PESI
Perma-Fix Environmental Services, Inc.v3 5.0/10 · 2026-11-03Perma-Fix Environmental Services, Inc., operating through its various subsidiaries, functions as a U.S.-based company offering specialized expertise in environmental solutions and technology. Its operations are divided into three core divisions: Treatment, Services, and Medical. The Treatment division specializes in the handling, processing, and safe disposal of various waste types, including nuclear, low-level radioactive, mixed, hazardous, and non-hazardous materials, utilizing its dedicated treatment and storage facilities. Furthermore, this segment conducts research and development to devise and apply innovative methods for managing challenging waste streams. The Services division delivers extensive technical support, encompassing professional radiological assessments and site surveys for both government and commercial clients, alongside integrated occupational safety and health programs. Its offerings also include consulting, engineering, project and waste management, environmental remediation, and on-site decontamination and decommissioning (D&D) services, as well as providing specialized technical and managerial personnel. For the nuclear sector, it provides technology-driven solutions covering engineering, D&D, construction, logistics, transportation, processing, and disposal, in addition to undertaking the cleanup of licensed nuclear facilities and legacy sites. This segment further maintains an advanced laboratory for calibrating, maintaining, and sourcing a wide array of health physics, industrial hygiene, and custom nuclear, environmental, and occupational safety and health monitoring equipment. The Medical segment concentrates its efforts on the research and development of technologies for producing medical isotopes. Perma-Fix serves a diverse clientele, ranging from research institutions and commercial enterprises to public utilities and government bodies, engaging with them either directly or via third-party channels. Established in 1990, Perma-Fix En
2-Year Price History
Valuation v3 Opus worker · 2026-11-03
Perma-Fix (PESI, $13.05 close on 2026-11-03, about $277M market cap on 21.2M shares, roughly $13M net cash) is a small nuclear and mixed-waste treater. Its stock now trades almost entirely on one option: its Richland plant, a mile from the Hanford site, becoming the main place where DOE's new glass-plus-grout strategy grouts Hanford tank waste. The milestones are real. In August 2026 it won one of three master IDIQ subcontracts (a shared $4.4B ceiling, 50M gallons, task orders 2027-2041). DOE publicly names Perma-Fix Northwest as the grouter for EMF secondary waste and for about 60k gallons a month of AP-106 waste. Waste receipts from the vitrification plant (DFLAW) have started, and the company is filing to raise its permit from 1.2M to more than 10M gallons a year by mid-2027. But the business today loses money badly: trailing EBITDA is about -$16M, H1-26 revenue fell 16%, a going-concern note is still in the 10-Q, and shareholders were diluted again in May (2.63M shares at $8.75). DFLAW runs at about 10% of design. No task order exists yet, Washington's Ecology department remains skeptical of expanded grouting, and the other two IDIQ holders (EnergySolutions, WCS) are competing for volume. My base case has grout volume ramping to about 1.5M gallons a year by 2029-30, slower than DOE's 6-9M-gallon goal. That gives about $200-220M revenue and $25M+ of FCF by 2030-31, worth about $14 a share at 15x. That is close to the price. The bull case (DOE's volumes, $80/gal) supports $25-35. The bear case (Ecology or DOE delays, another raise) is $4-6. Sentiment is in the middle (4/10). The stock has round-tripped from $19.43 in August, short interest is about 15% of shares, and a Hungarian fund (HOLD) raised its stake from 10.6% to 15.2% while MAK Capital sold below 5%. This is neither capitulation nor euphoria, and nothing like a valuation floor. Rating 5.0: fairly priced for a high-variance binary with poor near-term cash flow. Research rating 7.5: the outcome hinges on things that will become visible within 6-9 months (the Q3 print around Nov 10, the AP-106 permit-mod decision, the first IDIQ task order and its $/gallon, and DFLAW throughput). If they go right, the stock could double.
A deep dive would have to establish: Will Washington Ecology approve the AP-106/200-East grouting and PFNW 10M-gallon permit mods so that H2C issues PFNW its first task orders in early 2027, and at what $/gallon and gross margin, given that this determines whether PESI becomes a $30+ stock or needs another dilutive raise?
Research (expand)
What the company does
Perma-Fix Environmental Services (NASDAQ: PESI, Atlanta) runs three permitted mixed and low-level radioactive waste treatment plants: Perma-Fix Northwest in Richland WA, DSSI in Kingston TN, and Perma-Fix of Florida in Gainesville. It also has a Nuclear Services arm doing D&D, remediation, radiological surveys and waste management at DOE/DoD sites, and a nascent PFAS destruction business (a supercritical-water-oxidation style "Perma-FAS" unit, with Gen-2 being installed at Oak Ridge). Revenue was $89.7M in 2023, $59.1M in 2024, $61.7M in 2025 and about $24M in H1-26 (consensus about $56M for FY26). About 65% of revenue comes from US government-related customers. Historically this was a marginal business: at best low-single-digit EBITDA margins, and repeated losses since 2024.
The investment case
The case is Hanford. DOE has adopted a "glass-plus-grout" dual strategy. Vitrification continues at the WTP/DFLAW plant, but a large share of pretreated low-activity tank waste would be grouted. DOE cites less than $50/gal against about $1,200/gal for vitrification, and Savannah River has already grouted 13M gallons. Perma-Fix Northwest sits about a mile from the site, is permitted and operating today (1.2M gal/yr of liquid, 175k tons of macro-encapsulation), has union labor (UA Local 598) and a rail spur. It is the only option that solidifies liquids before they cross state lines, which Oregon and Spokane officials publicly want. Milestones:
- Aug 11, 2026: H2C awarded PESI one of three master IDIQ subcontracts for tank-waste grouting and disposal ($4.4B shared ceiling, 50M gal, task orders Jan 2027-Dec 2041). The other two holders are out-of-state (EnergySolutions/Utah and WCS/Texas). H2C picked off-site commercial treatment over building a new on-site grout plant.
