Stocks/SBMO.AS

SBMO.AS

SBM Offshore N.V.v3 5.5/10 · 2026-11-26
Energy·Oil & Gas Equipment & Services
34.86 EUR
$5.5B market cap
1.5% div yield
v3 Rating
5.5/104.5–6.5
Setup
4.0/103.0–5.5
Fair Value
35.00 EUR27.00 EUR–42.00 EUR+0%
DCF (10%)
36.00 EUR+3%
Base IRR
+12%+4%–+18%
Visibility
moderate±21%
Rating
Revenue (TTM)
$5.8B
Owner Earnings
€950M
Next-Yr Owner Earnings
€900M
Growth
+2.0% × 5y
P / Next-Yr OE
6.4x
Net Debt
€3.0B

Based in Schiphol, the Netherlands, SBM Offshore N.V. is a global provider of floating production systems for the offshore energy industry. The company, which traces its origins back to 1862, operates through two main business lines: Lease and Operate, and Turnkey solutions. SBM Offshore offers end-to-end services, covering the design, delivery, deployment, management, leasing, and life extension of a diverse range of offshore assets. These include Floating Production Storage and Offloading (FPSO) vessels, semi-submersibles, tension leg platforms, and LNG FPSOs. They also specialize in turret mooring systems, LNG regasification to power vessels, and pioneering floating offshore wind solutions, alongside developing brownfield and offshore loading terminals. Additionally, the company provides catenary anchor leg mooring (CALM) and single point mooring (SPM) terminals. Its expertise extends to offering comprehensive solutions for floating unit mooring, flexible flowline, and subsea structure installation. As of December 31, 2021, SBM Offshore managed an operational fleet consisting of 14 FPSO units and one semi-submersible. The company was formerly known as IHC Caland before officially rebranding as SBM Offshore N.V. in 2005.

2-Year Price History

$32.74+107.9%
$20$25$30$35Initial target $35.00 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.54.5–6.5
Setup
4.03.0–5.5
Fair value (EUR)
35.0027.00 – 42.00
Upside vs 34.86
+0%
DCF (10%)
36.0024.00 – 47.00+3%
Base IRR
12%4% – 18%
Visibility
moderaterange ±21%
Sentiment
7/10
Flow
6/10
2026-11-26 · claude-opus-5-5 · priced at 32.74

SBM Offshore is the largest FPSO contractor: a 16-unit lease-and-operate fleet at ~99% uptime throwing off ~$1.1bn a year of contracted EBITDA, plus a Turnkey arm now building five units (Jaguar, GranMorgu, Chalchi, SEAP I/II) and the just-awarded Longtail (Nov 17, 2026). The Q3 update (Nov 12) raised 2026 guidance again (revenue ~$7.9bn, EBITDA >$1.95bn), net debt is down to $3.6bn after the One Guyana sale, and the company is returning ~$440m in 2026 (~7% of a ~EUR5.4bn market cap) with a $2.1bn floor through 2031. At EUR32.74 (Nov 25 close; the pack's 34.02 is stale) the market already prices this as what it is: a well-run, contract-backed, oil-capex-cyclical contractor whose lease fleet is a slowly depleting asset. My DCF (~EUR1bn of unlevered owner earnings, roughly flat, ~8.5x year-5 FCF, 10%) gives ~EUR36/share: about 10% upside plus the yield, a ~12% base IRR. Rating 5.5: good business, fair price, no variant perception after a 3x run in three years. Setup 4: the Feb 18, 2027 results (new 2027-2032 return floor including SEAP and Longtail) is a dated catalyst, but the market already expects a higher floor.

Flow: The EUR227m ($270m) buyback that began Feb 27, 2026 was ~72% done on Nov 11, so ~EUR65m (~1.2% of shares) is left and should finish around year-end; a new, likely larger program is expected with the Feb 18, 2027 results and the 2027-2032 return update. 6m shares were cancelled Nov 5, 2026; no issuance or notable insider selling is known.

A deep dive would have to establish: Can SBM keep winning two-plus large FPSOs a year on its return discipline after 2030, so that turnkey margin and new O&M contracts replace the lease fleet as it rolls off?

Owner earnings, TTM
€950M€800M – €1.1B
Realistic peak profit
€1.2B€1.0B – €1.5B
Growth rate
2.0%-2.0% – 6.0%
Years of growth
53 – 8
Market cap
€5.4B€5.2B – €5.5B
EV
€8.4B€8.0B – €8.9B
Net debt
€3.0B€2.9B – €3.5B
Capital return / cap
7.0%5.5% – 8.5%
P/E
9.0×7.0× – 12.0×
EV/EBITDA
6.6×5.5× – 8.0×
FCF yield
7.0%5.0% – 9.0%
Projected FCF, base case (EUR millions)
Y1€900M€600M – €1.1B
Y2€1.0B€700M – €1.3B
Y3€950M€650M – €1.3B
Y4€1.0B€650M – €1.3B
Y5€1.0B€650M – €1.4B
Competition: MODEC, Yinson and BW Offshore in leased FPSOs, plus EPC contractors drawn in by Sale & Operate awards, compete for the ~16 large deepwater FPSO prospects in SBM's sweet spot over the next three years.
Governance: none flagged
Research (expand)

