TE

T1 Energy Incv3 4.5/10 · 2026-11-12
Industrials·Electrical Equipment & Parts
$1.32
$353M market cap
v3 Rating
4.5/103.0–6.0
Setup
6.5/105.0–8.0
Fair Value
$1.70$0.30–$5.00+29%
DCF (10%)
$1.90+44%
Base IRR
+8%-50%–+40%
Visibility
wide±138%
Wall Street
$7.00 target(2 analysts last quarter)(3 buy, 3 hold, 1 sell)
Rating
Revenue (TTM)
$982.9M
Owner Earnings
-$60M
Next-Yr Owner Earnings
-$80M
Growth
+15.0% × 3y
P / Next-Yr OE
--
Net Debt
$570M

T1 Energy Inc specializes in the creation and distribution of battery cells, catering to diverse sectors including stationary power storage, electric vehicles, and maritime applications. The company operates globally, with a strong presence across Europe. Furthermore, it undertakes the development and construction of manufacturing plants for lithium-ion batteries. T1 Energy Inc was established in 2018 and is headquartered in Luxembourg.

2-Year Price History

$1.93-8.1%
$2.0$4.0$6.0$8.0$10Initial target $1.50 · 2026-10-18Initial target $2.20 · 2026-11-10Initial target $1.70 · 2026-11-12volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-12

Rating
4.53.0–6.0
Setup
6.55.0–8.0
Fair value (USD)
1.700.30 – 5.00
Upside vs 1.32
+29%
DCF (10%)
1.900.20 – 5.50+44%
Base IRR
8%-50% – 40%
Visibility
very widerange ±138%
Sentiment
2/10
Reputation
5/10
2026-11-12 · claude-opus-5-5 · priced at 1.93

T1 Energy (ex-FREYR) runs the 5 GW G1_Dallas solar module plant it bought from Trina. It is building the 2.1 GW G2_Austin cell fab, which has $200-250M of spend left and no financing. The stock has fallen 84% from its $12 peak to $1.93, down about 16% on today's Q3 print. Q3 was bad: sales were $197M, gross margin was 8.5% even with 45X credits, adjusted EBITDA was -$16M, SG&A ran at $71M a quarter, and only $59.5M of cash is unrestricted. The market is pricing a real chance of a dilutive rescue. Net debt is about $570M after counting $704M of debt, $74M of preferred, European exit fees, and the $139M grants receivable at a haircut. That balance sheet sits on a business that loses money before 45X credits. The bull case is that Section 232 lifts US module prices to the mid-30s (cents per watt, imported cells) and mid-40s (domestic cells), G1 sells out its 5.3 GW in 2027, and G2 gets to management's $375-450M EBITDA run rate. My base case haircuts that to about $250M of EBITDA by 2028, and 45X credits start phasing down in 2030. On those numbers the DCF gives about $1.90 a share, roughly today's price, with a range from $0.20 to $5.50. The market is not clearly wrong. It is scared of financing that may be dilutive, and that fear is reasonable. Rating 4.5: no margin of safety until financing closes. Research rating 6.5: this is capitulation, with heavy short interest and a binary catalyst. If debt-based financing closes on acceptable terms and 2027 contract margins show up, the stock could double. Governance and Trina/FEOC questions weigh on it. Implied volatility of 110-130% is high, but forward earnings are too uncertain for a covered-call floor.

A deep dive would have to establish: Can T1 close a primarily debt-based G2 financing (plus 45X monetization) without heavy equity dilution, and do the post-232 2027 contracts produce positive module gross margins before 45X credits?

Owner earnings, TTM
-$60M-$110M – $0M
Realistic peak profit
$250M$100M – $450M
Growth rate
15.0%0.0% – 35.0%
Years of growth
31 – 5
Market cap
$615M$590M – $700M
EV
$1.2B$1.1B – $1.3B
Net debt
$570M$480M – $680M
Capital return / cap
0.0%0.0% – 0.0%
P/E
15.0×7.0× – 60.0×
EV/EBITDA
9.0×5.0× – 20.0×
FCF yield
-10.0%-20.0% – 0.0%
Projected FCF, base case (USD millions)
Y1-$80M-$220M – $30M
Y2$220M$40M – $380M
Y3$250M$50M – $420M
Y4$200M$20M – $380M
Y5$150M-$20M – $330M
Competition: A commoditized US module/cell market where First Solar, Qcells and new domestic cell fabs compete, and whose economics rest almost entirely on 45X credits and Section 232 trade protection, not on a durable moat.
Governance: Material concerns: DOJ grand jury and SEC inquiries into a director's 2023 share sales, the CAO fired in February 2026, Trina still a related-party customer and anti-dilution holder amid FEOC-compliance doubts, RWE litigation, and a complex dilutive capital structure.
Research (expand)

What it does. T1 Energy assembles TOPCon solar modules at G1_Dallas (5 GW; 4.0-4.2 GW in 2026, 5.3 GW planned for 2027) and sells them to utility-scale developers (Avantus, Clearway, Treaty Oak). It is building G2_Austin, a 2.1 GW Phase 1 cell fab with a $510M budget, about $250M spent and first cells around April 2027. It now owns its TOPCon IP, bought from Evervolt for $135M, mostly paid in shares.

