Nickel Industries Limitedv3 6.0/10 · 2026-11-03Nickel Industries Limited, headquartered in Sydney, Australia, operates in Singapore and Indonesia, focusing on nickel ore extraction and nickel pig iron production. The company possesses an 80% ownership stake in the extensive 5,983-hectare Hengjaya Mine, located within Central Sulawesi's Morowali Regency. Its portfolio also includes an 80% interest in the Ranger Nickel project and a 70% share in the Angel Nickel project. Additionally, Nickel Industries holds an option to acquire a 70% interest in the Oracle Nickel project. Founded in 2007, the company was formerly known as Nickel Mines Limited until its name was officially changed in June 2022.
2-Year Price History
Valuation v3 Opus worker · 2026-11-03
Nickel Industries is an Indonesian nickel miner and smelter run by an Australian team, with Tsingshan as its partner. It owns 80% of the Hengjaya laterite mine and 80% of four RKEF nickel pig iron plants, plus stakes in HPAL plants (10% HNC, 46% ENC, and a 36% CNE stake and a TMI stake still to come). The shares have halved from A$1.06 in May to A$0.585 (last close; it traded around A$0.57 intraday on 4 Nov), the bottom of the 1-year range, with no company news behind the fall. Four fears hit at once: LME nickel down about 25% from its peak to about US$15k/t; an El Nino drought that cut RKEF output to 75% of nameplate and the ENC ramp to 33%; sulfur cost shock from the Iran war; and a cash squeeze (cash fell to US$146M at September after a US$122M working-capital build, a US$169M TMI payment is due in November and US$144M for Sampala in April 2027). The business underneath is better than the chart. Indonesia's new HPM ore-price formula has moved structural margin into the mine, which just made a record US$77M quarterly EBITDA. ENC is producing MHP and cathode below HNC's cost even while commissioning, and a non-recourse US$245M ENC loan should send roughly US$100M back to NIC. On our numbers attributable EBITDA is about US$385M in 2026 and attributable unlevered owner earnings about US$260-275M (A$370M). Against an EV of about A$4.25B (US$3.0B), that is about 7.7x attributable EBITDA, with about 70% of EBITDA reaching owners. Held flat, though, today's earnings justify only about A$0.46/share, so the case depends on the HPAL ramp and on Sampala. Our 5-year DCF at flat nickel of about US$16k (8x year-5 FCF) gives about A$0.75 and a 14% base IRR. Rating 6.0: cheap and near capitulation, with a credible catalyst in the December wet season and the ENC dividend recap. But it is a levered, commodity-priced, Indonesia-policy and Tsingshan-dependent story at about 2.7x net debt/EBITDA, with no dividend and an acquisitive habit. Research rating 7.5: a 30-60% rebound within a year is plausible if rain, ENC sales and the RKAB increase arrive, and the funding question is answerable.
A deep dive would have to establish: Can NIC fund the November TMI payment and the April 2027 Sampala payment without an equity raise and still reach about US$470M+ of attributable EBITDA in 2027 at US$15-16k nickel, once ENC sells product, the drought breaks and the RKAB decision lands?
Research (expand)
What the company does
Nickel Industries (ASX: NIC) is an ASX-listed, Australian-managed nickel producer whose assets are all in Sulawesi, Indonesia. It owns 80% of the Hengjaya laterite mine (2026 RKAB sales quota 14.3Mt; it has applied for 19Mt). It owns about 80% of four RKEF nickel pig iron operations (HNI, RNI and ANI in IMIP/IWIP, plus ONI), selling about 100-110kt of nickel in NPI a year. In HPAL it holds 10% of HNC and 46% of ENC (72ktpa Ni nameplate, commissioning since May 2026, with first MHP in July and first cathode in August). It has also agreed to take 36% of CNE, paid for in Sampala shares, and a stake in TMI for US$169M due in November 2026, which adds about 7kt of attributable Ni from 2027-28. The Sampala mine project (about 42% held after the swap) is the next leg of mine growth. Tsingshan (Shanghai Decent) is the builder and operator of every processing asset and owns 21.7% of NIC. PT United Tractors (Astra) owns 19.7%.
Investment case
- Structural margin shift to the mine. Indonesia's revised HPM ore-pricing formula closed a roughly US$20/t gap between the official saprolite price and the market price. Hengjaya made record EBITDA of US$76.9M in Q3 2026 (up 68% on Q2) on record 4.5Mt of sales at about US$17/wmt. Indonesia also cut national RKAB quotas by about 30% for 2026 while Hengjaya got a 60% increase. NIC is an integrated, quota-favoured producer in a market the government is deliberately tightening.
