Pinnacle West Capital Corporationv3 4.0/10 · 2026-11-13Pinnacle West Capital Corporation (PNW), primarily operating through its Arizona Public Service Company (APS) subsidiary, delivers retail and wholesale electricity services predominantly within Arizona. The company manages the full scope of electricity provision, encompassing generation, transmission, and distribution, leveraging a diverse energy portfolio that includes coal, nuclear, natural gas, oil, and solar power facilities. Its robust infrastructure for power delivery features approximately 5,814 pole miles of overhead transmission lines and roughly 74 miles of subterranean transmission lines. For distribution, the company maintains about 11,258 miles of overhead lines and an estimated 22,821 miles of underground primary cabling. This network is further supported by 475 owned and managed transmission and distribution substations. PNW possesses or leases roughly 6,323 megawatts of regulated power generation capacity and supplies electricity to an estimated 1.3 million customers. Established in 1985, Pinnacle West Capital Corporation's corporate headquarters are situated in Phoenix, Arizona.
2-Year Price History
Valuation v3 Opus worker · 2026-11-13
Pinnacle West (APS) owns the monopoly grid in one of the fastest-growing US territories. Weather-normalized sales grew more than 9% for two quarters running, 2026 EPS guidance was raised about 10% to $5.05-5.25, and long-term sales growth was lifted to 8-10% a year through 2030, backed by a 25-year TSMC direct pricing contract (1.88 GW) and 5.8 GW of committed load. The best bull case is that a constructive December rate case plus formula rates close the roughly 200bp under-earning gap by 2029, so EPS growth converges with 8-10%+ rate-base growth. The market already knows this. The stock is at the top of its 3-year range (last close $107.43 on 2026-11-12, up about 22% this year) and trades at about 21x 2026 EPS, which includes weather, and 19x 2027, a premium to the utility group. Free cash flow is deeply negative (capex is about 3x D&A), and the company funds the gap with roughly $1B of new equity a year (about 22M forward shares still to settle). Valued as the brief asks (unlevered owner earnings of about $1.0B, growth capex counted, 10% discount rate, about 21x year-5 NOPAT), equity comes to about $55/share, half the price, because a regulated business earning a ~9.5% allowed ROE cannot clear a 10% hurdle. On market utility multiples it is roughly fairly priced at $100-110. That leaves no mispricing to exploit, and the binary December rate-case vote, RUCO's Supreme Court challenge to formula rates and a 2021 precedent of the ACC slashing ROE make it a poor short as well. Rating 4.0 (DCF well below price, but the business is safe and visible); interest 2.5: a good utility that is fully priced.
A deep dive would have to establish: Will the December 2026 ACC order deliver formula rates and an ROE that let APS actually earn near its authorized return on a rate base compounding 8-10%, and is that not already in a 19x 2027 multiple at a 3-year high?
Research (expand)
What it does. APS is Arizona's largest vertically integrated electric utility: 1.4M customers, part owner and operator of Palo Verde nuclear, about 6.3 GW owned generation, and a FERC transmission business. Customers are captive. Sentiment is souring (4/10) as bills climb, with a pending ~14% base-rate request.
What the market believes. Arizona is a structural load-growth story: TSMC ($265B planned), Amkor, other manufacturing and data centers. Q3 weather-normalized sales were +9.5% (C&I +14.5%). The new IRP doubles energy needs by 2041, and the DPC framework makes big customers pre-fund their infrastructure. Investors are pricing a constructive December rate order with formula rates, then a step-up in the capital plan and guidance in February 2027. Stock: 3-yr high, about 92% of its 1-yr range.
What it earns. 2026E net income is about $630M ($5.15 x ~122M shares). Adding back after-tax net interest (~$410M) gives NOPAT, i.e. unlevered owner earnings, of about $1.0-1.05B with maintenance capex taken as roughly equal to D&A (~$1.04B). Reported FCF is negative: 9M-2026 OCF $1.35B against capex $2.09B. 2025: OCF $1.81B, capex $2.62B. Capex runs about $3.5-4B a year in 2027-28 before IRP and Cholla additions. Dividends (~3.4% yield) and growth are paid for with debt and ATM/forward equity (~$920M priced YTD).
Five-year FCF (unlevered, after growth capex, $M): -1,200, -1,100, -1,000, -900, -700. DPC prepayments and formula-rate cash help. By 2031 NOPAT is about $1.65B, rate base has compounded 8-10%, and lag is mostly closed. This is a durable, still-growing regulated utility ("neither" bucket, upper end). Confidence in the business is high. Confidence in the return on equity it is allowed to earn is moderate.
Valuation. Market cap $13.0B (121.2M shares), net debt about $11.4B (LTD $10.16B + current $0.83B + CP $0.44B, cash ~$0), EV about $24.5B. That is about 24x 2026 NOPAT, about 10.8x EBITDA, 21x 2026 EPS and 19x 2027 consensus (~$5.68). At a 10% discount rate with an 18-24x year-5 NOPAT multiple, the DCF gives $26-77, mid about $55. The price implies roughly a 6-6.5% unlevered return, or about 8% to equity: dividend plus 6-7% EPS growth net of dilution, with the multiple held. My judgment fair value is about $100, i.e. 17.5-18x 2027 EPS. Nothing here would get us to a 50% return. Options: call IV 13% at a 3-yr high; this is not a valuation-floor covered-call setup.
Management, risks, competition. CEO Geisler and CFO Cooper are disciplined and candid about lag. They will not put nuclear on the balance sheet and insist on 'growth pays for growth'. Risks:
- The ACC is elected and history matters: the 2021 order cut ROE to 8.7% and the stock fell sharply.
- RUCO is asking the Arizona Supreme Court to block formula rates.
- The solar grid-access charge was vacated.
- Political backlash over affordability and shutoffs ($7M AG settlement).