What it does. SBM designs, builds and operates FPSOs. Two engines: Lease & Operate (16 units, ~2m boe/d, ~17% of deepwater output, long contracts with Petrobras, ExxonMobil, TotalEnergies; directional L&O EBITDA ~$1.1bn/yr) and Turnkey (construction; increasingly 'Sale & Operate', where the client buys the hull at sail-away and SBM keeps an O&M contract, so cash arrives during construction instead of over 20 years). Standardized Fast4Ward hulls (7th ordered June 2026; two unallocated under construction) are its edge on schedule.

What the market believes. A quality, de-risked contractor at the top of a deepwater cycle. The stock went from ~EUR10 (late 2023) to EUR37 (2026) and now sits at EUR32.74, ~70% up its 1-yr range. Backlog is a record $35.6bn; net cash backlog ~$8bn (before SEAP upside was fully added and before Longtail). I do not see what the market is missing: the story is told plainly by management every quarter and followed by ~15 sell-side analysts.

What it earns (EUR, ~1.18 USD/EUR). 2026 EBITDA (>$1.95bn) is inflated by the One Guyana sale. Underlying: L&O ~$1.1bn, Turnkey margin on a normal flow of projects ~$0.4-0.5bn after the ~$100m turnkey overhead, corporate ~-$0.1bn: ~$1.5bn normalized EBITDA. Less cash taxes (~$0.15bn) and modest maintenance/life-extension spend, unlevered owner earnings are ~$1.1bn = ~EUR0.95bn. Levered cash to equity shows in the return policy: $440m in 2026, $2.1bn floor 2026-31.

Five years (unlevered FCF, EURm): 2027 900, 2028 1,000, 2029 950, 2030 1,000, 2031 1,000. Working capital swings with Sale & Operate milestones (H2-25/H1-26 drag ~$950m) make single years noisy. Year 5: 'neither' -- a steady contractor whose older lease units roll off (Angola extensions help) while new O&M contracts and turnkey margin replace them; growth ~0-3%. Worth ~8-9x FCF given oil-cycle exposure. Confidence moderate: backlog covers turnkey through 2031, but post-2030 awards are unknown.

Valuation. EV ~EUR8.4bn (164m shares x 32.74 + ~EUR3.05bn net debt, mostly non-recourse project debt). DCF: PV of FCF ~EUR3.7bn + PV of 8.5x terminal ~EUR5.3bn = ~EUR8.9bn, less net debt = ~EUR5.9bn, ~EUR36/share. ~6.6x normalized EBITDA, ~9x normalized earnings, ~7% cash return yield. Fair value ~EUR35.

Management, risks, competition. Tangen/Wood are disciplined, conservative in guidance (raised twice in 2026) and return cash via cancelled buybacks (6m shares, 3.5%, cancelled Nov 5). Risks: execution on five large projects at once (a 1pt %-of-completion swing is material); a Chinese-yard subcontractor fatality in H1; competitors (MODEC, Yinson, BW, and EPC players drawn in by Sale & Operate) bidding harder -- the Venus/Namibia prospect reportedly tilted to a rival; an oil-price or energy-transition slowdown in FIDs; hull capex on spec. Customer concentration in Petrobras and Exxon Guyana.

Sentiment: 7/10. Liked by the sell side and value/yield funds after a 3x re-rating; the recent ~10% pullback from highs looks like oil/sector noise, not fear.

Financials — Adjusted

Adjusted · TTM 2026-Q2 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue5815+8%5925+24%4784-4%4962+1%4913
Gross profit2048+47%2027+79%1132-20%1419+20%1182
Operating expenses267+14%243+19%204-22%263+34%196
▸Adj EBITDA1852+50%1851+85%998-17%1198+14%1049
▸Adj OCF1941-43%2370-26%3210+21%2655+44%1848
CapEx-21.9-32.2-116-128-41.0
Adj FCF1920-42%2338-24%3094+22%2527+40%1807
Interest expense6666748470.000.00
▸Adj net income823846+460%151-88%1219+5%1162
▸Owner's earnings900--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA6079100%759100%1852100%1200100%1219100%1049100%
FCF (OCF−capex)334355%2396315%96852%1366114%-297-24%-1090-104%
Net income233638%31842%92650%15012%49140%45043%
▸Capital returned478779%2505330%105357%2047171%-273-22%-545-52%
Buybacks3891151681025.000.00
Dividends954129188249198190
Interest paid18012806748470.000.00
Debt paid down1643198024.1849-476-734
▸Reinvestment1953%-3.370%60.93%-61.0-5%16714%31.03%
Capex (PP&E)33416.732.211612841.0
Intangibles & M&A-1780.006.71-1850.000.00
Leases signed (net Δ)39.0-20.022.08.0039.0-10.0
Retained / other5359%17123%58231%35129%-23.8-2%-545-52%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 76 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)1676318099171571717615889
▸Liabilities (total)1010611617113131164610975
Net debt (incl. leases)59208068813787487882
Net debt / Adj EBITDA3.204.368.157.307.51
Net debt / Adj FCF3.083.452.633.464.36
Adj EBITDA / interest2.782.751.18----
Shares outstanding161175181181180
Dilution (YoY)-3.3%-3.2%-0.3%+0.7%-1.7%
Employees6301--------
MarginsTTM2025202420232022
Gross margin35.2%+9.434.2%+10.623.7%-4.928.6%+4.524.1%
Adj EBITDA margin31.9%+9.031.2%+10.420.9%-3.324.1%+2.821.4%
Adj OCF margin33.4%-29.740.0%-27.167.1%+13.653.5%+15.937.6%
Adj FCF margin33.0%-28.239.5%-25.264.7%+13.750.9%+14.136.8%
Net income margin15.9%+9.315.6%+12.53.1%-6.89.9%+0.79.2%
Adj NI margin14.2%+13.514.3%+11.13.2%-21.424.6%+0.923.6%
ROIC (adj, after-tax)13.6%11.7%5.0%8.9%6.7%
Cost of debt8.2%7.4%9.0%0.0%0.0%

