Stabilis Solutions, Inc.v3 5.2/10 · 2026-11-26Stabilis Solutions, Inc., along with its subsidiaries, delivers comprehensive small-scale liquefied natural gas (LNG) services—including production, distribution, and fueling—to a variety of end markets across North America. The company operates through two main divisions: LNG and Power Delivery. In its LNG segment, Stabilis supplies LNG to industrial, midstream, and oilfield sectors. It also offers alternative fuel solutions to industrial users dependent on propane, diesel, and other crude-based products, in addition to providing cryogenic equipment rental and field services. The Power Delivery segment focuses on electrical and instrumentation construction, installation, and the building of electrical systems. Stabilis caters to a broad clientele, encompassing aerospace, industrial, utilities and pipelines, mining, energy, commercial, and transportation markets. Founded in 2013, Stabilis Solutions, Inc. is headquartered in Houston, Texas.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
Stabilis is a small Gulf Coast LNG producer and trucker (George West plant, cryogenic trailers) whose 2026 collapsed after its Carnival bunkering and Louisiana power contracts ended: nine-month revenue $37M (-32%), adjusted EBITDA $1.4M, GAAP loss $8.5M. The bull case is 2027: a ~$200M, two-year bridge-power LNG contract for a US data center starts mid-Q1 2027 and ramps to full rate by Q4, which roughly triples revenue to $110-130M at management's 'high-teens' EBITDA margin, with aerospace (rocket launch LNG, +49% y/y) growing alongside. At $3.40 (11/25 close, a 3-year low; ~18.6M shares, $63M cap, ~$70M EV) the stock trades at ~4x 2027E and ~2.7x 2028E EBITDA. But the contract is bridge power with a cliff in early 2029, $25M of the revenue was prepaid and already spent on equipment (so it won't arrive as cash), unrestricted cash is $1.5M with a new fixed-charge covenant from Q1 2027, the CEO is interim, and Galveston has slid from 60% to ~16-25% contracted. My DCF (10%, years 2027-31, ~9x a ~$8M year-5 FCF since I can't tell whether data-center work keeps renewing) gives ~$3.2/share, about the price: the market is pricing two good years and a cliff, which is roughly right. Rating 5.2 (fair, pass), setup 4.0: the catalyst (Q1-Q2 2027 ramp, follow-on contracts) is dated, but I have no edge on whether the bridge contract extends or new ones land.
Flow: Nothing notable: no buyback, no issuance (share count flat at 18.6M all 2026), the controlling Crenshaw stake holds, and Westervelt Ballard's exit (10.6% to 2.2%, Feb 2025 to Jan 2026) is finished; a cash squeeze under the new revolver covenant from Q1 2027 is the main dilution risk.
A deep dive would have to establish: Does the data-center bridge contract extend and do new bridge/backup contracts land before the early-2029 cliff, or is 2027-28 a two-year peak?
Research (expand)
What it does. Stabilis makes small-scale LNG at George West, TX (~100k gal/day) and buys third-party LNG, then delivers it by its own cryogenic trailer fleet to rocket launchers (aerospace), industrials off the pipeline, pipeline/utility outage and peak-shaving jobs, marine bunkering, and behind-the-meter power (data centers). It also owns a Mexican JV stake (~$0.7M/yr equity income) and is trying to finance a $350-400M Galveston bunkering plant through a project SPV.
What the market believes. The stock fell from $6.00 (August) to $3.40 as the Q3 print showed Q4 will dip again, unrestricted cash is only $1.5M, Galveston offtake shrank and has no FID date, and the revolver now needs a $5M blocked cash account and a 1.20x fixed-charge test from Q1 2027. The market treats the $200M data-center deal as a two-year blip followed by a 2029 cliff, at ~2.7x peak-year EBITDA.
What it earns today. TTM adjusted EBITDA ~$2.9M; D&A ~$7M; no SBC recorded; maintenance capex I put at ~$4M. Unlevered owner earnings are about -$1.5M. 9M operating cash flow of $23.4M is $25M of customer prepayments recorded as deferred revenue; without them OCF was negative.
