Stocks/ORSTED.CO

ORSTED.CO

Ørsted A/Sv3 4.5/10 · 2026-11-13
Utilities·Renewable Utilities
140.35 DKK
183.7B DKK market cap
v3 Rating
4.5/103.0–6.0
Setup
4.0/103.0–5.0
Fair Value
115.00 DKK85.00 DKK–150.00 DKK-18%
DCF (10%)
100.00 DKK-29%
Base IRR
+4%-5%–+12%
Visibility
moderate±28%
Rating
Revenue (TTM)
83.3B DKK
Owner Earnings
kr21.0B
Next-Yr Owner Earnings
-kr4.0B
Growth
+5.0% × 3y
P / Next-Yr OE
--
Net Debt
kr70.0B

Ørsted A/S, a company founded in 1972 and based in Fredericia, Denmark, specializes in the complete lifecycle of sustainable energy infrastructure. Alongside its subsidiaries, it undertakes the development, construction, ownership, and operation of a wide array of renewable assets, including offshore and onshore wind farms, solar power installations, energy storage facilities, sites for producing renewable hydrogen and green fuels, and bioenergy plants. The company's activities are organized into three principal divisions: Offshore, Onshore, and Bioenergy & Other. The Offshore segment is dedicated to developing, building, owning, and managing offshore wind farms in significant international markets such as the United Kingdom, Germany, Denmark, the Netherlands, the United States, and Taiwan. This division also leads efforts in renewable hydrogen and green fuels development across Europe, as well as e-methanol projects on the U.S. Gulf Coast. The Onshore segment focuses on the development, construction, ownership, and operation of land-based wind and solar power assets, often incorporating integrated energy storage, throughout the United States and Europe. The Bioenergy & Other segment is responsible for generating heat and electricity, alongside providing ancillary services, from its combined heat and power (CHP) plants predominantly in Denmark. Additionally, this division trades power and gas in both wholesale and business-to-business markets and actively optimizes its gas portfolio. Originally known as DONG Energy A/S, the company formally rebranded to Ørsted A/S in November 2017.

2-Year Price History

$143.45-34.4%
$120$140$160$180$200Initial target $115.00 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
4.53.0–6.0
Setup
4.03.0–5.0
Fair value (DKK)
115.0085.00 – 150.00
Upside vs 140.35
-18%
DCF (10%)
100.0070.00 – 135.00-29%
Base IRR
4%-5% – 12%
Visibility
moderaterange ±28%
Sentiment
4/10
Reputation
5/10
2026-11-13 · claude-opus-5-5 · priced at 143.45

Ørsted is the world's largest offshore wind developer and operator. It has come back from near-junk: a DKK 60bn rights issue, about DKK 46bn of divestments, and a construction program now on time and on budget. Revolution Wind and Borkum Riffgrund 3 are now operating, and 9M EBITDA is up 19% to DKK 20.2bn. The bull case is real. EBITDA should go from about DKK 29bn in 2026 to more than 32bn in 2027 and about 38bn in 2028 as 8.1 GW commissions. Closing Greater Changhua 2 cuts net debt by about DKK 25bn. Europe is moving to CfD auctions, with more than 15 GW tendered in the next 12 months. At DKK 143.45 (12 Nov close; the pack quoted 141.95) on about 1,321m shares, market cap is about DKK 190bn. Add about DKK 70bn of senior claims: pro-forma net debt after Changhua, about DKK 35bn of hybrids, plus NCI and tax equity. That gives an EV of about DKK 260bn, plus about DKK 50bn of construction capex still to spend, against about DKK 38bn of 2028 EBITDA. That is about 8x, which looks cheap next to infrastructure buyers who pay 10-12x for operating CfD wind. The catch is that wind farms are wasting assets. Subsidy roll-offs of DKK 10-15bn around 2030 erode EBITDA. ROCE is 7.4%, new projects are underwritten at WACC plus 150-300bp, so roughly a 7-9% unlevered IRR, below our 10% hurdle, and the dividend will be modest. In a run-off DCF at 10%, with about DKK 26-29bn of unlevered FCF a year from 2029 and an 8.5x terminal for slowly declining contracted cash flows, I get about DKK 100/share. My fair value is DKK 115, which gives some credit for private-market values. The market already prices the de-risking: the stock is up from 107 to 143. I see no mispricing worth chasing. Rating 4.5, interest 4: pass.

A deep dive would have to establish: Can Ørsted replace DKK 10-15bn of subsidy roll-offs in the early 2030s with new projects that earn more than a 10% cost of equity-like hurdle, or is it a slowly depleting contracted-asset portfolio worth about 8x EBITDA?