Earnings Calls

2 calls

Earnings Call · 2026 Q2

2026-08-06

SBM Offshore delivered a strong first half of 2026, reinforcing management's confidence in its life-cycle FPSO model and the deepwater market. Directional revenue rose to approximately $4.9 billion from $2.3 billion in the prior-year period, while directional EBITDA exceeded $1.3 billion, nearly doubling year over year. Turnkey EBITDA benefited substantially from the sale of FPSO One Guyana, while Lease and Operate EBITDA increased as three large vessels entered the fleet during 2025. The company also completed the sale of One Guyana and divested a minority interest in FSO Chalchi. Commercial momentum was particularly strong. Petrobras awarded SBM the SEAP I and SEAP II FPSO contracts, lifting total backlog to a record $35.6 billion and more than offsetting first-half backlog consumption and divestments. SBM also secured the FEED contract for ExxonMobil's Longtail development in Guyana. Reflecting these developments and strong execution, 2026 directional revenue guidance increased from more than $6.9 billion to approximately $7.6 billion, comprising roughly $2.4 billion from Lease and Operate and $5.2 billion from Turnkey. EBITDA guidance increased from approximately $1.8 billion to $1.9 billion. The SEAP awards will have limited 2026 EBITDA effect because of their early stage, but add significant future revenue and cash potential. The company ended June with net debt of $3.7 billion and pro forma leverage of approximately 1.6 times EBITDA. Management expects leverage to remain below 3 times, although construction financing, project payment timing and Sale and Operate working-capital movements may cause short-term fluctuations. Net cash backlog was approximately $8 billion. Turnkey net cash backlog more than doubled to roughly $1 billion after the SEAP awards, although this measure includes Turnkey overheads and conservative assumptions. The company reiterated its minimum shareholder-return commitment of $2.1 billion for 2026–2031, including a $100 million interim dividend payable in September and a continuing $270 million-equivalent buyback. Further awards should create upside to that commitment. Execution capacity and market demand were central themes. SBM has five major projects under construction: Jaguar, GranMorgu, Chalchi and the two SEAP units. Jaguar remains on track for first oil in 2027, while GranMorgu and Chalchi are expected to start up subsequently. With three Fast4Ward hulls now under construction, including one assigned to Longtail, SBM has flexibility to pursue additional awards. Management said standardization, replication, early supplier engagement, advance ordering, partnerships and selective outsourcing should allow the company to expand beyond its historically stated six-FPSO parallel capacity while preserving execution discipline. Operational performance remained excellent, with approximately 99% uptime across 16 operating units. Debottlenecking in Guyana and Brazil has generated around 140,000 barrels per day of production above initial nameplate capacity. SBM also received a two-year N'Goma extension and continues brownfield work on Mondo and Saxi Batuque. Its deepwater outlook remains positive, supported by attractive breakevens, lower emissions intensity and a pipeline of more than 40 potential FPSO awards over three years. Management sees particularly strong opportunities in Brazil, Guyana, Mexico and West Africa, with gas processing and export becoming increasingly important. Beyond FPSOs, SBM is evaluating ocean infrastructure opportunities such as floating desalination with Veolia, while maintaining disciplined capital allocation. Analysts asked about capacity constraints, Venus in Namibia, tender timing, decarbonization, working capital, the sustainability of EBITDA improvements, project handovers, a fatality at a Chinese yard, geopolitical risks and the commercial potential of desalination. Management reported no material Middle East-related impact, maintained its return discipline on Venus and emphasized that safety investigations and lessons learned are being prioritized following the Chinese-yard incident.

