Stocks/NUAI

NUAI

New Era Energy & Digital, Inc.v3 4.8/10 · 2026-11-26
Energy·Oil & Gas Energy
$4.92
$478M market cap
v3 Rating
4.8/103.5–6.0
Setup
4.0/103.0–5.0
Fair Value
$4.50$0.80–$11.00-9%
DCF (10%)
$5.50+12%
Base IRR
+10%-40%–+45%
Visibility
wide±113%
Wall Street
$11.00 target(2 analysts last quarter)(1 buy)
Rating
Revenue (TTM)
$1.2M
Owner Earnings
-$55M
Next-Yr Owner Earnings
-$200M
Growth
+0.0% × 3y
P / Next-Yr OE
--
Net Debt
-$167M

New Era Energy & Digital, Inc. operates as an upstream energy company, specializing in the exploration, development, and production of a diverse range of resources. These include helium, crude oil, natural gas, and natural gas liquids (NGLs) across the United States. The company holds and develops a significant portfolio of approximately 137,000 acres situated in Southeast New Mexico. Its premier asset is the Pecos Slope Field, an expansive area covering 1893 square kilometers, located about 20 miles north of Roswell, New Mexico. New Era Energy & Digital primarily supplies its products to Tier 2 gas enterprises and distributors of balloon-grade helium. Headquartered in Midland, Texas, the company was formerly known as New Era Helium, Inc. and officially rebranded to New Era Energy & Digital, Inc. in August 2025.

2-Year Price History

$4.49+1051.3%
$1.0$2.0$3.0$4.0$5.0$6.0$7.0Initial target $4.50 · 2026-11-26volAug 25Oct 25Jan 26Mar 26Jun 26Aug 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
4.83.5–6.0
Setup
4.03.0–5.0
Fair value (USD)
4.500.80 – 11.00
Upside vs 4.92
-9%
DCF (10%)
5.500.80 – 14.00+12%
Base IRR
10%-40% – 45%
Visibility
very widerange ±113%
Sentiment
5/10
Flow
4/10
2026-11-26 · claude-opus-5-5 · priced at 4.49

New Era Energy & Digital (ex-New Era Helium) is a pre-revenue Texas AI data-center developer whose whole value is one site: TCDC near Odessa, where it now holds a 20-year take-or-pay PPA with Luminant/Vistra for ~207 MW of behind-the-meter power available Q3 2027 (outside ERCOT's Batch Zero queue), a planned ~550 MW islanded Phase 2 with Thunderhead (air permit pending in a paused, politicised TCEQ process), and a non-binding, exclusive LOI with an unnamed 'leading global technology company' for both phases. At $4.49 (close 2026-11-25; ~140.6M shares after the October $2.75 PIPE, ~$630M market cap, ~$187M cash of which $138M is restricted PPA collateral, $20M Macquarie debt) the market is pricing roughly even odds that the Phase 1 lease signs on good terms. Our probability-weighted DCF (signed lease -> ~$7-9/share after funding dilution; no lease -> a cash-burning shell carrying a ~$110M/yr take-or-pay exposure it can only walk away from before delivery starts, ~$0.5-1.5) lands around $5.5 with an enormous range, so the stock is roughly fairly priced as a binary. Rating 4.8: there is a real asset (near-term firm power is scarce), but the lease is unsigned, the 10-Q contradicts the call's 'fully permitted, nothing in our way' tone, controls are ineffective with a Q1 restatement, the company is a serial diluter (ATM at ~$6, PIPE at $2.75), Phase 1 needs $150-400M of capex the company does not have, and 25% of the float is short. Setup 4.0: a dated catalyst (lease signing, likely within months) exists, but we have no variant perception the market lacks; it already prices the binary.

Flow: Selling bias: the October 2026 PIPE (23.3M shares at $2.75, ~20% of shares) is being registered for resale now, ~$40M of ATM capacity remains and Phase 1 capex of $150-400M over the next 12 months implies more equity or warrants (Macquarie at $7.26); offsetting, short interest has risen to ~35M shares (~25% of float, 2.6 days to cover), fuel for a squeeze on a lease signing.

A deep dive would have to establish: Does the exclusive tenant sign a definitive Phase 1 lease on terms that cover the ~$110M/yr take-or-pay PPA and fund most of the $150-400M build without crushing dilution, before the 31 Dec 2027 walk-away window closes?

