Stanmore Resources Limitedv3 3.5/10 · 2026-11-18Stanmore Resources Limited, based in Brisbane, Australia, is actively engaged in the full spectrum of metallurgical coal operations across Australia, from exploration and development to production and sales. The company's portfolio includes various projects within Queensland's Bowen and Surat basins, such as Isaac Plains, Isaac Downs, Isaac South, Clifford, The Range, Mackenzie, Belview, Tennyson, and Lilyvale. It also possesses a 50% interest in the Millennium and Mavis Downs mines, situated near Moranbah, Queensland, and exports its products globally. Established in 2008, the firm was previously known as Stanmore Coal Limited before adopting its current name in May 2021. Stanmore Resources Limited operates as a subsidiary of Golden Investments (Australia) Pte. Ltd.
2-Year Price History
Valuation v3 Opus worker · 2026-11-18
Stanmore is a mid-tier Bowen Basin met coal miner (South Walker Creek, Poitrel, Isaac Plains; ~13 Mt/yr, about 70% PCI). It reports in USD and trades on the ASX at A$2.46 (last close in the pack, 16 Nov 2026; I found no fresher dated quote). Management's bull case is straightforward: record Q3 at South Walker Creek, net debt down to US$19m, a refinance that removes US$70m/yr of amortisation, a cheap US$105m Moranbah South deal sitting next to Eagle Downs, and a restored 2.2 USc dividend. On EBITDA the stock looks cheap, at about 4x EV/EBITDA. The headline hides the leases. The mining fleet is leased, and principal repayments ran at US$204m in FY25 and about US$90m in 1H26. Those payments sit below EBITDA and are a real ongoing cost of keeping the trucks running. FY25 cash from operations was US$381m. After US$110m of capex and US$204m of lease principal, about US$67m was left, and that included a US$43m tax refund. At realised prices of about US$155/t (PHCC around US$245 long run), my unlevered owner FCF is US$100-130m a year. A dip follows in 2028-29 as Isaac Plains runs out and Isaac Downs Extension capex lands. The base DCF (10%, 8x terminal FCF for a flat, finite-life cyclical miner) gives about A$1.45/share. Fair value is about A$1.70 once Eagle Downs, Moranbah South and Lancewood are counted as options. The price of A$2.46 needs roughly today's spot deck (realised about US$165/t) to hold for good. Each US$10/t moves EBITDA by about US$110-130m, so the range is very wide. Rating 3.5: expensive on owner cash flow, but not a short I would hold. GEAR (Indonesian) controls the register, coal is volatile, and there is no catalyst. Setup 2.5: the leases are the variant point, but sell-side coal analysts know about them, and there is no dated event that settles it.
Flow: No buyback and no issuance. GEAR holds about two-thirds of the shares and has shown no sign of selling, so the float is thin. A small 2.2 USc (about US$20m, about 0.9% yield) interim dividend is being paid in Q4 2026, and the next final dividend decision is due with FY26 results in late February 2027. The US$100m Moranbah South completion payment in Q4 2026 is funded from cash, not equity.
A deep dive would have to establish: Will Stanmore's realised price hold near US$165/t (PHCC about US$265) for years? The equity is worth about the current price only if it does, since fleet lease payments of about US$170m a year absorb most of the EBITDA at mid-cycle prices.
Research (expand)
What it does. Stanmore mines and sells seaborne metallurgical coal (PCI about 70%, coking 22%, thermal 6%) from South Walker Creek, Poitrel and the Isaac Plains Complex in Queensland. South Walker Creek and Poitrel were the 80% of BMC that GEAR/Stanmore bought from BHP in 2022. 2026 guidance is 12.8-13.4 Mt saleable, tracking to the top end, at an FOB cost of US$98-103/t. Development options are the Isaac Downs Extension (best-case approval end-2027 plus about 12 months to build), Eagle Downs (longwall, 30-36 months from FID) and Lancewood, with Moranbah South (724 Mt M&I, premium HCC) due to complete in Q4 2026 for US$105m.