- Equity overhang of about 22M forward shares, a 40% APS equity-ratio dividend covenant, and $711M of collateral triggers below investment grade.
- Execution risk on a ~15 GW build, and Colorado River water over the long term.
There is no retail competitor. The only competition is in procurement, where APS targets about 40-50% ownership of new generation.
Investor sentiment: 7/10. The stock is at a 3-yr high after the guidance raise and analysts are upbeat. But short interest climbed from 8.2M to 12.5M shares (8.8 days to cover) as the stock rose. Much of that likely hedges the forward/ATM issuance, though it may also reflect bets against the rate case.
- /Users/gregwo/stocks2/data/analysisv3/context/PNW.md (2026Q3 call transcript, price history, 10-Q forensic findings)
- /Users/gregwo/stocks2/data/edgar_filings/PNW/10-Q_2026-11-03_0000764622-26-000050.html
- /Users/gregwo/stocks2/data/edgar_filings/PNW/8-K_2026-11-03_0000764622-26-000051_EX99-1.html
- https://data.sec.gov/api/xbrl/companyconcept/CIK0000764622/us-gaap/NetCashProvidedByUsedInOperatingActivities.json
- https://data.sec.gov/api/xbrl/companyconcept/CIK0000764622/us-gaap/PaymentsToAcquireProductiveAssets.json
- https://data.sec.gov/api/xbrl/companyconcept/CIK0000764622/us-gaap/LongTermDebtNoncurrent.json
- https://stockanalysis.com/stocks/pnw/financials/balance-sheet/?p=quarterly
- https://www.spglobal.com/marketintelligence/en/news-insights/latest-news-headlines/pinnacle-west-shares-tumble-after-regulators-slash-returns-in-rate-case-66991920
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 5706+8% | 5340+4% | 5125+9% | 4696+9% | 4324 |
| Gross profit | 2996+48% | 1861-13% | 2137+16% | 1845+8% | 1708 |
| Operating expenses | 1523+64% | 702-38% | 1125+10% | 1020+4% | 976 |
| ▸Adj EBITDA | 2453+18% | 2129+8% | 1968+17% | 1679+8% | 1550 |
| ▸Adj OCF | 1615-4% | 1714+3% | 1667+45% | 1149-7% | 1239 |
| CapEx | -2761 | -2625 | -2249 | -1846 | -1707 |
| Adj FCF | -1146 | -911 | -582 | -697 | -468 |
| Interest expense | 477 | 422 | 377 | 331 | 256 |
| ▸Adj net income | 885+50% | 633+19% | 531+25% | 426+9% | 392 |
| ▸Owner's earnings | 650 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 9501100% | 1871100% | 2130100% | 2070100% | 1781100% | 1649100% |
| FCF (OCF−capex) | -3303-35% | -739-40% | -820-38% | -639-31% | -639-36% | -466-28% |
| Net income | 285630% | 64635% | 61729% | 60929% | 50228% | 48429% |
| ▸Capital returned | -445-5% | 20711% | -371-17% | 33.52% | -177-10% | -137-8% |
| Buybacks | -412 | 7.30 | -84.6 | -341 | 4.09 | 2.65 |
| Dividends | 1912 | 329 | 423 | 395 | 386 | 379 |
| Interest paid | 1749 | 363 | 422 | 377 | 331 | 256 |
| Debt paid down | -3694 | -492 | -1131 | -397 | -899 | -774 |
| ▸Reinvestment | 14469152% | 4082218% | 4750223% | 2508121% | 150584% | 162398% |
| Capex (PP&E) | 10519 | 2092 | 2625 | 2249 | 1846 | 1707 |
| Intangibles & M&A | -761 | 0.00 | 199 | -84.3 | -875 | 0.00 |
| Leases signed (net Δ) | 4710 | 1991 | 1927 | 343 | 534 | -84.4 |
| Retained / other | -348-4% | -583-31% | -225-11% | -211-10% | 74542% | -73.3-4% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 77 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 33464 | 31683 | 26103 | 24661 | 22723 |
| ▸Liabilities (total) | 25942 | 24596 | 19245 | 18376 | 16564 |
| Net debt (incl. leases) | 16956 | 17838 | 11045 | 10298 | 8872 |
| Net debt / Adj EBITDA | 6.91 | 8.38 | 5.61 | 6.13 | 5.73 |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | 5.15 | 5.04 | 5.21 | 5.07 | 6.06 |
| Shares outstanding | 121 | 122 | 114 | 114 | 113 |
| Dilution (YoY) | +1.5% | +6.7% | +0.2% | +0.7% | +0.1% |
| Employees | 94.0 | 2400 | 2300 | 2200 | 2059 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 52.5%+14.3 | 34.9%-6.8 | 41.7%+2.4 | 39.3%-0.2 | 39.5% |
| Adj EBITDA margin | 43.0%+3.9 | 39.9%+1.5 | 38.4%+2.7 | 35.8%-0.1 | 35.8% |
| Adj OCF margin | 28.3%-3.5 | 32.1%-0.4 | 32.5%+8.1 | 24.5%-4.2 | 28.6% |
| Adj FCF margin | -20.1%-5.1 | -17.1%-5.7 | -11.4%+3.5 | -14.8%-4.0 | -10.8% |
| Net income margin | 11.6%+0.4 | 11.6%-0.3 | 11.9%+1.2 | 10.7%-0.5 | 11.2% |
| Adj NI margin | 15.5%+4.4 | 11.9%+1.5 | 10.4%+1.3 | 9.1%+0.0 | 9.1% |
| ROIC (adj, after-tax) | 5.2% | 4.0% | 4.8% | 4.3% | 4.3% |
| Cost of debt | 3.1% | 2.9% | 3.4% | 3.3% | 3.0% |
Revenue Breakdown
Revenue Segments
| Electric Service | $601.7M | +15% |
| Electric and Transmission Service | $32.0M | +25% |
| Wholesale Energy | $15.0M | -40% |
Earnings Calls
Earnings Call · 2026 Q3
Pinnacle West reported strong Q3 2026 results, with EPS of $3.49, up $0.10 year over year, driven by exceptional sales growth across customer classes, customer expansion and favorable weather. These gains more than offset higher depreciation, amortization and financing costs. Management raised 2026 EPS guidance to $5.05-$5.25 from $4.55-$4.75. Weather-normalized sales rose 9.5% (commercial and industrial up 14.5%, residential up 4.5%), the second straight quarter above 9%, and customer growth was 1.8%. The 2026 retail sales growth outlook is now 8%-10%, with 5%-7% from large C&I. The long-term sales growth outlook through 2030 rises from 5%-7% to 8%-10%, with large C&I contributing 7%-9% and customer growth of 1.5%-2.5%. Operationally, APS served 12 record peak demand days, and Palo Verde ran at a 100% capacity factor over the