Owner earnings, TTM
-$55M-$70M – -$40M
Realistic peak profit
$250M$80M – $500M
Growth rate
0.0%-50.0% – 100.0%
Years of growth
30 – 8
Market cap
$631M$610M – $650M
EV
$464M$420M – $520M
Net debt
-$167M-$187M – -$120M
Capital return / cap
-15.0%-30.0% – -3.0%
P/E
-10.0×-12.0× – -8.0×
EV/EBITDA
-9.0×-12.0× – -6.0×
FCF yield
-9.0%-12.0% – -5.0%
Projected FCF, base case (USD millions)
Y1-$200M-$450M – -$40M
Y2-$120M-$300M – $0M
Y3$40M-$60M – $160M
Y4$90M-$50M – $250M
Y5$125M-$40M – $330M
Competition: Competes with every West Texas power-holding developer (Cipher, Applied Digital, Galaxy, Crusoe, IPPs) for a few hyperscale tenants who hold the leverage over a one-site, one-tenant developer.
Governance: Ineffective disclosure controls with a Q1 2026 restatement, a CEO change and dropped JV partner in 2026, a call that contradicts 10-Q permit risk factors, and repeated dilution at falling prices.
Research (expand)

What it does. A former helium/gas producer in New Mexico that rebranded in Aug 2025 to develop Texas Critical Data Centers (TCDC), 493 acres (+99 under contract) outside Odessa. Revenue TTM is under $1M (legacy gas); net loss TTM ~$65M, operating cash burn ~$23M, with management guiding $50-60M of cash needs over the next year before project capex.

The case. In Sept 2026 it signed a 20-year PPA with Luminant for 200-207 MW from the adjacent Odessa-Ector plant via a pre-2025 private-use network, exempt from ERCOT Batch Zero; power expected Q3 2027, ready-for-service Q4 2027. Firm 2027 power in Texas is genuinely scarce, so the site has option value to hyperscalers and neoclouds (Cipher publicly mentioned monetising Odessa). Management says economics are agreed with an exclusive tenant and a modular build costs under half a traditional one (a Riot/Anthropic-style powered-shell structure). Vistra gets 5% of Phase 1 and a ROFR on Phase 3.

What the market believes. That this is a binary on one unsigned lease, run by a management team that keeps changing (CEO swap July 2026, JV with Stream dropped, partners reshuffled), and that equity holders will be diluted to fund it. We agree; we do not have an edge on the lease odds.

Landmines (10-Q, Nov 12). The PPA is take-or-pay: ~$110M/yr fixed from the power delivery date, with uncapped mark-to-market collateral thereafter; it can be terminated without liability only if delivery has not commenced by 31 Dec 2027. $118M of cash is locked as LC collateral for the PPA term. Luminant's affiliate may draw up to $116M if Phase 1 substation costs go unpaid. Phase 1 capex $150-400M over 12 months vs $49M unrestricted cash and ~$40M of ATM left. Risk factors flag an indefinite TCEQ air-permit pause and a Governor-elect moratorium, at odds with the call's 'fully permitted'. Disclosure controls ineffective; Q1 2026 restated. Macquarie debt carries a MOIC premium ($9M paid on a $60M prepayment).

Earnings today and projection. Owner earnings today about -$55M. Signed-lease case: ~170 MW IT at ~$1.2-1.5M/MW/yr NOI is ~$200-250M/yr from 2028-29, plus Phase 2 upside; ~$1B of Phase 1 capex mostly debt-funded. Blended unlevered FCF ($M): 2027 -200, 2028 -120, 2029 40, 2030 90, 2031 125. Year 5: either a contracted infrastructure landlord worth ~12x (long-dated hyperscaler lease, but single-tenant, single-site) or nothing beyond residual cash. DCF at 10% with 12x terminal: EV ~$820M + ~$167M net cash = ~$990M over ~160M diluted shares = ~$6; we haircut to $5.5 for funding terms and warrants (Macquarie at $7.26). Fair value ~$4.5: we would not pay up for an unsigned binary with these disclosures.

Competition. Every developer with Permian/West Texas power (Cipher, Applied Digital, Galaxy, Crusoe, the IPPs themselves); tenant leverage is high because NUAI has one site and one counterparty under exclusivity.