Five-year FCF (unlevered, after the $25M prepaid revenue that will not be collected again, in $M): 2027 ~0 (EBITDA ~17 on ~$115M revenue, working-capital build, ~10 of invoices offset by the advance); 2028 ~5.5 (EBITDA ~26 on ~$160M, ~15 offset); 2029 ~10.5 (contract ends early 2029, partly replaced, WC release); 2030 ~7; 2031 ~8. Remaining project equipment is paid from the $16.8M restricted cash. Cash taxes are low on NOLs.
Year 5. 'We do not know': either a ~$100M-revenue trucker with aerospace and rolling data-center commissioning/backup work (~$8M FCF, 8-10x), or a data-center LNG specialist with extensions plus Galveston (~$18M+ FCF, 10-12x), or back to a $60-70M business earning ~$3-4M. Base: 9x ~$8M = $72M terminal. PV of FCF ~$22M + PV terminal ~$45M = ~$66M EV, less ~$7M net debt (notes $8.2M + leases $0.7M - $1.5M free cash) = ~$59M, or ~$3.2/share. Bull (extension + new bridge contracts + aerospace offtakes) ~$7; bear (execution/supply squeeze, cliff, covenant strain, Galveston $9.7M write-off) ~$1.5.
Multiples. ~4x 2027E EV/EBITDA, ~7x 2027E P/E; on TTM it is loss-making and ~24x EBITDA.
Management and risks. Controlled company: Executive Chairman Casey Crenshaw (interim CEO since the 2025 CEO exit and its $2.1M severance) owns the majority, so the float is small and illiquid (~$100k/day). Captive-supplier risk: one hyperscaler-adjacent customer will be well over half of 2027 revenue, the supply is mostly bought from third parties, and the end date depends on the grid connection. Auditor changed in July (HL&B absorbed by CohnReznick, benign). Competitors are larger: Chart/LNG trucking peers, NFE, Clean Energy, and turbine/diesel rental for bridge power.
Sentiment: 3/10. Stock at a 3-year low with one sell-side analyst, a 10% holder that sold out in 2025, and investors tired of Galveston promises; the 2027 ramp is known but not trusted.
- https://finviz.com/news/415805/stabilis-solutions-announces-third-quarter-2026-results
- Stabilis 10-Q for Q3 2026 filed 2026-11-04 (forensic findings in context pack)
- Stabilis Q3 2026 earnings call transcript, 2026-11-05 (context pack)
- /Users/gregwo/stocks2/data/transcripts/SLNG_2026Q2.json
- /Users/gregwo/stocks2/data/transcripts/SLNG_2025Q4.json
- https://finviz.com/news/417400/stabilis-returns-to-gaap-profit-as-q2-trough-passes-but-q4-dip-galveston-offtake-slide-and-thin-unrestricted-cash-put-the-story-on-2027
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 50.4-30% | 68.2-7% | 73.3+0% | 73.1-26% | 98.8 |
| Gross profit | 6.76-45% | 10.7-33% | 15.9+29% | 12.3-1% | 12.5 |
| Operating expenses | 16.5+34% | 13.2+6% | 12.5-6% | 13.2+6% | 12.5 |
| ▸Adj EBITDA | -2.68-137% | 4.83-54% | 10.5+51% | 6.97-19% | 8.61 |
| ▸Adj OCF | -0.90-110% | 6.89-36% | 10.8+62% | 6.68-23% | 8.66 |
| CapEx | -14.7 | -8.14 | -9.15 | -10.3 | -3.93 |
| Adj FCF | -15.6 | -1.25-174% | 1.68 | -3.57-176% | 4.73 |
| ▸Interest expense | 0.09 | 0.19 | 0.00 | 0.39 | 0.77 |
| ▸Adj net income | -9.88 | -2.53-184% | 3.01 | -1.49 | -1.79 |
| ▸Owner's earnings | -4.00 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 32.0100% | -3.11 | 6.23100% | 11.7100% | 8.64100% | 8.51100% |
| FCF (OCF−capex) | 24.075% | 11.8 | 0.467% | 4.5539% | -3.54-41% | 10.7125% |
| Net income | -7.04-22% | -8.52 | -1.35-22% | 4.6039% | 0.131% | -1.89-22% |
| ▸Capital returned | 12.238% | 0.92 | 2.5741% | 1.9116% | 4.0146% | 2.8333% |
