PEG
Public Service Enterprise Group Incorporatedv3 4.5/10 · 2026-11-06Public Service Enterprise Group Incorporated (PSEG) is an energy provider primarily operating through its subsidiaries in the Northeastern and Mid-Atlantic United States. The company's business activities are structured into two primary segments: PSE&G and PSEG Power. The PSE&G division is responsible for transmitting electricity and distributing both electricity and natural gas to residential, commercial, and industrial customers. This segment also commits resources to solar power generation projects and various energy efficiency initiatives, as well as offering appliance service and repair. By December 31, 2021, its substantial infrastructure included 25,000 circuit miles of electric transmission and distribution systems, supported by 862,000 utility poles. It also featured 56 switching stations with a total capacity of 39,353 megavolt-amperes (MVA) and 235 substations with a combined capacity of 9,285 MVA. The electric network was further managed by four main and five sub-electric distribution headquarters. On the gas side, PSE&G maintained 18,000 miles of gas mains, twelve primary and two secondary gas distribution headquarters, a single meter shop, and 58 natural gas metering and regulating stations. Public Service Enterprise Group Incorporated was established in 1985 and is headquartered in Newark, New Jersey.
2-Year Price History
Valuation v3 Opus worker · 2026-11-06
PSEG (NYSE: PEG, $72.61 close on 2026-11-06; the pack's last close was $73.10) is New Jersey's largest regulated electric and gas utility, PSE&G, which makes about 80% of earnings. It also owns a 3.7 GW merchant nuclear fleet with a federal production tax credit (PTC) price floor. The stock is down about 16% from its $86 one-year high and sits in the lower third of its range. Causes: a sector-wide utility sell-off as the 10-year Treasury rose to about 4.9-5.2% and the Fed raised rates; Governor Sherrill's push to keep rates flat ahead of an early PSE&G rate filing; a widening gap between the PECO zone (where PSEG's nuclear output is paid) and PJM West Hub, which caps nuclear upside; the loss of a 50bp transmission ROE adder from 2027 (about $40M a year); and a new Salem 1 thermal-shield outage. The business is steady: 2026 operating EPS is guided to $4.28-4.40 (21 straight years of meeting guidance), with 6-8% EPS growth a year through 2030 on $22.5-25.5B of regulated capex, no new equity, and a 3.7% dividend. At 16.7x 2026 and about 15.7x 2027 EPS, about 12.5x EV/EBITDA and about 20x EV to unlevered owner earnings of roughly $3.0B, it is fairly priced for a utility but nowhere near our hurdle. Our 10% unlevered DCF gives only about $41 a share, because free cash flow after growth capex is roughly zero for five years and about 40% of EV is debt. The equity-level base case (6.5% growth, 3.7% yield, flat multiple) returns about 9% a year. Sentiment is sour, not capitulated (4/10): the sector is the most oversold since 2023, but the Street is still mostly Buy with targets around $85. Rating 4.5: a sound, trustworthy compounder at a fair price, not a 50%-in-a-year idea; at most a covered-call income holding given about 23% implied volatility. Research rating 3: the upside levers (a nuclear contract with a data center, a constructive NJ rate outcome, falling rates) are real but worth about 15-25%, not 40%+.
A deep dive would have to establish: Whether the year-end PSE&G regulatory-lag filing and BPU Phase 2 reforms protect a roughly 9.6% earned ROE, and whether a large data-center contract for existing nuclear output plus uprates at a premium to PECO forwards is close enough to push 2027-2030 EPS growth to the top of 6-8%.
Research (expand)
What the company does
- PSE&G (about 80% of operating earnings, about $1.75B in 2026E): the regulated electric transmission and distribution plus gas distribution monopoly for about 2.4M electric and 1.9M gas customers in New Jersey. Rate base grows 6-7.5% a year (FERC formula transmission; BPU distribution at a 9.6% ROE from the 2024 settlement). The Conservation Incentive Program decouples margin from weather and sales volumes.
- PSEG Power & Other (about $450M of 2026E operating earnings): about 3.7 GW of nuclear (100% of Hope Creek, 57% of Salem 1 and 2, 50% of Peach Bottom), about 31-32 TWh a year at 92-95% capacity factors, hedged forward, with the inflation-indexed federal nuclear PTC (through 2032) as a price floor. Also the PSEG Long Island service contract, extended to 2030.
Investment case
- Bull: a utility with merchant-nuclear upside in a capacity-short PJM (the auction cleared at the $325/MW-day cap for 2028/29). Hyperscalers are signing nuclear power purchase agreements; Constellation's Google deal includes a 200 MW Salem uprate, of which PSEG's share is 112 MW. NJ lifted its ban on new nuclear and PSEG's Salem site holds an early site permit. Management says the 6-8% EPS CAGR excludes new nuclear contracts. No equity is needed through 2030, and the dividend has risen 15 years in a row.
- Bear: (1) The 10-year Treasury is near 5%, above the dividend yield, so the bond-proxy trade has unwound. (2) NJ affordability politics: Sherrill's Executive Orders 1 and 2 and the BPU's Phase 2 work on performance-based rates, earnings sharing and shared savings, just as PSE&G files early to fix a growing regulatory lag (Q3 PSE&G earnings fell 1.7% year over year as depreciation and interest outran recovery). (3) PECO now trades about 30% below West Hub, versus about 20% historically. (4) The 50bp transmission ROE adder ends 2027-01-01, about $40M of net income or $0.08/share. (5) Salem 1 thermal-shield degradation has extended its outage, scope unknown. (6) Passaic River Superfund (EPA estimates $2.3B plus $550M across many responsible parties; PSEG has accrued about $66M) and legacy fossil-site environmental costs.
- Verdict: a fairly priced quality utility. A re-rate needs falling bond yields or a large nuclear contract, and even then the one-year upside is about 15-25% plus the dividend. It fails the 50% screen.
