QS

QuantumScape Corporationv3 3.0/10 · 2026-10-27
Consumer Cyclical·Auto - Parts
$3.00
$1.8B market cap
v3 Rating
3.0/102.0–4.5
Setup
3.5/102.0–5.0
Fair Value
$2.75$0.80–$7.00-8%
DCF (10%)
$0.25-92%
Base IRR
-12%-45%–+35%
Visibility
wide±113%
Wall Street
$5.25 target(2 analysts last quarter)(8 hold, 3 sell)
Rating
Revenue (TTM)
$0.0M
Owner Earnings
-$310M
Next-Yr Owner Earnings
-$330M
Growth
+35.0% × 10y
P / Next-Yr OE
--
Net Debt
-$755M

QuantumScape Corporation, along with its affiliated entities, specializes in the advancement and market launch of innovative solid-state lithium-metal batteries. These cutting-edge power solutions are primarily engineered for electric vehicles (EVs) but also serve a range of other uses within the United States. The company, established in 2010, has its main corporate office located in San Jose, California.

2-Year Price History

$4.12-17.9%
$4.0$6.0$8.0$10$12$14$16$18Initial target $2.75 · 2026-10-27volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-27

Rating
3.02.0–4.5
Setup
3.52.0–5.0
Fair value (USD)
2.750.80 – 7.00
Upside vs 3.00
-8%
DCF (10%)
0.250.00 – 6.50-92%
Base IRR
-12%-45% – 35%
Visibility
very widerange ±113%
Sentiment
3/10
2026-10-27 · · priced at 4.18

QuantumScape is a pre-revenue solid-state lithium-metal battery developer that still burns about $300M a year of real free cash flow (after stock comp). Its stock has fallen from $18.44 (Oct 2025) to about $4.18 (intraday 2026-10-27, +7% on the day after a $3.90 close on 10-26, roughly a 3-year low), for a $2.6B market cap and about $1.85B of EV after $820M of liquidity. The story has been bending away from its original thesis. Volkswagen/PowerCo, the anchor licensee, first cut its maximum payments from about $131M to $75M (July 2026), then in October removed the transition payments and paused milestone payments while it renegotiates. Management has answered with new verticals: AI data-center in-rack batteries (the QS PowerBlock), defense/aerospace, a Honda JDA, and a 100 MWh mass-production line with Muhlbauer, start-up targeted for 2028 and up to $100M of equipment. That line is a step away from the 'capital-light licensing' model, and the funding is not yet arranged. On our method the DCF is close to zero. Free cash flow stays negative through at least 2030 in the base case, and cumulative 2027-31 burn (about $1.1B) is more than today's cash, so dilution is likely before any royalty arrives. What you are buying is a roughly $1.85B option on the technology working and being licensed at scale. On our probability weighting it is worth about $2.75/share. Rating 3.0: unattractive at this price, but not a clean short. Short interest is about 112M shares (about 18% of Class A), retail is still enthusiastic, and the Nov 11 Kyoto technology-roadmap event plus any data-center or defense customer announcement could squeeze it. Research rating 3.5: the open questions (will the technology hit automotive spec, will PowerCo re-commit, will the 100 MWh line be funded without dilution) will not be resolved in a year by desk work. This is not a covered-call floor setup, because there are no earnings to anchor a floor.

A deep dive would have to establish: Whether a funded commercial commitment (a renewed PowerCo statement of work with payments, a Honda license, or a paid data-center/defense order for the 100 MWh line) will arrive before QS must raise equity around 2028, and whether the Kyoto roadmap shows a cost and cycle-life path to automotive scale.

Owner earnings, TTM
-$310M-$340M – -$280M
Realistic peak profit
$300M-$50M – $2.0B
Growth rate
35.0%0.0% – 100.0%
Years of growth
103 – 15
Market cap
$2.6B$2.5B – $2.9B
EV
$1.9B$1.7B – $2.1B
Net debt
-$755M-$770M – -$740M
Capital return / cap
-5.0%-15.0% – -2.0%
P/E
-6.8×-7.5× – -6.0×
EV/EBITDA
-7.2×-8.0× – -6.5×
FCF yield
-12.0%-14.0% – -10.0%
Projected FCF, base case (USD millions)
Y1-$330M-$380M – -$260M
Y2-$320M-$400M – -$220M
Y3-$240M-$350M – -$120M
Y4-$160M-$320M – $40M
Y5-$80M-$300M – $250M
Competition: Well-funded incumbents (Toyota/Idemitsu, Samsung SDI, LGES, CATL, BYD) and startups (Factorial, Solid Power, SES) are racing to commercialise solid-state or semi-solid cells on 2027-29 timelines, while cheap LFP stays good enough for most data-center backup, so QS's lithium-metal/ceramic edge is real in the lab but unproven at cost and scale.
Governance: No fraud history, but this is a 2020-vintage SPAC with an outstanding derivative suit, heavy insider selling near the 2025 peak, steady SBC/ATM dilution, and a dominant partner-shareholder (VW/PowerCo) that has just paused its payments.
Research (expand)

What the company does

QuantumScape (San Jose, founded 2010, public via 2020 SPAC) develops an anode-free solid-state lithium-metal battery built around a proprietary ceramic separator. It is made with its COBRA heat-treatment process, and ceramic partners Murata and Corning are being set up to produce the separator. The product is QSE-5 (about 5 Ah, about 844 Wh/L, fast-charge). In 2026 the company reorganised into three verticals:

  • QSEV: automotive licensing to VW PowerCo and Honda, plus two other top-10 OEMs under JDAs and a new 'global mobility manufacturer'.
  • QSDC: in-rack AI data-center battery backup. The QS PowerBlock reference design was launched at OCP on Oct 8, 2026, with claims of 4x the OCP spec's power density and 5x its run time.
  • QSAS: defense, aviation, telecom and medical, with QSE-5 samples shipped and first billing in Q3.