| Buybacks | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 1.35 | 0.00 | 0.19 | 0.00 | 0.39 | 0.77 |
| Debt paid down | 10.9 | 0.92 | 2.39 | 1.91 | 3.61 | 2.06 |
| ▸Reinvestment | 42.9134% | 11.1 | 8.73140% | 9.0277% | 10.3119% | 3.8045% |
| Capex (PP&E) | 43.0 | 11.5 | 8.14 | 9.15 | 10.3 | 3.93 |
| Intangibles & M&A | -0.20 | 0.00 | 0.00 | 0.00 | 0.00 | -0.20 |
| Leases signed (net Δ) | 0.13 | -0.41 | 0.58 | -0.12 | -- | 0.07 |
| Retained / other | 13.342% | 10.9 | -1.93-31% | 2.6423% | -7.15-83% | 8.82104% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 6.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 102 | 83.1 | 85.6 | 81.3 | 96.6 |
| ▸Liabilities (total) | 43.6 | 16.4 | 18.6 | 19.5 | 36.7 |
| Net debt (incl. leases) | 7.37 | 1.37 | 0.36 | 4.24 | 0.80 |
| Net debt / Adj EBITDA | -- | 0.28 | 0.03 | 0.61 | 0.09 |
| Net debt / Adj FCF | -- | -- | 0.21 | -- | 0.17 |
| Adj EBITDA / interest | -30.8 | 25.8 | -- | 17.7 | 11.2 |
| Shares outstanding | 18.6 | 18.6 | 18.6 | 18.6 | 17.7 |
| Dilution (YoY) | +0.0% | +0.1% | +0.1% | +5.0% | +4.7% |
| Employees | 104 | 85.0 | 104 | 104 | 100 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 13.4%-3.6 | 15.6%-6.0 | 21.6%+4.8 | 16.9%+4.2 | 12.6% |
| Adj EBITDA margin | -5.3%-15.5 | 7.1%-7.3 | 14.4%+4.8 | 9.5%+0.8 | 8.7% |
| Adj OCF margin | -1.8%-14.1 | 10.1%-4.7 | 14.8%+5.6 | 9.1%+0.4 | 8.8% |
| Adj FCF margin | -30.9%-28.5 | -1.8%-4.1 | 2.3%+7.2 | -4.9%-9.7 | 4.8% |
| Net income margin | -17.4%-18.8 | -2.0%-8.2 | 6.3%+6.1 | 0.2%+2.1 | -1.9% |
| Adj NI margin | -19.6%-19.4 | -3.7%-7.8 | 4.1%+6.1 | -2.0%-0.2 | -1.8% |
| ROIC (adj, after-tax) | -11.4% | -2.6% | 4.0% | -0.8% | -0.1% |
| Cost of debt | 0.6% | 2.1% | 0.0% | 3.8% | 6.1% |
Revenue Breakdown
Revenue Segments
| Natural Gas, Gathering, Transportation, Marketing and Processing | $8.7M | -38% |
| Rental | $0.9M | -45% |
| Service | $0.8M | -52% |
| Product and Service, Other | $0.0M | -99% |
| UNITED STATES | $9.5M | -42% |
| MEXICO | $0.8M | +4% |
Earnings Calls
Earnings Call · 2026 Q3
Stabilis Solutions reported third quarter 2026 results that management said were in line with expectations and with the outlook from the prior call. Revenue was $14.8 million, down 27% year over year. The decline reflects the end of large marine and power generation contracts in Q4 2025. Revenue rose 25% (+$2.9 million) from $11.9 million in Q2. A short-term behind-the-meter power contract supporting commissioning of a U.S. data center began LNG deliveries in August. It lifted data center revenue to 17% of the total, from under 1% in Q2. That project ends in Q4, so Q4 revenue will reflect its conclusion. Aerospace revenue grew 49% year over year, and the legacy industrial business also grew. Adjusted EBITDA was $1.9 million, compared with $2.9 million a year ago and $0.1 million in Q2. Net income was $0.2 million, or $0.01 per diluted share, versus $1.1 million a year ago and a $4.6 million loss in Q2. SG&A was $2.5 million, flat sequentially and down from $2.8 million. Operating cash flow was $3.9 million, including a $5 million customer advance for the 2027 data center contract. Year-to-date operating cash flow is $23.4 million, reflecting the full $25 million of advances received. Cash, equivalents and restricted cash totaled $18.4 million, of which $16.8 million is restricted for equipment and preparation for the 2027 contract and $1.5 million is