NHC.AX
New Hope Corporation Limitedv3 3.5/10 · 2026-10-16New Hope Corporation Limited engages in the development and operation of coal mines. It operates through three segments: Coal Mining in Queensland, Coal Mining in New South Wales, and Other. The company holds interests in the New Acland mine, an open-cut thermal coal mine located in north-west of Oakey, southeast Queensland; Queensland Bulk Handling is a 12 million tonnes per annum coal export facility; and Bengalla mine, an open-cut coal mine situated near Muswellbrook, New South Wales. It also engages in port handling and logistics, investment in coal mines, and agriculture activities, as well as development and production of oil and gas. In addition, the company holds interests in the Bengalla exploration license situated in New South Wales; West Muswellbrook assessment lease located to the west of Muswellbrook, New South Wales; Maxwell Mine situated on south of Muswellbrook, New South Wales; and various undeveloped coal assets, including the North Surat Coal project and Bee Creek tenement in Queensland. Additionally, the company is involved in the port operation; and marketing activities. It has operations in Australia, Japan, China, Taiwan, Chile, Korea, Vietnam, Indonesia, Malaysia, and internationally. The company was founded in 1952 and is headquartered in Brisbane, Australia.
2-Year Price History
Valuation v3 Opus worker · 2026-10-16
New Hope (NHC.AX, A$5.84 on 16 Oct 2026, up ~45-50% YTD and ex the 30c final dividend) is a low-cost Australian thermal coal producer (80% of Bengalla in the Hunter Valley, 100% of New Acland in Queensland plus the QBH port, and 26% of Malabar's Maxwell underground mine). FY26 (to 31 July) was operationally clean, with 11.5Mt saleable and 11.8Mt sold, both above guidance. But NPAT fell 63% to A$161m on a A$145/t realised price and $88.9/t FOB costs. Underlying EBITDA was A$514m and FCF about A$371m, flattered by deferred sustaining capex. The Middle East LNG disruption has lifted gC NEWC to roughly US$135-148/t, so Q4 EBITDA ran at a ~A$680m annual pace. At ~US$135 NEWC, FY27 on 12.5-12.7Mt gives about A$680m EBITDA, ~A$280m NPAT and ~A$240m FCF after the New Acland Manning Vale West capex. At A$4.9bn market cap / ~A$4.7bn EV that is ~17.6x P/E, ~6.9x EV/EBITDA and a ~5% FCF yield, which is rich for a thermal miner with a finite (~2039) Bengalla consent. My 10% DCF has NEWC easing back to ~US$110-115 by FY29, and New Hope realises only ~82% of NEWC because of high-ash and Acland product. Adding net cash and ~A$350m for Malabar, it gives about A$2.70/share. Even flat ~US$135 coal forever only gets to ~A$4.7-5.4, so today's price needs the energy shock to be permanent. Rating 3.5/10: a good operator with franked-yield support and real optionality from Malabar and mine extensions, but priced for peak coal; avoid or trim rather than short, given the live LNG shock and Soul Patts' controlling stake. Research 3.5/10: the only question that matters is whether seaborne thermal coal has re-based structurally higher, and that is a macro call, not something more company work resolves.
A deep dive would have to establish: Whether the Middle East LNG disruption has structurally re-based seaborne NEWC above ~US$130/t for the rest of the decade, since only then does A$5.84 earn a 10% return, and whether Bengalla/Acland extensions push mine life well past 2039.
Research (expand)
What the company does
New Hope Group is an ASX-listed thermal coal miner, ~40% owned by Washington H. Soul Pattinson. Consolidated assets: Bengalla (80% JV, Hunter Valley NSW, open-cut, 13.4Mtpa ROM on a 100% basis, ~8.2Mt saleable attributable, consent to ~2039, with continuation being studied via EL9431), New Acland (100%, Darling Downs QLD, Stage 3 ramping from 3.3Mt to ~5Mt saleable as the Manning Vale West pit opens in early CY2027), and Queensland Bulk Handling, its own Brisbane export terminal (5.8Mt throughput FY26). It also holds 25.97% of Malabar Resources (Maxwell underground, longwall commissioned April 2026, targeting ~6Mtpa of premium coal at ~$63/t cost; Malabar realised US$142/t in the June quarter, a 5% premium to NEWC). Malabar is equity-accounted, not consolidated. FY ends 31 July. Sales go mostly to Japan, Taiwan, Korea, China and SE Asia; the product mix is ~half high-ash.
