Stocks/RKLB

RKLB

Rocket Lab USA, Inc.v3 3.0/10 · 2026-11-03
Industrials·Aerospace & Defense
$50.88
$29.7B market cap
v3 Rating
3.0/102.0–4.5
Setup
4.5/103.0–6.0
Fair Value
$25.00$12.00–$55.00-51%
DCF (10%)
$21.00-59%
Base IRR
-10%-25%–+10%
Visibility
wide±86%
Wall Street
$87.63 target(8 analysts last quarter)(17 buy, 5 hold, 1 sell)
Rating
Revenue (TTM)
$881.9M
Owner Earnings
$0M
Next-Yr Owner Earnings
-$150M
Growth
+28.0% × 10y
P / Next-Yr OE
--
Net Debt
$800M

Headquartered in Long Beach, California, Rocket Lab USA, Inc. is a prominent aerospace firm established in 2006. This company delivers a comprehensive suite of space-related services and hardware, primarily catering to the space and defense industries. Their operations encompass orbital launch capabilities, advanced spacecraft engineering and construction, production of various spacecraft components, and sophisticated on-orbit management services, including full constellation management. Rocket Lab is known for developing and producing a range of launch vehicles, from small to medium-class rockets. Key products include the highly successful Electron small orbital launch vehicle and the versatile Photon satellite platforms, both of which they design, manufacture, and market. Furthermore, the company is actively developing the larger Neutron launch vehicle, capable of carrying 8-ton payloads. Beyond manufacturing, they also conduct remote launch operations and craft specialized components and subsystems for both their Photon spacecraft family and the broader commercial spacecraft market. Their diverse clientele spans commercial enterprises, major aerospace contractors, and governmental entities.

2-Year Price History

$54.43+302.9%
$20$40$60$80$100$120$140Initial target $25.00 · 2026-11-03volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-03

Rating
3.02.0–4.5
Setup
4.53.0–6.0
Fair value (USD)
25.0012.00 – 55.00
Upside vs 50.88
-51%
DCF (10%)
21.007.00 – 60.00-59%
Base IRR
-10%-25% – 10%
Visibility
very widerange ±86%
Sentiment
5/10
2026-11-03 · claude-opus-5-5 · priced at 54.43

Rocket Lab is the best-run independent space company in the West. Electron leads dedicated small launch and is now a hypersonic test workhorse (HASTE). Space Systems builds satellites and components and now makes up 81% of revenue. Backlog is $2.36B (+137% YoY), and Q2 2026 revenue was $234M (+62%). The company has also agreed to buy Iridium for about $8B ($27 cash plus 0.40 RKLB shares per IRDM share, since RKLB is below the $67.50 collar), closing mid-2027. The stock ($54.43 on Nov 3) has fallen 64% from its $151 May peak, which was SpaceX-IPO euphoria. Three things drove the fall: the SpaceX IPO pulled money out of other space names, a $1.94B equity raise in September, and the October 14 slip of Neutron's first flight into 2027 with no date set, after voids were found in a composite tank dome. Stocktwits retail sentiment hit an all-time low. The price has not capitulated, though. The pro forma company is worth about $39B, roughly 40x 2026 revenue on a standalone basis and about 60x 2027 pro forma EBITDA. Free cash flow is still about -$430M a year before Iridium. My DCF counts stock comp, the Neutron fleet build and Iridium's eventual replacement capex. It assumes revenue compounds about 30% a year to roughly $3.8B standalone by 2031, plus Iridium, for about $850M of consolidated free cash flow in year 5, valued at 28x. That gives about $21 a share; $54 needs about $2B of free cash flow at 30x+, which is my bull case. This is a great growing business attached to a price that still assumes nearly everything goes right. Rating 3.0: unattractive to own, a mild short candidate. I would not short aggressively: beta is about 3, there are hard catalysts (Q3 results on Nov 9, the Neutron first flight), Iridium will bring real cash flow, and SpaceX's public valuation keeps propping up the comps. Research 4.5: the open questions can be answered, but that work is unlikely to turn up a 40%-undervalued long.

A deep dive would have to establish: Whether Neutron can fly in 2027 and reach 15-20+ reusable flights a year at 30%+ margins while Space Systems scales past $3B at mid-teens FCF margins, which is what it would take for about $2B of 2031 free cash flow to justify today's roughly $39B pro forma value.

Owner earnings, TTM
$0M-$200M – $120M
Realistic peak profit
$1.1B$500M – $2.5B
Growth rate
28.0%18.0% – 40.0%
Years of growth
106 – 15
Market cap
$39B$37B – $41B
EV
$40B$38B – $42B
Net debt
$800M$200M – $1.5B
Capital return / cap
-4.0%-8.0% – -1.0%
P/E
200.0×100.0× – 500.0×
EV/EBITDA
60.0×45.0× – 90.0×
FCF yield
-0.5%-1.5% – 0.5%
Projected FCF, base case (USD millions)
Y1-$150M-$450M – $50M
Y2$220M-$250M – $450M
Y3$480M$0M – $850M
Y4$640M$100M – $1.3B
Y5$850M$150M – $2.0B
Competition: SpaceX dominates launch and owns its own demand, Blue Origin, Firefly/Northrop, ULA, Relativity and Stoke contest medium lift, and York, Lockheed/Terran, Apex and Northrop compete in satellites, while Iridium faces Starlink/T-Mobile and AST in direct-to-device; RKLB's moat is real in small launch, HASTE and components but unproven in medium lift.
Governance: No fraud or control issues and a credible founder-CEO, but heavy serial dilution (about $3.5B+ of equity issued in 2026, collared forwards, 42.5M shares for Iridium) and steady insider selling.
Research (expand)
What the company does
  • Launch (19% of Q2 revenue, $44.6M): Electron is the leading dedicated small-launch rocket (21 launches in 2025, 13 so far in 2026 with 100% success). HASTE is Electron's suborbital variant for hypersonic and missile-defense testing. Contracts include a $190M deal for 20 HASTE launches and a $266M Space Force deal for up to 18 missions, the largest launch contract in company history. A deployable GHOST pad system is going to Kodiak, Alaska. Neutron is an 8-ton-class reusable medium-lift rocket priced at $50-55M a launch, with firm commercial and government bookings and NSSL Lane 1 on-ramp eligibility. It has not flown. First flight has slipped from 2024 to mid-2025, then Q1 2026, Q4 2026, and now 2027 with no date.
  • Space Systems (81%, $189.5M): Satellite buses: SDA Tranche 2 and 3 (over $1.3B of awards), Flatellite (a $397M Space Force airborne-moving-target-indicator award), first GEO satellites ($160M+), and interplanetary missions. Components: space solar (largest maker), reaction wheels, star trackers, Mynaric optical comms, GEOST payloads, Motiv robotics, electric propulsion. Vertical integration removes margin stacking and wins prime contracts.
  • Pending (mid-2027): Iridium. 66 L-band satellites, about 2.5M subscribers, $872M of 2025 revenue, $495M of OEBITDA, and about $270M of FCF a year after interest (9M 2026: $202.5M). Iridium has 106.2M shares and about $2.1B of debt. The constellation is good into 2035.
Investment case (bull view)

