Stocks/SGD.TO

SGD.TO

Snowline Gold Corp.v3 5.0/10 · 2026-11-26
Basic Materials·Gold
12.47 CAD
2.2B CAD market cap
v3 Rating
5.0/103.8–6.2
Setup
4.0/102.5–5.5
Fair Value
12.00 CAD6.00 CAD–19.00 CAD-4%
DCF (10%)
14.00 CAD+12%
Base IRR
+6%-15%–+22%
Visibility
wide±54%
Rating
Revenue (TTM)
0.0M CAD
Owner Earnings
-C$80M
Next-Yr Owner Earnings
-C$80M
Growth
+0.0% × 6y
P / Next-Yr OE
--
Net Debt
-C$221M

Snowline Gold Corp. is a Vancouver-based Canadian company primarily focused on the discovery and development of gold resources. In addition to gold, its exploration efforts extend to uncovering deposits of silver, zinc, nickel, vanadium, copper, and molybdenum. The firm's key asset is the extensive Rogue gold project, which covers roughly 110,189 hectares across 5,380 mineral claims in the Selwyn Basin of Canada's Yukon Territory. Established in 2017, the company operated under the name Skyledger Tech Corp. until it adopted its current identity, Snowline Gold Corp., in February 2021.

2-Year Price History

$11.50+115.0%
$6.0$8.0$10$12$14$16$18$20Initial target $12.00 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.03.8–6.2
Setup
4.02.5–5.5
Fair value (CAD)
12.006.00 – 19.00
Upside vs 12.47
-4%
DCF (10%)
14.005.00 – 24.00+12%
Base IRR
6%-15% – 22%
Visibility
widerange ±54%
Sentiment
5/10
Flow
5/10
2026-11-26 · claude-opus-5-5 · priced at 11.50

Snowline Gold is a pre-revenue developer whose one real asset is the Valley deposit (7.9 Moz measured and indicated at 1.21 g/t) on the Rogue project in the Yukon: an unusually high-grade, near-surface, open-pit bulk-tonnage gold deposit. The June 2025 PEA gave a C$3.4B after-tax NPV5 at US$2,150 gold, about C$6.8B at US$3,150, with C$1.7B initial capex and first-five-year AISC near US$570/oz. The stock (C$11.50 at the 2026-11-25 close, C$2.17B market cap, about C$221M of net cash after a C$150M bought deal at C$14.50 in August) has fallen 44% from its C$20.49 February high, almost entirely with gold, which slid from US$5,589 in January to about US$3,700. My DCF assumes gold flat at US$3,700, permits around 2030, first gold around 2032, and the mine valued at its own NPV10 when production starts. On those assumptions the equity is worth about C$14 per share before risk. After discounting for permitting, a likely First Nations process in the Yukon, financing dilution on a C$2B build, and delay, I put fair value near C$12. That leaves little edge: the price is a fair, gold-levered read of a good project. Rating 5.0, a pass. Setup 4: the only dated catalyst is the PFS and first reserves by Q1 2027, and the market is not visibly wrong about anything beyond the gold price. Flow 4.5: the 2026 programme is funded, but a C$2B build means more equity, streams or debt from 2028.

Flow: Snowline issued 10.35M shares (about 5.5%) in a C$150M bought deal at C$14.50 on 2026-08-05, and joined the S&P/TSX Composite and FTSE Canada indices on 2026-09-18. Both are done, so no near-term flow remains. B2Gold (about 9.9%) holds and keeps a participation right. The next large flow is the C$2B construction financing (equity, stream or debt), likely from 2028 after the feasibility study and permitting.

A deep dive would have to establish: Does Valley get its YESAB decision and First Nations consent, and finance a C$2B build without heavy dilution, by about 2030, at a gold price that stays above US$3,000?