Owner earnings, TTM
kr21Bkr16B – kr25B
Realistic peak profit
kr30Bkr24B – kr34B
Growth rate
5.0%0.0% – 10.0%
Years of growth
32 – 5
Market cap
kr190Bkr186B – kr193B
EV
kr260Bkr245B – kr280B
Net debt
kr70Bkr58B – kr85B
Capital return / cap
1.7%1.0% – 3.0%
P/E
18.0×14.0× – 24.0×
EV/EBITDA
8.9×7.5× – 10.0×
FCF yield
5.0%-3.0% – 12.0%
Projected FCF, base case (DKK millions)
Y1-kr4.0B-kr15B – kr5.0B
Y2kr14Bkr5.0B – kr22B
Y3kr29Bkr20B – kr34B
Y4kr28Bkr18B – kr33B
Y5kr26Bkr16B – kr31B
Competition: Auction-based offshore wind is fiercely competitive (RWE, Iberdrola, Equinor, TotalEnergies, infrastructure funds), and returns are bid down to WACC plus a thin spread, so Ørsted's scale and execution record earn only modest excess returns.
Governance: The Danish state (50.1%) and Equinor (about 10%) control the register, which makes a takeover premium unlikely; the company also needed a DKK 60bn deeply discounted rights issue in 2025 after repeated US project write-downs.
Research (expand)

What it does. Ørsted builds, owns and operates offshore wind farms in the UK, Germany, Denmark, Poland, Taiwan and the US. It has 11.1 GW of offshore capacity installed and 7.2 GW under construction. It also has a US onshore wind, solar and storage arm and Danish CHP/bioenergy plants. Most revenue is under CfDs, subsidies or PPAs.

What the market believes. After the 2023-25 disasters (US impairments, Hornsea 4 cancelled, the rights issue at DKK 66.6), the market now treats Ørsted as a de-risked, levered portfolio of contracted assets with little growth after 2028. That view is about right. Execution has been clean for 20 months. The US stop-work risk mostly faded once Revolution reached COD, and the 10% ITC adder is confirmed. Sunrise is 60% complete and due in H2 2027. Hornsea 3 has a grid backfeed. The bull would argue that 10-12x private-market multiples for operating offshore wind, plus Europe's energy-security push (gas at EUR 100/MWh, German CfDs), justify a rerating. I don't think the gap is large enough to beat 10%.

What it earns today. 2026 EBITDA guidance is above DKK 28bn, likely about 29bn. Some of that is Hornsea 3 construction-agreement profit and trading, which won't recur. Less about 2bn of cash tax and about 3bn of sustaining capex, unlevered owner earnings are about DKK 21bn. Statutory 9M FCF was -DKK 12.5bn because of the build-out, and 9M profit was DKK 2.6bn after DKK 6bn of impairments. Note that the Q3 US impairment was driven by interest rates.

5-year FCF (DKK bn, unlevered, run-off base with no new offshore FIDs): 2027 -4 (capex to finish Sunrise, Hornsea 3 and Baltica 2, partly offset by ITCs); 2028 14; 2029 29; 2030 28; 2031 26. If they win auctions, extra capex at a 7-9% IRR is roughly value-neutral or negative at a 10% discount rate.

Year 5. This is a 'neither' business: a large contracted fleet whose subsidies roll off (DKK 10-15bn by the early 2030s, per the BNP analyst on the call). It shrinks slowly unless it keeps reinvesting at modest returns. I use a terminal of 8.5x year-5 FCF (about DKK 221bn). EV is about DKK 202bn, less about 70bn of claims (NIBD after Changhua of about 23bn, hybrids of about 35bn, plus NCI and tax equity), which gives about DKK 100/share. Confidence is moderate, because power prices, roll-offs and the hybrid amount make the range wide (70-135).

Multiples. About 8.9x 2026 EV/EBITDA, about 8x 2028 including remaining capex. P/E is high-teens on adjusted profit. The dividend starts in 2027 near DKK 2-3/share, a yield under 2%.

Management, risks, competition. CEO Errboe and CFO Westlie are disciplined and plain-spoken ('value over volume'), and they ruled out further equity or hybrid raises. Risks: US Section 232 tariffs on Sunrise imports; UK AR9 timing for Hornsea 4; Taiwan turbine incidents; merchant power price exposure as subsidies end; capital intensity, the textile problem of auction competition bidding returns down to WACC. Competitors include RWE, Iberdrola, Equinor, TotalEnergies, Vattenfall, infrastructure funds, and potentially Chinese OEM-backed bidders. The Danish state owns 50.1% (Equinor about 10%), so a buyout is unlikely.

