SM.V
Sierra Madre Gold and Silver Ltd.v3 4.0/10 · 2026-11-26Sierra Madre Gold and Silver Ltd. operates as a mineral exploration firm primarily focused on identifying, acquiring, and advancing potential resource sites. The company's holdings include the Tepic silver-gold property, an asset comprising five mining concessions spanning 2,612.5 hectares, situated southeast of the city of Tepic in Nayarit. Additionally, it possesses the La Tigra gold-silver property, which encompasses seven mining concessions across 357 hectares, also located within Mexico's Nayarit State. Sierra Madre Gold and Silver Ltd.'s corporate headquarters are in West Vancouver, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
Sierra Madre is a single-mill Mexican silver-gold producer (La Guitarra, Mexico State, bought from First Majestic in 2023) that is ramping its plant from ~550 to 750-800 tpd now and 1,200-1,500 tpd by Q3 2027, and in mid-2026 bought First Majestic's idle Del Toro mine (US$20M cash + 10.87M shares + US$10M deferred + US$20M contingent) funded by a C$57.5M placement at C$1.30. The stock (C$1.02 at the 2026-11-25 close, the latest I found; ~252M shares, ~C$257M market cap) has fallen 58% from its C$2.40 peak as silver dropped from the low $60s realized in Q3 to ~$49. The bull case is operating leverage: unit costs should fall as throughput nearly triples, Del Toro could restart in 2028, and exploration (East District assays Q1 2027) is free optionality. But at spot metals Q3's AISC of US$52.84/AgEq oz is above the current silver price, the Q3 quarter lost US$3.6M (US$2.6M of it SBC), cash fell from US$22.2M to US$18.5M with phase-2 capex and a US$10M deferred payment still ahead, and the grade is slipping. My DCF at ~US$50-55 silver gives about C$0.75/share (wide: C$0.40-1.40); the price already pays for a good part of the expansion and Del Toro. Rating 4.0: a silver-price bet at a fair-to-full price, not a mispricing; setup 3.5, with nothing the market is clearly getting wrong and placement plus First Majestic lock-up supply overhanging.
Flow: First Majestic holds ~24.8% (62.4M shares), released from lock-up in 25% tranches from December 2026 to June 2028. The 44.2M placement shares from June 2026 (~18% of the stock, bought at C$1.30, now underwater) are free-trading, and the US$10M deferred Del Toro payment (due by ~Dec 2027) may be paid in shares (~5-6% at today's price). There are no buybacks.
A deep dive would have to establish: Can La Guitarra at 1,200-1,500 tpd bring AISC below ~US$38/AgEq oz so that the mine makes real free cash flow at a sub-$50 silver price, before Del Toro's restart needs another raise?
Research (expand)
What it does. Sierra Madre owns the La Guitarra silver-gold mine and mill in Temascaltepec, Mexico State (restarted 2025), the Del Toro mine and plant in Zacatecas (idle since 2019, acquired June 2026), and the Tepic and La Tigra exploration properties in Nayarit. There is no earnings call on disk; this works from the Q3 2026 release and deal news.
Q3 2026 (US$). Mill 50,795 t (+32% y/y), 89,145 oz silver and 906 oz gold (159,141 AgEq). Net revenue $8.58M, gross profit $1.54M, net loss $3.6M including $2.57M SBC. Cash cost $41.73 and AISC $52.84 per AgEq oz against a realized $62.96. Nine-month operating cash flow was roughly zero (-$0.04M). Cash was $18.5M, the First Majestic loan has been repaid, and US$10M of Del Toro consideration is due within 18 months of closing. Grade fell to 63 gpt Ag (from 71) and recoveries to 74% Ag and 68% Au.
What the market believes. It is a high-beta silver junior. It ran from C$0.45 to C$2.40 with silver and has given back most of it as silver fell to ~$49 and gold to ~$3,900. At spot metals, the current operation earns about zero after SBC and G&A.
The bull case. Phase 1 (751 tpd average in October) and phase 2 (1,200-1,500 tpd, Q3 2027) roughly triple throughput over a largely fixed cost base. If cost per tonne falls from $105 toward $70-80 at ~1.45M AgEq oz/yr, AISC drops into the $35-40 range. Del Toro is a permitted, past-producing plant with a ~US$10M restart budget and first production targeted for mid-2028. Exploration in the East District and at Del Toro is extra.
Owner earnings today. About C$-5M/yr unlevered at spot metals (Q3 run-rate EBITDA of ~US$1M/quarter at $63 silver turns negative at $49, and SBC is a real cost).
Projected FCF (C$M, mid): 2027 -12 (phase 2, dry-stack filter plant, ramp), 2028 +5, 2029 +14 (La Guitarra at scale, Del Toro starting), 2030 +25, 2031 +32. In year 5 it is neither a grower nor a corpse: a small two-mine Mexican producer with short reserves, exposed to Mexican tax plus the 7.5% mining royalty and to the silver price. It deserves ~7x FCF, not a quality multiple. Confidence is low: every US$5/oz move in silver shifts steady-state FCF by ~C$10M.
Valuation. PV of the FCF is ~C$21M; the terminal value (7x C$32M) is ~C$139M in today's money; net cash after the deferred payment is ~C$12M. That gives ~C$190M, or C$0.75/share against C$1.02. EV is ~C$245M, about 16x 2027 EBITDA and ~10x a hoped-for 2030 FCF. At $60+ silver the DCF reaches ~C$1.30-1.40.