FY26 actuals (primary: FY26 results release and presentation, 15 Sep 2026; Q4 quarterly, 17 Aug 2026)
- Saleable 11.5Mt (+7.6%), sales 11.8Mt (+11.8%), both above guidance.
- Realised price A$145.2/t incl. hedging (-10%). Group FOB cash cost A$88.9/t (FOR $62.4 + port/rail $26.5), royalties $11.3/t, underlying margin A$45/t (FY25: $64/t).
- Revenue A$1,767m. Underlying EBITDA A$514.3m (-33%). D&A A$238.7m (up on Bengalla/Acland fleet), net interest -A$19.7m, tax A$92.6m, NPAT A$161.0m (EPS 19.1c).
- Operating cash flow A$564m and FCF ~A$371m ($32/t). FCF was flattered by Bengalla sustaining capex of only A$84m (guided $100-130m; FY25 $178m) and a stock drawdown. Management called part of this deferral.
- Available cash A$778.5m (A$484.8m cash + A$293.7m fixed income). Debt is a new A$300m 2.625% convertible due 2032 (A$7.41 conversion, holder put Apr-2030, capped calls), about A$7m of old 2029 notes, and leases. Debt/equity is 0.11x.
- Dividends 40c fully franked for FY26 (10c interim + 30c final, paid 15 Oct 2026, about A$254m). The franking balance is ~A$900m, and the A$100m buyback is on foot but rarely used.
- Q4 FY26 alone: NEWC US$135.2 → realised US$110 / A$155.8, EBITDA A$169.3m. Realisation is ~82% of NEWC because of the high-ash mix and Acland's lower-CV product.
The investment case (bull)
1. Energy shock. The Middle East conflict has constrained LNG through Hormuz, so Japan, Korea and Taiwan are prioritising coal. NEWC was ~US$136 in late August and ~US$148 by 11 September. Indonesia's export centralisation is curbing supply. Every US$10/t on NEWC is roughly A$12/t realised, or ~A$150m of EBITDA on ~12.7Mt.
2. Volume growth that is already paid for. FY27 is guided to ~12.7Mt. Acland reaches ~5Mt once MVW opens (remaining capex ~A$130m), and attributable output trends to ~15Mt including Malabar. Capex then drops toward ~A$170-190m/yr of sustaining spend.
3. Balance sheet and franked yield. Net cash is ~A$250m after the final dividend, plus a Malabar stake I value at ~A$200-600m. Management says cash is "higher than we would ultimately want to hold", so another large franked payout is likely. Domestic holders value franking credits at ~1.43x the cash dividend.
4. Optionality. Bengalla continuation (brownfield, so not caught by the NSW greenfield ban), Malabar's ex-BHP Mt Arthur tenements, and Malabar's data-centre/energy-precinct land.
What it earns today and at maturity
- Run-rate (FY27E at ~US$135 NEWC, AUD ~0.70): realised ~A$158/t, costs ~$89 + royalties ~$13, margin ~$56/t × 12.5Mt → EBITDA ~A$680m. Less D&A ~A$245m and tax at 30% gives NPAT ~A$280-300m (~34c/share). FCF is ~A$240m after ~A$290m of capex (Acland growth plus catch-up of deferred Bengalla sustaining capex).
- At maturity (FY28+, ~13.4-13.6Mt consolidated, capex ~A$180m): at a normalised NEWC of US$110-120 (margin ~$32-40/t), EBITDA is ~A$420-530m, NPAT ~A$150-200m and FCF ~A$170-250m. At a sustained US$135-140, EBITDA is ~A$700m+, NPAT ~A$320-350m and FCF ~A$390m. Malabar adds equity income later (26% of a ~6Mt, low-cost mine).
Fair value and the multiples we pay
- Price A$5.84 (16 Oct 2026; context pack had A$5.82) × ~845m shares = A$4.94bn market cap. Net cash is ~A$245m (A$778m available cash, less the ~A$254m final dividend, less ~A$330m converts and leases, plus Aug-Oct FCF), so EV is ~A$4.69bn excluding Malabar.
