Stocks/SLVR.TO

SLVR.TO

Silver Tiger Metals Inc.v3 5.0/10 · 2026-11-26
Basic Materials·Other Precious Metals
0.68 CAD
399M CAD market cap
v3 Rating
5.0/103.5–6.5
Setup
4.0/103.0–5.5
Fair Value
0.65 CAD0.35 CAD–1.10 CAD-4%
DCF (10%)
0.70 CAD+3%
Base IRR
+12%-35%–+50%
Visibility
wide±58%
Rating
Revenue (TTM)
0.0M CAD
Owner Earnings
-C$8M
Next-Yr Owner Earnings
-C$135M
Growth
+5.0% × 5y
P / Next-Yr OE
--
Net Debt
-C$165M

Silver Tiger Metals Inc. specializes in the prospecting and assessment of mineral resources across Mexico, focusing on discovering deposits of gold, silver, copper, lead, and zinc. A primary asset is its complete ownership of the El Tigre property, an expansive site in Sonora, Mexico, which spans roughly 28,414 hectares and is made up of 59 Mexican federal mining concessions. The company, which was established in 2010 and operates from its headquarters in Halifax, Canada, previously traded as Oceanus Resources Corporation until it officially adopted the name Silver Tiger Metals Inc. in May 2020.

2-Year Price History

$0.58-23.7%
$0.60$0.70$0.80$0.90$1.0$1.1Initial target $0.65 · 2026-11-26volJun 26Jul 26Aug 26Aug 26Sep 26Oct 26Oct 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.03.5–6.5
Setup
4.03.0–5.5
Fair value (CAD)
0.650.35 – 1.10
Upside vs 0.68
-4%
DCF (10%)
0.700.30 – 1.30+3%
Base IRR
12%-35% – 50%
Visibility
widerange ±58%
Sentiment
3/10
Flow
4/10
2026-11-26 · claude-opus-5-5 · priced at 0.58

Silver Tiger is building the El Tigre Stockwork heap leach in Sonora, Mexico. It is a low-grade (0.40 g/t Au, 14.9 g/t Ag) mine whose value is ~80% gold, has a ~9-year life and targets first pour in December 2027. The build is funded on paper: ~US$120M of cash, no debt, against US$100M of US$124M capex still to spend. The stock (C$0.58, close 2026-11-25) has halved since September as gold fell ~32% from its January record to a 14-month low near US$3,760. On top of that, capex overran 42% and two 2026 raises (C$1.17 in February, C$1.00 in October) went underwater in tax-loss season. The pitch's ~C$0.86 DCF held only at spot metals. The test showed the market is not confused, it is pricing gold. At the PFS deck of US$3,200 Au the DCF equals the price. Funding is thin on a cost-plus build where most of the earthworks is not yet contracted. The starter pit carries the poor-recovery ore. Mexico and Sonora security justify the usual ~0.5x-NPV discount. Rerun at a mid-path of ~US$3,500 Au / US$42 Ag with a ramp-and-overrun haircut, the DCF is ~C$0.70 and fair value C$0.65, only ~12% above the price. The stock is effectively a 2-3x leveraged gold call with no dated test before December 2027. Rating 5.0: fairly priced, a hold or pass, unless you want gold beta, in which case it is a reasonable funded vehicle. Setup 4.0: tax-loss selling into mid-December is the only mechanical edge.

Flow: The October 13, 2026 C$100M deal (~100M shares, ~15% of the count, at C$1.00 with ~50M warrants at C$1.35) and the February 2026 C$1.17 deal are both underwater during Canadian tax-loss season, so selling should run through mid-December 2026 and then ease. There is no buyback. With a ~US$20M cushion on a cost-plus build, another raise in 2027 is a real possibility.

A deep dive would have to establish: Will gold hold above ~US$3,500 through first pour in December 2027 while El Tigre is built inside the US$124M budget?

Owner earnings, TTM
-C$8M-C$12M – -C$5M
Realistic peak profit
C$90MC$50M – C$140M
Growth rate
5.0%0.0% – 15.0%
Years of growth
53 – 8
Market cap
C$383MC$370M – C$400M
EV
C$218MC$190M – C$260M
Net debt
-C$165M-C$175M – -C$140M
Capital return / cap
0.0%0.0% – 2.0%
P/E
6.0×3.0× – 15.0×
EV/EBITDA
1.8×1.2× – 5.0×
FCF yield
23.0%8.0% – 37.0%
Projected FCF, base case (CAD millions)
Y1-C$135M-C$185M – -C$105M
Y2C$40M-C$10M – C$95M
Y3C$65MC$15M – C$120M
Y4C$90MC$35M – C$145M
Y5C$85MC$30M – C$140M
Competition: A price-taker in gold and silver; it competes only for capital with other Mexican developers, on low capex and AISC near US$1,240/oz AuEq.
Governance: Capex overran 42% within months of calling the build funded. The EPCM is cost-plus with the civil and structural contractors not yet selected, and the share count rose 81% in 18 months.
Research (expand)