unrestricted. Capex was $4 million in the quarter and $11.5 million year to date, mostly for the data center project. It is funded by the advances. More than $15 million of project equipment is on order. The focus is 2027, which management expects to be a record year. The multiyear bridge-power LNG contract is the largest in company history. It is roughly $200 million over two years, or about $100 million of revenue a year. It remains on track to start mid-Q1 2027 with mobilization and testing, then ramp over the first three quarters. Management expects full run rate by Q4 2027. Initial terms are two years, and an extension is possible if grid connections are delayed. LNG supply agreements and backup supply are being finalized. Management is not giving 2027 guidance. It reiterated that fixed costs are largely in place, so operating leverage should be strong. Much power-generation demand will be served with third-party LNG, which limits capital needs. Commodity risk is passed through to customers. Together, these should drive meaningful EBITDA growth and margins in the high teens. The data center pipeline spans four phases: construction, commissioning, bridge power and long-term backup. The pipeline has grown substantially. Backup is seeing the fastest increase in activity, followed by bridge, as grid connection delays mount. In aerospace, more customers and higher launch and testing activity are driving growth. Management is in talks with multiple customers on multiyear offtake and possible capacity additions. It cautioned that program timing is uncertain and some customers may vertically integrate. The Galveston marine bunkering project is a $350 million, 350,000 gallon-per-day facility. About 25% of the needed offtake is committed. Management will not commit to an FID timeline, which depends on financing and more offtake. It expects marine to contribute meaningfully around 2028 and beyond.
▸What volumes are involved in aerospace long-term offtake discussions compared with the current business, and could this lead to investment in additional liquefaction capacity?Martin Malloy · Johnson Rice
▸What is the term or end date of the new data center contract starting in Q1?Barry Haimes · Sage Asset Management
▸Can you update the marine market, and do you still have the cruise customer?Barry Haimes · Sage Asset Management
▸How much of the marine project's offtake is committed?Barry Haimes · Sage Asset Management
▸What rough percentage of revenue do behind-the-meter, marine and aerospace represent, now and going forward?Barry Haimes · Sage Asset Management
▸When in Q1 2027 does the data center contract start, and does the ramp over Q2–Q3 imply Q4 is the full run rate?Matthew Dhane · Tieton Capital Management
▸How is the data center pipeline trending, and which of the four buckets is largest?Matthew Dhane · Tieton Capital Management
▸Has the overall pipeline size grown versus 3–6 months ago?Matthew Dhane · Tieton Capital Management
SEC Filing Findings
SEC Filing — material findings
2026-11-04 · depth 9/10risk 6Liquidity/Covenants▸Revolver amendment requires a blocked cash collateral account of at least $5.0M and a 1.20x trailing-twelve-month fixed charge coverage test starting Q1 2027. Until two consecutive quarters of compliance, availability is limited to the collateral account balance (capped at $10.0M). Unrestricted cash was only $1.5M at quarter-end.
