Stocks/NRGV

NRGV

Energy Vault Holdings, Inc.v3 4.0/10 · 2026-11-13
Industrials·Electrical Equipment & Parts
$3.18
$469M market cap
v3 Rating
4.0/103.0–5.5
Setup
3.5/102.5–4.5
Fair Value
$2.80$1.00–$6.00-12%
DCF (10%)
$2.85-10%
Base IRR
+4%-15%–+20%
Visibility
wide±89%
Wall Street
$8.38 target(2 analysts last quarter)(8 buy, 2 sell)
Rating
Revenue (TTM)
$205.6M
Owner Earnings
-$45M
Next-Yr Owner Earnings
-$60M
Growth
+15.0% × 4y
P / Next-Yr OE
--
Net Debt
$70M

Energy Vault Holdings, Inc. develops and deploys utility-scale energy storage solutions in the United States, Switzerland, United Kingdom, North America, Australia, and internationally. The company offers B-Vault, an electrochemical battery energy storage solution for short-duration energy storage needs; G-Vault, a gravity energy storage solution for long-duration energy storage needs; and H-Vault, a hydrogen or hybrid energy storage solution. It also provides software solutions, such as Vault-OS Energy Management System which provides real-time monitoring, operational control, and optimized dispatch across an array of generation and short to ultra-long duration energy storage assets; Vault-Bidder, which utilizes artificial intelligence to leverage diverse, live data from directly monitored assets and external drivers to provide dispatch and revenue optimization; and Vault-Manager, which converts diverse, real-time data into clear asset performance visibility and insights, facilitating improved decision-making regarding maintenance, augmentation, and expansion. Energy Vault Holdings, Inc. was founded in 2020 and is headquartered in Westlake Village, California.

2-Year Price History

$3.67+151.4%
$1.0$2.0$3.0$4.0$5.0Initial target $2.70 · 2026-10-18Initial target $1.90 · 2026-11-08Initial target $2.80 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
4.03.0–5.5
Setup
3.52.5–4.5
Fair value (USD)
2.801.00 – 6.00
Upside vs 3.18
-12%
DCF (10%)
2.850.80 – 6.50-10%
Base IRR
4%-15% – 20%
Visibility
very widerange ±89%
Sentiment
4/10
Reputation
5/10
2026-11-13 · claude-opus-5-5 · priced at 3.77

Energy Vault, the former gravity-storage SPAC, is now a battery and behind-the-meter power integrator (build-and-transfer EPC at about 20% GAAP gross margin) that is also trying to become an independent power producer that owns storage and AI 'powered land' assets. The bull case is real. Backlog is $2.3B. The 1.25 GW Caterpillar-gas-plus-storage AI deal gives visibility on the 2027 guide of $600-700M revenue and $40-50M adjusted EBITDA. Cash is $236M and still rising. But the cash pile is customer deposits ($246M of contract liabilities, matched by $264M of advances to suppliers) plus $262M of new debt issued year to date. Shareholders' equity is negative. 2026 owner earnings after $22M a year of stock comp are about -$45M. The 2027 EBITDA guide is only about $20-25M once stock comp is counted. The owned portfolio needs $1B+ of capex financed through project debt, tax equity and OIC preferred, so most of its 'run-rate $200M EBITDA' will not reach common holders. Cross Trails already failed its DSCR covenant twice. The EPC side is a commoditized, textile-like integration business, and the AI genset trade is a temporary scarcity premium. My DCF (10%, 5 years plus 12x year-5 FCF, recourse net debt about $70M, roughly 195M diluted shares) gives about $2.85 against $3.77. At this price the market already pays for management's 2028 plan. It is not a clean short: about 18% of the float is short, there is a dated Q4 catalyst (about $250M of revenue in one quarter), and the AI theme keeps lifting the stock. Rating 4.0: modestly overvalued with very wide ranges. Interest 3.5: too hard, no variant edge, pass.

A deep dive would have to establish: Can the owned-asset portfolio deliver cash to common holders, after project debt, tax equity and the OIC preferred, at a level that justifies a ~$820M EV for what is otherwise a ~20%-gross-margin integration business?

Owner earnings, TTM
-$45M-$65M – -$25M
Realistic peak profit
$90M$30M – $200M
Growth rate
15.0%0.0% – 40.0%
Years of growth
42 – 6
Market cap
$690M$670M – $720M
EV
$820M$760M – $880M
Net debt
$70M$40M – $130M
Capital return / cap
-2.0%-5.0% – 0.0%
P/E
-25.0×-30.0× – -20.0×
EV/EBITDA
18.0×15.0× – 25.0×
FCF yield
-8.0%-15.0% – 0.0%
Projected FCF, base case (USD millions)
Y1-$60M-$140M – $0M
Y2-$40M-$110M – $20M
Y3$30M-$40M – $90M
Y4$60M-$10M – $130M
Y5$80M$0M – $170M
Competition: Battery integration is commoditized (Fluence, Tesla, Wartsila, Chinese OEMs) and the AI behind-the-meter genset niche depends on Caterpillar-class suppliers that hold the scarcity rent.
Governance: Promotional CEO with a record of re-based long-term targets; toxic-ish VWAP-discount amortizing debentures, a Cross Trails DSCR covenant failed twice, negative book equity, and 2022-23 shareholder suits.
Research (expand)

What it does. Energy Vault integrates battery storage and, since mid-2026, hybrid gas-plus-battery 'prime power' systems for AI data centers. It does this under build-and-transfer EPC contracts (about $825M of backlog) and keeps a growing build-own-operate portfolio (about $1.5B of contracted backlog): Calistoga, Cross Trails, Snyder/Crusoe, Stoney Creek AU, Mesa del Sol NM, Japan, and the Goshe 2.3 GW pipeline. Gravity storage, the original pitch, has effectively been abandoned.

