Stocks/SZG.DE

SZG.DE

Salzgitter AGv3 3.8/10 · 2026-11-26
Basic Materials·Steel
44.00 EUR
2.5B EUR market cap
0.5% div yield
v3 Rating
3.8/103.0–5.0
Setup
2.5/101.5–4.0
Fair Value
25.00 EUR12.00 EUR–42.00 EUR-43%
DCF (10%)
13.00 EUR-70%
Base IRR
-8%-20%–+10%
Visibility
wide±60%
Wall Street
(1 hold)
Rating
Revenue (TTM)
9.4B EUR
Owner Earnings
€170M
Next-Yr Owner Earnings
-€270M
Growth
+2.0% × 5y
P / Next-Yr OE
--
Net Debt
€2.3B

Salzgitter AG, together with its subsidiaries, engages in steel and technology businesses worldwide. The company operates through four segments: Steel Production, Steel Processing, Trading, and Technology. Its Steel Production segment manufactures steel and special steels, such as hot-rolled wide strip, steel sheet, sections, tailored blanks, as well as scrap trading. The Steel Processing segment produces various high-grade heavy plate products; and manufactures line pipes, HFI-welded tubes, and precision tubes. Its Trading segment operates a European sales network, as well as trading companies and agencies worldwide. The Technology segment engages in the provision of machinery and plants for the filling and packaging of beverages, as well as special machinery engineering for elastomer production. It also provides IT, facility management, logistics, automotive engineering, and research and development services, as well as supplies raw materials. The company was founded in 1858 and is headquartered in Salzgitter, Germany.

2-Year Price History

$40.82+151.8%
$20$30$40$50$60Initial target $25.00 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
3.83.0–5.0
Setup
2.51.5–4.0
Fair value (EUR)
25.0012.00 – 42.00
Upside vs 44.00
-43%
DCF (10%)
13.003.00 – 33.00-70%
Base IRR
-8%-20% – 10%
Visibility
widerange ±60%
Sentiment
5/10
Flow
4/10
2026-11-26 · claude-opus-5-5 · priced at 40.82

Salzgitter is a German integrated steelmaker (plus KHS bottling machines, a trading arm and a 29.99% stake in copper smelter Aurubis) having its best year in a while: 9M 2026 EBITDA VX EUR659m vs EUR224m, FY guide raised twice to EUR800-875m, helped by the EU safeguard quota cut, CBAM, the P28 cost programme and HKM's consolidation. The bull pitch is a regime change for European steel (imports throttled, carbon border tax) at ~5x EV/EBITDA and ~7x consensus 2027 earnings. It does not survive the cash arithmetic. About EUR250m of the EUR353m 9M EBT VX is the Aurubis equity result, so the steel business itself earns roughly break-even before interest. The Aurubis stake (13.1m shares, ~EUR1.8bn at ~EUR140) is the bulk of the market cap (~EUR2.25bn on ~55m shares). Against it sit EUR0.7bn net financial debt (incl. the EUR500m Aurubis exchangeable), an estimated ~EUR1.6bn of pension provisions, and green capex of at least EUR800m in 2027 (SALCOS ~EUR0.5bn net plus the EUR700m-net HKM arc furnace through 2029). On my DCF the core steel business generates negative free cash flow until 2029-30 and is worth ~EUR1.1bn. Equity comes to ~EUR13/share base, well under EUR40.82, and the stock only clears fair value if steel margins re-rate durably and Aurubis holds its copper-peak price. Rating 3.8: rich against the cash it will throw off, but a profitable, policy-protected cyclical on the way up with no catalyst is not a short. Setup 2.5: no variant perception on the long side; the short side needs Aurubis or steel spreads to roll over. Treasury-share sales (~9% of the shares) are a modest overhang.

Flow: Salzgitter is selling its ~10% treasury stake (about 6m shares, started Q2 2026, ~EUR50m sold so far at management's 'value-friendly' pace), so ~4-5m shares (~8-9% of outstanding) of supply remain through 2027; no buyback, token EUR0.20 dividend; Lower Saxony (26.5%) and the GP Papenburg/TSR group are sticky holders.

A deep dive would have to establish: Will EU trade defence and CBAM lift core steel margins enough, and fast enough, for the EUR1.5bn+ of green capex through 2029 to earn its cost of capital, or is Salzgitter's value really just its Aurubis stake minus pensions and debt?

Owner earnings, TTM
€170M€60M – €300M
Realistic peak profit
€400M€250M – €650M
Growth rate
2.0%-4.0% – 7.0%
Years of growth
53 – 8
Market cap
€2.2B€2.1B – €2.3B
EV
€4.6B€4.1B – €5.0B
Net debt
€2.3B€2.0B – €2.6B
Capital return / cap
-1.5%-4.0% – 1.0%
P/E
9.5×8.0× – 12.0×
EV/EBITDA
5.4×4.8× – 6.2×
FCF yield
-10.0%-20.0% – 0.0%
Projected FCF, base case (EUR millions)
Y1-€270M-€550M – -€50M
Y2€0M-€300M – €200M
Y3-€50M-€300M – €200M
Y4€220M€0M – €400M
Y5€250M€50M – €450M
Competition: Commodity flat and plate steel against thyssenkrupp, ArcelorMittal, Tata and voestalpine, plus imports now capped by the safeguard and CBAM; KHS competes with Krones in filling lines.
Governance: Lower Saxony's 26.5% blocking stake shapes capital allocation toward jobs and decarbonisation; the HKM purchase terms (former owners' contributions) are undisclosed.
Research (expand)

What it is. Salzgitter (Lower Saxony owns 26.5%) runs flat steel at Salzgitter and, since July 2026, 100% of HKM in Duisburg. It also has plate and line pipe (Steel Processing), a European steel trader, KHS filling lines (Technology, ~EUR120m EBITDA a year, the best business) and an at-equity 29.99% of Aurubis.

What the market believes. EU trade defence has turned. The safeguard has roughly halved import quotas with a 50% out-of-quota tariff since 1 July 2026, CBAM has applied since 1 January, and HRC sits at ~EUR715/t. P28 savings (EUR146m by September) are real. Consensus has ~EUR890m EBITDA for 2027, rising in 2028. At EUR40.82 (25 Nov close, down from a EUR66.55 peak as Aurubis fell from EUR225 to ~EUR140) the stock is on ~9-10x 2026 EPS VX and ~5x EV/EBITDA including pensions.

