Stocks/TGEN

TGEN

Tecogen Inc.v3 4.5/10 · 2026-11-10
Industrials·Electrical Equipment & Parts
$1.91
$53M market cap
v3 Rating
4.5/103.0–6.5
Setup
6.0/104.5–7.5
Fair Value
$1.60$0.60–$5.00-16%
DCF (10%)
$1.50-21%
Base IRR
-3%-60%–+90%
Visibility
wide±138%
Wall Street
$3.50 target(1 analyst last quarter)(4 buy)
Rating
Revenue (TTM)
$31.6M
Owner Earnings
-$7M
Next-Yr Owner Earnings
-$4M
Growth
+10.0% × 5y
P / Next-Yr OE
--
Net Debt
-$5M

Tecogen Inc. specializes in the design, manufacturing, sales, and ongoing support of industrial and commercial combined heat and power (CHP) systems. These energy solutions cater to a wide range of applications—residential, commercial, recreational, and industrial—both within the United States and internationally. The company's operations are segmented into three main areas: Products, Services, and Energy Production. Its product offerings include: Cogeneration units, such as the InVerde e+ and TecoPower models, which efficiently produce both electricity and hot water. TECOCHILL branded chillers for air conditioning and refrigeration purposes. Tecofrost gas engine-driven compressors used in refrigeration systems. Ilios brand water heaters. Ultera emissions control technology. Beyond equipment sales, Tecogen provides extensive support services, including long-term maintenance contracts, spare parts sales, and comprehensive turnkey installation. These services are delivered through a network of eleven field service centers located strategically across California, the Midwest, the Northeast, the Southeast, and Ontario, Canada. Additionally, the company undertakes the installation, ownership, operation, and maintenance of distributed generation systems for electricity and other energy solutions, along with complementary technologies. Tecogen serves a diverse clientele spanning numerous sectors, such as healthcare (hospitals, nursing homes), education (colleges, universities), hospitality (hotels, motels, health clubs, spas), commercial real estate (office, retail buildings), manufacturing (food and beverage processors, factories), multi-unit residential properties, and specialized facilities like laundries, ice rinks, swimming pools, municipal buildings, military installations, and indoor growing operations. Established in 2000, Tecogen Inc. is headquartered in Waltham, Massachusetts.

2-Year Price History

$1.68+82.6%
$2.0$4.0$6.0$8.0Initial target $1.40 · 2026-11-08Initial target $1.60 · 2026-11-10volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-10

Rating
4.53.0–6.5
Setup
6.04.5–7.5
Fair value (USD)
1.600.60 – 5.00
Upside vs 1.91
-16%
DCF (10%)
1.500.60 – 6.00-21%
Base IRR
-3%-60% – 90%
Visibility
very widerange ±138%
Sentiment
3/10
Reputation
6/10
2026-11-10 · claude-opus-5-5 · priced at 1.68

Tecogen is a $51M (30.2M shares x $1.68, last close 2026-11-10; Q3 results are due 12 Nov) maker and servicer of natural-gas engine chillers and CHP units. It ran from $0.70 to $12 on the story that its dual-power-source chillers solve grid constraints at AI data centers. After 18 months there is still no material data center order, only a 1MW Vertiv demo PO and 12 product demonstrations, and the stock has fallen about 80% from its peak. The base business is decent but sub-scale: about $18M a year of service revenue at 35-40% gross margin, plus lumpy product sales and a backlog above $8M. Spending on the data center pivot is burning about $7M a year of unlevered cash. Adjusted EBITDA was -$1.7M in each of Q1 and Q2. June cash was $6.8M and the 10-Q itself warns it may need to raise equity. The market prices the company at roughly its old pre-AI value plus a modest option on data centers, and that looks about right. In my base case the data center business arrives slowly, the base business is back near breakeven in 2028, and FCF reaches about $5M by 2031 at 12x. That DCF gives about $1.5 a share, close to the price. If a hyperscaler pilot turns into a real program, the stock is worth $5-8. If not, continued burn and a dilutive raise near $1.50 point to $0.50-1.00. Rating 4.5: no margin of safety, a near-certain financing overhang and no forced seller or accounting confusion to exploit. Research rating 6: this is a binary, cheap-to-check option, and the Q3 print and any named order in the next 1-2 quarters would largely settle it.