What the market believes. It is a show-me story. The stock is down about 40% from its $6.49 high on doubts over the Q4 ramp (about $250M of revenue in one quarter) and over how the owned assets get funded without dilution. Management's answer is that the market is missing the 2027 guide ($600-700M revenue, $40-50M adjusted EBITDA) and the run-rate EBITDA of more than $200M from owned assets by the end of 2028. I don't think the market is missing much. The guide is largely booked, so the market can see it. The problem is what it is worth: integration margins are about 20% gross and low single digits after opex. Owned-asset EBITDA is project-level and sits behind non-recourse debt, tax equity and the expensive OIC preferred. Calling 99% uptime a moat is weak.

Real earnings today. Q1-Q3 adjusted EBITDA was about -$47M. Q4 might add +$20-25M, so FY26 is about -$25M. Subtract $22M of stock comp and owner earnings are about -$45M. Operating cash flow of +$70M year to date comes from customer deposits, not profit: contract liabilities are $246M against $264M of supplier advances. Capex was $116M, partly offset by $40M of ITC sales. Debt is $280M ($221M recourse: the $150M converts at $5.18 and the toxic-ish 7.5% amortizing debentures that convert at 97% of VWAP). Unrestricted cash is $180M and there is a $28M redeemable preferred NCI. Stockholders' equity is -$12M. There are about 183M shares, plus up to about 50M from convertibles.

FCF projection (unlevered after SBC, net of parent equity put into projects and project debt service), $M. 2027: -60 (Mesa del Sol land $57M plus project equity). 2028: -40. 2029: +30. 2030: +60. 2031: +80. In five years it is probably 'neither': a mid-size storage integrator with a modest contracted IPP book, worth about 12x FCF. It is not a category leader. Fluence, Tesla, Wartsila and Chinese integrators set battery prices, and Caterpillar and the gas-engine makers hold the scarce part of the AI power trade. The DCF gives about $2.85 per share. The range is very wide ($0.8-6.5) because both the BOO buildout and the AI genset boom could go either way.

Multiples. Market cap about $690M. EV about $820M on a consolidated basis. That is about 18x the 2027 adjusted EBITDA guide and about 35x after stock comp. P/E is not meaningful. FCF yield is negative.

Management and risks. CEO Piconi is the largest holder. He has a long record of grand targets: gravity towers, then $1.5B of EBITDA by 2030, then $2B. They get re-based and quietly replaced. The CFO changed in 2026. Risks: Cross Trails failed its DSCR covenant in Q1 and Q2 and the cure cannot be used for Q3. Debenture amortization can force cash payments or below-market conversions. A nonrefundable equipment reservation fee. Tariffs and supplier failures. Receivable disputes with a key customer. Q4 concentration.

Sentiment: 4/10. Short interest is about 33M shares (about 18% of float, 8-9 days to cover). Retail and AI-theme money keep it volatile (IV about 110%). Sell-side analysts are constructive but few. Nobody loves it.

Sources
Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-10-182.843.54.02.702.406%3
2026-11-083.243.05.51.901.75-14%7
2026-11-133.774.03.52.802.854%4

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue206+145%204+341%46.2-86%342+134%146
Gross profit48.8+157%48.0+714%5.89-66%17.3-71%59.3
Operating expenses130-4%122-10%136+10%124+1%122
▸Adj EBITDA-73.6-68.6-129-106-54.9
▸Adj OCF-131-59.4-157-118-349%47.2
CapEx-126-41.1-58.7-36.5-2.32
Adj FCF-257-100-215-154-444%44.9
Interest expense17.19.860.120.040.00
▸Adj net income-97.6-90.8-125-98.3-62.5
▸Owner's earnings-120--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-454-71.5-80.3-135-97.9-69.7
FCF (OCF−capex)-362-45.8-46.7-115-129-25.7
Net income-506-90.3-104-136-98.4-78.3
▸Capital returned-460-164-82.11.914.85-221
Buybacks-229-5.26-7.580.374.77-221
Dividends0.000.000.000.000.000.00
Interest paid22.712.79.860.120.040.00
Debt paid down-254-171-84.41.420.050.06
▸Reinvestment27313441.958.036.92.51
Capex (PP&E)25411641.158.736.52.32
Intangibles & M&A18.919.10.00-0.230.000.00
Leases signed (net Δ)0.05-0.720.76-0.500.310.19
Retained / other10211245.2-116-134195