Rocket Lab is one of two Western companies that can build satellites and launch them itself. Launch is supply-constrained: SpaceX and Blue Origin capacity is increasingly used internally, and NSSL Lane 1's ceiling went from $5.6B to $17B. Defense space spending (Golden Dome, SDA, European sovereignty) is growing. Iridium adds recurring operator revenue and spectrum. Management executes on everything except Neutron's schedule.

What it earns today
  • 2026 revenue is about $970M. Adjusted EBITDA was -$8.8M in Q2, and the Q3 guide is -$17M to -$23M. That excludes about $100M a year of stock comp.
  • Reported FCF: Q1 -$77M, Q2 -$110M; 2026 is about -$430M (about -1.2% of market cap).
  • Owner earnings with Neutron R&D (about $40-50M a quarter) and Neutron capex added back as growth: Electron plus Space Systems earn about $140M a year of adjusted EBITDA. Less $100M of stock comp and about $40M of maintenance capex, with no cash taxes (NOLs), that leaves about $0M (range -$200M to +$120M). EBITDA conversion to owners is close to zero today.
  • Iridium after close: unlevered owner earnings of roughly $330-350M. RKLB is paying about $7.3B of EV ($2.87B cash, 42.5M shares worth about $2.3B, and $2.1B of assumed debt). That is about 14.6x OEBITDA and about 21x unlevered FCF. A fair price, not a bargain.
Balance sheet and shares

June 30 liquidity was $2.40B, with $13M of converts left. The September raise added $1.944B gross (29.3M shares at about $66) and replaced the $3.6B bridge. Estimated 9/30 cash is about $4.2B. Shares: 598.2M common plus 41.0M convertible preferred plus 29.3M is about 670M basic. Add 42.5M Iridium shares, 7.45M collared-forward shares (April 2028, $474-642M) and about 25M of RSUs and options: about 745M fully diluted pro forma, up from about 490M two years ago. Pro forma net debt at close is about $0.8B. Market cap is about $36.5B standalone and $38.8B pro forma; pro forma EV is about $39.6B.

5-year FCF projection (unlevered, after stock comp; Iridium from mid-2027)

| Year | Standalone revenue | Standalone FCF | Iridium | Total |

|---|---|---|---|---|

| 2027 | $1.45B | -$320M | +$170M | -$150M |

| 2028 | $2.0B | -$120M | $340M | $220M |

| 2029 | $2.6B | $140M | $340M | $480M |

| 2030 | $3.2B | $320M | $320M | $640M |

| 2031 | $3.8B | $550M | $300M | $850M |

That is about a 30% standalone revenue CAGR, still growing 15-20% in year 5, with 10+ years of growth left. In 5 years this is a growing income stream, not a corpse: a $5B+ revenue space prime and operator. Confidence in the shape is moderate. Confidence in the numbers is low, because Neutron's timing, cost and reuse are binary-ish. The mid-case is already above consensus 2027 EBITDA of about $172M (revised down from $225M).

Fair value and multiples
  • DCF at 10%: PV of 2027-31 FCF is about $1.4B. Terminal value is $850M x 28 = $23.8B, about $14.8B in PV. EV is about $16.2B, less $0.8B of net debt plus about $0.4B of forward proceeds, for equity of about $15.8B, or about $21 a share. Low case about $7 (Neutron late and sub-scale, $350M x 18x); high case about $60 ($2B x 35x).
  • What $54 implies: about $2B of year-5 FCF at about 30x, my bull case.
  • Multiples today: about 37x 2026 standalone sales and about 60x 2027 pro forma EBITDA. P/E is not meaningful (about 150x+ on 2028E). FCF yield is negative now and about 0.6% in 2028.
  • Base IRR: 2031 equity is about $24B on about 780M shares, or about $30 a share, roughly -10% a year.
  • Fair value about $25: a bit above the DCF for scarcity and strategic value, and because the SpaceX comp may keep lifting space multiples.
Management, risks, competition

Founder-CEO Peter Beck is a credible engineer-operator with a strong record on Electron, acquisitions and SDA programs. No fraud or governance flags. Capital return is negative, though: about $3.5B+ of stock issued in 2026, M&A described as not one-and-done, and steady insider selling (the CFO sold 140k shares at $70.82 on Oct 1; about $27M of insider sales last quarter). Risks: Neutron slipping again or stage-test failure; fixed-price SDA execution at mid-30s gross margins; Iridium's FCC review and close, D2D competition (Starlink/T-Mobile, AST) and replacement capex before 2035; dilution; 42% government concentration; beta about 3 and SpaceX-linked sector flows. Competition: SpaceX dominates launch and owns its own demand. Blue Origin's New Glenn is ramping. Firefly/Northrop, Relativity, ULA and Stoke compete in medium lift. York, Lockheed/Terran, Apex and Northrop compete in satellites. RKLB's moat is real in small launch, HASTE and components. In medium lift it is still an aspirant.

Sentiment: 5/10

Retail has capitulated: the stock is down 64% from its peak, Stocktwits sentiment is at an all-time-low 22/100, and the price sits at 13% of its 1-year range. The sell side still loves it: 17 of 23 analysts rate it Buy or Strong Buy, with an average target of about $102 (Citizens $90 from $130, BofA $110, Needham $120, Cantor $122, Stifel $132). Short interest is about 44M shares (about 2 days to cover), and IV is about 82%. This is a fallen euphoria name whose valuation still prices success: a $39B pro forma market cap with negative FCF is not blood on the ground. It is not a covered-call floor either. Catalysts: Q3 results on Nov 9, a Neutron date or static fire, and Iridium approvals.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue882+59%602+38%436+78%245+16%211
Gross profit319+82%207+78%116+127%51.2+170%19.0
Operating expenses563+39%436+43%306+34%229+49%154
▸Adj EBITDA-193-185-156-148-105
▸Adj OCF-247-192-151-145-115
CapEx-134-156-67.1-54.7-42.4
Adj FCF-381-348-219-200-157
Interest expense7.2010.63.954.257.80
▸Adj net income-204-202-195-186-146
▸Owner's earnings-190--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-702-129-172-152-145-105
FCF (OCF−capex)-979-239-322-116-154-149
Net income-881-174-198-190-183-136
▸Capital returned-3974-2537-1149-2992.168.07
Buybacks-3760-2539-12210.000.000.00
Dividends0.000.000.000.000.000.00
Interest paid28.72.1810.63.954.257.80
Debt paid down-2430.1661.5-303-2.090.27
▸Reinvestment76214632273.591.5130
Capex (PP&E)40584.215667.154.742.4
Intangibles & M&A26944.313210.815.365.8
Leases signed (net Δ)89.017.432.9-4.4021.521.5
Retained / other27562256705176-167-215