A deep dive would have to establish: Will any of the 12 demoed data center operators or the Vertiv channel produce a named multi-unit order before cash runs out, and what does a hyperscale chiller program do to unit economics and capacity?

Owner earnings, TTM
-$7M-$9M – -$5M
Realistic peak profit
$6M$3M – $15M
Growth rate
10.0%-5.0% – 40.0%
Years of growth
52 – 10
Market cap
$51M$48M – $54M
EV
$46M$43M – $50M
Net debt
-$5M-$7M – -$3M
Capital return / cap
0.0%0.0% – 0.0%
P/E
-6.0×-9.0× – -4.0×
EV/EBITDA
-7.0×-10.0× – -5.0×
FCF yield
-16.0%-22.0% – -10.0%
Projected FCF, base case (USD millions)
Y1-$4M-$8M – $2M
Y2-$1M-$5M – $5M
Y3$2M-$3M – $9M
Y4$4M-$2M – $12M
Y5$5M-$1M – $15M
Competition: Electric chiller incumbents (Trane, Carrier, JCI, Vertiv) dominate data center cooling, gas absorption and engine chillers from Yazaki and Broad compete in the niche, and on-site gas power (Caterpillar, Bloom) attacks the same grid-constraint problem.
Governance: No serious issues; there is an IT general-controls material weakness, repeated overpromising on order timing, and a 10-Q warning that equity financing may be needed.
Research (expand)

What it does. Tecogen (Waltham MA) builds gas-engine chillers (Tecochill), InVerde CHP units, Tecofrost compressors and Ultera emissions controls. It services an installed base through 11 service centers. Services are about 70% of revenue ($4.4M in Q2, up 10% year on year), products are lumpy ($1.1M in Q2, down 64%) and energy production is small.

The case and the market's view. The bull story is the hybrid chiller: it moves cooling load (up to 35% of data center power) off the grid onto gas during peaks, stays redundant through outages, uses no water and is quiet and clean next to diesel. Vertiv is designing Tecogen into 25-50MW of projects. In June-July the company held 12 demos for entities covering more than 8GW. The market believed this at $10. It no longer does: Q1 and Q2 showed falling revenue, widening losses and no hyperscale order, and the stock is now $1.68. Is the market wrong? Only partly. The technology is real and 40 years old, and grid scarcity is real. But a 150-ton gas chiller faces scale, reliability and supplier-qualification hurdles at hyperscalers, which favor Trane, Carrier, JCI and Vertiv's own lines. Management has said orders were 'imminent' for four straight calls. Testing the bull case turned up nothing new beyond press releases and token insider buys (CEO about $7K at $2.30).

What it earns today. FY25 revenue was $27.1M with adjusted EBITDA of -$5.6M. H1 2026 revenue was $12.1M with adjusted EBITDA of -$3.4M. SBC is about $0.5M a year and capex about $0.3M. Unlevered owner earnings are about -$7M a year. The six-month operating cash burn was $5.5M, including an inventory build. There is no financial debt, so net cash is roughly $5M by Q3. At 2024 opex levels the base business is roughly breakeven.

FCF projection (base, $M, 2027-31): -4, -1, 2, 4, 5. That assumes a few pilots, the base backlog above $8M and service margins recovering toward 45%, taking revenue to about $40M. In five years this is most likely a small, roughly 5%-growth niche industrial worth 12x FCF, about $60M. PV of the FCF is about $3M, plus a terminal PV of about $37M, plus about $5M of net cash, for roughly $45M or $1.5 a share. The burn must be funded first, likely by a raise near today's price, so the per-share number is fragile. In the bull case (a hyperscale program, $80-100M revenue, $12-15M FCF at 20x), the stock is worth $6-8. In the bear case (no orders, cash gone by mid-2027, about 30% dilution), it is worth $0.5-0.8. Multiples are meaningless today: EV about $46M is 1.7x sales on negative EBITDA.