Analyst Q&A (21)
▸
Which execution phase—engineering, procurement, fabrication or another—constrains FPSO capacity, and could SBM execute more than six projects as existing units progress? Also, what are Venus's engineering and execution challenges, and where does SBM have an advantage?
Guilherme Levy · Morgan Stanley
Engineering and procurement are the main internal capacity considerations, but partnerships, outsourcing, advance supply-chain planning, standardization and replication allow SBM to scale beyond six concurrent FPSOs. Management sees no specific constraint and can expand capacity without compromising execution quality. Venus is technically a good fit, but SBM will not comment on the bid's current status or provide further technical detail.
▸
Why did the company newly describe the environment as increasingly complex and volatile, and are there specific supply-chain challenges? What was Chalchi's EBITDA impact, and should the low H1 tax rate change in the second half?
Luuk Van Beek · e Degroof Petercam
The reference to volatility reflects a generally unpredictable global environment, but SBM believes its operational and financial predictability is a competitive strength. Chalchi had only a small, immaterial EBITDA impact in the first half. The low tax rate primarily reflected tax already paid on the One Guyana sale, leaving little associated tax expense in H1.
▸
What items should investors consider when bridging first-half EBITDA to second-half EBITDA, given that the One Guyana contribution will not recur and Chalchi also affected the period?
Philip Ngotho · Kepler Cheuvreux
The first-half result benefited significantly from One Guyana, so H2 EBITDA will not simply repeat H1. Apart from maintaining strong operational and project execution, management identified no other major factors affecting delivery of approximately $1.9 billion of 2026 EBITDA.
▸
Are competitors placing extra strategic value on entering Namibia and accepting lower margins, making Venus more important than a typical bidding process because of potential follow-on orders?
Philip Ngotho · Kepler Cheuvreux
Management cannot comment on competitors' commercial strategies, but Venus is strategically important as SBM seeks to establish a leading position in Namibia. SBM will not lower its return requirements to win a single project and remains disciplined on shareholder returns.
▸
How should investors think about working capital and net debt through year-end, considering new hull investments and additional SEAP and Longtail costs?
Philip Ngotho · Kepler Cheuvreux
Working capital can be volatile because Sale and Operate expenditures and customer payments may fall in different reporting periods. The additional hull investment will increase working capital, although the precise year-end net debt impact is difficult to predict.
▸
How has the tender pipeline evolved over the past year, and are customers delaying or accelerating decisions amid oil-price and geopolitical changes and a shifting competitive landscape?
Victoria McCulloch · RBC
The tender pipeline remains strong and has not materially slowed. Prospects typically reach tender only after substantial exploration and development work, so recent oil-price movements have limited immediate impact. Guyana, West Africa and Brazil remain attractive, although competition is increasing as more Sale and Operate structures attract additional contractors.
▸
Has the changing public stance on decarbonization by oil majors affected SBM's decarbonization work, tender opportunities or the incorporation of carbon-capture solutions into FPSOs?
Victoria McCulloch · RBC
SBM has been reducing FPSO emissions for years and continues to include those efficiency gains in new designs. The company is studying modular carbon-capture systems for future integration, but carbon capture is not yet materially appearing in current project specifications and policy developments remain important.
▸
Given approximately $3 billion of Turnkey work in each of 2027 and 2028, plus Longtail and expected additional awards, could Turnkey revenue rise toward $5 billion in the medium term?
Mick Pickup · Barclays
The current backlog is what it is, but the strong market and SBM's illustrative scenario indicate substantial opportunity. If SBM captures part of that opportunity, Turnkey revenue should grow toward the level suggested by the analyst.
▸
Why is Turnkey net cash backlog only about $1 billion against roughly $10 billion of backlog and teenage margins, and what explains the gap beyond taxes and corporate costs?
Mick Pickup · Barclays
The approximately $1 billion Turnkey net cash backlog includes some Longtail FEED-related items, is net of Turnkey overheads and includes conservative contingency. Overheads are roughly $100 million annually, and six years of overheads account for about $600 million. Adding those back implies roughly $1.6 billion before considering that Longtail has little or no net cash included yet.
▸
What impact could the subcontractor fatality at a Chinese yard have on schedules, audits, future Fast4Ward hull construction and the use of that yard?
Jeremy Kincaid · Van Lanschot Kempen