- HPAL ramp. At 50% of nameplate, ENC ran at a cash cost of US$13.9k/t, below HNC. The cathode circuit captures the gap between MHP payables (now about 84%) and 100%. NIC now has an MHP sales exemption and expects the IUI sales permit this quarter, which would release built-up stock. CNE and TMI are slated for mid/Sept 2027 nameplate.
- Near-term cash catalysts. Management expects most of the US$122M Q3 working-capital build to reverse in Q4. ENC's US$245M non-recourse 7-year facility (SOFR+2%) is meant to repay shareholder loans, about US$100M of it to NIC. The wet season normally starts in December.
- Sentiment. The stock is down 47% from May, at a fresh 52-week low with no announcement, and near the bottom of a 3-year range (A$0.425-1.10). All eight brokers still rate it Buy or Outperform, with an average target of A$1.13.
What it earns today (real free cash flow)
All figures are US$ unless stated (AUD/USD about 0.70).
- 2026 adjusted EBITDA is about US$470M: H1 247.6, Q3 125.9, and an estimated Q4 of about 95 under drought cuts and US$15k nickel. That includes about US$50M of attributable HNC EBITDA, which is equity-accounted and only partly distributed (US$13M in Q3).
- Taking out the 20% minorities in the mine and RKEF leaves attributable EBITDA of about US$385M.
- Less attributable cash tax (about 55) and maintenance capex (about 55; 2026 group capex guidance is US$66-73M, including ongoing kiln/furnace rebuilds, which we treat as maintenance), unlevered attributable owner earnings come to about US$260-275M (about A$370M). About 70% of attributable EBITDA reaches owners. Stock comp is negligible.
- Interest on US$800M of 9% 2030 notes plus a US$450M syndicated loan (cost about 7.1%, possibly falling to 6.1%) is about US$105-110M a year, or about US$95M after limited tax shield. That leaves about US$170-180M for equity, roughly a 10% levered owner-earnings yield on the A$2.54B (US$1.78B) market cap.
- Reported cash flow is much worse right now. Q3 cash fell US$122M on working capital, a US$50M ENC shareholder loan and US$43M of debt service. Committed growth spending is heavy: TMI US$169M in November 2026 (may be funded from the Tsingshan facility, i.e. more debt) and Sampala US$144M in April 2027 (deferrable).
- If nothing changes: US$265M / 10% = US$2.65B, less pro-forma net debt of about US$1.2B, gives about US$1.45B equity, or about A$0.46/share, below the price. The equity would earn about 10% a year on the current price before growth. The investment case therefore rests on the HPAL ramp and mine growth, not on today's earnings repeated.
Five-year free cash flow (unlevered, attributable, after growth capex and acquisition payments, flat nickel about US$16k/t)
| Year | Attrib. EBITDA (US$M) | FCF (US$M) | FCF (A$M) | Notes |
|---|---|---|---|---|
| 2027 | ~470 | ~150 | ~214 | ENC at ~65-70kt (46%), mine 15-17Mt, RKEF margin squeezed by ore cost; Sampala US$144M payment + haul road |
| 2028 | ~550 | ~315 | ~450 | CNE/TMI first full contribution (~17kt attrib.), Sampala development capex |
| 2029 | ~620 | ~380 | ~543 | Sampala ore ramp begins |
| 2030 | ~680 | ~430 | ~614 | |
| 2031 | ~700 | ~450 | ~643 | Mature, ex-growth integrated producer |
These numbers are about 20% below Bell Potter's flat-price case (attributable EBITDA US$590M in 2027 and US$690M in 2028 at US$16.5k), because we haircut HPAL margins for sulfur and MHP payables. Growth runs about 3-4 more years (ENC, then CNE/TMI, then Sampala), after which the company is a mature, cyclical, quota-dependent producer. A US$1k/t move in nickel shifts attributable EBITDA by roughly US$80-120M a year, so the ranges are wide.