The Eagle Line, a highly automated pilot line in San Jose, was inaugurated in Feb 2026. Management says core equipment uptime is above 90% and output doubled in H2 2026. On Oct 21 the company announced a 100 MWh mass-production line with Muhlbauer as cell-assembly equipment partner: SOP 2028, equipment cost to QS under $100M, site not chosen, funding sought from customers, government, ecosystem and licensing partners.

The investment case (bull)

  • If the ceramic-separator lithium-metal cell reaches automotive spec at cost, QS could become the 'operating system' (management's phrase) for solid-state batteries. It would collect royalties on tens of GWh (the PowerCo license allows up to 85 GWh/yr) without owning gigafactories.
  • Data-center BBU and defense are faster, price-insensitive markets that value safety (thermally stable above 300C vs about 180C for LFP) and a non-Chinese, graphite-free supply chain. These could bring revenue in 2028, ahead of automotive.
  • The balance sheet is real: $819.8M of cash and securities, only about $65M of lease liabilities, no debt. The adjusted EBITDA loss has been held flat at about $250-275M/yr, and stock comp fell from $96M to $74M (9M YoY).
  • Positioning: short interest was 112.2M shares at Sep 30 (+14.7%), about 9 days to cover. A credible Kyoto (Nov 11) roadmap or a named data-center customer could force covering.

The bear case (why it is at $4)

  • The anchor partner is retreating. In July 2026 PowerCo's maximum payments were cut from about $131M to about $75M. In October the transition payments were removed and milestone payments paused during renegotiation 'toward the long-term technology platform beyond QSE-5'. Reading through the language, VW is not ready to industrialise QSE-5 on the original timeline, and VW itself is restructuring. The $130M PowerCo royalty prepayment depends on milestones that now look further away.
  • A $9.6M reversal of milestone PSU expense (management judged the development milestones not probable) is an internal admission of schedule slippage.
  • The capital-light model is being diluted. A self-owned 100 MWh line is a manufacturing commitment at tiny scale. Even at premium pricing (about $500-1,000/kWh), 100 MWh is only $50-100M of revenue a year, from 2028-29 at the earliest.
  • Fifteen years in, there is still no GAAP revenue. 'Customer billings' ($19.5M in 2025; $31.6M YTD 2026) are partly booked to equity as capital contributions.

What it earns today (real free cash flow)

Nine months to Sep 30, 2026:

  • Operating cash flow -$171.3M.
  • Capex -$19.0M.
  • Stock comp $74.1M, treated as a real cost.
  • Real FCF about -$264M (about -$350M annualised).

Q3 alone was -$55.1M OCF, -$4.4M capex and -$16.3M SBC, about -$76M, or a roughly -$300M run-rate. That figure already includes about $32M/yr of interest income, so the burn before interest is slightly worse. There is no growth capex to add back in any meaningful sense, because capex is small ($27-37M guided for 2026) and the whole cost base is R&D. Current real FCF is about -$310M (range -$340M to -$280M).

Five-year FCF projection (before interest, after SBC, USD M)

| Year | Low | Mid | High | Notes |

|---|---|---|---|---|

| 2027 | -380 | -330 | -260 | Eagle Line sampling; 100 MWh line engineering; PowerCo payments paused |

| 2028 | -400 | -320 | -220 | 100 MWh equipment capex (up to $100M, maybe partly partner/government funded); SOP |

| 2029 | -350 | -240 | -120 | First DC/defense cell revenue, tens of $M at low margin |

| 2030 | -320 | -160 | 40 | Line ramps; possible first licensing prepayments/royalties |

| 2031 | -300 | -80 | 250 | Automotive royalty only in the upside case |

Cumulative mid-case burn for 2027-31 is about $1.1B against $820M of cash today (about $760M at year-end 2026). The base case therefore needs an equity raise or ATM (QS sold $264M of ATM stock in 2025 and $128M in 2024) of at least $300-500M, probably in 2028. That adds about 10-20% to the 622M shares outstanding (590.2M Class A + 31.8M Class B at Sep 30), on top of about 3%/yr of SBC dilution.

What it looks like in 5 years

In the base case, by 2031 QS is a still-loss-making technology licensor/niche cell maker. It has a 100 MWh line serving data-center and defense customers, one or two automotive licensees in pilot/low-volume production, and FCF of about -$80M. It is neither a corpse nor a compounder; it is still an option. Upside case (about 25-30%): QSE-5 or its successor is in VW/Honda vehicles, royalties and prepayments flow, and FCF turns positive at $200-400M heading higher. That is a high-growth licensor worth 25-30x FCF, or $6-10B. Downside case (about 30%): the technology misses automotive cost/cycle-life targets, OEMs move to sulfide solid-state (Toyota/Idemitsu, Samsung SDI) or Chinese semi-solid cells, and QS shrinks to a niche cell supplier needing repeated dilution, worth less than its cash. Confidence in the base case is low. The range of outcomes is very wide.

Fair value and multiples

  • Strict DCF (our method):

- PV of 2027-31 mid FCF at 10% is about -$900M.

- Year-5 FCF is negative, so the category-multiple terminal value is zero.

- Plus net cash of about $755M gives about -$150M of equity.

- Base-case DCF is effectively $0, about $0.25/share, allowing a little residual IP value.

- The upside-case DCF (2031 FCF of +$300M x 25) is about $6.5/share after dilution.