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 303 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)656923241184941989
▸Liabilities (total)766603802387316
Net debt (incl. leases)-4488-76349.4-68.1-319
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-26.8-17.5-39.5-34.9-13.5
Shares outstanding598525504489475
Dilution (YoY)+24.8%+4.1%+3.2%+2.9%+5.6%
Employees21002600210016501400
MarginsTTM2025202420232022
Gross margin36.2%+4.534.4%+7.826.6%+5.720.9%+11.99.0%
Adj EBITDA margin-21.9%+12.6-30.8%+5.0-35.8%+24.8-60.6%-10.7-49.9%
Adj OCF margin-28.0%+7.6-31.9%+2.8-34.7%+24.6-59.3%-5.0-54.3%
Adj FCF margin-43.2%+15.5-57.9%-7.7-50.1%+31.5-81.7%-7.3-74.4%
Net income margin-25.7%+9.9-32.9%+10.7-43.6%+31.0-74.6%-10.2-64.4%
Adj NI margin-23.2%+12.6-33.6%+11.0-44.6%+31.4-76.0%-6.8-69.2%
ROIC (adj, after-tax)-3.3%-9.2%-17.6%-19.2%-12.9%
Cost of debt--2.4%0.8%2.6%5.2%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Product$127.5M+58%
Service$72.9M+75%

Earnings Calls

12 calls

Earnings Call · 2026 Q2

2026-08-10

Rocket Lab delivered another quarter of strong execution, reporting record second-quarter 2026 revenue of $234 million, an increase of 62% year over year and 16.8% sequentially. Growth was led by Space Systems, where revenue reached $189.5 million, up 38.6% sequentially, reflecting stronger satellite-manufacturing activity and the initial contribution from Mynaric, acquired during the quarter. Launch Services revenue was $44.6 million, down 30% sequentially despite a similar number of launches, primarily because HASTE revenue is recognized over time and much of the relevant work had been recognized in prior periods, while Electron revenue is recognized at launch. Profitability exceeded guidance. GAAP gross margin was 36.1% and non-GAAP gross margin was 41.5%, benefiting partly from tariff refunds, offset by a Neutron Flight II inventory reserve. Adjusted EBITDA loss was $8.8 million, better than the guided $20 million-$26 million loss. Operating expenses and headcount increased materially as Mynaric was integrated and Neutron development continued. Cash use remained elevated: operating cash flow was negative $84.1 million and non-GAAP free cash flow was negative $110.1 million. Spending reflected Neutron tail production, testing, infrastructure, and replenishment of Mynaric’s supply chain. Liquidity was approximately $2.4 billion after Rocket Lab raised $1.08 billion through its at-the-market equity program, which was subsequently terminated. Commercial momentum accelerated. Rocket Lab signed more than $1 billion in contracts during Q2 and the subsequent period, increasing backlog to approximately $2.36 billion, split 40% Launch and 60% Space Systems. Key awards included a $397 million Space Force Flatellite spacecraft program, more than $160 million for three GEO satellites, a $266 million Space Force contract for up to 18 HASTE missile-defense missions, and a dedicated Neutron launch for Kepler Communications. Flatellite is a high-performance, low-profile satellite platform designed for rapid, high-volume production and deployment. The GEO awards expand Rocket Lab into a new government satellite market and incorporate technology from acquired GEOST. Electron and HASTE completed 13 launches year-to-date with 100% mission success. The VICTUS HAZE mission set records for responsive launch, spacecraft commissioning, and rendezvous-related operations. Rocket Lab also introduced GHOST, a deployable, containerized launch-site system intended to provide rapid launch and range infrastructure at locations such as Kodiak, Alaska. Management expects HASTE pricing to remain strong, with possible upside as strategic demand increases. Neutron development is progressing toward pad delivery in Q4 2026, although the window for a year-end launch is narrowing. More than 400 Archimedes hot fires have been completed, flight engines are in production, and major vehicle components are moving through final assembly and integrated testing. Management is balancing first-flight timing with the goal of reaching the tenth flight quickly through robust qualification and reusability. Neutron is already attracting full-price bookings at a planned $50 million-$55 million ASP, despite not yet having flown. The planned Iridium acquisition, expected to close in mid-2027, would add a profitable 66-satellite network, more than 2.5 million subscribers, roughly $870 million in annual revenue, and strategically valuable L-band spectrum. Rocket Lab intends to expand Iridium into IoT, direct-to-device, PNT, defense, aviation, and maritime safety, while using its own satellites and launch vehicles to lower deployment costs and accelerate new services. Q3 guidance calls for revenue of $250 million-$265 million, GAAP gross margin of 29%-31%, adjusted EBITDA loss of $17 million-$23 million, and continued elevated free-cash-flow investment as Neutron scales.