What it earns today (unlevered owner earnings, 2026E, $M)
From the Q3 2026 8-K and 10-Q. 9M 2026: revenue $9.42B, GAAP operating income $2.16B (after $251M of Q3 mark-to-market and NDT losses), D&A $975M, interest expense $821M, capex $2.30B, operating cash flow $2.54B, cash taxes roughly nil. Debt was $25.63B against $837M of cash; 498.5M shares outstanding on 2026-10-30.
| Item | Value |
|---|---|
| Non-GAAP operating earnings ($4.34 x about 501M shares) | 2,175 |
| + after-tax interest (about 1,110 x 0.72) | about 800 |
| = NOPAT (SBC already expensed) | about 2,975 |
| + D&A less maintenance capex (about equal) | about 0 |
| Unlevered owner earnings | about 2,950-3,000 |
| Adjusted EBITDA | about 4,900 (about 61% reaches owners) |
| FCF after all capex, before interest | about -200 |
| FCF after interest and dividends (funded with debt) | about -2,300 |
EV is about $61.0B ($36.2B market cap + $24.8B net debt). EV/owner earnings is about 20.5x (a 4.9% unlevered yield) and EV/EBITDA about 12.5x. After after-tax interest the equity earns about $2.18B a year, a 6.0% yield on the market cap: 3.7% is paid as dividends and the rest goes into rate base alongside about $2B a year of new debt. Perpetuity check at 10%: $3.0B / 10% = $30B, less $24.8B of net debt, is about $10/share. A 10% hurdle does not fit a utility whose cost of capital is about 6.5%.
Five-year FCF (before interest, after all capex incl. growth; $M, mid)
Assumptions: NOPAT grows about 6.5% a year; capex is about $5.0-5.6B a year (back-loaded $22.5-25.5B regulated plan plus Power); D&A rises from $1.4B to $1.9B; deferred taxes add about $0.2B a year.
| Year | NOPAT | FCF |
|---|---|---|
| 2027 | 3,170 | -400 |
| 2028 | 3,380 | -250 |
| 2029 | 3,600 | -100 |
| 2030 | 3,830 | +100 |
| 2031 | 4,080 | +300 |
In five years PEG is very likely still a regulated utility growing 5-7% and earning about $6.0/share ($5.5-6.4), with about $45-48B of rate base and about $36-38B of net debt: a growing income stream, not a corpse. Confidence is high on the shape of that future and moderate on the earned ROE, which depends on NJ politics.
Fair value and multiples
- DCF as prescribed: a 10% discount rate; five years of FCF (present value about -$0.4B); terminal value = 2031 owner earnings (maintenance capex only) of $4.08B x 18x, present value about $45.6B. EV is about $45.2B; less $24.8B of net debt, that is about $41/share ($31 at 16x, $51 at 20x). Regulated returns on new capex (about 6.5-7% unlevered) are below a 10% hurdle, so growth adds little value at that rate.
- Equity-level base case: 2031 EPS of about $6.0 x 16x is about $96, plus about $15 of dividends, so about 9% a year from $72.61.
- Market-relative view: 16.7x 2026E and about 15.7x 2027E EPS, below PEG's 3-year average of about 18-19x. Street targets run $78-92 (Truist $78 Hold, Citi $84 Neutral, Jefferies $89 Hold, Morgan Stanley $91 OW; consensus about $85-88).
- Fair value about $74 ($62-86): roughly the price, so a fair deal with no margin of safety against our hurdle. A buyout is implausible at this size in a regulated NJ setting. Net debt to EBITDA is about 5.1x, normal for a BBB+/Baa1-type utility.
Management, risks, competition
LaRossa (CEO) and Cregg (CFO) are conservative and credible: 21 years of meeting guidance, no equity in the plan, 15 years of dividend increases, and the fossil and solar businesses sold off to de-risk. There is no insider buying, only routine sales and tax withholding. PSE&G is a state-granted monopoly with top J.D. Power scores and strong storm response; the nuclear fleet is scarce carbon-free baseload. Key risks: NJ politics capping earned ROE; higher-for-longer rates (about $2B a year of new debt at 5.4-6%); PECO basis and PJM redesign (the capacity price collar ends after 2029/30); Salem 1 repairs; environmental tail liabilities; and load growth staying mostly edge computing rather than large campuses.
Sentiment: 4/10
The price fell from $86 to a $66.56 low in late September, now about $72-74. Utilities had their sharpest sell-off since 2023. Short interest peaked at 12.7M shares at the end of September, then fell 31% by mid-October as shorts covered. Analysts have cooled (Jefferies Hold in April, Citi $84, Truist $78 on Oct 15), but most remain Buy/OW around $85-91. Q3 EPS of $1.15 missed the $1.19-1.22 consensus, and guidance was reaffirmed, not tightened. This is disappointment, not capitulation or euphoria. Covered-call angle: predictable earnings and about 23% at-the-money implied volatility (rich for a utility) make a buy-write reasonable for income, though the multiple is mid-cycle rather than at a floor.