Management, risks, competition. The CEO is technically credible and governance is clean apart from an IT-controls material weakness. However, management has repeatedly overpromised on timing, and there is a going-concern-style financing warning. The main risks are dilution, the data center option fading, and service margin problems in NYC and Toronto. Competitors are electric chiller giants plus gas chillers from Yazaki and Broad, and gas gensets (Caterpillar, Bloom) addressing the same grid-constraint problem.

Sentiment: 2.5/10. The stock is down 80% from its peak and 45% in three months. Short interest is about 3.8% of shares with 8.6 days to cover, and the momentum crowd has left. Still, the price is about 2x pre-hype levels, so the option is not yet priced at zero and this is not full capitulation. With ATM put IV at 155% and almost no open interest, covered calls are not practical.

Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-11-081.724.55.01.401.705%3
2026-11-101.684.56.01.601.50-3%3

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue31.6+14%27.1+20%22.6-10%25.1+1%25.0
Gross profit12.3+16%9.82+0%9.87-3%10.2-8%11.1
Operating expenses23.3+47%17.0+18%14.4-1%14.6+9%13.4
▸Adj EBITDA-10.2-6.30-4.07-3.88-1.99
▸Adj OCF-7.20-5.97-3.74-2.89-1.91
CapEx-0.20-0.40-0.97-0.05-0.34
Adj FCF-7.39-6.37-4.71-2.94-2.25
Interest expense0.180.290.100.040.04
▸Adj net income-11.2-7.44-4.74-4.56-2.45
▸Owner's earnings-10.5--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-23.9-7.24-7.06-3.78-3.88-1.92
FCF (OCF−capex)-16.8-7.00-10.33.09-0.87-1.70
Net income-28.0-7.98-8.25-4.76-4.60-2.45
▸Capital returned-17.10.35-16.7-0.840.040.04
Buybacks-18.5-0.07-18.40.000.000.00
Dividends0.000.000.000.000.000.00
Interest paid0.620.150.290.100.040.04
Debt paid down0.750.281.40-0.940.000.00
▸Reinvestment2.96-0.101.112.27-0.08-0.23
Capex (PP&E)1.910.150.400.970.050.34
Intangibles & M&A0.440.000.070.090.210.07
Leases signed (net Δ)0.61-0.250.631.21-0.34-0.65
Retained / other0.51-7.206.623.94-1.08-1.76

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 1.4 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)30.437.031.127.828.3
▸Liabilities (total)14.115.521.013.19.27
Net debt (incl. leases)-2.77-9.61-1.670.13-0.60
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-55.6-21.6-40.0----
Shares outstanding30.229.825.024.924.9
Dilution (YoY)+1.7%+19.6%+0.4%+0.0%+0.0%
Employees91.011991.092.085.0
MarginsTTM2025202420232022
Gross margin38.8%+0.736.3%-7.443.6%+3.140.6%-3.744.3%
Adj EBITDA margin-32.3%-16.0-23.3%-5.3-18.0%-2.5-15.4%-7.5-8.0%
Adj OCF margin-22.8%-8.0-22.1%-5.5-16.6%-5.1-11.5%-3.9-7.6%
Adj FCF margin-23.4%-6.9-23.5%-2.7-20.8%-9.1-11.7%-2.7-9.0%
Net income margin-37.9%-18.3-30.5%-9.4-21.0%-2.8-18.3%-8.5-9.8%
Adj NI margin-35.6%-15.6-27.5%-6.5-21.0%-2.8-18.1%-8.3-9.8%
ROIC (adj, after-tax)-45.9%-23.2%-26.2%-21.7%-9.3%
Cost of debt6.8%8.8%3.1%3.7%2.4%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Service$4.6M+9%
Product$1.2M-54%
Energy Service$0.5M+5%
By Geography (2026-Q1)
Services Segment$4.6M+9%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-13

