NVX.AX
Novonix Limitedv3 2.5/10 · 2026-11-18Based in Brisbane, Australia, and established in 2012, Novonix Limited is a prominent supplier of essential components, specialized machinery, and expert services to the burgeoning North American lithium-ion battery industry. The company's operations are divided into three distinct segments. Its Graphite Exploration and Mining division is dedicated to discovering graphite resources within Australia. The Battery Technology segment is responsible for developing advanced battery cell testing equipment, producing actual batteries, and providing consultancy expertise. Meanwhile, the Battery Materials segment focuses on the creation and manufacturing of battery anode materials. Beyond these core areas, Novonix also participates in investment ventures and broader battery testing initiatives. Notably, the company operated as Graphitecorp Limited until its renaming to Novonix Limited in July 2017.
2-Year Price History
Valuation v3 Opus worker · 2026-11-18
Novonix has no revenue from continuing operations. It is a US synthetic-graphite anode developer whose single plant, Riverside in Chattanooga, keeps missing its milestones: Panasonic mass production has slipped to 2H 2027 and depends on a C-sample that still misses some specs, Stellantis walked away, and PowerCo's binding 32kt offtake became a non-binding framework with production pushed to 2029. The stock is down 87% this year to A$0.075, about A$75M of equity on about 1.0bn shares. The test found the balance sheet worse than the pitch assumed. Debt is about US$80M against about US$27M of cash, made up of: - a US$26.6M PNC secured loan on Riverside; - a US$33M LGES convertible, due June 2028 and convertible only at A$1.60; - about US$21M of Yorkville debentures, now being repaid in cash at US$7M every 30 days while the stock sits below the A$0.12 floor. Net debt is therefore about A$80M and EV about A$155M. PwC flags a material uncertainty about going concern. Management's own impairment test assumes US$7–11/kg selling prices against US$6–8/kg operating costs and full capacity only in Sept 2031, and the ITC rejected AD/CVD duties in March 2026. On a 10% DCF even the success case barely covers the debt, so the equity is worth roughly zero apart from option value on trade policy, and a heavily dilutive raise or restructuring is likely within months. Rating 2.5, a short on fundamentals. What keeps it from a stronger short is that it is hard to execute: about A$350k a day trades on the ASX, the Nasdaq ADS borrow is thin, single days of +12–24% have happened, and a pending Section 232 price-floor update or a refiled trade petition could squeeze the stock. Keep any position small.
Flow: Heavy issuance ahead. - Yorkville amortisation: US$7M is due every 30 days while the stock is below A$0.12. September and October are paid and about US$21M is left, draining cash toward a raise by Q1 2027. - Yorkville conversion: if the floor is lowered, the debentures convert into shares. At the A$0.12 floor the remaining US$35M already meant about 360M shares (~36%); at today's price it would be far more. - No buybacks and no insider buying. Phillips 66 (~11%) has let itself be diluted down from about 16% rather than add.
A deep dive would have to establish: Will Novonix be forced into a raise, restructuring or lower-floor Yorkville conversion before Panasonic qualification (2H 2027), wiping out most of today's equity behind ~US$80M of debt, or will a Section 232 price floor or strategic backstop rescue it first?
Research (expand)
What it does. Novonix is building North America's first large-scale synthetic graphite anode plant, Riverside in Chattanooga, TN, using continuous induction graphitization. It has sold its BTS testing unit to founder and ex-CEO Chris Burns for US$1 (BTS had to hold US$2M of cash at closing) and has sold the Mt Dromedary graphite asset. Revenue from continuing operations was zero in 1H 2026.
What the market believes. That Novonix is a funding-constrained science project. The record supports that view. Panasonic mass production has slipped from 2025 to early 2026 and then to 2H 2027, and the C-sample still misses some parameters. Stellantis terminated in Nov 2025 over specs. PowerCo became a non-binding framework in Oct 2026 with production in 2029. The US$754M DOE loan for a second plant has never closed.
Where the market may still be wrong. The equity may be priced too high. A A$75M market cap looks like a cheap option, but it sits on top of about US$80M of debt:
- PNC secured loan: US$26.6M (the borrowing subsidiary breached a covenant in 2025);
- LGES convertible: US$33M, a cash claim in 2028 because conversion is at A$1.60;
- Yorkville: about US$21M, amortising in cash.