What the market believes. The stock is $1.93, down from $12 in January. Investors are pricing a stalled G2 financing, fast cash burn and dilution. Unrestricted cash is $59.5M, and 9M operating cash flow was -$176M because inventory rose to $335M and 45X credits are not yet monetized. SG&A is about $280M a year. The bull case says Section 232 minimum import prices and tariffs have reset module prices, contracted 2027 volume is over 3.5 GW with a 22.8 GW pipeline, and the 45X receivable ($139M) plus a Nordic data-center LOI unlock liquidity. Testing it, the operating problem is real. Q3 gross profit was $16.7M on $197M of sales, and that already includes 45X credits of about $0.05-0.07/W. Underlying module economics before credits are negative. 'Related-party' Trina entities still made up $190M of Q3 sales, which keeps the FEOC and counterparty question open (RWE litigation, a fired CAO, a DOJ/SEC subpoena on a director's 2023 share sales, and a First Solar ITC TOPCon patent case with a hearing in February 2027). What survives is a policy-driven turnaround. It could work, but it depends on financing.

Earnings today. Unlevered owner earnings are negative, about -$60M annualized. Adjusted EBITDA was -$16M in Q3 and about -$21M for 9M once the $24M tariff refund is stripped out. Stock comp is about $20M a year, and G1 maintenance capex is about $20-30M.

Five-year FCF (unlevered, after SBC and capex, $M): 2027 -80, with G2 completion capex partly offset by inventory unwinding. 2028 +220, with G1 sold out at higher prices and G2 ramped. 2029 +250. 2030 +200 and 2031 +150 as 45X steps down 25% and then 50%. In year 5 this is a policy-dependent commodity manufacturer, worth about 7x FCF ($1.05B). Discounted at 10% and less about $570M of net debt, that gives about $610M of equity, or about $1.90 a share on roughly 318M shares (after the deferred Evervolt shares). The bull case, near management's target of about $400M EBITDA at 8x, gives about $5.50. If financing fails or is highly dilutive, it gives about $0.20. I have low confidence in the year-5 business.

Multiples. EV is about $1.18B. That is about 9x consensus 2027 EBITDA (about $130-160M, including 45X) and about 4.5x management's post-G2 run rate. Trailing figures are negative.

Management and risks. CEO Barcelo is a promotional deal-maker. The capital structure is complex: $545M of converts struck around $6.7-6.9, a Trina anti-dilution right at $1.70, 37M as-converted preferred shares, and $2M a month of European exit fees. Capex has overrun by 20% and the schedule has slipped twice. Competition comes from First Solar, Qcells, ES Foundry and Talon, plus imports after the 232 waivers.

Sentiment: 2/10. The stock is near its 3-year low after a mania, short interest is about 25% of the float, the CEO apologized on the call, and the price fell again on the print. Millennium went to 7.3%, probably hedged against the converts. The catalyst is the exclusive debt financing, which management targets for year-end.

Sources
Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-10-182.623.04.01.500.45-25%3
2026-11-102.074.56.02.202.6012%2
2026-11-121.934.56.51.701.908%2

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue983+146%7552.940.000.00
Gross profit78.8+15%55.6-5.91-5.46-0.48
Operating expenses264+37%235+194%80.1-29%113-7%121
▸Adj EBITDA-78.8-86.4-74.3-113-121
▸Adj OCF-125-136-117-119-111
CapEx-268-78.8-50.8-188-181
Adj FCF-393-215-168-307-292
Interest expense30.027.20.000.000.00
▸Adj net income-283-234-437-132-120
▸Owner's earnings-250--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-42132.4100%-228-83.8-42.9-98.6
FCF (OCF−capex)-1109-42616.7-154-276-271
Net income-1093-105-323%-368-450-71.9-98.8
▸Capital returned-428-284-878%157-50.00.00-250
Buybacks-310-9.620.00-50.00.00-250
Dividends0.000.000.000.000.000.00
Interest paid47.520.227.20.000.000.00
Debt paid down-165-2951300.000.000.00
▸Reinvestment1086306945%126272193184
Capex (PP&E)74825078.850.8188181
Intangibles & M&A133-0.380.001291.663.00
Leases signed (net Δ)20556.147.492.73.95--
Retained / other-767-121-374%-113-232-277-23.7

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 55 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)199313721336733828
▸Liabilities (total)16721050109998.2108
Net debt (incl. leases)859366641-254-429
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-2.63-3.17------
Shares outstanding295169156140140
Dilution (YoY)+88.9%+8.2%+11.6%+0.0%+20.0%
Employees328618328263--
MarginsTTM2025202420232022
Gross margin8.0%-9.27.4%+208.1-200.7%----
Adj EBITDA margin-8.0%+4.9-11.4%+2512.8-2524.2%----
Adj OCF margin-12.7%+9.9-18.0%+3970.3-3988.3%----
Adj FCF margin-40.0%+1.9-28.4%+5687.6-5716.0%----
Net income margin-29.9%+106.7-48.7%+15252.2-15300.9%----
Adj NI margin-28.8%+85.7-31.0%+14822.1-14853.1%----
ROIC (adj, after-tax)-11.8%-16.3%-7.2%-14.8%-13.1%
Cost of debt4.3%4.0%0.0%----