Tecogen’s second-quarter 2026 conference call centered on the company’s attempt to translate a rapidly expanding data-center opportunity pipeline into commercial orders, while also improving its underlying service economics and supporting growth in its traditional business. CEO Abinand Rangesh argued that the lengthy sales cycle should not necessarily be interpreted as weak market demand. Instead, he said Tecogen had spent substantial time identifying internal champions and establishing credibility with large and hyperscale operators that have the scale and influence to accelerate industry adoption. Over the preceding two months, Tecogen hosted 12 demonstrations—six in person and six virtually. Eight attendees were potential direct end customers; the remainder included engineers, data-center designers, partners, and a chip manufacturer. Collectively, the represented organizations operate more than 8 gigawatts of data-center capacity and have multiple additional gigawatts under construction, equivalent to approximately 15% to 20% of current U.S. data-center capacity. Management characterized full-day, in-person participation by multiple senior personnel as a meaningful commitment and said feedback had been consistently positive. Specific projects, requirements, and delivery dates have been discussed, but no customer names, order values, or firm timing were provided. Tecogen is preparing to build inventory of its dual-power-source chillers and Tecogen modules to reduce lead times. Management said capacity constraints can create friction after customers become interested, so inventory may allow the company to begin pilots or phased deployments quickly after receiving purchase orders and deposits. The company plans to balance inventory risk and cash flow by building against likely requirements from several prospects rather than funding all potential demand upfront. Potential applications include retrofits and expansions at operating facilities, new phases of hyperscale campuses, and primary cooling at smaller or urban data centers. Existing electric chillers would more commonly remain in place as backup rather than be fully removed. The Vertiv relationship remains active, with management describing progress as favorable but declining to discuss the MPA or previously referenced 25-to-50-megawatt projects until both parties approve disclosure. The 12 demonstrations were generated through Tecogen’s own sales and marketing efforts, though collaboration with Vertiv may be possible on individual opportunities. Outside data centers, base-business backlog exceeded $8 million, with $2 million to $3 million of additional projects expected to close in the next few months. Management expects product revenue and deposits to improve in Q3. Power constraints, long switchgear lead times, high utility rates, and insufficient grid capacity are supporting demand for Tecogen’s cogeneration, standard-generation, and cooling products, including from multifamily buildings. Financially, Q2 revenue declined 21% year over year to $5.8 million, largely because product revenue fell 64% to $1.1 million after unusually strong prior-year shipments tied to Inflation Reduction Act tax-credit timing. Gross profit declined 11.9% to $2.2 million, but gross margin improved to 37.8% from 33.8%, driven by better product mix and pricing. Operating expenses increased 11.6% year over year to $4.3 million, although they fell approximately $400,000 sequentially. Net loss widened to $2.2 million and adjusted EBITDA loss to $1.7 million. Service revenue rose 10% to $4.4 million, while energy-production revenue increased 35% to $240,000. A roughly $300,000 one-time service charge, including catastrophic chiller repairs and rental cooling, reduced service margin by about seven percentage points; cost reductions and pricing changes should benefit Q3. Tecogen also emphasized that its systems use closed-loop cooling, produce very low emissions, and operate more quietly than diesel generators.