  • Probability-weighted option value: 30% x about $8B, 40% x about $1.5B and 30% x about $0.3B gives about $3.1B in 2031. Discounted, less the interim burn and plus cash, that is about $1.8-2.0B of equity today, or $2.75/share on about 700M diluted shares.
  • Today's multiples: market cap about $2.60B (622M x $4.18), EV about $1.85B. P/E about -6.8x (TTM EPS about -$0.61). EV/adj. EBITDA about -7x. Real FCF yield about -12%. At $4.18 the market prices the success option at roughly 35-40%, which we think is too generous given that the lead partner has just paused payments.

Management, governance, capital return

CEO Siva Sivaram (ex-Western Digital, CEO since 2024) has run a disciplined budget: the adj. EBITDA loss has been flat, capex guidance was cut to $27-37M, and SBC is down 23% YoY. He also communicates in heavy promotional language ('de facto operating system', '$75B TAM'). There is no capital return; the share count rises about 3-5%/yr from SBC plus ATM raises. Insiders sold heavily near the Oct 2025 peak (CEO at $16-17), and 2026 Form 4s are mostly tax withholding; there is no insider buying. A shareholder derivative suit is outstanding from SPAC-era claims. VW holds a large voting stake (about 27% of votes per one report) and has rights including a right of first refusal on non-auto capacity. CFO Kevin Hettrich missed the Q3 call for a planned medical procedure. No fraud history, but this is a 2020-vintage SPAC.

Competition

  • Toyota/Idemitsu, Samsung SDI, LGES and SK On (sulfide solid-state, 2027-29 targets).
  • CATL and BYD (semi-solid and solid-state pilots by 2027).
  • Factorial (Mercedes and Stellantis), Solid Power (BMW and SK On), SES and Ion.
  • In data-center BBU, incumbent LFP/LTO and supercapacitor suppliers are cheap and good enough.

QS's edges are anode-free lithium metal, a ceramic separator with strong thermal stability, and a non-FEOC US supply chain. None of these is yet proven at cost and scale.

Sentiment: 3/10 (hated by the sell side, still loved by retail)

MarketScreener consensus is 'Underperform' across 9 analysts, with a $5.41 average target (range $2.50-8.30). Morgan Stanley (Sell), Goldman (Sell) and Truist/TD Cowen/Deutsche/UBS (Hold/Neutral, $5-6 targets) all sit at the cautious end. The stock is down about 60% YTD and about 77% from the Oct 2025 peak, at a 3-year low. Short interest is about 112M shares and rising. Stocktwits retail is bullish, with message volume up 234% after the 100 MWh announcement. Options are skewed bearish: $16M of put open interest vs $4M of calls, put IV 65% vs call IV 49%.

Bottom line

This is not one of our setups. There is no cash flow today, no visible cash flow by 2031 in the base case, a likely dilutive raise, and a lead partner backing off. Avoid on the long side. A short is defensible on fundamentals, but crowded positioning and the Nov 11 Kyoto catalyst make it a poor risk/reward timing trade. Revisit if PowerCo signs a new SOW with payments, or if a hyperscaler or defense prime places a funded order for the 100 MWh line.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue0.000.000.000.000.00
Gross profit-43.5-67.4-57.8-47.8-36.1
Operating expenses375-11%405-13%467+12%416+8%384
▸Adj EBITDA-362-405-467-416-384
▸Adj OCF-331-371-428-392-357
CapEx-31.3-36.3-62.1-84.5-159
Adj FCF-363-408-490-477-516
Interest expense1.892.042.222.382.40
▸Adj net income-385-436-481-430-412
▸Owner's earnings-400--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-1801-250-365-418-395-373
FCF (OCF−capex)-1507-190-279-337-325-377
Net income-2053-284-435-478-445-412
▸Capital returned-7130.33-276-137-294-6.20
Buybacks-735-3.71-281-142-298-9.41
Dividends0.000.000.000.000.000.00
Interest paid10.41.402.042.222.382.40
Debt paid down11.62.653.232.911.970.81
▸Reinvestment34713.112.655.079.7187
Capex (PP&E)36119.036.362.184.5159
Intangibles & M&A-1.110.00-1.110.000.000.00
Leases signed (net Δ)-12.3-5.95-22.5-7.10-4.7828.1
Retained / other-783-1890.20-197-28.4-368

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 640 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)11191308132215021475
▸Liabilities (total)124139165162156
Net debt (incl. leases)-755-900-817-970-956
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-192-199-210-175-160
Shares outstanding619605508491437
Dilution (YoY)+9.6%+19.0%+3.5%+12.4%+2.9%
Employees800700800850850
MarginsTTM2025202420232022
Gross margin----------
Adj EBITDA margin----------
Adj OCF margin----------
Adj FCF margin----------
Net income margin----------
Adj NI margin----------
ROIC (adj, after-tax)-31.1%-30.1%-33.2%-25.5%-23.4%
Cost of debt2.8%2.5%2.3%2.3%2.3%