Sentiment: 4/10. Ørsted is no longer hated. The stock is up about 35% from the August 2025 low and sits mid-range over one year, but generalists still distrust offshore wind after repeated blowups, and the sell side questions growth after 2028.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · DKK

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue83307+36%63606+8%58833-9%64602-47%122932
Gross profit-1788-110%-1716-110%16849+217%5309-79%25769
Operating expenses2268-85%0.00-100%10492-55%23162+69%13743
▸Adj EBITDA6191-50%8479-49%16582-8058-133%24309
▸Adj OCF22761+65%15926+45%10988+963%1034-92%12605
CapEx-43704-54776-42654-38223-33004
Adj FCF-20943-38850-31666-37189-20399
Interest expense8862852620542792850
▸Adj net income-19244-15965-563%3445-18900-192%20433
▸Owner's earnings5000--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA69922100%9325100%15654100%20267100%-438329059100%
FCF (OCF−capex)-107452-154%-20817-223%-31550-202%-24314-120%-9691-21080-73%
Net income-1971-3%187820%187812%-206-1%-205061498552%
▸Capital returned-74545-107%250227%-71428-456%401620%-4952-4683-16%
Buybacks-530270.00-5937837076991945
Dividends1267614715168760745617
Interest paid2125450682852620542792850
Debt paid down-55448-2713-15053-6583-16004-15095
▸Reinvestment175554251%23862256%48712311%27378135%3850337099128%
Capex (PP&E)1973032864654776426543822333004
Intangibles & M&A-25878-7450-6149-157601203361
Leases signed (net Δ)4129266685.0484160734
Retained / other1422520%-10801-116%48879312%-6365-31%-580-16908-58%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 21,252 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)377302367922298786281136314142
▸Liabilities (total)228282239936205302203345218610
Net debt (incl. leases)3778646042636804886733412
Net debt / Adj EBITDA6.105.433.84--1.37
Net debt / Adj FCF----------
Adj EBITDA / interest6.992.972.67-1.888.53
Shares outstanding13211321420420420
Dilution (YoY)+227.4%+214.4%+0.0%+0.0%-5.7%
Employees8251--------
MarginsTTM2025202420232022
Gross margin-2.1%-30.4-2.7%-31.328.6%+20.48.2%-12.721.0%
Adj EBITDA margin7.4%-12.713.3%-14.828.2%+40.6-12.5%-32.219.8%
Adj OCF margin27.3%+4.925.0%+6.418.7%+17.11.6%-8.710.3%
Adj FCF margin-25.1%+43.8-61.1%-7.3-53.8%+3.8-57.6%-41.0-16.6%
Net income margin-2.6%-2.13.0%+3.3-0.3%+31.4-31.7%-43.912.2%
Adj NI margin-23.1%-21.2-25.1%-31.05.9%+35.1-29.3%-45.916.6%
ROIC (adj, after-tax)-1.3%-0.7%2.3%-8.6%6.3%
Cost of debt0.7%2.5%6.5%4.9%4.2%

Earnings Calls

10 calls

Earnings Call · 2026 Q3

Ørsted reported Q3 2026 results with performance in line with expectations. Q3 EBITDA excluding new partnerships and cancellation fees was DKK 5.3bn, and 9M EBITDA exceeded DKK 20bn, up nearly 20% year on year on offshore ramp-up, slightly higher wind speeds and higher power prices. Offshore EBITDA was DKK 3.7bn (+68%), onshore DKK 1.0bn (+24%), and Bioenergy & Other DKK 0.4bn versus -0.1bn last year. A non-cash impairment of DKK 3.4bn on US onshore and offshore projects, caused by a 75bp rise in long-dated US rates, left net profit at -DKK 0.7bn; adjusted net profit was DKK 2.2bn. ROCE was 7.4%. Net debt rose DKK 16bn to DKK 38bn, as expected, and will fall about DKK 25bn when the 55% Greater Changhua 2 divestment closes around year-end. FFO/adjusted net debt was about 37% versus a target above 30%, liquidity exceeded DKK 105bn, and over 90% of debt is fixed rate. Full-year EBITDA guidance of more than DKK 28bn is maintained, while 2026 gross investments are lowered by DKK 5bn to DKK 45-50bn purely on payment timing. Strategically, management highlighted improving European regulatory frameworks, including Germany's draft amendment introducing CfDs, and more than 15GW of auctions in core markets in 2027, with further rounds committed for 2028-2030. Ørsted favors a disciplined, value-over-volume approach, with a 150-300bp spread to WACC, and expects to use early partnerships to limit farm-down risk. Favorable UK tax opinions on Walney Extension/Hornsea 1 and the earlier Elsam case further derisked the balance sheet. Construction is on time and on budget. Borkum Riffgrund 3 (913MW) and Revolution Wind began commercial operation, totaling 1.6GW. Greater Changhua 2b & 4 has all 66 turbines delivering power, with two awaiting commissioning, and full commissioning expected in Q4 after a blade and a thermal incident under warranty. Baltica 2 is about 45% complete, Sunrise Wind about 60% (full commissioning H2 2027), and Hornsea 3 about 40%, with initial grid connection achieved. The Blackwater 200MW solar project began construction, Ørsted has over 6GW of safe-harbored US onshore equipment, and it bought back the remaining Gunfleet Sands stakes for about GBP 15m. Safety incidents rose among own employees. In Q&A, management said they see no change to Hornsea 4 despite UK AR9 timing comments, explained the conservative guidance, described growth as slowing in 2028-2030 but continuing, said US tax credit sales are progressing, and said Sunrise is unaffected by Section 232 tariffs.