summer. APS pledged $250,000 for flood relief and $5 million in hardship assistance. In October APS signed its first direct pricing contract (DPC) with TSMC: a 25-year agreement for about 1.88 GW at full build-out, subject to regulatory approval, with upfront capital contributions and credit support so that residential customers do not subsidize growth. It is designed as a repeatable framework, and APS expects to file it with the commission shortly. Amkor expanded its Peoria investment to about $12 billion. The recently filed Integrated Resource Plan (IRP) projects energy requirements more than doubling by 2041 to about 80,600 GWh and peak demand of 14.5 GW. The preferred plan includes nearly 15 GW of new resources and about 2.6 GW of added transmission. Committed demand is 5.8 GW, up 1.3 GW, and it excludes the 20+ GW uncommitted queue. About half of the resources are in development, including 4.5 GW in service by 2028 and 2.8 GW of thermal, and roughly 40% are APS-owned. The remainder will be procured through annual all-source RFPs. Management is targeting closer to 50-50 ownership. Financing: in Q3 APS issued $700 million of senior notes and priced about $235 million under the ATM, bringing the year-to-date total to about $920 million. Most of the 2026-2027 equity need is priced. Management wants to keep the utility equity ratio above 50% (currently 52%+) and sees the formula rate and DPC upfront cash supporting credit metrics. Regulatory: closing briefs are filed in the rate case, an ALJ recommended order is expected within weeks, and a final decision is expected by year-end, likely mid-December. The long-term financial outlook and capital plan update will come on the Q4 call in February. The formula rate would see its first filing in May 2027, with 2029 as the run rate. Management aims to earn within 50 bps of the authorized return.
▸What is the limiting factor for incremental equity issuance as customer-backed projects enter the plan: FFO to debt or the utility equity capital structure?Julien Dumoulin-Smith · Jefferies
▸How should dilution and the translation of rate base growth into earnings growth be viewed, given potentially double-digit rate base growth?Julien Dumoulin-Smith · Jefferies
▸Historically there is about 200 bps of lag between EPS and rate base growth. Will 8%-10% sales growth narrow it, and what is the structural lag?Shahriar Pourreza · Wells Fargo
▸Could there be a special call in December to update the plan after the rate case order, or will the update wait until February?Shahriar Pourreza · Wells Fargo
▸What are the high-level in-service timing plans for the 15 GW of generation and 2.6 GW of transmission in the IRP?Richard Sunderland · Truist Securities
▸How does APS's anchor shipper status on the new gas pipeline tie to committed resources and customers?Richard Sunderland · Truist Securities
▸How will RFPs be staged to settle megawatts and the utility-owned versus non-owned split?David Arcaro · Morgan Stanley
▸Are projects excluded from the CapEx plan until they are won through RFPs?David Arcaro · Morgan Stanley
▸What milestones are needed before transmission CapEx is included in the forecast?David Arcaro · Morgan Stanley
▸Can the DPC framework be replicated for data centers and other manufacturers, and how soon could uncommitted queue load convert to committed?Nicholas Campanella · Barclays
▸What is the composition of the 8%-10% sales forecast, and does it include TSMC's total expansion?Nicholas Campanella · Barclays
▸Will higher long-term sales growth affect affordability?Paul Patterson · Glenrock Associates
▸How will transmission costs be allocated between large load customers and traditional retail FERC rates?Travis Miller · Morningstar
▸What is the timing to reach the 50 bps earnings gap target?Travis Miller · Morningstar
▸Could election results delay the rate case decision?Travis Miller · Morningstar
▸Can you explain and quantify the prepaid revenue feature of DPCs and how much of the capital need it covers?Sophie Karp · KeyBanc
▸Is nuclear uprate an option in the IRP?Sophie Karp · KeyBanc
▸How much of the $0.50 midpoint guidance raise was weather versus sales growth, and how much carries into 2027?Anthony Crowdell · Mizuho
▸Does the 2-3:1 ratio of new resources to committed load hold as load is added, and will the 40% APS ownership mix shift as DPCs increase?Stephen D'Ambrisi · RBC Capital Markets
SEC Filing Findings
SEC Filing — material findings
2026-11-03 · depth 9/10risk 6Liquidity/Covenants▸APS common equity ratio covenant: APS cannot pay common dividends if payment would reduce common equity ratio below 40%; ACC also limits equity infusions to 2.5% of total assets (3-yr rolling average), constraining Pinnacle West's ability to downstream capital to APS while capex is rising.
APS common equity ratio covenant: APS cannot pay common dividends if payment would reduce common equity ratio below 40%; ACC also limits equity infusions to 2.5% of total assets (3-yr rolling average), constraining Pinnacle West's ability to downstream capital to APS while capex is rising.
risk 6Hidden Liability▸TSMC Direct Pricing Contract requires upfront credit-support payments and collateral from APS beginning January 1, 2027, with amount varying by resource in-service dates; collateral obligations not quantified.