Revolver amendment requires a blocked cash collateral account of at least $5.0M and a 1.20x trailing-twelve-month fixed charge coverage test starting Q1 2027. Until two consecutive quarters of compliance, availability is limited to the collateral account balance (capped at $10.0M). Unrestricted cash was only $1.5M at quarter-end.
risk 6Liquidity/Covenants▸Galveston facility ($350-400M) has only about 16% of capacity contracted, and the 10-Q says no date is set for FID. Financing is expected to be nonrecourse and project-level, and $9.7M of capitalized costs would be assessed for impairment if financing is not probable.
Galveston facility ($350-400M) has only about 16% of capacity contracted, and the 10-Q says no date is set for FID. Financing is expected to be nonrecourse and project-level, and $9.7M of capitalized costs would be assessed for impairment if financing is not probable.
risk 6Hidden Liability▸Nine-month operating cash flow of $23.4M is driven by $25.0M of customer advance payments recorded as deferred revenue, most of which sits in restricted cash. Excluding this, operating cash flow would have been negative. The advances offset future invoices, so future cash receipts are reduced.
Nine-month operating cash flow of $23.4M is driven by $25.0M of customer advance payments recorded as deferred revenue, most of which sits in restricted cash. Excluding this, operating cash flow would have been negative. The advances offset future invoices, so future cash receipts are reduced.
Short Interest
Executive Compensation (2023.0-2025.0)
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| Tieton Capital Management, LLC | $950K | $4.13 | +$40K | +$950K | — | $348M |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $853K | $4.44 | +$36K | +$853K | — | $4.68T |
| BANK OF AMERICA CORP /DE/ | $558K | $5.32 | −$0 | −$174K | — | $1.54T |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $230K | $6.17 | +$39K | +$33K | — | $1.87T |
| SEI INVESTMENTS CO | $229K | $4.50 | −$229K | +$229K | — | $113.05B |
| Argent Trust Co | $213K | $5.00 | +$0 | +$0 | — | $3.46B |
| CITADEL ADVISORS LLC | $117K | $4.55 | +$61K | +$61K | — | $171.38B |
| Callahan Advisors, LLC | $99K | $3.85 | −$15K | −$15K | — | $1.33B |
| Sequoia Financial Advisors, LLC | $79K | $4.68 | +$8K | +$8K | — | $19.73B |
| DIMENSIONAL FUND ADVISORS LPPassive | $72K | $4.25 | −$4K | +$6K | — | $551.30B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2021 Q1 | 17M | 3M | 0M | $-0.02 | $-0.02 – $-0.02 | 1 |
| 2021 Q2 | 17M | 2M | -1M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2021 Q3 | 16M | 1M | -1M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2021 Q4 | 22M | 1M | -1M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2022 Q1 | 23M | 2M | -1M | $-0.10 | $-0.10 – $-0.10 | 1 |
| 2022 Q2 | 22M | 1M | -1M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2022 Q3 | 22M | 2M | -1M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2022 Q4 | 23M | — | 36M | $1.95 | $1.95 – $1.95 | 1 |
| 2023 Q2 | 27M | 2M | -0M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2023 Q4 | 16M | 0M | -1M | $-0.08 | $-0.08 – $-0.08 | 1 |
| 2024 Q2 | 17M | 2M | 0M | $0.01 | $0.01 – $0.01 | 1 |
| 2024 Q3 | 17M | 2M | 0M | $0.02 | $0.02 – $0.02 | 1 |
| 2024 Q4 | 18M | 2M | 0M | $0.03 | $0.03 – $0.03 | 1 |
| 2025 Q1 | 20M | 2M | 0M | $0.02 | $0.02 – $0.02 | 1 |
| 2025 Q2 | 18M | 2M | 0M | $0.01 | $0.01 – $0.01 | 1 |
| 2025 Q3 | 17M | 2M | 0M | $0.01 | $0.01 – $0.01 | 1 |
| 2025 Q4 | 13M | 1M | -1M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q1 | 12M | 1M | -1M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q2 | 11M | 0M | -1M | $-0.07 | $-0.07 – $-0.07 | 1 |
| 2026 Q3 | 15M | 2M | -0M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2026 Q4 | 17M | 2M | 1M | $0.03 | $0.03 – $0.03 | 1 |
| 2027 Q1 | 20M | 3M | 1M | $0.04 | $0.04 – $0.04 | 1 |
| 2027 Q2 | 22M | 4M | 2M | $0.10 | $0.10 – $0.10 | 1 |
| 2027 Q3 | 26M | 5M | 3M | $0.14 | $0.14 – $0.14 | 1 |
| 2027 Q4 | 26M | 6M | 3M | $0.17 | $0.17 – $0.17 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-09-09 | BUY | KUNTZ EDWARD L | director | 5,000 | $5.41 | $27K | $405K |