Earnings Calls

12 updates

Earnings Call · 2026 Q3

2026-11-12

T1 Energy's Q3 2026 call, themed "Actions Speak the Loudest," opened with management acknowledging stock pressure and disappointment that a comprehensive debt-based financing for G2_Austin Phase 1 was not announced months ago. CEO Dan Barcelo said closing that financing is the #1 priority; T1 is in exclusive negotiations (with certain exceptions) with institutional investors. He argued that equity invested (~$250M in G2), commercial momentum and Section 232 tailwinds make T1 a more attractive counterparty. Key milestones: a Commerce Department 232 waiver in October for up to 1.725 GW of cell imports to keep G1_Dallas running; nearly 1.6 GW of new offtake contracts, bringing contracted 2027 capacity to over 3.5 GW; and a 2027-2029 backlog and pipeline above 22.8 GW. Direct customers include Avantus, Clearway and Treaty Oak. Leading-edge module quotes are mid-$0.30s/W with imported cells and mid-$0.40s with domestic cells. T1 may sell out G1's 2027 capacity and plans to produce 5.3 GW in 2027. T1 is also engaging Commerce on the 232 onshoring relief program, citing $1.3B of commitments to 2030 for U.S. polysilicon and wafers (Hemlock, Corning) and $510M of Phase 1 investment in the polysilicon supply chain. G2_Austin construction: steel structure complete, all Phase 1 equipment in U.S. ports/warehouses and owned unlevered, MEP installation under way, long-lead items have set delivery dates. David Ziegler, new SVP of Special Projects, is leading the build. Assuming financial close by year-end, construction, commissioning and ramp should finish around midyear 2027; the deck now shows April for first production, reflecting financing delay. Financials: Q3 G1 production was 1,056 MW, with 326 MW built into inventory ahead of 2027 contracts; net sales were $197M. Q3 adjusted EBITDA was hurt by inventory build, higher SG&A (legal/transaction fees, hiring), slow 45X tax credit monetization for non-investment-grade companies, and G1 margins not yet reflecting new pricing. Cash was $137M including restricted, with $59.5M unrestricted. 2026 production guidance narrowed to 4.0-4.2 GW; Q4 may be the best quarter of the year. T1 raised a $50M convertible note bridge in September. It also signed a nonbinding LOI to redevelop its Norway Giga Arctic asset as a data center with no T1 equity contribution. Integrated EBITDA run-rate targets are unchanged: $375-450M post G2 Phase 1 and $650-750M at full 5 GW/5 GW. In Q&A, management said financing delays are not tied to 232 but to counterparty processes, outlined cell supply for 2027, discussed pricing and onshoring uncertainty (a ~$0.12/W cost band), said Talon questions are best directed to Talon, and described the NRI storage business as additive to solar customers.

Analyst Q&A (10)
▸
What is driving the delay in the debt-based financing, and are lenders waiting on 232 onshoring program approval?
Philip Shen · ROTH Capital Partners
Barcelo said lenders are not waiting on 232 or onshoring; the delay relates to certain counterparty processes. He highlighted a strong starting point: collateralized G1 with about $100M senior debt, an unlevered cell facility under construction, and 232 tailwinds. Calio said it is the singular focus and the timing reflects strategic decisions in the company's best interest.
▸
When must financing be secured to keep the April G2 start target, and can it wait a few months?
Philip Shen · ROTH Capital Partners
Barcelo said that with financial close by year-end, construction, commissioning and ramp should finish around midyear; the March-to-April shift reflects financing delay. Equipment is in the U.S., long-lead items have set delivery dates, and permitting, power and water are on track. Ziegler said steel, concrete and decking are done, so the project can make up schedule once funded. Calio added higher pricing improves margins during the ramp.
▸
Does T1 own the imported equipment, and can imported-cell module pricing go above the mid-$0.30s given the $0.38 MIP and 15% ad valorem tariff?
Philip Shen · ROTH Capital Partners
Barcelo said T1 owns all G2 equipment 100%, unlevered apart from corporate debt. Pricing is mid-30s heading toward 40 for imported-cell modules and mid-40s for domestic, with strong utility-scale customers. Calio said contracts lock in cell cost via the import waiver, prices have been rising, and upside depends on mix and how the onshoring plan is scored, where T1's $1.3B polysilicon/wafer commitments and $510M Phase 1 investment should help.
▸
What is the timing of the onshoring program approval, possibly December, or could it be delayed?
Philip Shen · ROTH Capital Partners
Andy Munro said discussions with Commerce are productive, a meeting is expected soon, and T1 is well positioned for a favorable deal. Delays are possible and no date can be guaranteed, but Commerce is focused on onshoring deals in the near future.
▸
Has T1 considered customer prepayments on new offtake to reduce the capital needing to be raised?
Gregory Lewis · BTIG
Barcelo said T1 has explored multiple options, including structuring vendor payment timing, and does not own-equipment encumbrances; exclusive negotiations continue toward a primarily debt-based solution. Calio said prepayments already appear on the balance sheet; newer contracts are shifting from cost-plus multiyear toward price and shorter duration, and 232 changed working capital cadence, so deposits are a tool but compete with construction uses of capital.
▸
What is the update on the Talon PV investment, and how do its cells fit into a 232 world?
Gregory Lewis · BTIG
Barcelo said the Talon investment was meant to be part of the Texas ecosystem with a less capital-intensive route to cells, and that could remain a strategy. Domestic cell demand is night and day stronger now, but he deferred specific questions to Talon's management.
▸
How should we think about 2027 cell supply: waiver coverage, inventory, and the G2 ramp?
Sean Milligan · Needham
Barcelo said commissioning and ramp-up produce functioning commercial cells, building inventory ahead of full ramp around midyear. Calio said cells imported under the waiver are for 2027 modules, with some inventory carried into 2027. G2 cell contracting is deliberately limited until financing closes and visibility improves, since contracts carry LDs; the balance will be imported cells, with further contracting awaiting the onshoring outcome given a ~$0.12/W cost band. Barcelo noted solar and storage demand for real hyperscaler projects remains strong.
▸
Is non-cell COGS per watt stable now?
Sean Milligan · Needham
Barcelo said non-cell BOM such as glass and frames has stabilized after tariff-related volatility; cell prices fell earlier and ticked up during the 120-day import window due to demand. Calio added conversion costs compress as volume scales, and cells deliverable after the window are priced significantly lower, with attractiveness depending on the onshoring and ad valorem outcome.
▸
What is the imported versus domestic cell split in the recent 1.6 GW of offtake, and is there flexibility?
Nicholas Lipinski · Vertical Research Partners
Calio said the contracts are heavily weighted to imported cells; G2 cell contracting is strategically limited until the onshoring plan and financing timing are clear. Barcelo said some of the 1.6 GW touches domestic cells through related relationships or negotiations, waivers were allocated to strategic customers expected to transition to domestic content, and customers blend to maximize incentives. Calio added the pre-232 Corning wafer contract gives T1 higher domestic content.
▸
How is T1's approach to NRI different, what was its contribution, and what are its growth potential and pipeline?
Nicholas Lipinski · Vertical Research Partners
Barcelo said NRI is not broken out yet as integration continues. He described three components: a network operating center with O&M fees, American-made BMS/EMS controllers, and BESS integration (where domestic LFP cells are scarce). The strategy is to be additive to T1's solar customers as projects increasingly attach storage, with stronger sales engineering.