The fatality involved a subcontractor's subcontractor at a Chinese yard. SBM is conducting a full Tier 1 investigation with the relevant authorities, supporting affected people and incorporating lessons learned, particularly as China is expected to remain important for growth. Management reported no direct impact on yard selection, capacity or schedules.
▸
What operational factors drove the EBITDA guidance upgrade, how sustainable are they, and should the higher result lead to a comparable increase in FY2027 and later forecasts?
Jeremy Kincaid · Van Lanschot Kempen
The guidance increase reflects better fleet performance, uptime-related bonuses and strong project execution, including progress through percentage-of-completion accounting. These are encouraging but do not represent a guaranteed permanent $100 million uplift; project performance and the balance of risks and opportunities will continue to determine future EBITDA.
▸
After substantial working-capital outflows in the last 12 months, should investors expect a similar drag over the next 6–12 months as SBM builds more hulls and adds Sale and Operate contracts?
Jeremy Kincaid · Van Lanschot Kempen
SBM targets average cash neutrality over the construction life of Sale and Operate projects, but timing differences can produce large temporary swings. More FPSOs structurally increase operating-phase working capital, while project additions, completions and payment timing determine the period-to-period effect. Growth therefore raises both absolute working capital and volatility.
▸
Could GranMorgu and Chalchi be finalized before the end of 2027, given their reported progress and apparent timing relative to delivery?
Thijs Berkelder · ABN AMRO ODDO BHF
Jaguar is the most advanced and remains scheduled for startup in 2027; GranMorgu and Chalchi are expected to start up in the subsequent year, in line with plan. Management expressed satisfaction with progress but did not indicate an earlier completion schedule.
▸
For Jaguar and GranMorgu, does the contract transfer ownership when the vessel leaves Singapore or only after first oil, and how is handover defined?
Thijs Berkelder · ABN AMRO ODDO BHF
Ownership under the Sale and Operate contracts transfers at the specified handover point from the yard, followed by a warranty period. The O&M contract begins as the unit enters the operational phase after offshore commissioning.
▸
If SBM does not win Venus, would it need to redeploy people from Namibia, or will it retain its local presence for broader Namibian opportunities?
Thijs Berkelder · ABN AMRO ODDO BHF
SBM maintains only a small Namibian structure, focused on mapping opportunities and positioning the company for future growth. It views Namibia as potentially prolific and does not tie that presence solely to winning Venus; the cost is minimal relative to the potential upside.
▸
Once Longtail is added, what is reasonable to assume for the shareholder-return outlook, and is it correct that little or no Longtail value is currently included in the 2027 backlog?
Thijs Berkelder · ABN AMRO ODDO BHF
The company updates its shareholder-return framework annually rather than midyear. SEAP I and II are already reflected in the net cash backlog, while Longtail is included in revenue backlog but not yet net cash backlog. If Longtail proceeds and further awards are secured, net cash backlog and shareholder returns should exceed the $2.1 billion minimum; returns are linked to backlog growth.
▸
Has the Middle East conflict materially affected SBM's operations, assets under construction or recent awards and supply-chain activity?
Thijs Berkelder · ABN AMRO ODDO BHF
SBM has assessed the situation in detail and sees no material impact from the Middle East conflict on operations, assets under construction or the supply chain for recent awards.
▸
Which supplies are most critical to SBM's projects, such as turbines or other rotating equipment, and are they exposed to current disruption?
Thijs Berkelder · ABN AMRO ODDO BHF
Rotating machinery is generally among the most critical supply-chain items, but SBM plans ahead for those deliveries and currently sees no Middle East-related impact.
▸
How large is the financial impact of the N'Goma extension, and what further extension potential exists after December 2028?
Quirijn Mulder · ING
The two-year N'Goma extension through approximately 2028 makes a small but meaningful contribution to net cash backlog. Management did not quantify additional potential beyond that extension.
▸
How concrete are the desalination plans with Veolia, what markets are being targeted and where could the floating plants be built?
Quirijn Mulder · ING
The Veolia desalination initiative combines Veolia's established water-treatment technology and industrial relationships with SBM's modular offshore infrastructure capabilities. The technology is well documented, but the companies are still assessing commercial applications, locations and market size, potentially including mining and other freshwater-intensive industries.
▸
How has the approximately $100 million Turnkey overhead evolved as the segment has grown, and how many employees or FTEs are currently allocated to Turnkey?
Philip Ngotho · Kepler Cheuvreux
Turnkey overhead has remained broadly stable over time. SBM actively manages its workforce and limits under-recovery, but did not provide an FTE split or detailed headcount by segment.