- /Users/gregwo/stocks2/data/analysisv3/context/PEG.md
- /Users/gregwo/stocks2/data/edgar_filings/PEG/8-K_2026-11-02_0001193125-26-442778_EX99-1.html
- https://www.sec.gov/Archives/edgar/data/0000788784/000119312526443789/peg-20260930.htm
- https://stockanalysis.com/stocks/peg/history
- https://utilitydive.com/news/pseg-power-nuclear-uprate-salem-data-center-earnings/873587/
- https://www.utilitydive.com/news/pseg-rates-new-jersey-sherrill-earnings/804853/
- https://finviz.com/news/407876/pseg-heads-into-q3-with-street-near-top-of-guidance-and-rate-case-looming
- https://finsee.ai/earnings/peg/2026/q3/en/
- https://www.panabee.com/news/public-service-enterprise-earnings-q3-2026-report
- https://www.ad-hoc-news.de/boerse/news/nebenwerte/truist-cuts-target-for-pseg-stock-to-usd-78-00/70331636
- https://rallies.ai/news/pseg-slides-as-jefferies-downgrade-highlights-nuclear-risk-overhang-trims-target
- https://247wallst.com/investing/etf/2026/10/02/utility-stocks-are-the-most-oversold-since-2023/
- https://www.ans.org/news/2026-10-06/article-8467/
- https://www.inquirer.com/business/energy/limerick-salem-data-center-nuclear-google-constellation-20261006.html
- https://www.nasdaq.com/articles/pseg-peg-q3-2026-earnings-call-transcript
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 12337+5% | 12168+18% | 10290-8% | 11237+15% | 9800 |
| Gross profit | 11442+175% | 8396+137% | 3541-27% | 4827+85% | 2604 |
| Operating expenses | 8773+600% | 5416+356% | 1188+4% | 1142-7% | 1223 |
| ▸Adj EBITDA | 3962-8% | 4338+16% | 3726-26% | 5009+88% | 2664 |
| ▸Adj OCF | 3501+10% | 3291+20% | 2737+10% | 2499+6% | 2350 |
| CapEx | -3214 | -3022 | -3380 | -3325 | -2888 |
| Adj FCF | 287-7% | 269 | -643 | -826 | -538 |
| Interest expense | 1021 | 961 | 841 | 688 | 562 |
| ▸Adj net income | 1599-17% | 1878+19% | 1572-40% | 2601+181% | 925 |
| ▸Owner's earnings | 900 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 19887100% | 3170100% | 4737100% | 4039100% | 5093100% | 2848100% |
| FCF (OCF−capex) | -1423-7% | 45214% | 2766% | -1247-31% | 4819% | -1385-49% |
| Net income | 892845% | 145146% | 211145% | 177244% | 256350% | 103136% |
| ▸Capital returned | 419421% | 47915% | 101221% | -457-11% | 185036% | 131046% |
| Buybacks | 500 | 0.00 | 0.00 | 0.00 | 0.00 | 500 |
| Dividends | 5672 | 1002 | 1258 | 1196 | 1137 | 1079 |
| Interest paid | 3854 | 802 | 961 | 841 | 688 | 562 |
| Debt paid down | -5832 | -1325 | -1207 | -2494 | 25.0 | -831 |
| ▸Reinvestment | 1463974% | 208866% | 296963% | 338884% | 332865% | 2866101% |
| Capex (PP&E) | 14700 | 2085 | 3022 | 3380 | 3325 | 2888 |
| Intangibles & M&A | -1.00 | 0.00 | 0.00 | 0.00 | -1.00 | 0.00 |
| Leases signed (net Δ) | -60.0 | 3.00 | -53.0 | 8.00 | 4.00 | -22.0 |
| Retained / other | -1762-9% | 77524% | 2255% | 51.01% | -680-13% | -2133-75% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 60317 | 57576 | 54640 | 50741 | 48718 |
| ▸Liabilities (total) | 42955 | 40594 | 38526 | 35264 | 34989 |
| Net debt (incl. leases) | 24928 | 24237 | 22763 | 20352 | 19974 |
| Net debt / Adj EBITDA | 6.29 | 5.59 | 6.11 | 4.06 | 7.50 |
| Net debt / Adj FCF | 86.9 | 90.1 | -- | -- | -- |
| Adj EBITDA / interest | 3.88 | 4.51 | 4.43 | 7.28 | 4.74 |
| Shares outstanding | 498 | 498 | 498 | 498 | 497 |
| Dilution (YoY) | -0.1% | +0.0% | +0.0% | +0.2% | -1.4% |
| Employees | 13047 | 13189 | 13047 | 12543 | 12525 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 92.8%+57.2 | 69.0%+34.6 | 34.4%-8.6 | 43.0%+16.4 | 26.6% |
| Adj EBITDA margin | 32.1%-4.7 | 35.6%-0.6 | 36.2%-8.4 | 44.6%+17.4 | 27.2% |
| Adj OCF margin | 28.4%+1.2 | 27.1%+0.4 | 26.6%+4.4 | 22.2%-1.7 | 24.0% |
| Adj FCF margin | 2.3%-0.3 | 2.2%+8.5 | -6.3%+1.1 | -7.3%-1.9 | -5.5% |
| Net income margin | 14.3%-3.5 | 17.4%+0.1 | 17.2%-5.6 | 22.8%+12.3 | 10.5% |
| Adj NI margin | 13.0%-3.4 | 15.4%+0.2 | 15.3%-7.9 | 23.1%+13.7 | 9.4% |
| ROIC (adj, after-tax) | 5.7% | 6.4% | 5.9% | 8.5% | 4.0% |
| Cost of debt | 4.5% | 4.0% | 3.8% | 3.4% | 2.8% |
Revenue Breakdown
Revenue Segments
| Gas Distribution Contracts | $1.4B | +19% |
| Public Service Electric and Gas Company | $1.2B | +24% |
| Electricity and Related Products | $729.0M | +61% |
| Transmission | $454.0M | +3% |
| Other Contract Revenues | $266.0M | -1% |
| Natural Gas | $177.0M | +26% |
Earnings Calls
Earnings Call · 2026 Q3
PSEG reported Q3 2026 net income of $0.76 per share (versus $1.24 a year earlier) and non-GAAP operating earnings of $1.15 per share (versus $1.13). Year-to-date non-GAAP operating earnings were $3.56 per share. Management reaffirmed 2026 non-GAAP guidance of $4.28 to $4.40 and the 6% to 8% growth outlook through 2030, and said investors should think of the midpoint for 2026. The regulated capital plan of $22.5 billion to $25.5 billion through 2030 (6% to 7.5% rate base CAGR) was maintained, with about $4.2 billion planned for 2026 and $1.1 billion invested in Q3. At PSE&G, transmission margin added $0.02 and distribution margin $0.03, offset by higher O&M, depreciation, interest and a $0.04 tax timing headwind. Operations were strong: a September nor'easter affecting 70,000 customers was restored within 24 hours, and PSEG Long Island is on track for its most reliable year. Regulatory items included a 5% residential gas bill cut effective October 1, GSMP 2 extension approval, and approvals of IAP ($14 million) and EV ($8 million) recoveries. PSE&G filed its EE 2.5 proposal, and PJM prospectively cut wholesale transmission rates after a FERC ruling, with credits to be filed in early 2027. Rather than a full base rate case by year end, PSE&G now expects to file a proposal to address regulatory lag, aligned with the governor's affordability agenda and executive orders, with details to follow. The BPU's utility business model study is in phase 2. PSEG Power and Other posted non-GAAP earnings of $68 million versus $50 million, helped by higher generation, capacity and gas margins and lower O&M with no Hope Creek outage. The nuclear fleet produced 8.2 TWh at a 95.5% capacity factor; Salem 1 completed a 491-day breaker-to-breaker run. Power cleared 3.6 GW at $325/MW-day in the July auction; the collar continues for December's auction. The basis discount between PECO and PJM West widened to about 30% from the historical 20%, but hedges limit near-term exposure; about 70 TWh is sold forward, over 95% hedged for 2026, and 2027 realized value is expected to exceed the nuclear PTC threshold. Management stressed that hedges are executed at the PECO zone using direct hedges, FTRs, swaps and options. On the market, FERC accepted parts and rejected parts of PJM's reliability backstop procurement, delaying the auction to March 2027 or later, and rejected the IRAS filing, shifting focus to states. Bilateral large-load deals continue, with conversations advancing but nothing to announce. Salem uprates are within the five-year plan. Liquidity was $3.9 billion, variable rate debt was about 3%, 2026 financing is largely complete, and no equity or asset sales are needed. 2027 guidance and a capital plan update will come in February 2027.
