Transmissora Aliança de Energia Elétrica S.A.v3 3.0/10 · 2026-11-01Transmissora Aliança de Energia Elétrica S.A., together with its subsidiaries, engages in the construction, operation, and maintenance of electric power transmission lines in Brazil. It operates approximately a total length of 15,319 kilometers (km) of transmission lines, which include 14,677 km of transmission lines in operation and 642 km of lines under construction; 113 substations with voltage between 230 and 525KV; and one system operation center located in Rio de Janeiro. The company was founded in 2000 is headquartered in Rio De Janeiro, Brazil.
2-Year Price History
Valuation v3 Opus worker · 2026-11-01
Taesa is Brazil's largest listed pure-play power transmission concessionaire. Its contracted RAP (permitted annual revenue) is R$4.56B for the 2026-27 cycle, plus R$305M from five Energisa lines it bought in August 2026. Availability runs at 99.9%, the EBITDA margin is about 87%, revenue is indexed to inflation, and the company pays out 100% of regulatory profit. At R$39.59 (the Oct 30 close, already after the post-election crash) the market cap is R$13.6B (344.5M units). With about R$15.3B of pro-forma net debt (proportional, including the Energisa deal), we pay about 7.7x 2027 EBITDA and about 9.3x unlevered owner earnings of about R$3.1B. After full interest the equity earns about R$1.3B a year (9.5%) and pays out about 7% in cash. The problem is the calendar. TSN, Novatrans, ETEO and ECTE carry about R$1.28B of RAP, roughly 26% of the portfolio, and their concessions expire between May and December 2030. Another R$0.72B expires by the end of 2032. Under Decree 11.314 the default when a concession ends is to re-auction it, and ANEEL's draft rule would compensate the company only for reinforcements. Leverage is already 4.2x net debt to EBITDA, and about a third of the debt pays a floating CDI rate above 14%. Discounting unlevered cash flow at Greg's 15% BRL rate, with a 6x declining-company multiple on post-cliff 2031 FCF, leaves only about R$8 per unit after debt. Discounting the cash left for shareholders at 15% gives about R$17, and sell-side models at about 8% real give R$32-45 (consensus mostly Sell or Neutral). The stock is a bond proxy priced for about an 8-9% real return. Brazilian inflation-linked bonds (NTN-B) pay about 7.5-8% real, and our hurdle is 15% nominal. There is no margin of safety and no catalyst for 50% upside. It is also a poor short: volatility is low and you would pay a 7% dividend carry. Rating 3/10. Research 3/10: only a surprise ANEEL ruling for renewal or full replacement-value compensation would change the picture.
A deep dive would have to establish: Whether ANEEL's final rule under Decree 11.314 (due around 2H26) lets Taesa renew or keep meaningful margins on the R$2.0B of RAP expiring in 2030-32, or pays it compensation at replacement value, which is the only plausible route to value well above the current R$39.59.
Research (expand)
What the company does
Taesa (Transmissora Alianca de Energia Eletrica) owns and operates about 15,000 km of high-voltage transmission lines and 113 substations across 44 concessions, plus 5 more acquired from Energisa in August 2026 (about 1,300 km, R$305M RAP, about 22 years of remaining life). It is paid a fixed, inflation-indexed annual permitted revenue (RAP) for keeping its lines available. Volume and price risk are essentially zero; the only deduction is the variable portion (PV) for outages, which was 0.73% of RAP in 6M26. Cemig (21.7%, controlled by the Minas Gerais state government) and ISA Investimentos (14.9%, ISA/Ecopetrol group) control it under a shareholder agreement; the free float is 63.4%. It also holds joint ventures: TBE (about 50%, with Alupar), AIE (50% of Aimores, Paraguacu and Ivai, with ISA Energia) and ETAU (75.6%).
Latest results (2Q26, released Aug 11, 2026; 3Q26 is due Nov 11)
- Regulatory consolidated: 6M26 net revenue R$1,334.7M (+9.5%), EBITDA R$1,139.3M (+10.5%, 85.4% margin), net income R$399.4M (-16.4%). In 2Q26 alone, net income was R$206.8M (-28.5%) because net financial expense jumped 51% (IPCA +1.99% and IGP-M +3.07% in the quarter, plus more debt).