SEC Filing Findings

SEC Filing — material findings

2026-08-12 · depth 9/10
risk 7Dilution
▸

Anti-dilution rights granted to Trina Solar: Trina can acquire shares to maintain proportional ownership on preferred conversion and on capital raises; Anti-Dilution Right liability of $31.3M at June 30, 2026 (revalued with share price). Convertible preferred (37.2M as-converted shares) and two convertible note series add substantial potential dilution vs. 280.6M shares outstanding.

“we provided Trina Solar the right (“Anti-Dilution Right”), but not the obligation, to acquire a number of shares of our common stock so that Trina Solar’s proportionate ownership of our common stock after the conversion of the Preferred Stock will be the same as before the conversion at a price equal to $ 1.70 per share”
risk 7Dilution
▸

Evervolt TOPCon IP purchase ($135M) is partly payable in common stock: $60M was paid in shares on July 31, 2026, and remaining tranches ($25M, $30M, $18M due Sept-Oct 2026) are payable in cash or stock at Company election, adding dilution or a ~$73M cash obligation.

“(i) $ 60.0 million, which was paid in shares of common stock of the Company on July 31, 2026; (ii) $ 25.0 million, payable on September 30, 2026; (iii) $ 30.0 million, payable on October 15, 2026; and (iv) $ 18.0 million, payable on October 30, 2026. Each of the remaining tranches are payable, at the Company’s election, (a) in cash, (b) by the issuance of our common stock”
risk 6Toxic Financing / Dilution
▸

Post-quarter $120M 4.75% convertible notes due 2031 placed privately, with conversion shares and further dilution not in the summary; the convertibles total roughly $504M principal post-raise across three series, all convertible at ~$6.7-6.9 per share versus a $9.48 share price used in the 10-Q valuation.

“On July 31, 2026, we completed a private placement of $ 120.0 million aggregate principal amount of the Company’s 4.75 % Convertible Senior Notes due 2031”
risk 7Litigation
▸

First Solar ITC Section 337 investigation seeks a general exclusion order covering TOPCon cells and cease-and-desist orders against T1 and subsidiary; ITC hearing set for February 16, 2027, with parallel district court case stayed. Could restrict imports of T1's core cell inputs.

“First Solar, Inc. has requested that the International Trade Commission issue a general exclusion order prohibiting the importation of products that infringe the ’074 Patent, which First Solar, Inc. alleges includes TOPCon solar cells”
risk 6Hidden Liability
▸

Accrued fees to exit European business: $41.2M accrued at June 30, 2026 with $2.0M/month fees until disposal and 19.9% of any shortfall below $45M consideration; European assets remain unsold.

“Unless waived by the counterparty in writing, we expect to incur fees of $ 2.0 million per month until the business is disposed of. Additionally, if the total consideration received through the disposal is less than $ 45.0 million, we will owe fees equal to 19.9 % of the shortfall.”
risk 6Litigation
▸

DOJ grand jury subpoenas and SEC document request regarding a director's 2023 stock sales (pledged collateral); company and individual cooperating; outcome unpredictable.