Sentiment: 5/10. Retail-loved momentum name (from $0.33 to $8), but heavily shorted (35M shares, rising every fortnight) and halved since September.

Sources
  • /Users/gregwo/stocks2/data/analysisv3/context/NUAI.md (Q3 2026 call transcript, 10-Q forensic findings, 8-K summaries)
  • 10-Q for quarter ended 2026-09-30, filed 2026-11-12 (SEC EDGAR)
  • 8-K 2026-11-12 Q3 business update and investor deck
  • https://stockanalysis.com/stocks/nuai/statistics/

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025
Revenue1.180.89
Gross profit-0.440.89
Operating expenses44.913.3
▸Adj EBITDA-44.0-11.5
▸Adj OCF-47.7-12.0
CapEx-7.13-1.67
Adj FCF-54.9-13.7
Interest expense2.974.79
▸Adj net income-47.6-17.1
▸Owner's earnings-19.0--

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2025→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025
▸Claimed: EBITDA-62.6-38.7-23.9
FCF (OCF−capex)-39.1-25.7-13.4
Net income-75.6-46.0-29.6
▸Capital returned-175-162-12.5
Buybacks-224-200-23.6
Dividends0.000.000.00
Interest paid7.762.974.79
Debt paid down41.234.96.23
▸Reinvestment14.311.82.44
Capex (PP&E)8.426.751.67
Intangibles & M&A5.875.100.78
Leases signed (net Δ)------
Retained / other1381343.16

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 24 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025
▸Assets (total)22914.1
▸Liabilities (total)35.316.7
Net debt (incl. leases)-102-1.04
Net debt / Adj EBITDA----
Net debt / Adj FCF----
Adj EBITDA / interest-14.8-2.41
Shares outstanding10753.4
Dilution (YoY)+310.2%--
Employees7.005.00
MarginsTTM2025
Gross margin-37.3%100.0%
Adj EBITDA margin-3735.3%-1302.2%
Adj OCF margin-4055.5%-1357.6%
Adj FCF margin-4660.9%-1545.7%
Net income margin-5345.2%-3341.5%
Adj NI margin-4048.5%-1930.6%
ROIC (adj, after-tax)-17.1%-5956.4%
Cost of debt14.2%--

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Natural Gas$1.2MNEW

Earnings Calls

2 calls

Earnings Call · 2026 Q3

2026-11-12

New Era (NUAI) used its fiscal Q3 2026 business update to review progress on its Texas Critical Data Centers (TCDC) campus in Odessa, Ector County. Management said the market is volatile, funding questions about data centers are growing, and communities want assurances on power, water and local impact. Power: The company signed a 20-year PPA for up to 207 MW and posted a $118 million cash-collateralized letter of credit. The power comes from a grandfathered private use network tied to Vistra's adjacent Odessa-Ector plant, so it is exempt from ERCOT's Batch Zero process under the amended Texas PURA. Power availability is expected in Q3 2027, with initial ready-for-service targeted for Q4 2027, with modular compute lighting up around September. Vistra will receive a 5% non-voting stake in Phase 1 power once delivery begins. Vistra also has a right of first refusal on Phase 3. The PSA requires New Era to pay for a new line from the plant and to buy Vistra's substation and electrical equipment, with pricing set by an existing baseball-style appraisal mechanism. Leasing: A non-binding LOI covers Phases 1 and 2 with the same prospective tenant, described as a "leading global technology company." The tenant is under exclusivity, and other discussions have stopped. Phase 1 lease negotiations are advanced. Management said the economics are fully agreed and only some technical items remain. Phase 2 documentation is separate, and Phase 1 doesn't depend on it. New Era is now self-executing the project rather than pursuing the earlier JV. Management said this was a mutual decision and that the tenant didn't request it. They called it the lower-risk path and said it leaves CapEx roughly similar. Development: The company owns 493 acres and is buying another 99 contiguous acres from Grow Odessa, with closing expected within weeks. The extra land eases utility build-out and easement constraints. Phase 1 is fully permitted, and clearing, grading and remediation are underway. Phase 2 plans about 550 MW of islanded on-site generation with Thunderhead Energy Solutions, which would bring planned capacity across the first two phases to about 757 MW gross. The TCEQ standard air permit is expected by year-end. Turbine deliveries are expected in Q4 2027 and Q1 2028. Phase 3 is still in design. Delivery and cost: The modular approach should cost less than half a comparable traditional build and speed delivery. It also reduces reliance on on-site labor. Long-lead items such as transformers are being managed. The tenant is helping with procurement, and the site already sits at usable voltage. The company has added senior hires from Microsoft, Meta, AWS, CyrusOne and others, including a new General Counsel. Responsible development: Management said its approach aligns with the priorities of Governor Abbott and Governor-elect Hinojosa. It plans closed-loop cooling and is evaluating treated Permian produced water for cooling. Phase 2 power is islanded, and the company is engaging with local communities. Financials: A $64 million PIPE closed recently and repaid Macquarie borrowings. As of October 31, cash was $187 million, made up of $49 million unrestricted and $138 million restricted. Macquarie debt outstanding is $20 million, fully cash-collateralized. After lease signing, the company may restructure the LC to release restricted cash. It retains an option for up to $200 million of Macquarie financing and is talking with other lenders about larger project debt.