▸How is the hedge strategy handling the widening basis, what instruments are used (FTRs?), and can you quantify the share of forward-sold power exposed?Shahriar Pourreza · Wells Fargo
▸Updated thoughts on Pennsylvania or New Jersey nuclear contract potential, and is a New Jersey deal possible given the optics?Shahriar Pourreza · Wells Fargo
▸Is the upcoming PSE&G filing a shift away from a full rate case, and is it about rate changes or accounting for regulatory lag?Richard Sunderland · Truist Securities
▸How is the BPU phase 2 effort informing the filing and broader strategy?Richard Sunderland · Truist Securities
▸Confirm 2027 stays above the PTC level despite the wider basis, and how does 2028 look?Nicholas Campanella · Barclays
▸Can you be outside the 6% to 8% range in a given year, or do you still expect to grow within it for 2027 and beyond?Nicholas Campanella · Barclays
▸What near-term items could enter the next capital update: competitive transmission, nuclear contracting, solar and storage?Nicholas Amicucci · Evercore ISI
▸Is Salem uprate earnings contribution in the current outlook?Nicholas Amicucci · Evercore ISI
▸How do you view PJM's latest RPP response to FERC versus pursuing bilateral opportunities?Carly Davenport · Goldman Sachs
▸What are the impacts of higher interest rates and financing needs on 2027 guidance or earnings sensitivities?Carly Davenport · Goldman Sachs
▸How are you thinking about utility-owned solar and storage investments?David Arcaro · Morgan Stanley
▸What proposals for addressing regulatory lag might you support beyond trackers?David Arcaro · Morgan Stanley
▸What is the future of PJM's capacity auction, and how will you set 2031 assumptions in the roll-forward?Michael Sullivan · Wolfe Research
▸What are your expectations for the upcoming PJM transmission open window?Michael Sullivan · Wolfe Research
▸What is the update on PSE&G large load inquiries, previously about 11.8 GW as of December 2025?Aiden Kelly (on behalf of Jeremy Tonet) · JPMorgan
▸Why not tighten the 2026 guidance range; is anything creating near-term ambiguity?Julien Patrick Dumoulin-Smith · Jefferies
▸How are 2027-2028 hedges positioned and is there a net increase in realized hedge value given multiyear price trends?Julien Patrick Dumoulin-Smith · Jefferies
▸How are new nuclear conversations progressing, given the early site permit, and what data points should we watch?Steve Fleishman · RBC Capital Markets
▸Would a large-load nuclear deal change your hedging strategy, such as going more open?Anthony Crowdell · Mizuho
▸Are you effectively short PJM West basis and long PECO via hedging?Anthony Crowdell · Mizuho
SEC Filing Findings
SEC Filing — material findings
2026-11-02 · depth 9/10risk 7Litigation / Environmental▸Lower Passaic River Superfund cleanup: EPA plans estimated $2.3B (Lower 8.3 miles) and $550M (Upper 9 miles); PSEG has ~$66M accrued, Occidental litigation ongoing, and PSEG states additional costs could be material and cannot estimate them.
Lower Passaic River Superfund cleanup: EPA plans estimated $2.3B (Lower 8.3 miles) and $550M (Upper 9 miles); PSEG has ~$66M accrued, Occidental litigation ongoing, and PSEG states additional costs could be material and cannot estimate them.
risk 6Hidden Liability / Environmental▸PSEG Power retained legacy fossil-site environmental liabilities (NJ ISRA, Connecticut CTA) with full remediation costs not estimable and likely material in aggregate; CCR Rule revisions could have material impact.
PSEG Power retained legacy fossil-site environmental liabilities (NJ ISRA, Connecticut CTA) with full remediation costs not estimable and likely material in aggregate; CCR Rule revisions could have material impact.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $65.00 | $7.50/$10.20 | 0 | $0.25/$0.45 | 34 |
| $67.50 | $5.20/$7.30 | 0 | $0.25/$1.00 | 34 |
| $70.00 | $3.50/$5.40 | 88 | $0.90/$1.45 | 154 |
| $72.50 | $2.05/$3.30 | 181 | $1.40/$2.20 | 13 |
| $75.00 | $0.90/$2.05 | 133 | $1.95/$4.30 | 113 |
| $77.50 | $0.60/$0.95 | 1,879 | $4.10/$6.50 | 7 |
| $80.00 | $0.05/$0.80 | 1,539 | $6.50/$8.70 | 1 |
| $82.50 | $0.10/$0.35 | 77 | $8.30/$11.00 | 0 |
Short Interest
Executive Compensation (2023.0-2025.0)
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $4.37B | $84.69 | +$154M | +$299M | — | $6.70T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $2.64B | $80.95 | +$9.9M | +$2.64B | — | $4.68T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $2.47B | $80.95 | +$10.9M | +$2.47B | — | $2.22T |
| STATE STREET CORPPassive | $2.39B | $67.26 | +$32.4M | +$175M | — | $3.38T |
| BANK OF AMERICA CORP /DE/ | $1.21B | $78.63 | +$50.9M | −$216M | — | $1.54T |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $1.07B | $67.01 | +$11.8M | +$55.8M | — | $1.87T |