- Multiples: ~30x trailing / ~17.6x FY27E P/E, 9.1x trailing / ~6.9x FY27E EV/EBITDA, FCF yield ~7.5% trailing (capex-flattered) / ~5% FY27E. The dividend yield is ~6.8% fully franked (~9.7% grossed up). Listed thermal peers such as Whitehaven and Yancoal usually trade at ~3-5x EBITDA.
- DCF (10%, FY27-31 explicit, terminal at -3% growth for finite reserves): FCF A$240/310/220/180/170m as NEWC fades from ~US$135 (FY27) to ~US$110-115 (FY29+), with AUD at 0.68-0.70 and costs inflating ~2%/yr. That is a PV of ~A$885m plus a terminal value of ~A$800m, plus net cash A$245m and Malabar ~A$350m, which comes to ~A$2.70/share.
- Sensitivity: flat ~US$135 coal forever with the -3% terminal gives ~A$4.7. Flat US$135 with no decay gives ~A$5.4. A crash back to US$100 gives ~A$1.2-1.6.
- The current price needs the energy shock to be permanent and the mine lives to be extended.
- Brokers: Macquarie Outperform A$7.40 (spot-price deck), Morgans Hold A$5.25, Bell Potter Hold A$5.00. Consensus averaged ~A$5.67 in early September, below the price.
- My fair value is ~A$3.9 (range 2.6-6.3). That sits above the pure DCF because it credits a longer-lasting LNG premium, franking value and the extension options.
- Base IRR ~ -10%/yr (dividends of ~30-40c/yr don't offset de-rating as coal normalises). The bull case, where NEWC holds US$140+, gives ~+7-8%.
Risks and competition
- Coal price: the dominant risk, in both directions. A Hormuz resolution or an LNG supply wave in 2027-28 (Qatar North Field, US projects) would pull NEWC back toward US$100-115. Chinese and Indian domestic output and Indonesian supply cap rallies.
- Logistics: Queensland Rail industrial action and Cross River Rail outages are hitting Acland, and the Hunter Valley chain is weather-exposed.
- Costs and safety: Bengalla's new enterprise agreement is being negotiated now (Aug-Sep 2026). Diesel inflation, and HPEFR rose to 4.65 in Q4 amid industry fatalities.
- Regulatory and ESG: the NSW greenfield ban, the Safeguard Mechanism, Queensland royalty changes, shrinking bank and insurer appetite (hence the large cash buffer), and Acland's long legal history (now resolved).
- Mine life: the Bengalla consent runs to ~2039 and Acland Stage 3 is finite, so terminal value depends on extensions.
- Competition: Whitehaven, Yancoal, Glencore and Thungela, Indonesian and Russian low-CV supply, and Chinese domestic output. NHC's edge is low strip ratios (~4x) and owning its port, not its product price.
- Converts: A$300m at A$7.41 is modest dilution, partly hedged by capped calls.
How investors feel (sentiment 6.5/10)
Sentiment is warm and rising. The stock is up ~45-50% in 2026 to near 52-week highs (A$6.49 in mid-September) on the LNG-driven coal rally, beats on volume, and a dividend lifted to 40c despite the profit fall. Brokers moved from Holds to mostly constructive, but the average target trails the price, and a "fully priced" Hold narrative is common. Retail and SMSF income investors love the franked yield. ESG funds can't own it, so the register is narrow and controlled by Soul Patts. Not euphoric, but the price embeds spot coal.