What it is. Silver Tiger (TSX: SLVR, OTCQX: SLVTF) owns 100% of El Tigre, a historic silver-gold district in Sonora. It is building a small open-pit heap leach on the Stockwork Zone. The board approved construction on March 18, 2026, KCA is the EPCM contractor under a cost-plus contract, and first doré is targeted for December 2027. The mine is designed to mine 40.3 Mt at 0.40 g/t Au and 14.9 g/t Ag, through 7,500 t/d in years 1-3 and 15,000 t/d after a US$20M expansion, recovering 408 koz Au and 8.6 Moz Ag over ~9 production years (gold is ~80% of revenue). AISC is ~US$1,240/oz AuEq. A separate underground PEA (NPV5 US$304M at US$38/US$3,200, US$83.5M capex) is the follow-on option.

What the market believes. At ~0.5x the PFS NPV, the market prices a gold mean-reversion, the usual Mexican single-asset discount, and some ramp-up and overrun risk. The fall since September is mostly gold beta, roughly 2-3x the metal, plus underwater 2026 deal holders selling into tax-loss season.

Earnings today. None. G&A is ~C$8M a year (half of it SBC). Cash was C$108.6M at June 30, 2026, plus ~C$95M net from the October deal, which gives ~US$120M now against US$100M of remaining capex. There is no debt. Shares went from 365M (Mar 2025) to ~660M (Oct 2026), with 22.8M options at C$0.40 and ~50M warrants at C$1.35.

FCF projection (C$M, unlevered). Uses ~US$3,500 Au and US$42 Ag, opex inflated ~15% over the PFS, Mexican tax and duties, and a slower ramp with some extra capex: Y1 −135 (build), Y2 +40 (ramp, starter-pit transition ore), Y3 +65 (after the US$20M expansion), Y4 +90, Y5 +85. Steady state is ~C$85-90M a year; at spot it is ~C$105M, and at US$3,200 ~C$75M.

What it is in year 5. A depleting single mine with an underground option, a cigar butt. Year-5 value is ~5 more years of Stockwork cash (≈C$320M) plus a risked underground (≈C$100M). Confidence is low: the value moves ~2x gold.

Fair value. Discounting at 10% gives an EV of ≈C$335M; add ~C$165M cash and deduct ~C$40M of G&A for ≈C$460M of equity, ~C$0.70/share (range C$0.30-1.30). At US$3,200 gold it falls to ~C$0.58, the price. Fair value is C$0.65 after jurisdiction risk. At the price, the multiple is ~1.8x steady-state EBITDA and the forward FCF yield is ~23%, normal for a pre-production Mexican developer.

Management and risks. CEO Glenn Jessome has delivered permits and funding, but the team called the build funded at US$87M in February and needed C$100M more by October. The risks are gold, recoveries in the starter-pit transition and sulphide ore, a cost-plus EPCM with platforms only 14-23% done, Mexico (no new concessions, higher mining duties, the open-pit ban debate), and Sonora security (a doré robbery at Los Mulatos in February 2026). There is no competitive moat: it is a price-taker.

Sentiment 3/10. It is hated: down 50% since September, both 2026 deals underwater, gold at a 14-month low, and tax-loss season.

Thesis test

  • 1. Gold, not confusion (challenger right). The pitch's upside existed only at spot. At the company's own US$3,200 deck the DCF equals the price, and gold is trending down. The base case is moved to a mid-path, which cuts the DCF from C$0.86 to ~C$0.70.
  • 2. Thin funding, overrun record, dilution (challenger right). The cost-plus EPCM, the uncontracted earthworks, the ~20% cushion and +81% shares in 18 months are all confirmed in the June FS and the October releases. The Y1 downside is widened, and the odds of another raise are real.
  • 3. Ramp and recoveries (challenger partly right). Starter-pit transition and sulphide ore at 56% Au recovery is in the PFS, so a slower ramp is reasonable. Cash is shifted ~C$40M later. But the metallurgy work is PFS-grade and the problem is not fatal.
  • 4. Mexico and Sonora (challenger right on the multiple). It makes a re-rate to 0.7-0.8x NPV unlikely. The permits are in hand, so this is a discount, not a kill.
  • 5. No catalyst, negative flow (challenger right). Nothing proves the thesis before December 2027, and the C$1.35 warrants cap a rebound.
  • Pitch held on. The balance sheet, the share count, the absence of debt and clean related parties all checked out. The mine's economics at spot are, if anything, conservative.
  • Conclusion. A funded, cheap-on-spot developer that is fairly priced on a sober gold deck. Rating 5.0: a pass unless you want leveraged gold exposure, and then only as a small position after tax-loss season.

