Stocks/SPCE

SPCE

Virgin Galactic Holdings, Inc.v3 3.5/10 · 2026-11-03
Industrials·Aerospace & Defense
$1.14
$162M market cap
v3 Rating
3.5/102.5–5.0
Setup
4.5/103.0–6.5
Fair Value
$2.80$0.40–$7.00+146%
DCF (10%)
$4.90+330%
Base IRR
+23%-45%–+55%
Visibility
wide±118%
Wall Street
$2.70 target(4 analysts last year)(5 buy, 7 hold, 5 sell)
Rating
Revenue (TTM)
$1.1M
Owner Earnings
-$238M
Next-Yr Owner Earnings
-$160M
Growth
+40.0% × 7y
P / Next-Yr OE
--
Net Debt
$0M

Virgin Galactic Holdings, Inc., an aerospace and space travel company, focuses on the development, manufacture, and operation of spaceships and related technologies. It engages in the design and development, manufacturing, ground and flight testing, spaceflight operation, and post-flight maintenance of spaceflight systems for private individuals, researchers, and government agencies. The company is headquartered in Tustin, California.

2-Year Price History

$2.50-59.8%
$3.0$4.0$5.0$6.0$7.0Initial target $2.80 · 2026-11-03volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-03

Rating
3.52.5–5.0
Setup
4.53.0–6.5
Fair value (USD)
2.800.40 – 7.00
Upside vs 1.14
+146%
DCF (10%)
4.900.30 – 13.00+330%
Base IRR
23%-45% – 55%
Visibility
very widerange ±118%
Sentiment
3/10
2026-11-03 · claude-opus-5-5 · priced at 2.50

Virgin Galactic is a pre-revenue suborbital space-tourism company. It is weeks from the most important tests in its history and short of cash to get through them. The first Delta-class ship, Apeiron, was ferried to Spaceport America on Oct 28, but the first commercial flight has slipped again (Q4 2026, then Feb 2027, now early Q2 2027), and the second ship is due late Q2 or early Q3 2027. The stock closed at $2.50 on Nov 3, 2026, about $379M of market cap on 151.6M shares. Estimated Sep 30 cash of about $189M roughly equals $190M of notes, so EV is about $380M. The business burns about $370M a year. The share count doubled in 2026 through the ATM program and debt-for-equity swaps, and the latest delay all but guarantees another raise before customer cash arrives. There is real upside: the $750k tranche sold out early, Blue Origin has stopped New Shepard flights until at least 2028, and management's model shows about $100M of adjusted EBITDA with 2 ships and about $450M with 4. If Delta flies at cadence, my base DCF is about $4.90 a share after dilution. But the cadence is unproven, the schedule has slipped three times in a year, and there is a going-concern note. Weighting failure or deep dilution (about 35%), a muddle (about 35%) and success (about 30%) gives fair value near $2.80, about the price. Sentiment is hated but not capitulated (24% of shares short, Morgan Stanley Underweight with a $2 target, near the 3-year low), and the May squeeze to $8.90 shows it is still a meme lottery ticket. Rating 3.5: no margin of safety, binary outcomes, a dilution overhang and no owner earnings for years. Research rating 4.5: the next 12 months of powered and first paid flights decide it, but most of that cannot be settled from the desk.

A deep dive would have to establish: Can the Delta fleet reach 8-10 flights a month in 2027-28 at an average of $500k or more per seat before the cash runway forces dilution that wipes out the per-share upside?

Owner earnings, TTM
-$238M-$265M – -$205M
Realistic peak profit
$200M$0M – $600M
Growth rate
40.0%10.0% – 80.0%
Years of growth
72 – 12
Market cap
$379M$370M – $395M
EV
$380M$360M – $420M
Net debt
$0M-$15M – $30M
Capital return / cap
-30.0%-60.0% – -10.0%
P/E
-1.6×-2.0× – -1.3×
EV/EBITDA
-1.8×-2.2× – -1.5×
FCF yield
-95.0%-110.0% – -70.0%
Projected FCF, base case (USD millions)
Y1-$160M-$230M – -$100M
Y2-$80M-$180M – $20M
Y3-$20M-$160M – $90M
Y4$60M-$130M – $220M
Y5$100M-$120M – $350M
Competition: Blue Origin has paused New Shepard until at least 2028, and orbital seats cost $50M+, so near-term suborbital competition is nil; the real limits are safety, cadence and the depth of demand for $750k+ seats.
Governance: Ex-SPAC with a history of peak insider selling and serial dilution (shares doubled in 2026 via ATM and debt swaps), a going-concern note, and repeatedly missed schedule guidance; no fraud findings.
Research (expand)

What the company does

Virgin Galactic flies paying customers (6 per Delta-class ship, against 4 on the retired Unity) on roughly 90-minute suborbital trips. The carrier aircraft VMS Eve releases the spaceship, a hybrid rocket takes it past 80 km, and a feather reentry system brings it back for a runway landing. Unity stopped flying in mid-2024 so the company could build the Delta fleet in Mesa, AZ, which is designed for 500 flights per ship and about 2 flights a week per ship. A new carrier aircraft (LVX) is targeted for about 2030, and an Italian spaceport is under study. Research payloads and cooperative agreements (AFRL in Oct 2026, LLNL in Dec 2025) are small side businesses.