Analyst Q&A (24)
▸
How quickly could Neutron scale to ten launches and beyond, could the ramp be accelerated, and does constrained launch supply create an opportunity to raise ASPs for Neutron, Electron, and HASTE?
Andres Sheppard-Slinger · Cantor Fitzgerald
Management is prioritizing a path to Neutron’s tenth flight, not merely first flight, and is trading qualification timing against rapid reusability and cadence. The expected ramp remains 1, 3, and 5 launches, with greater reusability potentially accelerating it. Neutron launched at a $50 million-$55 million ASP, with no meaningful early discounting; management sees more upside than downside for pricing across Neutron, Electron, and HASTE as demand remains strong.
▸
What opportunities and synergies does Iridium unlock through its constellation and vertical integration, and how will Rocket Lab allocate Neutron launches to Iridium and its customers?
Andres Sheppard-Slinger · Cantor Fitzgerald
Iridium would create substantial vertical-integration savings by allowing Rocket Lab to build and launch satellites itself, while opening growth in PNT, IoT, direct-to-device, and government and commercial mission-critical services. Neutron capacity would need to be balanced among commercial customers, government programs, Iridium’s constellation, and Rocket Lab’s future applications initiatives.
▸
Given Iridium’s profitability but slower growth, what are the lowest-hanging opportunities to accelerate its revenue growth in the near and intermediate term?
Jeff Van Rhee · Craig-Hallum Capital Group
Iridium provides profitable, durable operations and a constellation funded into 2035. Rocket Lab believes it can accelerate growth initiatives, particularly PNT, by adding capability to the constellation, while its broader capabilities will improve credibility with government and commercial customers seeking mission-critical, life-critical services. Management’s focus from closing onward will be growth.
▸
What infrastructure does GHOST require, what incremental business can it capture, and how did the concept originate?
Jeff Van Rhee · Craig-Hallum Capital Group
GHOST originated from a customer requirement for greater mobility in HASTE operations, rather than being a speculative product. Rocket Lab can containerize and move Electron-scale launch infrastructure relatively easily because it has already built multiple pads and now has experience with larger Neutron-scale hardware.
▸
How should investors think about revenue and cost per GHOST-enabled launch versus Electron or HASTE, and will Kodiak require a meaningful incremental CapEx step-up?
Trevor Walsh · Citizens
GHOST-enabled missions are HASTE missions and should initially be modeled with pricing consistent with existing HASTE. Rising strategic demand, including potential Golden Dome-related activity, could support higher ASPs over time, with opportunities across Alaska, Virginia, New Zealand, and international markets. Kodiak-related capital spending should be modest and substantially funded under customer contracts.
▸
Is there a separate Kodiak launch-site CapEx increase that should be expected during the balance of 2026?
Trevor Walsh · Citizens
The Kodiak site will require some additional CapEx, but it is small relative to Neutron spending. Much of the infrastructure investment is funded through the associated customer agreements.
▸
How is Rocket Lab thinking about next-generation Iridium constellation timing and synergies, and might it deploy the replacement constellation before the existing system reaches the mid-2030s?
Edison Yu · Deutsche Bank
The current Iridium constellation can operate into the mid-2030s, and its L-band spectrum is valuable for weather-penetrating, indoor, safety-critical, and sticky applications. Management believes a next-generation constellation will eventually be deployed, enabled by Rocket Lab’s self-launching capabilities, but it is too early to specify its design or timing.
▸
Will the recently awarded satellite and GEO contracts ramp linearly or have a lumpy revenue profile?
Edison Yu · Deutsche Bank
Government satellite programs generally run for about four years and follow an approximate 10%, 40%, 40%, 10% revenue-recognition curve, although individual programs vary.
▸
Across spacecraft components, where is the largest opportunity, and how does current and planned factory capacity compare with expected satellite and launch-cadence growth?
Jan-Frans Engelbrecht · Baird
Rocket Lab views components as a significant competitive moat because large quantities are difficult to source. Its scaled portfolio, including solar, reaction wheels, laser terminals, panels, and thrusters, should benefit as constellations expand. Merchant component sales provide attractive margins, while internal production eliminates margin stacking and improves competitiveness for large satellite-platform contracts. Capacity is being expanded as demand grows.
▸
How much of the $266 million HASTE award represents launches versus pad infrastructure, what does it imply for HASTE ASPs, and how are commercial customer negotiations developing?
Jan-Frans Engelbrecht · Baird
The $266 million HASTE contract includes infrastructure, continuing operations, and launch elements; launch revenue will be recognized at standalone selling prices, while infrastructure appears in CapEx and later depreciation. The mix does not alter HASTE’s underlying margin profile. Commercial HASTE interest is increasing, particularly as defense programs validate the capability, with further opportunities expected.
▸
Could Iridium eventually pursue broadband in addition to narrowband IoT, and what would that require?
Erik Rasmussen · Stifel
L-band is not well suited to broadband, and Rocket Lab is not currently targeting a direct broadband competition with major providers. Its value lies in capabilities that L-band enables, including services unavailable through other spectrum bands.
▸
Where are Mynaric’s gross margins currently, what is the target profile, and how long will it take to reach that target?
Erik Rasmussen · Stifel
Mynaric’s initial margins are pressured by prior supply-chain and insolvency-related challenges. Rocket Lab is rebuilding the business and expects margins to move toward the broader Space Systems merchant-business profile over several quarters, aided by volume growth and cost efficiencies; management expects the improvement to be faster than after the SolAero acquisition.
▸
What major milestones and risks must Rocket Lab clear to deliver Neutron to the pad and support a fourth-quarter 2026 launch?
Benjamin Johnson · Piper Sandler
The highest-risk milestone is integrated stage testing with fully fueled hardware and first engine ignition on the pad. After that, there is a sequence of progressively lower-risk checkout and integration milestones before flight.
▸
What early customer interest and opportunities have emerged from Rocket Lab’s European footprint, and are they concentrated in satellites, launch, or both?
Benjamin Johnson · Piper Sandler
European geopolitical developments are increasing demand for sovereign space capabilities, including satellite missile-warning systems and other defense programs. Germany and other countries may require external assistance because domestic capabilities are limited. Europe also has insufficient launch cadence for constellation deployment, creating opportunities for Rocket Lab in both spacecraft and launch.
▸
How much of the higher cash burn was due to Neutron development versus accelerating inventory purchases for future launches?
Kristine Liwag · Morgan Stanley
Higher cash consumption reflected accelerated Neutron tail production for parts considered unlikely to change after the first flight, supporting faster cadence. Mynaric also required supply-chain replenishment after prior challenges, but management expects that spending to normalize. The increase was therefore mainly Neutron inventory build-out plus Mynaric normalization.
▸
Will Neutron bookings accelerate as the test flight approaches, and is Q2 likely to represent peak free-cash outflow for the year?
Kristine Liwag · Morgan Stanley
Rocket Lab is selectively booking Neutron because supply is limited and capacity must serve commercial, government, Iridium, and Rocket Lab’s own future applications needs. On a standalone basis, free cash flow is driven principally by Neutron’s first successful test; adjusted EBITDA is expected to turn positive in the quarter after that event, while cash flow may take another 18-24 months because tail production will continue. Iridium would materially change the cash-flow profile once closed.
▸
What was the Space Systems product mix in Q2, how should Tranche 2 and Tranche 3 revenue ramp in the second half, and how should investors interpret gross-margin mix excluding Mynaric?
Ryan Koontz · Needham & Company
Space Systems mix varies between quick-turn merchant components and larger satellite-platform programs. Q2 had somewhat less mature, higher-margin merchant-product contribution, while Q3 is also expected to reflect a less favorable mix. SDA Tranche 2 and 3 programs are roughly mid-30% gross-margin businesses, whereas component margins range widely, making quarterly mix difficult to forecast.
▸
Should Neutron orders surge after a successful first flight, and could larger competing vehicles create excess industry capacity and reduce demand for Neutron in three to four years?
Gautam Khanna · TD Securities
Neutron demand is already strong before test flight, with customers booking at full price, although a successful flight should increase comfort. Broader launch capacity is likely to remain constrained because much of new competitors’ capacity is committed to their own internal programs, so management expects tight supply for an extended period.
▸
What is the status of the Mars Telecommunications Orbiter opportunity, and how well positioned is Rocket Lab to win it and contribute revenue?
Edward Morgan · BTIG
Rocket Lab is awaiting NASA’s procurement process for the Mars Telecommunications Orbiter program and expects a decision potentially soon. Management believes it is well positioned because few competitors can demonstrate comparable capabilities and experience.
▸
After Neutron’s successful launch, how quickly could NSSL task orders be awarded?
Edward Morgan · BTIG
NSSL task orders are controlled by the government and are released during defined periods. The increased NSSL contract ceiling provides substantially more resources, and management believes government customers are eager for Neutron, but it cannot control the timing of task-order awards after the test flight.
▸
Is Rocket Lab discussing orbital data-center opportunities as a supplier or operator, and could its high-efficiency solar capabilities make this a meaningful market?
Michael Leshock · KeyBanc Capital Markets
Orbital data centers are viewed as a real opportunity, though the ultimate scale remains uncertain. Rocket Lab has introduced solar cells aimed at the application and is engaging with interested parties. It does not currently plan to build data centers itself, but expects to be well positioned as a supplier if the market develops.
▸
Will Rocket Lab remain active in M&A after Iridium, and which capabilities or business areas are being targeted?
Michael Leshock · KeyBanc Capital Markets
Rocket Lab expects to remain active in M&A, particularly through tuck-in acquisitions, when attractive opportunities arise. Iridium is viewed as the beginning rather than the endpoint of the applications strategy; further acquisitions may expand capabilities beyond L-band communications and support a self-launching, vertically integrated space-services model.
▸
At what point in the 1-3-5 Neutron launch sequence will customers become as comfortable ordering Neutron as they are Electron, given that some are already pre-booking?
Sujeeva De Silva · ROTH Capital
Customer confidence in Neutron already resembles the comfort seen in Electron, despite limited initial supply and the vehicle not yet having flown. Customers are booking before test flight, and management is selectively allocating scarce capacity because Neutron will also support Iridium and Rocket Lab’s own future applications. The 1-3-5 cadence is a framework, but demand is already strong.
▸
What are Flatellite’s distinctive features, and how large could the opportunity be across government, commercial customers, and Rocket Lab’s own missions?
Sujeeva De Silva · ROTH Capital
Flatellite is designed for high-cadence production of large numbers of low-profile satellites optimized for deployment from a launch vehicle. Its first order, a major U.S. government program, validates customer confidence, and the platform could serve commercial constellation customers as well as Rocket Lab’s own future applications.