Owner earnings, TTM
-C$80M-C$110M – -C$55M
Realistic peak profit
C$1.1BC$600M – C$1.6B
Growth rate
0.0%0.0% – 0.0%
Years of growth
64 – 9
Market cap
C$2.2BC$2.1B – C$2.2B
EV
C$1.9BC$1.9B – C$2.0B
Net debt
-C$221M-C$230M – -C$200M
Capital return / cap
0.0%0.0% – 0.0%
P/E
-27.0×-40.0× – -20.0×
EV/EBITDA
-25.0×-35.0× – -18.0×
FCF yield
-3.7%-5.0% – -2.5%
Projected FCF, base case (CAD millions)
Y1-C$80M-C$110M – -C$60M
Y2-C$130M-C$220M – -C$90M
Y3-C$500M-C$900M – -C$150M
Y4-C$800M-C$1.1B – -C$300M
Y5-C$400M-C$900M – C$300M
Competition: A single-asset gold developer whose value rests on the gold price and on permits, not on competitors; Yukon peers and the 2024 Eagle heap-leach failure colour how investors see the territory.
Governance: none flagged
Research (expand)

What it is. Snowline is a single-asset Yukon gold developer. Valley is an intrusion-hosted, bulk-tonnage deposit with a high-grade core: 7.94 Moz M&I at 1.21 g/t plus 0.89 Moz inferred (August 2025 MRE). The 2025 PEA describes a 20-year open pit producing 6.8 Moz, with first-five-year AISC near US$570/oz and life-of-mine AISC of US$844/oz. Initial capex is about C$1.7B, and power comes from LNG or diesel with no grid connection. B2Gold holds about 9.9% and keeps a participation right. In 2026 the stock joined the S&P/TSX Composite, and Randy Smallwood, former CEO of Wheaton Precious Metals, joined the board.

What the market believes. At C$2.17B against an unrisked project NPV that I estimate at C$8-9B (NPV5 at US$3,700 gold, interpolated from the PEA), the market pays about 0.25x. That is the normal multiple for a pre-PFS, unpermitted northern project. The 44% fall from February tracks gold, which fell from US$5,589 to about US$3,700 on expectations of rate hikes. I find no company-specific bad news: the PFS is still on track for Q1 2027, and the Project Description goes to YESAB with it.

What it earns today. Nothing. The company burns about C$60-100M a year on drilling, studies and baseline work, and holds about C$221M of cash and almost no debt (188.65M shares). Unlevered owner earnings are about -C$80M.

Projected FCF (unlevered, C$M). 2027 about -80 (PFS and feasibility). 2028 about -130 (feasibility, permitting, early works). 2029 about -500 and 2030 about -800 (construction). 2031 about -400 (end of construction, commissioning). Year 5 is a newly built mine. At US$3,700 gold I assume roughly 450 koz a year in early years, about C$1.25B a year of after-tax FCF, and about C$0.75B a year later. The NPV10 at production start is about C$7.5B. Discounting back, netting the capex and adding cash gives about C$3.3B, or C$17.5 a share, if the schedule holds. A two-year permitting slip, which is likely given YESAB's Project Proposal in early 2028, takes that to about C$14. That is my base DCF. At US$3,000 gold it falls to about C$9-10. If First Nations consent or the permit fails, the value is closer to the cash plus the exploration ground, about C$3-5.

What kind of company it is in five years. It will be a newly built, low-cost, long-life mine, if permitted. That is a category-leader asset: majors pay full NAV for tier-1 jurisdiction ounces, so a takeout (B2Gold, Agnico, others) is a real second way to win. I am not very confident, though. The projection depends on gold, permitting and a C$2B financing.

Fair value. About C$12, below the C$14 base DCF, for financing dilution and the risk of not getting permits. The market cap is about 0.25x my unrisked NPV5, or about US$190 per M&I ounce. P/E and EV/EBITDA are meaningless.

Management and risks. CEO Scott Berdahl has executed cleanly: discovery to PEA in about four years, sound financings, and awards for environmental work. The risks are the gold price, which is the dominant driver, the Yukon assessment timeline and First Nations consent, remote-site capex inflation, LNG power logistics, and dilution when the build is financed. Competition does not matter much for a gold mine. Jurisdictional peers such as Rackla, Banyan and Victoria's Eagle (whose 2024 heap-leach failure hurt Yukon sentiment) affect how the market views the territory.