What the headline hides. Of 9M EBT VX of EUR353.5m, EUR252m is Aurubis. Steel Production EBT is EUR94m, Steel Processing -EUR69m, Trading EUR53m (with ~EUR11m one-off) and Technology EUR99m. 2026 core EBITDA excluding Aurubis is ~EUR520m. D&A is ~EUR330m, and the non-green capex needed to hold the asset base is EUR300-400m (management's figure, including HKM's EUR50-100m). Cash taxes are near zero on EUR4bn of loss carryforwards. That leaves core owner earnings of ~EUR170m before interest, in a good year.

FCF projection (core, unlevered, after all capex net of grants, EURm). 2027 -270 (capex >=EUR800m per CFO), 2028 0, 2029 -50 (3/4 of the HKM restructuring and the blast-furnace switch-off), 2030 +220, 2031 +250. Year 5 is neither grower nor corpse: a capital-intensive commodity producer whose margins now depend on Brussels keeping the wall up and on ETS/CBAM making DRI-EAF steel competitive (BCG says early 2030s). That earns ~7x FCF (range 4-10x). PV of the cash flows ~EUR0, plus terminal ~EUR1.1bn, gives a core value of ~EUR1.1bn. Add Aurubis at market (~EUR1.8bn), less net financial debt EUR0.71bn (Sept 30) and pensions ~EUR1.6bn (estimate; not verified this run). Equity is ~EUR0.7bn, ~EUR13/share. Even a generous case (EUR350m terminal FCF at 10x, Aurubis EUR180) gets only ~EUR33. The market is paying for EBITDA and ignoring that the next three years of EBITDA go into furnaces.

Fair value ~EUR25 (above the DCF, allowing for policy upside, phase-2 SALCOS stays paused, and lumpy grant timing). That is ~40% downside, but with no forcing event.

Management and risks. Groebler/Potrafki are candid on numbers and have delivered P28 and the trading restructuring. But they doubled down on HKM (EUR900m arc furnace, contributions from thyssenkrupp/Vallourec undisclosed) and sell treasury shares (bought at ~EUR63) rather than buy. Upside risks: a takeover (the GP Papenburg/TSR consortium approach in 2025 was rebuffed and is blocked by Lower Saxony's stake), copper, and a sharper steel upcycle. Downside: the Aurubis price (it also sets the exchangeable bond marks), heavy-plate weakness, energy prices and capex overruns.

Sentiment 5/10. Momentum and the 'European steel renaissance' narrative are positive, but the stock is down ~40% from its May high on the Aurubis slide and nervous HKM capex questions.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · EUR

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue9446+3%8981-10%10012-7%10791-14%12553
Gross profit1058-65%2546-2%2585-8%2819-32%4164
Operating expenses1026-69%2663-8%2902+17%2480-14%2884
▸Adj EBITDA345+77%201-35%307-54%661-58%1586
▸Adj OCF580+74%334+48%225-52%471-64%1318
CapEx-932-1070-969-752-443
Adj FCF-353-737-744-281-132%876
Interest expense13213015116278.7
▸Adj net income-192-250-466-142%1108-22%1424
▸Owner's earnings100--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA2547100%436100%317100%454100%419100%920100%
FCF (OCF−capex)-1429-56%-490-112%-615-194%-560-123%81.719%15417%
Net income102740%17239%-74.2-23%-352-78%20048%1081118%
▸Capital returned26811%-42.3-10%10935%-281-62%506121%-25.0-3%
Buybacks-679-179-5000.000.000.00
Dividends14110.910.824.354.140.6
Interest paid61997.713015116278.7
Debt paid down18727.6468-456291-144
▸Reinvestment237593%4.301%938296%727160%26864%43848%
Capex (PP&E)37945611070969752443
Intangibles & M&A-1386-502-113-278-481-11.4
Leases signed (net Δ)-33.7-54.5-19.736.2-3.007.30
Retained / other30812%15235%-481-152%14933%21852%26929%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 2.1 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)1228010481104651050211103
▸Liabilities (total)68466048601756686253
Net debt (incl. leases)9931185753361710
Net debt / Adj EBITDA2.885.902.460.550.45
Net debt / Adj FCF--------0.81
Adj EBITDA / interest2.621.542.044.0920.2
Shares outstanding57.454.154.154.154.1
Dilution (YoY)+3.0%+0.0%+0.0%+0.0%+0.0%
Employees24279--------
MarginsTTM2025202420232022
Gross margin11.2%-22.128.4%+2.525.8%-0.326.1%-7.033.2%
Adj EBITDA margin3.6%+1.52.2%-0.83.1%-3.16.1%-6.512.6%
Adj OCF margin6.1%+2.53.7%+1.52.3%-2.14.4%-6.110.5%
Adj FCF margin-3.7%+4.7-8.2%-0.8-7.4%-4.8-2.6%-9.67.0%
Net income margin1.6%+3.7-0.8%+2.7-3.5%-5.41.9%-6.88.6%
Adj NI margin-2.0%+1.8-2.8%+1.9-4.7%-14.910.3%-1.111.3%
ROIC (adj, after-tax)0.3%-1.4%-4.0%4.7%17.1%
Cost of debt5.8%6.9%10.0%10.1%4.7%