Against that, the asset base is mostly US$123M of construction-in-progress in specialised furnaces.
What it earns today. Operating burn is about US$40M a year; 1H26 operating outflow was US$23.1M. Capex has been cut to about US$9M per half. Unlevered owner earnings are about -A$60M a year.
Balance sheet and the clock.
- Cash was US$33.7M at 30 Sep 2026, about US$27M after the October Yorkville payment.
- Further US$7M payments recur every 30 days while the VWAP is below A$0.12.
- PwC flags a going-concern uncertainty.
- A raise, a restructuring or a lower-floor Yorkville conversion is all but certain by Q1 2027. Any of them is heavily dilutive at A$0.075.
Projected FCF (A$M). 2027: -75; 2028: -70; 2029: -45; 2030: -20; 2031: 0. This assumes Panasonic qualifies and a slow ramp to full capacity in Sept 2031, as in management's own plan.
Year-5 business. In the success case it is a 20kt plant earning US$1–3/kg of gross margin at management's assumed prices, roughly A$20M of FCF at maturity, worth about 10x. The PV of that terminal value (about A$125M) does not cover the PV of the burn (about A$150M) plus A$80M of net debt. In the failure case, creditors and Yorkville come ahead of shareholders. The DCF on equity is about zero; we put A$0.01 on option value and fair value at A$0.02.
Multiples. EV is about A$155M against negative EBITDA, and the FCF yield is about -100%. The question is solvency, not the multiple.
Management and risk. CEO Mike O'Kronley joined in 2025. The CFO has left, and the interim CFO is the former chair. Management promoted heavily ("oversold capacity", 150kt), and almost every milestone has slipped. Competitors are Chinese producers (BTR, Shanshan), which set the price, and the US peers Syrah and Westwater.
Sentiment. 1.5/10. The stock is down 87% YTD and holders are mostly retail.
Thesis test
- Objection 1 (net debt about A$80M, not -A$5M): the challenge was right. Note 7 of the 1H26 report shows borrowings of US$85.1M at 30 Jun, including the PNC loan and the LGES convertible the pitch missed. EV is about A$155M, and the equity is junior to about US$80M of claims. Fair value is cut from A$0.04 to A$0.02.
- Objection 2 (thin unit economics, tariffs gone): the challenge was right. Management's own impairment test assumes US$7–11/kg against US$6–8/kg costs, full capacity in 2031, and headroom down to US$45.5M. That was before the PowerCo deferral. The ITC voted no on 12 Mar 2026. max_profit is cut to about A$20M and the terminal value with it.
- Objection 3 (hard to short): right, as a limit on execution. ADS borrow was about 55k (US$110k) at a 1.8% fee in August, about A$350k a day trades, and there have been +24% spike days. It does not change value, but it caps position size and lowers the trade-setup score.
- Objection 4 (policy option): partly right. The Section 232 price-floor update is overdue and the ITC has been reconstituted, so a squeeze is plausible. But even US$11/kg barely clears costs, and Phillips 66 has let itself be diluted rather than rescue the company. That is option value of a cent or two, not a floor.
- Objection 5 (runway could stretch): timing only. Yorkville taking stock at a lower floor instead of cash delays the raise but makes dilution worse, so the thesis is unchanged.
- Conclusion: The fundamental short got stronger under test, and the equity looks worth roughly zero on a 10% DCF. It is a small, opportunistic short, ideally timed into the raise or the FY26 impairment, rather than a large conviction position.
