SHIM
Shimmick Corp.v3 5.5/10 · 2026-11-11Shimmick Corp. is engaged in delivering infrastructure solutions that help critical markets across water, energy, climate resiliency, and sustainable transportation. It is involved in completing complex water and other critical infrastructure projects, ranging from advanced wastewater recycling and purification systems to dams, locks, and transit systems. The firm’s infrastructure projects are focused on water and wastewater treatment, water resources, and other critical infrastructure. The company was founded in 1990 and is headquartered in Irvine, CA.
2-Year Price History
Valuation v3 Opus worker · 2026-11-11
Shimmick is a $95M market-cap (about 41.4M shares at the 2026-11-10 close of $2.29) public-agency water and transit civil contractor. It has nearly finished cutting away the loss-making legacy contracts left from its AECOM years. Backlog is at a two-year high: $991M at Q2, plus $221M of awards since. Core gross margin is about 11-12%, and adjusted EBITDA has been positive for four straight quarters. The stock has still fallen about 65% from its April high, because the backlog keeps converting to revenue slower than promised. Revenue guidance was cut, H1 adjusted EBITDA was only $7M against a $15-30M full-year guide, and the company raised equity at $3.50. On top of that, the Army Corps terminated it from the Chickamauga Lock contract, there is a $4.7B union False Claims Act suit, and the balance sheet shows a $50M equity deficit with about $56M of net debt. The market's view is that this contractor has never earned a steady margin and will dilute again. The market may be getting one thing wrong: once the legacy drag is gone, a roughly $1.2B book of higher-margin, more collaborative work should carry a fixed $60M overhead base toward $25-40M of EBITDA by 2027-28. On that, the $155M EV is about 5x forward EBITDA. My DCF, with 4-5% EBITDA margins, about 9x terminal FCF and net debt deducted, gives about $3.40 a share. But the spread of outcomes is very wide. Contractor margins can disappear on one bad job, the Chickamauga excess reprocurement and claim exposure has not been quantified, and the 4/10 customer score is getting worse. Rating 5.5: cheap if the ramp is real, but low visibility and possible dilution. Research rating 6.5: Q3 results on Nov 12 should show whether the ramp is real, and sentiment is near capitulation.
A deep dive would have to establish: A deep dive would have to establish three things: whether the Q3-Q4 2026 revenue ramp from the $1.2B backlog really arrives at an 11-12%+ gross margin with positive operating cash flow, and how large the Chickamauga excess reprocurement and claim exposure could be after netting the company's own termination claims.
Research (expand)
What it does. Shimmick is a California-based heavy civil contractor. Its main work is water and wastewater plants, dams and flood control, and transit, mainly in CA, TX and WA. Axia Electric adds electrical and data-center work. The customers are mostly public agencies. Mitchell Goldsteen controls 57.8% of the shares.
What the market believes. This is a serial disappointer, and the stock trades like one. The core business revenue fell in Q2 ($96M vs $113M). FY26 revenue guidance was cut to $525-575M, yet the $15-30M adjusted EBITDA guide was held even though H1 produced only $7M. Cash burn continues: H1 operating cash flow was -$24.6M. In May the company sold 4.29M shares at $3.50, and an at-the-market (ATM) share sale program is still open. Covenants were waived in July, and the Army Corps terminated it from Chickamauga citing schedule and quality failures.
What it may be getting wrong. The non-core work is now under 3% of backlog. The stock has been judged on blended results that included -43% gross margin legacy jobs. Core work runs at an 11-12% gross margin, and management says SG&A of about $60M can support $750M of revenue. The project starts were permitting-delayed (6-7 months instead of 3-4), not lost: under 10% of the last 12 months' bookings has been burned. The 12.5% equipment loan was refinanced in October at 9.31%, which added $4.3M of liquidity.
Testing it. The bear case is stronger than the bull case on several counts. (1) This management has guided to a ramp before, and revenue has fallen year on year for three quarters. (2) Contract assets rose to $123M, and some of that is unapproved claims and change orders. (3) If the Chickamauga termination stands as a default, the Corps can pursue the excess cost of finishing the work. That is unquantified and backed by the surety, so it could eventually be indemnified by Shimmick. (4) The Pipefitters False Claims Act suit is probably inflated, but it will cost legal fees. (5) The customer score is 4/10 and falling. The thesis survives, but only as a call option on execution.