“the Company and a Company executive and Board member (the “Individual”) received grand jury subpoenas from the Department of Justice (“DOJ”), which requested the production of documents relating to the sale of the Company’s stock in the second half of 2023”
risk 7Related-Party / Customer Concentration
▸

Single customer (Trina Group, a related party) accounted for ~100% of six-month net sales and 100% of trade receivables; Trina group also supplied $428.1M of materials in six months. Trina also holds preferred and anti-dilution rights.

“One customer accounted for approximately 100 % of our total net sales for the six months ended June 30, 2026”
risk 6Liquidity/Covenants
▸

Senior secured credit facility waiver required amendment tied to Trina ownership and board-appointment requirements; amendment effective only upon the July convertible offering closing, indicating prior covenant conditions tied to Trina's status.

“The Eighth Amendment became effective upon the closing of the offering of the Company’s 4.75 % Convertible Notes due 2031”
risk 6Liquidity/Covenants
▸

Phase 1 G2_Austin capex raised 20% to $510M and first production delayed; the company says financing is still not closed and comprehensive financing is still pending, with remaining Phase 1 spend $200-250M per call.

“We are currently targeting a comprehensive financing solution, which includes a significant debt component, in an amount sufficient to fund the remaining estimated capital expenditure required for the first phase of G2_Austin. However, there can be no assurance that we will timely secure a comprehensive financing solution on favorable terms, or at all.”

Options

Chain Snapshot (daily)

Call IV (ATM)113%
Put IV (ATM)130%
ATM Spread5.3%
Call $OI (near money)$2.9M
Put $OI (near money)$4.6M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$3.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$1.00$1.55/$2.0038--/$0.05142
$2.00$0.80/$1.00546$0.10/$0.152,199
$3.00$0.30/$0.451,887$0.55/$0.652,133
$4.00$0.15/$0.203,127$1.30/$1.453,369
$5.00$0.05/$0.104,535$2.20/$2.403,324
$6.00--/$0.108,861$3.10/$3.401,232
$7.00--/$0.054,364$4.00/$4.40239
$8.00--/$0.052,786$5.00/$5.4054
Snapshot: 2026-11-04

Short Interest

Short % of Float39.3%
Short Shares79.1M
Days to Cover4.5
Change (vs Prior)+7.6%
Short % Float History
39.30%+34.00pp
10.0%20.0%30.0%40.0%10-1512-3103-1305-2908-1410-30

Web Traffic

t1energy.com
Web rank#753,865
Est. visits/mo654K
Web Rank History
#753,865+270,460
rankest. visits/mo
500k600k700k800k900k1.0m566K639K712K785K857K04-1304-2004-27

Cash Runway

1.8months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Encompass Capital Advisors LLC$331M$4.75+$0+$204M—$2.32B
BlackRock, Inc.Passive$248M$5.70+$102M+$174M—$6.70T
STATE STREET CORPPassive$148M$7.22+$86.2M+$123M—$3.38T
Invesco Ltd.$105M$6.57+$92.8M+$75.5M—$1.26T
TWO SIGMA INVESTMENTS, LP$87.6M$4.69−$17.6M+$85.9M—$128.44B
VANGUARD CAPITAL MANAGEMENT LLCPassive$83.4M$4.78+$6.4M+$83.4M—$4.68T
DISCOVERY CAPITAL MANAGEMENT, LLC / CT$70.8M$9.48+$70.8M+$70.8M—$2.41B
UBS Group AG$48.2M$6.84+$16.1M+$40.9M—$627.66B
GEODE CAPITAL MANAGEMENT, LLCPassive$47.8M$3.34+$1.6M+$22.4M—$1.87T
CITADEL ADVISORS LLC$47.4M$7.12+$27.9M+$46.3M—$171.38B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

022.7M45.3M68.0M90.7M$0.97$3.10$5.23$7.35$9.482024-032024-092025-032025-092026-032026-06
hover the chart for per-quarter detailprice (right axis)
Encompass Capital Advisors LLC35.0MInvesco Ltd.11.1MTWO SIGMA INVESTMENTS, LP9.2MDISCOVERY CAPITAL MANAGEMENT, LLC / CT7.5MRENAISSANCE TECHNOLOGIES LLC4.2MUBS Group AG5.1MCITADEL ADVISORS LLC5.0MSituational Awareness LP4.9MSituational Awareness Partners LP—Southpoint Capital Advisors LP—