Analyst Q&A (10)
▸
Does the ~50% lower Phase 1 build cost and limited upfront capital outlay resemble the Riot/Anthropic powered-land lease structure, and should it be replicated in Phases 2 and 3?
Mike Grondahl · Northland
Ted Warner said yes, the structure looks similar, a modular build at about half the low end of traditional cost per MW. Leading tech companies are pursuing modular builds because speed to compute matters most. Phase 2 will likely look much like Phase 1, but that isn't finalized, and the focus is on finishing Phase 1.
▸
Are any approvals, permits or regulatory issues still outstanding for Phase 1, and how is the Phase 2 TCEQ air permit progressing?
Mike Grondahl · Northland
Evan Pierce said Phase 1 is fully permitted and site work has begun, so nothing stands between the company and delivery. The Phase 2 standard air permit is still expected by year-end. TCEQ is accepting permits again, and any delay shouldn't affect the project. Charlie Nelson added that the team has removed outstanding development risks.
▸
Where are the additional 99 acres and why were they acquired?
Mike Grondahl · Northland
Charlie Nelson said the parcel is contiguous to the existing property, bought from the City of Odessa as with an earlier ~50-acre purchase. It is usable land that eases utility build-out and makes getting power from point A to B easier.
▸
What is still being worked through in the advanced Phase 1 negotiations: technical, design or economics?
Nick Giles · B. Riley Securities
Ted Warner said the economics are fully agreed. Modular builds are fairly simple from an SLA perspective, and a few technical items remain. He said the team feels good about where things stand.
▸
Which long-lead items remain to be secured for Phase 1, are deposits needed, and how will capacity be reserved for Phase 2?
Nick Giles · B. Riley Securities
Ted Warner said the prospective tenant is helping with procurement through its supply chain. Jose Rodriguez said final design depends on lease completion, but the team is talking to equipment vendors about reservations and knows the needed electrical equipment, with no blockers. Charlie Nelson said the site is already at usable voltage, so the company avoids exposure to 345 kV step-down transformer constraints, and much of the module scope is handled externally.
▸
What is the expanded team working on now, and are they looking at new sites or pipeline?
Nick Giles · B. Riley Securities
Charlie Nelson said the team enabled the self-execution model, which attracted the tenant, and everyone is busy preparing to execute this project. The company has a pipeline, but the priority is finishing Phase 1 and reaching ready-for-service, then evaluating next steps.
▸
Cipher said on its call that it sees monetization value in the Odessa site, citing speed of site access and scarce long-lead equipment. What is the source of that, and does it relate to New Era's structure, equipment delivery or a JV?
Bryan Baratian · ROTH Capital Partners
Ted Warner couldn't comment on Cipher's remarks. He explained that the existing PPA requires the substation and electrical equipment to be bought back by Vistra or, here, New Era. New Era agreed in the PSA to pay for a new line to its site and buy the substation and equipment, priced through an existing baseball appraisal mechanism. That helps with long-lead items, and Phase 1 delivery is targeted for September.
▸
Given the incoming governor's comments about stopping projects that still need permits, why does New Era feel de-risked on its air permit and what is the timing?
Bryan Baratian · ROTH Capital Partners
Charlie Nelson said the aim is to ensure that new permits and projects in the batch process follow criteria around community and social license. Issued permits won't be pulled, and Phase 1 is already permitted. Phase 2 needs only a standard air permit, which will issue when it issues. He said New Era's community-first approach fits the new environment.
▸
Why use the word "tenant" rather than "hyperscaler," and is there still strong demand from other parties for the site?
Bryan Baratian · ROTH Capital Partners
Ted Warner said the LOI is with a leading global technology company under exclusivity, so other conversations have ceased. Demand was strong. Those parties first competed for the power, then became prospective tenants once New Era secured it. The Vistra alignment (5% stake and Phase 3 ROFR) won it, and Batch Zero uncertainty made the power more valuable.
▸
What needs to happen between power availability in Q3 2027 and ready-for-service in Q4 2027?
Kevin Pimental · Alliance Global Partners
Evan Pierce said the project is already clear to construct, so the question is power timing. Steps include the current PPA owner relinquishing the PPA and a short distribution build with Vistra to the site's on-site switching station with metal-clad switchgear. Final site prep for modules, delivery of the customer's assets and commissioning follow. He said it isn't very complicated.