Earnings Calls

4 calls

Earnings Call · 2026 Q2

2026-08-11

Salzgitter delivered a materially stronger first half of 2026 despite an economic environment that remains challenging. European GDP and underlying steel demand are still weak, while geopolitical tensions, energy-price volatility, Middle East-related freight disruption, weather conditions, and low Rhine water levels create continued uncertainty. Nevertheless, steel prices improved relative to raw materials, and the company saw positive effects from the EU’s Carbon Border Adjustment Mechanism and new steel safeguard measures. Management said imports have already declined and HRC prices have risen, although pre-buying ahead of the July safeguard implementation means the full effect will take time to work through inventories and the value chain. Additional antidumping measures on cold-rolled steel and Turkish hot-rolled steel are expected to provide further support. All Salzgitter segments improved year over year. Aurubis was a major contributor, while Steel Production also performed strongly. The P28 performance program generated EUR 97 million after six months, or 80% of its EUR 122 million 2026 target, with more than EUR 50 million coming from Steel Production. Trading produced nearly EUR 40 million following a major restructuring that reduced its workforce by about 30%; the improvement reflected both sustainable cost reductions and a favorable inventory cost-to-selling-price environment. A EUR 10–11 million one-time benefit in Q1 did not recur in Q2. Management expects more cautious Trading performance in the second half because of geopolitical and international-trade risks. First-half sales were EUR 4.6 billion, down 1.6% year over year, primarily because of lower Trading revenue. EBITDA and EBT improved across all segments. Reported EBT was EUR 258 million, or EUR 76 million including the exchangeable-bond valuation effect, and the all-in result after tax was EUR 43 million. Operating cash flow reached EUR 59 million, working capital rose to EUR 2.6 billion, cash increased to EUR 1.2 billion, and the equity ratio remained 42%. Full-year investment is expected to be EUR 650 million, including EUR 100 million for HKM. Net financial position should remain broadly stable, helped by HKM’s low debt and additional EBITDA. HKM is now fully owned by Salzgitter. The strategy is to reduce installed capacity from roughly 5 million tonnes to 2.5 million tonnes by operating one blast furnace. The furnace currently being relined is expected to restart in August, after which the other furnace will be closed in Q3. The workforce is planned to fall from approximately 3,000 to 1,000 by the end of 2029. Restructuring costs are mostly personnel-related, with roughly one-quarter expected in 2026 and three-quarters in 2029. Management estimates the HKM EAF transformation at EUR 900 million gross, including EUR 200 million of public funding, and targets late-2029 delivery of steel with about 90% lower CO2 emissions. The project budget includes contingencies and benefits from existing grid infrastructure and available land. Including operating cash generation, former-shareholder contributions, public support, maintenance, restructuring, and transformation investment, Salzgitter expects only EUR 100 million of net additional cash needs over the next three years. SALCOS Phase I remains on schedule for commissioning in late summer 2027. Its second phase, involving another EAF, is paused pending better market conditions, but engineering and business-case work continue. Salzgitter expects approximately EUR 500 million of net SALCOS investment in 2027, with total group CapEx potentially around or above EUR 800 million but unlikely to exceed EUR 1 billion. Management believes DRI/EAF economics should overtake blast-furnace economics in the early 2030s as CO2 prices rise. It is lobbying for ETS rules that reward first movers, lead markets for low-CO2 products, and internationally competitive energy prices. The company raised 2026 sales guidance to EUR 10 billion while maintaining EBITDA guidance of EUR 725–825 million and pretax profit guidance of EUR 325–425 million. Management remains confident but expects a more moderate second-half trajectory because of summer and Christmas seasonality, maintenance downtime, and approximately EUR 20 million of nonrecurring first-half benefits. The company also expects to utilize its substantial tax-loss carryforwards as profitability permits, limiting near-term cash taxes.

