Pirdop, Complex Recycling Hamburg and Richmond ramp successfully, sulfuric-acid pricing stays favorable, and lower capex converts the current earnings recovery into strong cash generation. Aurubis becomes a higher-return multimetal recycling platform despite weak concentrate charges.
▸ Valuation
14x EUR 700M owner earnings = EUR 9,800M equity value
▸ Target Rationale
The probability-weighted discounted scenario value is EUR 4,708M. I set the analytical target at EUR 4,500M because the arithmetic scenarios do not fully capture the credibility and execution discount created by Richmond's delayed and reduced economics, the prolonged capex and working-capital intensity, and the cyclicality of metal prices and TC/RCs. The balance sheet supports the equity and does not require a further distress discount, but the business does not yet warrant a premium multiple on peak TTM earnings.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Upgraded FY 2025/26 Forecasts: Aurubis AG raised its full-year profit guidance twice in early 2026. In May 2026, the company increased its operating EBT forecast to a range of €425 million to €525 million (up from the €375–475 million forecast set in February) and its operating ROCE to 10–12%. The upgrades were driven by persistently high metal prices, strong demand for copper products, improved scrap recycling processing margins, and robust sulfuric acid sales.
- H1 2025/26 Financial Results: For the first half of the fiscal year (ended March 31, 2026), Aurubis posted an operating EBT of €226 million, nearly flat compared to the €229 million in H1 of the prior year. Operating EBITDA rose 3% to €351 million. Net cash flow was €161 million, down slightly from €190 million due to working capital expansion amid high metal prices.
- Growth Capital Allocation: Roughly 90% of Aurubis' €1.7 billion strategic investment program has now been deployed. High-priority developments include the Complex Recycling Hamburg (CRH) project, which successfully achieved its "first melt" in March 2026. In Bulgaria, the 50% expansion of the copper tankhouse capacity is on schedule, with phased commissioning slated for summer 2026. In Lünen, a new high-purity oxygen air separation plant was inaugurated in February 2026, and in Hamburg, a major diffuse emissions reduction exhaust system was completed in June 2026.
- Operational Incident: On March 6, 2026, a serious industrial accident occurred at the primary copper Smelter Plant North in Hamburg, resulting in one employee fatality.
---
▸ Thesis-test Findings
Aurubis Richmond Phase 1 production ramp status 2026
- Findings: The $800 million Augusta, Georgia plant—the first secondary multimetal recycling facility in the United States—celebrated its "First Melt" in late September 2025 and commenced its scheduled Phase 1 ramp-up in Q1 2026. The ramp-up is progressing smoothly, with Phase 1 projected to reach full capacity by the end of H1 2026. Meanwhile, commissioning and ramp-up for Phase 2 are currently underway. Upon reaching full capacity, the site will process up to 180,000 metric tons of complex secondary scrap annually, yielding 70,000 tons of high-grade blister copper along with nickel, tin, and precious metals.
- Thesis Impact: Highly supportive of the bull case. The project is advancing on track with no major delays reported, giving Aurubis a highly profitable first-mover advantage in the domestic U.S. multimetal recycling market.
Copper concentrate treatment refining charges TC RC spot benchmark 2026 2027
- Findings: Spot treatment and refining charges (TC/RCs) remain under severe downward pressure through Q2 2026, hovering at historic lows (near -$120 to -$124 per ton) due to severe global copper concentrate shortages and aggressive smelting capacity expansion in China. Reflecting this extreme supply imbalance, the negotiated 2026 benchmark collapsed to a symbolic $0 per ton. Primary miners (such as Antofagasta) are currently pushing smelters to accept index-linked pricing rather than fixed annual benchmarks. Due to these unprofitable terms, some major smelters (such as Japan’s Mitsubishi Materials Onahama facility) have announced plans to suspend smelting operations by early 2027.
- Thesis Impact: Mixed, but fundamentally favorable for recycling. While the collapse of TC/RCs is a direct squeeze on Aurubis' primary smelting margins, the company is highly insulated relative to primary smelters. High refined copper premiums and strong scrap recycling margins are more than offsetting these weak primary terms, validating Aurubis' strategic pivot toward secondary recycling.
US copper scrap export restrictions and domestic supply trends
- Findings: In mid-2025, the U.S. administration implemented Section 232 tariffs on finished copper imports but exempted raw metal and scrap imports. However, the administration enacted new scrap retention policies: beginning in 2027, at least 25% of domestically produced high-quality copper scrap must be retained for the domestic market, with this quota rising to 30% in 2028. Influenced by these geopolitical pressures, U.S. copper scrap exports to China have collapsed to 21-year lows. At the same time, domestic recycling capacity is expanding by over 280,000 metric tons per year, led by major investments from Aurubis, Wieland, and Ames Copper.
- Thesis Impact: Strong bull case driver. The domestic retention quotas starting in 2027 and the decline of exports to China ensure a highly abundant, localized, and cost-effective scrap feedstock supply for Aurubis' newly launched Richmond plant, shielding it from global supply shocks.