Stocks/NEXG.V

NEXG.V

NeXGold Mining Corp.v3 5.5/10 · 2026-11-26
Basic Materials·Gold
1.09 CAD
256M CAD market cap
v3 Rating
5.5/104.0–7.0
Setup
4.5/103.0–6.0
Fair Value
1.25 CAD0.50 CAD–2.50 CAD+15%
DCF (10%)
1.50 CAD+38%
Base IRR
+12%-30%–+45%
Visibility
wide±80%
Rating
Revenue (TTM)
0.0M CAD
Owner Earnings
-C$50M
Next-Yr Owner Earnings
-C$180M
Growth
-8.0% × 5y
P / Next-Yr OE
--
Net Debt
-C$74M

NeXGold Mining Corp. is a Canadian enterprise primarily engaged in the exploration and advancement of gold projects. Central to its operations is the Goliath Gold Complex, a fully-owned, high-grade gold deposit. This advanced-stage asset, located near Dryden, Ontario, comprises the Goliath, Goldlund, and Miller projects. The Goliath property itself spans approximately 7,601 hectares, composed of 284 mining claims (totaling roughly 6,254 ha), four mining leases (359.25 ha), and 28 land parcels (1,347.189 ha). Previously known as Treasury Metals Inc., the company rebranded as NeXGold Mining Corp. in July 2024. Established in 1997, NeXGold Mining Corp. maintains its corporate headquarters in Toronto, Canada.

2-Year Price History

$1.00+56.3%
$0.80$1.0$1.2$1.4$1.6$1.8$2.0$2.2Initial target $1.25 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.54.0–7.0
Setup
4.53.0–6.0
Fair value (CAD)
1.250.50 – 2.50
Upside vs 1.09
+15%
DCF (10%)
1.500.50 – 3.00+38%
Base IRR
12%-30% – 45%
Visibility
very widerange ±80%
Sentiment
3/10
Flow
3/10
2026-11-26 · claude-opus-5-5 · priced at 1.00

NexGold is a pre-revenue, debt-free Canadian gold developer. Its lead project, Goldboro in Nova Scotia, is fully permitted: a 1.15Moz probable reserve at 2.26 g/t, about 100koz a year in the 2022 FS, early works since September 2026. Goliath in Ontario (1.2Moz PFS) sits on hold behind it. At C$1.00 (the 2026-11-25 close) the stock is down 57% from February as gold fell from US$5,589 to below US$4,000 and the Goldboro FS update slipped twice, now to end-Q4 2026. The asset is clearly worth more than the C$180M EV: at US$3,500 gold it should earn about C$200M a year after tax once running. But the thesis test cut the per-share value hard. The build needs roughly C$200-300M of new equity on top of a non-binding US$175M Appian debt LOI, and at C$1 that is near a doubling of the share count. First gold is more likely late 2029 or 2030 than early 2029. Redone, the 10% DCF gives about C$1.50 a share after dilution (C$0.50 at US$3,000 gold with a capex overrun, C$3.00 if capex lands near the C$289M Nova Scotia peer and the raise is small). Fair value is about C$1.25. That is roughly 25% upside with a gold-price-driven downside, and the only real variant view is a gold deck, not a misread asset. Rating 5.5: a reasonable gold option, not a mispricing. The end-Q4 FS and the financing package (H1 2027) decide it.

Flow: Heavy issuance ahead: likely C$150-300M of equity (roughly 60-120% of the 256M shares at C$1) around a Goldboro construction decision in H1 2027, plus about 0.75M Sprott shares a quarter until January 2028 and 100M warrants (C$1.67 average) that add supply above that price; no buyback.

A deep dive would have to establish: Does the end-Q4 2026 Goldboro FS show capex near C$350M or below, and can the H1 2027 financing package be closed without more than about 200M new shares at around C$1?