Web Traffic

sbmoffshore.com
Web rank#474,386
Est. visits/mo864K
Traffic YoY▼ 17.6%
Traffic QoQ (12w)▲ 12.8%
Web Rank History
#474,386+83,668
rankest. visits/mo
100k200k300k400k500k600k700k06.1M12.2M18.3M24.3M05-1908-2512-0103-0906-1509-2111-16

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2007 Q21.7B668M223M$1.27$1.23 – $1.313
2007 Q42.0B624M191M$1.10$1.05 – $1.133
2008 Q22.5B504M106M$0.91$0.83 – $0.995
2008 Q42.3B483M91M$1.37$1.29 – $1.464
2009 Q22.2B143M89M$0.57$0.55 – $0.593
2009 Q42.1B442M86M$0.92$0.54 – $1.337
2010 Q21.8B433M79M$0.71$0.46 – $0.866
2010 Q42.1B459M96M$1.10$0.92 – $1.278
2011 Q22.1B447M86M$1.40$1.29 – $1.485
2011 Q42.3B470M101M$0.83$0.81 – $0.865
2012 Q22.4B450M86M$1.21$1.13 – $1.284
2012 Q42.5B451M85M$2.12$1.60 – $2.644
2013 Q22.6B223M84M$1.47$1.42 – $1.533
2013 Q43.1B256M99M$1.85$1.34 – $2.595
2014 Q23.0B270M83M$1.80$1.65 – $2.027
2014 Q43.0B189M83M$2.02$1.93 – $2.096
2015 Q22.0B244M57M$0.81$0.39 – $1.006
2015 Q42.0B147M70M$0.89$0.49 – $1.655
2016 Q21.4B276M48M$0.41$0.37 – $0.464
2016 Q41.4B107M72M$0.72$0.31 – $1.154
2017 Q21.1B323M53M$0.43$0.31 – $0.554
2017 Q42.2B201M142M$0.54$-0.92 – $1.2716
2018 Q2905M278M31M$0.22$0.22 – $0.233
2018 Q42.2B257M182M$0.05$0.04 – $0.054
2019 Q21.1B248M91M$0.39$0.37 – $0.404
2019 Q41.2B237M101M$0.44$0.42 – $0.453
2020 Q42.7B488M224M$1.31$0.74 – $2.2015
2021 Q43.1B396M257M$1.95$0.66 – $3.3413
2022 Q42.1B256M170M$0.73$0.25 – $1.2910
2024 Q42.0B1.3B287M$1.68$1.68 – $1.681
2025 Q42.3B802M269M$1.58$1.58 – $1.581
2026 Q24.0B1.1B527M$3.09$3.09 – $3.091
2026 Q42.5B—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-08-06) — for comparison onlyclick to expand

Thesis

SBM Offshore is moving from a highly leveraged, project-heavy FPSO developer toward a more valuable combination of recurring Lease and Operate cash flows and a repeatable standardized construction platform. The record backlog, approximately 99% fleet uptime, new Petrobras SEAP awards, Longtail FEED work and the completed One Guyana sale materially improve visibility and balance-sheet flexibility. The 2026 guidance increase to approximately $7.6B of revenue and $1.9B of EBITDA confirms strong near-term execution. The principal analytical caution is cash conversion. The latest EBITDA and adjusted FCF figures are flattered by project timing, sale proceeds and working-capital movements; management itself warned that new hull investment and Sale and Operate growth can produce significant net-debt swings. One Guyana's contribution will not repeat, and higher EBITDA is not necessarily a permanent run-rate uplift. The long-term franchise is strong, but execution, construction inflation, safety, customer timing and leverage remain meaningful sources of permanent-loss risk.

Trade Signal

Trade rating
+6.2/10
Buy
Horizon
~4mo
gpt-5.6-luna2026-08-06 · saw 34.55 EUR+0.9% since

Buy SBM Offshore: the market is valuing a record-backlog, high-uptime FPSO franchise at roughly half the analyst's equity value, with cash-conversion risk the main reason to apply a discount rather than reject the thesis.

Temporary mispricing+3.0

The stock advanced from roughly $24.50 at year-end 2025 to above $30 in January-February 2026, likely reflecting the One Guyana sale, deleveraging and stronger operating visibility. It continued toward $37 in April-May after the SEAP awards, upgraded guidance, buyback progress and AEX inclusion, then declined about 15% from the high to roughly $31-$35 through June-August as enthusiasm cooled and investors focused on project financing, cash conversion and execution risk. The stock was flat around the August 6 earnings release despite higher 2026 revenue and EBITDA guidance, record backlog and strong execution. This looks like a modestly missed positive update rather than a panic dislocation: the recent pullback is somewhat excessive, but much of the earlier repricing was justified. The gap should close gradually if subsequent prints confirm cash generation, not immediately.

Market view+2.0

The market is constructive but not euphoric. The shares rose 39% over the past year and SBM entered the AEX, suggesting improving institutional recognition, yet the stock remains 15% below its 52-week high and was unchanged around the strong August 6 earnings release. Bulls see record backlog, Petrobras and ExxonMobil repetition, high uptime and deleveraging; bears focus on capital intensity, lumpy working capital, construction risk, leverage and the nonrecurring One Guyana sale. Positioning appears mixed rather than crowded, with limited evidence of a fully priced-in rerating. The flat earnings reaction suggests the market is waiting for cash conversion and execution proof.

Inflectionwindow ~3mo+5.0

A positive inflection is underway, but part of it is already visible in the 39% one-year share-price gain and higher valuation. The next step-up would come from converting SEAP I/II and Longtail into profitable, repeatable projects while the growing Lease and Operate fleet makes earnings less dependent on turnkey transactions. Consensus appears to recognize the backlog and 2026 EBITDA upgrade, but likely underappreciates the duration and quality of the recurring cash-flow transition. The evidence is more likely to emerge through the next two to three reporting cycles than in the immediate post-earnings print.