What the market believes. It treats Stanmore as a cheap, de-levered coal producer that benefits from tight supply (China safety curbs, Russian disruption, Australian decline) and Indian demand growth. At A$2.46 x 901m shares the market cap is A$2.22bn (about US$1.53bn). Pro-forma net debt after the Moranbah South payment and the dividend is about US$90m. FY26E EBITDA is about US$410m, so EV/EBITDA is about 4x excluding leases and about 4.7x including them.
What I think it misses. EBITDA is not the cash. Lease principal (fleet) was US$182m in FY24, US$204m in FY25 and about US$90m in 1H26. D&A of US$400m (including the BHP-deal step-up) drives statutory losses: -US$47m in FY25 and -US$44m in 1H26. FY25 cash from operations of US$381m (with a US$43m tax refund), less US$110m capex and US$204m leases, left about US$67m. 1H26 free cash flow on the company's own definition (after capex and leases) was US$47m at US$153/t.
Owner earnings today. FY26E EBITDA of about US$420m, less leases of about US$170m, sustaining capex of about US$85m and tax of about US$30m, leaves about US$135m (about A$195m). That is about 11-12x EV for a cyclical, finite-life miner.
Five-year FCF (unlevered, US$m, realised price US$155/t flat, cost about US$100/t). 2027: 120. 2028: 45. 2029: 45. The 2028-29 dip is Isaac Plains winding down plus Isaac Downs Extension capex. 2030: 130. 2031: 130. Each US$10/t changes annual FCF by about US$90m after tax.
Year 5. Neither a star nor a corpse: a flat, price-taking miner. Poitrel needs Eagle Downs or Moranbah South (US$1bn+ of capex) to replace it in the 2030s. Terminal value is 8x FCF.
Fair value. The DCF gives about US$1.00/share, or A$1.45. Development options add A$0.25-0.40. Rehab provisions (about US$180m) are a modest offset. Fair value is about A$1.70. The current price needs realised prices of about US$165/t (PHCC around US$265) to last forever. Spot PHCC (about US$263 on 6 Nov) is already backwardated and softening.
Management and governance. CEO Matos (ex-Vale) runs operations well. Costs, safety and guidance delivery have been good, and the refinance and stamp-duty win were sensible. The dividend policy (50% of FCF after debt service) is real, but the board skipped the 1H25 interim and first skipped the 1H26 interim, then declared it after the Q3 result. GEAR (Golden Energy and Resources, Indonesian, Sinar Mas-linked) controls about two-thirds of the shares, so the float is thin and minority returns depend on GEAR's cash needs.
Risks and competition. Price taker against BMA, Anglo/Dhilmar, Peabody, Whitehaven and Russian and Mongolian supply. Queensland's punitive progressive royalties (20-30% tiers above A$175/t) cap the upside. Diesel and a stronger AUD are pushing costs up. Weather. Approvals for the Isaac Downs Extension and Eagle Downs. Upside risk to a short: a supply shock that lifts PLV above US$300.
Sentiment: 4/10. The stock is mid-range (1-yr range A$1.97-3.10) after a 28% 1-year gain, on thin sell-side coverage and ESG exclusion.