| 2026-05-13 | BUY | KUNTZ EDWARD L | director | 7,500 | $3.89 | $29K | $272K |
| 2026-05-12 | BUY | KUNTZ EDWARD L | director | 167 | $3.60 | $601 | $224K |
| 2026-05-12 | BUY | Puhala Andrew Lewis | officer: Chief Financial Officer | 2,000 | $3.68 | $7K | $157K |
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand
Thesis
Stabilis is a potentially valuable small-scale LNG platform at an unusually important transition point. The old marine and power contracts rolled off, driving revenue and EBITDA sharply lower, but the company has secured a large behind-the-meter data-center bridge-power contract and is seeing strong aerospace demand. If the data-center project performs, the largely established corporate cost base can create substantial operating leverage. The main issue is that the attractive future contract economics are not yet demonstrated in reported earnings. Current cash flow is distorted by customer prepayments, while the business has spent heavily on equipment and carries a costly bunkering-vessel commitment without a fully secured deployment. The delayed Galveston project, covenant history, customer concentration, and lack of long-term aerospace volume commitments make the range of outcomes exceptionally wide. The base case therefore assumes meaningful recovery but applies a restrained multiple and a discount to the mechanical scenario output.
Trade Signal
No trade, with a modest negative bias: the transformative data-center contract offers substantial upside, but at $5.61 the stock is already around or above the analyst's risk-adjusted value while current earnings and execution remain unproven.
The stock drifted lower from $5.65 in late February to roughly $3.5–$4.0 in March-April as investors reacted to the Galveston contract termination, weak Q1 results and the runoff of legacy contracts. It then recovered in several sharp legs: the February data-center contract and related growth narrative supported the initial case; Q2 data-center and aerospace expectations helped the June/July rebound; and the August 11 earnings release was followed by a move from $5.01 to $5.61 despite a 31% revenue decline and only $0.1 million of adjusted EBITDA. The recovery from the March panic was understandable, but the latest move looks overextended: the market has reacted more to forward contract potential than to demonstrated earnings. This is a modest overreaction/temporary dislocation toward the upside, not an extreme bubble, and could correct if Q3 margins or commissioning timing disappoint.
The visible market view is constructive: the only tracked analyst rates the stock Buy, the share price is near its 52-week high, and the stock has responded strongly to the data-center narrative. Retail participation is elevated at roughly 59% of off-exchange flow, suggesting attention is rising, while short interest is negligible rather than indicating a crowded bearish setup. Bulls focus on the executed two-year bridge-power contract, aerospace growth and fixed-cost leverage. Bears focus on the 31% Q2 revenue decline, negative current earnings, customer concentration, the lost Galveston anchor contract, vessel obligations and restricted cash. The prevailing view is optimistic about the future but may be stale about how little of that future has reached the income statement.
There is a genuine potential inflection when the data-center commissioning work ramps in late 2026 and the roughly $100 million annual bridge-power program begins in early 2027. However, the market is not unaware of it: the sole analyst already forecasts sequential EBITDA improvement from $1.6 million in Q3 2026 to roughly $2.2 million per quarter by late 2027, and the stock's recent rally appears to have capitalized part of the story. The study's $20 million-plus EBITDA outcomes require successful execution, high-teens margins and additional confidence in a concentrated contract base; that is plausible but not yet demonstrated.
- ▲2026-11 · Q3 2026 earnings and data-center commissioning ramp — August deliveries and the newly mobilized six-month commissioning contract should test management's claim that second-half revenue will rise more than 50% versus the first half; margin and cash conversion are key.