Investment case

  • Bull: more than 700 reservations, and the $750k tranche was oversubscribed and added over $50M of future revenue. A higher-priced tranche opens this fall. Blue Origin paused New Shepard on Jan 30, 2026 for at least 2 years. Management's math: a $60M ship, 6 seats at $600k and over 80% contribution means payback in under a year and about $1.4B of lifetime contribution per ship. That supports about $100M of annualized adjusted EBITDA in a 2028 quarter with 2 ships, over $450M with 4 ships plus a second carrier aircraft, and over $1B with 2 spaceports. Note principal was cut by about $93M in 2026. The 2027 converts are down to $17.9M (due Feb 2027), and the $172M of 9.8% first-lien 2028 notes have no mandatory payment until March 2028.
  • Bear: a decades-long record of missed dates, and three Delta slips in 12 months. Glide and powered tests on Apeiron have not started, and avionics software validation is now the critical path. Ten-plus flights a month has never been done in human spaceflight. Liquidity was $286M on Jun 30. After Q3 FCF (-$95M to -$100M), Q4 (-$80M to -$90M) and the $17.9M note repayment, about $85M is left entering Q2 2027, so a $100-250M raise looks very likely in the next 6-9 months. There are 31.7M warrants at $6.696, and the 2028 notes have a floor-price clause that forces cash redemptions if the stock is weak. Shares went from 73.3M (Dec 2025) to 151.6M (Aug 2026). Founding astronauts mostly paid $200-450k, and $80.3M of deposits is already collected, so the early manifest brings in much less cash than the $600k model. One accident could ground the fleet for years.

What it earns today

Adjusted EBITDA is about -$52M a quarter (Q2: -$51.7M), SBC about $25M a year, D&A about $16M a year and revenue about zero. Unlevered owner earnings are about -$235M to -$240M a year. Almost all capex (about $40M a quarter) is growth spending on ships and tooling. Reported 2026 FCF is about -$370M. With EBITDA negative, there are no owner earnings to put a multiple on.

FCF projection (unlevered, after SBC and reinvestment, $M, mid with range)

  • 2027: -160 (-230 to -100). Service starts Q2, second ship Q3, founders fly at legacy prices.
  • 2028: -80 (-180 to +20). Two ships ramp toward 8-10 flights a month; ship 3-4 and LVX capex begin.
  • 2029: -20 (-160 to +90). About $100M adjusted EBITDA run-rate offset by heavier LVX capex.
  • 2030: +60 (-130 to +220).
  • 2031: +100 (-120 to +350).

There are 5-10+ years of growth if it works. The base case needs about $270M of new equity, about 90M shares at around $3, for roughly 240M shares out.

The company in 5 years

  • Works (about 30%): a growing luxury-experience franchise with 4+ ships, $600-800M of revenue and $100-350M of FCF, worth 18-20x FCF.
  • Muddle (about 35%): 3-5 flights a month, fixed costs absorb the contribution, and repeated dilution leaves the equity at or below today's price per share.
  • Corpse (about 35%): an accident, failed tests or a funding squeeze before the 2028 notes.

Confidence in any single path is low.

Fair value and multiples

  • Market cap about $379M. Net debt about $0 on Sep 30 (estimated $189M of cash against $190M of notes), rising to about $90M at year-end. EV about $380M.
  • Deposits ($80.3M) are prepaid revenue but become claims if the company fails.
  • P/E about -1.6x, EV/EBITDA about -1.8x, FCF yield about -95%.
  • DCF at 10%: PV of 2027-31 FCF is about -$124M. Terminal value of $100M x 18 = $1.8B is worth about $1.12B today. EV about $994M, less about $90M of net debt, gives about $904M, or $5.96 a share on today's count. About $4.90 after funding dilution.
  • Base IRR: about 23% (about $7.40 a share in 2031), but only if it works.
  • Probability-weighted fair value: about $2.80-2.90, against the $2.50 price.
  • Covered calls: IV is about 115%, but there is no valuation floor or predictable earnings, so this is not a covered-call setup.

Management, risks, competition

  • Management: CEO Colglazier and CFO Ahrens have managed the balance sheet well. They extended maturities, swapped debt for equity, and sold $134M of stock into the May 2026 SpaceX-IPO squeeze. Their schedule guidance is unreliable and their long-term EBITDA figures are promotional.
  • Governance: an ex-SPAC with past insider selling and serial dilution. No capital return. No fraud findings, and a derivative suit was settled in 2026.
  • Competition: Blue Origin is paused until at least 2028, and orbital seats cost $50M+. The real limits are safety, cadence and the depth of the market for $750k+ seats.