Financials — Adjusted

Adjusted · TTM 2027-Q2 · CAD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue0.000.000.000.000.00
Gross profit-0.00-0.00-0.00-0.00-0.00
Operating expenses8.07+73%6.03+21%4.98+29%3.87-7%4.15
▸Adj EBITDA-8.07-6.03-4.98-3.87-2.38
▸Adj OCF-3.14-4.13-4.21-3.20-3.68
CapEx-52.6-13.5-8.47-20.0-19.8
Adj FCF-55.7-17.6-12.7-23.2-23.5
Interest expense0.000.000.000.000.00
▸Adj net income-6.20-5.19-4.15-3.09-3.62
▸Owner's earnings-18.0--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026 +2027YTD

Where the Cash WentTotal2027YTD2026202520242023
▸Claimed: EBITDA-22.3-3.95-5.85-4.50-3.87-4.15
FCF (OCF−capex)-115-42.9-17.4-11.3-21.6-21.9
Net income-19.2-2.89-5.23-4.25-3.16-3.68
▸Capital returned-52.6-0.06-1330.00-0.0980.7
Buybacks-52.6-0.06-1330.00-0.0980.7
Dividends0.000.000.000.000.000.00
Interest paid0.000.000.000.000.000.00
Debt paid down0.000.000.000.000.000.00
▸Reinvestment10441.913.58.4720.019.8
Capex (PP&E)10441.913.58.4720.019.8
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)------------
Retained / other-62.6-42.8116-11.3-21.6-103

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 5.5 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)21420980.884.387.0
▸Liabilities (total)7.211.231.051.512.84
Net debt (incl. leases)-74.2-117-3.19-9.22-29.8
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest----------
Shares outstanding659558365365364
Dilution (YoY)+37.8%+53.0%+0.0%+0.1%+35.0%
Employees3.00--------
MarginsTTM2026202520242023
Gross margin----------
Adj EBITDA margin----------
Adj OCF margin----------
Adj FCF margin----------
Net income margin----------
Adj NI margin----------
ROIC (adj, after-tax)-3.1%-2.3%-4.9%-3.7%-3.9%
Cost of debt----------

Institutional Ownership

note: probably the least-tested part of this site, take with a grain of salt
Holder behavior (holder profile)source: holder
On big dips (−10%+)
-8.9%
how holders react when this stock falls
On quiet Qs
-1.6%
−10% to +10% baseline
On rallies (+10%+)
+0.7%
how they react when this stock rises
Holders' portfolio flow this Q
+1.6%
inflows — adds are organic
Sellers' portfolio flow this Q
+0.0%
Sellers' overall flow ~ flat.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

03K6K8K11K2022-062022-122023-062023-122024-03
hover the chart for per-quarter detailprice (right axis)
Williams Jones Wealth Management, LLC.11K
v2 analysis (legacy, 2026-07-05) — for comparison onlyclick to expand

Thesis

Silver Tiger Metals has crossed the line from explorer to developer at its 100%-owned El Tigre project in Sonora, Mexico. Over the past six months it delivered a PEA for underground expansion and an updated PFS for the Stockwork zone (15-year mine life), raised C$57.5M, took a formal construction decision on the surface heap-leach operation, awarded an EPCM contract to Kappes Cassidy, graduated to the TSX main board, and began earthworks with first doré targeted December 2027. The heap-leach phase reportedly carries a 92% IRR and low capital intensity, and the company says it is fully funded through initial construction — a genuine de-risking milestone for a junior. The underground/Stockwork ore body offers a second, larger growth leg that will require additional capital. Currently pre-revenue, burning cash on capex and G&A, with $117M cash and no debt on the balance sheet after the raise, so near-term solvency is not a concern; the key risks over the next two years are construction execution, cost inflation, and Mexican permitting/political risk for a foreign operator, plus further dilution to fund the underground phase.