- DOE graphics name PFNW for EMF effluent (receipts started July 2026) and for about 60k gal/month from tank AP-106 from late 2026/2027. That rises to about 130k gal/month once AMPS runs in 2028, and the West-side WRMS system adds about 3M gal/yr later. DOE's target is 6M+ gal/yr, and 9M gal/yr after 2030.
- PFNW has filed to expand its permit to 10M+ gal/yr. Mixers and infrastructure are targeted for Q2-Q3 2027 inside existing buildings.
- Services: a $24M Lawrence Livermore D&D MTA, $17M+ services backlog, and a Mirion mentor-protege partnership. Treatment backlog was $15.7M at June 30 (+29% QoQ).
The economics if it works: $4.4B over 50M gallons is about $88/gal including rail and out-of-state disposal. Even 1.5M gal/yr at $70 is about $105M of new revenue, nearly double today's company, on a plant whose fixed costs are already staffed. 3-4M gal/yr would make PESI a $300M+ revenue business with $50M+ EBITDA.
What it earns today (real free cash flow)
It earns nothing yet. Continuing-ops EBITDA was -$7.0M in Q1-26 and -$5.9M in Q2-26, about -$16M trailing twelve months (Q3-25 about -$1M, Q4-25 about -$2.5M). Stock comp is small (about $0.8M a year) and is already inside EBITDA. D&A is about $2M a year, maintenance capex about $1.5-2M, and cash taxes are zero (large NOLs). Unlevered owner earnings are therefore about -$17M. Part of that is deliberate pre-staffing for Hanford volumes that slipped (customer-directed protocol changes pushed Q2 processing into Q3), so the underlying run-rate of the legacy business is perhaps -$5M to +$3M. H1-26 operating cash burn was $8.8M plus $2.9M capex. The May 2026 raise (2.63M shares, $23M gross at $8.75) took cash to $20.5M at June 30 against $2.1M debt. I estimate about $15M cash and about $13M net cash at Sept 30. PNC requires $5M minimum daily liquidity, and the facility was extended to May 2030. There is no meaningful EBITDA to compare EV with: EV is about $264M against negative owner earnings, so you are paying entirely for the Hanford future.
Five-year projection (base case, FCF after SBC, capex and working capital, before interest)
| Year | Revenue | EBITDA | FCF |
|---|---|---|---|
| 2027 | ~$85M (first East-side grout task orders, EMF ramp, permit-expansion capex ~$10M) | ~$4M | ~-$8M |
| 2028 | ~$130M (AMPS feed, ~1M gal grout) | ~$16M | ~$7M |
| 2029 | ~$170M | ~$27M | ~$18M |
| 2030 | ~$200M (~1.5M gal grout + DFLAW secondary + services) | ~$34M | ~$25M |
| 2031 | ~$220M | ~$38M | ~$26M |
This is deliberately well below DOE's own volume plan. Hanford has never delivered on schedule, DFLAW runs at about 10k gal/month against 100k design, Ecology has called the dual path a diversion, and three vendors share the IDIQ. Funding is also tight: cash of about $15M against 2027 needs means another equity raise or revolver draw is likely (I assume about 1.3M more shares). If grout runs, years of growth remain: the program runs to 2041 and around 200M gallons of retrieved liquid. In 5 years the base case is a growing government-contract processor with a 15-year visible stream: not a corpse, but a single-customer, single-site, regulator-dependent business. It deserves about 15x FCF (the durable 5-10% category with concentration risk).
Fair value and multiples
DCF at 10%: PV of 2027-31 FCF is about $45M. The terminal value is $26M x 15 = $390M, with a PV of about $242M. EV is therefore about $287M; adding about $13M net cash gives about $300M of equity. On about 22.5M diluted shares that is about $13-14/share, so the stock prices in roughly the base case. Base IRR is about 10% a year (about $21/share in 2031). The bull case uses DOE volumes: 3-4M gal/yr at about $80, 2031 FCF about $60-70M at 18x, which gives $30-40/share. That is in line with Craig-Hallum's $30 target. The bear case: Ecology stalls AP-106 grouting, West-side volumes go mostly to WCS and EnergySolutions, and losses continue with another dilutive raise below $8, giving $4-6 (book value is about $58M, or $2.7/share). Multiples on 2028E: about 16x EV/EBITDA, about 25x P/E, about 2.5% FCF yield. On today's numbers every multiple is negative. Fair value is about $13.5, roughly equal to the price, with a very wide range. This is not a covered-call valuation-floor setup: IV is 75-82%, but there are no predictable earnings underneath.
Management, risks, competition
CEO Mark Duff (former Hanford/DOE contractor executive), CFO Ben Naccarato, and founder Dr. Lou Centofanti (EVP Strategic Initiatives). Management is credible on nuclear and regulatory substance and candid about misses ("not the quarter we wanted"). But it has been chronically early on Hanford timing: DFLAW revenue was guided for Q2-26 at $1-2M a month and actually ran at about $0.2-0.25M a month. It has also funded losses with repeated equity raises (May 2024, Dec 2024, May 2026). There is no fraud history and no serious governance issue. The insider-ownership signal is neutral: there are only routine director fee-in-stock grants and no open-market buying.
Key risks:
1. Washington Ecology's approval of the AP-106/200-East grouting permit mods (DOE filed in August; the 60-day comment period ended about Oct 6; no decision found yet) and of PFNW's own 10M-gallon permit mod.
2. No task order yet. Task orders can start Jan 2027 and pricing is unknown, with three-way competition. The out-of-state rivals EnergySolutions and WCS (also disposal partners) could win West-side volume on cost.
3. DFLAW ramp issues reduce EMF volumes.
4. Federal budget, shutdowns and administration priorities. The grout push is driven by the current EM leadership (Tim Walsh).