Sentiment: 3/10

  • The stock is down about 95% in 3 years and sits about 6% up its 1-year range ($2.13-8.90). The May spike faded completely.
  • Short interest is about 36.8M shares (about 24% of shares), 5.6 days to cover.
  • Seven analysts, consensus Hold, average target about $3.5. Morgan Stanley is Underweight at $2.00 and expects more slips. Jefferies is Buy at $5. Susquehanna is Neutral at about $3.
  • Retail on Stocktwits is meme-driven and trades SpaceX headlines.
  • It is disliked but not capitulated: there is no forced seller and no sound cash business being thrown away.
  • Catalysts: the Q3 call on Nov 12 (funding and test plan), glide and powered flights, and pricing of the new tranche.
Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue1.10-34%1.54-78%7.04+3%6.80+194%2.31
Gross profit-111-87.7-89.9-43.7-2.71
Operating expenses139-36%195-32%287-41%488-2%497
▸Adj EBITDA-234-267-361-518-489
▸Adj OCF-230-262-344-500-463
CapEx-164-198-122-44.3-16.5
Adj FCF-394-460-466-545-479
Interest expense8.6012.812.912.912.1
▸Adj net income-248-274-347-503-500
▸Owner's earnings-400--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-1682-162-250-318-476-476
FCF (OCF−capex)-2085-283-438-475-493-397
Net income-1807-179-279-347-502-500
▸Capital returned-118116.9-104-125-466-504
Buybacks-9460.00-227-138-479-102
Dividends0.000.000.000.000.000.00
Interest paid56.35.5512.812.912.912.1
Debt paid down-29111.31100.190.23-413
▸Reinvestment50812317012257.936.2
Capex (PP&E)50212119812244.316.5
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)6.091.59-28.5-0.2213.519.7
Retained / other-848-295-321-337-13.8119

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 151 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)74780396111801140
▸Liabilities (total)404529639674660
Net debt (incl. leases)63.317.2-70.1-383-434
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-27.3-20.9-27.9-40.3-40.3
Shares outstanding15273.333.020.013.7
Dilution (YoY)+163.2%+122.2%+65.0%+45.7%+6.3%
Employees694694744805--
MarginsTTM2025202420232022
Gross margin-10102.2%-4945.6-5680.7%-4402.4-1278.3%-635.1-643.2%-526.0-117.3%
Adj EBITDA margin-21317.0%-4012.5-17267.4%-12134.3-5133.1%+2486.6-7619.7%+13525.9-21145.6%
Adj OCF margin-20951.9%-4042.0-16957.7%-12065.5-4892.2%+2466.3-7358.5%+12657.5-20016.0%
Adj FCF margin-35826.6%-7381.4-29784.5%-23160.4-6624.1%+1386.0-8010.1%+12719.1-20729.2%
Net income margin-22007.5%-4391.8-18063.9%-13135.8-4928.1%+2459.2-7387.3%+14245.6-21632.9%
Adj NI margin-22570.4%-5089.1-17751.6%-12815.9-4935.7%+2455.5-7391.2%+14244.2-21635.4%
ROIC (adj, after-tax)-35.3%-37.4%-36.5%-42.1%-41.3%
Cost of debt2.9%3.0%2.6%2.7%2.6%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-12

Virgin Galactic’s second-quarter update centered on strong customer demand, progress toward commercial service, and the financing and unit economics needed to support fleet expansion. The company said its latest tranche of spaceflight expeditions, offered at $750,000, was oversubscribed and booked out earlier than expected. This increased expected future spaceflight revenue by more than $50 million. The company has now built an astronaut community of more than 700 people, and approximately 60% of its newest customers are connected to group bookings, including multigenerational expeditions, research missions, corporate charters and nonprofit initiatives. Active bookings are closed while new astronauts are onboarded; Virgin Galactic plans to reopen sales this fall at higher prices. Management expects each subsequent tranche to be priced above the prior one, citing continued demand and the substantially higher pricing of competing suborbital experiences. The first commercial spaceflight is now expected in February 2027, a schedule shift attributed to accumulated delays across hundreds of relatively small but important installation tasks. Management emphasized that there was no material scope expansion and no single issue driving the change. Avionics, wiring, mechanical systems, fit checks, quality inspections and engineering reviews have simply taken longer than estimated on the first build of the new spaceship. The company expects to complete this phase later in August, begin integrated vehicle ground testing shortly thereafter, and send the vehicle to New Mexico in October for flight testing. The second spaceship is expected to arrive in New Mexico in March. Management said these changes still support the previously stated operating plan: reaching at least 10 flights per month by the end of the second quarter of 2027 and achieving positive quarterly cash flow during 2027. Financially, Virgin Galactic raised $134 million through its ATM equity program, which is now substantially complete, and ended the quarter with $286 million in cash, cash equivalents and marketable securities, compared with $251 million at the prior quarter-end. It also reduced principal on its 2027 and 2028 notes by $93 million, leaving only $17.9 million due on the 2027 notes and no required 2028 principal payments until March 2028. Management currently does not expect to need additional capital to reach commercial service and positive cash generation, although future financing could accelerate fleet growth. Second-quarter operating expenses were $65 million, capital expenditures were $41 million and free cash flow was negative $91 million. Third-quarter revenue is expected to be approximately $400,000, while free cash flow is forecast at negative $95 million to $100 million because of temporary labor and installation costs. Fourth-quarter free cash flow is expected to improve to negative $80 million to $90 million, with CapEx declining further in 2027 as the company shifts from vehicle construction to commercial operations. Customer payments collected before flights should improve cash flow beginning in February 2027. Management highlighted significant projected unit economics. Each new spaceship is expected to cost approximately $60 million to produce, support an estimated 500 flights carrying six astronauts each, and generate more than $1.4 billion in lifetime contribution margin at an average $600,000 ticket price and contribution margins above 80%. With two spaceships and one launch vehicle, the company expects to reach a quarterly adjusted EBITDA level equivalent to approximately $100 million annualized in 2028 as higher-priced bookings enter the manifest. Four spaceships and one fully utilized spaceport could generate more than $450 million of annual adjusted EBITDA, while two fully utilized spaceports could exceed $1 billion annually. Eve is expected to support three flights per week, with maintenance capacity potentially allowing more, and rocket production will initially target approximately three motors per week, scalable toward 15 as the fleet expands.