Earnings today. Trailing adjusted EBITDA is about $15M. Take off stock comp of about $4M and capex of about $2M; cash taxes are near zero because of NOLs. That leaves unlevered owner earnings of about $9M, and interest of about $7-8M takes nearly all of it. EV is about $155M: $95M of equity plus about $56M of net debt and $5M of contingent consideration, with leases excluded because rent is expensed. That is about 17x current owner earnings and about 10x trailing EBITDA.
Five-year FCF projection (before interest, after stock comp and working capital): $8M, $16M, $21M, $23M, $25M. This assumes revenue of $650M rising to $830M and EBITDA margins of 4-5%. In five years Shimmick would be a sub-$1B regional water and civil contractor growing 3-5%, which is neither a category leader nor a melting ice cube. I value year 5 at about 9x FCF because contractor cash flows are not durable. PV: $68M of FCF plus $140M of terminal value, minus about $61M of debt, gives about $146M, or about $3.40 a share on roughly 43M diluted shares. The bear case (2-3% margins, another raise, a Chickamauga charge) is about $0.80. The bull case (6-7% margins, data-center electrical work at 15-20% gross margin) is about $7. Fair value is $2.80, below the DCF, because of thin liquidity, covenant waivers and dilution risk.
Management and competition. CEO Ural Yal has de-risked the bid mix, but he has missed revenue guidance. The controlling holder makes a take-private conceivable, though it has not been signalled. Competitors are larger: Granite, Sterling, Kiewit, Flatiron and Myers, which is also a JV partner. Shimmick has no structural moat beyond its water and underground expertise and its relationships with agencies.
Sentiment: 2/10. The stock is down 65% since April, near its 1-year low ($2.07-6.67), and short interest has nearly tripled since August. Previews call the setup clearly bearish. This is close to capitulation, but the business is not clearly sound yet.
- /Users/gregwo/stocks2/data/edgar_filings/SHIM/8-K_2026-08-10_0001193125-26-342368_EX99-1.html
- /Users/gregwo/stocks2/data/edgar_filings/SHIM/10-Q_2026-08-10_0001193125-26-342455.html
- /Users/gregwo/stocks2/data/edgar_filings/SHIM/8-K_2026-10-08_0001193125-26-418076.html
- https://finviz.com/news/416290/shimmick-must-prove-its-12-billion-backlog-can-finally-become-revenue
- https://finviz.com/news/405473/shimmick-completes-143-million-equipment-refinancing-reduces-borrowing-costs
- https://www.army.mil/article/292316/usace_terminates_chickamauga_lock_chamber_contract
- https://www.enr.com/articles/63043-army-corps-terminates-shimmick-from-chickamauga-dam-lock-project
- https://www.fool.com/quote/NASDAQ/SHIM
Financials — Adjusted
Adjusted · TTM 2027-Q2 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 |
|---|---|---|---|
| Revenue | 437-23% | 480-20% | 598 |
| Gross profit | 44.1+2% | -55.6 | 1.93 |
| Operating expenses | 54.5-5% | 61.9+208% | 20.1 |
| ▸Adj EBITDA | 1.63 | -102 | -1.78 |
| ▸Adj OCF | -1.96-195% | -111 | -12.7 |
| CapEx | -6.13 | -10.5 | -7.04 |
| Adj FCF | -8.09 | -121 | -19.8 |
| Interest expense | 8.56 | 5.43 | 0.99 |
| ▸Adj net income | -19.1 | -122 | -18.4 |
| ▸Owner's earnings | -10.0 | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2024→FY2025 +2027YTD
| Where the Cash Went | Total | 2027YTD | 2025 | 2024 |
|---|---|---|---|---|
| ▸Claimed: EBITDA | -106 | 5.60100% | -105 | -6.49 |
| FCF (OCF−capex) | -2033 | -1906 | -31.7 | -95.1 |
| Net income | -460 | -312 | -125 | -23.5 |
| ▸Capital returned | -1236 | -1233 | 25.8 | -28.6 |
| Buybacks | 0.00 | 0.00 | 0.00 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 108 | 101 | 5.43 | 0.99 |
| Debt paid down | -1344 | -1334 | 20.4 | -29.6 |
| ▸Reinvestment | 191 | 159 | 17.7 | 13.9 |
| Capex (PP&E) | 338 | 320 | 10.5 | 7.04 |
| Intangibles & M&A | -142 | -156 | 6.26 | 6.88 |
| Leases signed (net Δ) | -4.38 | -5.32 | 0.94 | 0.00 |
| Retained / other | -547 | -416 | -58.4 | -72.4 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 91 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 |
|---|---|---|---|
| ▸Assets (total) | 225 | 234 | 427 |
| ▸Liabilities (total) | 275 | 269 | 356 |
| Net debt (incl. leases) | 66.2 | -8.27 | -18.3 |
| Net debt / Adj EBITDA | 40.6 | -- | -- |
| Net debt / Adj FCF | -- | -- | -- |
| Adj EBITDA / interest | 0.19 | -18.9 | -1.80 |
| Shares outstanding | 41.3 | 34.0 | 25.5 |
| Dilution (YoY) | +17.2% | +33.5% | -- |
| Employees | 971 | 1200 | -- |