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 166 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)702313184341417
▸Liabilities (total)68622457.6117129
Net debt (incl. leases)100.038.1-28.7-108-201
Net debt / Adj EBITDA----------
Net debt / Adj FCF---------4.49
Adj EBITDA / interest-4.29-6.96-1048----
Shares outstanding182169153147134
Dilution (YoY)+12.3%+10.3%+4.5%+9.0%+29.7%
Employees142142158179170
MarginsTTM2025202420232022
Gross margin23.7%+1.123.6%+10.812.8%+7.75.1%-35.640.6%
Adj EBITDA margin-35.8%+100.8-33.7%+245.4-279.1%-248.1-31.0%+6.7-37.7%
Adj OCF margin-63.5%+41.8-29.2%+309.6-338.8%-304.4-34.5%-66.832.4%
Adj FCF margin-124.8%+29.6-49.3%+416.5-465.8%-420.7-45.1%-75.930.8%
Net income margin-54.0%+118.6-50.9%+243.0-293.8%-265.0-28.8%+24.9-53.7%
Adj NI margin-47.5%+106.5-44.6%+225.1-269.7%-240.9-28.8%+14.1-42.8%
ROIC (adj, after-tax)-22.9%-35.8%-80.4%-37.4%-17.2%
Cost of debt8.6%17.7%------

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Software Licensing$0.2M+63%
Intellectual Property Licensing$0.0M-100%

Earnings Calls

11 calls

Earnings Call · 2026 Q3

2026-11-10

Energy Vault reported Q3 2026 results that management described as in line with expectations, with the real story being a massive Q4 ramp. Q3 revenue was $13.1 million, down 61% year over year on expected shipment and milestone timing. About 75%-80% of full-year revenue lands in Q4, which should be the company's largest quarter ever at roughly $250 million. Adjusted gross margin was 81%, including a $4.3 million tariff refund; excluding it, adjusted gross margin was 48% and GAAP gross margin 37.9%. Adjusted operating expenses rose $9 million to $25.2 million on project development, legal costs for the owned-and-operated platform, and bonus accruals. Adjusted EBITDA was a $14.7 million loss, and GAAP net loss was $28.2 million, or $0.17 per share. Backlog reached $2.3 billion, up about 147% year over year and roughly 15% sequentially, and management expects it to approach $3 billion by year-end. About 35%-40% should convert within 12-15 months. Build-and-transfer backlog is about $825 million, and build-own-operate backlog about $1.5 billion. The controlled portfolio could generate over $200 million of run-rate EBITDA exiting 2028, in addition to build-and-transfer earnings. Full-year 2026 revenue guidance was narrowed to the top half of the prior range, $290-$310 million, with GAAP gross margin of 20%-22%. Year-end cash is expected at $170-$200 million with further reduction of corporate recourse debt. For the first time, the company guided 2027: revenue of $600-$700 million, more than double 2026, and EBITDA of $40-$50 million, its first full year of positive EBITDA. Most 2027 revenue is already booked build-and-transfer work, and quarters should be smoother. Cash ended at $236 million including $55 million restricted, the seventh straight quarterly increase, up about 60% sequentially and 3x year over year, even after closing the Goshe acquisition in cash. Corporate recourse debt fell $12 million to $221 million. Non-recourse debt rose on engine financing and Goshe-related financing. A $300 million preferred fund has only $35-40 million used, enabling roughly $1-1.2 billion of capex. Management stressed minimizing dilution and said guidance assumes no parent-level capital raise. Strategically, the company highlighted its 1.25 GW hybrid generation-plus-storage agreement for behind-the-meter AI data center power, with modular roughly 250 MW blocks and deliveries already begun. Its software manages engines and batteries, balances volatile AI loads, targets five-nines uptime, and cuts emissions. Stoney Creek (1 GWh, Australia) received grid interconnection approval and is moving to financing for 2028 operation. Goshe added 2.3 GW of U.S. development projects, and an Italian project received national-importance status. Management believes the stock is undervalued and under-owned, with investors waiting for Q4 execution.