Analyst Q&A (8)
▸
What portion of the commercial launch delay reflects changed scope versus a deliberate de-risking decision, and how durable is demand at higher prices? How is Virgin Galactic thinking about pricing for the next tranche?
Julia Shelanski · TD Cowen
Management said the scope has not materially changed. The delay reflects hundreds of small installation tasks taking longer than estimated, including fit, wiring, quality inspection and engineering-review issues. Integrated vehicle ground testing is expected to begin later in August, with the ship moving to New Mexico in October for flight testing. Management expects the next booking tranche this fall to be priced above $750,000, with continued price increases while demand remains strong; it views the likely $1 million-$2 million range associated with competing suborbital offerings as an indication that further increases are possible.
▸
As rocket production restarts in the fourth quarter using Unity's propulsion system, will additional labor be needed, and how long does it take to produce a rocket motor?
Michael Leshock · KeyBanc Capital Markets
The Arizona team is multi-skilled and will shift from spaceship installation and static-test work into rocket production as those activities finish, so a significant labor ramp is not expected. The new production line will initially support about three rocket motors per week, with additional shifts and bottleneck improvements potentially increasing capacity to roughly 15 per week for a larger fleet.
▸
Will Virgin Galactic need additional capital to reach positive cash generation in 2027, and how should investors think about burn and cash-flow improvement as commercial flights resume?
Michael Leshock · KeyBanc Capital Markets
No additional capital raise is currently needed. The company ended the quarter with more cash after raising $134 million through its ATM and reduced near-term debt obligations. Customer cash collections should begin with commercial service in February 2027, including payments for future flights, improving cash flow as the company transitions from manufacturing to operations. Future capital could be raised to accelerate fleet expansion when attractive growth opportunities arise.
▸
How should investors frame the trajectory of third-quarter CapEx through 2027 in light of the updated flight schedule?
Ceara Perry · Jefferies
CapEx should decline substantially after the third quarter as the first spaceship completes its build and enters ground testing, with another meaningful reduction in 2027. The business will shift from capital-intensive vehicle manufacturing toward a more operating-expense-driven commercial flight model.
▸
With Eve currently serving as the sole mothership, what flight-cycle and maintenance cadence is planned, and are there structural limitations as Delta flight testing begins?
Emilee Deutchman · Wolfe Research
Eve has a detailed inspection schedule ranging from every flight to intervals of three, five, seven, ten and 30 flights. The company continues to plan for three flights per week, although the maintenance program could support a higher rate. No new structural limitations apply to Delta vehicles versus Unity; Eve has been upgraded and is expected to be a highly capable workhorse launch vehicle.
▸
What is the expected CapEx commitment and timeline for procuring and building the next mothership, and is the program paused until Delta reaches operating cadence?
Emilee Deutchman · Wolfe Research
The next mothership is not paused, but work is progressing more slowly while the company prioritizes completing the first spaceship. Engineering resources will next focus on the launch vehicle, followed by supply-chain planning and more precise CapEx estimates. Virgin Galactic expects to alternate production of launch vehicles and spaceships to expand the fleet in balance.
▸
At the projected $90 million-$115 million adjusted EBITDA run rate for two spaceships and one launch vehicle, how should investors think about operating-cash and free-cash-flow conversion after considering customer deposits and excluding CapEx?
Kristine Liwag · Morgan Stanley
Customer cash is collected ahead of flights, so free cash flow can initially exceed EBITDA as the company ramps. Cash conversion relative to EBITDA is expected to be very high, though the precise level will vary with future vehicle-development spending. CapEx is not expected to become a significant drag until around 2029, when larger launch-vehicle development investments increase.
▸
Does the $60 million cost estimate apply to the next incremental spaceships or only to a mature future production run, and how will management balance fleet investment and EBITDA growth against free-cash-flow generation and balance-sheet stability?
Kristine Liwag · Morgan Stanley
The approximately $60 million production cost applies to near-term additional spaceships, including Delta vehicles three and four, rather than being dependent on a much more mature production system. Management expects a spaceship to pay back its cost in less than a year of flight operations because of its high contribution margin. Therefore, when demand exists, reinvesting cash into additional vehicles should be the fastest way to expand revenue and profitability, while preserving a sound balance sheet and monitoring demand, operating performance and cash levels.