Catalysts
  • ▲2026-09 · September 2026 interim dividend and continued share buyback — Provides tangible shareholder return and supports per-share value while leverage remains manageable.
  • ▲2026-11 · Q3 2026 trading update — Evidence of continued fleet uptime, project execution and progress toward approximately $1.9B EBITDA guidance could force estimates higher.
  • ▲2027-02 · 2026 year-end results and 2027 guidance — The key test is whether recurring Lease and Operate growth and lower leverage offset the nonrecurring One Guyana contribution.
  • ▲H2 2026-H1 2027 · Jaguar and other FPSO construction milestones — On-time execution and confirmation of 2027 first oil would reduce the market's project and schedule-risk discount.
  • ▲Next 12 months · Additional Guyana, Brazil or Namibia FPSO awards — Further awards would validate the repeatable Fast4Ward platform and expand the already substantial backlog.
Flow+4.0

Net flow is supportive. The company is executing a roughly $270M buyback, has committed substantial dividends and buybacks through 2031, and reported approximately 3% TTM share-count dilution reduction rather than dilution. There is no evident death-spiral or major lockup overhang. The offset is that construction financing and working-capital needs can compete with shareholder returns, and the buyback is supportive rather than transformational.

Floor / Ceiling+3.0

There is a meaningful but not hard floor from approximately 14% reported FCF yield, active buybacks, recurring operating-fleet cash flows and a large contracted backlog. However, net debt is still approximately $3.7B, project financing and working capital can absorb cash, and the bear case supports roughly $24 per share; therefore this is not a net-cash or asset-value floor. There is no obvious hard ceiling, although capital intensity and execution concerns may limit multiple expansion above the mid-to-high-$50s until cash conversion improves.

Buyability

High. SBM is an established European offshore infrastructure franchise with a $35.6B backlog, roughly 99% fleet uptime, visible Petrobras and ExxonMobil relationships, recurring Lease and Operate cash flows, a buyback and a stated $2.1B minimum shareholder-return commitment. The main limitation is that cash conversion is lumpy and the business remains capital-intensive, so the next buyer is more likely to be a value-oriented energy or infrastructure investor than a pure growth investor.

Fear vs Greedfear 4/10 (-1.0)greed 8/10 (+2.0)

Greed is stronger than fear. The stock combines a large valuation discount with record backlog, strong operating performance, improving leverage and a buyback. I would not underwrite the full $10.5B target without a larger haircut for working-capital volatility and the loss of One Guyana's exceptional contribution, but the current price appears to discount too much execution risk.

Valuation

Our Target
$10.5B+75%
Market Should Pay
$11.0B+84%
target ×1.05 (greed premium)
Current Market Cap
$6.0BSlightly bearish
What Changed
transcript · 2026-08-06
+12%fair value on this information

The genuinely new information is the combination of the 2026 Q2 update, the increase in directional revenue guidance to approximately $7.6B and EBITDA guidance to $1.9B, confirmation of the SEAP I and II awards, record backlog of approximately $35.6B, and net debt of about $3.7B with pro forma leverage near 1.6x. The call also newly clarified that One Guyana materially benefited H1, will not recur, and that working capital and hull investment can make near-term cash flow and leverage volatile.

▸ How the cases moved

The event raises the bear case from roughly $4,300M to $4,600M as lower leverage and stronger backlog reduce downside risk; raises the base case from roughly $11,800M to $13,200M as 2026 EBITDA guidance increases to $1.9B and SEAP adds future work; and raises the bull case from roughly $20,500M to $22,700M because SEAP I/II, Longtail and potential follow-on awards extend the growth runway. Base probability rises from about 0.52 to 0.55, bull from 0.23 to 0.25, while bear falls from 0.25 to 0.20.

2-Year Plausible Outcomes
bear20%
$4.6B
rev +3%/yrOE $650M

FPSO demand remains healthy but working-capital requirements, construction financing and project timing keep cash conversion below accounting EBITDA. One Guyana's exceptional contribution does not recur, some projects experience cost or schedule pressure, and net debt remains elevated. The franchise survives but deserves a lower multiple because returns are capital-intensive and earnings are volatile.

▸ Valuation

7x $1,300M EBITDA = $9,100M EV - $4,500M net debt = $4,600M equity

base55%
$13.2B
rev +8%/yrOE $1050M

SBM executes Jaguar, GranMorgu, Chalchi and the SEAP units broadly on plan, while the Lease and Operate fleet expands and uptime remains strong. Turnkey EBITDA normalizes after the One Guyana sale, but the record backlog and standardized Fast4Ward platform support mid-single-digit growth. Cash generation improves over time, though working capital remains lumpy and leverage declines only gradually.

▸ Valuation

9x $1,800M EBITDA = $16,200M EV - $3,000M net debt = $13,200M equity

bull25%
$22.7B
rev +12%/yrOE $1400M

SBM converts the SEAP awards and Longtail into a larger, repeatable FPSO franchise, wins additional Guyana, Brazil or Namibia work, and scales beyond its historical project-capacity limits without sacrificing execution. Fleet uptime, project bonuses and operating cash flow remain excellent; shareholder returns exceed the stated minimum and net debt falls materially. The market treats SBM as a high-quality, visible deepwater infrastructure compounder.