5. The going-concern note and the $5M liquidity covenant, so further dilution is likely.
6. A Notice of Violation at PFNW (April 2026, from a June 2025 inspection).
7. Customer concentration and lumpiness.
Competitive position: proximity, being permitted now, union labor, rail access and political appeal (no liquid on highways) are real and hard to replicate for the East-side and EMF streams. The H2C decision against a new on-site grout plant removed the biggest threat.
Sentiment: 4/10
The stock ran from $9.82 (May) to $19.43 (Aug, the IDIQ win), then fell 7.6% on the Q2 miss and the lock-up expiry, and has drifted to $12-13 (41% of its 1-year range). Short interest rose to 3.2M shares (about 15% of shares outstanding, 8-12 days to cover) by Sept 30. Holders are rotating: MAK Capital cut below 5% in August, while Hungarian manager HOLD Alapkezelo went from 10.6% to 15.2% by Oct 27. Craig-Hallum, the only real coverage (B. Riley asks questions on calls), rates it Buy with a $30 target (raised from $17 in Aug 2026). Consensus sees FY26 revenue down about 10%. Retail is a loyal Hanford-story base, fatigued after a decade of "next year". The mood is skeptical-but-hopeful, not capitulation and not euphoria. The near-term catalyst is the Q3 print (around Nov 10, 2026). Management said the delayed Q2 waste would be processed and caught up in Q3, so a clean Q3 with positive EBITDA would help. A third straight miss would likely bring another raise.
- /Users/gregwo/stocks2/data/analysisv3/context/PESI.md (context pack incl. Q2-2026 call transcript)
- /Users/gregwo/stocks2/data/edgar_filings/PESI/10-Q_2026-08-12_0001493152-26-037410.html (Q2-2026 10-Q: 21,218,351 shares at Aug 7 2026, cash flows, May 2026 raise, going concern)
- https://stockanalysis.com/stocks/pesi/history
- https://finviz.com/news/381363/perma-fix-reports-second-quarter-2026-results-award-of-hanford-master-idiq-subcontract-and-commencement-of-dflaw-waste-receipts
- https://www.globenewswire.com/news-release/2026/08/12/3343492/0/en/perma-fix-awarded-master-idiq-subcontract-by-hanford-tank-waste-operations-closure-for-grouting-and-disposal-of-hanford-mixed-low-level-waste.html
- https://www.tricitiesbusinessnews.com/articles/expanded-hanford-waste-grouting
- https://www.aol.com/articles/radioactive-waste-grouting-eastern-wa-223509000.html
- https://www.chronline.com/stories/feds-get-more-time-to-decide-whether-to-ship-liquid-radioactive-waste-from-washington-state,394020
- https://www.ans.org/news/2026-08-12/article-8288/hanford-site-grouting-developments-could-accelerate-cleanup/
- https://www.hanford.gov/c.cfm/media/attachments.cfm/DOE/Over_100,000_Gallons_of_Hanford_Tank_Waste_Turned_to_Glass.pdf
- https://finance.yahoo.com/markets/stocks/articles/perma-fix-pesi-stock-trades-065300061.html
- https://www.sec.gov/Archives/edgar/data/891532/000208635826000007/xslSCHEDULE_13G_X02/primary_doc.xml (HOLD Alapkezelo 15.2%, Oct 27 2026)
- https://www.sec.gov/Archives/edgar/data/891532/000138570226000006/xslSCHEDULE_13G_X02/primary_doc.xml (MAK Capital 4.8%, Aug 24 2026)
- https://www.sec.gov/Archives/edgar/data/891532/000149315226043642/form8-k.htm (Sept 2026 investor presentation 8-K)
- https://www.tipranks.com/news/the-fly/perma-fix-environmental-price-target-raised-to-20-from-18-at-craig-hallum-thefly
- https://us.trendlyne.com/us/equity/consensus-estimates/1554556/PESI/perma-fix-environmental-services-inc
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 57.7-5% | 61.7+4% | 59.1-34% | 89.7+27% | 70.6 |
| Gross profit | -3.64-168% | 5.94 | 0.00-100% | 16.4+70% | 9.61 |
| Operating expenses | 17.3-1% | 17.7+13% | 15.7+0% | 15.6+4% | 15.0 |
| ▸Adj EBITDA | -19.5 | -9.97 | -13.9-519% | 3.32 | -3.29 |
| ▸Adj OCF | -18.0 | -8.65 | -13.2-475% | 3.52 | -1.55 |
| CapEx | -7.88 | -4.85 | -3.65 | -1.76 | -1.02 |
| Adj FCF | -25.9 | -13.5 | -16.8 | 1.75 | -2.57 |
| ▸Interest expense | 0.27 | 0.41 | 0.54 | 0.42 | 0.24 |
| ▸Adj net income | -23.1 | -14.0 | -20.1 | -0.43 | -5.76 |
| ▸Owner's earnings | -12.0 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -35.6 | -15.8 | -8.95 | -13.4 | 3.83100% | -1.26 |
| FCF (OCF−capex) | -48.2 | -16.7 | -15.6 | -18.8 | 4.43116% | -1.58 |
| Net income | -54.2 | -17.1 | -13.8 | -20.0 | 0.4813% | -3.82 |
| ▸Capital returned | -38.0 | 0.99 | 1.40 | -40.1 | -1.28-33% | 1.07 |
| Buybacks | -41.9 | 0.02 | 0.02 | -41.9 | -0.09 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 1.85 | 0.25 | 0.41 | 0.54 | 0.42 | 0.24 |
| Debt paid down | 2.11 | 0.73 | 0.96 | 1.18 | -1.60 | 0.84 |
| ▸Reinvestment | 16.3 | 6.24 | 4.72 | 3.08 | 2.4163% | -0.16 |
| Capex (PP&E) | 17.0 | 5.67 | 4.85 | 3.65 | 1.76 | 1.02 |
| Intangibles & M&A | -0.04 | 0.00 | -0.03 | -0.00 | 0.00 | -0.00 |
| Leases signed (net Δ) | -0.63 | 0.57 | -0.10 | -0.57 | 0.65 | -1.18 |
| Retained / other | -8.40 | -17.4 | -16.6 | 21.9 | 6.13160% | -2.41 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 3.1 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 102 | 88.0 | 97.2 | 78.7 | 70.9 |
| ▸Liabilities (total) | 47.2 | 37.9 | 34.9 | 39.4 | 33.4 |