- https://announcements.asx.com.au/asxpdf/20260831/pdf/073hx9ts9rktnv.pdf
- https://quartr.com/events/novonix-nvx-q3-2026-tu_F9I1aG1f
- https://investorpa.com/announcement/360598/
- https://www.panabee.com/news/novonix-updates-powerco-supply-agreement-to-framework-model
- https://www.usitc.gov/press_room/news_release/2026/er0312_68281.htm
- https://au.marketscreener.com/news/novonix-shares-tumble-15-after-stellantis-scraps-supply-deal-ce7d5cded88ff326
- https://curvedtrading.com/stocks/nvx/borrow-fee/
- https://www.fool.com.au/tickers/asx-nvx/
Financials — Adjusted
Adjusted · TTM 2025-Q4 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2020 |
|---|---|---|---|---|---|
| Revenue | 5.76-2% | 5.76-2% | 5.85-27% | 8.05+106% | 3.90 |
| Gross profit | -25.2-717% | -25.2-717% | 4.08 | -25.5 | -2.88 |
| Operating expenses | 25.1-55% | 25.1-55% | 55.6+145% | 22.7+57% | 14.4 |
| ▸Adj EBITDA | -45.6 | -45.6 | -46.9 | -45.0 | -15.6 |
| ▸Adj OCF | -25.7 | -25.7 | -23.1 | -24.6 | -5.87 |
| CapEx | -49.9 | -49.9 | -12.8 | -10.3 | -11.1 |
| Adj FCF | -75.6 | -75.6 | -36.0 | -34.9 | -17.0 |
| Interest expense | 12.2 | 12.2 | 3.48 | 2.93 | 3.78 |
| ▸Adj net income | -63.4 | -63.4 | -30.3 | -51.3 | -21.1 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2020→FY2025
| Where the Cash Went | Total | 2025 | 2024 | 2023 | 2020 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -166 | -48.8 | -66.6 | -35.3 | -15.2 |
| FCF (OCF−capex) | -149 | -75.6 | -27.4 | -27.8 | -17.7 |
| Net income | -218 | -96.0 | -51.3 | -46.6 | -23.8 |
| ▸Capital returned | -167 | -74.8 | -24.3 | -26.3 | -41.7 |
| Buybacks | -64.9 | 8.56 | -28.8 | -0.38 | -44.3 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 22.4 | 12.2 | 3.48 | 2.93 | 3.78 |
| Debt paid down | -125 | -95.5 | 1.04 | -28.9 | -1.20 |
| ▸Reinvestment | 86.4 | 48.0 | 15.0 | 9.97 | 15.6 |
| Capex (PP&E) | 84.2 | 49.9 | 12.8 | 10.3 | 11.1 |
| Intangibles & M&A | -1.35 | -1.35 | 0.00 | 0.00 | 0.00 |
| Leases signed (net Δ) | 3.57 | -0.52 | 2.18 | -0.35 | 4.52 |
| Retained / other | 42.4 | 12.7 | 0.39 | 1.48 | 27.8 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 12 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2020 |
|---|---|---|---|---|---|
| ▸Assets (total) | 283 | 283 | 226 | 263 | 64.6 |
| ▸Liabilities (total) | 126 | 126 | 88.5 | 79.4 | 5.87 |
| Net debt (incl. leases) | 16.1 | 16.1 | 27.9 | -10.4 | -5.86 |
| Net debt / Adj EBITDA | -- | -- | -- | -- | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -3.74 | -3.74 | -13.5 | -15.3 | -4.13 |
| Shares outstanding | 998 | 698 | 497 | 489 | 464 |
| Dilution (YoY) | +40.5% | +40.5% | +1.7% | -- | +0.0% |
| Employees | 202 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2020 |
|---|---|---|---|---|---|
| Gross margin | -437.2%-507.0 | -437.2%-507.0 | 69.8%+387.0 | -317.2%-243.5 | -73.7% |
| Adj EBITDA margin | -791.6%+10.4 | -791.6%+10.4 | -801.9%-243.9 | -558.1%-158.5 | -399.6% |
| Adj OCF margin | -446.8%-51.5 | -446.8%-51.5 | -395.3%-90.4 | -304.9%-154.6 | -150.3% |
| Adj FCF margin | -1312.8%-698.4 | -1312.8%-698.4 | -614.3%-181.3 | -433.0%+2.4 | -435.4% |
| Net income margin | -1665.7%-788.8 | -1665.7%-788.8 | -876.9%-298.8 | -578.1%+30.7 | -608.7% |
| Adj NI margin | -1100.1%-583.2 | -1100.1%-583.2 | -516.9%+119.6 | -636.5%-96.7 | -539.9% |
| ROIC (adj, after-tax) | -15.4% | -15.4% | -19.6% | -19.7% | -18.9% |
| Cost of debt | 14.3% | 14.3% | 4.9% | 4.3% | 40.3% |
Earnings Calls
Earnings Call · 2025 Q1
NOVONIX, a developer and producer of synthetic graphite for the lithium-ion battery market, provided a comprehensive update for the first quarter of 2024. Interim CEO and CFO Robert Long led the presentation, highlighting the company’s strategic positioning as a leader in sustainable battery technology within the United States. A primary theme was the company's transition from development to large-scale commercial production, bolstered by strong alignment with U.S. government policy aimed at onshoring critical mineral supply chains and reducing dependence on China. A significant organizational update was the