- https://announcements.asx.com.au/asxpdf/20260915/pdf/074353r6vzz8n0.pdf (FY26 Full Year Results release, 15 Sep 2026)
- https://announcements.asx.com.au/asxpdf/20260915/pdf/07436xq5mc14w7.pdf (FY26 results presentation, 15 Sep 2026)
- https://announcements.asx.com.au/asxpdf/20260817/pdf/072tf4lm0m671y.pdf (Quarterly Activities Report, 31 Jul 2026)
- /Users/gregwo/stocks2/data/transcripts/NHC.AX_2026Q4.json (Q4 FY26 quarterly call, 17 Aug 2026)
- /Users/gregwo/stocks2/data/analysisv3/context/NHC.AX.md (context pack)
- https://www.marketindex.com.au/asx/nhc/announcements/new-hope-successfully-prices-a300m-convertible-notes-2A1533644 (A$300m 2.625% notes, A$7.41 conversion)
- https://www.investsmart.com.au/security/asx/nhc/new-hope-corporation-limited/share-price (price A$5.84, 16 Oct 2026)
- https://www.fool.com.au/2026/09/15/new-hope-shares-near-52-week-high-heres-what-stood-out-in-the-result/
- https://www.fool.com.au/2026/09/02/buy-hold-sell-new-hope-boq-santos-shares/
- https://quartr.com/events/new-hope-corporation-limited-nhc-h2-2026_FkBAlV5X (FY27 ~12.7Mt guidance summary)
- https://www.iea.org/reports/coal-mid-year-update-2026/prices
- https://www.woodmac.com/press-releases/prolonged-middle-east-supply-disruption-drives-thermal-coal-demand-and-price/
- https://equityespresso.beehiiv.com/p/new-hope-corporation-broker-ratings (broker targets)
Financials — Adjusted
Adjusted · TTM 2026-Q4 · AUD
| TTM & Fiscal-Year P&L | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Revenue | 1754-2% | 1754-2% | 1796+0% | 1802-33% | 2701 |
| Gross profit | 635-25% | 635-25% | 848-5% | 896-49% | 1748 |
| Operating expenses | 355-21% | 355-21% | 452+154% | 178-15% | 208 |
| ▸Adj EBITDA | 518-12% | 518-12% | 587-33% | 879-48% | 1681 |
| ▸Adj OCF | 564+9% | 564+9% | 516-9% | 569-53% | 1213 |
| CapEx | -185 | -185 | -304 | -272 | -187 |
| Adj FCF | 379+79% | 379+79% | 211-29% | 297-71% | 1026 |
| Interest expense | 32.2 | 32.2 | 33.4 | 13.1 | 14.2 |
| ▸Adj net income | 167-57% | 167-57% | 387-24% | 508-57% | 1183 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026
| Where the Cash Went | Total | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 3907100% | 518100% | 821100% | 867100% | 1701100% |
| FCF (OCF−capex) | 227358% | 37973% | 26732% | 29033% | 133879% |
| Net income | 216455% | 16131% | 43954% | 47655% | 108764% |
| ▸Capital returned | 211854% | 26952% | 39949% | 34340% | 110765% |
| Buybacks | 567 | -10.1 | 14.3 | 3.30 | 560 |
| Dividends | 1407 | 206 | 347 | 321 | 533 |
| Interest paid | 92.9 | 32.2 | 33.4 | 13.1 | 14.2 |
| Debt paid down | 51.2 | 41.1 | 5.09 | 4.95 | 0.00 |
| ▸Reinvestment | 95624% | 23545% | 26632% | 28933% | 16610% |
| Capex (PP&E) | 948 | 185 | 304 | 272 | 187 |
| Intangibles & M&A | -27.0 | 11.1 | -29.2 | -0.24 | -8.69 |
| Leases signed (net Δ) | 34.7 | 38.7 | -9.48 | 17.8 | -12.4 |
| Retained / other | 2757% | 13025% | -70.2-9% | -39.1-5% | 25415% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 15 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Assets (total) | 3615 | 3615 | 3539 | 3469 | 3243 |
| ▸Liabilities (total) | 1000 | 1000 | 911 | 925 | 722 |
| Net debt (incl. leases) | -389 | -389 | -334 | -452 | -634 |
| Net debt / Adj EBITDA | -0.75 | -0.75 | -0.57 | -0.51 | -0.38 |
| Net debt / Adj FCF | -1.03 | -1.03 | -1.58 | -1.52 | -0.62 |
| Adj EBITDA / interest | 16.1 | 16.1 | 17.6 | 67.0 | 118 |
| Shares outstanding | 844 | 844 | 843 | 854 | 864 |
| Dilution (YoY) | +0.1% | +0.1% | -1.4% | -1.1% | -7.6% |
| Employees | 1468 | -- | -- | -- | -- |