- https://app-sns-ws-p-ae-01.azurewebsites.net/wp-content/uploads/2026/02/2025-SMR-ASX-Appendix-4E-and-FS.pdf
- https://announcements.asx.com.au/asxpdf/20260824/pdf/07332gc4t1wydz.pdf
- /Users/gregwo/stocks2/data/analysisv3/context/SMR.AX.md (2026Q3 quarterly call transcript, 26 Oct 2026)
- https://www.fool.com.au/2026/10/27/stanmore-resources-q3-2026-earnings-record-coal-production-and-new-dividend/
- https://announcements.asx.com.au/asxpdf/20260904/pdf/073q6r8jy36cnq.pdf
- https://gmk.center/en/news/global-coking-coal-prices-fall-in-early-november/
- https://www.engineeringnews.co.za/article/exxaro-to-sell-moranbah-south-project-to-stanmore-2026-09-04
Financials — Adjusted
Adjusted · TTM 2025-Q4 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 1925-20% | 1925-20% | 2396-16% | 2835+6% | 2681 |
| Gross profit | 1041-48% | 1041-48% | 1999+0% | 2000+5% | 1903 |
| Operating expenses | 1049-39% | 1049-39% | 1713+58% | 1081+12% | 963 |
| ▸Adj EBITDA | 409-37% | 409-37% | 649-48% | 1243+7% | 1166 |
| ▸Adj OCF | 384+25% | 384+25% | 307-60% | 767-28% | 1060 |
| CapEx | -86.0 | -86.0 | -148 | -201 | -121 |
| Adj FCF | 298+88% | 298+88% | 159-72% | 566-40% | 940 |
| Interest expense | 56.4 | 56.4 | 88.7 | 99.6 | 89.5 |
| ▸Adj net income | -31.8-120% | -31.8-120% | 159-70% | 534-25% | 715 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025
| Where the Cash Went | Total | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 3243100% | 409100% | 619100% | 1097100% | 1117100% |
| FCF (OCF−capex) | 219568% | 29873% | 24940% | 55951% | 108897% |
| Net income | 128240% | -48.6-12% | 19231% | 47243% | 66760% |
| ▸Capital returned | -345-11% | 20350% | 22336% | 53749% | -1307-117% |
| Buybacks | -516 | 0.00 | 0.00 | 0.00 | -516 |
| Dividends | 235 | 64.9 | 116 | 54.8 | 0.00 |
| Interest paid | 334 | 56.4 | 88.7 | 99.6 | 89.5 |
| Debt paid down | -398 | 81.6 | 18.3 | 383 | -881 |
| ▸Reinvestment | 201162% | -83.0-20% | 92.415% | 39136% | 1610144% |
| Capex (PP&E) | 555 | 86.0 | 148 | 201 | 121 |
| Intangibles & M&A | 1560 | -2.72 | 40.3 | -8.97 | 1531 |
| Leases signed (net Δ) | -104 | -166 | -95.5 | 200 | -41.5 |
| Retained / other | 131441% | 15538% | 75.212% | 13012% | 95485% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 3097 | 3097 | 3202 | 3605 | 3316 |
| ▸Liabilities (total) | 1375 | 1375 | 1372 | 1852 | 1982 |
| Net debt (incl. leases) | 518 | 518 | 383 | 329 | 432 |
| Net debt / Adj EBITDA | 1.27 | 1.27 | 0.59 | 0.26 | 0.37 |
| Net debt / Adj FCF | 1.74 | 1.74 | 2.41 | 0.58 | 0.46 |
| Adj EBITDA / interest | 7.26 | 7.26 | 7.32 | 12.5 | 13.0 |
| Shares outstanding | 901 | 901 | 901 | 901 | 901 |
| Dilution (YoY) | +0.0% | +0.0% | +0.0% | +0.0% | +205.3% |
| Employees | 414 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 54.0%-29.4 | 54.0%-29.4 | 83.4%+12.9 | 70.5%-0.5 | 71.0% |
| Adj EBITDA margin | 21.3%-5.9 | 21.3%-5.9 | 27.1%-16.7 | 43.9%+0.4 | 43.5% |
| Adj OCF margin | 20.0%+7.2 | 20.0%+7.2 | 12.8%-14.2 | 27.0%-12.5 | 39.5% |
| Adj FCF margin | 15.5%+8.9 | 15.5%+8.9 | 6.6%-13.3 | 20.0%-15.1 | 35.0% |
| Net income margin | -2.5%-10.5 | -2.5%-10.5 | 8.0%-8.7 | 16.7%-8.2 | 24.9% |
| Adj NI margin | -1.6%-8.3 | -1.6%-8.3 | 6.6%-12.2 | 18.9%-7.8 | 26.7% |
| ROIC (adj, after-tax) | -0.3% | -0.3% | 9.1% | 25.5% | 38.4% |
| Cost of debt | 8.5% | 8.5% | 13.1% | 14.1% | 9.3% |
Earnings Calls
Earnings Call · 2026 Q3
Stanmore Resources Limited presented its September 2026 quarterly activities report, delivered by CEO Marcelo Matos with CFO Shane Young. Matos opened by describing the third quarter as another successful one, with favorable dry conditions, a strong pit preparation program in the first half, no serious accidents, and a record performance at South Walker Creek. Year-to-date saleable production is tracking well within guidance, closing ROM stockpiles were 1.7 million tonnes at 30 September, and the company reaffirmed full-year saleable production guidance while tracking toward the top end of the range. Market conditions were a key driver. Supply shortages in China, driven by safety inspections, production curtailments and slow clearance of Mongolian landborne volumes, combined with disruption to Russian exports from Black Sea terminals and higher Russian fuel and labor costs, pushed premium hard coking coal and low-vol PCI prices to peaks of USD 285 and USD 220 per tonne respectively. Because of the roughly 30-day