| Capital Research Global Investors | $870M | $70.35 | +$12.0M | +$249M | — | $716.77B |
| MORGAN STANLEY | $621M | $65.18 | +$64.2M | +$35.0M | — | $1.88T |
| Invesco Ltd. | $614M | $64.78 | +$22.6M | +$88.7M | — | $1.26T |
| Legal & General Group Plc | $555M | $66.28 | +$10.9M | +$10.5M | — | $479.43B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2006 Q1 | 4.6B | 527M | 255M | $0.69 | $0.55 – $0.83 | 20 |
| 2006 Q2 | 2.2B | 429M | 172M | $0.23 | $0.18 – $0.28 | 8 |
| 2006 Q3 | 2.6B | 627M | 316M | $0.54 | $0.43 – $0.65 | 15 |
| 2006 Q4 | 2.9B | 179M | -50M | $0.39 | $0.31 – $0.47 | 9 |
| 2007 Q1 | 3.1B | 552M | 284M | $0.50 | $0.40 – $0.60 | 20 |
| 2007 Q2 | 2.3B | 480M | 223M | $0.39 | $0.31 – $0.47 | 13 |
| 2007 Q3 | 3.0B | 771M | 456M | $0.82 | $0.66 – $0.98 | 18 |
| 2007 Q4 | 5.2B | 584M | 314M | $1.27 | $1.02 – $1.52 | 7 |
| 2008 Q1 | 3.3B | 823M | 388M | $0.65 | $0.52 – $0.78 | 10 |
| 2008 Q2 | 2.4B | 224M | -140M | $0.56 | $0.45 – $0.67 | 13 |
| 2008 Q3 | 3.9B | 1.1B | 689M | $1.04 | $0.83 – $1.25 | 16 |
| 2008 Q4 | 3.5B | 489M | 253M | $0.57 | $0.46 – $0.68 | 8 |
| 2009 Q1 | 3.3B | 802M | 361M | $0.65 | $0.52 – $0.78 | 19 |
| 2009 Q2 | 2.5B | 721M | 306M | $0.61 | $0.49 – $0.73 | 10 |
| 2009 Q3 | 2.9B | 934M | 472M | $0.86 | $0.69 – $1.03 | 20 |
| 2009 Q4 | 2.4B | 838M | 337M | $0.58 | $0.46 – $0.70 | 19 |
| 2010 Q1 | 3.7B | 934M | 502M | $0.88 | $0.70 – $1.06 | 13 |
| 2010 Q2 | 2.3B | 610M | 221M | $0.63 | $0.50 – $0.76 | 14 |
| 2010 Q3 | 2.8B | 977M | 508M | $0.86 | $0.69 – $1.03 | 7 |
| 2010 Q4 | 2.8B | 598M | 291M | $0.64 | $0.51 – $0.77 | 13 |
| 2011 Q1 | 3.0B | 922M | 471M | $0.69 | $0.55 – $0.83 | 14 |
| 2011 Q2 | 2.3B | 704M | 300M | $0.51 | $0.41 – $0.61 | 13 |
| 2011 Q3 | 2.6B | 713M | 287M | $0.79 | $0.63 – $0.95 | 11 |
| 2011 Q4 | 2.7B | 780M | 368M | $0.49 | $0.39 – $0.59 | 11 |
| 2012 Q1 | 2.3B | 821M | 361M | $0.49 | $0.39 – $0.59 | 19 |
| 2012 Q2 | 2.2B | 656M | 220M | $0.47 | $0.38 – $0.56 | 13 |
| 2012 Q3 | 2.3B | 825M | 333M | $0.69 | $0.55 – $0.83 | 18 |
| 2012 Q4 | 2.3B | 791M | 213M | $0.37 | $0.30 – $0.44 | 19 |
| 2013 Q1 | 2.4B | 760M | 272M | $0.63 | $0.50 – $0.76 | 7 |
| 2013 Q2 | 2.2B | 791M | 311M | $0.42 | $0.34 – $0.50 | 15 |
| 2013 Q3 | 2.6B | 918M | 390M | $0.76 | $0.61 – $0.91 | 9 |
| 2013 Q4 | 2.1B | 651M | 182M | $0.41 | $0.33 – $0.49 | 19 |
| 2014 Q1 | 3.1B | 889M | 370M | $0.93 | $0.74 – $1.12 | 10 |
| 2014 Q2 | 2.3B | 690M | 220M | $0.53 | $0.42 – $0.64 | 13 |
| 2014 Q3 | 2.5B | 968M | 426M | $0.71 | $0.57 – $0.85 | 20 |
| 2014 Q4 | 2.6B | 974M | 445M | $0.43 | $0.34 – $0.52 | 18 |
| 2015 Q1 | 2.9B | 1.1B | 530M | $0.86 | $0.69 – $1.03 | 8 |
| 2015 Q2 | 2.2B | 845M | 326M | $0.51 | $0.41 – $0.61 | 15 |
| 2015 Q3 | 2.7B | 983M | 444M | $0.82 | $0.66 – $0.98 | 10 |
| 2015 Q4 | 2.3B | 767M | 309M | $0.50 | $0.40 – $0.60 | 9 |
| 2016 Q1 | 2.5B | 905M | 455M | $0.85 | $0.68 – $1.02 | 17 |
| 2016 Q2 | 1.9B | 590M | 190M | $0.59 | $0.47 – $0.71 | 10 |
| 2016 Q3 | 2.3B | 737M | 307M | $0.78 | $0.62 – $0.94 | 17 |
| 2016 Q4 | 2.0B | 847M | -96M | $0.52 | $0.42 – $0.62 | 12 |
| 2017 Q1 | 2.4B | 1.1B | 105M | $0.78 | $0.62 – $0.94 | 15 |
| 2017 Q2 | 2.0B | 897M | 101M | $0.54 | $0.43 – $0.65 | 16 |
| 2017 Q3 | 2.3B | 875M | 404M | $0.86 | $0.69 – $1.03 | 12 |
| 2017 Q4 | 2.1B | 1.5B | 939M | $0.55 | $0.44 – $0.66 | 17 |
| 2018 Q1 | 2.9B | 1.1B | 569M | $1.01 | $0.81 – $1.21 | 17 |
| 2018 Q2 | 2.0B | 745M | 265M | $0.62 | $0.50 – $0.74 | 10 |
| 2018 Q3 | 2.3B | 928M | 394M | $0.87 | $0.70 – $1.04 | 8 |
| 2018 Q4 | 2.4B | 711M | 195M | $0.54 | $0.43 – $0.65 | 14 |
| 2019 Q1 | 3.1B | 1.2B | 644M | $1.00 | $0.88 – $1.09 | 7 |
| 2019 Q2 | 2.3B | 656M | 158M | $0.60 | $0.52 – $0.65 | 11 |
| 2019 Q3 | 2.6B | 962M | 395M | $0.95 | $0.84 – $1.04 | 7 |
| 2019 Q4 | 2.8B | 1.0B | 423M | $0.62 | $0.54 – $0.68 | 10 |
| 2020 Q1 | 3.3B | 1.0B | 439M | $1.02 | $0.89 – $1.11 | 9 |
| 2020 Q2 | 2.2B | 851M | 308M | $0.61 | $0.53 – $0.66 | 6 |
| 2020 Q3 | 2.4B | 1.2B | 581M | $0.97 | $0.85 – $1.06 | 6 |
| 2020 Q4 | 2.7B | 973M | 431M | $0.65 | $0.57 – $0.71 | 6 |
| 2021 Q1 | 3.2B | 1.2B | 555M | $1.12 | $0.98 – $1.22 | 6 |
| 2021 Q2 | 2.2B | 318M | -177M | $0.71 | $0.62 – $0.77 | 5 |
| 2021 Q3 | 2.6B | -986M | -1.5B | $0.92 | $0.81 – $1.01 | 5 |
| 2021 Q4 | 3.1B | 881M | 432M | $0.67 | $0.58 – $0.73 | 5 |
| 2022 Q1 | 2.6B | 468M | -2M | $1.13 | $0.99 – $1.23 | 6 |
| 2022 Q2 | 1.8B | 614M | 131M | $0.64 | $0.56 – $0.70 | 6 |
| 2022 Q3 | 2.0B | -1.1B | -1.6B | $0.83 | $0.73 – $0.90 | 6 |
| 2022 Q4 | 2.1B | 987M | 475M | $0.62 | $0.55 – $0.68 | 6 |
| 2023 Q1 | 2.8B | 508M | -2M | $1.25 | $1.09 – $1.36 | 9 |