| Margins | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Gross margin | 36.2%-11.0 | 36.2%-11.0 | 47.2%-2.5 | 49.7%-15.0 | 64.7% |
| Adj EBITDA margin | 29.6%-3.1 | 29.6%-3.1 | 32.7%-16.1 | 48.8%-13.5 | 62.3% |
| Adj OCF margin | 32.2%+3.5 | 32.2%+3.5 | 28.7%-2.9 | 31.6%-13.3 | 44.9% |
| Adj FCF margin | 21.6%+9.8 | 21.6%+9.8 | 11.8%-4.7 | 16.5%-21.5 | 38.0% |
| Net income margin | 9.2%-15.3 | 9.2%-15.3 | 24.5%-1.9 | 26.4%-13.9 | 40.3% |
| Adj NI margin | 9.5%-12.0 | 9.5%-12.0 | 21.6%-6.6 | 28.2%-15.6 | 43.8% |
| ROIC (adj, after-tax) | 6.0% | 6.0% | 9.6% | 16.8% | 41.4% |
| Cost of debt | 8.3% | 8.3% | 9.1% | 5.6% | -- |
Earnings Calls
Earnings Call · 2026 Q4
New Hope Group reported its fiscal 2026 fourth quarter (July quarter), which closed out the financial year. CEO Rob Bishop called it a great operational year. Safety was mixed: TRIFR fell 12% to 3.89, but the high potential event frequency rose from 1.21 to 4.65. Management responded with group-wide safety pauses, more frontline engagement and verification of critical controls, citing recent industry fatalities. Bengalla ran at its targeted 13.4Mtpa (100% basis) rate. Quarterly raw coal output was 3.0Mt, up 16%, as the strip ratio moderated after heavy overburden removal in the first half. Saleable coal was 2.3Mt, up 8%. At New Acland, raw coal was 1.7Mt, up 3%, but sales of 0.9Mt were down 7% because Queensland Rail protected industrial action and Cross River Rail outages cancelled rail paths. Group underlying EBITDA was $169 million, up 30%, helped by better benchmark prices and FX. Management expects Middle East conflict to keep energy markets volatile, supporting thermal coal. For the full year, group saleable production was 11.5Mt, up 8% and above guidance. New Acland produced 3.3Mt saleable (up 17%) and sold 3.6Mt, ahead of guidance, as it ramps toward 5Mtpa; access to the Manning Vale West pit is due in the second half of calendar 2026, with first coal expected early next calendar year. Bengalla produced and sold 8.2Mt, above guidance, at an FOB cash cost of $81.30/t, the low end of the $81–89 range. Full-year underlying EBITDA was $514 million and operating cash flow $564 million. Full-year results are due 15 September. In Q&A, Glyn Lawcock (Barrenjoey) probed the strong cash build (about $800 million available). Management cited higher prices and volumes, a slight coal stock reduction, and Q3 outflows (dividends, convertible bond buyback) that flattered Q4. Bishop said cash is above what the company wants to hold, though it keeps a higher buffer than a decade ago given the narrower bank universe and fewer operating assets. With a large franking balance, a reasonable dividend is expected. Remaining New Acland capex is about $130 million, and capex should then fall while production grows. Daniel Roden (Jefferies) asked about strip ratios (expected to stay in the 4s at Bengalla; New Acland swings by quarter), yields (driven by flexible wash strategy and seam mix) and sustaining capex (savings from optimized overhauls, partly deferral). Roden also asked about Malabar: Maxwell is ramping up and nearing positive cash generation; Malabar's acquired Mount Arthur tenements would not count as greenfield; data center and battery opportunities are Malabar's to pursue, not Bengalla's. Christopher Creech (Morgans) asked about New Acland's ramp-up; the 5Mt target is unchanged, though the mine is slightly ahead of schedule. Lawcock also asked about Bengalla's unit cost volatility; Q4 is more indicative, with lower sales and inflation, and enterprise bargaining is due. Bishop said there is nothing external of interest; the focus remains organic growth.