Analyst Q&A (47)
▸
Whether recent HRC price increases were driven by low European water levels through higher logistics costs, a steeper cost curve, or supply impacts.
Reinhard van der Weal · Bank of America
Management said low Rhine water levels have not yet affected Salzgitter’s production or materially driven HRC prices. Prolonged low levels could create shortages and lift prices, but no such impact has been observed so far.
▸
Whether Q3 volumes should follow normal seasonality or benefit from the new EU tariff-rate quota.
Reinhard van der Weal · Bank of America
TRQ effects should become visible in Q3, although material imported before July must first move through the value chain. Flat products should remain broadly stable, while plate and large-diameter tube demand needs to improve after the summer; international projects also depend on trade conditions, particularly in the U.S.
▸
Whether EUR 900 million is sufficient for the HKM EAF and associated infrastructure, whether contingency is included, and how restructuring costs and their timing should be understood.
Tristan Gresser · BNP Paribas
Salzgitter is confident that the roughly EUR 900 million gross HKM EAF investment is sufficient and includes contingencies. Existing grid infrastructure and available space make HKM favorable for the project. Restructuring costs are mainly personnel-related, with the larger portion expected when the second blast furnace is shut; total costs are undisclosed but should be slightly below comparable German steel restructurings.
▸
Whether the main HKM restructuring costs will occur in 2029 when the second blast furnace is shut.
Tristan Gresser · BNP Paribas
The larger headcount reduction and related restructuring cost will occur in 2029 when the second blast furnace is closed.
▸
Whether HKM restructuring costs will already affect 2026 because of the first blast furnace shutdown.
Tristan Gresser · BNP Paribas
Yes. The first blast furnace shutdown creates restructuring costs in 2026, while the larger portion comes in 2029; management gave a rough split of 25% in 2026 and 75% in 2029.
▸
Whether those 2026 restructuring costs are included in the guidance.
Tristan Gresser · BNP Paribas
Yes, the 2026 HKM restructuring costs are included in the updated group guidance.
▸
How the EUR 100 million three-year net cash requirement reconciles with the EUR 100 million HKM CapEx included in the group guidance, and whether additional maintenance spending must be added.
Tristan Gresser · BNP Paribas
The EUR 100 million represents Salzgitter’s net additional cash requirement for HKM over three years, after considering operating cash generation, shareholder contributions, public funding, restructuring, maintenance, gray-route investments, and green-transformation spending. It is not an additional EUR 100 million of maintenance CapEx.
▸
What level of HKM investment should be expected for maintenance and other spending unrelated to the EAF transformation.
Tristan Gresser · BNP Paribas
For HKM, non-transformation investments should generally be between EUR 50 million and EUR 100 million annually.
▸
Whether the EUR 100 million net cash impact excludes maintenance and plant cash generation.
Tristan Gresser · BNP Paribas
The EUR 100 million net three-year figure includes maintenance as well as restructuring, gray-route and green-route investments, EAF spending, HKM cash generation, shareholder contributions, and public funding.
▸
What investment cash needs should be expected in 2027, including HKM maintenance, remaining SALCOS spending, and the timing of funding.
Tristan Gresser · BNP Paribas
Group investment spending is expected to total EUR 650 million in 2026 including HKM, or EUR 550 million excluding HKM. HKM non-green investment should be EUR 50 million to EUR 100 million, while SALCOS investment in 2027 is expected to be approximately EUR 500 million.
▸
Whether the remaining EUR 200 million of SALCOS Phase I funding will arrive in the second half of 2026 or in 2027.
Tristan Gresser · BNP Paribas
The remaining EUR 200 million of SALCOS Phase I funding is expected to be received half in 2026 and half in 2027.
▸
Whether the expected mid-double-digit HKM EBITDA contribution in H2 is purely accounting-driven or reflects recurring underlying earnings that could be annualized.
Maxime Kogge · ODDO BHF
The mid-double-digit million-euro HKM EBITDA contribution expected in H2 2026 reflects a mixture of underlying operating performance and accounting effects. Management would not quantify or split the components, and the PPA effect is not included.
▸
Whether management would separate the underlying HKM contribution from accounting effects.
Maxime Kogge · ODDO BHF
Management confirmed the contribution cannot currently be split between operating and accounting effects, and emphasized that PPA effects are excluded.
▸
Whether the financial contributions from thyssenkrupp Steel and Vallourec are recognized progressively over three years as HKM restructuring and investment spending increases.
Maxime Kogge · ODDO BHF
Yes. The financial contributions from the former HKM shareholders will flow progressively over the next three years alongside restructuring and CapEx needs.
▸
How much of the strong Trading result was due to valuation adjustments or exceptional gains versus sustainable underlying performance.
Maxime Kogge · ODDO BHF
Trading benefited from a favorable combination of inventory cost and selling-price bases after stock was built at attractive material prices. A EUR 10–11 million one-time gain occurred in Q1 but did not recur in Q2; second-half expectations are more cautious because of geopolitical uncertainty.
▸
Whether approximately EUR 4 billion of tax-loss carryforwards will begin to be recognized as profitability improves.
Maxime Kogge · ODDO BHF
Salzgitter expects to use its tax-loss carryforwards as soon as profitable results can be offset against them.
▸
Whether tax payments should remain minimal over the coming year because of the tax-loss carryforwards.
Maxime Kogge · ODDO BHF
Tax cash outlays should remain limited while profits can be offset against available tax losses.
▸
What HKM produced in 2025 and how the blast furnace configuration will change, including whether the furnace currently being relined will restart.
Bastian Synagowitz · Deutsche Bank
HKM operated both blast furnaces at good production levels in 2025, but the exact output was not disclosed. The blast furnace currently being relined will restart in August, while the other furnace will then be shut, reducing capacity from roughly 5 million tonnes to 2.5 million tonnes.
▸
Whether HKM’s 2025 production was approximately 4 million tonnes.
Bastian Synagowitz · Deutsche Bank
The exact 2025 HKM output was not disclosed because production was shared among three shareholders.
▸
When the second HKM blast furnace will be taken out of operation.
Bastian Synagowitz · Deutsche Bank
The second blast furnace will be shut in Q3, shortly after the relined furnace returns to stable operation.
▸
Whether the change represents a net capacity reduction to one operating blast furnace by the end of 2026.
Bastian Synagowitz · Deutsche Bank
Yes. HKM is moving from operating two blast furnaces in 2025 and the first half of 2026 to a one-blast-furnace run rate by year-end.
▸
Whether the EUR 50–100 million HKM maintenance CapEx range applies to one or two blast furnaces.
Bastian Synagowitz · Deutsche Bank
The EUR 50–100 million range covers HKM’s expected blast-furnace-related investment needs this year and in subsequent years. Spending should trend toward the lower end after moving from two furnaces to one, but management is not providing a narrower estimate.
▸
Whether HKM’s earnings contribution will cover maintenance CapEx and restructuring costs, particularly after reducing the workforce.
Bastian Synagowitz · Deutsche Bank
Management said HKM’s operating cash generation, shareholder contributions, public funding, and the additional EUR 100 million group cash commitment together cover CapEx, restructuring, and transformation. A slab delivery contract with thyssenkrupp should also support HKM’s operating results in 2026–2028, especially 2027.