| 2023 Q2 | 2.0B | 678M | 144M | $0.63 | $0.55 – $0.69 | 8 |
| 2023 Q3 | 2.2B | -1.3B | -1.8B | $0.75 | $0.29 – $0.93 | 12 |
| 2023 Q4 | 2.4B | 1.1B | 522M | $0.52 | $0.51 – $0.53 | 9 |
| 2024 Q1 | 3.0B | 548M | -3M | $1.30 | $1.19 – $1.42 | 9 |
| 2024 Q2 | 2.0B | 908M | 311M | $0.62 | $0.53 – $0.73 | 10 |
| 2024 Q3 | 2.4B | 1.1B | 435M | $0.87 | $0.74 – $1.09 | 8 |
| 2024 Q4 | 2.0B | 1.0B | 413M | $0.83 | $0.82 – $0.85 | 10 |
| 2025 Q1 | 3.0B | 1.5B | 718M | $1.44 | $1.35 – $1.57 | 8 |
| 2025 Q2 | 2.4B | 1.0B | 349M | $0.70 | $0.64 – $0.77 | 13 |
| 2025 Q3 | 2.7B | 1.2B | 509M | $1.02 | $1.01 – $1.03 | 10 |
| 2025 Q4 | 2.7B | 999M | 355M | $0.71 | $0.70 – $0.73 | 10 |
| 2026 Q1 | 3.4B | 1.4B | 719M | $1.44 | $1.39 – $1.47 | 9 |
| 2026 Q2 | 2.7B | 1.1B | 396M | $0.79 | $0.71 – $0.87 | 10 |
| 2026 Q3 | 3.2B | 1.3B | 596M | $1.19 | $1.16 – $1.23 | 10 |
| 2026 Q4 | 3.3B | 1.1B | 407M | $0.81 | $0.74 – $0.86 | 8 |
| 2027 Q1 | 3.9B | 1.6B | 791M | $1.59 | $1.47 – $1.68 | 5 |
| 2027 Q2 | 3.0B | 1.2B | 446M | $0.89 | $0.76 – $1.07 | 3 |
| 2027 Q3 | 3.3B | 1.4B | 622M | $1.25 | $1.06 – $1.49 | 3 |
| 2027 Q4 | 3.9B | 1.2B | 409M | $0.82 | $0.70 – $0.98 | 3 |
| 2028 Q1 | 1.5B | 1.8B | 888M | $1.78 | $1.51 – $2.13 | 4 |
| 2028 Q2 | 1.8B | 1.3B | 454M | $0.91 | $0.77 – $1.09 | 4 |
| 2028 Q3 | 2.3B | 1.5B | 659M | $1.32 | $1.12 – $1.58 | 4 |
| 2028 Q4 | 3.7B | 1.4B | 504M | $1.01 | $0.86 – $1.21 | 4 |
| 2029 Q1 | 1.6B | 1.9B | 955M | $1.91 | $1.62 – $2.28 | 3 |
| 2029 Q2 | 1.9B | 1.3B | 488M | $0.98 | $0.83 – $1.17 | 3 |
| 2029 Q3 | 2.4B | 1.6B | 707M | $1.42 | $1.20 – $1.69 | 3 |
| 2029 Q4 | 3.7B | 1.4B | 543M | $1.09 | $0.92 – $1.30 | 3 |
| 2030 Q1 | 3.7B | 2.0B | 1.0B | $2.03 | $1.72 – $2.42 | 3 |
| 2030 Q2 | 3.8B | 1.5B | 517M | $1.04 | $0.88 – $1.24 | 3 |
| 2030 Q3 | 3.9B | 1.7B | 750M | $1.50 | $1.27 – $1.79 | 3 |
| 2030 Q4 | 3.9B | 1.6B | 575M | $1.15 | $0.98 – $1.38 | 3 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-11-02 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $73.60 | $153K | $20.35M |
| 2026-10-01 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $67.48 | $141K | $18.86M |
| 2026-09-01 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $73.46 | $153K | $20.68M |
| 2026-08-11 | SELL | Thigpen Richard T | officer: SVP Corporate Citizenship | 8,000 | $74.56 | $596K | $1.56M |
| 2026-08-03 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $76.47 | $159K | $21.69M |
| 2026-07-01 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $80.51 | $168K | $22.96M |
| 2026-06-24 | SELL | Hanemann Kim C | officer: President and COO - PSE&G | 3,035 | $82.00 | $249K | $8.10M |
| 2026-06-01 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $77.01 | $160K | $22.12M |
| 2026-05-01 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $81.21 | $169K | $23.49M |
| 2026-04-01 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $81.24 | $169K | $23.67M |
| 2026-03-09 | SELL | Hanemann Kim C | officer: President and COO - PSE&G | 9 | $84.04 | $738 | $0 |
| 2026-03-05 | SELL | LaRossa Ralph A | director, officer: Chair, President and CEO | 2,083 | $83.66 | $174K | $24.50M |
| 2026-03-03 | SELL | Thigpen Richard T | officer: SVP Corporate Citizenship | 4,700 | $83.00 | $390K | $2.36M |
v2 analysis (legacy, 2026-08-04) — for comparison onlyclick to expand
Thesis
PSEG is a relatively high-quality regulated utility with an unusually valuable combination of New Jersey rate-base growth and a nuclear fleet positioned to benefit from PJM reliability scarcity. The core utility is executing well, reliability and customer service appear strong, and management has a credible record of funding a large capital program without equity dilution. The planned earlier PSE&G rate case could reduce regulatory lag and is the most important near-term catalyst. The counterweight is capital intensity. Adjusted FCF has only recently turned positive and remains small relative to reported earnings, while net debt is approximately $24.5B and roughly 5.9x adjusted EBITDA. Nuclear economics, ZEC refunds, PJM market design, environmental remediation and New Jersey affordability politics create meaningful tail risks. Data-center demand is promising but has not yet accelerated materially, and new nuclear is too distant to underpin a two-year valuation. Using bear/base/bull terminal equity values of $9.8B, $17.0B and $24.7B with probabilities of 25%, 55% and 20% produces a probability-weighted terminal value of $16.85B. Discounted two years at 12%, the model value is approximately $13.48B. The base case is deliberately below management's most optimistic growth framing because cash conversion and regulatory execution remain the key uncertainties.