Analyst Q&A (11)
▸
Hornsea 4 is a key growth card; how does the UK Energy Minister's wish to pause before AR9 affect it, and what if AR9 slips by a year?
Kristian Tornøe Johansen · SEB
Management sees no real change in UK support for renewables or Hornsea 4; the focus is affordability and value for money, which bottom-fixed offshore wind delivers. They do not read the statements as an AR9 delay, Hornsea 4 is back in development and still important, and the timing and manner of bidding is too early to say.
▸
Why not raise full-year EBITDA guidance given strong wind output and power prices, particularly in bioenergy?
Peter Bisztyga · Bank of America
Trond Westlie said the guidance of more than DKK 28bn is right relative to analyst expectations and how the year-end looks. Market conditions are good, but Ørsted guides only on average wind speeds for the remainder of Q4.
▸
Can Ørsted plausibly deliver high single-digit EBITDA growth beyond 2028, which could require about DKK 60bn of added EBITDA and roughly DKK 0.5tn of CapEx, given subsidy roll-offs?
Harry Wyburd · BNP Paribas
Rasmus Errboe said current growth is steep (about DKK 25bn last year, above DKK 28bn this year, above DKK 32bn next year), will slow in 2028-2030 with US onshore contributing, and later growth depends on tender success. He sees Ørsted as a net growth company in the 2030s, with 15GW+ of tenders ahead, and expects to give more feedback during 2027.
▸
What is the status of US tax credit marketing, and has Treasury signed off on the 10% bonus for Revolution Wind?
Robert Pulleyn · Morgan Stanley
Trond Westlie said Revolution tax credit sales are slightly more positive than early in the year, with buyers signing up and delivery as planned. The extra 10% community element sign-off has been confirmed. Sunrise tax equity structuring is under way and not yet signed, but progressing as expected.
▸
What is the market view on project M&A while awaiting auctions, and can a sale of the US onshore business be ruled out given talk of growth in 2028-2030?
Jenny Ping · Citi
Project M&A is one of three growth buckets but is secondary to centralized tenders, where frameworks are improving. On US onshore, Errboe does not comment on M&A rumors but is pleased with the separated unit, the 6GW+ of safe-harbored pipeline and attractive projects, and confirmed growth from onshore in 2028-2030.
▸
How will Ørsted balance growth with discipline on bid returns (IRR minus WACC), and what prevents a repeat of past cost overruns?
Alberto Gandolfi · Goldman Sachs
Ørsted guides to a 150-300bp spread to WACC plus internal unlevered IRR hurdles it keeps private, under a value-over-volume approach. Evidence of control includes on-time, on-budget construction for 20 months, early partnerships to limit farm-down risk, and a robust balance sheet that avoids forced value sacrifice.
▸
Outside AR9, are there auctions where Ørsted has a strong chance, and is Germany's planned merchant-first then CfD structure appropriate?
Olly Jeffery · Deutsche Bank
Errboe declined to indicate which tenders Ørsted will pursue, noting the bid in Taiwan and upcoming tenders in the Netherlands, Belgium, Germany and the UK. He called Germany's merchant first step unnecessary and prefers going straight to CfDs, with opt-out later, because consistent CfD tendering lowers costs, though overall the direction is positive.
▸
Will Ørsted exercise options to buy back minority stakes, such as the UK CfD asset stake held by Brookfield, and how much of the DKK 7bn Revolution tax equity has been monetized?
Mark Freshney · UBS
Trond Westlie said Ørsted will not comment on how much tax equity is signed or monetized until it is close to finalized, though progress is good and assumptions will be met. There are only a few buyback options, the larger Macquarie one comes toward 2030, and buybacks should not be seen as a growth avenue.
▸
How many of the 15GW of auctions can Ørsted pursue while keeping FFO/net debt at 30%?
Louis Boujard · ODDO
Errboe clarified the 15GW includes Taiwan, and said Ørsted does not solve for the balance sheet: if value is there it will find a way, and it has a robust, flexible balance sheet.
▸
Could Ørsted consider rights issues or hybrids to fund growth if needed?
Louis Boujard · ODDO
Trond Westlie said funding would rely on early partnerships, asset-level project financing and different EPC and funding structures. Raising equity or hybrids at the Ørsted level is not an option.
▸
Does the 180-day pause on Section 232 tariffs let Sunrise Wind import remaining components under current rules and avoid future tariff risk?
Casper Blom · Danske Bank
Errboe said the proclamation has no immediate impact on Sunrise construction. Even if nothing changes for 180 days, to around May next year, the project will be far progressed. He would not specify remaining imports, noting the fabrication and import schedule was already optimized and is unchanged.