Analyst Q&A (9)
▸
What is the 2027 revenue mix between build-and-transfer and Asset Vault, and how much comes from the 1.25 GW integrated power agreement?
Justin Clare · Roth Capital Partners
2027 is mostly already-booked build-and-transfer revenue; Calistoga and Cross Trails operate, perhaps one more U.S. project in Q4, with most owned projects coming online in 2028. The 1.25 GW contract will be an important part of revenue but under half, and quarters should be smoother.
▸
What gives visibility to the ~$3 billion backlog by year-end, and is it net of Q4 revenue?
Justin Clare · Roth Capital Partners
Growth is a balanced mix of owned-asset project financings in Australia/U.S. (10-15 year streams) and build-and-transfer demand for off-grid, microgrid and behind-the-meter solutions. The net-of-Q4-revenue part was not directly addressed.
▸
How is the pipeline for other integrated power solutions evolving since the 1.25 GW agreement?
Justin Clare · Roth Capital Partners
It is growing and active, driven by speed and not relying on the grid. Interest is strong, and the software that manages batteries and generation, cuts emissions and handles AI load volatility with five-nines uptime is a differentiator.
▸
What is the market missing in the story given continued execution?
Derek Soderberg · Cantor Fitzgerald
Rob said it's a show-me market, with the heavy Q4 weighting making investors wait for delivery; the company did the same last year. Nitin said the company is under-owned and at an inflection point. Rob added investors worry about dilution, but cash, project financing and the preferred fund (only $35-40M used, enabling $1-1.2B of capex) address that.
▸
How do OpEx and gross margin get to the 2027 adjusted EBITDA guidance?
Derek Soderberg · Cantor Fitzgerald
OpEx growth should slow after this year's front-loaded increase, and backlog adjusted gross margins of 20%+ still hold since much of the revenue comes next year. They will still invest where warranted, and EBITDA margins should grow as build-own-operate assets come online.
▸
What is the role of EMS software in projects using reciprocating engines and islanded data center power?
Noel Parks · Tuohy Brothers
Software was a decision factor in winning the 1.25 GW contract. It integrates with Caterpillar engine controls and battery management, optimizes charging, discharging and engine timing, balances volatile AI loads, reduces emissions, and ensures five-nines uptime. Deliveries have begun, and the company expects to learn from these first behind-the-meter deployments.
▸
What is the timeline for Stoney Creek construction and operation?
Sid Rajeev · Fundamental Research Corp.
Development approval and grid interconnection approval (received two weeks ago) are done and the land is owned. The project is in financing mode and will come online in 2028, with a tighter timeframe likely next quarter.
▸
How much capital do you need to raise in Q4 and 2027?
Sid Rajeev · Fundamental Research Corp.
The $170-$200M year-end cash guidance assumes no parent-level raise, and recourse debt will be paid down. Project-level financing is non-recourse. U.S. projects will use ITC/tax equity and project debt, plus the preferred fund, which still has ample capacity.
▸
How much of 2027 revenue guidance is covered by backlog (~85%?), and why did under-construction/contracted MWh shift in the build-and-transfer backlog?
Tyler Bisset · Goldman Sachs (for Brian Lee)
Nitin said most 2027 revenue is build-and-transfer but some comes from elsewhere, and they are confident in the range. Rob said Tyler's math is roughly right and a lot of 2027 is covered. He said there is no real reduction in build-own-operate; upcoming financings will add $200-300M increments, while build-and-transfer from hybrid generation contracts is growing.

SEC Filing Findings

SEC Filing — material findings

2026-08-11 · depth 9/10
risk 8Toxic Financing
▸

2026 Debentures ($80.0M, 7.5%, secured) carry monthly principal installments starting Aug 2026, convertible at 97% of lowest VWAP with $1.19 floor; amortization events can force cash payments up to 20% of outstanding principal; mandatory cash redemption tied to borrowing base.

“While an amortization event is in effect, the monthly installment must be paid in cash and the installment amount may increase to the greater of the scheduled amount and 20.0% of then-outstanding principal.”
risk 7Dilution
▸

Senior Convertible Notes conversion price ~$5.18 with capped call; holders' make-whole can raise conversion rate to 246.3054 shares per $1,000 (up to ~28,977k base shares growing), and convertible instruments total ~50M potential shares versus 180M outstanding.

“The Senior Convertible Notes initially are convertible at a rate of 193.1807 shares of the Company's common stock per $1,000 principal amount”
risk 7Liquidity/Covenants
▸

Cross Trails failed DSCR covenant for Q1 and Q2 2026; lenders waived default only after sponsor cash cure of $1.2M; cure right may not be used for Q3 2026. CRC DSCR testing deferred to Nov 30, 2026 with reserve reduction and make-whole waiver.

“The amendment provides that the cure right may not be used for the quarter ending September 30, 2026.”
risk 6Liquidity/Covenants
▸

Accounts receivable facility drawn to fund supplier deposits; advances to suppliers rose to $30.1M and other assets include $10M power equipment reservation deposit (raised to $17M, paid $7M in July) with a sales contract deadline of Aug 12, 2026 and nonrefundable fees.

“In July 2026, the Company paid the additional $ 7.0 million reservation fee. The reservation fee is generally nonrefundable”
risk 6Hidden Liability
▸

Mesa del Sol/NM land purchase of $120.1M aggregate with $57.4M initial closing due Dec 18, 2026; contingent 7% service fee on each tract; $7.5M PNM reimbursement funded.