appointment of Michael Kronley as the new permanent CEO, scheduled to start on May 19. This transition marks a stabilization of leadership as the company enters a capital-intensive growth phase. Financially, NOVONIX strengthened its balance sheet in early 2024, completing an equity raise in January that included a $5 million investment from Phillips 66 and over $20 million through a share purchase plan. The company ended March with a cash balance of $47.9 million. This liquidity is supplemented by ongoing funding from the Department of Energy (DOE) MESC grant, which supports the commissioning of equipment at the Riverside facility. The Riverside facility in Chattanooga remains the near-term operational focus. NOVONIX is currently installing and commissioning equipment to reach an initial production milestone of 3,000 tons per annum. This output is critical to fulfilling supply agreements with major partners including Panasonic, Stellantis, and PowerCo. Long noted that Riverside’s eventual capacity is targeted at 20,000 tons per annum, and the facility is already oversold, necessitating the acceleration of future production sites. To address this demand, the company secured a purchase and sale agreement for a 182-acre land parcel for its second mass production site, NOVONIX Enterprise South. This facility is projected to add 31,500 tons per annum of capacity. The company is actively working to finalize a $754 million conditional loan commitment from the DOE to fund this expansion. Additionally, NOVONIX is pursuing various tax incentives, such as the 45X production tax credit. The technological edge of NOVONIX continues to be a focal point, particularly its "all-dry, zero-waste" cathode process developed in Halifax, Nova Scotia. While the anode business in Tennessee is closer to commercial scale, the cathode division represents a significant long-term growth lever. However, the path forward is not without challenges. Long acknowledged that macroeconomic factors, including tariffs on steel and critical equipment, are impacting lead times and costs. The company is also participating in trade group actions regarding Chinese graphite anti-dumping, seeing a preliminary win that could favor domestic producers. Despite these headwinds, the outlook remains optimistic due to the high demand for synthetic graphite that meets Tier 1 EV OEM specifications. Long concluded by reiterating the goal of reaching a total capacity of 150,000 tons per annum in the long term, positioning NOVONIX as a vital pillar in the domestic battery ecosystem.
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| Capital Square, LLC | $1K | $1.20 | −$0 | −$0 | — | $228M |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2019 Q2 | 2M | -23M | -24M | $-0.03 | $-0.03 – $-0.03 | 2 |
| 2020 Q2 | 4M | -26M | -30M | $-0.05 | $-0.05 – $-0.05 | 2 |
| 2021 Q2 | 9M | -74M | -75M | $-0.04 | $-0.04 – $-0.04 | 2 |
| 2022 Q2 | 54M | -458M | -461M | $0.06 | $0.06 – $0.06 | 2 |
| 2024 Q4 | 6M | -40M | -44M | $-0.05 | $-0.05 – $-0.05 | 1 |
| 2025 Q2 | 3M | -51M | -55M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2025 Q4 | 5M | -22M | -35M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q2 | 47M | -70M | -76M | $-0.09 | $-0.09 – $-0.09 | 1 |
| 2026 Q4 | 102M | -46M | -58M | $-0.07 | $-0.07 – $-0.07 | 1 |
| 2027 Q2 | 112M | -44M | -61M | $-0.07 | $-0.07 – $-0.07 | 1 |
| 2027 Q4 | 169M | -18M | -43M | $-0.05 | $-0.05 – $-0.05 | 1 |
| 2028 Q2 | 284M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2028 Q4 | 443M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- Highly Discounted Capital Raising (June 2026): On June 17, 2026, NOVONIX announced a successful institutional placement raising A$20.7 million, alongside a non-underwritten Share Purchase Plan (SPP) aiming to raise an additional A$3.0 million. The capital raise was executed at a 33.3% discount to its last traded price, with the proceeds designated to fund essential capital expenditures needed to support production capacity at the Riverside facility and meet forecast customer demand.