Web Traffic

orsted.com
Web rank#737,685
Est. visits/mo660K
Traffic YoY▼ 7.7%
Traffic QoQ (12w)▼ 3.7%
Web Rank History
#737,685+15,443
rankest. visits/mo
0200k400k600k800k1.0m08.2M16.5M24.7M33.0M06-0209-1512-1503-2306-2209-2111-16

Cash Runway

47.6months
WATCH

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q120.6B11.3B6.8B$5.12$4.53 – $5.721
2019 Q217.3B5.3B2.3B$1.74$1.53 – $1.941
2019 Q314.3B6.5B3.4B$2.56$2.26 – $2.861
2019 Q418.0B11.7B5.9B$4.48$3.96 – $5.001
2020 Q117.6B7.7B3.9B$2.99$2.64 – $3.341
2020 Q214.0B4.3B1.3B$0.98$0.87 – $1.101
2020 Q312.1B4.9B1.8B$1.38$1.22 – $1.541
2020 Q416.5B6.0B2.2B$1.64$1.45 – $1.831
2021 Q113.9B5.9B2.6B$1.95$1.73 – $2.181
2021 Q214.7B15.7B9.8B$7.41$6.55 – $8.281
2021 Q311.5B4.6B1.6B$1.20$1.06 – $1.351
2021 Q416.0B16.8B10.1B$7.64$6.75 – $8.531
2022 Q118.9B7.4B3.6B$2.71$2.39 – $3.021
2022 Q224.2B11.2B6.0B$4.55$4.02 – $5.091
2022 Q324.7B6.9B2.5B$1.93$1.70 – $2.151
2022 Q434.5B10.9B3.4B$2.54$2.24 – $2.831
2023 Q128.8B8.8B4.2B$3.15$2.79 – $3.521
2023 Q217.7B3.6B328M$0.25$0.22 – $0.281
2023 Q317.3B-19.9B-23.2B$-17.53$-28.11 – $0.913
2023 Q424.2B-5.2B-9.8B$-7.42$-12.51 – $-3.423
2024 Q125.7B12.2B6.5B$4.95$4.47 – $5.432
2024 Q216.6B6.2B2.0B$1.55$-11.90 – $14.992
2024 Q316.0B9.1B2.8B$2.09$-0.03 – $4.222
2024 Q426.0B14.9B7.5B$5.49$5.09 – $6.151
2025 Q121.7B17.1B8.1B$5.92$-6.43 – $13.993
2025 Q216.5B2.0B-3.5B$-2.52$-5.44 – $0.412
2025 Q315.8B4.5B-340M$-0.25$-0.40 – $-0.102
2025 Q420.5B3.4B474M$0.34$-0.20 – $1.053
2026 Q123.0B10.5B4.3B$3.09$2.87 – $3.471
2026 Q216.6B7.1B1.6B$1.17$1.08 – $1.311
2026 Q315.5B6.8B2.8B$2.06$1.91 – $2.311
2026 Q422.1B12.9B6.1B$4.41$4.39 – $4.442
2027 Q124.2B11.9B5.0B$3.60$3.34 – $4.041
2027 Q218.0B7.4B1.4B$1.00$0.93 – $1.121
2027 Q318.5B7.7B1.4B$1.00$0.93 – $1.121
2027 Q424.6B14.5B5.9B$4.32$4.01 – $4.841
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Ørsted is transitioning from a financially stressed, capital-intensive developer into a more disciplined renewable infrastructure owner. The latest quarter was operationally encouraging: first-half EBITDA excluding partnerships and cancellation fees was about DKK 15 billion, projects were reported on schedule and budget, liquidity exceeded DKK 115 billion, and management maintained 2026 EBITDA guidance above DKK 28 billion. The completed divestment program, rights issue and prospective U.S. tax-credit proceeds materially reduce near-term financing risk. The central question is not whether the construction portfolio can produce EBITDA, but how much of that EBITDA becomes owner earnings after capex, interest, working capital and required reinvestment. The historical record is poor on this measure, with persistent negative adjusted FCF and a sharply elevated net-debt-to-adjusted-EBITDA ratio in the supplied financials. The portfolio also remains exposed to U.S. policy and tariffs, project completion risk, auction pricing and a possible late-decade growth gap. The latest call improves the trajectory but does not eliminate the structural uncertainty. Management's refusal to quantify work in progress or explain how ROCE can recover from roughly 6.5% to above 13% is a meaningful limitation. I therefore assign the largest probability to successful but capital-intensive execution rather than to a rapid return to high-quality compounding.