- ▲2027-02 · Q4 2026 earnings / first full second-half recovery — A meaningful EBITDA recovery would validate that the legacy-contract runoff was temporary rather than evidence of structurally weak economics.
- ▲2027-Q1 · Behind-the-meter data-center bridge-power project begins — The contracted project is scheduled to start in early 2027 and could materially change revenue and earnings expectations if equipment, financing and customer readiness remain on schedule.
- ▲H2 2026–H1 2027 · Additional data-center or aerospace contract awards — New take-or-pay or longer-term awards could improve visibility and reduce the market's concern about customer concentration and contract churn.
- •Late 2026–2027 · Galveston LNG project financing and FID decision — The Coast Guard milestone helps, but termination of the anchor supply agreement leaves financing and economics unresolved; an FID would be positive, while continued delay would reinforce the value haircut.
- ▼2026-12 · Annual debt-covenant test and liquidity review — The covenant waiver removes quarterly pressure but not the December test; weak execution or continued losses could renew financing concerns.
Flow is modestly positive but not a major driver. TTM dilution is reported at 0%, there is no meaningful short squeeze fuel with short interest at only 0.5% of float, and two insiders made small open-market purchases with no reported insider selling. There is no buyback, tender offer, index-flow catalyst or evident large-holder accumulation. Thin daily dollar volume and 126% annualized volatility make trading flow potentially unstable.
There is no hard floor near today's price. Liquidity is helped by customer advances and roughly $5 million of net debt, but much of the cash is restricted, the company has a $22.4 million vessel lease exposure, remains loss-making, and has covenant risk. The vessel and LNG assets may have value, but they do not provide a clean liquidation backstop. The principal support is the executed data-center contract and potential operating leverage, not tangible asset value. There is also no absolute ceiling, although the recent rally and unproven 2027 economics create meaningful valuation resistance above the current price.
Moderately buyable but not compelling at $5.61. The next buyers would be small-cap energy and data-center-power investors seeking operating leverage from the contracted 2027 bridge-power project, but the company is tiny, thinly traded, highly volatile, and still loss-making. Institutional sponsorship is limited and the investment case depends on execution that has not yet appeared in reported earnings.
Fear pulls slightly harder than greed at $5.61. The long-term data-center opportunity is real and potentially transformational, but the stock has already risen 48% in one month and 12% through the latest earnings print while current revenue fell 31%, EBITDA was nearly breakeven, and net loss widened. I would rather wait for proof of profitable ramping than pay today for the optimistic scenario.
Valuation
The genuinely new information is that the six-month data-center commissioning agreement has been executed and is being mobilized, with deliveries expected in August, while the 2027 bridge-power contract's customer advances reached $25M and fully funded the contractual advance requirement. Management also quantified second-half revenue as more than 50% above the first half. The weak Q2 results themselves were largely anticipated from the legacy-contract expirations.
▸ How the cases moved
Before the quarter, I would have assigned approximately 0.35 probability to a $18M bear outcome, 0.50 to a $135M base outcome, and 0.15 to a $280M bull outcome. The quarter raises the bear equity value to $15M but lowers its probability to 0.30 because the commissioning contract is executing and second-half activity is improving. Base value rises to $155M and probability to 0.50 as the 2027 project appears more operationally tangible. Bull value rises to $300M and probability to 0.20 because $25M of customer advances are fully received and mobilization has begun, although the weak Q2 margin prevents a larger upgrade.
The legacy-contract runoff persists, data-center commissioning is delayed or low-margin, aerospace growth does not convert into durable contracted volume, and Galveston remains stalled. EBITDA recovers only modestly to roughly $4M, with limited owner earnings after vessel and maintenance costs.
▸ Valuation
5x $4M EBITDA = $20M EV − $5M net debt = $15M equity
The executed commissioning project ramps in the second half of 2026 and the contracted bridge-power project begins in 2027, but execution is uneven and the business remains highly concentrated in a few customers. Revenue grows sharply from the depressed 2026 base, EBITDA reaches approximately $20M by 2028, and normalized owner earnings reaches about $12M as fixed costs are absorbed and capex intensity moderates.