SEC Filing Findings

SEC Filing — material findings

2026-08-12 · depth 9/10
risk 8Going Concern
▸

10-Q concludes substantial doubt about ability to continue as a going concern. Management's evaluation excluded revenue, capital market transactions and debt-repayment changes, and its mitigation plans are not deemed probable under ASC 205-40.

“it is uncertain whether we will have sufficient cash and marketable securities to maintain our planned operations for the next twelve months following the issuance date of the condensed consolidated financial statements and we have concluded that there are conditions present in the aggregate that raise substantial doubt about our ability to continue as a going concern”
risk 6Dilution
▸

Pre-funded warrants for 10.3M shares at a nominal $0.0001 exercise price, exercisable from June 29, 2026, with a cashless feature. Economically these are common-share equivalents already counted in loss-per-share calculations.

“The pre-funded warrants are exercisable at any time on or after June 29, 2026 at an exercise price of $ 0.0001 per share.”
risk 6Liquidity/Covenants
▸

2028 Notes (9.80%) are secured by a first-priority lien on substantially all company and domestic subsidiary assets, carving out customer deposits. Remaining contractual interest through 2028 totals about $40.6M, and redemptions are required from December 2027 at $10.1M per quarter.

“The 2028 Notes are secured on a first-priority basis by liens on substantially all of the assets of the Company and its domestic subsidiaries, subject to customary exceptions, including customer deposits”

Options

Chain Snapshot (daily)

Call IV (ATM)78%
Put IV (ATM)66%
ATM Spread2.0%
Call $OI (near money)$2.9M
Put $OI (near money)$4.2M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$2.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$0.50$1.83/$2.243--/$0.300
$1.00$1.33/$1.740--/$0.080
$1.50$0.70/$1.312--/$0.093
$2.00$0.52/$0.8324--/$0.13313
$2.50$0.25/$0.308,019$0.12/$0.32603
$3.00$0.12/$0.155,985$0.59/$0.8690
$3.50$0.06/$0.10227$0.77/$1.5124
$4.00$0.01/$0.0747$1.23/$1.788
Snapshot: 2026-11-04

Short Interest

Short % of Float40.2%
Short Shares40.2M
Days to Cover7.6
Change (vs Prior)+2.9%
Short % Float History
40.20%+29.80pp
10.0%20.0%30.0%40.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2023.0-2025.0)

Direct Pay$68.5M
Incentive & Other$24.0M
Total Compensation$92.4M
% of Revenue759.1%

Cash Runway

4.9months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
HUNTINGTON NATIONAL BANK$0$39.00+$0+$0—$20.60B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

04.5M9.1M13.6M18.2M$30$72$114$156$1982021-092022-032022-092023-032023-092024-03
hover the chart for per-quarter detailprice (right axis)
TWO SIGMA INVESTMENTS, LP207KMORGAN STANLEY4.2MGOLDMAN SACHS GROUP INC1.7MVOLORIDGE INVESTMENT MANAGEMENT, LLC—NORGES BANK652KMILLENNIUM MANAGEMENT LLC83KCITADEL ADVISORS LLC12KCREDIT SUISSE AG/928KTWO SIGMA ADVISERS, LP197KCHARLES SCHWAB INVESTMENT MANAGEMENT INC2.5M