TSMC Direct Pricing Contract requires upfront credit-support payments and collateral from APS beginning January 1, 2027, with amount varying by resource in-service dates; collateral obligations not quantified.
risk 6Hidden Liability▸Contingent collateral exposure: if PNW/APS debt ratings fell below investment grade, counterparties could demand additional collateral of ~$51M on derivatives plus ~$711M on non-derivative energy contracts.
Contingent collateral exposure: if PNW/APS debt ratings fell below investment grade, counterparties could demand additional collateral of ~$51M on derivatives plus ~$711M on non-derivative energy contracts.
risk 6Litigation▸Arizona Court of Appeals ruled the residential solar grid access charge was imposed without adequate notice; ACC denied reconsideration and APS plans Supreme Court petition, creating regulatory/legal uncertainty over rate design.
Arizona Court of Appeals ruled the residential solar grid access charge was imposed without adequate notice; ACC denied reconsideration and APS plans Supreme Court petition, creating regulatory/legal uncertainty over rate design.
risk 6Regulatory▸Pending formula-rate policy challenge: RUCO filed a special action with the Arizona Supreme Court seeking to enjoin implementation of retail formula rates, which underpins the company's regulatory-lag remedy.
Pending formula-rate policy challenge: RUCO filed a special action with the Arizona Supreme Court seeking to enjoin implementation of retail formula rates, which underpins the company's regulatory-lag remedy.
risk 6Dilution▸Substantial forward-sale equity overhang: ~10.6M shares under ATM forward agreements (~$1.04B) plus ~11.2M shares under February 2024 forwards, with settlement dilution to basic EPS upon delivery.
Substantial forward-sale equity overhang: ~10.6M shares under ATM forward agreements (~$1.04B) plus ~11.2M shares under February 2024 forwards, with settlement dilution to basic EPS upon delivery.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $90.00 | $15.00/$17.70 | 0 | --/$3.50 | 42 |
| $95.00 | $9.70/$13.10 | 74 | --/$3.10 | 18 |
| $100.00 | $6.40/$8.10 | 845 | $0.75/$1.15 | 86 |
| $105.00 | $2.20/$4.50 | 113 | $1.10/$2.60 | 7 |
| $110.00 | $0.15/$2.45 | 1,323 | $4.20/$6.40 | 2 |
| $115.00 | --/$1.15 | 1,305 | $8.30/$10.70 | 0 |
| $120.00 | --/$2.85 | 6 | $12.30/$16.50 | 0 |
| $125.00 | --/$1.15 | 7 | $17.30/$21.50 | 0 |
Short Interest
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| Capital Research Global Investors | $1.76B | $76.51 | +$6.1M | +$150M | — | $716.77B |
| BlackRock, Inc.Passive | $1.26B | $83.59 | +$1.5M | +$128M | — | $6.70T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $845M | $100.83 | +$10.3M | +$845M | — | $4.68T |
| STATE STREET CORPPassive | $751M | $71.33 | +$11.3M | +$38.5M | — | $3.38T |
| BARROW HANLEY MEWHINNEY & STRAUSS LLC | $704M | $70.36 | −$45.5M | −$8.5M | — | $32.90B |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $641M | $100.75 | −$193K | +$641M | — | $2.22T |
| ATLAS Infrastructure Partners (UK) Ltd. | $571M | $85.14 | +$27.6M | +$264M | — | $3.30B |
| Invesco Ltd. | $447M | $67.72 | −$8.2M | −$8.1M | — | $1.26T |
| Soroban Capital Partners LP | $415M | $91.20 | +$2.2M | +$415M | — | $14.16B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $344M | $74.65 | +$9.6M | +$21.0M | — | $1.87T |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2006 Q1 | 1.4B | 163M | 17M | $0.34 | $0.27 – $0.41 | 16 |
| 2006 Q2 | 772M | 340M | 90M | $0.69 | $0.55 – $0.83 | 11 |
| 2006 Q3 | 959M | 446M | 162M | $1.44 | $1.15 – $1.73 | 10 |
| 2006 Q4 | 1.3B | 197M | 24M | $0.31 | $0.24 – $0.37 | 20 |
| 2007 Q1 | 738M | 171M | 18M | $0.18 | $0.14 – $0.22 | 11 |
| 2007 Q2 | 863M | 389M | 79M | $0.78 | $0.62 – $0.94 | 9 |
| 2007 Q3 | 839M | 488M | 156M | $1.19 | $0.95 – $1.43 | 15 |
| 2007 Q4 | 1.7B | 109M | 6M | $-0.15 | $-0.18 – $-0.12 | 7 |
| 2008 Q1 | 1.7B | 150M | -10M | $0.22 | $0.17 – $0.26 | 18 |
| 2008 Q2 | 684M | 271M | 95M | $0.57 | $0.46 – $0.68 | 13 |