lag in pricing mechanisms, much of the late-quarter rally would only flow into realized prices later. The company's average quarterly sales price rose to USD 163 per tonne, up 6% on the June quarter, and was 18% higher year-to-date versus the first nine months of the prior year. Matos flagged risks ahead, including pressure on Chinese steel margins, the direction of Chinese steel production after the holiday season, and US-China tariff discussions. He also highlighted India's post-monsoon recovery, the commissioning of new coke oven capacity, and a draft Indian national steel policy vision to 2047 that projects metallurgical coal demand more than tripling by 2047. Operationally, South Walker Creek delivered record ROM production of 2.8 million tonnes and saleable production of 1.9 million tonnes, with CHPP running above nameplate capacity and closing ROM stocks above 800,000 tonnes. Poitrel's saleable production fell to 1.1 million tonnes because a planned CHPP shutdown, deferred from June to July, constrained feed until processing normalized in August and September; ROM output nonetheless reached 1.9 million tonnes and ROM inventories rose above 700,000 tonnes. Year-to-date Poitrel saleable production of 3.6 million tonnes is on track for the upper end of full-year guidance. At Isaac Plains, the company assumed operatorship of Isaac Downs during the quarter, with early gains in fleet performance, dragline dig methodology, strip ratios, saleable production and coal sales. On development, the Moranbah South acquisition is progressing toward completion in the fourth quarter. The tenements contain 724 million tonnes of measured and indicated resources of believed premium hard coking coal quality in the Goonyella Middle Seam, directly north of Eagle Downs. Management plans a broader study that could include an integrated joint development with Eagle Downs, with a timeline update to come after completion, while Eagle Downs stand-alone work and approvals continue. Financially, Stanmore ended the quarter with consolidated cash of USD 231 million. After the drawn balance of a new USD 250 million term loan, net debt was USD 19 million, an improvement of USD 53 million on the June quarter. Key outflows included USD 22 million of capital expenditure and an initial USD 5 million payment toward Moranbah South, largely offset by a USD 26 million refund from a successful objection to a 2025 stamp duty assessment relating to Eagle Downs. Total liquidity rose to USD 501 million, which supports the remaining USD 100 million Moranbah South completion payment. The Board had deferred an interim dividend in August given uncertainty around Moranbah South but has now declared an interim dividend of approximately USD 20 million, citing greater certainty on Moranbah South, a strong third quarter, improved prices and the earlier-than-expected stamp duty refund. Future dividends will be assessed under the dividend policy. Guidance for 2026 was reaffirmed, with saleable production tracking toward the top end. FOB cash cost and capital expenditure guidance are unchanged, but both face upward pressure from diesel and a stronger Australian dollar. Year-to-date SGO diesel has averaged about USD 150 per barrel versus the USD 120 assumption in guidance. Operational cost improvements and hedging have partly offset these pressures. In the Q&A, analysts asked about the drivers of the Poitrel yield gap, which management attributed to the CHPP shutdown plus lower-yield thermal product after higher-yield feed was washed in June. Management expects steady Q4 production with weather as the main risk. On Eagle Downs, management said it is not slowing that work and that an integrated Moranbah South development would involve years before mining, with approvals still required. On financials, the debt program cost a few million dollars in fees, roughly in line with typical refinancing costs. Q4 capex will be heavy, but spending remains within guidance, with upside from FX and early de-mudding progress at G pit. On pricing, management said China is driving spot indices, seaborne coal remains competitive against domestic prices, the forward curve implies slight backwardation, and India has been quiet, holding off while keeping low inventories. Matos closed by thanking employees and contractors and said the company looks forward to the Q4 and full-year 2026 update in the new year.