▸ Valuation

11x $2,200M EBITDA = $24,200M EV - $1,500M net debt = $22,700M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is $11,084M. I set the analytical target modestly below that at $10,500M because the scenario multiples still capitalize EBITDA more confidently than the cumulative cash-conversion record warrants. The discount reflects volatile working capital, construction-financing needs, the nonrecurring One Guyana contribution and execution risk across five major projects, partially offset by the sharply improved leverage profile and exceptionally strong backlog.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now8/10
Trajectory8/10
Risk5/10
Governance7/10
Insolvency prob (2yr)2%
Outcome uncertainty6/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Twin SEAP FPSO Contracts in Brazil (May 2026): SBM Offshore was awarded major contracts by Petrobras to design, build, and operate two FPSOs (SEAP-I and SEAP-II) in the Sergipe-Alagoas basin. Operating under a Build-Operate-Transfer (BOT) model, SBM Offshore will construct the units utilizing its 11th and 12th Fast4Ward® hulls, and operate them for an initial 6.5-year period before transferring ownership to Petrobras. Petrobras’ total investments in these deepwater developments exceed $12 billion, with vessel deliveries expected in 2030 and 2031.
  • Q1 2026 Trading Update & Upgraded Guidance (May 2026): SBM Offshore reported a 216% increase in year-to-date Directional revenue to $3.5 billion and raised its full-year 2026 Directional revenue guidance from ~$6.5 billion to above $6.9 billion. Baseline Directional EBITDA guidance was maintained at ~$1.8 billion. The performance was primarily driven by its turnkey division and the finalization of the sale of the *ONE GUYANA* FPSO to ExxonMobil in February 2026 for $2.3 billion.
  • Balance Sheet Deleveraging & Shareholder Returns (May 2026): Driven by the cash proceeds of the *ONE GUYANA* sale, SBM Offshore reduced its Directional net debt by 43% to $3.2 billion at the end of March 2026. SBM remains on track to return at least $2.1 billion to shareholders through 2031. In Q1 2026, SBM paid a cash dividend of $100 million and made progress on its $270 million share buyback program (~18% completed by May).
  • Deepwater Installation Vessel Joint Venture (June 2026): SBM Offshore formed a joint venture (49.9% SBM / 50.1% Solstad Offshore) to build a next-generation multi-purpose deepwater installation and construction vessel targeted for delivery in H1 2029. The vessel will support the deployment of FPSOs and other ocean infrastructure, securing capacity for SBM's own project pipeline under an initial 14-year charter agreement.
  • Partial Stake Divestment in FSO Chalchi (June 2026): SBM signed an agreement to sell a 45% ownership interest in the special purpose companies responsible for leasing and operating the under-construction *FSO Chalchi* to Nippon Yusen Kabushiki Kaisha (NYK). SBM retains a 55% majority interest. The FSO is destined for a 20-year lease with Woodside Energy at the Trion field offshore Mexico.
  • AEX Index Inclusion (March 2026): SBM Offshore was formally added to the AEX index in Amsterdam.
▸ Thesis-test Findings
SBM Offshore Alexandre de Gusmão FPSO delivery status updates

The status of the *FPSO Alexandre de Gusmão* supports the bull case by successfully transitioning from the construction phase into steady-state cash generation. SBM Offshore announced that the vessel officially achieved first oil, completed its 72-hour continuous production test, and went formally on hire under its 22.5-year lease and operate contract with Petrobras at the Mero field in Brazil as of May 24, 2025. Recent performance updates from late 2025 and early 2026 confirm that the vessel, along with *FPSO Almirante Tamandaré* (on hire since Feb 2025), is operating reliably and contributing directly to SBM's high-uptime lease-and-operate fleet revenues, mitigating prior execution and schedule risks.

ExxonMobil Guyana FPSO development plans and SBM Offshore backlog

The backlog outlook continues to strongly favor the bull case through SBM's deep-rooted partnership with ExxonMobil in Guyana. SBM successfully closed the $2.3 billion sale of the *ONE GUYANA* FPSO to ExxonMobil in February 2026. Directly following this, in March 2026, SBM secured FEED contracts for the *Longtail* project in Guyana, representing its sixth FPSO collaboration with ExxonMobil in the region. This FEED contract has already triggered early-stage funding and the allocation of SBM's ninth Fast4Ward® hull. ExxonMobil's stated regional execution strategy of "design one and build many" directly leverages SBM’s standardized Fast4Ward designs, establishing a highly visible, highly repetitive, and low-risk multi-year backlog for SBM.

FPSO market competition and shipyard capacity constraints 2026

While global shipyard capacity constraints represent a potential bear case bottleneck for the broader offshore industry—as scarce drydock space and intense competition for resources at Chinese shipyards threaten to delay conversions and drive up construction costs—SBM’s unique strategy shifts this into a bull case competitive advantage. To mitigate these market constraints and capture rising deepwater demand, SBM ordered two additional speculative Fast4Ward multi-purpose floater hulls in Q1 2026. By pre-ordering hulls and reserving yard slots early, SBM effectively insulates itself from shipyard bottlenecks, enabling shorter delivery times and reinforcing its dominant market position in competitive bidding processes.