Trade Signal

Trade rating
-0.8/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-08-13 · saw 142.60 DKK-1.6% since

No trade: Ørsted's operational recovery is credible, but the current price is approximately fair value while negative free cash flow, capital intensity and balance-sheet uncertainty leave insufficient margin of safety.

Temporary mispricing+0.5

The recent move has been a partial recovery from the 2025 low, followed by a rise to DKK 170.35 in early May and a decline to DKK 142.60. The study attributes the positive fundamental legs to European onshore divestment, construction progress, the Revolution Wind legal resolution and expected tax-credit proceeds; the more recent weakness appears related to ongoing macro, U.S. policy and funding concerns rather than a new company-specific collapse. The 4% fall on the 13 August earnings release looks like a modestly negative digestion of an operationally solid print, not a panic overreaction. The price is broadly consistent with the facts, with at most a small temporary undershoot.

Market view-1.0

The market appears mixed rather than euphoric: the stock is up 24% over one year but down 12% over three months and 16% from its 52-week high. Investors recognize the recovery story and recent project progress, yet remain skeptical because of the prior U.S. offshore-wind setbacks, capital intensity, leverage, weak FCF and policy/tariff uncertainty. The 4% post-earnings decline suggests the strong operational print was not enough to change the market's core concern about cash conversion. Positioning data such as short interest, options skew and retail flows is not provided, so there is no basis for calling the stock crowded or heavily shorted.

Inflectionwindow ~3mo+2.0

There is a constructive operational inflection as the 8.1 GW construction portfolio approaches completion, Revolution Wind resumes, and divestments plus tax-credit proceeds improve funding. But this is substantially visible in the current narrative and analyst scenarios. The critical, unproven step is conversion of EBITDA into owner earnings and sustained positive free cash flow; current consensus and the study do not establish that this is imminent.

Catalysts
  • ▲Q3 2026 · Borkum Riffgrund 3 commissioning — More than 99% complete; successful commissioning would reinforce the execution and EBITDA-recovery narrative.
  • ▲Late Q3–Q4 2026 · Greater Changhua 2b and 4 commissioning — Projects are approximately 85% complete; completion and the planned 50% Changhua 2 divestment could support cash generation and deleveraging.
  • ▲H2 2026 · Revolution Wind commercial operations — Expected in H2 2026; confirms recovery from the BOEM dispute and enables further U.S. tax-credit monetization.
  • ▲H2 2026–early 2027 · Sunrise Wind construction progress and tax-credit monetization — Further construction milestones and tax-equity proceeds would reduce funding pressure, though U.S. tariff and policy risks remain.
  • •Late 2026 · Q3 2026 earnings and full-year guidance update — The key test is whether project commissioning, EBITDA guidance above DKK 28bn and balance-sheet improvement are translating into cash generation.
  • ▲Early 2027 · First dividend announcement — A modest dividend is expected with the 2026 annual report, potentially broadening the shareholder base but likely too small to drive a major rerating.
Flow-2.0

Asset divestments and expected tax-credit proceeds are positive funding flows, while the reinstated dividend should eventually improve shareholder appeal. Against that, the company remains highly capital intensive, has no meaningful current FCF yield, and reported TTM dilution of 215%, although the share-count data is explicitly unreliable and may reflect corporate actions. No active buyback or meaningful insider-buying signal is provided.