SEC Filing Findings

SEC Filing — material findings

2026-08-10 · depth 9/10
risk 8Dilution
▸

Massive ATM equity issuance: $1.53B gross ATM proceeds in 6M 2026; $3.0B May 2026 ATM program; collared forward transactions locking 7.45M shares with proceeds capped at ~$642M through April 2028. Share count up ~25% YoY.

“Under the May 2026 Equity Distribution Agreement, the Company may offer and sell, from time to time, the shares of its common stock through or to the May 2026 Sales Agents, acting as the Company’s agents or principal, having an aggregate offering price of up to $ 3,000,000”
risk 9Hidden Liability / Acquisition Financing
▸

Iridium acquisition (~$8.0B EV) requires >$3.0B cash plus potential ~$1.8B refinancing; $3.6B bridge loan committed; company is obligated to close regardless of financing availability and expects substantial new indebtedness with covenants.

“we will nonetheless remain obligated to complete the Iridium Transaction and pay the Cash Consideration, subject to the terms of the Iridium Merger Agreement, and Iridium may seek to enforce that obligation, including, in specified circumstances, through an action for specific performance.”

Options

Chain Snapshot (daily)

Call IV (ATM)67%
Put IV (ATM)96%
ATM Spread0.83%
Call $OI (near money)$50.6M
Put $OI (near money)$87.4M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$55.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$40.00$12.30/$14.552,717$1.16/$1.507,235
$42.00$11.40/$13.60404$1.59/$1.982,065
$45.00$8.70/$10.90758$2.38/$2.862,801
$47.00$6.90/$10.30746$3.30/$3.651,910
$50.00$7.00/$7.602,629$4.60/$4.958,129
$55.00$4.70/$5.153,000$7.05/$7.704,414
$60.00$3.10/$3.554,545$10.35/$11.105,577
$65.00$2.07/$2.413,568$14.30/$15.554,550
Snapshot: 2026-11-04

Short Interest

Short % of Float7.9%
Short Shares46.4M
Days to Cover2.8
Change (vs Prior)+2.5%
Short % Float History
7.90%-1.40pp
4.0%6.0%8.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2021.0-2023.0)

Direct Pay$43.9M
Incentive & Other$14.3M
Total Compensation$58.1M
% of Revenue3.2%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$4.12B$47.41+$264M+$1.81B—$6.70T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$2.76B$66.12+$140M+$2.76B—$2.22T
VANGUARD CAPITAL MANAGEMENT LLCPassive$2.57B$65.72+$103M+$2.57B—$4.68T
Invesco Ltd.$1.86B$82.06+$1.50B+$1.23B—$1.26T
STATE STREET CORPPassive$1.47B$42.43+$52.6M+$359M—$3.38T
JPMORGAN CHASE & CO$1.35B$62.86+$318M+$806M—$1.71T
GEODE CAPITAL MANAGEMENT, LLCPassive$1.08B$44.00−$6.9M+$360M—$1.87T
BAILLIE GIFFORD & CO$1.06B$52.32−$818M+$609M—$110.23B
Capital World Investors$749M$40.83+$13.0M−$595M—$846.00B
MORGAN STANLEY$701M$53.88+$154M+$349M—$1.88T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