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (2 analysts)$7.00+483.3%
Last Year (9 analysts)$9.61+700.8%
Current Price$1.20
Analyst Ratings
3
3
1
Buy: 3Hold: 3Sell: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2022 Q31M-51M-51M$-0.30$-0.38 – $-0.261
2022 Q41M-36M-36M$-0.21$-0.27 – $-0.181
2023 Q11M-50M-50M$-0.29$-0.37 – $-0.251
2023 Q30M-50M-51M$-0.30$-0.38 – $-0.261
2023 Q41M-39M-42M$-0.24$-0.31 – $-0.211
2024 Q10M-31M-33M$-0.19$-0.24 – $-0.171
2024 Q20M-30M-32M$-0.18$-0.24 – $-0.161
2025 Q173M-6M-20M$-0.07$-0.08 – $-0.061
2025 Q2140M-1M-38M$-0.13$-0.15 – $-0.111
2025 Q3207M-9M-44M$-0.15$-0.21 – $-0.092
2025 Q4368M32M-3M$-0.01$-0.01 – $-0.011
2026 Q195M-0M-34M$-0.12$-0.13 – $-0.101
2026 Q2207M-1M-32M$-0.11$-0.13 – $-0.101
2026 Q3271M4M-33M$-0.11$-0.20 – $-0.073
2026 Q4341M19M-20M$-0.07$-0.09 – $-0.032
2027 Q1301M22M-18M$-0.06$-0.08 – $-0.053
2027 Q2317M28M-14M$-0.05$-0.06 – $-0.041
2027 Q3377M54M8M$0.03$0.02 – $0.031
2027 Q4430M79M25M$0.09$0.08 – $0.101
2028 Q1340M58M7M$0.03$0.02 – $0.032
2028 Q2370M75M19M$0.06$0.06 – $0.072
2028 Q3440M83M23M$0.08$0.07 – $0.092
2028 Q4489M97M32M$0.11$0.10 – $0.122
2029 Q1576M—0M$0.00$0.00 – $0.000
2029 Q2731M—0M$0.00$0.00 – $0.000

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Major holders (≥10% beneficial owners)
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$190.31M
2 txns · 1 insider · 22,500,000 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-05-22SELLTRINA SOLAR (SCHWEIZ) AG10 percent owner9,500,000$8.14$77.29M$249.39M
2026-05-21SELLTRINA SOLAR (SCHWEIZ) AG10 percent owner13,000,000$8.69$113.02M$349.08M
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

T1 has a credible industrial opportunity: G1 Dallas is now producing at meaningful scale, gross margins have improved, domestic-content policy is favorable, and G2 Austin could provide the missing cell-manufacturing capability. The problem is that the company has not yet demonstrated that growth converts into owner earnings. Cumulative negative FCF, rising lease and debt obligations, heavy dilution, high working-capital consumption and continued capital needs make the equity structurally fragile. The Q2 call showed operational progress, including 19.6% gross margin and 935 MW of production, but the headline $10.7M adjusted EBITDA included a $24.4M tariff refund. Underlying economics remain weak. The comprehensive G2 financing is still not closed despite repeated prior target dates, remaining Phase 1 spending is $200M-$250M, and the First Solar patent action creates a potentially existential technology risk. The likely outcome is a slow, highly dilutive transition rather than a clean 2027 inflection.

Trade Signal

Trade rating
-6.6/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-13 · saw $4.79-72.4% since

Short: at $4.79 the market is valuing a heavily financed, still loss-making solar platform as though G2 Austin will ramp successfully, despite delayed production, rising capex, severe dilution, and roughly $699M of net debt including leases.

Temporary mispricing+2.0

The stock rose from roughly $1.1 in mid-2025 to $12.04 over the following year as the market embraced the U.S. manufacturing, tariff-protection, G2 Austin, and domestic-content growth narrative. It then fell to $4.22 around the July 28 preliminary update, when management disclosed negative Q2 EBITDA, a 20% Phase 1 capex increase, and a delay in first production. A brief recovery toward $5.87 preceded the post-earnings decline from $5.49 to $4.79 after the August 12 report, as investors recognized that reported Q2 EBITDA depended heavily on a tariff refund. The recent decline is directionally justified, but the broader move still appears to underreact to dilution, leverage, and execution risk relative to the valuation gap. This is a durable overvaluation risk rather than a clean panic dislocation; the modest positive score reflects that the latest earnings reaction may not yet have fully digested the facts.

Market view-3.0

The published analyst consensus is strongly bullish, with a $9.56 average target and mostly Buy/Hold ratings, but those targets appear stale relative to the July capex increase, Austin delay, tariff-refund dependence of Q2 EBITDA, and capital-structure risk. The stock is nevertheless disliked by sophisticated positioning: short interest has risen from roughly 7% of float in mid-2025 to 25.1%, while retail participation remains elevated and options imply extreme volatility with a call-heavy open-interest profile. The market is split between a policy-driven domestic-solar growth narrative and a financing/dilution short thesis; the bullish narrative likely remains too anchored to the long-term story.

Inflectionwindow ~3mo-5.0

The near-term evidence is moving against the premium valuation. Q2 gross margin was approximately 19.6%, but adjusted EBITDA of $10.7M included a $24.4M tariff refund; the underlying quarter was negative EBITDA, consistent with the preliminary warning. G2 Austin's first production moved from Q4 2026 to Q1 2027 and Phase 1 capex rose 20% to $510M. The analyst's base case reaches only about $60M of owner earnings by year two, while the sparse consensus path assumes roughly $118M–$142M of quarterly EBITDA in 2028. Thus the market appears to be pricing a highly successful ramp well ahead of proof, while the downside financing and dilution risks are underappreciated.