Floor / Ceiling-2.0

There is no hard floor at the current price. Liquidity above DKK 115bn, the construction portfolio, asset-sale proceeds and expected tax-credit monetization provide support, but net debt is rising, free cash flow is deeply negative and the bear case shows equity value could be effectively wiped out if project economics deteriorate. The main ceiling is the company's need to preserve capital and potentially issue equity or hybrids if cash conversion disappoints.

Buyability

Moderately buyable for investors seeking European renewable-infrastructure exposure, especially if project execution and balance-sheet repair continue. However, the absence of demonstrated free cash flow, capital intensity, U.S. policy risk and uncertain share-count data make it difficult to attract incremental buyers purely on valuation.

Fear vs Greedfear 8/10 (+1.0)greed 7/10 (+2.0)

Fear is slightly stronger than greed. Operational execution is encouraging and the project pipeline offers upside, but at this price the stock already requires successful commissioning, tax-credit monetization, lower leverage and eventual FCF conversion. The downside is not adequately protected by current earnings or assets.

Valuation

Our Target
58.0B DKK-68%
Market Should Pay
45.2B DKK-75%
target ×0.78 (fear discount)
Current Market Cap
183.7B DKKBullish
What Changed
transcript · 2026-08-13
+8%fair value on this information

The genuinely new information is that first-half 2026 EBITDA excluding new partnerships and cancellation fees reached approximately DKK 15 billion, more than DKK 1 billion above the prior-year period; the major construction projects remain on schedule and on budget; and management expects to begin a modest dividend in 2027 under the new 2026-2028 policy. The call also newly clarified that Sunrise Wind tax-credit marketing will not begin until early 2027 and that management still cannot quantify work in progress or provide a clear ROCE bridge.

▸ How the cases moved

The latest quarter raises the base-case equity value from roughly DKK 72,000M to DKK 81,000M as first-half EBITDA outperformed, project execution remained on schedule and balance-sheet liquidity strengthened. The bull case rises from about DKK 155,000M to DKK 170,000M because Revolution Wind progress and improving tax-credit monetization reduce U.S. downside risk. The bear case probability falls modestly from 0.28 to 0.25, while base rises from 0.52 to 0.55 and bull from 0.20 to 0.20; the improvement is operational, not yet a proof of superior cash returns.

2-Year Plausible Outcomes
bear25%
0M DKK
rev -5%/yrOE $7000M

U.S. policy, tariffs, project delays or weak auction economics consume the expected cash generation from the construction portfolio. EBITDA remains volatile, owner earnings stay low after maintenance capex and interest, and leverage absorbs essentially all enterprise value. Equity is effectively wiped out without requiring formal insolvency.

▸ Valuation

5x DKK 7,000M owner earnings = DKK 35,000M EV − DKK 35,000M terminal net debt = DKK 0M equity

base55%
81.0B DKK
rev +6%/yrOE $12000M

The 8.1 GW construction portfolio is completed broadly on schedule, 2026 guidance is achieved and EBITDA rises above DKK 32 billion in 2027, but cash conversion remains held back by heavy capital spending, construction working capital and modest returns on new projects. Net debt declines as divestments and tax-credit proceeds arrive, while the late-decade growth gap limits the multiple.

▸ Valuation

8x DKK 12,000M owner earnings = DKK 96,000M EV − DKK 15,000M terminal net debt = DKK 81,000M equity

bull20%
170.0B DKK
rev +12%/yrOE $18000M

Revolution Wind, Sunrise Wind, Changhua, Baltica 2 and Hornsea 3 ramp successfully, tax-credit monetization proceeds as planned, and European offshore-wind auctions provide attractive reinvestment opportunities. Owner earnings catch up with EBITDA as construction spending normalizes and leverage falls, restoring Ørsted's reputation as a high-quality renewable infrastructure compounder.