Analyst Q&A (11)
▸
Asked whether the 12 demonstrations represented 12 different potential customers and whether the pace of demonstrations had accelerated, noting that six occurred in early July and six more recently.
Bobby Brooks · Northland Capital Markets
Of the 12 demonstrations, eight involved potential direct end customers; the others involved engineers, data-center designers, partners, and one chip manufacturer. Tecogen intentionally scheduled the most important and largest prospects later, which explains why the disclosed capacity increased over time.
▸
Asked whether larger data-center operators’ recent interest represented growing comfort with Tecogen’s technology and capacity limitations, or an evolution of the previously identified group willing to scale with Tecogen.
Bobby Brooks · Northland Capital Markets
Capacity remains a potential source of friction, but Tecogen believes it can mitigate that issue by building inventory, shortening lead times, and starting with pilots or retrofits at existing facilities before scaling. Larger operators may also incorporate Tecogen systems into individual phases of broader projects.
▸
Asked about the prospective size and cost of building inventory ahead of customer orders and how management would manage the associated cash-flow risk.
Bobby Brooks · Northland Capital Markets
Management would not provide an exact investment figure. Tecogen is estimating likely year-end and early-2027 requirements and may build enough capacity to serve at least one of three or four prospective customers. It intends to balance inventory risk, cash needs, deposits, and expected delivery timing rather than fund all capacity upfront.
▸
Asked whether the 12 data-center demonstrations were opportunities Tecogen would pursue through Vertiv or represented a separate path.
Eric Stine · Craig Hallum
The 12 demonstrations were generated through Tecogen’s own sales and marketing efforts and are proceeding in parallel with the Vertiv relationship. Collaboration with Vertiv could occur where appropriate, but the demonstrations were not dependent on Vertiv.
▸
Asked for an update on finalizing the Vertiv MPA and on the status of projects for which Vertiv had reportedly been specifying 25 to 50 megawatts of Tecogen capacity.
Eric Stine · Craig Hallum
Management said discussions with Vertiv were progressing well but declined to provide further details about the MPA or the 25-to-50-megawatt projects because disclosures require approval from both companies. Tecogen will announce substantive deals when they close.
▸
Asked whether management’s inventory comments implied a further build beyond the inventory accumulated over the preceding three quarters and how that would be reconciled with capital constraints.
Eric Stine · Craig Hallum
Tecogen had some inventory but expects existing non-data-center backlog to absorb much of it, requiring additional inventory. The objective is to compress lead times while limiting capital exposure, building only when confidence in prospective orders is high, and shipping quickly after purchase orders and deposits arrive.
▸
Asked for timing ranges for data-center pilots, early deployments, and larger opportunities, including whether the discussed dates were near-term or longer-term.
Chip Moore · ROTH MKM
Management would not provide specific timing. Tecogen is working with customers on scalable deployments and currently prioritizes securing projects with recognized brand names because an initial reference customer could influence future industry adoption. Smaller projects would still be pursued if they close first.
▸
Asked about trends in the base business, the markets driving the increased backlog, and whether management was seeing changes in customer demand.
Chip Moore · ROTH MKM
The base business is benefiting from broad power constraints, long lead times for electrical equipment and switchgear, high utility rates, and insufficient available power. Demand for cogeneration and standard generation is beginning to recover among multifamily and other buildings, while inventory could help Tecogen capture customers unable to obtain conventional electrical equipment.
▸
Asked whether the market opportunity would primarily involve newly built data centers, retrofits of existing centers, or expansions of existing facilities.
Alexander Blanton · Clear Harbor Asset Management
Tecogen is seeing a mix of opportunities: retrofits and expansions at operating data centers, incorporation into new phases of larger campuses, primary cooling for smaller facilities, and deployments near urban pockets of available power. Existing cloud facilities may use Tecogen to free electrical capacity for additional workloads.
▸
Asked whether customers might remove electric chillers and replace them with Tecogen systems, and how significant that opportunity could be.
Alexander Blanton · Clear Harbor Asset Management
Retrofit opportunities exist, but at live facilities customers are more likely to add Tecogen systems as expansion capacity and retain electric chillers as backup rather than remove the existing chillers entirely. Some customers are nevertheless considering replacing electric systems.
▸
Asked how Tecogen addresses data centers’ water-use, pollution, and noise concerns, and how its systems would function during grid constraints or outages.
Alexander Blanton · Clear Harbor Asset Management
Tecogen’s natural-gas systems can shift cooling or selected standby loads away from the constrained grid during peak periods, reducing reliance on diesel generators. Its systems are designed for continuous operation, have very low NOx and carbon-monoxide emissions, use closed-loop cooling with no evaporative water consumption, and operate at substantially lower noise levels than diesel generators. Modular InVerde systems can address selected loads while diesel remains reserved for emergencies.

SEC Filing Findings

SEC Filing — material findings

2026-08-13 · depth 9/10
risk 6Internal Controls
▸

Management concluded disclosure controls were not effective due to a material weakness in IT general controls, with remediation still in progress and dependent on resources.