▸
Whether the HKM purchase-price-allocation effects are likely to be positive or negative and whether they can be quantified.
Bastian Synagowitz · Deutsche Bank
It is too early to provide either a direction or quantification for the HKM PPA effects.
▸
How the EUR 100 million net cash requirement will be sequenced over three years and whether additional EU or ETS-related public funding is expected.
Boris Bourdet · Kepler Cheuvreux
No additional public funding is included in the business plan, although Salzgitter would pursue opportunities if they arise. The former shareholders will make substantial contributions toward HKM restructuring and investment.
▸
Whether HKM will create a large initial cash drain followed by improvement later in the period.
Boris Bourdet · Kepler Cheuvreux
The EUR 100 million net cash requirement is expected to be relatively evenly spread, with no significant impact in 2026.
▸
Whether the combined contributions from thyssenkrupp and Vallourec are approximately EUR 500 million.
Boris Bourdet · Kepler Cheuvreux
The amounts contributed by thyssenkrupp and Vallourec are confidential and will not be disclosed.
▸
What the net CapEx schedule will look like over the next several years, including 2027 SALCOS, HKM, maintenance, and a preliminary 2028 figure.
Andrew Jones · UBS
For 2027, net SALCOS Phase I investment is expected to be around EUR 500 million after funding. HKM will require EUR 50–100 million for non-green investment, plus EAF payments, while other non-green group investment is expected at EUR 300–400 million.
▸
Whether approximately EUR 800 million is a reasonable all-in 2027 CapEx estimate.
Andrew Jones · UBS
Management considered EUR 800 million too low rather than high for total 2027 investment, given EUR 500 million of SALCOS spending, HKM spending and EAF payments, and EUR 300–400 million of other investment.
▸
Whether CapEx will fall toward approximately EUR 500 million after SALCOS Phase I spending peaks.
Andrew Jones · UBS
After the main SALCOS spending phase, CapEx should likely decline toward a level closer to EUR 500 million, although timing can be affected by project-payment delays.
▸
How operating costs for the new EAF/DRI routes at Salzgitter and HKM should compare with existing blast furnaces under stable CO2 prices.
Andrew Jones · UBS
In a rising-CO2-price environment, DRI/EAF should become more cost competitive than the blast-furnace route in the early 2030s. Salzgitter expects its new EAFs at Salzgitter and HKM to be among Europe’s most cost-efficient.
▸
Whether HKM should keep the second blast furnace running to benefit from tighter European supply after import restrictions take effect.
Andrew Jones · UBS
The current strategy remains to close HKM’s second blast furnace, although opportunities could be evaluated before the irreversible shutdown. The market may absorb the resulting slab volumes, supported by contracts and the expected removal of Russian slabs.
▸
Whether the European slab market will require tariff-paying imports to balance supply after quota reductions.
Andrew Jones · UBS
Slabs are not currently covered by the TRQ, so regulatory effects are less direct. The loss of Russian slab supply could be met by additional imports or HKM production, particularly after 2028.
▸
Whether European domestic capacity can restart quickly enough to replace approximately 14 million tonnes of imports.
Andrew Jones · UBS
Salzgitter expects to restart one of its own currently idle blast furnaces in Q4, allowing a relatively rapid capacity increase if demand requires it.
▸
Whether competitors, including challenged assets such as Ilva and Liberty, can restore enough capacity to meet demand.
Andrew Jones · UBS
Management believes the European market can supply at least most of the potential lost import volume through existing producers, with imports filling any remaining gap at higher prices.
▸
Whether 2027 gross or net CapEx could exceed EUR 1 billion once HKM EAF payments and other items are included.
Tristan Gresser · BNP Paribas
CapEx above EUR 1 billion in 2027 is not currently expected and would be surprising, although the company will finalize the numbers in the autumn and adjust spending to maintain flexibility.
▸
How Q3 steel-production costs and spreads should develop quarter over quarter after HKM consolidation and the blast furnace relining.
Tristan Gresser · BNP Paribas
Q3 steel spreads are expected to be broadly stable, with a slight possibility of contraction. HKM’s relined furnace should provide operating-cost improvement, while Salzgitter’s own cost base should not change materially.
▸
Whether the pace of treasury-share sales will change in Q3.
Tristan Gresser · BNP Paribas
Salzgitter has no cash pressure and will sell treasury shares opportunistically in a manner intended to protect value; the pace may vary with market conditions.
▸
Whether the planned Q4 blast furnace restart remains appropriate given weak demand and HKM’s full consolidation.
Dirk Schlum · D Bank
Salzgitter still plans to restart its own idle blast furnace in Q4, while continuing to monitor market conditions and demand.
▸
Whether low water levels are causing meaningful operational effects, higher logistics costs, or production disruptions.
Dirk Schlum · D Bank
Low water levels have not affected production. Salzgitter’s Hamburg supply route is unaffected; HKM has increased inventories and moved coal by rail from Rotterdam. Logistics costs are higher for HKM but can be passed through to customers.
▸
Whether the quarter-on-quarter and year-on-year decline in Technology order intake reflects normal volatility or the absence of unusually large prior-year orders.
Dirk Schlum · D Bank
Technology order intake weakness is viewed as project timing and seasonal volatility rather than a structural deterioration. Management believes the business remains on track.
▸
The cost and phasing of the HKM EAF and whether additional subsidies can be secured.
Elaine Gabriel · Morgan Stanley
The HKM EAF investment is approximately EUR 900 million gross, or EUR 700 million net of EUR 200 million public funding. Spending is expected to be weighted toward the latter part of the project. No additional grants are included in the plan, though opportunities will be pursued.
▸
The expected amount and timing of HKM restructuring costs and the contributions from the former shareholders.
Elaine Gabriel · Morgan Stanley
HKM restructuring mainly involves reducing employees from approximately 3,000 to 1,000 by the end of 2029. Costs are broadly comparable to, or slightly below, recent German steel restructurings. Contributions from thyssenkrupp and Vallourec remain undisclosed.
▸
How much of Trading’s strong performance came from windfall gains versus sustainable self-help measures.
Elaine Gabriel · Morgan Stanley
Trading’s Q1 result included a roughly EUR 10–11 million nonrecurring benefit. Q2 also benefited from purchasing material at favorable costs and selling it into a favorable price environment; second-half expectations are more cautious.
▸
Whether Salzgitter will continue selling treasury shares at current prices despite an approximate EUR 63 cost basis.
Stefan
Salzgitter has no need to sell treasury shares for liquidity and will continue selling opportunistically, with the pace determined by market conditions and the objective of protecting stake value.
▸
What the steel-production order book indicates for the second half and whether 6% year-on-year growth reflects current spot pricing.
Jakob Schleider · IMC
Steel production’s flat-products order intake is expected to remain stable and positive through Q3 and the rest of the year, with no major change from Q2. Steel processing remains more project-dependent and requires continued order work.
▸
Question content was not transcribed; management indicated it had already been addressed.
Emmanuel · Reuters
The transcript says management had already answered Emmanuel’s question, but does not reproduce its content or a distinct response.