| 2008 Q3 | 1.1B | 348M | 157M | $1.62 | $1.30 – $1.94 | 19 |
| 2008 Q4 | 204M | 55M | -52M | $-0.04 | $-0.05 – $-0.03 | 17 |
| 2009 Q1 | 251M | 92M | -72M | $-0.05 | $-0.07 – $-0.04 | 18 |
| 2009 Q2 | 925M | 258M | 76M | $0.97 | $0.78 – $1.16 | 20 |
| 2009 Q3 | 972M | 371M | 164M | $1.54 | $1.23 – $1.85 | 20 |
| 2009 Q4 | 454M | 149M | -18M | $-0.07 | $-0.08 – $-0.05 | 9 |
| 2010 Q1 | 87M | 124M | -49M | $-0.08 | $-0.10 – $-0.06 | 18 |
| 2010 Q2 | 822M | 314M | 117M | $0.87 | $0.70 – $1.04 | 19 |
| 2010 Q3 | 1.1B | 446M | 226M | $1.94 | $1.55 – $2.33 | 12 |
| 2010 Q4 | 110M | 212M | 26M | $0.04 | $0.03 – $0.04 | 14 |
| 2011 Q1 | 46M | 17M | -163M | $-0.11 | $-0.13 – $-0.09 | 8 |
| 2011 Q2 | 882M | 292M | 95M | $0.94 | $0.75 – $1.13 | 16 |
| 2011 Q3 | 1.1B | 468M | 241M | $2.00 | $1.60 – $2.40 | 12 |
| 2011 Q4 | 496M | 188M | 8M | $0.03 | $0.03 – $0.04 | 9 |
| 2012 Q1 | 621M | 164M | -8M | $-0.07 | $-0.08 – $-0.06 | 13 |
| 2012 Q2 | 824M | 311M | 114M | $0.98 | $0.78 – $1.18 | 13 |
| 2012 Q3 | 1.1B | 467M | 248M | $2.27 | $1.82 – $2.72 | 7 |
| 2012 Q4 | 491M | 186M | 15M | $0.11 | $0.09 – $0.13 | 19 |
| 2013 Q1 | 510M | 189M | 16M | $0.07 | $0.05 – $0.08 | 9 |
| 2013 Q2 | 893M | 326M | 128M | $1.12 | $0.90 – $1.34 | 10 |
| 2013 Q3 | 1.2B | 462M | 239M | $2.28 | $1.82 – $2.74 | 8 |
| 2013 Q4 | 604M | 185M | 20M | $0.16 | $0.13 – $0.19 | 14 |
| 2014 Q1 | 637M | 189M | 15M | $0.12 | $0.10 – $0.14 | 14 |
| 2014 Q2 | 876M | 325M | 128M | $1.11 | $0.89 – $1.33 | 11 |
| 2014 Q3 | 1.1B | 454M | 237M | $2.08 | $1.66 – $2.50 | 15 |
| 2014 Q4 | 2.6B | 179M | 8M | $0.28 | $0.22 – $0.33 | 8 |
| 2015 Q1 | 863M | 209M | 20M | $0.22 | $0.18 – $0.26 | 16 |
| 2015 Q2 | 996M | 348M | 136M | $1.36 | $1.09 – $1.63 | 19 |
| 2015 Q3 | 1.2B | 502M | 259M | $2.34 | $1.87 – $2.81 | 8 |
| 2015 Q4 | 516M | 219M | 26M | $0.17 | $0.13 – $0.20 | 13 |
| 2016 Q1 | 2.0B | 194M | 7M | $0.18 | $0.14 – $0.22 | 7 |
| 2016 Q2 | 966M | 342M | 128M | $1.20 | $0.96 – $1.44 | 14 |
| 2016 Q3 | 1.2B | 511M | 270M | $2.47 | $1.98 – $2.96 | 8 |
| 2016 Q4 | 739M | 252M | 53M | $0.47 | $0.38 – $0.56 | 18 |
| 2017 Q1 | 516M | 214M | 16M | $0.11 | $0.09 – $0.13 | 7 |
| 2017 Q2 | 742M | 339M | 122M | $0.85 | $0.68 – $1.02 | 13 |
| 2017 Q3 | 1.1B | 515M | 259M | $2.18 | $1.74 – $2.62 | 13 |
| 2017 Q4 | 480M | 227M | 10M | $0.05 | $0.04 – $0.07 | 20 |
| 2018 Q1 | 1.6B | 221M | 5M | $0.10 | $0.08 – $0.12 | 20 |
| 2018 Q2 | 974M | 416M | 167M | $1.48 | $1.18 – $1.78 | 20 |
| 2018 Q3 | 1.2B | 586M | 306M | $2.64 | $2.11 – $3.17 | 9 |
| 2018 Q4 | 592M | 240M | 19M | $0.13 | $0.10 – $0.16 | 7 |
| 2019 Q1 | 719M | 243M | 18M | $0.17 | $0.16 – $0.17 | 6 |
| 2019 Q2 | 979M | 407M | 158M | $1.42 | $1.36 – $1.46 | 4 |
| 2019 Q3 | 1.3B | 625M | 336M | $2.99 | $2.86 – $3.07 | 3 |
| 2019 Q4 | 772M | 277M | 49M | $0.47 | $0.45 – $0.49 | 3 |
| 2020 Q1 | 742M | 254M | 21M | $0.16 | $0.16 – $0.17 | 2 |
| 2020 Q2 | 916M | 422M | 162M | $1.50 | $1.44 – $1.54 | 2 |
| 2020 Q3 | 1.2B | 612M | 320M | $2.88 | $2.76 – $2.96 | 2 |
| 2020 Q4 | 716M | 120M | -109M | $0.04 | $0.04 – $0.04 | 2 |
| 2021 Q1 | 706M | 264M | 26M | $0.26 | $0.25 – $0.26 | 2 |
| 2021 Q2 | 946M | 446M | 179M | $1.65 | $1.58 – $1.69 | 4 |
| 2021 Q3 | 1.2B | 616M | 313M | $2.79 | $2.67 – $2.86 | 3 |
| 2021 Q4 | 660M | 306M | 50M | $0.05 | $0.05 – $0.05 | 3 |
| 2022 Q1 | 693M | 276M | 9M | $0.07 | $0.07 – $0.07 | 4 |
| 2022 Q2 | 975M | 441M | 148M | $1.31 | $1.26 – $1.35 | 3 |
| 2022 Q3 | 1.3B | 746M | 396M | $2.61 | $2.50 – $2.68 | 3 |
| 2022 Q4 | 638M | 339M | 55M | $-0.18 | $-0.19 – $-0.17 | 3 |
| 2023 Q1 | 808M | 296M | 10M | $0.01 | $0.01 – $0.01 | 2 |
| 2023 Q2 | 1.1B | 485M | 163M | $1.16 | $1.14 – $1.18 | 5 |
| 2023 Q3 | 1.6B | 829M | 435M | $3.42 | $3.21 – $3.55 | 7 |
| 2023 Q4 | 1.1B | 376M | 60M | $-0.13 | $-0.26 – $0.03 | 6 |
| 2024 Q1 | 982M | 327M | 11M | $-0.02 | $-0.06 – $0.03 | 5 |
| 2024 Q2 | 1.2B | 528M | 159M | $1.28 | $1.26 – $1.30 | 6 |
| 2024 Q3 | 1.7B | 865M | 434M | $3.49 | $2.96 – $4.10 | 13 |
| 2024 Q4 | 1.1B | 322M | -18M | $-0.14 | $-0.17 – $-0.10 | 5 |