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (4 analysts)$2.70+152.3%
Current Price$1.07
Analyst Ratings
5
7
5
Buy: 5Hold: 7Sell: 5Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q32M-253M-255M$-3.21$-3.21 – $-3.214
2019 Q41M-329M-331M$-4.17$-4.17 – $-4.174
2020 Q11M-64M-66M$-2.96$-2.96 – $-2.963
2020 Q21M-50M-53M$-5.27$-5.27 – $-5.272
2020 Q31M-51M-53M$-5.28$-5.28 – $-5.282
2020 Q40M-71M-74M$-6.17$-6.17 – $-6.172
2021 Q10M-433M-436M$-5.48$-5.48 – $-5.482
2021 Q20M-63M-66M$-6.57$-6.57 – $-6.575
2021 Q31M-39M-41M$-5.60$-5.60 – $-5.604
2021 Q40M-87M-88M$-6.90$-6.90 – $-6.904
2022 Q10M-67M-73M$-6.47$-6.47 – $-6.475
2022 Q20M-55M-62M$-7.20$-7.20 – $-7.203
2022 Q30M-33M-39M$-8.18$-8.18 – $-8.183
2022 Q40M-76M-82M$-10.30$-10.30 – $-10.303
2023 Q11M-85M-92M$-10.40$-10.40 – $-10.402
2023 Q23M-51M-58M$-10.16$-10.16 – $-10.162
2023 Q31M-30M-36M$-8.37$-9.16 – $-7.577
2023 Q43M-70M-77M$-6.02$-6.62 – $-5.226
2024 Q12M-109M-116M$-5.88$-6.79 – $-5.435
2024 Q23M-389M-395M$-4.97$-4.97 – $-4.975
2024 Q32M-437M-445M$-4.01$-4.01 – $-4.011
2024 Q42M-463M-471M$-3.11$-3.63 – $-2.794
2025 Q10M-399M-407M$-2.68$-3.01 – $-2.346
2025 Q20M-348M-355M$-2.34$-2.49 – $-2.035
2025 Q30M-210M-217M$-1.43$-1.57 – $-1.283
2025 Q40M-150M-157M$-1.04$-1.05 – $-1.012
2026 Q10M-125M-131M$-0.86$-1.88 – $0.151
2026 Q20M-91M-97M$-0.64$-1.40 – $0.112
2026 Q30M-65M-71M$-0.47$-0.49 – $-0.442
2026 Q42M-60M-65M$-0.43$-0.49 – $-0.361
2027 Q119M-53M-60M$-0.40$-0.46 – $-0.332
2027 Q240M-37M-45M$-0.30$-0.65 – $0.051
2027 Q335M-34M-44M$-0.29$-0.63 – $0.051
2027 Q459M-12M-24M$-0.16$-0.35 – $0.031

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$50K
1 txn · 1 insider · 20,000 sh
Sells ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-05-19BUYStrandberg Diana S.director20,000$2.49$50K$177K
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Virgin Galactic remains a binary development-stage company. The long-term opportunity is substantial: newly priced seats are being oversubscribed, the company claims contribution margins above 80%, and each additional spaceship could have attractive economics if the fleet operates reliably. However, the present business is not an operating company in the conventional sense: TTM revenue is only about $1M, adjusted FCF is negative $404M, and share count has increased from 14M to 101M in several years. The latest quarter provides both validation and disappointment. Demand for the $750,000 tranche was stronger than expected and added more than $50M to expected future revenue. The $134M ATM raise and debt reduction materially improve near-term liquidity. But the first commercial flight moved from late 2026 to February 2027 because hundreds of installation and review tasks took longer than expected. That is not necessarily a fundamental design failure, but it confirms that schedule risk is intrinsic to the program. The valuation is consequently dominated by execution, safety, financing and dilution rather than current earnings.

Trade Signal

Trade rating
+1.8/10
No trade
Horizon
~6mo
gpt-5.6-luna2026-08-13 · saw $3.14-63.7% since

No trade: the stock is materially below the analyst's fair value, but the apparent discount is not sufficient compensation for binary launch execution, roughly $100M quarterly cash burn and severe dilution risk.

Temporary mispricing+1.5

The stock rose from approximately $2.4-$2.7 in March-April to above $3 as the Delta timeline was maintained and then jumped to $6.18 in late May after the derivative-settlement news and renewed enthusiasm around premium ticket sales. It subsequently retraced to the high-$2s as investors focused on dilution, cash burn and execution risk, then recovered toward $3.3 into the August earnings release. After the August 12 report, which combined strong $750,000-tranche demand and a $134M raise with a delay of first commercial service to February 2027, the stock fell only 4% from $3.27 to $3.14. The recent move broadly reflects the information: demand was a positive surprise, while the delay and dilution were negatives. There may be a small undershoot because the stock held up despite the delay, but this is not a large temporary dislocation; the core discount is durable until testing validates the program.

Market view-5.5

The stock is disliked and heavily shorted, with short interest rising from roughly 11% of float in mid-2025 to about 40% currently. Retail participation is high, consistent with a speculative narrative and potential squeeze dynamics, while analyst consensus is mixed/Hold and the average one-year target of $2.93 is below the current price. Bulls focus on oversubscribed premium tickets, Blue Origin's pause and attractive eventual contribution margins; bears focus on repeated delays, negligible revenue, cash burn, dilution and safety/execution risk. The market is not ignoring the bull case, but it likely discounts the launch and financing risks more heavily than the analyst's fair-value framework.

Inflectionwindow ~6mo+2.5

The first commercial flight could transform the narrative from development-stage cash burner to high-margin space-tourism operator, and the $750,000 tranche being oversubscribed is better than consensus appears to assume. But the major inflection is already widely recognized: analyst estimates already embed a sharp revenue ramp beginning in late 2026, and the latest delay moved launch to February 2027. Therefore the payoff is asymmetric, but the near-term positive surprise is limited unless testing succeeds early and cash conversion is visibly better than expected.