SEC Filing Findings

SEC Filing — material findings

2026-11-12 · depth 9/10
risk 8Take-or-Pay / Contingent Obligation
▸

Phase 1 PPA is take-or-pay. At minimum contract quantity, fixed annual obligation is about $110M in contract year 1 before gas-indexed and pass-through charges. Obligation starts at Power Delivery Date, which is not yet determinable, and no tenant lease is signed. The 10-Q says the company may terminate without liability only if delivery has not commenced by December 31, 2027.

“PowerCo will pay for the full contract quantity made available, whether or not consumed... At the minimum contract quantity, the fixed and determinable portion of the annual obligation is approximately $ 110 million in the first contract year, before the gas-indexed component and pass-through charges.”
risk 7Contingent Liability / Collateral
▸

After power delivery, PowerCo must post uncapped mark-to-market collateral to Luminant. The requirement rises if forward ERCOT prices fall relative to the PPA price or on certain credit events. Luminant may draw the letter of credit for termination payments, unpaid amounts, and non-performance losses.

“From the Power Delivery Date, the PPA also requires PowerCo to post additional security equal to Luminant’s periodic calculation of its mark-to-market exposure under the PPA. The additional security is not capped and would increase if forward Electric Reliability Council of Texas (“ERCOT”) electricity prices decline relative to the PPA price or upon certain credit-related events.”
risk 7Liquidity / Restricted Cash
▸

About $118.3M of cash collateral backing the $116M letter of credit is locked up as restricted cash for the PPA term, funded by $60M of term loan draws and about $58.3M of cash on hand. This is separate from the unrestricted cash the call emphasized. Letter of credit fees are 2.00% per year, plus a 1.00% fronting fee.

“The collateral will be presented as restricted cash and is expected to remain restricted for the term of the PPA. PowerCo paid a fronting fee of 1.00% of the face amount at issuance, which will be amortized over the term of the letter of credit, and will pay a letter of credit fee of 2.00% per annum, payable quarterly in arrears.”
risk 7Contingent Liability / Related Party Obligation
▸

Under the Development Framework Agreement with a Luminant affiliate, TCDC must reimburse substation and transmission costs. If the Phase 1 agreement is not timely executed and TCDC fails to pay invoiced Phase 1 costs, Luminant's affiliate may draw up to $116.0M on the credit support. The 10-Q says the substation purchase price and any redundant feed cost are still to be set in the related purchase and sale agreements.

“If the Phase 1 agreement is not timely executed and TCDC fails to pay invoiced Phase 1 costs, Luminant’s affiliate may draw up to $116.0 million on the credit support described below.”
risk 7Liquidity / Capital Needs
▸

Management estimates Phase 1 capex of $150M–$400M over the next twelve months, with expenditures rising materially once a tenant term sheet or lease and the Phase 1 purchase agreement are signed. Separately it expects $50M–$60M of cash requirements over twelve months, with about $40M of ATM capacity remaining. The 10-Q also warns the company may have to surrender pledged assets to preserve liquidity.