| 2025 Q1 | 1000M | 348M | 2M | $0.02 | $0.02 – $0.02 | 3 |
| 2025 Q2 | 1.4B | 580M | 198M | $1.59 | $1.54 – $1.64 | 6 |
| 2025 Q3 | 1.8B | 809M | 382M | $3.07 | $3.03 – $3.10 | 4 |
| 2025 Q4 | 1.2B | 359M | 6M | $0.05 | $0.03 – $0.07 | 4 |
| 2026 Q1 | 1.1B | 377M | 1M | $0.01 | $-0.01 – $0.03 | 5 |
| 2026 Q2 | 1.4B | 596M | 181M | $1.46 | $1.42 – $1.58 | 6 |
| 2026 Q3 | 1.9B | 879M | 413M | $3.32 | $3.08 – $3.62 | 5 |
| 2026 Q4 | 1.1B | 377M | -14M | $-0.12 | $-0.21 – $-0.06 | 4 |
| 2027 Q1 | 1.2B | 434M | 26M | $0.21 | $0.19 – $0.22 | 2 |
| 2027 Q2 | 1.6B | 671M | 209M | $1.68 | $1.54 – $1.79 | 1 |
| 2027 Q3 | 2.1B | 997M | 456M | $3.67 | $3.38 – $3.91 | 1 |
| 2027 Q4 | 1.3B | 480M | 15M | $0.12 | $0.11 – $0.13 | 1 |
| 2028 Q1 | 1.3B | 510M | 32M | $0.26 | $0.24 – $0.27 | 1 |
| 2028 Q2 | 1.6B | 787M | 249M | $2.00 | $1.84 – $2.13 | 1 |
| 2028 Q3 | 2.1B | 1.1B | 482M | $3.87 | $3.57 – $4.13 | 1 |
| 2028 Q4 | 1.4B | 541M | 14M | $0.11 | $0.10 – $0.12 | 1 |
| 2029 Q1 | 2.0B | 596M | 41M | $0.33 | $0.30 – $0.35 | 1 |
| 2029 Q2 | 2.0B | 884M | 264M | $2.12 | $1.95 – $2.26 | 1 |
| 2029 Q3 | 2.0B | 1.2B | 518M | $4.17 | $3.84 – $4.44 | 1 |
| 2029 Q4 | 2.0B | 628M | 17M | $0.14 | $0.13 – $0.15 | 1 |
| 2030 Q1 | 2.0B | 680M | 46M | $0.37 | $0.34 – $0.39 | 1 |
| 2030 Q2 | 2.0B | 990M | 290M | $2.33 | $2.15 – $2.48 | 1 |
| 2030 Q3 | 2.0B | 1.3B | 560M | $4.50 | $4.15 – $4.80 | 1 |
| 2030 Q4 | 2.0B | 727M | 43M | $0.35 | $0.32 – $0.37 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-11-09 | SELL | Sims Paula J | director | 2,000 | $105.44 | $211K | $952K |
| 2026-08-10 | SELL | Blankenship Elizabeth A | officer: VP, Controller and CAO | 980 | $99.17 | $97K | $1.08M |
| 2026-08-07 | SELL | Esparza Jose Luis Jr | other: SVP Public Policy APS | 1,800 | $102.01 | $184K | $501K |
| 2026-05-13 | SELL | Tetlow Jacob | other: EVP, COO, APS | 6,567 | $99.00 | $650K | $657K |
v2 analysis (legacy, 2026-08-04) — for comparison onlyclick to expand
Thesis
PNW owns a regulated Arizona electric franchise at an unusually attractive demand inflection. Semiconductor manufacturing, data centers, residential growth, and broader commercial expansion are driving weather-normalized sales growth well above the historical norm. TSMC's additional $100B Arizona commitment is a meaningful long-duration demand signal, and transmission investment plus potential gas capacity create a large rate-base opportunity. The constraint is not demand but capital recovery. Capex is running far above operating cash flow, lease and purchased-power commitments are rising, debt has increased, and equity issuance is likely to remain part of the funding model. The pending Arizona rate case is therefore central: a favorable outcome can turn rapid load growth into attractive earnings growth, while a weak decision leaves PNW carrying substantial construction and financing risk. The next year should remain operationally strong, but valuation depends on regulatory execution rather than on demand alone.
Trade Signal
No trade, with a mild long bias: PNW has a credible Arizona growth engine and modest upside to analyst value, but the narrow valuation gap does not compensate for rate-case uncertainty, leverage, negative FCF, and financing risk.
PNW rose from roughly $88 at the end of 2025 to the $103–109 range during February–July 2026 as the market increasingly recognized the Arizona demand and TSMC growth story. It then declined from the July 16 high of $109.29 to about $100 after late-July weakness, with no major adverse company announcement identified; this appears partly sector/rate sensitivity and partly de-risking ahead of the ACC decision. Q1 earnings and guidance reaffirmation did not generate a durable breakout, and the stock was unchanged around the August 4 Q2 earnings release despite solid demand commentary and guidance at the top half of the range. The recent pullback modestly overshot the operational facts, but the gap is small and could represent a justified regulatory-risk discount rather than a clear temporary dislocation.