021.3M42.5M63.8M85.0M$36$52$69$85$1022025-062025-092025-122026-032026-06
hover the chart for per-quarter detailprice (right axis)
Invesco Ltd.18.3MJPMORGAN CHASE & CO13.8MBAILLIE GIFFORD & CO10.4MCapital World Investors7.4MVK Services, LLC—MORGAN STANLEY6.9MGOLDMAN SACHS GROUP INC5.6MNORGES BANK5.4MBANK OF AMERICA CORP /DE/4.3MD. E. Shaw & Co., Inc.1.1M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
ASTSAST SpaceMobile, Inc.341.84×
CLSCelestica Inc.318.37×
NOKNokia Oyj317.12×
NETCloudflare, Inc.315.69×
HOODRobinhood Markets, Inc.414.14×
ARMArm Holdings plc American Depositary Shares312.55×
HWMHowmet Aerospace Inc.310.91×
COHRCoherent, Inc.310.61×
TERTeradyne, Inc.310.18×
LITELumentum Holdings Inc.39.18×
PLTRPalantir Technologies Inc.57.21×
MRVLMarvell Technology, Inc.57.21×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (8 analysts)$87.63+76.6%
Last Year (26 analysts)$100.08+101.7%
Current Price$49.63
Analyst Ratings
17
5
Buy: 17Hold: 5Sell: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2021 Q35M-91M-97M$-0.12$-0.13 – $-0.111
2021 Q424M-24M-30M$-0.05$-0.05 – $-0.051
2022 Q141M-6M-15M$-0.05$-0.05 – $-0.042
2022 Q253M-15M-25M$-0.05$-0.06 – $-0.052
2022 Q359M-81M-90M$-0.07$-0.07 – $-0.062
2022 Q447M-30M-39M$-0.06$-0.07 – $-0.062
2023 Q153M-42M-50M$-0.08$-0.09 – $-0.081
2023 Q262M-32M-39M$-0.07$-0.07 – $-0.061
2023 Q368M-19M-28M$-0.05$-0.07 – $-0.045
2023 Q463M-41M-50M$-0.08$-0.09 – $-0.075
2024 Q195M-40M-49M$-0.08$-0.08 – $-0.084
2024 Q2105M-42M-51M$-0.08$-0.10 – $-0.085
2024 Q3102M-50M-59M$-0.09$-0.11 – $-0.082
2024 Q4131M-45M-56M$-0.09$-0.11 – $-0.056
2025 Q1121M-58M-70M$-0.11$-0.12 – $-0.104
2025 Q2135M-51M-62M$-0.10$-0.11 – $-0.076
2025 Q3152M-52M-64M$-0.10$-0.12 – $-0.086
2025 Q4177M-55M-75M$-0.11$-0.12 – $-0.117
2026 Q1190M-27M-44M$-0.07$-0.08 – $-0.055
2026 Q2232M-17M-38M$-0.06$-0.07 – $-0.055
2026 Q3257M-7M-30M$-0.05$-0.06 – $-0.036
2026 Q4282M15M-12M$-0.02$-0.02 – $-0.024
2027 Q1285M12M-17M$-0.03$-0.03 – $-0.024
2027 Q2323M27M-4M$-0.01$-0.01 – $-0.011
2027 Q3341M36M1M$0.00$0.00 – $0.001
2027 Q4391M54M13M$0.02$0.02 – $0.021
2028 Q1397M71M24M$0.04$0.03 – $0.042
2028 Q2433M96M41M$0.06$0.06 – $0.072
2028 Q3471M103M44M$0.07$0.06 – $0.072
2028 Q4499M120M54M$0.08$0.07 – $0.092
2029 Q1543M—0M$0.00$0.00 – $0.001
2029 Q2561M—0M$0.00$0.00 – $0.001
2029 Q3579M—0M$0.00$0.00 – $0.001
2029 Q4649M—0M$0.00$0.00 – $0.001

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$691.25M
55 txns · 11 insiders · 9,031,330 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-11-02SELLArmagno Ninadirector10,926$52.78$577K$5.30M
2026-11-02SELLSpice Adam C.officer: Chief Financial Officer140,157$52.79$7.40M$61.02M
2026-10-01SELLSpice Adam C.officer: Chief Financial Officer140,157$70.82$9.93M$81.86M
2026-09-02SELLSpice Adam C.officer: Chief Financial Officer140,157$62.63$8.78M$72.40M
2026-08-27SELLKampani Arjunofficer: SVP & General Counsel6,034$66.65$402K$16.72M
2026-08-27SELLKlein Frankofficer: Chief Operations Officer35,558$66.61$2.37M$61.66M
2026-08-24SELLClevenger Marvin Bradfordofficer: President, Rocket Lab USA, Inc15,051$69.63$1.05M$31.95M
2026-08-24SELLKampani Arjunofficer: SVP & General Counsel7,754$69.63$540K$17.89M
2026-08-24SELLKlein Frankofficer: Chief Operations Officer45,692$69.63$3.18M$66.93M
2026-08-24SELLRicupati Agostinoofficer: VP Corp Controller & CAO669$69.63$47K$1.87M
2026-08-24SELLSpice Adam C.officer: Chief Financial Officer9,677$69.63$674K$80.49M
2026-07-08SELLBeck Peterdirector, officer: CEO990,960$82.86$82.12M$142.88M
2026-07-07SELLBeck Peterdirector, officer: CEO1,298,622$84.92$110.28M$230.57M
2026-07-06SELLBeck Peterdirector, officer: CEO986,197$95.33$94.02M$382.64M
2026-06-18SELLKampani Arjunofficer: SVP & General Counsel88,000$107.98$9.50M$28.58M
2026-06-02SELLSlusky Alexander Rdirector40,000$123.60$4.94M$41.37M
2026-05-28SELLClevenger Marvin Bradfordofficer: President, Rocket Lab USA, Inc3,500$146.67$513K$69.52M
2026-05-28SELLKampani Arjunofficer: SVP & General Counsel23,804$147.43$3.51M$52.00M
2026-05-28SELLKlein Frankofficer: Chief Operations Officer36,860$147.42$5.43M$148.45M
2026-05-28SELLSlusky Alexander Rdirector60,000$149.40$8.96M$55.98M
v2 analysis (legacy, 2026-08-11) — for comparison onlyclick to expand

Thesis

Rocket Lab is transitioning from a pure small-launch provider into a vertically integrated space platform spanning launch (Electron/HASTE/Neutron), spacecraft manufacturing, and now (pending) satellite services via the Iridium acquisition. Q2 2026 revenue hit $234M (+62% YoY), backlog swelled to $2.36B, and adjusted EBITDA loss narrowed to just $8.8M versus a guided $20-26M loss — the company continues to beat its own guidance quarter after quarter. The bull case is a genuine SpaceX-style platform: Neutron flying successfully in late 2026/early 2027 unlocks NSSL task orders and high-ASP medium-lift launches, Space Systems scales via SDA Tranche 2/3 and GEO defense programs, and Iridium (closing ~mid-2027) bolts on ~$870M of profitable, durable revenue plus L-band optionality (PNT, IoT, defense). The bear case is that Neutron continues to slip (it has already slipped multiple times, most recently from Q1 to Q4 2026), cash burn stays structurally high, dilution (the $1.08B ATM raise and $642M collared forward) keeps eating per-share value, and Iridium integration proves harder or more dilutive than advertised. Financially the company is still deeply unprofitable on an owner-earnings basis (TTM adj FCF -$420M) but sits on ~$2.4B of liquidity, giving it a long runway and low near-term insolvency risk. The stock trades on backlog growth and narrative more than current earnings, and Nasdaq-100 inclusion has added a structural bid from passive flows.