“We currently estimate total capital expenditures for the first phase of our flagship project of approximately $150 million to $400 million over the next twelve months, subject to the terms and conditions agreed with our future tenants.”
risk 7Dilution / Equity Financing
▸

The October PIPE sold 23.27M shares at $2.75, about 20% of 117.5M shares outstanding at 9/30/26, with a 6% placement fee and a resale registration obligation. This is well below the $3.35 April offering price and the roughly $6.23 average price of the 9.63M ATM shares sold in 2026 (~$60M gross). The Macquarie warrant issued October 7 has a $7.26 exercise price.

“the Company entered into securities purchase agreements with certain accredited investors to sell 23,272,727 shares of common stock at $2.75 per share in a private placement for gross proceeds of approximately $64.0 million.”
risk 6Debt Terms / Prepayment Triggers
▸

The Macquarie facility carries a MOIC premium that is fully earned on signing and payable on any repayment. The $60M early repayment cost a $9.0M premium, and the remaining $20.6M carries a premium too. Lender prepayment rights tied to no data center lease are waived only as to the October 8, 2026 date. Pricing is Term SOFR plus 5.50%–7.75%.

“The borrowings are subject to a multiple on invested capital (“MOIC”) premium, which is fully earned upon execution of the agreement and payable upon repayment, prepayment, or acceleration.”
risk 8Regulatory / Permitting
▸

The 10-Q risk factors say the Texas pause on data center air permits may extend beyond the ERCOT audit and that TCDC permits could be delayed indefinitely, denied, or made more burdensome. A Governor-elect moratorium is also flagged. The call characterized Phase 1 as fully permitted with no outstanding development risk; the 10-Q expressly discloses permit delay risk for TCDC, including air permits.

“As a result, the existing pause on TCEQ permits for data centers may be extended beyond completion of the ERCOT audit, and permits necessary for TCDC and our other Texas projects could be delayed for an extended or indefinite period, denied, or made subject to new or more burdensome conditions.”
risk 6Controls / Restatement
▸

Q1 2026 results were restated, with net loss understated by $1.83M from stock-based compensation and professional-fee classification errors. The 10-Q concludes disclosure controls were not effective and reports additional material weaknesses that remain unremediated.

“The combined effect of the errors described above, in addition to certain other immaterial errors, was an understatement of net loss of $ 1,832,087 for the three months ended March 31, 2026”

Short Interest

Short % of Float47.8%
Short Shares35.3M
Days to Cover2.6
Change (vs Prior)+6.2%

Cash Runway

45.5months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Hood River Capital Management LLC$54.8M$6.38+$54.8M+$54.8M—$13.79B
BlackRock, Inc.Passive$46.0M$6.00+$40.9M+$46.0M—$6.70T
STATE STREET CORPPassive$26.7M$6.22+$25.4M+$26.7M—$3.38T
Conversant Capital LLC$22.4M$6.38+$22.4M+$22.4M—$852M
VANGUARD CAPITAL MANAGEMENT LLCPassive$21.0M$5.37+$11.9M+$21.0M—$4.68T
MARSHALL WACE, LLP$13.8M$5.98+$11.8M+$13.8M—$117.88B
GEODE CAPITAL MANAGEMENT, LLCPassive$13.6M$5.66+$10.5M+$13.3M—$1.87T
Tyro Capital Management LLC$12.3M$6.38+$12.3M+$12.3M—$446M
Alyeska Investment Group, L.P.$10.9M$5.98+$9.7M+$10.9M—$38.84B
MORGAN STANLEY$10.0M$5.90+$7.5M+$9.4M—$1.88T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

06.0M12.0M17.9M23.9M$1.84$2.98$4.11$5.25$6.382024-122025-062025-122026-06
hover the chart for per-quarter detailprice (right axis)
Hood River Capital Management LLC8.6MConversant Capital LLC3.5MMARSHALL WACE, LLP2.2MTyro Capital Management LLC1.9MAlyeska Investment Group, L.P.1.7MMORGAN STANLEY1.6MUBS Group AG1.3MSEI INVESTMENTS CO1.2MFIRST TRUST ADVISORS LP1.0MMILLENNIUM MANAGEMENT LLC965K