Valuation

Our Target
420M CAD+5%
Market Should Pay
399M CAD+0%
target ×0.95 (fear discount)
Current Market Cap
399M CADSlightly bearish
2-Year Plausible Outcomes
bear25%
220M CAD
rev 0%/yrOE $-22M

Construction hits cost overruns and permitting friction typical of first-mover foreign miners in Mexico; first pour slips well past Dec-2027 and additional dilutive financing is needed before any cash flow materializes. Market discounts the project NAV heavily for execution/jurisdiction risk and dilution overhang.

▸ Valuation

Discounted project NAV ~$500M x 0.4x for delay/dilution risk = $200M EV, net cash ~+$20M (spent down) = $220M equity value

base50%
500M CAD
rev 0%/yrOE $30M

Construction proceeds roughly on plan with modest slippage; heap-leach operation reaches commissioning around late 2027/early 2028, ramping toward the first full production year. Market re-rates the stock from developer to near-producer, applying a moderate P/NAV multiple to a project NAV built on PEA/PFS economics, with underground optionality still only partially priced.

▸ Valuation

Project NAV ~$750M x 0.65x P/NAV (near-producer) = $488M, plus residual net cash ~$12M = $500M equity value

bull25%
950M CAD
rev 0%/yrOE $60M

Construction stays on/ahead of schedule, first pour achieved on time, and exploration on the northern veins confirms a materially larger underground resource (management flags potential to double it). Market fully re-rates to a producer multiple on an expanded NAV, rewarding the low-capex, high-IRR heap-leach economics.

▸ Valuation

Expanded project NAV ~$1,100M x 0.9x P/NAV = $990M equity value (net cash roughly offset by underground development capex)

▸ Target Rationale

Model math is close to fair, but I trim slightly below it to reflect the track record of heavy shareholder dilution (53% share count growth YoY) and the elevated execution risk inherent in a multi-year Mexican construction project with a long lead to first cash flow (Dec-2027 target). The fully-funded status for the initial heap-leach build is a real positive that keeps the discount modest rather than severe.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now5/10
Trajectory8/10
Risk6/10
Governance5/10
Insolvency prob (2yr)6%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-07-06

Company news

Silver Tiger Metals transitioned from an explorer to a developer in early 2026, reaching several material milestones for its El Tigre project in Sonora, Mexico. In January, the company released a Preliminary Economic Assessment (PEA) for an underground expansion alongside an updated Pre-Feasibility Study (PFS) for the Stockwork Zone, outlining a potential 15-year mine life {Link: 1.1.4, 1.1.8}. Following a successful C$57.5 million financing in February, the Board of Directors approved a formal construction decision in March 2026 {Link: 1.5.2, 1.5.6}. By June 2026, the company reported that earthworks were underway, a 50-person camp was operational, and an EPCM contract was awarded to Kappes, Cassidy & Associates, with the first doré pour targeted for December 2027 {Link: 1.5.1, 1.5.3}. Additionally, the company graduated to the main Toronto Stock Exchange in May 2026 {Link: 1.5.8}.

Thesis findings

The bull case centers on the project’s high-margin economics and low capital intensity. The surface heap leach operation features an exceptionally high internal rate of return (IRR) of 92%, while the separate underground ore body allows for concurrent mining without surface interference {Link: 1.5.1, 1.5.7}. The company is currently fully funded for the initial build, significantly de-risking the path to production {Link: 1.5.2}. Exploration results from northern veins suggest substantial resource expansion potential that could double the underground resource base {Link: 1.5.1}. Conversely, the bear case is rooted in jurisdictional and execution risks. While Silver Tiger secured the first Mexican construction permit for a foreign firm since 2019, the region's regulatory history remains a concern for some investors {Link: 1.5.1}. Furthermore, the long lead time to first production (late 2027) exposes the project to inflationary pressures and potential construction delays {Link: 1.5.3}.

Market opinion (price-aware)

The prevailing market sentiment is highly bullish, with a consensus narrative that the stock remains deeply undervalued relative to its project NPV. Analysts at Stifel Canada and Desjardins maintained "Buy" ratings following the January PEA, with an average 12-month price target of $1.79 CAD—representing significant upside from the current trading price of approximately $0.59 CAD {Link: 1.3.2, 1.4.9}. Retail sentiment on Reddit and X is similarly positive; investors often cite the "2x to 5x upside" potential if the stock re-rates to match its combined project NPV of over $760 million USD {Link: 1.4.2, 1.4.5}. Recent price action saw a 16% surge in mid-June 2026, driven by a broader rotation into silver developers amid rising metal prices {Link: 1.4.4, 1.3.9}. While some bears point to the "funding gap" common in junior miners, the company's $120 million CAD cash balance has largely neutralized the dilution argument for the near term {Link: 1.5.2}.