| Margins | TTM | 2025 | 2024 |
|---|---|---|---|
| Gross margin | 10.1%+2.5 | -11.6%-11.9 | 0.3% |
| Adj EBITDA margin | 0.4%+0.6 | -21.3%-21.0 | -0.3% |
| Adj OCF margin | -0.5%-0.8 | -23.0%-20.9 | -2.1% |
| Adj FCF margin | -1.9%+1.3 | -25.2%-21.9 | -3.3% |
| Net income margin | -3.8%-0.7 | -26.0%-22.1 | -3.9% |
| Adj NI margin | -4.4%-0.9 | -25.4%-22.3 | -3.1% |
| ROIC (adj, after-tax) | -9.9% | -364.6% | -12.4% |
| Cost of debt | 11.0% | 10.0% | 2.6% |
Revenue Breakdown
Revenue Segments
| Fixed-Price Contract | $81.2M | -21% |
Earnings Calls
Earnings Call · 2026 Q2
Shimmick Corporation delivered a materially improved second quarter despite lower revenue as the company continued winding down legacy and noncore projects and repositioning toward higher-quality infrastructure work. Consolidated revenue was $107 million, compared with $128 million in the prior-year quarter. Shimmick project revenue declined to $96 million from $113 million because several projects reached or approached completion, while noncore revenue fell to $11 million from $16 million following the termination of the Chick Lock replacement project and continued project closeouts. Profitability improved substantially. Consolidated gross margin rose 53% to $12 million, or 12% of revenue versus 6% a year earlier. Project gross margin declined by $4 million as older work wound down, but this was more than offset at the consolidated level by the absence of significant noncore project losses incurred in the prior year. Noncore gross margin improved by $9 million year over year, from a $7 million loss to $2 million of profit. Net loss narrowed to $5 million from $9 million, while adjusted EBITDA increased to $4 million from a $234,000 loss. G&A rose modestly to $16 million because of one-time legal and equity-issuance costs. Backlog and bookings continued to strengthen. Shimmick booked $138 million in the quarter, generating a 1.4x book-to-burn ratio and marking the fourth consecutive quarter above 1.0x. Ending backlog was $991 million, the highest in two years, and awards pending fully executed contracts totaled another $221 million. Additional post-quarter awards exceeded $265 million, including transportation, flood protection, wastewater and electrification projects. Noncore backlog is now below 3% of total backlog, significantly improving the expected mix and reducing exposure to loss-making work. Management expects revenue and margins to improve sequentially as newer awards transition from preconstruction and early-stage activity into execution. Although the typical project startup period is three to four months, certain larger projects took six to seven months because of permitting and customer-related delays. A February award began in July, illustrating the timing lag. Less than 10% of backlog booked over the past year has converted into revenue, leaving substantial growth runway and potential for better overhead absorption. Full-year 2026 revenue guidance is now approximately $525 million to $575 million, representing about 12% growth at the midpoint, while adjusted EBITDA guidance remains $15 million to $30 million, or roughly 350% midpoint growth year over year. Mission-critical infrastructure is becoming a central growth platform. Shimmick established a dedicated business unit to pursue data centers, advanced manufacturing, defense, renewables, critical minerals and related opportunities. The West Virginia data-center project is entering preconstruction, and Texas is particularly attractive because of strong water infrastructure and data-center demand. Management expects mission-critical work to become a sizable business component within 12 months, with approximately 80% of the work electrical and targeted gross margins of 15% to 20%. Core geographic priorities remain California, Texas and Washington, while expansion elsewhere will be selective and generally follow existing customers. Operationally, safety performance is ahead of 2025 levels, and enhanced project controls, IT, AI, cost management and finance processes are supporting margin consistency. SG&A is expected to remain broadly stable as revenue grows, allowing improved EBITDA and net-income conversion. Cash flow should also improve as legacy projects decline to less than 3% of backlog. The Tennessee project has been demobilized and is being resolved with the client, while another legacy project should wind down over the next two quarters at declining volumes.