“with an initial closing requirement for certain tracts representing approximately $ 57.4 million of the aggregate purchase price by December 18, 2026”

Options

Chain Snapshot (daily)

Call IV (ATM)106%
Put IV (ATM)119%
ATM Spread4.7%
Call $OI (near money)$6.0M
Put $OI (near money)$97K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$3.0
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$1.50$1.50/$1.8530--/$0.200
$2.00$1.05/$1.350--/$0.1514
$2.50$0.75/$0.950$0.05/$0.301
$3.00$0.50/$0.652,052$0.30/$0.500
$3.50$0.30/$0.45306$0.55/$0.850
$4.00$0.15/$0.3076$0.95/$1.201
$4.50$0.10/$0.3515$1.35/$1.600
$5.00$0.05/$0.25120$1.80/$2.100
Snapshot: 2026-11-04

Short Interest

Short % of Float28.2%
Short Shares36.1M
Days to Cover8.2
Change (vs Prior)+12.0%
Short % Float History
28.20%+20.80pp
5.0%10.0%15.0%20.0%25.0%30.0%10-1512-3103-1305-2908-1410-30

Web Traffic

energyvault.com
Web rank#891,177
Est. visits/mo609K
Web Rank History
#891,177+175,738
rankest. visits/mo
700k750k800k850k900k603K621K639K657K675K07-2808-18

Executive Compensation (2021.0-2023.0)

Direct Pay$66.5M
Incentive & Other$7.1M
Total Compensation$73.6M
% of Revenue17.5%

Cash Runway

34.5months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
SB INVESTMENT ADVISERS (UK) LTD$51.3M$10.02−$9.9M−$9.9M-2.5%$7.73B
STATE STREET CORPPassive$19.2M$4.44+$366K+$11.6M-0.2%$2.89T
SCOGGIN MANAGEMENT LP$18.1M$2.30+$1.4M+$8.3M+0.4%$254M
MARSHALL WACE, LLP$18.1M$3.55+$7.6M+$18.1M-0.2%$92.71B
VANGUARD CAPITAL MANAGEMENT LLCPassive$17.0M$3.30+$17.0M+$17.0M—$4.04T
SailingStone Capital Partners LLC$14.7M$6.71−$1.6M−$12.4M+1.8%$440M
Legal & General Group Plc$13.6M$4.58+$512K+$13.5M-0.1%$432.24B
UBS Group AG$10.8M$3.64+$5.7M+$9.4M+0.0%$562.11B
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$9.1M$4.11−$6K+$8.6M—$73.71B
BlackRock, Inc.Passive$7.1M$1.29+$1.9M−$15.6M—$5.69T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

09.8M19.5M29.3M39.1M$0.70$4.50$8.30$12$162021-122022-092023-062024-032024-122025-092026-03
hover the chart for per-quarter detailprice (right axis)
SB INVESTMENT ADVISERS (UK) LTD15.5MPrime Movers Lab LLC—SCOGGIN MANAGEMENT LP5.5MSailingStone Capital Partners LLC4.4MInvesco Ltd.1.9MLegal & General Group Plc4.1MMARSHALL WACE, LLP5.5MMILLENNIUM MANAGEMENT LLC2.1MADAGE CAPITAL PARTNERS GP, L.L.C.—Palantir Technologies Inc.—

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (2 analysts)$8.38+224.8%
Last Year (4 analysts)$7.69+198.1%
Current Price$2.58
Analyst Ratings
8
2
Buy: 8Sell: 2Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2022 Q113M-152M-154M$-0.04$-0.05 – $-0.031
2022 Q26M-5M-7M$-0.09$-0.12 – $-0.071
2022 Q38M-18M-23M$-0.14$-0.18 – $-0.101
2022 Q480M-20M-20M$-0.12$-0.16 – $-0.091
2023 Q113M-36M-36M$-0.21$-0.27 – $-0.151
2023 Q254M-32M-32M$-0.19$-0.25 – $-0.141
2023 Q3121M-20M-21M$-0.12$-0.14 – $-0.102
2023 Q4144M-19M-20M$-0.11$-0.13 – $-0.093
2024 Q113M-23M-23M$-0.13$-0.15 – $-0.103
2024 Q215M-19M-20M$-0.11$-0.13 – $-0.102
2024 Q313M-23M-23M$-0.13$-0.14 – $-0.121
2024 Q443M-22M-22M$-0.12$-0.14 – $-0.102
2025 Q124M-22M-22M$-0.12$-0.13 – $-0.101
2025 Q231M-11M-14M$-0.07$-0.08 – $-0.061
2025 Q334M-10M-14M$-0.08$-0.09 – $-0.061
2025 Q4148M-2M-10M$-0.05$-0.06 – $-0.041
2026 Q121M-12M-19M$-0.10$-0.12 – $-0.091
2026 Q214M-19M-26M$-0.14$-0.16 – $-0.122
2026 Q314M-21M-29M$-0.16$-0.18 – $-0.132
2026 Q4244M24M11M$0.06$0.05 – $0.072
2027 Q180M-6M-17M$-0.09$-0.11 – $-0.081
2027 Q2117M1M-12M$-0.06$-0.07 – $-0.051
2027 Q3176M12M-3M$-0.01$-0.02 – $-0.011
2027 Q4281M22M4M$0.02$0.02 – $0.021