Earnings Calls

13 calls

Earnings Call · 2026 Q3

2026-10-21

QuantumScape's Third Quarter 2026 earnings call centered on the company's move to scale up production, progress across its three business verticals, and its financial results. CEO Dr. Srinivasan Sivaram led the operational update, and Chief Accounting Officer Agnes Penn covered financials because CFO Kevin Hetrick is recovering from a planned medical procedure. Management wished him a speedy recovery. Manufacturing scale-up was the headline. The Eagle Line, the company's highly automated pilot line inaugurated in February, is now fully operational and has become the workhorse of customer engagement, increasing the pace of customer sampling and flowing into customer billings. Management said the Eagle Line's demonstrated scalable production gave it the confidence to announce a 100 megawatt-hour mass production line, with start of production targeted for 2028. The line's design is built on Eagle Line advancements and is intended to serve as a stepping stone toward gigawatt-hour scale. QuantumScape also announced an ecosystem partnership with Mühlbauer Group to supply cell assembly equipment. Combined with previously announced partners Murata and Corning, management said this creates an end-to-end production flow across materials, separators, and downstream assembly. In data centers, the QS power block, an in-rack energy storage reference design, launched on October 8 at the Open Compute Project Global Summit. In testing, it demonstrated four times the power density and five times the run time of the OCP reference specification. Management emphasized safety as a key differentiator: conventional lithium-ion chemistries including LFP are not thermally stable above roughly 180 degrees Celsius, while QS solid-state cells have been shown to be thermally stable well above 300 degrees Celsius, validated in customer and third-party lab testing. In automotive (QSEV), the company recorded its first customer billings from the Honda agreement announced in June, which covers joint development to integrate its solid-state platform into Honda's technology roadmap. It also signed an agreement with a new global mobility manufacturer. Management said it is updating its statement of work with Volkswagen PowerCo, having amended the collaboration agreement to eliminate transition payments and to add milestones tied to technology advancements. Two other top-10 OEMs are also in active engagement. Management plans to share details of its next-generation technology platform and collaboration model at its third annual solid-state battery symposium in Kyoto, Japan, on November 11, with the aim of aligning automotive customers on a common platform. In advanced applications (QSAS), the company has shipped QSE-5 samples to customers in defense, aviation, and telecommunications, and recorded its first billing from the segment this quarter. Management cited a total addressable market of up to $75 billion by 2030 across defense, aerospace, medical devices, consumer electronics, and other areas. It highlighted that defense customers face foreign government restrictions on procuring advanced batteries, and that its cells are built in America with supply chains designed to avoid critical dependencies on Chinese equipment or materials such as graphite. Management reviewed its four 2026 goals: demonstrating scalable production on the Eagle Line, advancing automotive commercialization, entering new high-value markets, and going beyond QSE-5 with a technology roadmap update. It said it has made strong progress on each. On financials, GAAP operating expenses in Q3 were $92.4 million and GAAP net loss was $84.5 million. Adjusted EBITDA loss was $60.7 million, in line with expectations. The company reiterated full-year 2026 adjusted EBITDA loss guidance of $250 million to $275 million and capital expenditure guidance of $27 million to $37 million. Q3 capex was $4.4 million, mainly for technology roadmap investment and facility spending. Customer billings were $9.8 million, which management noted can fluctuate by quarter and are not a substitute for GAAP revenue. The company ended the quarter with $819.8 million in liquidity and said it will remain prudent with its balance sheet. During Q&A, management said the 100 megawatt-hour line's equipment cost to QuantumScape is targeted at under $100 million, that the company is pursuing nondilutive funding from customers, government, ecosystem, and licensing partners, and that site selection is underway with an announcement to follow at the appropriate time. It reiterated that its capital-light licensing model remains in place for automotive, with technology transferred to OEMs such as Volkswagen PowerCo or Honda, while the new line will focus primarily on high-value applications like aerospace, defense, and data centers. Management said QSDC and QSAS may reach market faster than QSEV, but its QSEV targets have not changed. It also said the PowerCo relationship remains strong, with a move toward milestone-based payments and possible expansion into data center and robotics applications. Management did not disclose specific customer counts or sample numbers, but said it wants multiple data center and aerospace customers signed before 2028 start of production.

Analyst Q&A (10)
▸
What is the economic arrangement for the 100 megawatt-hour line with Mühlbauer, including who owns and pays for it, and what does it mean for the capital-light model?
Winnie Dong · Deutsche Bank
The longest lead-time item is equipment design and installation, which has started. The company is targeting equipment cost to QS of under $100 million and is pursuing nondilutive funding from customers, government, ecosystem, and licensing partners. Site selection is underway and will be kept confidential until announced. The capital-light licensing model remains for automotive, with technology transferred to OEMs so they can ramp their own production.
▸
How large are the first Honda billings, and what is the timeline to a long-term agreement with Honda?
Winnie Dong · Deutsche Bank
Management did not size the billings. It said engagement with Honda is very strong and the company is working closely with them. Product and product-line announcements must come from the customer.
▸
Has the cell been retuned from EV design for the high-power, high-pulse backup battery unit application, which has different cycling needs?
Mark Shooter · William Blair
Backup power has different needs than automotive, with no low-temperature or frequent full-depth discharge requirements, mostly high-frequency charge and discharge. Against the OCP spec, the cell delivers four times the power and five times the run time. Safety is the most important factor, since the cells sit next to high-value GPUs, and the QSE-5 is a good fit.
▸
Why depart from the capital-light model given the roughly $100 million cost, and does Volkswagen have a right of first refusal or ownership role in the line?
Mark Shooter · William Blair
The PowerCo contract allows nonautomotive applications, but the decision reflects the strong performance of the Eagle Line. PowerCo is working closely with the company. The line is built on Eagle Line advances and will be directed primarily at high-value applications such as aerospace, defense, and data centers. Automotive work with VW or Honda will remain capital-light.
▸
Could government programs such as DOE funding support the new line, similar to nondilutive funding seen in the private sector?
Mark Shooter · William Blair
The company has seen such funding and other government grants, loans, and instruments, and will evaluate them.
▸
How competitive is the environment across automotive, data center, and aerospace and defense?
Ben Kallo · Baird
The markets differ in customer base. In defense and aerospace, the company's US-based manufacturing, graphite-free supply chain, and friendly non-FEOC partners are significant advantages. Data center customers are also seeking friendly-source supply chains, and the safety profile adds advantage. The cell also offers better energy and power for conventional applications.
▸
How is the relative timing of commercialization across the three verticals, and how has it changed over the past year?
Ayush Ghose · Goldman Sachs
The 100 megawatt-hour line is targeted to start production by 2028. QSDC and QSAS may reach market faster than the more rigorous QSEV application, but QSEV targets have not changed and remain tied to revenue and commercialization. The end-to-end partner model is meant to address high-value markets quickly.
▸
What implications could Volkswagen's restructuring have for the PowerCo relationship, and how will the relationship evolve beyond QSE-5?
Ayush Ghose · Goldman Sachs
The PowerCo relationship remains very strong and the collaboration goal is unchanged. The partnership is moving toward milestone-based payments and will expand to other applications such as data center and robotics.
▸
What level of customer interest supports the 100 megawatt-hour decision, how many customers are testing samples, and what commercial commitments would the company like to see over the next 12 months?
Gabriel Gonzales · UBS
Confidence comes from three directions: strong feedback from power block and QSAS sampling with requests for volume, the Eagle Line's capability as a foundation, and Mühlbauer's validation and ownership role. Management did not give specific sample counts or target commitments.
▸
Could awards be announced in 2027, ahead of the 2028 start of production, given that automotive awards typically take two to three years to reach production?
Gabriel Gonzales · UBS
Defense and data center markets are moving very fast, and the BBU concept has advanced quickly. The company wants to start production in 2028 and have multiple customers signed before then to ensure uptake.