Trade Signal
No trade at present: PEG is a high-quality utility with modest upside optionality, but the analyst valuation gap is too small to overcome leverage, regulatory uncertainty, insider selling, and the absence of a decisive near-term earnings inflection.
PEG has drifted lower rather than suffered a company-specific collapse: it fell from the low-$80s in late June to $76.29 by August 3, with the recent leg occurring despite reaffirmed guidance and a solid Q2 report. The stock was already down roughly 5% over three months and 12% over one year, likely reflecting utility/rate sensitivity and concern about New Jersey data-center regulation. The unchanged price immediately after the August 4 earnings print suggests the market viewed the results as confirmation, not a new upside surprise. The decline looks modestly excessive relative to the operating facts, but the gap is not large enough to establish a strong temporary dislocation; much of the repricing may be durable valuation and regulatory caution.
The market is constructive but not euphoric: analyst consensus is Buy with a roughly $90.80 target, and the stock has a 3% dividend yield and a recognized nuclear/capacity-price story. At the same time, the stock is down about 12% over the past year and 13% below its 52-week high, suggesting rate sensitivity, regulatory concerns, and valuation skepticism. Short interest is low and there is no evidence of a crowded or heavily retail-driven trade. The consensus may underappreciate the near-term rate-case catalyst, but it already recognizes the core growth narrative.
There is a favorable operating setup—regulated rate-base growth, high PJM capacity prices, and potential nuclear/data-center optionality—but the market already expects roughly 6%-8% EPS growth and analysts are broadly constructive. The upcoming rate-case filing could improve visibility, but New Jersey affordability politics and restrictions on data-center cost shifting make the upside inflection uncertain rather than clearly underappreciated.
- ▲2026-11 · Q3 2026 earnings and updated 2026 guidance — A clean result and confirmation of the $4.28-$4.40 EPS outlook could validate the regulated investment and nuclear earnings path.
- ▲Late 2026 · PSE&G base-rate case filing — An earlier-than-expected filing by year-end could reduce regulatory lag concerns and clarify future rate-base recovery.
- ▲Late 2026 · Cobalt-60 implementation or NRC licensing update — Progress toward late-2026 implementation would add incremental value to the Salem nuclear fleet, though it is not material enough alone to drive the thesis.
- •H2 2026 · New Jersey data-center legislation and Executive Order 1 Phase 2 — Rules governing infrastructure cost allocation and customer protections could either preserve profitable load growth or impair the hyperscaler-colocation option.
- ▲2027-02 · Q4 2026 / FY2026 earnings and 2027 outlook — The key test is whether management can sustain 6%-8% growth while funding the capital plan without equity issuance.
- ▲Q2 2027 · Salem subsequent-license-renewal applications — Applications expected in 2027 would extend the operating lives of the nuclear units and support long-duration value, but the evidence is outside the immediate trade window.
Share count is broadly stable and management says no equity issuance is needed for the five-year capital plan, which is supportive. However, there is no meaningful buyback, while officers and directors made nine sales totaling about $1.9 million over 12 months and no purchases. Short interest is low at 2.2% of float, providing little squeeze fuel; options positioning is modestly call-heavy but not decisive.
The dividend, regulated monopoly assets, substantial rate-base investment, and essential nuclear generation provide a reasonable downside anchor, but there is no hard asset-value floor at the current price. Leverage around 5.6x net debt/EBITDA, capital intensity, and weak reported free cash flow constrain support. The main ceiling is valuation: at roughly 33.5x TTM P/E and 19x P/FCF, the stock needs continued earnings delivery to reach the more optimistic analyst targets; insider selling may also limit upside near $80-$85.
High. PEG is an established regulated utility with a durable dividend, visible rate-base investment, strong liquidity, and a scarce nuclear fleet benefiting from elevated PJM capacity prices. The next buyer is likely a utility-income or quality-growth investor, although leverage, negative-to-flat free cash flow, and New Jersey political risk limit enthusiasm.
Mild greed, but not enough for an aggressive position. The business is high quality and the recent decline occurred despite solid earnings, yet the valuation gap is small and much of the 6%-8% growth and PJM capacity upside is already recognized by consensus.
Valuation
The genuinely new information is that PSEG intends to file a PSE&G base-rate case by year-end 2026, materially earlier than the previously indicated 2029 deadline. The quarter also showed continued regulated investment growth and improved Power earnings, but management reaffirmed rather than raised 2026 guidance and said large-load interest has not accelerated materially. The call provided no new 2027-2028 hedging detail and no quantified bilateral-generation opportunities.