▸Given the strong second-quarter margins but somewhat lower-than-expected revenue, what should investors expect for second-half 2026 revenue, and are current margins representative of the remaining backlog?Gerard Sweeney · ROTH Capital
▸Does the growing backlog and pipeline indicate that Shimmick is in the early stages of accelerating revenue?Gerard Sweeney · ROTH Capital
▸What revenue scale is Shimmick built to support, and how can the company grow into that capacity over the next several years?Gerard Sweeney · ROTH Capital
▸What is happening in the data-center and electrical markets, what opportunities are developing, and when could they become meaningful to the business?Gerard Sweeney · ROTH Capital
▸Are the higher margins expected on mission-critical work in the range of 15% to 20% gross margin?Gerard Sweeney · ROTH Capital
▸How is Shimmick's geographic expansion developing, especially in Texas, and what growth does management see in additional markets?Aaron Spychalla · Craig-Hallum
▸How will Shimmick balance SG&A discipline with investments in the business, and what are the labor and operational implications of growth over the next several years?Aaron Spychalla · Craig-Hallum
▸What were the quarter's free-cash-flow dynamics, and when should cash generation improve as new projects ramp and profitability increases?Aaron Spychalla · Craig-Hallum
▸Are there any remaining issues or risks on the Tennessee legacy project, and what legacy work remains to be completed?Aaron Spychalla · Craig-Hallum
SEC Filing Findings
SEC Filing — material findings
2026-08-10 · depth 9/10risk 8Litigation▸California False Claims Act suit by Pipefitters-affiliated committee against Shimmick and 20 others (incl. sureties) alleging $4.7B in damages plus treble damages; discovery early, too early to assess probable loss; no accrual.
California False Claims Act suit by Pipefitters-affiliated committee against Shimmick and 20 others (incl. sureties) alleging $4.7B in damages plus treble damages; discovery early, too early to assess probable loss; no accrual.
risk 6Litigation▸Company is pursuing claims/change orders with customers, including termination cost recovery on a Non-Core Project; recovery is unrecognized and uncertain.
Company is pursuing claims/change orders with customers, including termination cost recovery on a Non-Core Project; recovery is unrecognized and uncertain.
risk 7Liquidity/Covenants▸Ansley Park equipment loan carries 12.5% rate with full parent guarantee; $6M accrued PIK interest outstanding; Credit Agreement amended July 29, 2026 to waive a covenant noncompliance and leverage covenant testing delayed to Q3 2027; Credit Agreement secured by substantially all assets.
Ansley Park equipment loan carries 12.5% rate with full parent guarantee; $6M accrued PIK interest outstanding; Credit Agreement amended July 29, 2026 to waive a covenant noncompliance and leverage covenant testing delayed to Q3 2027; Credit Agreement secured by substantially all assets.
risk 6Liquidity/Covenants▸$10M standby letters of credit outstanding for insurance carriers (none at prior year-end), an off-facility obligation that reduces available capacity.
$10M standby letters of credit outstanding for insurance carriers (none at prior year-end), an off-facility obligation that reduces available capacity.
risk 6Dilution▸Active $7.8M ATM program (reduced registration to $5.0M after May offering) with up to 3% commission; shares outstanding rose ~15% in the half-year via 4.29M-share underwritten offering at $3.50 and option/RSU issuance.