- Proportional (including joint ventures): 6M26 EBITDA R$1,603M (87.2% margin); net debt R$13.0B; net debt to EBITDA 4.2x. Debt is about 67% IPCA-linked at about IPCA + 4.5-7.2% and about 29% CDI + 0.5-1.7%.
- IFRS net income 6M26 R$920.8M. IFRS overstates economic earnings because the contract asset accrues inflation correction and remuneration; the regulatory books are the better cash proxy, and dividends are sized off regulatory profit.
- 2026-27 RAP cycle: R$4.56B total (R$4.29B operational, R$271M under construction: the rest of Ananai, Tangara and Saira plus Jurua and reinforcements), before the R$305M Energisa add-on.
- Capex: 6M26 R$445M; the remaining contracted capex is R$0.6-0.7B for 2026 and R$0.2-0.3B for 2027, so the big build cycle is over.
- Energisa deal: equity R$1.638B paid at the August 12 close, plus about R$0.75B of assumed net debt, for an EV of R$2.29B. That is about 7.5x RAP, or about 8.5-9x EBITDA, for assets with about 22 years of life. It is debt-financed, which explains why leverage stays above 4x.
What it earns today (IFRS cash-flow check, Brazil rules)
Run-rate after the July 2026 RAP step-up and Energisa, on a proportional basis:
- Regulatory EBITDA: about R$3.75B in 2027 (R$3.2B annualized 1H26, plus the new cycle, partial energizations and Energisa).
- Maintenance capex: about R$0.17B. Most reinforcements earn new RAP, so they count as growth.
- Cash tax at unlevered rates: about R$0.45B. SUDENE/SUDAM regional tax incentives, presumed-profit regimes and JCP keep actual tax near zero today.
- Unlevered owner earnings: about R$3.1B, so about 83% of EBITDA reaches owners. EV of about R$28.9B (R$13.64B market cap plus R$15.3B pro-forma proportional net debt) is about 9.3x unlevered owner earnings and about 7.7x 2027 EBITDA.
- Interest: about R$1.85-2.0B a year accrued on about R$15.3B. That includes IPCA accretion of the principal, which is a real cost even though it is non-cash in the year. Interest is booked in financing cash flow (R$396M of debenture interest plus R$164M of swap settlements in 6M26), so it has to be deducted. Leases are negligible (R$0.8M).
- After-interest equity owner earnings: about R$1.3B (9.5% of the market cap). Regulatory net income is about R$0.9-1.1B because regulatory depreciation of about R$0.65-0.7B is a real cost here: the concessions are wasting assets.
- Cash yield: dividends plus JCP have been R$0.56 (1Q26) and R$0.60 (2Q26) per unit, and FY2025 was R$3.26 per unit. That puts 2026 at about R$2.6-3.0 per unit, a 6.5-7.5% yield. There are no buybacks and no stock comp or dilution. JCP is paid about 3.5 months after declaration (2Q JCP declared Aug 11, paid Nov 26). The payout is covered by maintenance-basis equity FCF, but growth capex and the Energisa purchase were debt-funded.
The concession cliff (the whole thesis)
Expiry dates come from Taesa's own concessions table (proportional RAP for 2026-27):
- 2030: ETEO (May, R$166M), ECTE (Nov, R$17M), TSN (Dec, R$532M), Novatrans (Dec, R$560M). Total R$1.28B, about 26% of RAP.
- 2031: EATE and ETEP (Jun, R$277M).
- 2032: NTE, GTESA, STE, PATESA, ETAU, ENTE, ERTE (R$445M).
- 2034-36: ATE I, II and III, Munirah, Transleste, Transirape, Transudeste, STC and Lumitrans (R$0.6B).
By the end of 2032 about 41% of today's RAP (R$2.0B) is gone, and about 54% by 2036. Decree 11.314/2022 makes re-auction the default for expiring transmission concessions, with renewal only as an exception. ANEEL's draft rule (CP 43/2025, final rule expected around 2H26) would compensate only for incremental reinforcements, not unamortized original assets. Taesa's residual book value is R$1.3B for 2030-32 expiries (about 37% reinforcements) and R$3.6B in total, at historic cost. Taesa could rebid for its own lines, but re-auctioned brownfield RAP will look like O&M plus a return on new investment, a fraction of today's IGP-M-indexed legacy RAP. The CEO says the company must declare its intentions by 2027.