Web Traffic

salzgitter-ag.com
Web rank#802,032
Est. visits/mo637K
Web Rank History
#802,032+92,103
rankest. visits/mo
700k750k800k850k900k593K614K636K657K678K11-2401-1902-16

Cash Runway

21.4months
WATCH

Institutional Ownership

note: probably the least-tested part of this site, take with a grain of salt
Holder behavior (holder profile)source: holder
On big dips (−10%+)
-10.0%
how holders react when this stock falls
On quiet Qs
-1.5%
−10% to +10% baseline
On rallies (+10%+)
-7.4%
how they react when this stock rises
Holders' portfolio flow this Q
+17.0%
inflows — adds are organic
Sellers' portfolio flow this Q
+0.0%
Sellers' overall flow ~ flat.

Ownership Over Time

Ownership composition

Active
0.0%
1 filers
hedge / family / endowment
Retail funds
—
Fidelity, Schwab, 401(k)
Passive
0.0%
0 filers
Vanguard, iShares, SPDR
Market makers
0.0%
0 filers
Citadel, Susquehanna
Insiders
—
Form 4 — latest per insider
Not enough quarterly ownership history to chart yet.

Analyst Coverage

Analyst Coverage
Analyst Ratings
1
Hold: 1Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2005 Q22.0B—0M$0.00$0.00 – $0.000
2005 Q31.6B257M129M$3.27$3.18 – $3.402
2006 Q11.9B281M149M$0.23$0.23 – $0.242
2006 Q22.1B164M40M$1.68$1.63 – $1.742
2006 Q32.0B218M87M$1.43$1.39 – $1.492
2006 Q42.0B242M106M$1.94$1.88 – $2.022
2007 Q12.3B328M181M$3.21$3.12 – $3.342
2007 Q22.5B371M216M$3.58$3.39 – $3.813
2007 Q32.6B364M206M$3.15$3.05 – $3.293
2008 Q12.9B400M233M$3.70$3.53 – $3.924
2008 Q23.2B381M211M$3.82$3.50 – $4.174
2008 Q33.4B445M264M$4.15$3.99 – $4.354
2008 Q42.7B378M199M$0.27$0.13 – $0.495
2009 Q12.1B111M-11M$-1.09$-1.48 – $-0.227
2009 Q22.1B16M-76M$-0.91$-1.49 – $-0.127
2009 Q31.9B4M-92M$-0.77$-1.69 – $-0.329
2009 Q42.1B305M-72M$1.79$1.63 – $1.983
2010 Q11.8B-41M-136M$0.00$0.00 – $0.001
2010 Q22.2B80M-17M$0.27$0.11 – $0.6910
2010 Q32.2B112M9M$0.00$0.00 – $0.004
2010 Q42.2B230M6M$0.55$0.42 – $0.688
2011 Q12.3B148M31M$0.60$0.45 – $0.799
2011 Q22.5B167M46M$0.77$0.67 – $0.8810
2011 Q32.4B167M47M$0.53$0.45 – $0.769
2011 Q42.4B181M19M$0.74$0.29 – $2.095
2012 Q12.5B260M129M$-0.08$-0.28 – $0.527
2012 Q22.6B109M-17M$0.22$-0.11 – $0.927
2012 Q32.6B93M-8M$-0.13$-0.38 – $0.026
2012 Q42.5B226M-25M$0.45$0.24 – $0.665
2013 Q12.6B71M-53M$0.73$0.71 – $0.763
2013 Q22.5B279M-18M$-0.44$-1.39 – $0.405
2013 Q32.4B-181M-281M$-1.03$-1.28 – $-0.856
2013 Q42.4B62M-68M$-1.31$-1.88 – $-0.704
2014 Q12.3B7M-106M$-0.29$-0.46 – $-0.145
2014 Q22.4B101M-15M$0.06$-0.09 – $0.255
2014 Q32.2B111M-3M$-0.13$-0.21 – $-0.025
2014 Q42.2B194M3M$-0.22$-0.37 – $-0.075
2015 Q12.3B85M-20M$0.52$0.50 – $0.542
2015 Q22.3B142M31M$0.67$0.39 – $0.973
2015 Q32.2B114M7M$-0.21$-0.58 – $0.145
2015 Q42.1B98M-37M$-0.38$-0.86 – $0.385
2016 Q12.0B51M-57M$-0.08$-0.13 – $-0.034
2016 Q22.1B126M16M$0.29$0.15 – $0.554
2016 Q32.1B119M7M$0.52$0.32 – $0.914
2016 Q42.1B105M4M$0.76$0.39 – $1.173
2017 Q12.3B165M47M$0.64$0.62 – $0.662
2017 Q22.4B163M50M$0.51$0.27 – $0.745
2017 Q32.3B119M14M$0.39$0.29 – $0.484
2017 Q42.3B216M47M$0.66$0.52 – $0.834
2018 Q12.4B197M86M$0.85$0.74 – $0.983
2018 Q22.5B189M67M$1.36$1.22 – $1.523
2018 Q32.3B163M62M$0.95$0.81 – $1.144
2018 Q42.3B213M62M$0.75$0.54 – $0.934
2019 Q12.3B200M85M$0.98$0.97 – $0.982
2019 Q22.3B212M94M$0.27$0.27 – $0.272
2019 Q32.1B104M-2M$-2.51$-2.52 – $-2.492
2019 Q42.1B173M-127M$-2.69$-2.71 – $-2.682
2020 Q12.0B-99M-195M$-0.35$-0.36 – $-0.351
2020 Q21.6B53M-34M$-2.21$-2.22 – $-2.201
2020 Q31.7B-25M-110M$-1.25$-1.26 – $-1.251
2020 Q42.0B5M-116M$0.26$0.26 – $0.261
2021 Q12.3B-42M-130M$0.81$0.81 – $0.811
2021 Q22.6B219M118M$2.17$2.16 – $2.181
2021 Q32.6B315M202M$3.73$3.71 – $3.751
2021 Q42.6B418M104M$1.91$1.90 – $1.921
2022 Q13.0B312M206M$3.80$3.78 – $3.822
2022 Q23.5B411M294M$5.42$5.39 – $5.442
2022 Q32.8B229M129M$2.38$1.49 – $2.884
2022 Q42.7B-431M-558M$1.09$0.69 – $1.492
2023 Q12.8B200M78M$1.43$1.42 – $1.441
2023 Q22.9B200M72M$1.32$1.32 – $1.331
2023 Q32.5B100M-15M$-0.27$-0.27 – $-0.271
2023 Q42.5B144M9M$0.17$0.17 – $0.171
2024 Q12.6B157M35M$0.65$0.59 – $0.701
2024 Q22.6B149M27M$0.49$0.46 – $0.511
2024 Q32.4B138M-109M$-1.99$-2.11 – $-1.911
2024 Q42.2B149M-140M$-2.50$-2.55 – $-2.451
2025 Q12.4B116M3M$0.05$0.05 – $0.051
2025 Q22.3B72M-38M$-0.69$-0.70 – $-0.671
2025 Q32.2B99M-9M$-0.16$-0.18 – $-0.142
2025 Q42.2B129M11M$0.20$0.20 – $0.211
2026 Q12.3B258M136M$2.44$2.15 – $2.722
2026 Q22.4B163M49M$0.88$0.86 – $0.901
2026 Q32.5B168M50M$0.89$0.79 – $0.992
2026 Q42.6B187M63M$1.12$1.10 – $1.151
2027 Q12.8B219M87M$1.55$1.38 – $1.732
2027 Q22.7B230M92M$1.65$1.61 – $1.681
2027 Q32.7B202M62M$1.11$1.08 – $1.131
2027 Q42.8B239M91M$1.63$1.59 – $1.661
2028 Q12.8B291M135M$2.41$2.35 – $2.451
2028 Q22.8B285M125M$2.24$2.19 – $2.281
2028 Q32.8B279M116M$2.07$2.03 – $2.111
2028 Q42.8B279M112M$2.01$1.96 – $2.051
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Salzgitter is a cyclical steel producer attempting a capital-intensive decarbonization while consolidating and restructuring HKM. The latest half-year update is materially better operationally: all segments improved, P28 is ahead of its annual savings pace, EU safeguards and CBAM are improving the competitive backdrop, and management raised 2026 sales guidance while maintaining a EUR 725–825M EBITDA range. However, the reported TTM adjusted EBITDA of only EUR 252M, negative adjusted FCF of EUR 410M, EUR 1.13B of net debt including leases, and interest coverage of just 1.9x show that the recovery is not yet proven in owner-earnings terms. The central issue is cash conversion. SALCOS Phase I and the HKM EAF may create a stronger, lower-carbon franchise over time, but 2027 investment could exceed EUR 800M and management has not disclosed important HKM restructuring, PPA, shareholder-contribution or hydrogen-cost details. KHS and Technology provide strategic and possible asset-sale support, while tax-loss carryforwards reduce near-term cash taxes. I estimate current owner earnings at EUR 100M, with a two-year probability-weighted terminal value of EUR 1.665B discounted to EUR 1.332B today. The range is wide because steel spreads, regulation, project execution and funding all matter materially.

