OM.TO
Osisko Metals Incorporatedv3 5.0/10 · 2026-11-26Osisko Metals Incorporated, together with its subsidiaries, engages in acquiring, exploring, and developing base metals deposits in Canada. The company explores for copper, zinc, lead, and molybdenum deposits. Its flagship project is the Gaspé project located near Murdochville in the Gaspé peninsula of Eastern Québec. The company was formerly known as Bowmore Exploration Ltd. and changed its name to Osisko Metals Incorporated in June 2017. Osisko Metals Incorporated is headquartered in Toronto, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
Osisko Metals is a pre-revenue explorer whose whole value is the Gaspé Copper project at Murdochville, Quebec: a past-producing open pit bought from Glencore in 2023, now 1.83 Bt M&I at 0.32% CuEq (4.9 Mt contained Cu) plus 239 Mt inferred at 0.46%, with road, port, rail and Hydro-Quebec power already on site, and a 50% carried stake in the Pine Point zinc JV with Appian. The stock ran from C$0.17 to C$1.94 on copper's AI-driven rally and strategic backing (Glencore, Hudbay, Agnico Eagle, Franco-Nevada), then fell 40% from September to C$1.05 (close 2026-11-25, the latest found) as LME copper slid from its US$14,875/t record and Glencore sold part of its converted stake. At C$963M (C$1.05B fully diluted) and about C$113M cash after the November flow-through, the market pays roughly 0.25-0.35x a plausible pre-study project NPV, which is the normal discount for a project with no PEA yet (due H1 2027), a feasibility study in early 2028, a flooded pit to dewater, first production around 2032, and multi-billion capex that dwarfs the company. My DCF (five years of cash burn, then a year-5 value for a permitted, feasibility-stage project) gives about C$1.00 per share, roughly the price. Rating 5.0: a fairly priced copper option with buyout optionality, not a mispricing; trade setup 4.0 because the PEA is a dated catalyst and three majors circle it, but I cannot say what the market is getting wrong.
Flow: Glencore still holds ~107M shares (11.6%) after selling 21.5M in July 2026 and is a likely seller on strength; 99M warrants at C$0.36 and 26M options (~13% of the count) keep converting, and more equity will be needed by 2028. Against that, Agnico and Hudbay bought the C$25M flow-through at C$2.64 on Nov 4 2026 and Hudbay has rights to top up toward 9.9%.
A deep dive would have to establish: Will the H1 2027 PEA show a Gaspé mine whose after-tax NPV, at a conservative copper price, is several times the C$1B market cap, enough to draw Hudbay, Glencore or Agnico into a buyout before the capex dilution arrives?
Research (expand)
What it is. Osisko Metals (TSX: OM) owns 100% of the Gaspé Copper project, the former Noranda/Glencore Copper Mountain mine (closed 1999), and 50% of Pine Point Mining Ltd (zinc, NWT), where Appian funds everything to FID and pays a ~C$18M milestone at FID. In November it spun New Brunswick claims into Osisko Critical Minerals for 40M+4M OCMC shares (~C$11M). The 2026 MRE (effective Jan 17 2026): M&I 1,834 Mt at 0.27% Cu, 0.017% Mo, 1.57 g/t Ag (10.8 Blb Cu, 673 Mlb Mo, 93 Moz Ag); strip ratio ~1.6; pit shell at 160 ktpd throughput and US$4.50 Cu. Drilling keeps adding higher-grade skarn to the south (94 m at 1.47% Cu, Oct 7). Glencore keeps a 1-3% NSR, a US$20M payment at production, and 100% offtake.
What the market believes. This is a copper call option on a very large, low-grade, brownfield porphyry in a top jurisdiction. The price moved with copper and the AI trade: up 10x from 2023, down 40% since September as LME copper fell ~11% from its record and juniors fell 2-3x as much. Glencore converted its US$25M debenture in July (~128M shares) and sold 21.5M at ~C$1.60; it still holds ~107M (11.6%).
What it earns today. Nothing. Cash overhead runs about C$15M/yr plus ~C$15-20M/yr of stock comp (21.4M of compensation in 9M, 12.5M of it SBC); exploration ~C$35-45M/yr. Unlevered owner earnings ~ -C$30M/yr before exploration. The C$157M 9M net loss is mostly a non-cash C$132.6M fair-value loss on the Glencore convertible, now gone.
Five years. Burn of roughly C$60M, 75M, 90M, 120M, 150M (2027-2031: drilling, PEA H1 2027, feasibility early 2028, ESIA and permits, dewatering from 2027, early works), funded by the ~C$113M cash, ~C$36M of in-the-money warrants (99M at C$0.36) and more equity. In year 5 it is neither grower nor corpse: a permitted, feasibility-stage project awaiting a construction decision with a partner or buyer. A 58 Mtpa operation at 0.32% CuEq makes ~170 kt CuEq/yr; at US$4.50 Cu I sketch after-tax margin of ~C$700-900M/yr against ~C$4-6B capex, a project NPV8 of perhaps C$3-5B (much more at today's ~US$6 Cu, much less if costs creep). I value the company in 2031 at ~C$2.0B (0.4-0.6x NPV), range C$0.6-5B. Discounted at 10%, less the burn, plus cash and Pine Point, over ~1.06B diluted shares: ~C$1.00/share.
Fair value and multiples. EV ~C$850M, i.e. ~C$0.17 per lb of M&I copper, in line with large undeveloped porphyries. Fair value ~C$1.05-1.10; base IRR ~8%/yr, below our hurdle. A takeover (Hudbay has a 9.9% top-up right path; Glencore owns the offtake; Agnico participates) is the most plausible way to beat that, but no process exists.