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$491K
6 txns · 5 insiders · 132,440 sh
Sells ($, 12mo)
$1.14M
4 txns · 2 insiders · 295,000 sh
Major holders (≥10% beneficial owners)
Buys ($, 12mo)
$65K
2 txns · 1 insider · 20,000 sh
Sells ($, 12mo)
$16.95M
1 txn · 1 insider · 3,000,000 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-08-26SELLUnwin Stephaniedirector115,000$3.71$427K$677K
2026-08-17BUYHixon Dylandirector27,472$3.88$107K$107K
2026-08-14BUYHixon Dylandirector85,518$3.74$320K$119K
2026-07-06SELLBeer Michael Thomasofficer: Chief Financial Officer65,000$4.08$265K$4.17M
2026-04-06SELLBeer Michael Thomasofficer: Chief Financial Officer65,000$3.18$207K$3.37M
2026-03-31BUYPiconi Robertdirector, 10 percent owner, officer: Chief Executive Officer12,500$3.21$40K$54.31M
2026-03-25BUYMandanas Mary Bethdirector5,000$3.65$18K$1.28M
2026-03-04BUYErtel Thomas Rdirector5,450$3.37$18K$1.23M
2026-03-02BUYLadwa Akshayofficer: Chief Operations Officer4,000$3.08$12K$5.63M
2026-02-27BUYPaulson Larrydirector5,000$3.15$16K$1.58M
2026-02-26BUYPiconi Robertdirector, 10 percent owner, officer: Chief Executive Officer7,500$3.25$24K$65.40M
2026-01-15SELLSOFTBANK VISION FUND (AIV M2) L.P.10 percent owner3,000,000$5.65$16.95M$87.78M
2025-12-23SELLBeer Michael Thomasofficer: Chief Financial Officer50,000$4.91$246K$5.65M
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Energy Vault is attempting a high-risk transition from an episodic, loss-making storage integrator into an owner-operator of storage, generation, and AI power infrastructure. The opportunity is significant: backlog has reached approximately $2B, the company has announced a 1.25 GW behind-the-meter framework agreement, and owned-and-operated projects could eventually produce attractive recurring margins. However, the current economics remain far from that destination. TTM revenue is $226M, adjusted EBITDA is -$65M, adjusted OCF is -$111M, and adjusted FCF is -$153M. Quarterly revenue is extremely uneven, with the latest quarter producing only $17M of revenue and a $23M adjusted EBITDA loss despite the strong reported backlog.

Trade Signal

Trade rating
-5.8/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-13 · saw $3.69-13.8% since

Short, with caution: the stock trades roughly 45%-plus above the analyst's fair value while negative owner earnings, funding risk, covenant stress, and dilution are being overshadowed by a backlog and AI-infrastructure narrative.

Temporary mispricing-4.0

The stock rose from roughly $0.70 in March 2025 to $4.61 by December 2025 and $6.49 over the following 52-week high, reflecting the storage, AI infrastructure, backlog, and owner-operator narrative. It then fell from the $5-$6 area to $2.51-$3.00 in June-July 2026 as execution, financing, and valuation concerns resurfaced, before rebounding to $3.69. The latest leg was a 10% rise around the August 11 earnings release after the company doubled Q2 revenue, raised guidance, and announced a $2B backlog. The initial 2026 decline was a reasonable repricing of risk; the post-earnings rebound looks somewhat overdone because losses and cash burn remain severe and the largest AI agreement is a framework with revenue weighted to 2027. This is a potentially temporary overreaction upward, but the extreme volatility and squeeze dynamics make timing difficult.

Market view-2.0

The market is mixed but highly speculative. Bulls focus on the doubling revenue, raised guidance, $2B backlog, AI/data-center power demand, and potential 60%-80% recurring gross margins. Bears emphasize that much of the backlog is unfunded or framework-based, owner earnings and FCF are deeply negative, Cross Trails has covenant stress, and the company may need more capital. Analyst sentiment is bullish, but 23.2% short interest and the rise in short interest from roughly 8% in February indicate substantial skepticism. Retail participation is elevated but not extreme. The 10% post-earnings move suggests investors are rewarding backlog and guidance faster than the financial evidence warrants.

Inflectionwindow ~3mo-3.0

There is a genuine strategic inflection from episodic EPC toward owned-and-operated storage, generation, and AI power infrastructure. However, the market has already received the key narrative catalysts: revenue doubled, backlog reached about $2B, guidance was raised, and analysts already carry a roughly $7 target. The study's own earnings path remains far weaker than the promotional long-term EBITDA illustration: consensus still expects negative EBITDA through 2027, while the company remains cash consuming. The next evidence is execution and funding, not an undiscovered step-up. Near-term inflection is therefore modestly negative on a risk-adjusted basis.