Management, risks and competition. Alex Langer's team bought two First Majestic castoffs cheaply and is executing the ramp on schedule. Risks: a dilutive culture (C$57.5M raise at C$1.30, heavy option grants, the deferred payment can be settled in shares), Mexican permitting and security, falling grade, dry-stack tailings construction, and the Del Toro capex likely being understated. It competes for capital with dozens of Mexican silver juniors; there is no moat beyond owning permitted mills.
Sentiment: 3/10. The stock is near its 1-year low (C$0.92-3.09 range), placement buyers at C$1.30 are underwater, and silver sentiment has turned with a hawkish Fed.
- https://www.miningstockeducation.com/2026/11/sierra-madre-reports-q3-2026-financial-results-with-record-mill-throughput-and-silver-production-la-guitarra-phase-1-expansion-throughput-achieved/
- https://www.barchart.com/story/news/2579083/sierra-madre-and-first-majestic-announce-closing-of-acquisition-of-the-del-toro-silver-mine-for-up-to-us60m
- https://www.theassay.com/news/financing/sierra-madre-announces-closing-of-second-tranche-of-its-c57-5m-offering/
- https://mexicobusiness.news/mining/news/sierra-madre-finalizes-del-toro-silver-mine-acquisition-0
- https://www.mining.com/joint-venture/pdac-video-sierra-madre-eyes-quicker-del-toro-restart/
- https://tradingeconomics.com/commodity/silver/news/601262
- https://www.newsfilecorp.com/release/274428?lang=fr
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 32.6+95% | 24.2+273% | 6.47 | 0.00 | 0.00 |
| Gross profit | 10.1+161% | 7.96+514% | 1.30 | -0.70 | -0.26 |
| Operating expenses | 9.83+193% | 4.35-15% | 5.09-42% | 8.79 | -1.35 |
| ▸Adj EBITDA | 2.24+23% | 5.33 | -3.40 | -9.47-861% | 1.24 |
| ▸Adj OCF | 2.59+215% | 3.31 | -3.12 | -6.92 | -3.45 |
| CapEx | -14.6 | -4.55 | -3.72 | -3.23 | -0.12 |
| Adj FCF | -12.0 | -1.24 | -6.84 | -10.1 | -3.57 |
| Interest expense | 0.55 | 0.84 | 0.37 | 0.13 | 0.42 |
| ▸Adj net income | 4.50 | 8.60 | -4.43 | -89.4 | 3.56 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -54.8 | -0.89 | 5.29100% | -3.34 | -53.5 | -2.42 |
| FCF (OCF−capex) | -30.5 | -9.46 | -1.04-20% | -7.44 | -10.4 | -2.16 |
| Net income | -56.0 | -3.30 | 8.25156% | -4.17 | -54.0 | -2.81 |
| ▸Capital returned | -41.0 | -8.05 | -15.1-286% | -0.74 | -14.6 | -2.48 |
| Buybacks | -41.3 | -10.7 | -16.0 | -1.12 | -13.5 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 1.88 | 0.13 | 0.84 | 0.37 | 0.13 | 0.42 |
| Debt paid down | -1.63 | 2.49 | 0.00 | 0.01 | -1.21 | -2.91 |
| ▸Reinvestment | 21.4 | 10.8 | 4.5586% | 3.72 | 2.13 | 0.18 |
| Capex (PP&E) | 22.4 | 10.8 | 4.55 | 3.72 | 3.23 | 0.12 |
| Intangibles & M&A | -1.04 | 0.00 | 0.00 | 0.00 | -1.10 | 0.06 |
| Leases signed (net Δ) | -- | -- | -- | -- | -- | -- |
| Retained / other | 13.5 | -1.27 | 14.9282% | -6.33 | 5.44 | 0.69 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 2.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 135 | 66.8 | 34.9 | 40.4 | 38.1 |
| ▸Liabilities (total) | 25.4 | 18.0 | 9.94 | 5.01 | 16.8 |
| Net debt (incl. leases) | -18.3 | -11.9 | 4.93 | -2.53 | 13.0 |
| Net debt / Adj EBITDA | -8.20 | -2.24 | -- | -- | 10.4 |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | 4.10 | 6.38 | -9.25 | -73.8 | 2.95 |
| Shares outstanding | 197 | 198 | 154 | 124 | 64.0 |
| Dilution (YoY) | +66.8% | +28.7% | +23.8% | +94.3% | -0.1% |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 31.1%+7.8 | 33.0%+12.9 | 20.1% | -- | -- |
| Adj EBITDA margin | 6.9%-4.0 | 22.1%+74.5 | -52.5% | -- | -- |
| Adj OCF margin | 8.0%+3.0 | 13.7%+61.9 | -48.2% | -- | -- |
| Adj FCF margin | -36.9%-32.0 | -5.1%+100.5 | -105.6% | -- | -- |
| Net income margin | 13.3%+15.6 | 34.1%+98.5 | -64.4% | -- | -- |
| Adj NI margin | 13.8%+16.6 | 35.6%+104.0 | -68.4% | -- | -- |
| ROIC (adj, after-tax) | 0.3% | 6.7% | -9.9% | -21.2% | 3.0% |
| Cost of debt | -- | 15.6% | 9.3% | -- | 8.8% |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2024 Q3 | 2M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2025 Q3 | 6M | 5M | 4M | $0.02 | $0.02 – $0.02 | 1 |
| 2025 Q4 | 8M | 5M | 4M | $0.02 | $0.02 – $0.02 | 1 |
| 2026 Q1 | 10M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2026 Q2 | 8M | — | 10M | $0.04 | $0.04 – $0.04 | 1 |
| 2026 Q3 | 9M | 6M | 5M | $0.02 | $0.02 – $0.02 | 1 |
| 2026 Q4 | 9M | 10M | 8M | $0.03 | $0.03 – $0.03 | 1 |