Free cash flow, next 5 years (unlevered, proportional, nominal R$B)
Assumptions: about 4% RAP indexation, the rest of the construction pipeline energized in 2026-28, maintenance capex of R$0.17-0.2B, growth capex of R$0.15-0.3B (contracted work plus small reinforcements, no new auctions), and unlevered taxes of about 12% of EBITDA.
- 2027: EBITDA 3.75, FCF 2.83
- 2028: EBITDA 3.95, FCF 3.10
- 2029: EBITDA 4.14, FCF 3.31
- 2030: EBITDA 4.22 (ETEO gone from May), FCF 3.37
- 2031: EBITDA about 3.1 (TSN, Novatrans and ECTE gone, EATE and ETEP half-year), FCF 2.43
2032 EBITDA falls to about R$2.6B. On today's debt that is about 5.5-6x leverage unless the company cuts the payout or adds long-dated assets in the meantime. It has room for maybe 2-3 more good years of growth; after that the legacy book runs off.
What the company looks like in 5 years
It is not a corpse, but it is a smaller, still-indebted annuity. In 2031-32 the remaining book is about R$2.6B of RAP (2026 R$, Energisa included) with expiries spread across 2038-2054, plus whatever it wins at auction. Auction wins come at roughly IPCA + 9-11% unlevered returns, about NPV-neutral at our hurdle. The market will price that company as a declining utility at about 5-8x FCF. Confidence in the 2027-30 cash flows is high: they are contracted, inflation-indexed and run at 99.9% availability. Confidence in 2031+ is low because it hinges on an ANEEL rule not yet written.
Fair value and multiples
- Greg-method DCF at 15% BRL: PV of 2027-31 unlevered FCF is R$10.1B. Terminal value at 6x 2031 FCF (R$14.6B) is worth R$7.25B today. Probability-weighted compensation for unamortized assets adds R$0.55B. EV R$17.9B, less R$15.3B net debt, leaves R$2.6B, about R$7.6 per unit. At a 5x terminal multiple it is about R$1; at 8x with generous compensation, about R$20. The method penalizes Taesa because its debt costs about 12% nominal, below the 15% discount rate.
- Discounting the cash left for shareholders (after interest) at 15% gives about R$5-6B, or about R$15-19 per unit.
- Today's year repeated forever (an invalid approach because of the expiries): R$3.1B / 10% - R$15.3B = R$15.7B, about R$46 per unit; at 15% about R$16 per unit. If nothing changes, the equity earns about R$1.3B a year, 9.5% on the market cap, until 2030.
- Sell-side real-terms DCFs at about 8% real: R$32-45 per unit (Bradesco BBI R$38-40 Sell; BTG R$40 Sell as of late Oct 2026; Safra R$31.8 Sell; XP R$36 Neutral; Itau BBA R$44.9 Market Perform; BB Investimentos R$42.6 Buy). BBI estimates that full compensation for non-depreciated assets would add about R$8.6 per unit, which is the main upside optionality.
- Multiples at R$39.59: P/E about 12.5x 2027 regulatory earnings (about 7.5x IFRS); EV/EBITDA about 7.7x forward; equity FCF yield about 9.5%; cash dividend yield about 7%.
- Fair value (my judgment): about R$26 per unit, between the 15%-hurdle values and the sell-side's 8%-real values, with a range of R$18-38. Base-case IRR from R$39.59 is about 6% nominal: high dividends through 2030, then a shrinking, levered stub. That is well under the 15% hurdle.
Price chart
The units are at R$39.59, 34% of the way up the 1-year range (R$36.02-46.45) and 62% of the 3-year range (R$28.19-46.45). They rallied about 40% from R$29.7 (Feb 2025) to R$46 as the Selic peaked, and slipped about 5% in October after the Lula re-election repriced the DI curve up 200-260bp. The units are not at a valuation floor, and implied volatility on a utility like this is low, so this is not a covered-call setup.
Management, governance, risks, competition
- Management runs the assets well: 99.9% availability, projects delivered 10-25 months early and about 15% under ANEEL's capex budget. It has been disciplined in auctions, but it is now levering up (4.2x) to buy brownfield lines at about 7.5x RAP to fill the coming hole.