| Net debt (incl. leases) | -9.91 | -7.45 | -24.1 | -1.64 | 1.65 |
| Net debt / Adj EBITDA | -- | -- | -- | -0.49 | -- |
| Net debt / Adj FCF | -- | -- | -- | -0.93 | -- |
| Adj EBITDA / interest | -72.0 | -24.1 | -25.8 | 7.99 | -13.9 |
| Shares outstanding | 21.2 | 18.5 | 18.4 | 13.6 | 13.3 |
| Dilution (YoY) | +14.9% | +0.8% | +34.7% | +2.4% | +1.1% |
| Employees | 293 | 307 | 305 | 297 | 296 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | -6.3%-15.1 | 9.6%+9.6 | 0.0%-18.2 | 18.2%+4.6 | 13.6% |
| Adj EBITDA margin | -33.7%-16.7 | -16.2%+7.4 | -23.5%-27.2 | 3.7%+8.4 | -4.7% |
| Adj OCF margin | -31.2%-16.3 | -14.0%+8.3 | -22.3%-26.2 | 3.9%+6.1 | -2.2% |
| Adj FCF margin | -44.9%-23.5 | -21.9%+6.6 | -28.5%-30.4 | 1.9%+5.6 | -3.6% |
| Net income margin | -39.5%-20.4 | -22.4%+11.4 | -33.8%-34.3 | 0.5%+6.0 | -5.4% |
| Adj NI margin | -40.1%-20.6 | -22.7%+11.3 | -34.1%-33.6 | -0.5%+7.7 | -8.2% |
| ROIC (adj, after-tax) | -27.5% | -17.0% | -18.4% | 1.1% | -10.4% |
| Cost of debt | 5.6% | 9.4% | 10.3% | 9.2% | 6.0% |
Revenue Breakdown
Revenue Segments
| Segments Total | $11.1M | -20% |
| Treatment | $7.9M | -14% |
| Services | $3.3M | -31% |
| Segments Total | $11.1M | -20% |
Earnings Calls
Earnings Call · 2026 Q2
Perma-Fix Environmental Services acknowledged that its fiscal second-quarter 2026 financial performance was below expectations. Revenue declined to $12.9 million from $14.6 million in the prior-year quarter, while the net loss widened to $6.2 million, or $0.32 per share, from a $2.7 million loss, or $0.15 per share. The primary problem was a timing mismatch in the Treatment segment. Perma-Fix received the Hanford-related waste it expected, but customer-directed changes to treatment protocols, including adjustments related to a different disposal facility, delayed processing and revenue recognition from the second quarter into the third quarter. The company had already incurred labor and operating costs to handle the material. Lower-margin processing of previously stored waste and several services projects starting later than anticipated added to the pressure. Despite the weak quarter, management emphasized improving operating indicators. Treatment backlog increased 29% sequentially, from $12.2 million to $15.7 million, and stood above the prior-year level. New waste receipts increased $4.1 million from the first quarter. Management expects the delayed material already on site to move through treatment shortly and to be substantially caught up by the end of Q3. DFLAW-related receipts should build as Hanford’s vitrification operation addresses feed-system, emissions, and other equipment issues. DFLAW is currently processing roughly 10,000 gallons monthly, versus a long-term goal of approximately 100,000 gallons monthly, although July volumes reached about 35,000 gallons and August was expected to be higher. The central strategic development was DOE’s award of the H2C master IDIQ subcontract vehicle for Hanford tank-waste operations, grouting, and disposal. The vehicle has a maximum value of approximately $4.4 billion shared among subcontractors, with task orders eligible from 2027 through 2041; it is not a commitment of that amount to Perma-Fix. The company believes its Perma-Fix Northwest facility has a strong competitive position because it is about one mile from Hanford, already operating and permitted, and can solidify waste locally before rail shipment of stabilized grout. DOE selected an off-site commercial treatment path rather than constructing a new on-site facility, which management views as favorable. DOE’s glass-plus-grout strategy is intended to supplement vitrification and accelerate tank closure at lower cost. Management expects roughly 60,000 gallons per month to be available for grouting from AP-106 beginning late in 2026, potentially continuing through 2027. AMPS could provide approximately 130,000 gallons monthly for grouting in 2028, while the broader West and East tank programs could ultimately support DOE’s stated goal of 9 million gallons annually after 2030. Perma-Fix is seeking to expand its annual permit from 1.2 million gallons to approximately 9–10 million gallons. Design, concrete work, procurement, and infrastructure upgrades have begun, with completion targeted around Q2 or Q3 2027. Storage capacity would increase from approximately 650,000 to 800,000 gallons. Nuclear Services provided diversification, with quarterly revenue up 44% year over year to $4.6 million and backlog exceeding $17 million over the next 18 months. PFAS activity also improved during the summer, supported by new awards and an approximately $8 million pipeline. The company raised approximately $21 million net in May, ended the quarter with $20.5 million of cash and only $2.1 million of debt, and extended its PNC credit facility maturity from 2027 to 2030. Management acknowledged the going-concern disclosure but believes current liquidity, expected operating cash flow, and borrowing availability are sufficient for the next 12 months.