SEC Filing Findings

SEC Filing — material findings

2026-10-23 · depth 9/10
risk 7Related-Party / Revenue Quality
▸

PowerCo (VW-owned, ~27.3% voting holder) collaboration payments are accounted as a presumed repayment obligation and booked as APIC capital contributions, not revenue; October 2026 amendment removed $7.0M of transition payments, reduced the maximum receivable, and suspended milestone payments during renegotiation.

“During this negotiation period, PowerCo will not make milestone payments under the July 2026 Amendment.”
risk 6Related-Party / Contract Uncertainty
▸

PowerCo IP License Agreement (initial $130M royalty pre-payment) remains unsigned and contingent on milestones that have not been achieved on schedule; certain technical milestones were missed and corresponding payments will not be paid.

“Certain technical milestones have not been achieved within the contemplated time frames and the corresponding payments will not be paid to us.”

Options

Chain Snapshot (daily)

Call IV (ATM)120%
Put IV (ATM)55%
ATM Spread6.3%
Call $OI (near money)$5.8M
Put $OI (near money)$13.4M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$4.0
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$1.00$3.30/$3.6017--/$0.101
$2.00$2.15/$2.733--/$0.1141
$3.00$1.18/$1.5727$0.02/$0.06131
$4.00$0.61/$0.87901$0.19/$0.295,453
$5.00$0.18/$0.321,254$0.60/$0.9552
$6.00$0.05/$0.11749$1.45/$1.93263
$7.00$0.04/$0.05589$2.49/$2.730
$8.00--/$0.03131$3.45/$3.903
Snapshot: 2026-11-04

Short Interest

Short % of Float21.7%
Short Shares110.0M
Days to Cover7.1
Change (vs Prior)+0.2%
Short % Float History
21.70%+12.60pp
8.0%10.0%12.0%14.0%16.0%18.0%20.0%22.0%10-1512-3103-1305-2908-1410-30

Web Traffic

quantumscape.com
Web rank#942,490
Est. visits/mo595K

Executive Compensation (2023.0-2025.0)

Direct Pay$144.2M
Incentive & Other$0.1M
Total Compensation$144.3M
% of Revenue0.0%

Cash Runway

38.0months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$216M$6.96+$51.0M+$86.7M—$6.70T
VANGUARD CAPITAL MANAGEMENT LLCPassive$160M$6.39+$1.8M+$160M—$4.68T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$142M$6.42+$5.3M+$142M—$2.22T
Capricorn Investment Group LLC$86.9M$19.99+$0−$24.9M—$22.49B
GEODE CAPITAL MANAGEMENT, LLCPassive$66.8M$8.00+$3.7M+$14.5M—$1.87T
STATE STREET CORPPassive$62.1M$8.09+$5.0M+$12.9M—$3.38T
GOLDMAN SACHS GROUP INC$55.6M$6.61+$16.0M+$45.1M—$953.46B
D. E. Shaw & Co., Inc.$54.9M$7.72−$94.3M−$9.6M—$153.37B
DIMENSIONAL FUND ADVISORS LPPassive$53.6M$6.18+$10.2M+$7.2M—$551.30B
MORGAN STANLEY$42.4M$8.09+$1.9M+$20.5M—$1.88T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

014.3M28.6M43.0M57.3M$4.16$8.12$12$16$202021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
Capricorn Investment Group LLC11.5MVK Services, LLC—Board of Trustees of The Leland Stanford Junior University—D. E. Shaw & Co., Inc.7.3MMORGAN STANLEY5.6MMirae Asset Global Investments Co., Ltd.42KRENAISSANCE TECHNOLOGIES LLC1.0MTWO SIGMA INVESTMENTS, LP3.0MBNP Paribas Asset Management Holding S.A.7KNORGES BANK—