Trade Signal

Trade rating
-5.6/10
Short
Horizon
~5mo
gpt-5.6-luna2026-08-13 · saw 51.75 EUR-15.0% since

Short, with a valuation ceiling: Salzgitter's operational recovery and policy support are genuine, but €2.8 billion of equity value prices in durable owner earnings that its negative FCF, leverage and heavy SALCOS/HKM investment cycle have not demonstrated.

Temporary mispricing-3.5

The major move was a durable-looking rerating from €15.70 at end-2024 to €40.14 at end-2025 and a peak of €66.55 in 2026, driven by the earnings recovery, P28 savings, tighter EU steel protections, CBAM, SALCOS funding and strategic-asset optionality. The subsequent decline from the high to €51.75 was a modest digestion rather than a panic selloff; the latest earnings caused only a roughly 1% decline from €52.50, suggesting the strong results were already priced. The initial rerating was justified by improved operations, but the move appears to have overshot the evidence on owner earnings and cash conversion. That gap is likely to close gradually through weaker cash-flow and investment disclosures, though policy and asset-sale headlines could delay the correction.

Market view+3.5

The market appears constructive on the recovery and European industrial-policy story, reflected in the 2025-26 rerating from roughly €16 to above €50 and the 127% one-year return. Bulls point to CBAM, tighter safeguards, P28 savings, Aurubis and potential KHS monetization. Bears point to cyclical steel spreads, negative FCF, net debt, SALCOS energy economics and heavy 2027 CapEx. Formal analyst sentiment is only Hold with minimal coverage, so this is not euphoric consensus, but price action suggests the market is more optimistic than the cash-flow evidence warrants. Positioning data are not provided, so there is no basis to assume a crowded short or a squeeze.

Inflectionwindow ~4mo-2.0

The latest earnings print was a positive operational inflection: P28 is ahead of pace, all segments improved and management raised sales guidance while maintaining strong EBITDA guidance. However, the stock has already risen 127% over the past year, and the consensus path supplied in the study does not show a comparable durable earnings step-up. The next important inflection is cash conversion, not EBITDA: 2027 investment, HKM restructuring and SALCOS funding may prevent owner earnings from approaching the bull case. Overall, the market has likely priced much of the near-term recovery while underappreciating execution risk.

Catalysts
  • ▼2026-10 to 2026-11 · Q3 2026 operating update and HKM blast-furnace closure — Expected in Q3/Q4 2026; tests whether the strong first-half performance survives maintenance, seasonality, weaker Trading and HKM restructuring costs.
  • ▼2027-02 · FY 2026 results and 2027 guidance — Likely to expose cash conversion, net debt and the burden of the major 2027 SALCOS investment cycle; a miss or cautious outlook could challenge the current valuation.
  • ▲H2 2026 to 2027 · KHS strategic review or sale decision — A transaction near the reported potential €1 billion valuation could provide funding and validate hidden-asset value, although timing and price are uncertain.
  • ▲H2 2026 to H1 2027 · Further EU safeguard, antidumping and CBAM implementation data — Evidence of declining imports and sustained European steel spreads would support earnings, but much of the policy benefit is already reflected in the rerating.
  • ▲2027-08 to 2027-09 · SALCOS Phase I commissioning milestones — Late-summer 2027 commissioning could validate the decarbonization strategy, but it is beyond the immediate 12-month resolution window and carries execution and energy-cost risk.
Flow-2.5

No dividend or meaningful buyback is supporting demand. TTM dilution is approximately 2%, while the SALCOS/HKM investment program creates funding pressure and potential future equity or asset-sale supply. A KHS sale could improve the flow picture, but it is uncertain; there is no clear squeeze or imminent tender fuel.

Floor / Ceiling-2.5

There is some asset and strategic support from Aurubis, KHS, technology assets, public SALCOS funding and tangible industrial infrastructure, but no hard floor near today's price. Net debt including leases is about €1.13 billion, adjusted free cash flow is deeply negative, and 2027 CapEx could approach €1 billion. Below roughly the analyst's €19-25 per-share value, asset-sale or strategic-buyer interest could emerge; above the current price, the lack of cash returns and weak cash conversion create a meaningful valuation ceiling.

Buyability

Moderate but deteriorating at €51.75. European trade protection, Aurubis exposure, KHS optionality and the green-steel transition can attract strategic or thematic buyers, but the stock offers no dividend, has negative free cash flow, rising investment needs and limited evidence that EBITDA converts into owner earnings. The next buyer likely needs to believe in sustained steel spreads or strategic-asset value rather than current cash returns.

Fear vs Greedfear 7/10 (+1.0)greed 7/10 (+3.0)

Fear is stronger than greed at this price. The operational recovery is real, but the market is capitalizing cyclical EBITDA and policy support as though they were durable owner earnings, despite negative FCF, leverage and a very expensive investment cycle. The main reason not to be aggressively short is that EU protection, strategic assets and takeover interest can keep the stock supported longer than valuation implies.

Valuation

Our Target
1.3B EUR-49%
Market Should Pay
1.0B EUR-58%
target ×0.82 (fear discount)
Current Market Cap
2.5B EURSlightly bullish
What Changed
transcript · 2026-08-11
+18%fair value on this information

The genuinely new information is the stronger first-half operating recovery and EUR 97M of P28 savings, the raised 2026 sales guidance, evidence that EU safeguards and CBAM are already improving imports and HRC pricing, and the detailed HKM consolidation/funding timetable. The call also newly clarifies that 2027 investment may exceed EUR 800M and that HKM's mid-double-digit H2 EBITDA contribution cannot be cleanly separated between recurring operations and accounting effects.

▸ How the cases moved

The new quarter and call raise the bear-case equity value modestly from roughly EUR 250M to EUR 300M because EU safeguards, CBAM and lower imports reduce the probability of prolonged distressed spreads. The base case rises from roughly EUR 1,500M to EUR 1,800M: P28 delivered EUR 97M in six months, all segments improved, and 2026 sales guidance was raised while the EBITDA range was maintained. The bull case rises from roughly EUR 2,600M to EUR 3,000M because tariff protection, potential strategic-asset value and HKM funding/contribution details improve the upside. Base probability increases from 0.50 to 0.55 and bull from 0.17 to 0.20; bear declines from 0.33 to 0.25, though the probability shift is limited by weak quarterly adjusted EBITDA, high capex and unresolved HKM disclosures.