▸What grouting volumes could Perma-Fix process later in 2026 and during 2027, and how much excess East Side capacity is available?Aaron Spychalla · Craig-Hallum
▸How could the recent Class II and Class III permit modifications affect the glass-plus-grout strategy and its schedule?Aaron Spychalla · Craig-Hallum
▸Will inclusion of the EMF waste stream in the H2C contract affect the existing EMF program, and are third-quarter improvements likely as DFLAW receipts increase?Aaron Spychalla · Craig-Hallum
▸What investments, costs, and labor-force requirements will be associated with the permit expansion and capacity ramp?Aaron Spychalla · Craig-Hallum
▸What is Perma-Fix’s peak processing capacity, and how long will it take to ramp up sufficiently to meet H2C demand?Yuan Zhi · B. Riley
▸Beyond the Washington permit, are equipment upgrades or facility expansions likely to constrain the ramp?Yuan Zhi · B. Riley
▸Is it reasonable to estimate average revenue of approximately $88 per gallon using the H2C contract’s maximum cumulative value and volume?Yuan Zhi · B. Riley
▸How should investors think about long-term revenue visibility and potential lumpiness as Hanford volumes scale?Yuan Zhi · B. Riley
▸What will the facility’s processing capacity be after the planned expansion is completed next year?Steve Fein · [SoFein] LLC
▸Will the expanded capacity be available next year or only by 2030?Steve Fein · [SoFein] LLC
▸What storage capacity will Perma-Fix have after completing the upgrades?Steve Fein · [SoFein] LLC
▸Does the expansion imply annual processing capacity of roughly 10 million gallons while allowing storage of only around 1 million gallons at a time?Steve Fein · [SoFein] LLC
▸Is it significant that DOE plans to divert some waste previously expected to go to vitrification toward grouting?Steve Fein · [SoFein] LLC
▸Is Perma-Fix able to safely process essentially 100% of the received waste, whereas vitrification has much lower effective efficiency and creates secondary waste?Steve Fein · [SoFein] LLC
▸Is the absence of comparable secondary-waste generation a key distinction between Perma-Fix’s grouting and vitrification?Steve Fein · [SoFein] LLC
▸Because the tank waste is largely solid, must DOE add liquid to retrieve it, potentially increasing the 56-million-gallon inventory to roughly 150–200 million gallons for processing?Steve Fein · [SoFein] LLC
▸If Perma-Fix processes one million gallons, would that effectively correspond to three million gallons flowing through or being generated by the vitrification process?Steve Fein · [SoFein] LLC
▸Will the vitrification program improve from its current troubled performance, and does uncertainty in waste composition create an additional challenge when transporting the material?Steve Fein · [SoFein] LLC
SEC Filing Findings
SEC Filing — material findings
2026-08-12 · depth 10/10risk 6Regulatory/Enforcement▸Washington Dept. of Ecology Notice of Non-Compliance at PFNW Richland facility (from June 2025 inspection); Ecology may pursue escalated enforcement; company does not believe loss is probable and has no accrual. Not disclosed in the web-search thesis test, which reported no active NOVs.
Washington Dept. of Ecology Notice of Non-Compliance at PFNW Richland facility (from June 2025 inspection); Ecology may pursue escalated enforcement; company does not believe loss is probable and has no accrual. Not disclosed in the web-search thesis test, which reported no active NOVs.
risk 7Going Concern / Liquidity Covenants▸Auditor-reviewed filing maintains substantial doubt about going concern despite May 2026 equity raise; management says plans depend on government-directed shipments outside its control. Covenant compliance is required for borrowing availability; PNC requires $5M minimum daily liquidity.
Auditor-reviewed filing maintains substantial doubt about going concern despite May 2026 equity raise; management says plans depend on government-directed shipments outside its control. Covenant compliance is required for borrowing availability; PNC requires $5M minimum daily liquidity.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $5.00 | $6.20/$9.50 | 9 | --/$2.05 | 0 |
| $7.50 | $4.40/$6.60 | 50 | --/$2.15 | 41 |
| $10.00 | $3.00/$3.40 | 298 | $0.15/$0.50 | 485 |
| $12.50 | $1.30/$1.70 | 188 | $0.90/$1.75 | 153 |
| $15.00 | $0.40/$1.85 | 74 | $1.65/$3.50 | 256 |
| $17.50 | --/$1.00 | 82 | $3.80/$5.80 | 10 |
| $20.00 | --/$0.50 | 6,278 | $6.20/$8.70 | 19 |
| $22.50 | --/$2.10 | 60 | $8.70/$11.20 | 0 |
Short Interest
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $17.9M | $12.02 | +$1.2M | +$1.0M | — | $6.70T |
| MAK CAPITAL ONE LLC | $14.8M | $10.85 | +$1.6M | +$13.4M | — | $694M |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $11.6M | $10.92 | +$747K | +$11.6M | — | $4.68T |
| PRESCOTT GROUP CAPITAL MANAGEMENT, L.L.C. | $11.1M | $10.60 | +$0 | +$0 | — | $1.16B |