▸Was there anything to call out behind the exceptionally strong cash flow and year-end cash balance?Glyn Lawcock · Barrenjoey
▸Was there a one-off working capital unwind, given roughly $200 million of cash generated in the quarter?Glyn Lawcock · Barrenjoey
▸With almost $800 million of available cash, how much does the company want to hold, and how much New Acland spend remains?Glyn Lawcock · Barrenjoey
▸What cash balance was held 5 to 10 years ago, and how much higher is the current minimum?Glyn Lawcock · Barrenjoey
▸Is the Bengalla strip ratio of 4 in the quarter the new norm for FY27 and FY28, or a short-term recalibration?Daniel Roden · Jefferies
▸Did lower yields reflect a deliberate response to the API 5 versus Newcastle spread or sequencing into lower quality areas?Daniel Roden · Jefferies
▸How much of the sustaining capex deferral should be expected in FY27?Daniel Roden · Jefferies
▸Can you update on the Brisbane rail network constraints?Webcast
▸What is New Hope doing to ensure safety at its sites given recent industry events?Webcast
▸How will the roughly 26% Malabar equity stake be accounted for as it ramps up and starts generating cash?Daniel Roden · Jefferies
▸How might Malabar's Mount Arthur tenements fit into its pipeline given the New South Wales greenfield ban?Daniel Roden · Jefferies
▸What is the view on Malabar's data center and energy precinct plans, and is New Hope considering similar opportunities near its tenements?Daniel Roden · Jefferies
▸Is New Acland still on track to reach nameplate capacity around 2029, or could it come earlier?Christopher Creech · Morgans Financial
▸Why did Bengalla unit costs jump around across quarters, and is Q4 indicative going forward?Glyn Lawcock · Barrenjoey
▸Did Q4 include diesel and is there a new workforce contract kicking in this year?Glyn Lawcock · Barrenjoey
▸Is there any external M&A opportunity of interest after recent asset sales, or is the focus internal?Glyn Lawcock · Barrenjoey
Web Traffic
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| CONFLUENCE INVESTMENT MANAGEMENT LLC | $871K | $5.34 | +$1.2M | +$871K | — | $6.40B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2013 Q1 | 318M | — | 0M | $0.00 | $0.00 – $0.00 | 2 |
| 2020 Q3 | 456M | 223M | 99M | $0.05 | $0.05 – $0.05 | 2 |
| 2021 Q1 | 410M | 124M | 27M | $0.03 | $0.03 – $0.03 | 2 |
| 2021 Q3 | 407M | 155M | 45M | $0.05 | $0.05 – $0.05 | 2 |
| 2022 Q3 | 823M | 339M | 179M | $0.16 | $0.13 – $0.23 | 6 |
| 2023 Q3 | 1.7B | — | 0M | $0.00 | $0.00 – $0.00 | 2 |
| 2024 Q3 | 2.0B | — | 0M | $0.00 | $0.00 – $0.00 | 2 |
| 2025 Q1 | 1.0B | 443M | 228M | $0.27 | $0.27 – $0.27 | 1 |
| 2025 Q3 | 804M | 246M | 93M | $0.11 | $0.11 – $0.11 | 1 |
| 2026 Q1 | 814M | 215M | 57M | $0.07 | $0.07 – $0.07 | 1 |
| 2026 Q3 | 958M | 319M | 124M | $0.15 | $0.15 – $0.15 | 1 |
| 2027 Q1 | 1.1B | 431M | 202M | $0.24 | $0.24 – $0.24 | 1 |
| 2027 Q3 | 1.2B | 433M | 203M | $0.24 | $0.24 – $0.24 | 1 |
| 2028 Q1 | 1.2B | 468M | 227M | $0.27 | $0.27 – $0.27 | 1 |
| 2028 Q3 | 1.1B | 470M | 228M | $0.27 | $0.27 – $0.27 | 1 |
| 2029 Q1 | 1.8B | 554M | 284M | $0.34 | $0.34 – $0.34 | 1 |
| 2029 Q3 | 1.7B | 511M | 252M | $0.30 | $0.30 – $0.30 | 1 |
| 2030 Q1 | 913M | 446M | 208M | $0.25 | $0.25 – $0.25 | 1 |
| 2030 Q3 | 908M | 439M | 205M | $0.24 | $0.24 – $0.24 | 1 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- FY26 Half-Year Financial Results (March 17, 2026): For the half-year ending January 31, 2026, New Hope reported stable saleable coal production of 5.5 million tonnes (up 0.4% year-on-year). However, due to a lower-pricing coal environment, the company's average realized price declined 20% to A$138/t (down from A$173/t in 1H FY25). This caused underlying EBITDA to drop 58.5% year-on-year to A$214.8 million and net profit after tax (NPAT) to fall 84% to A$54.3 million. Despite the earnings compression, New Hope declared a fully franked interim dividend of 10.0 cents per share and maintained a robust available cash balance of A$616.8 million.