Owner earnings, TTM
-C$50M-C$70M – -C$20M
Realistic peak profit
C$210MC$90M – C$360M
Growth rate
-8.0%-15.0% – 0.0%
Years of growth
54 – 8
Market cap
C$257MC$235M – C$280M
EV
C$183MC$150M – C$215M
Net debt
-C$74M-C$90M – -C$55M
Capital return / cap
0.0%0.0% – 0.0%
P/E
2.5×1.5× – 8.0×
EV/EBITDA
1.0×0.6× – 3.0×
FCF yield
-20.0%-30.0% – -8.0%
Projected FCF, base case (CAD millions)
Y1-C$180M-C$260M – -C$110M
Y2-C$300M-C$420M – -C$180M
Y3-C$60M-C$200M – C$120M
Y4C$190MC$0M – C$340M
Y5C$210MC$60M – C$360M
Competition: It competes for capital and contractors with other permitted Canadian gold developers, including St Barbara's 15-Mile hub in Nova Scotia; gold is a commodity, so cost position and grade matter, and Goldboro's 2.26 g/t open pit is mid-pack.
Governance: Serial equity issuer (four raises since 2024, warrants attached), royalties sold piecemeal to fund the company (Sprott 2.2% on Goliath, Appian 2.9% on Goldboro), Sprott minimums paid in shares, and a CRA flow-through dispute open since 2016; nothing fraudulent seen.
Research (expand)

What it is. A gold developer (formerly Treasury Metals; merged with Blackwolf in 2024 and with the distressed Signal Gold in December 2024).

  • Goldboro, Nova Scotia. The January 2022 FS shows a 1.15Moz probable reserve at 2.26 g/t, about 100koz a year for about 11 years, C$271M initial capex and AISC of US$849/oz at US$1,600 gold. All key permits were in hand by October 2025 (EA 2022, IA August 2025, Crown lease May 2025, federal Fisheries Act authorization October 2025), and there are benefit agreements with the Mi'kmaw Chiefs and the municipality. Early earthworks began in September 2026; the site earthworks contract starts in early 2027; there is no construction decision yet.
  • Goliath/Goldlund, Ontario. 2023 PFS: 1.2Moz recovered over 13 years. Its FS was paused in January 2026.

What the market believes. Gold is down about 30% from its January peak, and juniors fall about twice as fast as gold. The build needs a large equity raise at a depressed price, and the FS keeps slipping.

Earnings today. None. Corporate cost is about C$15M a year, and exploration and study spend another C$40-60M a year (C$16M net loss in Q2 2026). SBC is about C$3-4M a year. Cash was C$101M at June 30, an estimated C$70-80M now; there is no debt beyond US$4.7M of Sprott minimums (often paid in shares).

FCF (C$M, unlevered, US$3,500 gold, AISC about US$1,400-1,500 including the 2.9% Appian NSR, capex C$350-450M). 2027: -180; 2028: -300; 2029: -60 (finish and first gold); 2030: +190; 2031: +210. In year 5 it is a depleting single mine with about 8 years left, plus the Goliath option: a terminal value of about C$1.05B. The PV is about C$455M, plus C$74M net cash, so about C$530M. Then about C$220M of new equity at about C$0.95 (about 230M shares) gives about C$1.50 a share. It is a finite resource, so the year-5 value is the remaining cash, not a multiple.

Fair value. C$1.25, below the DCF for first-build execution risk and gold dependence. On 2031 numbers we pay about 1x EV/EBITDA after the raise, which is typical for a pre-FID developer.

Risks.

  • Capex in the FS, size and price of the raise, Appian terms (stream or warrant sweeteners).
  • Gold price, and Nova Scotia's operating history (Touquoy).
  • 100M warrants (C$1.67 average) cap rallies.
  • Sprott shares each quarter until January 2028.
  • A small CRA flow-through dispute.

Competition. Other Canadian developers for capital and contractors, including St Barbara's 15-Mile hub in the same province.

Sentiment: 3/10. At a one-year low; juniors are out of favor.