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (2 analysts)$5.25+79.2%
Last Year (7 analysts)$8.83+201.4%
Current Price$2.93
Analyst Ratings
8
3
Hold: 8Sell: 3Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2025 Q11M-112M-131M$-0.21$-0.21 – $-0.213
2025 Q21M-109M-131M$-0.21$-0.26 – $-0.164
2025 Q32M-109M-126M$-0.20$-0.23 – $-0.174
2025 Q42M-91M-107M$-0.17$-0.19 – $-0.143
2026 Q11M-96M-111M$-0.18$-0.18 – $-0.173
2026 Q21M-96M-110M$-0.18$-0.19 – $-0.174
2026 Q31M-94M-107M$-0.17$-0.18 – $-0.163
2026 Q41M-92M-104M$-0.17$-0.18 – $-0.164
2027 Q11M-94M-105M$-0.17$-0.17 – $-0.171
2027 Q23M-94M-105M$-0.17$-0.17 – $-0.171
2027 Q30M—-105M$-0.17$-0.17 – $-0.171
2027 Q40M-95M-105M$-0.17$-0.17 – $-0.171
2028 Q10M-92M-101M$-0.16$-0.16 – $-0.161
2028 Q21M-89M-99M$-0.16$-0.16 – $-0.161
2028 Q33M-96M-104M$-0.17$-0.17 – $-0.171
2028 Q45M-92M-100M$-0.16$-0.16 – $-0.161

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$60.37M
37 txns · 6 insiders · 5,948,139 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-10-05SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER97,500$4.54$443K$0
2026-09-15SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER97,500$5.09$496K$0
2026-08-21SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER12,723$6.01$77K$0
2026-08-19SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER41,876$5.76$241K$0
2026-07-02SELLHettrich Kevinofficer: CHIEF FINANCIAL OFFICER9,800$7.28$71K$13.23M
2026-07-02SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER137,245$7.28$1000K$0
2026-06-22SELLHettrich Kevinofficer: CHIEF FINANCIAL OFFICER9,800$7.94$78K$14.50M
2026-06-02SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER190,935$9.30$1.77M$0
2026-05-21SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER118,417$8.23$975K$0
2026-05-21SELLHettrich Kevinofficer: CHIEF FINANCIAL OFFICER9,800$8.06$79K$14.78M
2026-05-20SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER184,437$7.50$1.38M$0
2026-05-12SELLStraubel Jeffrey Bdirector27,106$7.85$213K$1.03M
2026-05-06SELLSingh Mohitofficer: CHIEF DEVELOPMENT OFFICER50,000$7.87$394K$14.20M
2026-04-02SELLHettrich Kevinofficer: CHIEF FINANCIAL OFFICER9,800$6.20$61K$8.42M
2026-04-02SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER161,331$6.18$997K$0
2026-04-02SELLStraubel Jeffrey Bdirector27,106$6.17$167K$977K
2026-03-11SELLHettrich Kevinofficer: CHIEF FINANCIAL OFFICER9,800$6.95$68K$9.51M
2026-03-11SELLStraubel Jeffrey Bdirector27,106$6.95$188K$1.29M
2026-03-06SELLMCCARTHY MICHAEL O IIIofficer: CHIEF LEGAL OFFICER45,000$6.73$303K$6.42M
2026-03-05SELLHolme Timothyofficer: CHIEF TECHNOLOGY OFFICER161,331$6.86$1.11M$0
v2 analysis (legacy, 2026-07-23) — for comparison onlyclick to expand

Thesis

QuantumScape remains a pre-revenue, deeply capital-intensive bet on commercializing solid-state lithium-metal battery technology. The company burns roughly $400M/year (Adj FCF) funded almost entirely by equity issuance (614M shares, dilution running 9-19%/yr), sitting on $859M of liquidity that management says funds operations into 2029-2030. The Q2 2026 print continues a now-familiar cadence: no revenue, modest but growing 'customer billings' ($21.8M YTD, already exceeding all of 2025), and a widening ecosystem story — Volkswagen/PowerCo, plus now Honda, plus new AI-data-center (QSDC) and aerospace/defense (QSAS) verticals layered on top of the core EV thesis (QSEV). Eagle Line uptime >90% and lower FY26 capex guidance show growing manufacturing and capital discipline. The bull case is a genuine platform technology monetized across multiple huge end markets by 2029; the base case is continued slow-motion de-risking with commercial-scale production still years out and dilution the primary funding mechanism; the bear case is that 2029 targets slip further (as PowerCo's Salzgitter capacity pause hints), OEM partners stay in 'evaluation' mode indefinitely, and the company is forced into ever-larger dilutive raises as burn continues unabated.

Trade Signal

Trade rating
+5.5/10
Buy
Horizon
~9mo
Claude2026-07-23 · saw $5.12-41.4% since

QuantumScape is a speculative but asymmetric buy: the market is pricing close to the bear-case cash-plus-option-value floor (~$3B) despite genuine, under-monetized diversification into AI data-center and defense verticals alongside its OEM partnerships (now including Honda), though persistent pre-revenue dilution and multi-year commercialization risk cap this at a moderate-conviction position rather than a high-conviction strong buy.

Temporary mispricing+4.0

The stock's 12-month arc is a boom-bust: it rallied from ~$4 (May'25) to an $18.44 high (Oct'25) on Volkswagen/PowerCo momentum and broad EV-narrative enthusiasm, then round-tripped nearly the whole move, falling 68% from that high to $5.87 as the market digested the reality of continued pre-revenue status, PowerCo's Salzgitter capacity-expansion pause, and macro risk-off in unprofitable/high-multiple names. The last leg (past 3 months, -20%) is drift/de-risking fatigue rather than a single bad print. Notably, the Q2 print itself (Honda partnership signed, new AI-data-center/defense verticals launched, capex guidance cut - genuinely incremental positive news) only moved the stock -3%, i.e., the market barely reacted to real optionality-expanding news. That's a case of the market largely ignoring/underweighting a genuine positive development amid broader dilution fatigue and momentum-driven selling - a temporary dislocation rather than a re-rating that reflects new facts.