▸ Valuation
8x $20M EBITDA = $160M EV − $5M net debt = $155M equity
The $100M-plus annual data-center bridge-power program executes on schedule, additional commissioning and bridge-power awards follow, aerospace continues growing, and the company achieves management's high-teens EBITDA-margin framework. Galveston is either financed or becomes an option rather than a cash drain; owner earnings reaches approximately $22M after the current investment cycle.
▸ Valuation
10x $30M EBITDA = $300M EV − $0M net debt = $300M equity
▸ Target Rationale
The probability-weighted discounted scenario value is $105.2M, but I set the analytical target at $90M. The haircut reflects weak current earnings, restricted rather than freely deployable cash, the $22.4M vessel lease exposure, covenant risk, customer concentration, and the fact that the headline data-center contract has not yet produced a full year of operating results. The target still gives substantial credit for the executed contract and operating leverage, but does not capitalize management's most optimistic pipeline claims or assume Galveston succeeds.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Termination of Galveston LNG Supply Agreement & Project Delay (March 2026): On March 31, 2026, Stabilis Solutions terminated its previously announced 10-year LNG supply agreement with a leading global marine operator. The contract had targeted the supply of roughly 50 million gallons of LNG per year (about 40% of planned capacity) to anchor the company's proposed 350,000 gallon-per-day Galveston liquefaction facility. The termination occurred because prospective project financing lenders requested contract modifications that the counterparty rejected. Consequently, Stabilis expects delays in securing project financing, reaching a final investment decision (FID), and the overall development timeline for the Galveston facility.
- First Quarter 2026 Financial Results (May 2026): Stabilis reported Q1 2026 revenues of $10.4 million, down 40.2% year-over-year. This drop was anticipated following the completion of two major long-term contracts late in 2025. Net loss widened to $4.1 million (compared to $1.6 million in Q1 2025), and Adjusted EBITDA fell to $(0.7) million. On a positive note, the aerospace segment saw 31% year-over-year revenue growth. Operating cash flow reached $12.4 million, bolstered by $15.0 million in upfront customer advance payments. The company held $13.7 million in cash (of which $10.6 million is restricted) and had $3.5 million in credit availability as of March 31, 2026.
▸ Thesis-test Findings
- Seaspan Garibaldi Vessel Charter Status: Following the termination of its Galveston marine bunkering contract, Stabilis revised its deployment plans for the *Seaspan Garibaldi*, a 7,500-cbm LNG bunkering vessel it originally chartered from Seaspan Energy in December 2025. In May 2026, company management announced that they expect to sub-charter the vessel during the second quarter of 2026. This pivot indicates that while the vessel cannot yet be utilized for its originally intended Galveston bunkering operations, Stabilis is actively seeking to sub-charter the asset to mitigate ongoing charter costs and maintain financial flexibility.
- Stabilis Solutions AmeriState Debt Covenant Waiver: Prior risk disclosures highlighted potential covenant compliance issues on the company's $7.2 million AmeriState Bank secured term loan facility. To address this risk, Stabilis amended the AmeriState Loan Agreement during the first quarter of 2026. The amendment clarifies that financial covenant compliance will be measured and calculated only on an annual basis (as of December 31 of each year) rather than quarterly. This renegotiation effectively defers the threat of an immediate intra-year covenant breach, providing the company with a wider operational runway.
- Small-Scale LNG Data Center Power Contract Execution: In February 2026, Stabilis executed a major multi-year, take-or-pay contract to supply LNG for behind-the-meter power generation at a U.S. data center. Valued at approximately $200 million over its initial 2-year term, deliveries are scheduled to commence in Q1 2027 and run through Q1 2029. During the Q1 2026 earnings call, management also highlighted that they are finalizing several other smaller, behind-the-meter data center power contracts, which they expect to commence as early as the second quarter of 2026. This supports the bull case surrounding on-site, utility-bypassing data center power generation.