| DIAMOND HILL CAPITAL MANAGEMENT INC | $9.2M | $12.24 | +$4.1M | +$3.5M | — | $12.49B |
| KENNEDY CAPITAL MANAGEMENT LLC | $8.7M | $13.77 | +$7.9M | +$8.7M | — | $5.65B |
| Potomac Capital Management, Inc. | $6.8M | $12.35 | +$2.6M | +$6.8M | — | $137M |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $6.5M | $9.70 | +$321K | +$475K | — | $1.87T |
| HEARTLAND ADVISORS INC | $5.7M | $8.30 | +$0 | −$1.2M | — | $2.25B |
| STATE STREET CORPPassive | $5.0M | $10.66 | +$203K | +$875K | — | $3.38T |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2002 Q1 | 3M | -12M | -14M | $0.36 | $0.29 – $0.43 | 14 |
| 2002 Q2 | 22M | 6M | 3M | $0.30 | $0.24 – $0.36 | 11 |
| 2002 Q3 | 42M | 5M | 2M | $0.45 | $0.36 – $0.54 | 7 |
| 2003 Q1 | 41M | 0M | -1M | $0.32 | $0.25 – $0.38 | 13 |
| 2003 Q3 | 19M | 7M | 3M | $0.15 | $0.12 – $0.18 | 20 |
| 2009 Q1 | 73M | 4M | 2M | $-0.10 | $-0.12 – $-0.08 | 10 |
| 2009 Q2 | 9M | 2M | 0M | $0.02 | $0.02 – $0.03 | 12 |
| 2009 Q3 | 18M | 4M | 1M | $0.07 | $0.05 – $0.08 | 13 |
| 2010 Q1 | 52M | 3M | 1M | $0.15 | $0.12 – $0.18 | 10 |
| 2010 Q2 | 26M | 4M | 1M | $0.15 | $0.12 – $0.18 | 10 |
| 2010 Q3 | 41M | -1M | -2M | $0.41 | $0.33 – $0.50 | 8 |
| 2011 Q1 | 47M | 1M | -1M | $0.23 | $0.18 – $0.27 | 16 |
| 2011 Q2 | 12M | 3M | 1M | $0.05 | $0.04 – $0.07 | 10 |
| 2011 Q3 | 12M | 7M | 4M | $0.10 | $0.08 – $0.12 | 16 |
| 2012 Q2 | 51M | -2M | -3M | $0.36 | $0.29 – $0.43 | 17 |
| 2012 Q3 | 29M | 0M | -1M | $0.14 | $0.11 – $0.16 | 20 |
| 2013 Q1 | 6M | -3M | -4M | $-0.10 | $-0.12 – $-0.08 | 9 |
| 2013 Q2 | 62M | -1M | -2M | $-0.05 | $-0.06 – $-0.04 | 7 |
| 2014 Q1 | 1M | -31M | -32M | $-0.24 | $-0.29 – $-0.19 | 10 |
| 2014 Q2 | 1M | 2M | 0M | $-0.14 | $-0.16 – $-0.11 | 11 |
| 2014 Q3 | 3M | — | 8M | $0.13 | $0.10 – $0.15 | 12 |
| 2015 Q1 | 11M | -0M | -2M | $-0.07 | $-0.09 – $-0.06 | 10 |
| 2015 Q2 | 3M | 0M | -1M | $-0.06 | $-0.08 – $-0.05 | 15 |
| 2015 Q3 | 22M | 3M | 1M | $0.18 | $0.14 – $0.22 | 17 |
| 2023 Q1 | 18M | — | 26M | $1.43 | $1.43 – $1.43 | 1 |
| 2023 Q2 | 23M | 2M | 1M | $0.06 | $0.06 – $0.06 | 1 |
| 2023 Q3 | 27M | 3M | 2M | $0.10 | $0.10 – $0.10 | 1 |
| 2023 Q4 | 22M | 1M | 1M | $0.03 | $0.03 – $0.03 | 1 |
| 2024 Q1 | 16M | -4M | -5M | $-0.25 | $-0.25 – $-0.25 | 1 |
| 2024 Q2 | 16M | -2M | -3M | $-0.16 | $-0.16 – $-0.16 | 2 |
| 2024 Q3 | 17M | -1M | -2M | $-0.10 | $-0.10 – $-0.10 | 1 |
| 2024 Q4 | 16M | -2M | -3M | $-0.12 | $-0.12 – $-0.12 | 1 |
| 2025 Q1 | 15M | -2M | -3M | $-0.14 | $-0.14 – $-0.14 | 1 |
| 2025 Q2 | 16M | -2M | -3M | $-0.14 | $-0.14 – $-0.14 | 1 |
| 2025 Q3 | 16M | -2M | -3M | $-0.12 | $-0.12 – $-0.12 | 1 |
| 2025 Q4 | 18M | -2M | -2M | $-0.09 | $-0.09 – $-0.09 | 1 |
| 2026 Q1 | 13M | -4M | -5M | $-0.24 | $-0.24 – $-0.24 | 1 |
| 2026 Q2 | 13M | -6M | -7M | $-0.31 | $-0.31 – $-0.31 | 1 |
| 2026 Q3 | 15M | -4M | -4M | $-0.21 | $-0.21 – $-0.21 | 1 |
| 2026 Q4 | 17M | -2M | -3M | $-0.14 | $-0.14 – $-0.14 | 1 |
| 2027 Q1 | 19M | -1M | -2M | $-0.09 | $-0.09 – $-0.09 | 1 |
| 2027 Q2 | 23M | -0M | -1M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2027 Q3 | 25M | 1M | 0M | $0.01 | $0.01 – $0.01 | 1 |
| 2027 Q4 | 28M | 2M | 1M | $0.06 | $0.06 – $0.06 | 1 |
| 2028 Q1 | 30M | 3M | 2M | $0.08 | $0.08 – $0.08 | 1 |
| 2028 Q2 | 33M | 4M | 3M | $0.12 | $0.12 – $0.12 | 1 |
| 2028 Q3 | 36M | 6M | 4M | $0.17 | $0.17 – $0.17 | 1 |
| 2028 Q4 | 39M | 7M | 4M | $0.21 | $0.21 – $0.21 | 1 |
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand
Thesis
Perma-Fix owns strategically located, permitted waste-treatment assets with potentially valuable Hanford exposure, but the present business is financially distressed rather than an established growth compounder. TTM revenue has fallen to $57M, gross margin is negative, adjusted EBITDA is negative $17M, and adjusted net income is negative $21M. The Q2 loss was caused partly by timing and customer-directed protocol changes, but the scale of the operating deficit shows that the business has little margin for execution errors. The upside is unusually asymmetric. Hanford's decision to supplement vitrification with off-site grouting could create a much larger and more predictable treatment market, while the H2C vehicle, LLNL work, PFAS pipeline, and Nuclear Services backlog provide additional avenues for recovery. However, the H2C $4.4B headline is a shared ceiling rather than awarded revenue, and the permit expansion, task orders, waste composition, pricing, and DFLAW ramp remain uncertain. The latest call improved the long-term thesis but did not yet prove near-term profitability. The most likely path is a recovery from the current trough, not immediate achievement of management's full long-term scenario. Liquidity is better after the $21M offering and debt is modest, but the going-concern disclosure, minimum-liquidity covenant, regulatory exposure, recent losses, dilution, and dependence on government project timing justify a substantial risk discount.