What it looks like in 5 years
In 2031 we expect a larger, more HPAL-weighted integrated producer: about 60kt+ of attributable HPAL nickel, a 19Mt-plus Hengjaya and a ramping Sampala. Without new deals it should be deleveraged, and it may be paying dividends again. It is not a corpse: Indonesian laterite on the low end of the cost curve with integrated ore is the marginal-cost-setting system of the global nickel market. Nor is it a compounder. The market will price it as a cyclical commodity producer at about 6-9x FCF (we use 8x), discounted for Indonesian sovereign and policy risk and dependence on Tsingshan. Confidence is moderate on volumes and low on price.
Fair value and multiples
- Market cap A$2.54B (4,342M shares x A$0.585). Pro-forma net debt about US$1.2B (A$1.72B): US$1,104M at September, plus US$169M for TMI, less the expected working-capital unwind and part of the ENC recap. EV is about A$4.25B (US$3.0B).
- EV / 2026 attributable EBITDA is about 7.7x, and about 6.3x on our 2027 figure. EV / attributable owner earnings is about 11.5x. Net debt / EBITDA is about 2.7x against a 3.5x covenant.
- Forward P/E is about 9-10x on 2027 consensus-like NPAT. Broker P/Es that look like 3-4x assume US$20k nickel.
- DCF (10%, 5 years plus 8x year-5 FCF, less net debt): EV about A$4.99B, equity about A$3.27B, about A$0.75/share. At today's price the base-case IRR is about 14%.
- Fair value about A$0.72. That is slightly below the DCF because of the leverage and funding squeeze, the reliance on a nickel price we cannot forecast, and a near-term chance of extra debt or equity. If nickel gets back to US$18k and the drought breaks, value is A$1.00-1.20. If US$14k nickel lasts another year and the RKAB is not raised, A$0.35-0.45 with a possible equity raise.
- This is not a covered-call floor: forward earnings are commodity-driven, not predictable.
Management, risks and competition
- Management. Justin Werner (MD) and CFO Chris Shepherd have delivered projects on time with Tsingshan and refinanced well: 9% 2030 notes replaced 11.25% amortising notes, the syndicated margin is falling, and the ENC debt is non-recourse at SOFR+2%. On the other side, they have been serially acquisitive (ENC, Sampala, CNE, TMI), withdrew the dividend in 2025, and keep committing cash ahead of cash flow. That is how the company landed in a liquidity squeeze when the drought hit. Shareholders have not had capital back lately.
- Tsingshan. Every processing asset is built and operated by Tsingshan, which is also a 21.7% holder and a lender (the TMI facility). The relationship is a moat (low capex, low cost) and also a concentration and related-party risk. NIC is Australian-run, not Chinese-run, but it is effectively Tsingshan's listed junior partner.
- Risks. Nickel price (Indonesian oversupply; MHP spot below some producers' cash costs). Sulfur prices (Iran war; down from US$1,100-1,200 to about US$800). Indonesian policy: RKAB quotas, royalties, HPM formula, export rules, forestry permits (Sampala's haul road is waiting on one). Weather. Environmental and safety scrutiny of IMIP. Leverage and covenants. Dilution if the funding gap widens.
- Competition. Tsingshan, Huayou, GEM, Lygend, Harita and Vale Indonesia run larger integrated operations. NIC's edge is owned ore (about 60% saprolite self-sufficient, plus a captive limonite slurry line feeding ENC) and its favourable quota allocation, not scale.
How investors feel (sentiment 3/10)
The market hates it right now. The stock slid to fresh lows through late October with no announcement and has fallen about 15-20% since the 21 October quarterly, at the bottom of its 1-year range, as holders give up on the 2026 nickel rally. Sell-side analysts disagree with the market. All 8 covering brokers rate it Buy or Outperform, with an average target of A$1.13 (range A$0.80-1.80). Bell Potter has a Buy at A$1.45 (September) and Macquarie and Jefferies upgraded to Outperform/Buy at about A$0.85-0.90 in October. On the other side, Citi downgraded to Neutral (target cut to A$0.80) and UBS cut its target to A$1.05. Retail commentary centres on 'is it cheap or a value trap'. This looks like capitulation driven by weather, the nickel price and liquidity, not a broken franchise. The open question is whether the balance sheet gets through to the wet season and the ENC cash release without an equity raise.