▸What drove the large gap between ROM and saleable production at Poitrel, beyond the July CHPP shutdown, and was mining delayed or back-ended?Christopher Creech · Morgans Financial
▸With strong ROM stocks, could Q4 saleable production exceed guidance, and are there any production disruptions expected outside weather?Christopher Creech · Morgans Financial
▸Does completing Moranbah South in Q4 change the timing of the Eagle Downs FID, or is it potential upside?Christopher Creech · Morgans Financial
▸What was the cost of the debt refinancing program during the quarter, and was it material?Glyn Lawcock · Barrenjoey
▸Was the reference to a few million in fees roughly a mid-single-digit percentage of the facility?Glyn Lawcock · Barrenjoey
▸Capex is well behind nine months in; will it catch up, or is there saving or deferral into 2027?Glyn Lawcock · Barrenjoey
▸Since quarter end, PLV prices have rolled down. What is happening and how does the rest of the year look?Glyn Lawcock · Barrenjoey
▸Is India reluctant to pay current prices, or is it waiting for lower prices?Glyn Lawcock · Barrenjoey
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2019 Q2 | 407M | 481M | 334M | $0.37 | $0.35 – $0.39 | 3 |
| 2020 Q2 | 396M | 112M | 68M | $0.17 | $0.12 – $0.20 | 4 |
| 2021 Q2 | 369M | 103M | 64M | $0.11 | $0.09 – $0.13 | 4 |
| 2022 Q2 | 413M | 179M | 71M | $0.25 | $0.19 – $0.34 | 4 |
| 2023 Q4 | 3.3B | — | 0M | $0.00 | $0.00 – $0.00 | 2 |
| 2024 Q4 | 5M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2025 Q4 | 1.5B | 147M | -95M | $-0.10 | $-0.10 – $-0.10 | 1 |
| 2026 Q2 | 1.4B | 198M | -34M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q4 | 1.7B | 337M | 80M | $0.09 | $0.09 – $0.09 | 1 |
| 2027 Q2 | 974M | 254M | 25M | $0.03 | $0.03 – $0.03 | 1 |
| 2027 Q4 | 979M | 244M | 21M | $0.02 | $0.02 – $0.02 | 1 |
| 2028 Q2 | 984M | 267M | 41M | $0.05 | $0.05 – $0.05 | 1 |
| 2028 Q4 | 989M | 252M | 34M | $0.04 | $0.04 – $0.04 | 1 |
| 2029 Q2 | 994M | 233M | 23M | $0.03 | $0.03 – $0.03 | 1 |
| 2029 Q4 | 999M | 285M | 62M | $0.07 | $0.07 – $0.07 | 1 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- FY2025 Financial & Operational Results (February 2026): Stanmore Resources (SMR) delivered record run-of-mine (ROM) production of 20.5 million tonnes (Mt) and saleable production of 14.0 Mt for the full year 2025. Despite a 21% decline in average realized coal prices to US$133/t, the company generated US$385 million in underlying EBITDA and US$296 million in free cash flow. A statutory net loss after tax of US$47 million was recorded, primarily driven by higher depreciation and amortization of US$400.8 million. The company maintained a robust balance sheet with US$482 million in total liquidity and net debt of just US$33 million as of December 31, 2025, declaring a fully franked final dividend of 8.9 US cents per share.