Catalysts
  • ▲late 2026-08 · Completion of first Delta spaceship installation and subsystem work — Expected in late August; finishing this phase without new defects would restore confidence in the February commercial-service target.
  • ▲2026-10 · Integrated ground testing and transfer to New Mexico — Testing begins after installation completion, with New Mexico transfer targeted for October; execution here is the next tangible program milestone.
  • ▼2026-11 · Q3 2026 earnings and cash-burn update — Another roughly $95M-$100M of negative FCF would pressure the funding thesis unless management confirms sufficient runway to commercial service.
  • ▲late 2026 to early 2027 · Delta flight testing — Successful glide and powered tests would materially reduce the principal technical risk; further slippage would be highly damaging.
  • ▲2027-02 · First commercial Delta flight — Targeted for February 2027; this is the central validation event for the demand, pricing and unit-economics thesis.
  • ▲2027-03 · Second Delta spaceship reaches New Mexico — The second ship is expected in March, providing evidence that the company can move beyond a one-vehicle operating model.
Flow-3.5

The $134M ATM raise materially increased supply and historical dilution has been extreme, with reported TTM dilution of 142%. The ATM is substantially complete and there is one small insider purchase with no reported insider selling, but ongoing negative FCF makes another financing plausible if the February launch slips. Short interest is approximately 40% of float, creating squeeze fuel on good test news but also reflecting substantial structural skepticism.

Floor / Ceiling+1.0

Cash and marketable securities of approximately $286M provide some asset support against a roughly $316M reported market cap, but that is not a hard floor because quarterly FCF burn remains near $100M, debt and operating obligations remain, and the share count has been highly unstable. There is no committed bid or active buyback. Upside also faces a ceiling from financing risk and the market's skepticism of management's ramp assumptions.

Buyability

Speculative buyers can own the demand and scarce-provider story, especially with Blue Origin paused and new $750,000+ pricing. However, institutions are constrained by the binary launch risk, negligible current revenue, extreme cash burn, unreliable share count and likely future dilution; this is difficult to own as a core position.

Fear vs Greedfear 9/10 (+2.0)greed 8/10 (+1.0)

Fear pulls harder than greed. The upside optionality is real and the demand signal is unusually encouraging, but the current equity still represents a cash-burning development program whose value can be destroyed by one more delay or financing. Any position would need to be small and event-driven.

Valuation

Our Target
$550M+239%
Market Should Pay
$429M+164%
target ×0.78 (fear discount)
Current Market Cap
$162MSlightly bearish
What Changed
transcript · 2026-08-12
-3%fair value on this information

The genuinely new information is that the latest $750,000 booking tranche was oversubscribed and sold faster than expected, implying stronger near-term demand and more than $50M of additional expected future revenue. The commercial launch date also moved to February 2027 because the first Delta build has taken longer than planned. The $134M ATM raise and $93M debt reduction improve liquidity, but the financing itself was partly anticipated as a risk; the specific scale and debt retirement are new.

▸ How the cases moved

Before the release, I estimate the bear/base/bull values at $0M/$475M/$3,500M with probabilities of 0.35/0.50/0.15. After the release, the base value rises to $500M because the oversubscribed $750,000 tranche and more than $50M of incremental expected revenue support demand and pricing; the bull value rises to $3,650M for the same reason. However, the February 2027 launch date increases the bear probability from 0.35 to 0.40 and reduces the base probability from 0.50 to 0.45; the bull probability remains 0.15. The equity raise and debt reduction reduce immediate liquidity risk but also reinforce dilution concerns.

2-Year Plausible Outcomes
bear35%
$0M
rev -20%/yrOE $-350M

The Delta program suffers another material delay, commercial operations remain uneconomic or require a restructuring, and continued cash burn forces highly dilutive financing or an equity wipeout. Legacy demand and the new pricing model do not compensate for execution, safety and funding risk within two years.

▸ Valuation

0x $0M EBITDA = $0M EV - $0M net debt = $0M equity

base50%
$500M
rev +150%/yrOE $50M

The first Delta ship begins commercial service in early 2027 and a second ship follows, but the ramp is slower than management's 10-flights-per-month target. Revenue grows rapidly from a negligible base, customer deposits improve cash conversion, and annualized EBITDA approaches $100M by 2028. Execution remains capital-intensive and the company retains a meaningful financing and safety discount.

▸ Valuation

6x $100M EBITDA = $600M EV - $100M net debt = $500M equity

bull15%
$3.6B
rev +250%/yrOE $350M

The Delta build and testing process completes without another major slip, demand supports ticket prices above $750,000, and Virgin Galactic ramps two ships rapidly while beginning fleet expansion. High contribution margins, advance customer payments and sharply lower construction spending allow owner earnings to approach $350M annually by 2028. The market begins valuing the company as a scarce, high-growth space-tourism platform rather than a cash-burning development project.