Thesis test

  • Funding gap bigger than C$150M: the challenge was right. Rebuilt sources and uses (cash of about C$75M, US$175M of non-binding debt, capex plus two years of burn) leave C$150-300M of equity. I now assume C$220M at about C$0.95; per-share DCF falls about 20%.
  • Schedule slip: the challenge was right. The FS moved from "later in 2026" to Q3 to end-Q4, and site earthworks start in early 2027, so first gold is late 2029 at best. Cash flows were shifted a year.
  • The thesis is a gold bet, not a misread asset: the challenge was right. Our deck is already below spot, so the asset value holds at spot. But what the market fears is gold and dilution, both real, so the variant perception is weak.
  • Capex could be lower (15-Mile at C$289M): this supports the pitch. It narrows the funding gap and is the main way to win, and is reflected in the high case.
  • Serial issuer, royalty stack, warrant overhang: the challenge was right but this was already partly priced. It caps the pace of any re-rating and keeps flow negative.
  • Conclusion: a real, permitted asset that is cheap in gold terms. After honest dilution and timing, it is about 25-50% below a risked value with gold-price downside and no edge on what the market misreads. It is a pass at C$1.00; it becomes interesting near C$0.70, or after an FS with sub-C$350M capex and a financing that does not double the share count.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue0.000.000.000.000.00
Gross profit-0.88-0.84-0.46-0.20-0.36
Operating expenses57.7+59%37.8+126%16.7+36%12.3-53%26.3
▸Adj EBITDA-57.7-37.8-16.7-12.3-26.4
▸Adj OCF-54.0-39.2-16.3-11.8-24.0
CapEx-0.28-0.17-0.05-0.01-18.2
Adj FCF-54.3-39.4-16.4-11.8-42.2
Interest expense0.903.791.481.381.75
▸Adj net income-56.8-41.2-18.1-13.4-31.9

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-148-48.3-38.1-18.2-12.3-31.1
FCF (OCF−capex)-142-38.9-36.1-15.1-11.3-40.1
Net income-150-44.7-41.0-19.6-13.4-31.6
▸Capital returned-109-17.7-84.83.02-1.94-7.76
Buybacks-144-18.4-107-14.3-4.130.00
Dividends0.000.000.000.000.000.00
Interest paid8.910.513.791.481.381.75
Debt paid down25.50.2418.115.90.80-9.52
▸Reinvestment-9.500.262.47-16.20.013.96
Capex (PP&E)18.70.260.170.050.0118.2
Intangibles & M&A-28.20.002.30-16.30.00-14.2
Leases signed (net Δ)------------
Retained / other4.74-20.750.2-0.35-8.00-16.4

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 8.4 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)239256191118124
▸Liabilities (total)21.515.832.218.219.7
Net debt (incl. leases)-80.2-1015.026.851.73
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-64.0-9.97-11.3-8.88-15.1
Shares outstanding25622565.441.034.8
Dilution (YoY)+59.2%+244.8%+59.3%+18.0%+9.0%
Employees22.0--------
MarginsTTM2025202420232022
Gross margin----------
Adj EBITDA margin----------
Adj OCF margin----------
Adj FCF margin----------
Net income margin----------
Adj NI margin----------
ROIC (adj, after-tax)-20.7%-12.3%-7.3%-8.5%-17.2%
Cost of debt--22.8%7.8%7.9%11.5%

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2024 Q460M—0M$0.00$0.00 – $0.000
2025 Q160M—0M$0.00$0.00 – $0.000
2025 Q260M—0M$0.00$0.00 – $0.000
2025 Q360M—0M$0.00$0.00 – $0.000
2025 Q460M—0M$0.00$0.00 – $0.000
2026 Q160M—0M$0.00$0.00 – $0.000
2026 Q260M—0M$0.00$0.00 – $0.000
2026 Q360M—0M$0.00$0.00 – $0.000
2026 Q460M—0M$0.00$0.00 – $0.000
2028 Q160M—0M$0.00$0.00 – $0.000
2028 Q260M—0M$0.00$0.00 – $0.000
2028 Q360M—0M$0.00$0.00 – $0.000
2028 Q460M—0M$0.00$0.00 – $0.000
2029 Q160M—0M$0.00$0.00 – $0.000