- FY2026 Guidance: SMR announced its 2026 guidance, expecting saleable coal production of 12.8 to 13.4 Mt, reflecting a planned step-down at Isaac Plains. FOB cash costs (excluding royalties) are projected to rise to US$93–97/t, up from FY2025 levels due to inflationary pressures, higher strip ratios, and mining intensity.
- Q1 2026 Activities Report (April 2026): SMR experienced disruption early in the first quarter of 2026 from ex-Tropical Cyclone Koji. However, the company recorded a strong operational recovery in March, spearheaded by a monthly production record at South Walker Creek (1.1 Mt ROM, 0.7 Mt saleable). SMR concluded Q1 2026 with total cash of US$166 million and liquidity of US$436 million.
- BMC Assets Integration: SMR completed the full integration of the former BHP Mitsui Coal (BMC) assets. This milestone has streamlined Bowen Basin logistics, enhancing overall operational efficiencies and cash-generating capacity.
▸ Thesis-test Findings
Queensland metallurgical coal FOB cash costs peer comparison BHP Whitehaven Stanmore
Stanmore remains highly cost-competitive in the Bowen Basin compared to its direct peers, although it is experiencing mild cost-creep. SMR reported FY2025 FOB cash costs (excluding royalties) of US$88/t (down from US$89.4/t in FY2024), with guidance for FY2026 projecting an increase to US$93–97/t. In comparison, BHP's BMA operations are facing severe cost pressures, with FY2026 unit costs guided toward the upper end of US$116–128/t—partially driving BHP to put its Saraji South mine into care and maintenance and warning that high royalties are rendering operations uncompetitive. Meanwhile, Whitehaven Coal reported QLD and NSW consolidated unit costs at approximately A$135/t (~US$90–95/t) for H1 FY2026 but historically guides QLD metallurgical operations in the A$140–155/t (excluding royalties) range. While SMR's costs are trending slightly upward, its operating cost base remains structurally lower than peer majors in the region.
India metallurgical coal import volumes forecast 2026 2027
India represents a vital long-term demand pillar, though shifting procurement dynamics present a headwind for Australian exporters. Driven by ambitious domestic policies aiming for 300 Mt of steel capacity by 2030, Indian steel giants are continuously expanding blast furnace capacity. Ports data from April–May of the 2026–27 fiscal year showed a 6% year-on-year increase in coking coal import traffic. However, India's Ministry of Commerce and Industry is aggressively pushing a geographic diversification strategy to lessen its reliance on Australian coking coal due to historical price volatility. Australia's share of the Indian coking coal import basket fell from 78% in FY2022 to roughly 60% in FY2024, as India increased imports from Russia, Canada, and the United States. While absolute Indian import demand remains robust, Australian producers face market share pressure.
Stanmore Resources Eagle Downs project status update 2026
Stanmore continues to treat the 100%-owned Eagle Downs project as a highly valuable strategic "optionality" play. According to SMR's Q1 2026 quarterly update, development studies are progressing with a near-term focus on surface infrastructure design. Environmental approvals and ecological surveys for interconnecting infrastructure between Eagle Downs, Poitrel, and the Isaac Plains Complex were carried out during the wet season. The project is fully permitted and practically construction-ready, with two underground access drifts already 40% complete. SMR is leveraging nearby existing logistics to minimize the future capital required to bring the mine online. Management does not intend to rush immediate full-scale development but is positioning the asset to exploit the next upward turn in the metallurgical coal market cycle.