2-Year Plausible Outcomes
bear25%
300M EUR
rev -4%/yrOE $50M

Steel spreads fade after the initial benefit from EU safeguards, Trading normalizes sharply, and the large SALCOS/HKM investment cycle absorbs most operating cash. Owner earnings remain positive but weak, while leverage and execution risk force a low multiple.

▸ Valuation

6x EUR 50M owner earnings = EUR 300M equity value

base55%
1.8B EUR
rev +3%/yrOE $200M

EU trade protection and CBAM support European steel pricing, P28 savings largely stick, and HKM contributes modestly after consolidation. Technology remains a quality offset to cyclical steel, but heavy 2027 investment prevents a full conversion of EBITDA into free cash flow. Owner earnings recover gradually.

▸ Valuation

9x EUR 200M owner earnings = EUR 1,800M equity value

bull20%
3.0B EUR
rev +8%/yrOE $300M

Safeguards materially tighten the European market, steel spreads remain favorable, P28 delivers its EUR 500M target, and KHS/Aurubis and the green-steel transition are valued as strategic assets. SALCOS funding and operating cash generation contain the equity funding burden, allowing owner earnings to approach EUR 300M.

▸ Valuation

10x EUR 300M owner earnings = EUR 3,000M equity value

▸ Target Rationale

The arithmetic model produces EUR 1.332B, but I set the analytical target at EUR 1.250B because the model necessarily understates execution and capital-allocation risk: current free cash flow is deeply negative, net debt has risen, 2027 investment is unusually heavy, and management could not separate recurring HKM earnings from accounting effects or quantify restructuring/PPA costs. The target still credits the improved European steel backdrop, P28 savings, Technology quality and tax-loss carryforwards, but does not capitalize the full bull-case strategic value before cash conversion is demonstrated.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now5/10
Trajectory7/10
Risk8/10
Governance6/10
Insolvency prob (2yr)8%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Recovery: On May 12, 2026, Salzgitter AG reported a strong turnaround for the first quarter of 2026, delivering an underlying EBITDA VX of €280 million and an EBT VX of €179 million, compared to a loss in Q1 2025. The performance was driven by falling input costs (energy and raw materials), an increase in crude steel output by 1.4% to 1.27 million tons, €43 million in savings from the "P28" efficiency program, and a massive €147 million equity contribution from its stake in Aurubis AG. For the full year 2026, the company expects EBITDA to reach between €625 million and €725 million.
  • Potential KHS Division Sale: In June 2026, reports surfaced that Salzgitter is considering a sale of its beverage filling equipment division, KHS GmbH, which is valued at up to €1 billion ($1.1 billion). The proceeds of this potential divestment would be used to self-finance the capital-intensive decarbonization of its core steel business.
  • Increased Government Funding for SALCOS: In February 2026, the German Federal Ministry for Economic Affairs and Energy confirmed an additional €322 million in state funding for the first stage of the SALCOS low-carbon steel project. This aid addresses a financing gap identified since the initial €1 billion grant was approved under the IPCEI scheme, providing the project with greater financial security.
  • Launch of the KLASSE Project: In late March 2026, Salzgitter launched a joint research project named KLASSE (budgeted at €1.4 million) aimed at using energy-efficient methods to recover high-value metals (iron, vanadium, manganese, and chromium) from electric arc furnace slag, pushing forward its circular economy strategy.
▸ Thesis-test Findings
GP Gunter Papenburg Salzgitter Takeover Offer

In January 2025, a consortium consisting of GP Günter Papenburg AG (Salzgitter’s second-largest shareholder) and TSR Recycling GmbH raised a non-binding takeover bid to €18.50 per share, valuing the company at approximately €1.1 billion. However, the takeover was met with strong opposition from the largest shareholder, the state of Lower Saxony, and labor unions. In April 2025, Salzgitter's Executive Board officially terminated these talks, citing significantly differing views on the company's value, and declared its commitment to remaining independent.

  • Bull/Bear Case Impact: While the termination of the buyout talks eliminated a near-term acquisition premium, the bid highlighted the underlying value of Salzgitter's assets. It also prompted management to accelerate its "P28" performance program (doubling its savings target to €500 million) and consider strategic asset sales (such as KHS) to unlock value and support self-funded green transformation.
EU CBAM Steel Tariff Enforcement Updates

The EU’s Carbon Border Adjustment Mechanism (CBAM) entered its definitive phase on January 1, 2026. In June 2026, EU member states agreed to expand the scope of CBAM to include downstream steel-based manufactured products to prevent "carbon leakage" and stop companies from shifting manufacturing to countries with weaker climate policies. Concurrently, the EU overhauled its steel trade safeguard regime, cutting duty-free import quotas by approximately 47% and raising out-of-quota tariffs to 50%, effective July 1, 2026.

  • Bull/Bear Case Impact: This is highly bullish for domestic steelmakers like Salzgitter. The aggressive combination of carbon import tariffs and halved import quotas protects European producers against cheap, high-emission foreign imports (specifically from regions like China), creating a sheltered domestic "lead market" for green steel.
Salzgitter SALCOS Hydrogen Supply Contract Cost

In June 2026, Salzgitter Flachstahl signed its first major external long-term supply agreement with EWE for green hydrogen. Starting in 2030, EWE will supply 10,000 tons of green hydrogen annually for seven years from its planned Emden facility, covering roughly 6.5% of SALCOS’s Phase 1 requirements. However, the specific contract price or procurement cost was not publicly disclosed. Both companies warned that stringent EU criteria on "additionality" and temporal electricity correlation are threatening to drive up production costs significantly, and they are actively lobbying Brussels for regulatory relaxations.

  • Bull/Bear Case Impact: Securing this supply contract de-risks the first phase of SALCOS. However, the lack of pricing transparency, combined with Salzgitter’s late-2025 decision to delay later stages of SALCOS (emissions reduction to 95%) by three years to 2028–2029 due to uncompetitive energy costs, underscores the bear case: green hydrogen remains an expensive, highly subsidized raw material that may pressure long-term steelmaking margins without persistent government support.