▸ Valuation

8x $450M EBITDA = $3,600M EV - (-$50M net debt) = $3,650M equity

▸ Target Rationale

The probability-weighted scenario value is approximately $636M after discounting the terminal outcomes at 12% for two years. I set the analytical target below that figure at $550M because the scenario framework may understate future dilution, the history of repeated capital raises and schedule slippage, the going-concern disclosure, unusually high executive compensation relative to revenue, and the possibility that additional fleet investment consumes the cash generated by initial operations. This is a business with valuable upside optionality, but the equity structure and execution record justify a conservative target.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality3/10
Situation now2/10
Trajectory5/10
Risk9/10
Governance4/10
Insolvency prob (2yr)20%
Outcome uncertainty10/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Performance & Going Concern Risk: On May 14, 2026, Virgin Galactic announced its Q1 2026 financial results, posting revenue of $227,000 (mainly from astronaut access fees) and a net loss of $65 million. Free cash flow was negative $93 million. As of March 31, 2026, the company held $251 million in cash, cash equivalents, and marketable securities. Because of its high cash burn rate, the company flagged a "going concern" risk in its filings, indicating a tight cash runway of roughly 2 to 3 quarters unless commercial operations commence on schedule or additional capital is raised.
  • Transition to Delta-Class Testing & Flight Timeline: Virgin Galactic moved its first completed Delta-class spaceship from its assembly hangar to its test-and-launch hangar to begin ground testing. The company remains on schedule to begin glide flight tests in Q3 2026 and powered test flights to space in Q4 2026, with the goal of entering revenue-generating commercial operations in late 2026.
  • VSS Unity Returns to the Skies for Training: On May 27, 2026, the retired prototype vehicle *VSS Unity* returned to flight at Spaceport America for glide tests. Because *Unity* has a similar landing approach and cockpit view to the Delta-class, these flights are being utilized to train pilots and ground crews, building "muscle memory" to support a rapid testing ramp-up once the Delta ship is ready for flight.
  • New Ticket Sales and Price Points: Virgin Galactic opened a new sales window for its "Spaceflight Expeditions" at significantly higher price points, targeting $750,000 to $950,000 per seat (up from prior ticket pricing of $450,000 to $600,000).
  • Settlement of Derivative Actions: In late May 2026, Virgin Galactic announced an $8.5 million settlement to resolve a major shareholder derivative lawsuit regarding past safety and engineering disclosures, removing a notable legal overhang for the firm.
▸ Thesis-test Findings
Virgin Galactic Delta class wing testing progress 2026

In its Q1 2026 earnings update, Virgin Galactic reported that it completed flight control surface testing under loaded conditions at the Southwest Research Institute in San Antonio, Texas. The company is currently preparing to structurally test the as-built configurations of the wing, fuselage, and "feather" subassemblies. Meanwhile, ground-based tests of subsystems—including avionics, hydraulics, and pneumatics—continue at its Southern California integration facility using the "Iron Bird" test rig.

  • Bull/Bear Case Impact: *Bull Case:* Structural assembly of the first ship is complete, and major subassembly testing is progressing as scheduled, keeping the Q3/Q4 2026 flight-test windows active. *Bear Case:* Wing and structural load testing are happening just months before planned flight tests, leaving virtually zero margin for error; any design anomalies found during structural testing would cause delays that the company's tight cash runway cannot easily absorb.
Spaceport America flight frequency FAA regulations

Spaceport America is licensed by the FAA as a commercial horizontal and vertical launch site. While the FAA regulates launch safety, emergency response, and commercial spaceports under strict guidelines (specifically Part 450 regulations), there are no explicit federal flight frequency limit caps that would restrict Virgin Galactic's planned expansion. However, operations require strict coordination of hazard areas and restricted airspace (managed by the neighboring U.S. Army White Sands Missile Range).

  • Bull/Bear Case Impact: *Bull Case:* There are no statutory, regulatory, or licensing flight limits preventing Virgin Galactic from scaling its flight cadence to its target of 8 to 10+ flights per month by mid-2027. *Bear Case:* The requirement to coordinate flight windows, clear airspace over land, and manage hazard areas in cooperation with military and civil aviation regulators means that as Virgin ramps up its frequency, logistical bottleneck risks and regulatory red tape could still limit operational consistency.
Suborbital space tourism demand and backlog pricing trends

Suborbital space tourism demand remains resilient, with a persistent booking backlog of 12 to 24 months across the industry. Virgin Galactic currently holds a backlog of approximately 650 "Founding Astronauts" (representing around $186 million in future revenue). Crucially, in January 2026, competitor Blue Origin paused its suborbital *New Shepard* tourism flights for at least two years to prioritize its NASA Artemis lunar lander contract. To capture the supply vacuum, Virgin Galactic raised its ticket prices to a premium range of $750,000 to $950,000.

  • Bull/Bear Case Impact: *Bull Case:* Blue Origin's two-year suborbital pause leaves Virgin Galactic as the sole operational player in the near-to-medium term. The pricing power is highly visible, with early positive feedback on tickets priced at $750,000+. *Bear Case:* The 650-passenger backlog is locked in at much lower historic pricing (typically $250,000 to $450,000). High-margin ticket revenues from the newer, $750,000+ pricing tier will not be fully realized until the company clears its multi-year legacy backlog.