- /Users/gregwo/stocks2/data/analysisv3/context/NIC.AX.md (2026Q3 call transcript, earlier call summaries, price history)
- https://nickelindustries.com/carbon/assets/0007ea/000009/NIC_20260920.pdf
- https://uk.investing.com/news/stock-market-news/nickel-industries-q3-2026-slides-mining-hits-record-amid-rkef-squeeze-93CH-4924040
- https://www.investing.com/news/transcripts/earnings-call-transcript-nickel-industries-posts-strong-q3-2026-operating-gains-93CH-4964500
- https://stockanalysis.com/quote/asx/NIC/
- https://in.marketscreener.com/quote/stock/NICKEL-INDUSTRIES-LIMITED-44548980/consensus/
- https://kalkinemedia.com/au/stocks/value/is-nickel-industries-asxnic-a-bargain-after-its-slide
- https://discoveryalert.com/news/indonesia-nickel-production-cuts-enc-drought-november-2026/
- https://www.bloomberg.com/news/articles/2026-10-21/nickel-extends-rebound-on-prospect-of-indonesian-production-cuts
- https://www.argusmedia.com/en/news-and-insights/latest-market-news/2787275-indonesia-to-cut-nickel-mining-quota-in-2026
- https://www.metalnomist.com/2026/04/nickel-industries-rkab-quota-secures.html
- https://www.tipranks.com/news/company-announcements/nickel-industries-secures-800-million-in-bond-issuance-to-strengthen-financial-position
- https://www.ad-hoc-news.de/boerse/news/nebenwerte/ubs-cuts-target-to-aud-1-05-for-nickel-industries-stock/70376389
- https://fxnx.com/fr/blog/decision-rba-3-novembre-ce-que-les-traders-aud-usd-doivent-surveiller
Financials — Adjusted
Adjusted · TTM 2025-Q4 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 1694-3% | 1694-3% | 1744-37% | 2758+128% | 1209 |
| Gross profit | 170-46% | 170-46% | 315-52% | 660+131% | 286 |
| Operating expenses | 41.3-75% | 41.3-75% | 164-51% | 337 | 13.6 |
| ▸Adj EBITDA | 248-11% | 248-11% | 279-36% | 436+29% | 338 |
| ▸Adj OCF | 103-25% | 103-25% | 138-63% | 376+35% | 278 |
| CapEx | -16.2 | -16.2 | -65.7 | -246 | -123 |
| Adj FCF | 87.1+20% | 87.1+20% | 72.6-44% | 131-16% | 155 |
| Interest expense | 132 | 132 | 110 | 88.0 | 33.7 |
| ▸Adj net income | -46.8-157% | -46.8-157% | 82.1-58% | 195+5% | 186 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025
| Where the Cash Went | Total | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 1076100% | 239100% | 62.7100% | 436100% | 338100% |
| FCF (OCF−capex) | 12011% | 87.136% | 178284% | -59.5-14% | -85.7-25% |
| Net income | 58.75% | -57.9-24% | -169-269% | 12529% | 16047% |
| ▸Capital returned | -1396-130% | 14963% | 46.374% | -1359-312% | -233-69% |
| Buybacks | -1262 | 0.00 | 0.00 | -1156 | -106 |
| Dividends | 320 | 18.2 | 139 | 88.3 | 74.4 |
| Interest paid | 363 | 132 | 110 | 88.0 | 33.7 |
| Debt paid down | -817 | -0.34 | -202 | -380 | -234 |
| ▸Reinvestment | 48945% | 16.27% | 65.7105% | 14634% | 26177% |
| Capex (PP&E) | 450 | 16.2 | 65.7 | 246 | 123 |
| Intangibles & M&A | 38.2 | 0.00 | 0.00 | -99.6 | 138 |
| Leases signed (net Δ) | -- | -- | -- | -- | -- |
| Retained / other | 1841171% | 69.329% | 242385% | 1487341% | 42.713% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 4267 | 4267 | 3896 | 4071 | 3941 |
| ▸Liabilities (total) | 1807 | 1807 | 1348 | 1165 | 1265 |
| Net debt (incl. leases) | 847 | 847 | 844 | 70.1 | 415 |
| Net debt / Adj EBITDA | 3.42 | 3.42 | 3.03 | 0.16 | 1.23 |
| Net debt / Adj FCF | 9.72 | 9.72 | 11.6 | 0.54 | 2.67 |
| Adj EBITDA / interest | 1.88 | 1.88 | 2.54 | 4.95 | 10.0 |
| Shares outstanding | 4342 | 4341 | 4287 | 3553 | 2731 |