Trade Signal
Short, with substantial squeeze risk: PESI is priced for a successful Hanford-driven transformation despite severe current losses, an uncertain cash runway and analyst fair value near $3-$4 per share.
The stock sold off from $15.65 in February to $8.95 in May as Q1 revenue fell 20%, losses widened, a going-concern warning appeared and the company raised equity. It then recovered sharply through June and July as Hanford receipts began, the H2C master vehicle was highlighted and investors anticipated a treatment-volume ramp; the move accelerated from roughly $13 in early July to $17.46 on July 17 and $16.93 after the July 28 preliminary-loss announcement. It reached $19.43 around the August 12 earnings release and slipped to $17.96 the next day, only about 1% below the pre-earnings level despite a $6.2 million quarterly loss and negative margins. This is an overbought, narrative-led repricing that has not yet reflected the financial facts. It may correct on the next few earnings prints, although Hanford milestones can make the overvaluation persist longer than fundamentals warrant.
The market appears constructive to speculative rather than broadly institutionally loved. The stock rose 96% over three months and 50% over a year, despite falling revenue, deeply negative EBITDA and the Q2 loss. The prevailing bull narrative focuses on the PFNW permit expansion, DFLAW receipts, the $4.4 billion H2C vehicle and PFAS optionality, while discounting that H2C is not committed PESI revenue and that operations remain distressed. The preliminary Q2 loss and earnings release produced little lasting downside, suggesting the market has been slow to absorb the financial deterioration. Short interest has climbed to 13.3% and retail flow is elevated, creating a crowded, high-volatility battleground rather than a clean consensus long.
The business could eventually inflect if DFLAW and H2C volumes become recurring, PFNW completes its capacity expansion and PFAS adds operating leverage. However, the available consensus already assumes a substantial revenue recovery from $17.5 million in Q3 2026 to $37.8 million in Q4 2027, while still forecasting negative EBITDA through that period. The study's $11 million base owner-earnings case and $25 million bull case therefore require execution beyond current evidence, not an unpriced near-term step-up. Near-term evidence is more likely to test the recovery than confirm an exceptional inflection.
- ▼late 2026 · Q3 2026 earnings and Hanford treatment update — Expected delayed Q2 material should be processed in Q3; failure to catch up or continued losses could expose the valuation gap.
- ▲late 2026 · DFLAW secondary-waste volume ramp — Higher monthly receipts and evidence of recurring PFNW throughput would support the bull case, although current volumes remain far below long-term targets.
- ▲H2 2026 · Gen 2 Perma-FAS testing and commercial awards — Successful commissioning or meaningful customer wins could add credibility to the PFAS growth option; delays would reinforce execution concerns.
- ▼Q1 2027 · Q4 2026 earnings / cash runway update — Another weak quarter or continued cash burn could revive financing and going-concern concerns; modest operational recovery may be insufficient at the current valuation.
- ▲Q2-Q3 2027 · PFNW permit-expansion milestones — Completion of design, infrastructure and permitting work is needed before the company can exploit the larger Hanford opportunity.
The May equity offering supplied approximately $21 million net but added shares and signals that internal cash generation is inadequate. TTM dilution is reported at roughly 1%, with no buyback and no material recent insider or major-holder buying. Rising short interest to 13.3% of float provides squeeze fuel, while unusually call-heavy options positioning and elevated retail participation can amplify upside volatility rather than create durable demand.
The principal support is approximately $18 million of net cash after the May offering, but that is not a hard floor because the business is burning cash and remains subject to going-concern risk. There is no committed bid, active buyback or established FCF support. Conversely, the valuation itself creates a substantial ceiling: at roughly 5.8x sales and with negative EBITDA, the stock needs rapid execution to justify its price. The H2C vehicle is shared and provides no guaranteed revenue to PESI.
Poor at $17.96. The stock is being bought for Hanford/H2C optionality and retail momentum, but the company is loss-making, has negative gross margins and a going-concern disclosure. A marginal buyer may remain interested while Hanford volumes rise, but durable institutional demand requires evidence of positive gross margins and cash generation.
Fear is stronger than greed at this price. The strategic assets and Hanford exposure are real, but the market is capitalizing a highly uncertain recovery before positive gross margins, sustainable operating cash flow or meaningful H2C task-order economics have been demonstrated. The main risk to a short is a narrative-driven squeeze on new Hanford milestones.
Valuation
The genuinely new information was the detail around the H2C vehicle and DOE's glass-plus-grout strategy: Perma-Fix appears positioned as a near-term Hanford grouting destination, with AP-106 potentially supplying roughly 60,000 gallons per month beginning late 2026 and larger streams later. The call also clarified that the Washington permit expansion is the principal bottleneck and is targeted for operation around mid-2027. The weak Q2 results and delayed processing were largely already known from the preliminary July release, while the absence of formal H2C task orders limits the immediate value of the headline opportunity.
▸ How the cases moved
The Q2 earnings miss itself was substantially previewed by the July 28 preliminary release, so the quarter's negative operating data only modestly reduced the bear/base outlook versus the day before. The call raised the bull terminal equity value from roughly $190M to $215M by clarifying the strategic importance of H2C, the expected 2027 permit completion, and the potential scale of Hanford grouting; bull probability rose from 0.18 to 0.20. Base value moved from approximately $80M to $81M with probability unchanged at 0.40. Bear probability declined from 0.42 to 0.40 because liquidity, backlog, and the Hanford pathway were better than the worst case, although the bear value remained $40M because near-term losses and execution risk persist.