Management, risks, competition. The Osisko group has built and sold mining projects before; spending is disciplined and disclosure clean. Risks: capex several times the market cap (heavy dilution or a sell-down at the project level), low grade with negative-TC concentrate markets, the PEA disappointing on strip or capex, the flooded pit and town next to the pit (Murdochville), copper volatility. It competes for capital with other large Canadian porphyries.
Sentiment: 5/10. Loved through summer, now a falling junior with strategic holders still adding (Agnico and Hudbay paid C$2.64 for flow-through shares on Nov 4, a tax-driven premium).
- https://osiskometals.com/wp-content/uploads/2026/11/Osisko-Metals-MD-and-A-Q3-2026.pdf
- https://stockanalysis.com/quote/tsx/OM/statistics
- https://mining.com.au/osisko-raises-25-5-million-for-quebec-exploration/
- https://www.miningweekly.com/article/glencore-canada-reduces-osisko-shareholding-to-119-2026-07-28
- https://www.miningweekly.com/article/major-players-back-osiskos-capital-raise-for-gasp-copper-2025-12-04
- https://news.metal.com/newscontent/HPSJFB5W7OIYMM4YPU4ZEOJU7MTVWGRUBNTCQ2A-lme-copper-hits-four-month-low-as-ai-selloff-and-china-weakness-weigh
- https://www.mining.com/osisko-metals-seeks-financing-partner-on-huge-gaspe-copper-project-in-quebec
Financials — Adjusted
Adjusted · TTM 2026-Q3 · CAD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Gross profit | -0.32 | -0.37 | 0.01 | -0.11 | -0.01 |
| Operating expenses | -3.09-151% | -5.10-218% | 4.32+13% | 3.84-73% | 14.0 |
| ▸Adj EBITDA | 3.17 | 5.07 | -4.32 | -3.97 | -14.0 |
| ▸Adj OCF | -18.6 | -16.5 | -3.16 | -5.05 | -2.98 |
| CapEx | -43.7 | -46.0 | -5.90 | -10.5 | -24.1 |
| Adj FCF | -62.2 | -62.5 | -9.06 | -15.6 | -27.0 |
| Interest expense | 6.92 | 8.16 | 6.01 | 2.74 | 0.06 |
| ▸Adj net income | -5.21 | -8.94 | -11.0 | -5.68 | -18.5 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -116 | -88.0 | -12.8 | -14.0 | 13.1100% | -13.9 |
| FCF (OCF−capex) | -143 | -36.8 | -56.3 | -8.32 | -14.0-107% | -27.4 |
| Net income | -206 | -157 | -19.5 | -21.4 | 11.386% | -18.6 |
| ▸Capital returned | -151 | -37.1 | 6.64 | -95.8 | -12.4-95% | -12.6 |
| Buybacks | -167 | -42.4 | -1.43 | -102 | -8.47 | -12.7 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 22.1 | 5.12 | 8.16 | 6.01 | 2.74 | 0.06 |
| Debt paid down | -6.62 | 0.17 | -0.08 | 0.00 | -6.70 | 0.00 |
| ▸Reinvestment | 103 | 26.6 | 48.8 | -0.76 | 4.0531% | 24.1 |
| Capex (PP&E) | 113 | 26.6 | 46.0 | 5.90 | 10.5 | 24.1 |
| Intangibles & M&A | -9.90 | 0.50 | 2.75 | -6.66 | -6.49 | 0.00 |
| Leases signed (net Δ) | -0.43 | -0.54 | -- | -- | -- | -- |
| Retained / other | 40.5 | 4.89 | -57.5 | 100 | 7.6959% | -14.8 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 12 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 318 | 287 | 245 | 144 | 105 |
| ▸Liabilities (total) | 45.9 | 127 | 73.8 | 39.8 | 19.4 |
| Net debt (incl. leases) | -90.0 | 8.39 | -53.1 | 29.8 | 2.98 |
| Net debt / Adj EBITDA | -28.4 | 1.65 | -- | -- | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | 0.46 | 0.62 | -0.72 | -1.45 | -243 |
| Shares outstanding | 917 | 683 | 339 | 257 | 226 |
| Dilution (YoY) | +31.4% | +101.8% | +32.0% | +13.7% | +11.8% |
| Employees | 21.0 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | -- | -- | -- | -- | -- |
| Adj EBITDA margin | -- | -- | -- | -- | -- |
| Adj OCF margin | -- | -- | -- | -- | -- |
| Adj FCF margin | -- | -- | -- | -- | -- |
| Net income margin | -- | -- | -- | -- | -- |
| Adj NI margin | -- | -- | -- | -- | -- |
| ROIC (adj, after-tax) | 0.8% | 1.5% | -1.5% | -2.9% | -12.1% |
| Cost of debt | 5.7% | 12.2% | 15.5% | 15.5% | -- |
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| LVM CAPITAL MANAGEMENT LTD/MI | $40K | $0.66 | +$15K | +$40K | -0.4% | $1.06B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2025 Q2 | 0M | — | -7M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2025 Q3 | 0M | — | -7M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2025 Q4 | 0M | — | -5M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2026 Q1 | 0M | — | -18M | $-0.03 | $-0.03 – $-0.03 | 2 |
| 2026 Q2 | 0M | — | -4M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2026 Q3 | 0M | — | -5M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2026 Q4 | 0M | — | -5M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2027 Q1 | 0M | — | -5M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2027 Q2 | 0M | — | -5M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2027 Q3 | 0M | — | -5M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2027 Q4 | 0M | — | -5M | $-0.01 | $-0.01 – $-0.01 | 1 |