▸ How the cases moved
The earlier year-end 2026 base-rate filing modestly improves the base and bull cases by bringing a potential remedy for regulatory lag closer: base equity value rises approximately $16,500M to $17,000M and bull value approximately $24,000M to $24,700M. However, management gave no rate-case size or direction, and its answers on 2027-2028 hedging and large-load opportunity scale remained non-specific. The bear case is broadly unchanged near $9,800M. Base probability rises modestly from 0.53 to 0.55, bull remains near 0.20, and bear declines from 0.27 to 0.25.
Regulated investment continues but regulatory lag, customer-affordability pressure, nuclear/ZEC refunds and environmental liabilities constrain returns. Data-center and PJM opportunities remain mostly prospective, while merchant-power earnings normalize. Owner earnings settle near $700M and the company receives a discounted utility earnings multiple.
▸ Valuation
14x $700M owner earnings = $9,800M equity value
PSE&G earns recovery on its large modernization program, the year-end rate case establishes a reasonable path to reduce regulatory lag, and nuclear benefits from elevated PJM capacity prices without a major speculative expansion. Earnings grow broadly in line with management's lower-end outlook, while substantial capex continues to consume cash but builds rate base. Owner earnings reach approximately $1,000M.
▸ Valuation
17x $1,000M owner earnings = $17,000M equity value
The rate-case process is constructive, regulated rate-base growth converts efficiently into earnings, nuclear capacity and uprate opportunities earn attractive utility-like returns, and large-load contracts begin to materialize. PSEG sustains 6%-8% earnings growth with no equity issuance and owner earnings rise to approximately $1,300M. A premium multiple reflects improved visibility and the strategic value of reliable carbon-free generation in PJM.
▸ Valuation
19x $1,300M owner earnings = $24,700M equity value
▸ Target Rationale
The arithmetic model value is $13,480M. I set the analytical target at $13,500M, essentially in line with but modestly above the model, because the regulated franchise, strong operating execution, low variable-rate exposure and absence of expected equity issuance provide some support not fully captured by a two-year owner-earnings approach. I do not apply a larger premium because the balance sheet is leveraged, cumulative FCF is weak, and environmental, nuclear and regulatory liabilities could consume equity value.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Earnings (May 5, 2026): PSEG reported robust financial results, with non-GAAP operating earnings rising to $778 million in Q1 2026 compared to $718 million in Q1 2025. This growth was driven by regulated investments in energy efficiency, gas system modernization, and transmission within the PSE&G segment, as well as higher realized energy prices from PSEG Power & Other. PSEG maintained its full-year 2026 non-GAAP operating earnings guidance of $4.28 to $4.40 per share and reaffirmed its long-term strategic compound annual growth rate of 6% to 8% through 2030, emphasizing that no new equity issuances or asset sales are required to achieve this goal.
- FERC Transmission Decision (March 17, 2026): PSE&G secured a significant victory when the Federal Energy Regulatory Commission (FERC) rejected a proposed settlement that would have disproportionately allocated transmission project costs to PSE&G's customers. Backed by the New Jersey Board of Public Utilities (NJ BPU) and the NJ Division of Rate Counsel, PSE&G was the only electric utility in the PJM Interconnection footprint to oppose the settlement, a move estimated to save its customers hundreds of millions of dollars.
- Cobalt-60 Commercial Agreement (January 27, 2026): PSEG Nuclear entered into a long-term commercial agreement with Westinghouse and Nordion to introduce Cobalt-60 isotope production technology at PSEG’s Salem Generating Station (Units 1 and 2). PSEG’s License Amendment Request is currently under review by the Nuclear Regulatory Commission (NRC), with the parties targeting implementation in late 2026.
- Lowering Gas Bills (June 5, 2026): PSE&G proposed lowering gas bills for New Jersey customers by approximately 5% starting in Fall 2026, aimed at maintaining the lowest gas rates in the state and the surrounding region.
▸ Thesis-test Findings
- PSEG Salem County nuclear power uprates FERC status: During its Q1 2026 earnings presentation, PSEG highlighted a potential physical capacity uprate at the Salem plant of nearly 200 MW (~112 MW PSEG share), which includes an approximate 7% thermal power increase. Regarding FERC, PSEG filed a petition on March 31, 2026, seeking a regulatory confirmation of Salem's "independent contractual right" to continue receiving compensation for reactive power supplied to PJM. However, the PJM Independent Market Monitor filed a protest on April 21, 2026, contesting this right and referencing Salem's prior Interconnection Service Agreements (ISAs). On the NRC licensing side, PSEG continues its path to submit subsequent license renewal applications between April and June 2027 to extend Salem's operational lifespan out to 2056 and 2060.
- New Jersey data center tax incentives legislation 2026: New Jersey is experiencing a legislative shift that balances data center development incentives with strict consumer protections. While the state's "Next NJ Program - AI" tax incentive remains active (dedicating up to $500 million in tax credits to support large-scale AI hyperscale facilities), a flurry of restrictive legislation has emerged over the last six months. On May 27, 2026, Governor Mikie Sherrill introduced a "Comprehensive Plan" targeting data center regulations to prevent utility ratepayer cost-shifting. Active bills, such as S731/A796 (mandating 100 MW+ facilities pay for their own grid infrastructure) and A5165 ("End Data Center Tax Credits Act," introduced in June 2026), represent a mounting regulatory hurdle. These laws could force data centers to construct self-sufficient clean energy sources or pay special tariffs, presenting a potential drag on PSEG’s direct nuclear colocation and rapid load-growth plans.
- PJM capacity auction prices 2027 2028 projections: In December 2025, PJM released results for the 2027/2028 delivery year, which cleared at the maximum "price collar" cap of $333.44 per megawatt-day across the RTO footprint due to an acute generation deficit and rising data center demand. Looking forward, the Federal Energy Regulatory Commission (FERC) approved a PJM proposal on April 28, 2026, to extend this administrative price collar to both the 2028/2029 and 2029/2030 delivery auctions. This regulatory intervention sets an administrative price cap of approximately $325/MW-day—averting a projected run-up to $550/MW-day—but effectively locks in historically high capacity revenue. The next capacity auction (for the 2028/2029 delivery year) is scheduled to begin on June 30, 2026. For PSEG, this extension of the capacity price cap limits absolute upside pricing volatility, but cements a highly profitable "new normal" for its 3,758 MW merchant nuclear fleet.