Hanford and grouting awards remain slower than hoped, permitting or facility execution delays the ramp, and Services remains uneven. Management cuts costs enough to reach roughly $5M of annual owner earnings by year two, but the company remains a subscale, contract-dependent operator valued at a low sales multiple.
▸ Valuation
0.5x $50M revenue = $25M EV + $15M net cash = $40M equity
Treatment recovers as delayed Hanford material is processed, DFLAW volumes build gradually, and the LLNL agreement and Nuclear Services backlog support revenue. The Washington permit expansion is completed around mid-2027, but large-scale H2C economics are not yet fully realized. Owner earnings recover to approximately $11M annually.
▸ Valuation
6x $11M owner earnings = $66M EV + $15M net cash = $81M equity
DFLAW and H2C task orders are awarded promptly, the permit expansion works on schedule, and Perma-Fix becomes a meaningful regional Hanford grouting and secondary-waste processor. PFAS and Nuclear Services add operating leverage, producing a durable high-margin earnings stream and approximately $25M of annual owner earnings by year two.
▸ Valuation
8x $25M owner earnings = $200M EV + $15M net cash = $215M equity
▸ Target Rationale
The probability-weighted discounted scenario value is $73.12M, but I set the analytical target at $60M. The model necessarily gives credit to terminal recovery before Perma-Fix has demonstrated positive gross margins or sustainable operating cash flow. I also discount for the going-concern disclosure, the narrow liquidity cushion before the equity raise, regulatory and permitting execution risk, dilution, and the fact that H2C is a vehicle with no guaranteed Perma-Fix task-order value. The target is therefore below the arithmetic model rather than simply copying it.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Richland PFNW Facility Permit Renewal (January 2026): Effective January 1, 2026, the Washington State Department of Ecology issued a final Dangerous Mixed Waste Permit Renewal for the Perma-Fix Northwest (PFNW) facility in Richland, Washington. The permit approximately triples PFNW's permitted liquid mixed waste processing capacity, expanding authorized annual throughput from 400,000 gallons to roughly 1.2 million gallons, while authorizing up to 175,000 tons of waste treatment via macroencapsulation annually.
- $24 Million Demolition Contract (March 2026): On March 26, 2026, Perma-Fix announced it was awarded a two-year master task agreement valued at approximately $24 million by Lawrence Livermore National Security, LLC (LLNS). The company will provide demolition, excavation, and disposal services at Lawrence Livermore National Laboratory (LLNL) in California.
- Paducah Site PFAS Project Completion (April 2026): On April 6, 2026, the company successfully completed a 1,500-gallon PFAS treatment and onsite tank remediation project for Four Rivers Nuclear Partnership (FRNP), the DOE contractor responsible for the Paducah Site. The project utilized Perma-Fix's proprietary Perma-FAS destruction technology.
- Q1 2026 Earnings & Operations (May 2026): Reported on May 6, 2026, the company experienced a temporary slowdown in PFAS receipts during Q1, though activity resumed strongly in May. On the nuclear waste treatment side, backlog remains highly elevated. To capture a surge in demand from the Hanford Site’s Central Plateau cleanup, the company doubled its Transuranic (TRU) waste processing capacity by adding extra operating shifts.
- $20 Million Public Offering (May 2026): On May 15, 2026, Perma-Fix announced the pricing of a public offering of common stock to raise $20.0 million in gross proceeds to fund working capital, capital expenditures, and general corporate purposes.
▸ Thesis-test Findings
Washington State Department of Ecology Richland facility NOV enforcement actions Perma-Fix 2026
A search for 2026 Notice of Violation (NOV) enforcement actions against Perma-Fix's Richland facility (PFNW) indicates a highly stable regulatory profile, contrary to historic bear-case concerns. There are no active or pending NOVs or major enforcement actions issued by the Washington Department of Ecology against the facility in 2026. In fact, the regulatory relationship has proven highly productive: the Department of Ecology finalized a major Dangerous Mixed Waste Permit Renewal effective January 1, 2026, allowing Perma-Fix to significantly expand its liquid waste treatment footprint. Furthermore, Perma-Fix's SEC filings from mid-May 2026 explicitly declare that the company is not subject to any outstanding notices of violation, material suits, or inquiries.
Hanford DFLAW liquid secondary waste treatment start date May 2026
This query provides a powerful piece of evidence supporting the bull thesis. The Hanford Direct-Feed Low-Activity Waste (DFLAW) vitrification facility is actively operational and successfully solidifying tank waste (having vitrified over 100,000 gallons as of May 2026). In late May 2026, the Washington Department of Ecology agreed to a significant operational shift: instead of recycling the liquid secondary waste generated during vitrification back through the glass melters, the state will allow this secondary waste to be grouted and stabilized offsite at Perma-Fix Northwest (PFNW) in Richland before being shipped out of state. This milestone diverts an estimated 87,000 gallons of waste annually directly to PFNW, establishing a highly visible and recurring high-margin treatment stream for Perma-Fix.
Perma-Fix Oak Ridge Gen 2 PFAS commercial contract wins
Findings for this query represent a mixed near-term outlook but a highly supportive long-term expansion case. Perma-Fix is currently assembling its Gen 2.0 Perma-FAS destruction system at its Environmental Waste Operations Center (EWOC) in Oak Ridge, TN, designed to triple the company’s overall PFAS processing capacity to 3,000 gallons per day. Although supply chain and fabrication issues delayed the system’s initial testing phase from early May into later in the year, commercial pipeline momentum is picking up. While massive commercial contract wins specifically dedicated to the Oak Ridge Gen 2 unit have not been formally publicized yet, the company completed its first commercial-scale DOE-contractor PFAS project in April and reported "several new wins at regional airports" in May 2026.