- Governance: two strategic controllers. Cemig is state-owned, and its long-discussed sale of its stake (about R$2.5B) has been blocked or delayed by TCE-MG, the state audit court, so it remains a potential overhang or block trade. Shareholder-meeting governance and 100% tag-along via units are decent. Related-party joint ventures with ISA Energia and Alupar are arm's length and regulated. No fraud history.
- Risks: (1) the adverse compensation and re-auction rule for 2030-32 expiries; (2) higher-for-longer Selic after the election, with about 29% of debt on CDI and IPCA accretion squeezing regulatory profit and dividends; (3) a possible payout cut to hold leverage below 4x; (4) tax reform and changes to JCP and dividend taxation (JCP withholding is rising and a minimum tax on dividends is coming); (5) IGP-M volatility on the legacy RAP.
- Competition: regulated natural monopolies once built; new lines are won in competitive ANEEL auctions against ISA Energia, Axia (ex-Eletrobras), Alupar, State Grid, Copel, Engie and others, with heavy discounts to the auction ceiling (40-55%), which keeps new-project returns modest.
Sentiment: 5/10
Retail investors love it as a dividend cow (it is a staple of Brazilian income portfolios). The sell-side leans negative: BTG has it as its only Sell in utilities, Bradesco BBI and Safra rate it Sell, XP and Itau Neutral, and only BB Investimentos says Buy. Consensus price targets cluster around R$36-42. Genial calls it 'a lot to lose and little to gain.'
What would change my mind
A final ANEEL/MME rule that lets incumbents renew TSN and Novatrans at meaningful margins, or that pays compensation at replacement value (VNR, new replacement cost), would add about R$5-9 per unit. A Cemig block sale at a discount, sending the stock to about R$30, would move it toward fair value but would still not clear a 15% hurdle.
- https://ri.taesa.com.br/wp-content/uploads/2018/11/TAESA_Release-2T26.pdf
- https://ri.taesa.com.br/en/taesa/concessions/
- https://ri.taesa.com.br/
- https://www.infomoney.com.br/mercados/taesa-tem-lucro-liquido-regulatorio-de-r-2068-mi-no-2o-tri/
- https://cenarioenergia.com.br/2026/08/12/taesa-registra-ebitda-de-r-114-bilhao-no-semestre-com-avanco-de-novas-concessoes/
- https://renovainvest.com.br/blog/taesa-energisa-transmissoras-aquisicao/
- https://cenarioenergia.com.br/2026/05/21/taesa-adquire-cinco-ativos-de-transmissao-da-energisa-por-r-23-bi/
- https://www.ad-hoc-news.de/boerse/news/nebenwerte/taesa-stock-reports-brl-567-1-million-q2-profit/70205939
- https://agenciainfra.com/blog/transmissoras-temem-prejuizos-com-relicitacao-sem-indenizacao/
- https://cenarioenergia.com.br/2025/12/09/aneel-abre-consulta-publica-para-regulamentar-relicitacao-e-prorrogacao-das-concessoes-de-transmissao/
- https://www.terra.com.br/economia/taesa-espera-definicao-sobre-regras-para-renovacao-de-concessoes-nos-proximos-meses-diz-ceo,86b57f2ae539801897b0c19c2fedd247glc0n3zo.html
- https://www.moneytimes.com.br/taesa-taee11-por-que-apesar-dos-dividendos-robustos-bbi-recomenda-venda-veja-novo-preco-alvo-lmrs/
- https://investidor10.com.br/noticias/taesa-taee11-ganha-novo-preco-alvo-em-2026-com-compra-de-ativos-da-energisa-120521/