Active $7.8M ATM program (reduced registration to $5.0M after May offering) with up to 3% commission; shares outstanding rose ~15% in the half-year via 4.29M-share underwritten offering at $3.50 and option/RSU issuance.
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| SANDERS MORRIS HARRIS LLC | $2.8M | $4.65 | −$188K | +$57K | +0.4% | $630M |
| Pacific Ridge Capital Partners, LLC | $1.6M | $5.50 | +$36K | −$106K | +0.1% | $462M |
| SEI INVESTMENTS CO | $906K | $3.59 | +$815K | +$906K | -0.7% | $108.06B |
| 1492 Capital Management LLC | $550K | $6.15 | +$173K | +$148K | -0.9% | $257M |
| Informed Momentum Co LLC | $508K | $3.67 | +$508K | +$508K | +7.9% | $865M |
| THOMPSON DAVIS & CO., INC. | $461K | $2.52 | +$3K | +$295K | +0.9% | $150M |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $312K | $3.81 | +$60K | +$148K | -0.1% | $1.61T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $225K | $3.67 | +$225K | +$225K | — | $4.04T |
| RENAISSANCE TECHNOLOGIES LLC | $131K | $4.61 | +$72K | +$131K | +0.7% | $63.91B |
| VANGUARD FIDUCIARY TRUST COPassive | $120K | $3.67 | +$120K | +$120K | — | $395.83B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2023 Q4 | 173M | 24M | 15M | $0.43 | $0.43 – $0.44 | 1 |
| 2024 Q1 | 159M | 1M | -3M | $-0.07 | $-0.08 – $-0.07 | 1 |
| 2024 Q2 | 126M | -6M | -12M | $-0.34 | $-0.34 – $-0.33 | 1 |
| 2024 Q3 | 124M | -5M | -10M | $-0.28 | $-0.29 – $-0.28 | 1 |
| 2024 Q3 | 120M | 1M | -5M | $-0.12 | $-0.40 – $0.14 | 2 |
| 2024 Q3 | 120M | 1M | -5M | $-0.12 | $-0.40 – $0.14 | 2 |
| 2025 Q1 | 119M | -9M | -14M | $-0.35 | $-0.36 – $-0.35 | 1 |
| 2025 Q1 | 119M | -11M | -16M | $-0.35 | $-0.37 – $-0.34 | 1 |
| 2025 Q2 | 94M | -6M | -11M | $-0.25 | $-0.26 – $-0.24 | 1 |
| 2025 Q2 | 94M | -5M | -10M | $-0.25 | $-0.26 – $-0.24 | 1 |
| 2025 Q3 | 113M | -2M | -6M | $-0.14 | $-0.15 – $-0.13 | 1 |
| 2025 Q3 | 113M | -1M | -5M | $-0.14 | $-0.14 – $-0.14 | 1 |
| 2025 Q4 | 120M | 3M | -2M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q1 | 111M | 4M | -2M | $-0.04 | $-0.05 – $-0.04 | 1 |
| 2026 Q2 | 117M | 2M | -3M | $-0.07 | $-0.11 – $-0.04 | 2 |
| 2026 Q3 | 122M | 4M | -1M | $-0.02 | $-0.03 – $-0.01 | 2 |
| 2026 Q4 | 140M | 8M | 2M | $0.04 | $0.03 – $0.05 | 2 |
| 2027 Q1 | 154M | 7M | 2M | $0.04 | $0.04 – $0.04 | 1 |
| 2027 Q2 | 137M | 5M | 0M | $0.01 | $0.01 – $0.01 | 1 |
| 2027 Q3 | 148M | 8M | 3M | $0.06 | $0.06 – $0.06 | 1 |
| 2027 Q4 | 152M | 11M | 5M | $0.12 | $0.11 – $0.13 | 1 |
| 2028 Q1 | 160M | 13M | 6M | $0.14 | $0.13 – $0.15 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-03-17 | SELL | Goldsteen Mitchell B. | director, 10 percent owner: | 125,000 | $2.86 | $358K | $59.99M |
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand
Thesis
Shimmick appears to be improving operationally, but it is not yet a financially healthy contractor. Four consecutive quarters of positive adjusted EBITDA, sharply better gross margins, a $991M backlog and the near-elimination of noncore backlog support a credible turnaround. The critical question is whether the new work produces cash rather than merely accounting EBITDA. The company remains highly fragile. TTM free cash flow is negative, cash is only $17M, net debt including leases is $66M, interest coverage is inadequate, and PIK interest increases the debt burden. Recent equity issuance and the ATM facility also create dilution risk. The very large False Claims Act claim, project-control weaknesses and prior legacy-project failures make the downside unusually asymmetric despite the better operating trend. I therefore assign the highest probability to a moderate turnaround, meaningful weight to a restructuring or equity-wipeout scenario, and only a modest probability to the full mission-critical growth thesis. The business trajectory is improving, but the equity remains a speculative turnaround rather than a proven compounder.