| Dilution (YoY) | +1.3% | +1.3% | +20.6% | +30.1% | +8.6% |
| Employees | 40000 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 10.1%-8.0 | 10.1%-8.0 | 18.0%-5.9 | 23.9%+0.2 | 23.7% |
| Adj EBITDA margin | 14.6%-1.4 | 14.6%-1.4 | 16.0%+0.2 | 15.8%-12.2 | 28.0% |
| Adj OCF margin | 6.1%-1.8 | 6.1%-1.8 | 7.9%-5.7 | 13.7%-9.4 | 23.0% |
| Adj FCF margin | 5.1%+1.0 | 5.1%+1.0 | 4.2%-0.6 | 4.7%-8.1 | 12.9% |
| Net income margin | -3.4%+6.2 | -3.4%+6.2 | -9.7%-14.2 | 4.5%-8.7 | 13.2% |
| Adj NI margin | -2.8%-7.5 | -2.8%-7.5 | 4.7%-2.4 | 7.1%-8.3 | 15.4% |
| ROIC (adj, after-tax) | 3.1% | 3.1% | 3.8% | 7.7% | 14.0% |
| Cost of debt | 11.7% | 11.7% | 12.1% | 11.7% | 7.5% |
Earnings Calls
Earnings Call · 2026 Q3
Nickel Industries reported a September quarter with adjusted EBITDA of US$125.9 million, up on the June quarter. Highlights were record Hengjaya Mine ore sales of 4.5 million tonnes (up 56%) and record mining EBITDA of US$76.9 million (up 68%), driven by the Indonesian government's revised HPM saprolite pricing. EBITDA per wet metric tonne rose about 8% to a little over US$17, helped by shorter limonite hauls to the ENC slurry plant. Safety was solid, with a 12-month LTIFR of 0.06 despite one lost-time incident, and the company ranked in the top 20 of APAC peers in the S&P sustainability assessment. RKEF EBITDA fell 30% to US$40.7 million as higher ore costs shifted margin to the mine. Sales were 26,800 tonnes at an NPI price of US$14,408/t and a cash cost of US$13,054/t. HNC EBITDA fell 42% to US$8.4 million on higher sulfur costs, but margin held at about US$4,400-4,500/t. Sulfur has since fallen from US$1,100-1,200 to about US$800/t, and HNC distributed US$13 million to NIC. ENC produced first MHP and first nickel and cobalt cathode, reaching 50% of nameplate within weeks. Quarter-to-date it produced 4,840t of nickel and 494t of cobalt in MHP at a commissioning cash cost of US$13,943/t, below HNC. Cathode conversion cost was US$3,888/t, targeted to fall to about US$2,500/t. LME registration is progressing, and an MHP sales exemption was received. The IUI for full sales is expected this quarter. El Niño drought has forced ENC back to about 33% capacity, though management may ramp the cathode refinery (about 40ktpa) to full capacity. RKEF output was cut to about 75% of nameplate from October because of water shortages, while ANI is running at 128%. A rebuild of one HNI line is due mid-November. Cash fell from US$268 million to US$146 million. The CFO cited US$50 million of growth spend (mainly the ENC working capital loan), US$12 million of Sampala capex and US$43 million of debt service. Working capital swings, including inventories, HPAL prepayments, receivables and payables, took cash flow before growth and debt to negative US$12 million, and these are expected to unwind in Q4. The company signed a non-recourse US$245 million, 7-year OCBC-led ENC facility at SOFR+2% (about 5.9%), which will fund a recap of shareholder loans, with NIC's 46% share about US$100 million. Management is reassessing a draw on the US$169 million Tsingshan facility. A US$144 million Sampala payment is due in April and could be deferred with the vendor's agreement. FY26 guidance: mine sales of 14.3Mt (10.4Mt to date, with an RKAB increase pending), RKEF nickel sales of 100-110kt, HPAL attributable sales of 10-11kt, and capex of US$66-73 million. Sampala haul-road work is progressing, awaiting forestry and feasibility approvals.