Market view-3.0

Sell-side is lukewarm-to-negative (0 buy/8 hold/3 sell) despite an average 12-month target of $10.22, which is nearly 2x the current price - an unusual disconnect suggesting targets haven't been cut as fast as the stock has fallen. Retail dominates the tape (41% of flow, rising) with high realized volatility (76% ann), consistent with a story/meme-adjacent stock that swings hard on sentiment rather than fundamentals. Bulls point to the widening partner base (VW, Honda, 2 more Top-10 OEMs) and new TAMs (AI data centers, defense) as de-risking a previously binary EV bet; bears point to zero revenue, ~$400M/yr cash burn funded by 9-19%/yr dilution, and PowerCo's own capex pullback as evidence commercialization keeps slipping. Institutional ownership among visible 13F holders is thin/low-conviction. Net: a beaten-down, retail-heavy name that's fallen out of favor after a failed 2025 breakout - disliked but not universally hated, and the muted reaction to genuinely good Q2 news suggests the prevailing bearish framing is stale.

Inflectionwindow ~9mo+4.0

The reorganization into three verticals (QSEV/QSDC/QSAS) plus the Honda JRA is a real broadening of the addressable market and de-risks the single-partner/single-vertical bet that dominated the bear case a year ago. Data-center BBU demand (800V DC, thermal-safety needs for AI racks) is a genuinely new, potentially faster-cycling revenue path than automotive OEM qualification cycles. However, actual monetization remains nascent - $21.8M YTD billings, still pre-revenue at scale, and consensus/Street targets (avg $10.22, Hold-heavy) don't appear to have moved to price in the vertical diversification. The market's tepid reaction to the Honda/AI announcement suggests this inflection is under-appreciated, but the evidence needed to confirm it (Eagle Line output doubling H2'26, contract conversions) is still 2-4 quarters away.

Catalysts
  • ▲2026-Q3/Q4 · H2 2026 Eagle Line output doubling — Proof point on manufacturing scale-up; failure to hit would confirm bear case
  • •2026-10 · Q3 2026 earnings/billings update — Watch billings trajectory vs YTD $21.8M and cash burn vs $859M liquidity
  • ▲H2 2026-2027 · Additional AI data-center/defense pilot conversion or contract — First real revenue proof outside auto would be a major re-rating trigger
  • •2026-2027 · PowerCo/VW Salzgitter solid-state timeline update — Could confirm 2029 target or push out further given VW's cost-cutting
  • ▼2026-2027 · Potential equity raise/dilution event — Cash runway to 2029-30 but continued 9-19%/yr dilution likely persists
  • •2027-01/02 · Q4 2026/FY26 guidance reset — Capex/opex discipline signal, watch for further cuts vs overruns
Flow-6.0

Heavy structural dilution - share count growing 9-19%/yr to fund ~$400M/yr cash burn, with no buyback or dividend. $859M liquidity buys runway to 2029-2030 per management, reducing near-term forced-raise risk, but the funding model remains equity-issuance-based and will keep growing the share count. No index-inclusion or squeeze catalysts evident; short interest not disclosed but historically elevated. Net flow is negative for per-share value creation despite adequate absolute liquidity.

Floor / Ceiling+2.0

EV of $2,351M vs $3,143M market cap implies roughly $790M net cash, about 25% of the market cap - a real, tangible cushion, though not a hard floor since burn continues at ~$400M/yr against it. No buyback or dividend; floor rests on cash-plus-option-value (as the analyst's bear case explicitly frames, ~$3.0B = cash + tech option value, which is right where the stock trades today). No visible hard ceiling either - no controlling holder dumping strength, no near-term forced dilution trigger, though continued equity issuance to fund burn will be a persistent mild drag on upside.

Buyability

Highly liquid ($165M/day), retail-favored, high-beta story stock - real buyers exist and rotate in aggressively on any positive catalyst (as the 2025 run to $18 showed), so this is not an untouchable microcap. The bear case already prices close to current levels (cash + option value ≈ $3.0B ≈ today's cap), giving asymmetric optionality that both momentum retail and select growth/thematic funds can rally behind if Eagle Line or data-center proof points land. Institutional sponsorship is thin, which caps near-term upside pace but doesn't block a retail-led re-rating.

Fear vs Greedfear 7/10greed 7/10

Greed edges out fear here: the stock has already been beaten down to roughly its cash-plus-option-value floor, the Street's own targets sit well above the current price, and a low-cost call option on a multi-vertical solid-state platform (EV+AI+defense) with credible OEM validation (VW, Honda, 2 more Top-10s) is being sold at a discount because of dilution fatigue and macro risk-off - but the total absence of revenue and reliance on continued equity funding keep this firmly in speculative, not core, territory.

Valuation

Our Target
$8.8B+383%
Market Should Pay
$9.7B+431%
target ×1.1 (greed premium)
Current Market Cap
$1.8BExtremely bearish
2-Year Plausible Outcomes
bear35%
$3.0B
rev 0%/yrOE $-450M

PowerCo/OEM commercialization slips well past 2029 (echoing the Salzgitter capacity pause), Eagle Line yields disappoint at scale, and data-center/defense pilots stay in evaluation without converting to real contracts. Burn continues near current levels, additional dilution accelerates (share count could double), and the market re-rates the story toward 'science project' territory, pricing mainly off cash-on-hand plus a small option value.