Trade Signal
Modest short: the operational turnaround is credible, but at $3.73 the stock is above conservative fair value while negative cash flow, debt, dilution and litigation leave the equity structurally fragile.
The stock rallied from roughly $1.7–$2.0 in mid-2025 to $4.20 by February 2026 as the turnaround, positive adjusted EBITDA and backlog recovery gained traction. It then declined to around $3.0–$3.2 in March before rallying sharply to $5.9 in late April/early May, likely on the record Q1 bookings/backlog and reaffirmed guidance. The May decline toward $3.5 followed the Chickamauga termination, the related operating/liability concerns and the 4.29M-share equity offering. It recovered toward $4.47 into the August 10 earnings report, then fell 17% to $3.73 over three sessions. The latest drop is partly justified by lower revenue, continuing losses and weak cash economics, although it arguably underreacts to the longer-term dilution and insolvency risks. This is not an attractive oversold dislocation; it is a volatile, partially justified repricing with modest residual downside toward the $2.04 fear-adjusted value.
The stock is disliked and volatile rather than euphorically owned. Consensus is Hold, with no buy ratings, short interest has risen from negligible levels to 5.4% of float, and the stock is 44% below its 52-week high. Bulls point to the backlog, margin recovery, infrastructure demand and possible data-center exposure; bears focus on negative cash flow, debt, PIK interest, dilution, project execution and the False Claims Act lawsuit. The market appears skeptical of the turnaround, but the post-earnings decline also reflects legitimate balance-sheet concerns rather than pure panic.
There is a credible positive operating inflection, but it is not yet a proven earnings or cash-flow inflection. Backlog has reached $991M, noncore work is below 3% of backlog and new awards could improve revenue absorption and margins over the next several quarters. However, the analyst's base case already assumes $18M of owner earnings and a $180M equity value, while the stated consensus data is poor and internally inconsistent—its forward EBITDA estimates remain deeply negative despite management's positive 2026 guidance. Thus the market may not fully price the operational improvement, but the evidence required to validate it is cash conversion, not another adjusted EBITDA print.
- ▲2026-11 · Q3 2026 earnings and backlog-conversion update — Likely in November 2026; the key test is whether newer backlog converts into revenue and cash while margins remain near 10%–12%.
- ▲2027-02 · FY2026 guidance update / Q4 earnings — Management's $525M–$575M revenue and $15M–$30M adjusted EBITDA outlook needs confirmation; a cash-flow-positive result could support the stock.
- ▲H2 2026–2027-02 · Mission-critical and data-center contract awards — Texas, Reno or West Virginia awards would validate the higher-margin Axia/electrical growth thesis, though no regional awards are finalized yet.
- ▼2026-09–2027-06 · Liquidity, refinancing or covenant update — Cash is only $17M, free cash flow is negative and PIK interest is building; any financing stress or renewed covenant issue could sharply pressure equity.
- ▼H2 2026–2027 · False Claims Act litigation developments — The active California labor-classification case remains a material tail risk; adverse rulings, settlement demands or expanded disclosures could overwhelm operating improvement.
- ▼2026-2027 · Additional equity issuance or ATM activity — The May offering already increased shares by roughly 7% TTM; further working-capital financing would cap per-share upside and pressure the stock.