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (2 analysts)$11.00+145.0%
Last Year (5 analysts)$10.32+129.8%
Current Price$4.49
Analyst Ratings
1
Buy: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2026 Q10M-5M-8M$-0.07$-0.13 – $-0.031
2026 Q21M-5M-6M$-0.05$-0.08 – $-0.032
2026 Q30M-13M-14M$-0.13$-0.17 – $-0.102
2026 Q40M-16M-17M$-0.16$-0.19 – $-0.123
2027 Q10M-17M-18M$-0.17$-0.27 – $-0.103
2027 Q20M-19M-20M$-0.18$-0.34 – $-0.071
2027 Q30M-21M-23M$-0.21$-0.38 – $-0.081
2027 Q47M-20M-21M$-0.20$-0.36 – $-0.081
2028 Q124M-17M-20M$-0.18$-0.34 – $-0.072
2028 Q249M-9M-14M$-0.13$-0.24 – $-0.052
2028 Q375M2M-6M$-0.06$-0.11 – $-0.022
2028 Q493M12M-1M$-0.01$-0.01 – $0.002

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Major holders (≥10% beneficial owners)
Buys ($, 12mo)
$3.69M
2 txns · 1 insider · 750,000 sh
Sells ($, 12mo)
$16.55M
1 txn · 1 insider · 4,490,000 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-10-14BUYMCCARTHY KENT C10 percent owner500,000$5.00$2.50M$8.30M
2026-10-14SELLMCCARTHY KENT C10 percent owner4,490,000$3.69$16.55M$0
2026-10-09BUYMCCARTHY KENT C10 percent owner250,000$4.77$1.19M$45.55M
v2 analysis (legacy, 2026-07-08) — for comparison onlyclick to expand

Thesis

New Era Energy & Digital is a shell-like former oil & gas producer (legacy revenue now under $1M/quarter and shrinking) that has re-branded around a speculative pivot into AI data-center development — a 492-acre 'Texas Critical Data Centers' campus targeting 1.4GW of behind-the-meter capacity for hyperscalers. The legacy business is economically irrelevant; the entire equity story is now an option on execution of a capital-intensive, multi-hundred-million-dollar infrastructure buildout, financed so far by a $290M Macquarie term loan and continuous equity dilution (shares up 307% YoY). The company burns ~$18-20M/year of cash with only $2.2M on the balance sheet, is being funded almost entirely through dilution and new debt rather than operations, and faces active shareholder litigation and a New Mexico AG action tied to its legacy business and disclosure practices. A July 2026 C-suite overhaul (new CEO/Chairman, Amazon/ByteDance-alumni development and compliance officers) signals the board is trying to build credibility for the data-center pivot, but this is still a pre-revenue, pre-proof-of-concept project layered on top of a distressed legacy shell.

Valuation

Our Target
$90M-81%
Market Should Pay
$95M-80%
target ×1.05 (greed premium)
Current Market Cap
$479MSlightly bullish
What Changed
financials release · 2026-05-15
-7%fair value on this information

The Q1 2026 print itself (filed 5/15/26) mostly confirms rather than surprises: legacy revenue remains negligible (~$0.8M, still +321% QoQ off a tiny base), losses widened again (Adj NI -$8.9M, Adj FCF -$9.2M), SBC and capex both stepped up materially versus prior quarters, and dilution continued. The $290M Macquarie financing was already announced in April and is largely priced in by the time of this filing; the CEO/C-suite overhaul came later (July) and is a separate trigger. So the incremental new information here is mainly confirmation that cash burn and dilution are accelerating faster than legacy revenue, with capex/SBC upticks suggesting the TCDC buildout is now consuming real resources without yet showing contracted revenue.

▸ How the cases moved

Bear probability nudges up slightly (0.40→0.45) given the accelerating burn and rising capex without matching revenue; base case equity value trimmed modestly (75→70) reflecting a slower-than-hoped ramp; bull case largely unchanged (600) since the marquee-tenant thesis is unaffected by this quarter's numbers, though bull probability trimmed slightly (0.22→0.20) on execution-pace concerns.

2-Year Plausible Outcomes
bear45%
$15M
rev -10%/yrOE $-22M

TCDC financing/execution stalls (permitting delays, hyperscaler tenant fails to materialize, Macquarie facility covenants tighten), litigation (AG action, shareholder suits) drags on and erodes credibility, and the company continues diluting merely to survive. Legacy oil/gas revenue keeps shrinking toward zero. By year 2 the company is a distressed shell with a stalled project, negative tangible equity after further losses and dilution.