Sentiment: 5/10. A darling into early 2026, it is now at the bottom of its one-year range with gold falling. It is not hated: B2Gold and index buyers are holding, and the August deal at C$14.50 is underwater.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue0.000.000.000.000.00
Gross profit-1.26-1.12-0.65-0.24-0.12
Operating expenses79.7+31%67.5+52%44.4+44%31.0+104%15.1
▸Adj EBITDA-79.7-67.5-44.4-31.0-15.1
▸Adj OCF-73.0-65.6-42.4-29.5-16.2
CapEx-1.07-0.79-4.49-2.22-1.05
Adj FCF-74.1-66.4-46.9-31.7-17.2
Interest expense0.020.040.050.080.06
▸Adj net income-78.2-66.9-43.3-30.0-16.3

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-187-66.8-54.4-30.1-23.6-12.6
FCF (OCF−capex)-192-52.5-58.7-38.2-25.7-16.5
Net income-184-61.4-54.2-31.2-23.9-12.8
▸Capital returned-404-169-120-46.2-39.8-29.9
Buybacks-404-169-120-46.2-39.8-29.9
Dividends0.000.000.000.000.000.00
Interest paid0.080.020.040.050.080.06
Debt paid down0.000.000.000.000.000.00
▸Reinvestment10.20.921.044.422.471.30
Capex (PP&E)9.480.920.794.492.221.05
Intangibles & M&A0.680.000.25-0.070.250.25
Leases signed (net Δ)------------
Retained / other21211660.78.1213.913.2

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 28 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)24813169.149.332.0
▸Liabilities (total)11.78.0611.69.562.64
Net debt (incl. leases)-221-104-43.5-35.7-21.8
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-----879-371-270
Shares outstanding18817315914596.9
Dilution (YoY)+11.4%+9.3%+9.2%+49.8%--
Employees53.0--------
MarginsTTM2025202420232022
Gross margin----------
Adj EBITDA margin----------
Adj OCF margin----------
Adj FCF margin----------
Net income margin----------
Adj NI margin----------
ROIC (adj, after-tax)-27.1%-44.0%-61.9%-61.9%-41.0%
Cost of debt----------

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Hodges Capital Management Inc.$91K$11.10+$0+$91K—$1.51B
Strategic Investment Solutions, Inc. /IL$18K$13.62+$6K+$18K—$437M
MILLER WEALTH ADVISORS, LLC$9K$17.36+$0+$9K—$237M
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

021K41K62K82K$5.08$8.15$11$14$172023-092025-032025-092026-032026-06
hover the chart for per-quarter detailprice (right axis)
MEDICI CAPITAL LLC—Hodges Capital Management Inc.10KBank of Marin—ORG Partners LLC—Ascentis Independent Advisors—Strategic Investment Solutions, Inc. /IL2KFNY Investment Advisers, LLC—MILLER WEALTH ADVISORS, LLC1K

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2024 Q41M-5M-5M$-0.03$-0.03 – $-0.031
2025 Q30M—-17M$-0.11$-0.11 – $-0.111
2025 Q41M-6M-7M$-0.04$-0.07 – $-0.013
2026 Q11M-6M-6M$-0.03$-0.03 – $-0.031
2026 Q21M-19M-19M$-0.10$-0.10 – $-0.101
2026 Q31M-34M-34M$-0.19$-0.21 – $-0.143
2026 Q41M-8M-8M$-0.05$-0.07 – $-0.033
2027 Q11M-6M-6M$-0.03$-0.05 – $-0.023
2027 Q21M-16M-16M$-0.09$-0.09 – $-0.091
2027 Q31M-20M-20M$-0.11$-0.11 – $-0.111
2027 Q41M-7M-8M$-0.04$-0.04 – $-0.041
2028 Q11M-4M-4M$-0.02$-0.02 – $-0.022
2028 Q21M-16M-16M$-0.09$-0.09 – $-0.092
2028 Q31M-25M-26M$-0.14$-0.14 – $-0.142
2028 Q41M-5M-5M$-0.03$-0.03 – $-0.032