- C-Sample Delivery to Panasonic (June 2026): On June 11, 2026, NOVONIX achieved a significant technical milestone by delivering its first North American-produced mass production qualification C-sample of synthetic graphite anode active material (AAM) to its anchor customer, Panasonic Energy. Internal testing shows the material meets all customer specifications, though formal validation by Panasonic is pending. Mass production for Panasonic is targeted for the second half of 2027.
- CFO Departure and Interim Management (June 2026): On June 9, 2026, NOVONIX announced that CFO Robert Long will depart the company in July. To facilitate a smooth transition, Chairman Ron Edmonds will step aside as Chair to serve as Interim CFO, and Deputy Chair Admiral Robert Natter will step in as Chairman during the search for a permanent CFO.
- Divestiture of Battery Technology Solutions (BTS) (April 2026): On April 30, 2026, NOVONIX finalized the divestment of its non-core BTS business in Canada to its former CEO for a nominal cash consideration. NOVONIX retained a 15% equity interest in the spun-out cathode business (Dryve Battery Materials Inc.) to focus corporate attention and capital on scaling its vertically integrated synthetic graphite supply chain in the U.S..
- Section 48C Tax Credit Certification (April 2026): On April 8, 2026, the U.S. Government certified NOVONIX's Riverside project for a previously allocated US$103 million Section 48C Advanced Energy Project Credit. The credit can be sold to third parties and will be received when the first 11,000 tonnes per annum (tpa) of production capacity is operational (required before April 7, 2028).
- Strategic Expansion Land Rights (March 2026): NOVONIX secured exclusive rights to evaluate the purchase of 17.5 acres of land adjacent to its Chattanooga Riverside facility for US$26.5 million. This potentially allows the company to consolidate its planned 50,000 tpa expansion onto a single site rather than two separate locations, promising capital savings of up to US$200 million alongside major operational synergies.
- Production Timeline Postponement (January 2026): NOVONIX revised its timeline for starting battery-grade synthetic graphite mass production for Panasonic Energy, shifting the expected launch from early 2026 to the second half of 2027 due to rigorous qualification protocols. However, the company remains on track to begin mass production of industrial-grade synthetic graphite in 2026.
▸ Thesis-test Findings
Novonix Riverside Chattanooga commissioning progress 2026
Operational progress at the Chattanooga Riverside facility presents a mixed picture of near-term delays alongside long-term technical validation. On the operational side, NOVONIX completed the installation and commissioning of mass-production equipment for Panasonic’s specifications in late 2025. However, in January 2026, the company officially pushed its commercial mass production start for Panasonic to the second half of 2027. On a positive note, in June 2026, the company achieved a critical milestone by delivering the first North American-produced mass production qualification C-sample to Panasonic, which is now undergoing formal customer validation. Meanwhile, the company remains on track to begin mass production of industrial-grade synthetic graphite in 2026, preserving a dual-pathway commercial strategy.
Department of Energy LPO Novonix loan final approval status
As of mid-2026, the proposed direct loan of up to US$754.8 million from the U.S. Department of Energy (DOE) Loan Programs Office (LPO) remains a conditional commitment. Final, binding approval and definitive loan documentation have not been completed. A key hurdle emerged in January 2025 when NOVONIX disclosed it was not selected for 48C tax credits for the planned Enterprise South facility (the primary target of the LPO loan). Although the conditional commitment value itself is unchanged, the company is still in ongoing discussions with the LPO to assess what structural impact, if any, this tax credit exclusion will have on the ultimate loan finalization.
Synthetic graphite market price vs Chinese export tariffs 2026
The synthetic graphite market continues to test the bear case, characterized by severe oversupply and aggressive pricing dynamics. Chinese manufacturers have flooded global markets, keeping average graphite anode prices at multi-year lows to squeeze out Western competitors. In March 2026, the U.S. International Trade Commission (ITC) handed a major setback to domestic suppliers by reversing proposed anti-dumping tariffs of up to 170% on Chinese active anode materials, finding that imports do not materially injure the domestic industry. While the existing 35% Section 301 tariffs remain in place, new Section 301 investigations launched in March 2026 could introduce more protective duties in Q3 2026. The most critical near-term catalyst for NOVONIX is the U.S. Inflation Reduction Act's Foreign Entity of Concern (FEOC) sourcing rules for graphite, which are set to take effect on January 1, 2027, creating a looming hard deadline for automakers to procure compliant non-Chinese supply.