▸ Valuation

Liquidation/asset-based: ~$86M gross assets less $76M liabilities and further 2yr cash burn/dilution write-down ≈ $15M residual equity value

base35%
$70M
rev +50%/yrOE $-20M

The company secures incremental drawdowns on the Macquarie facility and makes visible but partial progress on TCDC — first phase (a fraction of the 1.4GW target) begins construction/energization discussions with a tenant LOI but limited signed contracted revenue by year 2. Continued heavy dilution funds ongoing burn; legacy business is immaterial. The equity trades as a speculative option on eventual completion rather than on current cash flows.

▸ Valuation

Option/early-stage NAV on partial project progress plus residual legacy assets, net of debt drawn ≈ $70M equity value (no meaningful EBITDA to multiply)

bull20%
$600M
rev +300%/yrOE $30M

TCDC lands a marquee hyperscaler anchor tenant with a long-term contracted lease, first phase of the campus is energized and generating high-margin colocation/power revenue, and the new development-focused leadership team executes credibly. The market re-rates the company as a legitimate emerging data-center developer rather than a distressed oil & gas shell, drawing a growth multiple on forward contracted EBITDA.

▸ Valuation

15x forward EBITDA of ~$50M on first-phase contracted capacity = $750M EV − ~$150M net debt (post further drawdowns) = $600M equity

▸ Target Rationale

I discount below the arithmetic model because the scenario math can't fully price in the governance overhang (AG litigation, shareholder fiduciary-duty suits, allegations of overstated permit progress), the demonstrated willingness to dilute aggressively (307% YoY share growth) which structurally caps upside per share even if the project succeeds, and very low data reliability given the company's tiny, near-meaningless legacy financials next to a huge unrelated capital project. The base and bull cases require real execution from a management team that just turned over its CEO and several C-suite seats simultaneously — an execution-risk discount is warranted beyond the raw probability-weighted math.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality3/10
Situation now2/10
Trajectory5/10
Risk9/10
Governance3/10
Insolvency prob (2yr)30%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-07-08

Company news

In July 2026, New Era Energy & Digital (NUAI) appointed Charlie Nelson as Chairman and CEO, succeeding E. Will Gray II, who transitioned to a development-focused role. This followed a broader C-suite expansion, including new Chief Development and Compliance officers with experience from Amazon and ByteDance (Investing.com). Operationally, the company advanced its Texas Critical Data Centers (TCDC) project by securing a $290 million Macquarie term loan facility in April 2026 and finalizing an equipment procurement deal via Thunderhead Energy to de-risk its supply chain (Investing.com, Business Wire). However, July 2026 also saw the initiation of several shareholder investigations by law firms including Frank R. Cruz and Grabar Law, focusing on potential breaches of fiduciary duty and disclosure transparency regarding previous oil-and-gas dealings (Morningstar).

Thesis findings

The bull case centers on NUAI’s strategic pivot from helium to AI infrastructure, specifically its 492-acre TCDC campus in the Permian Basin. This site targets 1.4 GW of capacity using a "behind-the-meter" strategy—leveraging on-site natural gas generation to bypass grid constraints and accelerate deployment for hyperscalers (Seeking Alpha). Partnerships with Stream Data Centers and Primary Digital Infrastructure add institutional credibility to this development-stage play. Conversely, the bear case is rooted in high execution risk and fundamental weakness; the company remains pre-revenue in its AI segment, reporting a $9 million loss on just $0.9 million in legacy revenue last quarter (StocksToTrade). Significant governance concerns persist due to ongoing litigation from the New Mexico Attorney General and allegations of overstated progress regarding environmental permits (Morningstar).

Market opinion (price-aware)

The market currently views NUAI as a high-volatility "broken momentum" story. Sentiment shifted sharply bearish in early July 2026 after the stock plummeted over 17% in a single day following the CEO transition, falling from mid-$6 levels to roughly $4.35 (StocksToTrade). Despite this, sell-side coverage remains surprisingly optimistic: B. Riley recently initiated coverage with a Buy rating and a $10.00 price target, citing a de-risked capital structure after a recent $120 million equity raise. Retail sentiment on Reddit is polarized; while some users label the recent drawdown "dumb luck" for dip-buying, others on StockTwits express fear over the "litigation storm" and potential dilution from convertible debt. The prevailing narrative is that NUAI is a "speculative buy" on the AI power bottleneck, contingent on securing a formal hyperscale lease.