▸ Valuation

10x DKK 18,000M owner earnings = DKK 180,000M EV − DKK 10,000M terminal net debt = DKK 170,000M equity

▸ Target Rationale

The probability-weighted, discounted scenario value is DKK 62,840M. I set the analytical target below that level at DKK 58,000M because the scenario arithmetic likely gives too much credit for EBITDA conversion while the company has not demonstrated sustained positive free cash flow, ROIC recovery or transparent work-in-progress economics. The target does not include an additional emotional discount; that is captured separately in the fear-greed modifier.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now5/10
Trajectory7/10
Risk8/10
Governance5/10
Insolvency prob (2yr)4%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Strong Q1 2026 Operational Performance: Ørsted reported robust operational results for the first quarter of 2026, with EBITDA (excluding new partnerships and cancellation fees) rising 11% year-over-year to DKK 9.5 billion. This performance was primarily driven by a 27% increase in offshore generation compared to Q1 2025, powered by wind speeds slightly above normal and the successful ramp-up of the Borkum Riffgrund 3 wind farm in Germany and Greater Changhua 4 in Taiwan.
  • U.S. Impairments Drag Net Profit: Despite the operational EBITDA growth, Ørsted’s Q1 2026 net profit fell 46% year-over-year to DKK 2.62 billion. The bottom line was heavily impacted by a DKK 1.4 billion non-cash impairment across its U.S. offshore and onshore assets, triggered by higher long-dated U.S. interest rates, as well as associated non-cash tax effects.
  • Completion of European Onshore Divestment: In April 2026, Ørsted completed the sale of its entire European onshore business to Copenhagen Infrastructure Partners (CIP) for EUR 1.44 billion (approx. DKK 10.7 billion). This transaction formally finalized Ørsted’s core divestment program, allowing the company to refocus its European strategy purely on offshore wind.
  • Contemplated U.S. Onshore Asset Sale: In May 2026, reports surfaced that Ørsted is exploring a potential sale of more than $1 billion of its U.S. onshore renewables portfolio, continuing its balance sheet recovery strategy by recycling capital out of non-core onshore assets.
  • Guidance and Dividend Reaffirmation: Ørsted maintained its full-year 2026 EBITDA guidance of above DKK 28 billion (excluding new partnerships and cancellation fees) and confirmed its intention to reinstate its dividend beginning with the 2026 financial year.
▸ Thesis-test Findings
Revolution Wind Commission Status and BOEM Litigation Updates

This finding provides a strong positive catalyst for the bull case, removing a major source of political and financial risk. Following a lease suspension and stop-work order issued by the Bureau of Ocean Energy Management (BOEM) on December 22, 2025—which cited national security concerns near East Coast population centers—the U.S. District Court for the District of Columbia granted a preliminary injunction in Ørsted's favor on January 12, 2026. This legal victory allowed Ørsted to immediately resume construction. Consequently, Revolution Wind delivered its first power to the New England grid in Q1 2026. The 704 MW project (a 50/50 joint venture) is now more than 90% complete and remains on track to achieve full commercial operations in the second half of 2026, averting billions of dollars in feared write-downs.

Orsted Asset Divestment Pricing Hornsea 4

Our search indicates that Hornsea 4 has not been divested. Instead, Ørsted made the strategic decision in May 2025 to discontinue the 2.4 GW project in its current form due to macroeconomic headwinds, including soaring supply chain costs and high interest rates, exiting its Allocation Round 6 CfD. In its Q4 2025 earnings call, management confirmed they are reconfiguring the project for potential future development while holding the seabed lease and key permits.

To test the bear/bull case on divestment *pricing*, the completed Hornsea 3 transaction serves as the nearest proxy. In late December 2025, Ørsted finalized a 50% stake sale of the 2.9 GW Hornsea 3 project to Apollo-managed funds for approximately DKK 39 billion (~$6.5 billion). This represents a robust transaction multiple of approximately DKK 27 million/MW, indicating that high-quality offshore wind assets still command premium valuations. Across 2025 and 2026, Ørsted’s entire divestment program raised DKK 46 billion, significantly beating its DKK 35 billion target and validating their capital recycling model.

US Offshore Wind Investment Tax Credit Monetization Terms 2026

This finding supports the bull case for balance sheet rehabilitation. Under the One Big Beautiful Bill Act (OBBBA), enacted in July 2025, the U.S. government placed strict limitations on future clean energy tax credits, implementing a July 4, 2026 deadline to start construction. Crucially, however, the OBBBA preserved Section 6418 tax credit transferability rules intact. Since Ørsted's primary offshore assets (Revolution Wind and Sunrise Wind) are "legacy" projects already under construction, they escape OBBBA's transition rules. In its Q1 2026 earnings call, Ørsted announced it received initial tax equity contributions during the quarter, generating a deferred tax equity liability at Revolution Wind and Old 300 BESS of just under DKK 900 million. Ørsted intends to monetize the majority of the tax credits for the Revolution Wind project via the transferability market, which will limit any future negative tax impacts. The company expects total tax equity/ITC proceeds across its 50% stake in Revolution Wind and 100% stake in Sunrise Wind to reach approximately DKK 25 billion, which significantly reduces external funding pressures.