- https://www.suno.com.br/noticias/taesa-taee11-safra-recomenda-venda-acoes-evm
- https://content.btgpactual.com/research/ativo/TAEE11
- https://www.moneytimes.com.br/taesa-ainda-e-um-caso-de-muito-a-perder-e-pouco-a-ganhar-diz-genial/
- https://braziljournal.com/cemig-comeca-a-vender-sua-posicao-na-taesa/
- https://investidor10.com.br/acoes/taee11/
- /Users/gregwo/stocks2/data/analysisv3/context/TAEE11.SA.md
- /Users/gregwo/stocks2/notes/brazil_macro_2026_10_26.md
Financials — Adjusted
Adjusted · TTM 2026-Q3 · BRL
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 4028-11% | 4624+24% | 3720+10% | 3369+29% | 2617 |
| Gross profit | 2836+9% | 2546+3% | 2474+16% | 2128+0% | 2118 |
| Operating expenses | 291-3% | 267+1% | 266+24% | 214-12% | 242 |
| ▸Adj EBITDA | 2533+10% | 2235+0% | 2233+16% | 1932+1% | 1909 |
| ▸Adj OCF | 657-59% | 1383+54% | 897-12% | 1022+23% | 831 |
| CapEx | -46.7 | -43.8 | -44.3 | -75.3 | -179 |
| Adj FCF | 611-61% | 1339+57% | 852-10% | 947+45% | 652 |
| Interest expense | 802 | 927 | 786 | 790 | 626 |
| ▸Adj net income | 1595+22% | 1281+5% | 1215+10% | 1101+6% | 1039 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 12173100% | 2214100% | 2678100% | 2673100% | 2245100% | 2363100% |
| FCF (OCF−capex) | 705258% | 155570% | 148856% | 149656% | 68130% | 183278% |
| Net income | 737661% | 128258% | 158059% | 169363% | 137261% | 144961% |
| ▸Capital returned | 513942% | 89.74% | 109041% | 212379% | 57826% | 125953% |
| Buybacks | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Dividends | 5532 | 829 | 1020 | 1007 | 1004 | 1672 |
| Interest paid | 3705 | 575 | 927 | 786 | 790 | 626 |
| Debt paid down | -4098 | -1314 | -858 | 330 | -1216 | -1040 |
| ▸Reinvestment | 6285% | 59.93% | 1506% | 42.82% | 71.93% | 30213% |
| Capex (PP&E) | 371 | 29.0 | 43.8 | 44.3 | 75.3 | 179 |
| Intangibles & M&A | 272 | 30.8 | 107 | 0.00 | 0.02 | 134 |
| Leases signed (net Δ) | -15.1 | 0.08 | -0.79 | -1.44 | -3.43 | -9.51 |
| Retained / other | 534644% | 201091% | 121745% | 1596% | 89340% | 106645% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 25591 | 22507 | 20431 | 19337 | 17309 |
| ▸Liabilities (total) | 17366 | 14898 | 13492 | 12814 | 10739 |
| Net debt (incl. leases) | 12510 | 9689 | 9049 | 8397 | 7073 |
| Net debt / Adj EBITDA | 4.94 | 4.34 | 4.05 | 4.35 | 3.70 |
| Net debt / Adj FCF | 20.5 | 7.23 | 10.6 | 8.87 | 10.8 |
| Adj EBITDA / interest | 3.16 | 2.41 | 2.84 | 2.44 | 3.05 |
| Shares outstanding | 1033 | 344 | 344 | 344 | 344 |
| Dilution (YoY) | +200.0% | +0.0% | +0.0% | +0.0% | +0.0% |
| Employees | 687 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 70.4%+12.7 | 55.1%-11.4 | 66.5%+3.3 | 63.2%-17.8 | 81.0% |
| Adj EBITDA margin | 62.9%+11.8 | 48.3%-11.7 | 60.0%+2.7 | 57.4%-15.6 | 73.0% |
| Adj OCF margin | 16.3%-19.3 | 29.9%+5.8 | 24.1%-6.2 | 30.4%-1.4 | 31.8% |
| Adj FCF margin | 15.2%-19.3 | 29.0%+6.1 | 22.9%-5.2 | 28.1%+3.2 | 24.9% |
| Net income margin | 40.9%+2.7 | 34.2%-11.4 | 45.5%+4.8 | 40.7%-14.6 | 55.4% |
| Adj NI margin | 39.6%+10.6 | 27.7%-4.9 | 32.7%+0.0 | 32.7%-7.0 | 39.7% |
| ROIC (adj, after-tax) | 10.1% | 10.9% | 12.0% | 11.3% | 10.8% |
| Cost of debt | 6.8% | 8.8% | 7.9% | 8.2% | 7.6% |