Catalysts
  • ▼2026-11 · Q3 2026 earnings and G2 Austin financing update — The market will test whether Dallas profitability persists without tariff refunds and whether the delayed, higher-cost Austin build has secured non-destructive financing.
  • ▼H2 2026–2027 · TOPCon patent litigation developments — An adverse ITC ruling or exclusion risk could impair U.S. sales or force costly supply-chain changes; favorable developments would reduce a major bear risk.
  • ▼2026-08 to 2026-10 · Remaining G2 Austin funding and IP consideration payments — Approximately $200M–$250M of Austin capex remains, while the $135M IP acquisition includes payments through October 2026; equity funding or unfavorable debt terms would pressure the stock.
  • ▲2027-02 · Q4 2026 earnings / construction milestone — Evidence that the Austin facility is mechanically complete and equipment installation is progressing could support the bull case, though first production is now targeted for Q1 2027.
  • ▼Next 6–12 months · Convertible and equity dilution disclosures — New converts, equity tranches, earn-outs, or financing-linked issuance could further transfer value from existing shareholders even if the operating story improves.
Flow-7.0

Strongly negative net supply. TTM dilution was 79%, the company has raised substantial convertible debt, and the TOPCon IP acquisition includes dilutive equity tranches. Trina Solar sold approximately 22.5M shares for roughly $190M in May, and insiders have not bought while one insider sold. Short interest at 25.1% of float and heavy call open interest provide squeeze risk, but that is volatility fuel rather than durable demand.

Floor / Ceiling-5.0

There is no hard equity floor near today's price. Cash and restricted cash were only $149M against approximately $699M of net debt including leases, while the company remains cash-flow negative and still needs substantial Austin capex. The structural ceiling is more important: financing needs, convertible securities, IP-related equity consideration, and possible rescue issuance can cap upside and dilute a rally. A real floor would require an acceptable G2 financing package or a credible strategic buyer, neither of which is established.

Buyability

Weak at $4.79. The domestic-solar and BESS story can attract retail and thematic buyers, but institutional buyers are likely deterred by approximately $699M of net debt including leases, negative owner earnings, ongoing capex needs, patent litigation, and repeated dilution. The next credible buyer would need evidence that G2 Austin is financed on acceptable terms and can earn attractive margins.

Fear vs Greedfear 9/10 (+2.0)greed 7/10 (-1.0)

Fear is stronger than greed. The operating assets and U.S. policy tailwinds are real, but the price still capitalizes a successful, well-funded G2 ramp despite negative owner earnings, high leverage, delayed production, elevated capex, and a material patent threat. The main risk to the short is a financing announcement or retail-driven squeeze, not fundamental valuation support.

Valuation

Our Target
$250M-29%
Market Should Pay
$170M-52%
target ×0.68 (fear discount)
Current Market Cap
$353MSlightly bearish
What Changed
transcript · 2026-08-12
-5%fair value on this information

The quarter and call provided incremental confirmation that G1 production and gross margin are improving, but also clarified that the $10.7M Q2 adjusted EBITDA included a $24.4M tariff refund. Management still had no definitive comprehensive G2 financing terms after multiple delayed target dates, and it declined to disclose pricing and structure for the Clearway agreement. Much of the production delay and capex increase was already disclosed in the July 28 preliminary update, so the genuinely new information is mainly the quality of the reported EBITDA and the continued absence of financing certainty.

▸ How the cases moved

The bear case became modestly more likely as management acknowledged that the comprehensive G2 financing remains delayed and provided no committed terms: bear probability increased from 0.35 to 0.40 and bear equity value declined from $25M to $0M. The base case remains the central outcome, but its probability declined from 0.45 to 0.40 and terminal equity value fell from $450M to $420M because Q2 EBITDA was materially supported by a $24.4M tariff refund and financing/startup costs remain unresolved. The bull case remains possible at $1,200M, but probability declined from 0.20 to 0.20 effectively unchanged; the call provided demand validation but no disclosed pricing or financing closure.

2-Year Plausible Outcomes
bear40%
$0M
rev -15%/yrOE $0M

G2 Austin financing remains delayed or becomes prohibitively dilutive, while the First Solar TOPCon litigation or weaker policy support impairs the domestic-cell strategy. G1 Dallas remains a low-margin assembler with recurring cash burn, and the company restructures or requires another equity rescue. Equity holders receive negligible value.

▸ Valuation

0.0x $0M sustainable owner earnings = $0M equity value

base40%
$420M
rev +20%/yrOE $60M

G1 Dallas continues operating near the current production run rate with modestly positive gross profit, while G2 Austin begins limited production during 2027 but ramps slowly. Domestic-content demand helps revenue, yet financing costs, dilution, startup expenses and working-capital needs prevent rapid conversion to cash. By year two, owner earnings reach approximately $60M as the business transitions from construction to operations.

▸ Valuation

7.0x $60M owner earnings = $420M equity value

bull20%
$1.2B
rev +40%/yrOE $150M

The comprehensive G2 financing closes on acceptable terms, Phase 1 starts production successfully, and domestic-content scarcity allows T1 to earn attractive margins on G1 and G2 output. Clearway, Treaty Oak and additional offtake contracts support a rapid ramp, while tariff offsets and owned TOPCon IP reduce input and royalty burdens. Owner earnings reach approximately $150M by year two, with financing and startup costs largely absorbed by the expanded platform.