▸ Valuation

Option-value approach: ~$1.0B residual cash + modest tech-option premium ~$2.0B = $3.0B equity value (no debt to net out)

base45%
$12.0B
rev 0%/yrOE $-420M

Steady, incremental de-risking continues: Eagle Line scales output, more OEM/AI/defense partners sign on but conversion to real production revenue remains gradual, PowerCo 2029 target holds but with continued milestone-based (not volume) payments. Billings grow into the tens of millions but the company is still pre-revenue at scale by 2028; the market continues to value QS as a well-funded, credible long-duration optionality play with multiple large addressable markets now instead of one.

▸ Valuation

Optionality/NAV approach reflecting diversified TAM (EV+data center+defense) and cash runway: ~$12.0B equity value, no meaningful net debt to subtract

bull20%
$22.0B
rev 0%/yrOE $-380M

Honda and VW both accelerate toward real commercial volumes, Murata/Corning scale the ceramic separator supply chain successfully, and the AI data-center vertical converts quickly given faster hyperscaler cycles and urgent 800V safety needs. QS becomes recognized as the emerging standard for solid-state cells across autos, data centers, and defense, commanding a platform/technology premium well beyond current fundamentals despite still being pre-revenue at scale by 2028.

▸ Valuation

Platform-premium approach reflecting multi-vertical de-risking and credible path to 2029 volume production: ~$22.0B equity value

▸ Target Rationale

Model arithmetic (probability-weighted terminal value discounted 12%/2yr) lands near $8.6B. I hold my target close to model — the scenario spread already captures the wide range of technology/commercialization outcomes and the heavy, ongoing dilution that funds them. I nudge slightly above model to reflect that the Honda addition plus the deliberate reorganization into three verticals genuinely broadens the option set versus a pure-EV, single-partner bet, which should modestly reduce tail-bear risk relative to how the market priced QS a year ago.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now3/10
Trajectory7/10
Risk7/10
Governance5/10
Insolvency prob (2yr)4%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Honda Joint Research Agreement (June 2026): QuantumScape (QS) announced a multi-year joint research agreement with Honda R&D Co., Ltd. to advance its solid-state lithium-metal battery platform and manufacturing processes. This partnership follows a successful hands-on technology evaluation and competitive benchmarking by Honda, in which QS’s technology demonstrated "compelling and unique advantages". This marks QuantumScape's second major global automotive partner alongside Volkswagen.
  • Eagle Line Commissioning (February 2026): The company officially inaugurated its automated "Eagle Line" pilot production facility in San Jose, California. The line serves as a physical manufacturing blueprint to prove scalable production methods. It integrates QS's next-generation "Cobra" separator heat-treatment process, which is roughly 25 times faster than the previous "Raptor" system.
  • Financial Position and Customer Billings (April 2026): In its Q1 2026 earnings report, pre-revenue QuantumScape reported a net loss of $100.8 million. However, the company maintained robust liquidity, extending its cash runway through 2029–2030. Crucially, QS generated initial "customer billings" (recording $11 million in Q1) from ecosystem partners investing in QS-proprietary hardware and systems.
▸ Thesis-test Findings
PowerCo Salzgitter Solid State Battery Factory Timeline 2028

Volkswagen’s battery subsidiary, PowerCo, officially commissioned its Salzgitter, Germany gigafactory in December 2025, starting production of its Unified Cells. However, these initial cells utilize traditional nickel-manganese-cobalt (NMC) chemistries. While the Unified Cell architecture is designed to seamlessly accept solid-state chemistry as a "drop-in" (reusing over 70% of production line equipment), a direct solid-state production timeline for 2028 is unconfirmed. Furthermore, in early 2026, VW paused its plans to expand Salzgitter's capacity from 20 GWh to 40 GWh due to broader group-wide initiatives to cut costs by 20% by 2028.

  • Thesis Impact: *Mixed/Bearish.* While the manufacturing format is technically optimized for QuantumScape's eventual solid-state technology, Volkswagen's capital budget constraints and the paused expansion at Salzgitter may push out the timeline for high-volume, commercial-scale solid-state cell output.
Murata Manufacturing Ceramic Separator Capacity Scaling QS

In October 2025, QuantumScape entered a Joint Development Agreement (JDA) with Murata Manufacturing, a world-class ceramics specialist. The collaboration focuses on scaling up high-volume production of QS’s proprietary ceramic separator. During the Q1 2026 earnings update, QS confirmed its engineers are actively holding parallel workstream meetings with Murata (and Corning) to build out the global supply chain necessary for gigawatt-hour scale production. Murata is actively investing in QS-proprietary manufacturing hardware.

  • Thesis Impact: *Bullish.* The partnership directly targets QS’s primary manufacturing bottleneck—high-volume ceramic film processing—by leveraging Murata's decades of material science expertise. Murata's willingness to commit capital to QS-specific hardware de-risks the industrialization phase and supports the capital-light licensing model.
Data Center 800V DC Solid State Battery Backup Adoption

Hyperscale data centers are actively transitioning from traditional AC systems to 800V DC power distribution to handle the massive energy requirements (600 kW to 1 MW per rack) of next-generation AI GPU clusters. In its Q1 2026 earnings call, QuantumScape explicitly framed its solid-state technology as an "AI infrastructure play". The company is targeting rack-level battery backup units (BBUs), pitching its solid-state cells as a safer, higher-density solution capable of handling rapid power fluctuations on a nanosecond scale without the thermal runaway risks of conventional lithium-ion.

  • Thesis Impact: *Bullish.* Diversifying into the rapidly growing 800V AI data center market provides QS with a massive, high-margin enterprise market outside of passenger EVs. However, overall solid-state adoption in data centers remains under 1%, and competitors like Samsung SDI and Ampace are also advancing backup prototypes, meaning execution and contract conversion will be critical.