Catalysts
  • ▼2026-11 · Q3 2026 earnings and cash-flow update — Likely tests whether the sharply raised FY26 revenue guidance is converting into cash without further dilution or margin deterioration.
  • ▼2026-12 · Mesa del Sol land-purchase funding deadline — The required $57.4M initial closing by December 18 creates a meaningful liquidity and financing checkpoint.
  • ▼2027-02 to 2027-03 · FY2026 results and 2027 guidance — A large Q4 revenue contribution is expected; any miss, weak owner earnings, or cautious 2027 outlook could challenge the backlog narrative.
  • ▲Q4 2026 to 2027 · 1.25 GW AI power framework execution milestones — Evidence of signed orders, funded projects, and initial Q4 revenue could validate repeatability, although the agreement remains a framework rather than fully realized earnings.
  • ▼2026-11 to 2027-02 · Cross Trails debt covenant and asset-performance updates — Continued failure to meet DSCR requirements could increase refinancing pressure and reinforce concerns about project-level economics.
  • ▲H2 2026 to H1 2027 · Project-financing and tax-equity closes for owned assets — Successful non-recourse financing would reduce corporate cash needs and support the transition toward higher-margin recurring revenue.
Flow-5.0

Flow is negative overall. TTM dilution is approximately 14%, the company issued expensive convertible notes, and the transition to owned infrastructure requires substantial capital. Insider selling and SoftBank's $16.9M sale outweigh modest insider purchases. Short interest is high at 23.2% of float, creating squeeze fuel after positive news, while call open interest is much larger than put open interest; that supports short-term upside volatility but not durable share demand.

Floor / Ceiling+1.0

Cash and restricted cash of roughly $148M provides some asset support, but it is not a hard floor because trailing adjusted operating cash flow and FCF are deeply negative, the company has substantial project funding requirements, and Cross Trails debt is under covenant pressure. The $2B backlog is not a liquidation value and may require additional capital to convert. There is no clear hard ceiling either, but dilution and financing overhang should become more visible on rallies.

Buyability

Moderate but speculative. AI power infrastructure, a $2B backlog, and the prospect of recurring owner-operator earnings can attract momentum and thematic buyers, but persistent cash burn, project-financing needs, covenant stress, and 14% annual dilution make it difficult for fundamental buyers to underwrite today. The next buyer is likely a momentum or AI-infrastructure investor rather than a quality compounder investor.

Fear vs Greedfear 8/10 (+1.0)greed 8/10 (+4.0)

Fear pulls harder than greed at $3.69. The operating story is improving, but the market is capitalizing a highly contingent future while current owner earnings are approximately negative $120M, FCF is negative, and the company must finance large projects. The main risk to a short is not valuation support but another AI-themed announcement or a financing win producing a sharp squeeze.

Valuation

Our Target
$300M-36%
Market Should Pay
$216M-54%
target ×0.72 (fear discount)
Current Market Cap
$469MSlightly bullish
What Changed
transcript · 2026-08-11
+12%fair value on this information

The genuinely new information is the approximately $650M sequential backlog increase to $2B, the 1.25 GW behind-the-meter AI power framework worth an estimated $500M-$600M through 2027, and the increase in FY2026 revenue guidance to $270M-$310M. The quarter also revealed that execution remains highly back-end loaded and cash-consuming: Q2 revenue was only $17.4M, adjusted EBITDA was negative, and the company drew on an accounts-re receivable facility for supplier deposits. Management also acknowledged that most of the new framework revenue arrives in 2027, not immediately.

▸ How the cases moved

The bull case equity value rises from roughly $1,300M to $1,580M as the 1.25 GW AI power framework, larger backlog, and raised revenue guidance improve the probability of scalable recurring infrastructure earnings; bull probability increases from 0.12 to 0.15. The base case rises modestly from approximately $360M to $400M because guidance and backlog conversion visibility improve, but base probability remains 0.50 due to continued losses and uneven revenue recognition. The bear case remains near $50M and its probability declines from 0.38 to 0.35 because liquidity guidance and the announced project-financing progress reduce near-term failure risk, although covenant and financing concerns remain.

2-Year Plausible Outcomes
bear35%
$50M
rev -20%/yrOE $-150M

The backlog proves difficult to finance or convert, the AI infrastructure agreement is delayed, and project-level losses and covenant pressure consume much of the balance-sheet liquidity. Revenue remains episodic, margins stay near historical EPC levels, and owner earnings remain deeply negative. The equity is valued close to a distressed asset/NAV value rather than on earnings power.

▸ Valuation

0.5x $150M revenue = $75M EV − $25M net debt = $50M equity

base50%
$400M
rev +25%/yrOE $50M

Energy Vault converts a meaningful portion of the $2B backlog, including the 1.25 GW framework, but remains cash-consuming while building owned-and-operated assets. Revenue grows, gross margins improve modestly, and owner earnings approach positive territory by the end of year two, though dilution, financing costs, and project working capital limit equity value. The company earns a conventional infrastructure/industrial multiple rather than a premium software or data-center multiple.

▸ Valuation

8x $50M owner earnings = $400M equity

bull15%
$1.6B
rev +45%/yrOE $140M

The AI power platform becomes repeatable, the 1.25 GW agreement expands, and project financing plus tax-equity funding allows Energy Vault to scale owned assets without excessive corporate dilution. High-margin recurring infrastructure earnings begin replacing episodic EPC revenue, producing materially positive owner earnings and a valuation premium for visible growth.