Trade Signal

Trade rating
-5.5/10
Short
Horizon
~6mo
Claude2026-08-11 · saw $80.01-36.4% since

Rocket Lab is executing brilliantly operationally, but at ~$46B market cap versus an $8.5-11.5B fair-value range (even the bull case tops out near $20.5B), the stock is priced for a near-flawless, multi-year platform transformation that isn't yet proven — combine that with heavy insider selling, 25% annual dilution, and no valuation floor, and this is a short despite the strong fundamentals.

Temporary mispricing+1.0

Stock has been extremely volatile: ran from ~$70 to $143 (Feb-May) on Neutron progress, Iridium deal announcement, Nasdaq-100 inclusion and beat-and-raise prints, then collapsed back to the $60s-80s over June-July as the market digested dilution (ATM raise + forwards), insider selling, and lack of near-term Neutron flight catalyst. The post-earnings -5% move on an otherwise strong beat (record revenue, narrower EBITDA loss, huge backlog) suggests the market is now more skeptical/fatigued on the stock despite continued operational beats — a modest overreaction to the print itself, but set against a name that remains priced for a scenario (bull case $20.5B) still far above even the analyst's bull case relative to current $46B cap. This isn't really a temporary mispricing story; it's a durable, structural overvaluation that has been correcting in fits and starts.

Market view+5.0

Market view is bullish/euphoric-leaning: 16 buy/4 hold/1 sell analyst consensus, but average target ($97) still implies the Street sees more room than the stock's fair value under any of the analyst's scenarios; Nasdaq-100 inclusion forced passive buying; retail attention is high (~33-38% retail order flow); short interest is low-moderate (8.5%, rising off cycle lows) reflecting more skepticism creeping in but still not a crowded short. The bull narrative (space platform optionality, Iridium, Neutron) is well known and largely priced in; insiders (especially CEO Beck) have been selling heavily and consistently, a clear divergence from retail enthusiasm.

Inflectionwindow ~4mo-1.0

No exceptional near-term step-up beyond what's already guided/priced: Q3 guidance of $250-265M revenue and continued EBITDA losses is in line with the steady beat-and-raise cadence the market already expects. Neutron's maiden flight (Q4 2026, timeline narrowing) is the single event that could change the profitability trajectory meaningfully, but consensus estimates already bake in modest ramp assumptions through 2028, and Iridium closing isn't until mid-2027. The market is arguably ahead of the fundamentals already given the ~60x P/S.

Catalysts
  • •Q4 2026 · Neutron maiden launch attempt — Binary catalyst — success could reignite bull case, another slip or anomaly would hit hard given repeated delays already
  • •2026-11 · Q3 2026 earnings — Watch whether beat-and-raise cadence continues and cash burn trajectory relative to $2.4B liquidity
  • •H1 2027 · Iridium acquisition regulatory progress/close — Integration/regulatory risk could delay or complicate; deal is dilutive-ish and adds execution risk
  • ▼ongoing · Continued ATM/forward equity issuance — 25% TTM dilution is a persistent drag on per-share value
  • ▼ongoing · Insider selling cadence (Beck and others) — Consistent heavy insider selling with zero buying is a negative signal on management's own view of value
Flow-6.0

Heavy net dilution: TTM share count dilution ~25%, $1.08B raised via ATM in Q2 alone (since terminated), plus $642M in collared forwards outstanding. Officers/directors sold $924M over 12 months with zero insider buying. Nasdaq-100 inclusion provided a one-time passive-flow boost already realized in June. No buyback. This is a persistent share-count headwind, only partly offset by strong institutional (BlackRock, State Street) accumulation.

Floor / Ceiling-6.0

No real valuation floor here — negative FCF (-48% margin), no net cash cushion relative to market cap (EV close to mkt cap), no dividend/buyback, and no credible take-out scenario at this valuation. The $2.4B liquidity is being burned for growth, not returned. Above the price, there's essentially a soft ceiling from persistent equity issuance (dilution accelerates on rallies, as seen with the $1.08B ATM raise into strength) and insiders reliably selling into strength (Beck sold three tranches in July at $83-95).

Buyability

Real buyers exist (momentum/growth funds, passive index flows, retail) and will keep buying the growth/optionality story as long as execution continues — this is genuinely different from a distressed cheap stock nobody wants; it's a crowded, well-loved growth name. But that means the marginal buyer is paying for a narrative already reflected in a 60x P/S multiple with a company still deeply free-cash-flow negative, heavily diluting, and with insiders exiting. The stock is buyable by momentum players, not by value discipline.

Fear vs Greedfear 5/10 (-1.0)greed 8/10 (+3.0)

Fear dominates at this valuation — a ~60x sales multiple, persistent heavy insider selling, ongoing dilution, and a stock priced well above even the analyst's optimistic bull-case fair value screams overvaluation risk, even though the business itself is executing well operationally.

Valuation

Our Target
$8.5B-71%
Market Should Pay
$11.5B-61%
target ×1.35 (greed premium)
Current Market Cap
$29.7BExtremely bullish
What Changed
results release · 2026-08-10
+9%fair value on this information

The market already knew growth was strong and Neutron was targeted for Q4 2026, but the magnitude of the beat is new: adjusted EBITDA loss of only $8.8M vs a guided $20-26M loss, GAAP gross margin of 36.1% (record), backlog surging to $2.36B (+137% YoY) on over $1B of new bookings including the $397M Flatellite award, $266M HASTE award, and new GEO satellite contracts. Also new: confirmation that Mynaric integration is proceeding, more detail on Iridium's growth levers, and management's explicit framing that EBITDA turns positive 'the quarter after' Neutron's first successful flight, giving investors a clearer profitability catalyst timeline. The $1.08B ATM raise (now terminated) was a known overhang but its scale/execution is now confirmed.