▸What is the weather impact on regional RKEF production, and will peers coordinate production cuts across the sector?Austin Yun · Macquarie
▸How should the fixed versus variable cost split be viewed as production falls?Austin Yun · Macquarie
▸What saprolite/limonite mix is expected for the remaining ~4Mt of the Hengjaya RKAB, and will saprolite sales be maximized?Richard Knights · Barrenjoey
▸What is the expected split over the next three months?Richard Knights · Barrenjoey
▸How far have MHP price realizations pulled back versus nickel, and has a floor been found?Richard Knights · Barrenjoey
▸How will the US$245 million ENC facility proceeds be used, and will they repay the US$50 million NIC loan?Jit Ming Tan · Barclays
▸Will attributable saprolite volumes to RKEFs fall in line with the 25% production cut?Hamish Wiltshire · Jefferies
▸What is the timing of the IUI sales permit, and can built-up stocks be sold immediately?David Coates · Bell Potter Securities
▸How sustainable is ANI running well above nameplate?David Coates · Bell Potter Securities
▸Any update on Sampala permitting and schedule?David Coates · Bell Potter Securities
▸How feasible are the CNE and TMI HPAL projects given high sulfur costs and weak HPAL supply/demand?Kay Hatanto · Indo Premier Securities
▸What are the terms and use of the intercompany loan in the cash flow waterfall?Ebrahim · Deutsche Bank
▸What are the repayment terms as the project comes online?Ebrahim · Deutsche Bank
▸How will the November HPAL payments be met, and will the Tsingshan facility be drawn?Aman Aggarwal · JPMorgan
▸Which entity would hold the Tsingshan and ENC debt?Aman Aggarwal · JPMorgan
▸What is the impact of RKEF cuts on Hengjaya mine production?Aman Aggarwal · JPMorgan
▸How much of Q3 limonite sales went to ENC?Aman Aggarwal · JPMorgan
▸What has the NPI ASP been so far in Q4?Aman Aggarwal · JPMorgan
▸How should saprolite realizations be viewed in Q4 given lower nickel prices?Vikash Agarwala · Primus Asset Management
▸Will the ENC working capital be returned soon after the OCBC drawdown?Vikash Agarwala · Primus Asset Management
▸What further ENC working capital is needed on a 100% basis?Vikash Agarwala · Primus Asset Management
▸What are the HNC margins if sulfur stays around US$800?Vikash Agarwala · Primus Asset Management
▸Will the Tsingshan facility be used for the November and April payments, and what cash is released at corporate level from the ENC financing?Love Sharma · Point72
▸What is the outstanding ENC working capital loan balance, and do the CNE and TMI timing targets still hold?Xiang Gao · BofA
▸Will CNE and TMI margins resemble HNC or ENC?Xiang Gao · BofA
▸How do reported Tsingshan production cuts affect NIC?Donavan Tan · BlackRock
▸Is there any debt at ENC besides the shareholder loans?Bharat Shettigar · Standard Chartered Bank
▸Can the new loan immediately repay shareholder loans?Bharat Shettigar · Standard Chartered Bank
▸Does the dividend recap cover just the ~US$100 million loans or also equity infused?Bharat Shettigar · Standard Chartered Bank
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2020 Q4 | 373M | 64M | 33M | $0.01 | $0.01 – $0.01 | 2 |
| 2022 Q4 | 412M | 88M | 21M | $0.05 | $0.04 – $0.05 | 5 |
| 2024 Q4 | 805M | 112M | -2M | $0.00 | $0.00 – $0.00 | 1 |
| 2025 Q2 | 835M | 174M | 52M | $0.01 | $0.01 – $0.01 | 1 |
| 2025 Q4 | 819M | 151M | 9M | $0.00 | $0.00 – $0.00 | 1 |
| 2026 Q2 | 944M | 241M | 94M | $0.02 | $0.02 – $0.02 | 1 |
| 2026 Q4 | 897M | 187M | 46M | $0.01 | $0.01 – $0.01 | 1 |
| 2027 Q2 | 1.1B | 285M | 127M | $0.03 | $0.03 – $0.03 | 1 |
| 2027 Q4 | 1.2B | 365M | 192M | $0.04 | $0.04 – $0.04 | 1 |
| 2028 Q2 | 1.2B | 442M | 256M | $0.06 | $0.06 – $0.06 | 1 |
| 2028 Q4 | 1.2B | 483M | 290M | $0.07 | $0.07 – $0.07 | 1 |
| 2029 Q2 | 1.2B | 631M | 410M | $0.09 | $0.09 – $0.09 | 1 |
| 2029 Q4 | 1.3B | 561M | 355M | $0.08 | $0.08 – $0.08 | 1 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- April–May 2026 Operating Update: Nickel Industries reported a strong operational recovery in May 2026, delivering an adjusted EBITDA of approximately US$51 million. This marked a significant rebound from a softer April (US$29 million), which had been temporarily dragged down by planned maintenance and downtime at the Hengjaya Mine.