- Q3 FY26 Operational Rebound (May 18, 2026): New Hope's quarterly activities report for the period ending April 30, 2026, demonstrated a significant acceleration in operational momentum. Group Run-of-Mine (ROM) coal production grew 5% quarter-on-quarter to 4.26 million tonnes, and saleable coal production rose 8.7% QoQ to 3.01 million tonnes. Backed by a slightly stronger average realized price of A$140.7/t (up 1.2% QoQ) and aggressive cost compression at Bengalla, quarterly underlying EBITDA surged 21.7% QoQ to A$130.1 million. Available cash at quarter-end stood at A$571.6 million.
- Strategic Debt Refinancing (April/May 2026): New Hope successfully issued A$300 million in new senior unsecured convertible notes due in 2032 while simultaneously repurchasing A$293.3 million of its existing convertible notes due in 2029. This capital structure optimization pushes out its debt maturity profile and materially mitigates near-term refinancing risks.
- Bengalla Lifetime Expansion: In February 2026, development approvals were highlighted for the life extension of the Bengalla mine, securing the continuity of its flagship operation through 2060.
▸ Thesis-test Findings
Newcastle thermal coal index forward price curve 2026 2027
The forward curve for ICE Newcastle Coal Futures indicates strong, resilient pricing through 2026 and 2027, supporting a positive bull case. While spot prices reached short-term peaks in June 2026 near USD 152.25/t due to Indonesian export constraints and peak Northern Hemisphere cooling demand, the forward curve remains remarkably steady. Contract prices for the remaining months of 2026 (July–December) sit in a tight range between USD 130.65/t and USD 132.15/t. This stable trend carries directly into 2027, with contract futures holding solid between USD 130.90/t and USD 132.40/t. Furthermore, major forecasters like Fitch Ratings upgraded their average Newcastle thermal coal assumptions in June 2026 to USD 120/t for 2026 and USD 100/t for 2027 (up from USD 110/t and USD 95/t, respectively), while Westpac expects prices to settle around USD 120/t through 2027. These figures remain well above historical pre-crisis averages, indicating structural pricing resilience.
Malabar Resources Maxwell Underground longwall production ramp updates
The longwall production thesis was validated on April 15, 2026, when Malabar Resources officially commenced first longwall coal production at its Maxwell Underground mine in the Hunter Valley, successfully executing its first full shears of coal. This transition from development drivage to sustained longwall extraction allows the operation to begin ramping up toward its full approved capacity of up to 8 million tonnes per annum (Mtpa) of run-of-mine coal. New Hope is highly leveraged to this milestone, having increased its equity stake in Malabar Resources to approximately 25.97% during the financial year. The successful commissioning of the longwall system on schedule supports the bull case, expanding New Hope's exposure to low-cost, high-margin metallurgical coal and premium thermal coal over a mine life projected to exceed 25 years.
Bengalla coal mine FOB cost per tonne performance FY26
Bengalla’s cost performance strongly bolsters the bull case, showing a rapid operational recovery that has outpaced expectations. Following a difficult H1 FY26, where weather disruptions in late FY25 necessitated extensive pit re-alignment and pre-stripping (pushing H1 FOB cash costs up to AUD 83.7/t), the mine delivered a major cost breakthrough in Q3 FY26. For the quarter ending April 30, 2026, Bengalla's FOB cash costs (excluding state royalties) dropped by 12.4% quarter-on-quarter to AUD 74.0 per sales tonne. Given that the company's full-year FY26 FOB cash cost guidance for Bengalla was set at AUD 81.0 to AUD 89.0 per sales tonne, current run-rates indicate the mine is positioned to achieve the low end of or outperform its full-year cost targets. This highlights excellent fixed-cost absorption as the mine targets its steady-state 13.4 Mtpa ROM run-rate.