Net flow is negative. The May public offering added 4.29M shares and TTM dilution is approximately 7%; the ATM creates additional supply risk. There is no meaningful buyback, institutional ownership appears limited, and a major holder has sold roughly $0.6M over the past year. Short interest at 5.4% of float and 3.8 days to cover provides some squeeze fuel, but not enough to offset dilution and financing needs.
There is no hard equity floor: the company has negative free cash flow, inadequate interest coverage, net debt including leases and a meaningful insolvency/refinancing risk. The nearly $1B backlog and improving core margins provide some fundamental support, but backlog is not cash and legacy-project losses, litigation or dilution could erode that support. Above the current price, the May equity offering, potential ATM issuance and the lack of positive owner earnings create a meaningful ceiling.
Moderate but fragile. Improving backlog, infrastructure exposure and a potential data-center/electrical growth story could attract turnaround and small-cap industrial buyers, but negative free cash flow, $66M net debt including leases, PIK interest, covenant history, litigation and possible dilution make it difficult for durable fundamental buyers to own aggressively. The next buyer likely needs evidence of cash conversion, not merely adjusted EBITDA.
Fear pulls harder than greed. The operating turnaround is real—four quarters of positive adjusted EBITDA, better gross margins and a stronger backlog—but the stock is already above the analyst's conservative fair value while the business still loses cash and carries refinancing, dilution and litigation risk. I would prefer a small, tightly risk-managed short rather than a large position because positive backlog or data-center news could produce violent squeezes.
Valuation
The quarter supplied fresh evidence that the margin turnaround is continuing: adjusted EBITDA reached roughly $4.4M, the fourth consecutive positive quarter, while gross margin improved despite lower revenue. Backlog reached $991M and noncore backlog fell below 3%. The offsetting new information was that revenue remained below the prior-year level, adjusted free cash flow was still negative, and management continues to describe a delayed conversion process rather than demonstrating sustained cash generation.
▸ How the cases moved
Before the Q2 result, I would have carried approximately $150M bear equity value, $155M base equity value and $420M bull equity value, with probabilities of 0.40, 0.50 and 0.10 respectively. After the quarter, the bear case falls to $0M with probability 0.35 because legacy exposure is shrinking and operating losses are improving; the base rises to $180M with probability 0.50 because gross-margin recovery and the $991M backlog are more credible; and the bull rises to $490M with probability 0.15 because mission-critical work and backlog conversion now have greater evidence, though not yet enough to make the bull likely. The probability-weighted undiscounted value therefore increases from approximately $120M to $163.5M before discounting.
Legacy-project losses, negative cash conversion, PIK interest and refinancing pressure overwhelm the improving core business. The False Claims Act litigation or further project disputes create a restructuring or equity-wipeout outcome before the backlog can mature.
▸ Valuation
0x -$20M owner earnings = $0M equity value
Legacy work largely exits, the nearly $1 billion backlog converts gradually, and gross margins remain around 10%–12%. Revenue recovers toward the historical $600M–$700M scale, SG&A is absorbed, and owner earnings become modestly positive, but debt, dilution, weak cash conversion and litigation keep the multiple restrained.
▸ Valuation
10x $18M owner earnings = $180M equity value
Backlog converts faster than expected, mission-critical electrical and data-center work becomes material, and gross margins approach the targeted 15%–20% range on that work. Stable SG&A and improving project cash flow produce durable owner earnings well above current levels, while refinancing removes the immediate balance-sheet constraint.
▸ Valuation
14x $35M owner earnings = $490M equity value
▸ Target Rationale
The probability-weighted scenario value discounted at 12% is $131M, but I set the analytical target at $110M. The haircut reflects the gap between EBITDA and cash earnings, $66M of net debt including leases, PIK interest, likely future dilution, covenant history, weak internal controls and the unresolved litigation tail. The target still recognizes that the operating turnaround has real evidence behind it; it is not reduced merely because the story feels risky.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Chickamauga Lock Replacement Project Termination and Appeal (May 2026): On May 8, 2026, the U.S. Army Corps of Engineers (USACE) Nashville District terminated Shimmick’s contract for the lock chamber portion of the Chickamauga Lock Replacement project in Chattanooga, Tennessee. The USACE cited a failure to maintain schedules and correct quality deficiencies. Shimmick has formally disputed the termination, blaming the delays on change orders and pandemic-related challenges, and announced its intention to appeal the decision within 90 days to seek compensation for work-related costs. On May 19, 2026, Shimmick filed a WARN Act notice of a mass layoff affecting 183 workers at the Chattanooga facility as a result of the permanent closure of the project.