- Substantial Near-Term Cash Inflows: The company is scheduled to receive a US$70 million working capital distribution from its RKEF operations by early July 2026. Furthermore, following a strategic pivot to prioritize higher-margin HPAL technology, the company decided not to proceed with its investment in the ONI matte converter. Consequently, its largest shareholder, Shanghai Decent, refunded a US$15 million option fee.
- Debt Refinancing and Balance Sheet Optimization: In late April 2026, the company executed new unsecured syndicated loan facilities totaling US$450 million (led by PT Bank Negara Indonesia) to retire US$398 million of existing bank debt and provide general working capital. Post-refinancing, net debt stands at approximately US$994 million, featuring a flexible leverage-linked interest rate structure.
- Strong Q1 2026 Financial Results: Nickel Industries reported an adjusted EBITDA of US$135 million for the March 2026 quarter. This robust performance was driven by a massive 155% expansion in Nickel Pig Iron (NPI) margins, recovering from a Q4 2025 trough.
- Renewable Energy Progress: The captive solar and battery project inside the Indonesia Morowali Industrial Park (IMIP)—designed to supply 262MWp of photovoltaic power and 80MWh of battery energy storage to the Excelsior Nickel Cobalt (ENC) project—successfully achieved financial close in late January 2026.
▸ Thesis-test Findings
Indonesian RKAB Mining Quota Approvals Nickel 2026
- Findings: The Indonesian Ministry of Energy and Mineral Resources (ESDM) capped the 2026 nickel ore mining quota (RKAB) at 260–270 million wet metric tonnes (wmt). This allocation is significantly lower than the 2025 approved quota of 379 million wmt and falls short of the country's estimated refinery demand of 340–350 million wmt. Local industry groups warn that processing capacity utilization across the country could plunge to 70–75% due to ore scarcity, which has already driven up global nickel prices.
- Impact on Case: This is a double-edged sword. For the bear case, a tight ore market increases feedstock costs and presents localized supply risks. However, it heavily supports the bull case: the resulting supply squeeze has triggered a sharp rally in LME nickel and NPI pricing. Nickel Industries has effectively insulated itself by proactively building several months of saprolite stockpiles during Q1 2026 and securing a 15-year, 14 million wmt per annum limonite supply MOU through the Sampala project.
Sphere Corp SpaceX Supplier Nickel Offtake Agreement
- Findings: In late January 2026, South Korean alloy producer Sphere Corp—a certified Tier 1 supplier to SpaceX with a 10-year supply agreement exceeding US$1 billion—completed its acquisition of a 10% equity stake in the Excelsior Nickel Cobalt (ENC) HPAL project from Shanghai Decent, valuing the project at US$2.4 billion. Under this agreement, Sphere will take its proportional 10% share of ENC nickel production as cathode and has entered into an additional market-priced offtake agreement for excess volumes.
- Impact on Case: Strongly bullish. This transaction represents the first Western offtake agreement for the ENC project and directly validates the high quality, traceability, and low-carbon credentials of Nickel Industries' planned cathode output. It opens direct pathways into premium North American aerospace supply chains. Furthermore, by acquiring the stake from Shanghai Decent rather than the company, Nickel Industries' own interest remained intact, and they restructured their final acquisition payments to purchase an additional 2% stake (raising ownership to 46%) for a single payment of US$46 million, avoiding US$207 million in previously scheduled cash outflows.
Excelsior HPAL Project Commissioning Updates 2026
- Findings: Commissioning at the ENC HPAL project is progressing rapidly. The limonite feed preparation plant received its first ore in May. During late June 2026, the company is igniting the sulfuric acid plant, commissioning the first of three autoclaves, and initiating slurry transport from the Hengjaya Mine. First mixed hydroxide precipitate (MHP) is anticipated by mid-July. The refinery and leach circuit will also commence commissioning in late June using MHP stock, targeting first nickel cathode by mid-August 2026 to facilitate registration on the LME and SHFE.
- Impact on Case: Highly bullish. Bringing the ENC project online on-schedule validates the core investment thesis of transitioning Nickel Industries from a traditional, lower-margin industrial NPI producer into a premium, battery-grade nickel supplier. However, as the plant ramps up, the capital-intensive nature of the project remains a minor bear-case watchpoint given the company's substantial net debt of ~US$994 million.