▸ How the cases moved

Base case probability essentially unchanged but base equity value nudges up slightly (management continuing to execute ahead of plan, de-risking the transition timeline) versus the day-before baseline; bull case probability ticks up modestly (0.22->0.25) given accelerating bookings and multiple new high-value contract wins that make the platform story more credible; bear case probability ticks down slightly (0.23->0.20) as the magnitude of the EBITDA beat reduces near-term burn/dilution risk.

2-Year Plausible Outcomes
bear20%
$3.6B
rev +20%/yrOE $-150M

Neutron slips again or has early flight anomalies, delaying NSSL/task-order revenue and eroding customer confidence; Iridium deal stalls in regulatory review or proves dilutive/harder to integrate; dilution from forwards/ATM continues to outpace earnings growth. Organic growth decelerates to ~20%/yr, margins stay deeply negative, and the market re-rates the stock down toward a distressed growth multiple despite the large cash pile.

▸ Valuation

2.5x $1,107M revenue = $2,768M EV + ~$800M net cash cushion (after continued burn) = $3,568M equity

base55%
$9.5B
rev +40%/yrOE $100M

Neutron reaches the pad and flies successfully in late 2026/early 2027 with a gradual 1-3-5 ramp; Iridium closes roughly on schedule mid-2027 and contributes a partial year of profitable revenue by 2028; Space Systems keeps scaling on SDA/GEO defense contracts. Margins improve steadily but capex/tail-production spend keeps owner earnings only modestly positive by year 2. Dilution continues but moderates as EBITDA turns positive.

▸ Valuation

4.3x ~$2.2B blended revenue (organic ~$1.5B + partial-year Iridium) = $9,460M EV + ~$300M net cash post-Iridium funding = $9,760M equity (rounded to $9,500M)

bull25%
$20.5B
rev +58%/yrOE $500M

Neutron flies flawlessly, ramps faster than 1-3-5 via reusability, and captures NSSL task orders at premium ASPs; Iridium closes on time and Rocket Lab cross-sells PNT/IoT/defense services while cutting Iridium's own launch/replacement costs; orbital data-center and GHOST optionality add new TAM. Combined organic+Iridium revenue approaches $2.9B with EBITDA margins scaling to platform-level economics (~25%).

▸ Valuation

20x $725M EBITDA = $14,500M EV, plus premium re-rating for platform optionality and Iridium cash generation to $20,000M EV + ~$500M net cash = $20,500M equity

▸ Target Rationale

Model value nets to ~$8.85B; I trim slightly to $8.5B to reflect real execution risk that isn't fully captured mechanically — Neutron has already slipped multiple times and the Iridium deal is not yet closed, adding integration/regulatory uncertainty, while ongoing heavy dilution (ATM + $642M collared forwards) is a persistent tax on per-share value that the case math doesn't fully price. Offsetting this, management's track record of beating its own guidance every quarter for over a year argues against being too punitive.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now6/10
Trajectory8/10
Risk6/10
Governance6/10
Insolvency prob (2yr)2%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Record Backlog and Historic Launch Deal (May 2026): Rocket Lab announced the largest contract in company history. An undisclosed customer booked a bulk order of five dedicated Neutron launches and three dedicated Electron launches baseline-scheduled to fly between 2026 and 2029. This contract pushed Rocket Lab’s total backlog to a record $2.2 billion (launches make up 41.5% of this total). The company also reported record Q1 2026 revenues of $200.3 million, reflecting a 63.5% year-over-year increase.
  • M&A Expansion to Strengthen Space Systems (April/May 2026): In May 2026, Rocket Lab completed the acquisition of Motiv Space Systems for $40 million in cash plus a potential $20 million in milestone-based stock. Rebranded as "Rocket Lab Robotics," the acquisition brings in-house, Mars-proven robotics and solar array drive assemblies. In April 2026, the company acquired laser optical communications terminal provider Mynaric AG, plugging another critical capability into its end-to-end satellite design pipeline.
  • U.S. Space Force Geostationary Contract (May 2026): Rocket Lab secured a $90 million contract from the U.S. Space Force’s Space Systems Command to build and operate two geostationary defense satellites, utilizing its in-house optical systems and the "Heimdall" payload architecture.
  • Inclusion in the Nasdaq-100 Index (June 2026): On June 12, 2026, Nasdaq announced that Rocket Lab would join the Nasdaq-100 Index, effective prior to market open on June 22, 2026. This places Rocket Lab among the 100 largest non-financial companies on the exchange and forces major passive index-tracking funds to include the stock in their holdings.
▸ Thesis-test Findings
  • Space Development Agency Tracking Layer Delivery Schedule: In December 2025, Rocket Lab was awarded an $805 million prime contract (with options up to $816 million) to design, build, and operate 18 satellites for the Space Development Agency's (SDA) Tracking Layer Tranche 3 (TRKT3) missile defense constellation. In late May 2026, the company successfully completed its System Requirements Review (SRR). The official delivery and launch schedule for the TRKT3 constellation is slated for fiscal year 2029. This timeline strengthens the long-term bull case by locking in highly visible defense revenue, but represents a "slow-burn" tailwind, as high-volume production revenues will build starting around 2027–2028 leading up to the 2029 launch.
  • Archimedes Engine Hot Fire Test Duration: Following its initial multi-second hot fire in August 2024, Rocket Lab completed a full-mission-duration hot fire of the Archimedes engine on August 7, 2025, simulating over seven minutes (420+ seconds) of continuous burn time to emulate flight conditions. As of the Q1 2026 earnings update (May 2026), CEO Peter Beck stated the engine design is stable, all performance criteria have been met, and test stands at NASA's Stennis Space Center are in operation "all day every day". While the technical progress validates the stability of the staged combustion cycle, the timeline remains tight as they run a rapid ground qualification campaign to support the rocket's debut.
  • Neutron Launch Complex 3 Wallops Construction Progress: Rocket Lab officially opened Launch Complex 3 (LC-3) at NASA's Wallops Flight Facility in Virginia with a ribbon-cutting ceremony on August 28, 2025. Although the main pad is completed and operational, Rocket Lab’s debut launch of the Neutron rocket has officially shifted to "no earlier than the last quarter of 2026" to allow for extensive ground validation and risk retirement. Current construction efforts at Wallops have transitioned to auxiliary infrastructure upgrades: expanding a nearby docking facility (with channel dredging), upgrading power and water utility loops, and installing propellant tanks to reduce recycle times between launches to under 24 hours. Progress is visible as the first and second stages are prepared for pad-level integrated systems testing.