- Q1 2026 Financial Results (May 2026): Shimmick announced its Q1 2026 earnings on May 14, 2026. Revenue was reported at $88 million, down 28% year-over-year from $122.1 million in Q1 2025, primarily due to the wind-down of non-core projects and adverse weather. However, the net loss narrowed significantly to $4.6 million (compared to a loss of $9.8 million in the prior year's quarter), and overall gross margins improved to 12% (up from 4% in Q1 2025). The company achieved its third consecutive quarter of positive Adjusted EBITDA, recording $3 million. Total backlog grew to $944 million, reflecting a public-company record book-to-burn ratio of 2.6x driven by $289 million in new bookings. The company reaffirmed its full-year 2026 guidance, predicting revenue of $550 million to $600 million and Adjusted EBITDA of $15 million to $30 million.
- Public Stock Offering (May 2026): On May 26, 2026, Shimmick successfully closed an underwritten public offering of 3,730,000 shares of common stock. Concurrently, the underwriters fully exercised their over-allotment option for an additional 559,500 shares, bringing the aggregate sold shares to 4,289,500. The offering generated approximately $14.0 million in net proceeds, which Shimmick intends to deploy for working capital and general corporate purposes to ease short-term liquidity pressures.
- COO Appointment (April 2026): Effective April 28, 2026, Shimmick appointed Sarah Tacker as Executive Vice President and Chief Operating Officer, aiming to strengthen the company’s operational execution and risk management across its core projects.
▸ Thesis-test Findings
- Shimmick Union Pipefitters False Claims Act lawsuit updates 2026 2027:
The lawsuit filed in May 2025 by a labor management committee affiliated with the Pipefitters Union against Shimmick and 20 other defendants (including sureties) remains active. The lawsuit, which involves 27 projects across 23 public agencies in California (none of whom are parties to the suit), alleges California False Claims Act violations based on improper job classifications (assigning work to the Laborers Union instead of the Pipefitters) and violating apprentice-to-journeyperson ratios. The Union alleges a headline damage figure of $4.7 billion based on cumulative contract values plus treble damages. In its Q1 2026 Form 10-Q (filed May 15, 2026), Shimmick denies all claims, arguing that exceptions/disclosures occurred that nullify the allegations, and that the legal theory represents a misapplication of the False Claims Act. The litigation presents an active, long-term bear-case tail risk, though no adverse judgments or material changes in legal status were reported in the first half of 2026.
- Axia electrical data center contract awards Texas Reno:
Shimmick is pursuing growth in the data center market through its wholly-owned electrical subsidiary, Axia Electric LLC (launched in 2025). During the Q1 2026 earnings call, CEO Ural Yal identified Texas and Reno as highly attractive emerging markets for data center expansion, noting that the company is actively bidding on mechanical and electrical scopes (including water treatment, cooling, racks, switchgear, medium voltage, and power generation). While Shimmick has "multiple active bids" in Reno and Texas and is in ongoing dialogues with hyperscaler customers, no official data center contract awards have been finalized or announced in these regions as of mid-2026.
- Shimmick credit facility amendments and covenant compliance:
To address past defaults under its legacy revolving credit facility, Shimmick restructured its debt in early 2025, replacing its old facility with a $15 million senior secured revolving line of credit from Ares Commercial Finance (ACF Credit Agreement) and a $15 million equipment term loan from Ansley Park Capital. Under its larger $60 million Credit Agreement (with AECOM and BHSI), Shimmick executed a key amendment on May 8, 2026, which waived a specified noncompliance of its Material Project Documents covenant regarding entering into non-bonded contracts. Crucially, the maximum leverage ratio covenant testing date under the Credit Agreement was pushed out and is now set to commence at the close of the second quarter of 2027. As of the close of Q1 2026, Shimmick reported no known instances of noncompliance with its financial or non-financial covenants, and maintains compliance with the ACF Credit Agreement's $5 million minimum liquidity requirement.