The stock is liked selectively but not loved: consensus is Hold with 17 Holds, 7 Buys, and 1 Sell, while the average 12-month target is below the current price. Bulls see a rare regulated-utility growth story driven by Arizona semiconductor, data-center, and transmission demand; bears focus on the ACC rate-case outcome, high leverage, negative FCF, water and data-center restrictions, and dilution. Short interest has climbed from roughly 4% to 7.6% of float, suggesting meaningful skepticism, while low retail participation and limited holder-flow data indicate the stock is more institutionally debated than retail-driven. The market may be underappreciating the operating demand data, but it is appropriately cautious about converting demand into earned returns.
There is a real positive operating inflection in Arizona load growth, with 9.6% weather-normalized Q2 sales growth, 2.1% customer growth, and accelerated TSMC expansion. However, much of the 5%–7% long-term growth narrative is already embedded in the analyst valuation and reflected in the stock's 13% one-year gain. The next major evidence is regulatory rather than earnings-based: a constructive rate case could improve earnings visibility and reduce regulatory lag, but consensus is broadly Hold and the average target is only $98.87, indicating the market is not yet underwriting a major re-rating.
- ▲2026-08 · APS rate-case initial briefs — Initial briefs are due August 27; the record and commission staff posture should clarify the probability of a constructive base-rate increase and FRAM mechanism.
- ▲2026-09 · APS rate-case reply briefs — Replies due September 11 may sharpen the expected size of the award, although the outcome remains binary and politically exposed.
- ▲2026-10 · Updated integrated resource plan — The IRP is expected by late October and should incorporate accelerated TSMC demand, other large-load commitments, Cholla conversion, and transmission needs.
- •2026-10 · Q3 2026 earnings — The print should test whether 9.6% weather-normalized sales growth persists, but guidance is already reiterated and weather creates noise.
- ▲2026-11 · Recommended APS rate-case order — A recommended order is expected in Q4 and will be the first meaningful read on recovery of the $1.7 billion investment base and the FRAM concept.
- ▲2026-12 · Final Arizona Corporation Commission decision — A final decision is expected before year-end; a partial or strong win could remove the principal valuation overhang, while a heavily diluted award would damage the thesis.
- ▲H2 2027 · TSMC Arizona load ramp — Fab 2 production is scheduled to begin in the second half of 2027, offering longer-duration demand upside but not an immediate earnings catalyst.
Share supply is modestly negative: TTM dilution is about 2%, the company has used its prior $900 million ATM and filed a new $500 million ATM, and the heavy capital program requires continued debt and potentially equity financing. No insider buying or meaningful institutional accumulation is evident; one officer sold in May. Short interest has risen to 7.6% of float, providing some squeeze fuel if the rate case is favorable, but not enough to offset financing needs.
The dividend, regulated asset base, and essential-service franchise provide some support, but there is no hard floor near $100: PNW has negative free cash flow, net debt/EBITDA of roughly 6–8x, substantial capex, and financing dependence. The principal ceiling is not hard, but rate-case disappointment, higher interest costs, and equity issuance could constrain upside.
A credible, liquid U.S. regulated utility with a 4% dividend, durable Arizona customer growth, and identifiable next buyers if the rate case validates the growth-investment model. However, negative free cash flow, high leverage, and recurring equity/debt financing make it less compelling than a clean compounding utility.
Slightly more greed than fear because Arizona demand, TSMC expansion, and transmission investment are genuinely differentiated for a regulated utility. But the 7%–10% valuation gap is too small to compensate for the binary rate case, leverage, negative FCF, and potential dilution; this feels closer to a watchlist buy than an actionable position.
Valuation
The quarter showed 9.6% weather-normalized sales growth and 12.7% commercial and industrial growth despite relatively flat TSMC production, demonstrating that current demand is broader than the market may have assumed. TSMC also announced an additional $100B Arizona investment, and management said the October IRP will incorporate the full intended build-out. The offsetting new information is that Q2 EPS declined year over year from higher interest and depreciation, the IRP was pushed to October, the company used the remaining $900M ATM and opened a new $500M ATM, and a potential $440M Cholla conversion is not in current capital guidance.
▸ How the cases moved
The Q2 event modestly raises the bull and base cases: the bull terminal equity value moves from roughly $18,000M to $19,000M as TSMC's additional $100B commitment, strong non-TSMC demand, and potential transmission upside become more concrete; bull probability rises from 0.22 to 0.25. The base value moves from roughly $12,500M to $12,800M, with base probability rising from 0.48 to 0.50 because growth is broad rather than dependent on one customer. The bear value remains near $6,500M, but bear probability falls from 0.30 to 0.25 because current demand is strong and management has financing capacity, despite unresolved rate-case, water, commitment, and execution risks.
Arizona load growth moderates as data-center projects face water, regulatory, and permitting friction. The rate case produces only partial recovery, regulatory lag remains elevated, and rapid capital spending raises financing costs and dilution. Owner earnings settle near reported net income, with a lower utility earnings multiple.
▸ Valuation
13x $500M owner earnings = $6,500M equity value
APS converts a substantial portion of its committed semiconductor, data-center, and manufacturing demand into rate base, while the rate case moderately improves recovery and reduces regulatory lag. Revenue and rate base grow at roughly the lower end of management's outlook, but interest expense, depreciation, and ongoing equity needs limit conversion of EBITDA into owner earnings. Earnings reach approximately $800M and merit a mid-teens regulated-utility multiple.
▸ Valuation
16x $800M owner earnings = $12,800M equity value
TSMC's expanded Arizona commitment accelerates materially, data-center and advanced-manufacturing loads are contracted, and the Arizona rate case delivers strong recovery with a constructive formula-rate mechanism. Transmission and generation investment earns timely returns, regulatory lag narrows, and customer-funded infrastructure protects residential affordability. Owner earnings approach $1.0B and the company receives a premium growth-utility multiple.