▸ Valuation

12x $140M owner earnings = $1,680M EV − $100M net debt = $1,580M equity

▸ Target Rationale

The probability-weighted scenario value is $363.6M, but I set the analytical target below that at $300M. The scenario math gives substantial credit to a successful transition toward recurring infrastructure earnings, while the current evidence shows severe cash burn, high customer concentration, covenant stress at Cross Trails, expensive secured convertible financing, major project funding requirements, and roughly 14% annual share dilution. Management's backlog and guidance are potentially valuable, but backlog is not equivalent to funded, profitable owner earnings. The lower target reflects execution risk, financing risk, and the gap between the promised 60%-80% recurring gross margins and the company's currently negative owner earnings.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now3/10
Trajectory6/10
Risk9/10
Governance4/10
Insolvency prob (2yr)18%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Strategic IPP Model Transition: Energy Vault is transitioning from a technology licensing and third-party engineering, procurement, and construction (EPC) provider to an Independent Power Producer (IPP) model via its "Own & Operate" strategy. Under this consolidated framework, the company targets higher gross margins (60% to 80% versus historical 20% to 25% for EPC).
  • Q1 2026 Financial Results: For the quarter ended March 31, 2026, Energy Vault reported revenue of $21.9 million, up 156% year-over-year from $8.5 million. However, the net loss widened to $32.5 million compared to $21.1 million in Q1 2025. Operating cash flow remained highly negative at $(53.8) million. The company's total cash and restricted cash stood at $117.1 million, bolstered by the issuance of $150.0 million in 5.250% Senior Convertible Notes due 2031 in February 2026. Despite the net loss and revenue missing analyst consensus, the contract backlog surged to $1.35 billion, with over 80% representing recurring, high-margin IPP revenue.
  • AI and Data Center Expansion: In February 2026, Energy Vault announced partnerships with Peak Energy to secure 1.5 GWh of sodium-ion battery supply for AI data centers and with Crusoe Energy to deploy modular data centers at grid-connected sites in Snyder, Texas. The company added 100 MW of "Powered Land" and "Powered Shell" data center projects, which are projected to yield more than $65 million in annual, recurring EBITDA.
  • Japan Portfolio Acquisition: In April/May 2026, Energy Vault completed the acquisition of an 850 MW battery energy storage system (BESS) development portfolio in Japan from BayWa r.e.. This includes 350 MW of advanced-stage projects targeted to reach Notice to Proceed (NTP) in H2 2027.
  • South Africa Gravity Storage: In May 2026, Energy Vault signed a development agreement with South Africa's state utility, Eskom, to deploy a 25 MW / 100 MWh gravity-based system utilizing its next-generation solid-block EVx 2.0 technology.
  • Texas BESS Acquisition: In March 2026, the company acquired the 175 MW / 350 MWh McMurtre BESS project near Dallas, Texas. NTP is projected for Q4 2026 with commercial operations starting in December 2027, targeting $15 to $20 million in annual revenues.
▸ Thesis-test Findings
Mesa Del Sol Project Status Updates 2026

According to the company's Q1 2026 Form 10-Q, Energy Vault entered into a reimbursement agreement with Public Service Company of New Mexico (PNM) in March 2026 to fund up to $7.5 million of preliminary engineering, design, permitting, and environmental work for a potential battery storage, power generation, and data center project in Albuquerque. Subsequent to March 31, 2026, Energy Vault signed a non-binding term sheet with Clean AI, LLC, allowing them up to a 35% undivided interest in the project's land tracts, and paid a $10.0 million non-refundable reservation fee to 2G Energy Inc. to secure manufacturing capacity for power generation equipment. To execute the project, the company holds a land purchase agreement for $120.1 million in total, which requires an initial transaction of $57.4 million to close by December 18, 2026.

Cross Trails BESS ERCOT Revenue Generation 2026

The 57 MW / 114 MWh Cross Trails BESS in Snyder, Texas, reached commercial operations in May 2025. It is optimized by Gridmatic under a 10-year physically settled revenue floor contract (which began in Q2 2025) designed to mitigate merchant ERCOT risk. However, a significant bear case signal emerged in Energy Vault's Q1 2026 financial report: the project failed to satisfy its debt service coverage ratio (DSCR) covenant for its Senior Notes based on Q1 2026 performance. As a result, the associated $16.7 million debt balance was reclassified as a current liability. Although the lender has not declared an event of default, the underperformance of the asset under ERCOT’s highly competitive and depressed ancillary services pricing environment highlights execution risks.

Orion Infrastructure Asset Vault Preferred Equity Terms

In October 2025, Energy Vault closed a $300 million preferred equity commitment with Orion Infrastructure Capital (OIC) to launch "Asset Vault, LLC," a fully consolidated subsidiary. OIC purchased 300 million Series A preferred units for an initial cash contribution of $35 million, with further contributions up to $300 million conditioned upon milestone achievements. The instrument is non-dilutive to common shareholders but features milestones for common equity participation to align shareholder interests. To fund Asset Vault, Energy Vault contributed 100% of the equity of the Calistoga Resiliency Center and the Cross Trails BESS in exchange for 1.2 billion common units. OIC’s $300 million commitment acts as anchor capital designed to unlock over $1.1 billion in total CapEx through project-level debt and tax equity monetizations. The subsidiary retains Energy Vault for EPC and long-term services, returning cash flows to the parent while targeting levered project IRRs of 15% or more.