▸ Valuation

8.0x $150M owner earnings = $1,200M equity value

▸ Target Rationale

The probability-weighted scenario value is $326.4M, but I set the analytical target at $250M because the scenario arithmetic understates financing and dilution risk. The company has approximately $699M of net debt including leases, ongoing negative owner earnings, substantial remaining G2 capital requirements and a material TOPCon patent threat. A target near the model value would assume that the base case can be funded without a severe equity transfer; the lower target better reflects the capital structure and execution risk while still assigning value to G1, the commercial pipeline and a successful G2 outcome.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality4/10
Situation now3/10
Trajectory6/10
Risk9/10
Governance4/10
Insolvency prob (2yr)25%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Acquisition of KORE Power (June 3, 2026): T1 Energy entered into a definitive agreement to acquire KORE Power, Inc., an engineering-focused Battery Energy Storage Systems (BESS) and software solutions provider, for an enterprise value of approximately $32 million in equity, cash, and assumed debt, along with a potential $9.6 million equity-based earn-out. The transaction centers on KORE's NRI division, a utility-scale energy storage installer and designer, which will be rebranded as T1 NRI. The acquisition positions T1 to enter the utility-scale energy storage and AI data center markets. T1 expects the transaction to be EBITDA-positive in 2026 and contribute $15 million to $20 million of EBITDA in 2027.
  • Q4 2025 and Q1 2026 Financial Results: In its full-year 2025 and Q4 earnings release (reported March 31, 2026), T1 reported record quarterly module production of 1.13 GW and net sales of $358.5 million in Q4 2025, bringing full-year production to 2.79 GW. In its Q1 2026 results (reported May 12, 2026), the company maintained its 2026 module production guidance for its Dallas facility at 3.1–4.2 GW. T1's cash, cash equivalents, and restricted cash stood at $123.7 million as of March 31, 2026, down from $270.8 million at year-end 2025 due to working capital ramp-ups and capital expenditures.
  • Convertible Notes Offering (April 14, 2026): T1 Energy closed an upsized public offering of 4.00% convertible senior notes due 2031, raising $160 million in aggregate principal. Proceeds are earmarked to fund the remaining capital expenditures for Phase 1 of the G2 Austin solar cell fab.
  • Operational Milestones: On June 17, 2026, T1 announced that its 5 GW G1 Dallas module manufacturing facility received an "A" grade in an independent bankability assessment by Intertek CEA, placing it among the highest-rated operations globally.
▸ Thesis-test Findings
First Solar ITC TOPCon patent litigation updates T1 Energy

First Solar filed a Section 337 complaint with the U.S. International Trade Commission (ITC) in February 2026, alleging infringement of its TOPCon solar technology patents (specifically U.S. Patent No. 9,130,074) by 47 respondents, including T1 Energy, Inc. and its subsidiary, T1 G1 Dallas Solar Module LLC. In March 2026, the ITC officially instituted the investigation (337-TA-1494), while a parallel civil lawsuit in the U.S. District Court for the District of Delaware was stayed pending the ITC's final determination. If First Solar is successful, the ITC could issue exclusion or cease-and-desist orders restricting T1's ability to import or sell certain components in the U.S.. While the U.S. Patent Office supported First Solar in early 2026 by rejecting invalidation petitions from overseas competitors, JinkoSolar secured a patent invalidation ruling against a parallel First Solar TOPCon patent in China in May 2026, which could impact the broader legal landscape. This litigation introduces a material legal and supply chain headwind for T1 Energy’s bear case.

G2 Austin solar plant construction progress Phase 1

T1 Energy officially broke ground on the 2.1 GW Phase 1 of its G2 Austin solar cell fabrication plant in Rockdale, Texas, in mid-December 2025, representing an estimated $400 million to $425 million capital investment. Operational updates from March 31, 2026, confirmed that construction is progressing on schedule. Structural steel erection was slated to begin in April 2026, and long-lead turnkey production equipment has been ordered from Laplace Renewable Energy Technology. Official Texas regulatory filings registered in May 2026 indicate a scheduled project completion date of May 31, 2027. However, T1 management maintains its target to start initial commercial cell production in the fourth quarter of 2026. By deploying existing cash early, remaining Phase 1 capital spending has been reduced to $350 million, supported by the company’s recent $160 million convertible note raise. Successful execution of G2 Austin supports the bull case for vertical integration, as it completes the domestic supply chain link to T1's 5 GW G1 Dallas module facility.

US solar cell import tariffs and AD CVD rulings 2026

The bull case for domestic solar cell manufacturing is significantly strengthened by aggressive new U.S. trade protections. In February and April 2026, the U.S. Department of Commerce issued preliminary affirmative determinations in its anti-dumping (AD) and countervailing duty (CVD) investigations of crystalline silicon solar cells and modules imported from India, Indonesia, and Laos. Combined preliminary tariff exposures have risen drastically, reaching approximately 234% for India, 121%–178% for Indonesia, and 103% for Laos. Furthermore, in February 2026, the Department of Commerce concluded a sunset review and maintained existing AD/CVD duties on solar imports from China (at dumping margins up to 165.04%) and Taiwan. These heavy tariffs make imported cells from traditional Southeast Asian hubs highly uneconomical. This regulatory environment creates a powerful commercial tailwind for T1 Energy, boosting demand from domestic project developers (such as Treaty Oak Clean Energy) seeking tariff-exempt, domestically produced U.S. solar modules.