▸ Valuation
19x $1,000M owner earnings = $19,000M equity value
▸ Target Rationale
The probability-weighted scenario value discounted at 12% is $10,220M. I set the analytical target modestly below that figure at $10,000M because the scenario arithmetic does not fully capture the persistent negative FCF, approximately $18B of reported current net debt including leases in the latest available balance-sheet snapshot, rapidly increasing purchase commitments, execution risk on a large construction program, and the possibility that regulatory recovery lags capital deployment. The target still recognizes the unusually strong Arizona demand runway and the value of a regulated franchise.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Turnaround: On May 4, 2026, Pinnacle West Capital Corporation (PNW) reported a significant return to profitability for the first quarter ended March 31, 2026. The company posted consolidated net income of $32.9 million ($0.27 per diluted share), a substantial improvement over a net loss of $4.6 million (-$0.04 per diluted share) in Q1 2025. Total operating revenues increased 11.4% year-over-year to $1.15 billion. Financial performance was primarily propelled by hotter-than-normal weather that drove higher customer sales and usage, alongside higher retail transmission revenues and disciplined operations and maintenance (O&M) cost controls.
- Earnings Guidance Reaffirmed: Management reaffirmed its full-year 2026 weather-normalized consolidated earnings guidance in the range of $4.55 to $4.75 per diluted share.
- Sustained Customer Growth and Massive Capital Plan: PNW reported 2.2% customer growth in its core Arizona Public Service (APS) segment in Q1 2026. To support long-term regional demand, the company executed $628 million in capital expenditures during the quarter and continues to project more than $2.5 billion in annual capital spending through 2028 to bolster grid reliability and infrastructure. Long-term annual customer sales growth is expected to average 5% to 7% through the end of the decade.
- Liquidity and Financing Operations: To fund its capital projects, APS successfully issued $600 million in 5.10% senior unsecured notes due 2036. Management confirmed that its 2026 equity issuance needs are fully satisfied.
▸ Thesis-test Findings
Arizona Corporation Commission APS rate case decision 2026
- Findings: APS’s major rate case—originally filed in June 2025—is currently progressing through its evidentiary hearings, which commenced on May 18, 2026, and are scheduled to run through July 2026. A final decision from the Arizona Corporation Commission (ACC) is anticipated in late 2026 at the earliest, with new rates slated to take effect in early 2027. APS is requesting a base rate increase of roughly 14% to 16% (a $579 million net revenue increase) to recover $1.7 billion in system investments. To protect retail consumers, the proposal introduces a rate hike of more than 45% for extra-large power users like data centers, alongside a highly contested annual "Formula Rate Adjustment Mechanism" (FRAM) to permit annual rate adjustments without a full rate case. Meanwhile, regulatory uncertainty was highlighted in June 2026, when an Arizona appellate court ruled against a previously approved (March 2024) bill increase on residential solar users, citing insufficient cost-of-service analysis by the commission.
- Bull/Bear Bearing: This pending decision is a critical binary event. The pro-business commission’s ultimate ruling on the base rate increase and the annual FRAM mechanism will either secure the steady, predictable capital recovery the company needs to support its massive grid expansion (bull case) or, if significantly diluted by intense public opposition and litigation, delay cost recovery and constrain returns (bear case).
TSMC Phoenix fab construction power demand schedule
- Findings: TSMC has aggressively compressed and accelerated its multi-fab Phoenix expansion. In January 2026, the company announced that the mass production timeline for its second Arizona wafer fab (Fab 2) has been advanced to the second half of 2027—a full year ahead of its original 2028 projection—driven by massive client demand for advanced AI and high-performance computing (HPC) processors. Construction on its third Phoenix fab began in early 2026, with equipment installation scheduled for later in the year. To secure further long-term growth, TSMC also finalized a $197 million land purchase in early 2026, expanding its footprint to accommodate up to six total fabs. This explosive industrial concentration is placing historic strain on the local grid; utility and civic leaders noted in June 2026 that Arizona’s electric infrastructure, which took over a century to build, must essentially double its capacity over the next four to five years to handle incoming loads.
- Bull/Bear Bearing: This acceleration acts as a powerful long-term sales driver for PNW, underpinning its optimistic 5% to 7% annual load growth forecast. However, the condensed schedule also exacerbates the bear case risk, as it forces the utility to execute rapid, capital-intensive grid upgrades under tight timelines, heightening operational execution risks and requiring massive upfront capital outlays before regulatory rate structures can catch up.
Arizona data center power and water availability restrictions
- Findings: Severe environmental and legislative headwinds have emerged regarding data center expansions in Arizona. In June 2026, lawmakers instituted a three-year moratorium on new data center state tax incentives within the annual budget to prevent unmitigated resource consumption while policymakers evaluate the long-term impact on the utility system. From a water perspective, Bureau of Reclamation studies declared a Level 1 shortage on Lake Mead for 2026, forcing a severe 18% cut to the state’s Colorado River allocation. In response, several municipal water utilities (including Mesa, Avondale, and Phoenix) have passed strict ordinances capping industrial water usage and requiring developers to fund supplemental supplies. In June 2026, Tucson advanced a restrictive draft code banning the use of potable water for data center cooling and mandating rigorous public utility-equivalent reviews. Furthermore, state Attorney General Kris Mayes challenged a private electric service agreement between a local utility and a hyperscale developer in early 2026, asserting that customized large-user rates bypass public oversight.
- Bull/Bear Bearing: On the bear side, the tax incentive moratorium and severe water constraints could slow down the pipelines of new data center projects, potentially capping the utility’s forecasted hyper-growth. On the bull side, the regulatory pushback and proposed municipal restrictions help manage grid congestion, while APS's strategy to levy 45%+ rate hikes on data centers ensures that the burden of massive grid infrastructure upgrades is shifted away from retail ratepayers and onto the balance sheets of tech hyperscalers.