“our Chief Executive Officer and Chief Financial Officer, after evaluating the effectiveness of our disclosure controls and procedures as of the end of the period covered by this Report, has concluded that our disclosure controls and procedures were not effective due to a material weakness with respect to a small number of individuals dealing with general controls over information technology.”
risk 7Liquidity/Capital Needs
▸

Six-month operating cash burn of $5.5M against $6.8M year-end-plus-June cash balance; the filing says resources are sufficient for 12 months but also states cash needs will rise and new debt or equity financing may be needed, with no assurance of terms.

“we expect that our cash requirements will increase and we may need to raise additional capital through one or more debt or equity financings to meet our need for capital to fund operations and future growth. There can be no assurance that we will be able to raise such additional financing or upon terms that are acceptable to us or at all.”

Options

Chain Snapshot (daily)

Call IV (ATM)--
Put IV (ATM)155%
ATM Spread--
Call $OI (near money)$48K
Put $OI (near money)$28K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$2.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$2.50--/$0.7534$0.45/$1.202
$5.00--/$0.901$2.70/$4.000
$7.50--/$0.900$5.20/$6.500
Snapshot: 2026-11-04

Short Interest

Short % of Float6.0%
Short Shares1.1M
Days to Cover3.7
Change (vs Prior)-5.5%
Short % Float History
6.00%-0.70pp
6.0%7.0%8.0%9.0%10.0%11.0%12.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2023.0-2025.0)

Direct Pay$5.3M
Incentive & Other$0.9M
Total Compensation$6.3M
% of Revenue7.6%

Cash Runway

6.7months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Portolan Capital Management, LLC$8.1M$5.93+$5.8M+$5.7M—$2.67B
VANGUARD CAPITAL MANAGEMENT LLCPassive$4.1M$2.62+$98K+$4.1M—$4.68T
BARD ASSOCIATES INC$3.6M$8.81−$32K+$306K—$451M
Clear Harbor Asset Management, LLC$3.4M$3.35+$0+$209K—$1.60B
Herald Investment Management Ltd$2.2M$8.81+$0+$515K—$737M
GRATIA CAPITAL, LLC$2.0M$5.22+$2.0M+$2.0M—$87.0M
UBS Group AG$1.9M$3.67+$226K+$1.9M—$627.66B
Meros Investment Management, LP$1.8M$3.02+$323K+$1.8M—$302M
Palisades Investment Partners, LLC$1.7M$8.67−$56K+$1.7M—$349M
SUSQUEHANNA INTERNATIONAL GROUP, LLPMM$1.6M$6.97+$1.1M+$1.6M—$112.57B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

01.1M2.2M3.2M4.3M$0.81$2.81$4.81$6.81$8.812021-092022-062023-032023-122025-122026-06
hover the chart for per-quarter detailprice (right axis)
Portolan Capital Management, LLC1.6MBARD ASSOCIATES INC682KClear Harbor Asset Management, LLC650KHerald Investment Management Ltd420KPalisades Investment Partners, LLC323KArosa Capital Management LP125KTWO SIGMA INVESTMENTS, LP—GENDELL JEFFREY L50KGRATIA CAPITAL, LLC389KIntegrated Wealth Concepts LLC112K

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (1 analysts)$3.50+98.9%
Last Year (2 analysts)$5.50+212.5%
Current Price$1.76
Analyst Ratings
4
Buy: 4Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2015 Q32M-1M-1M$-0.02$-0.02 – $-0.028
2017 Q113M0M0M$-0.04$-0.05 – $-0.0315
2017 Q28M-0M-0M$-0.01$-0.01 – $-0.018
2018 Q118M0M0M$0.02$0.01 – $0.0213
2018 Q23M-3M-3M$0.05$0.04 – $0.0616
2018 Q34M-2M-2M$0.04$0.03 – $0.0417
2019 Q110M-44M-44M$0.01$0.00 – $0.018
2019 Q210M-0M-0M$-0.01$-0.01 – $-0.018
2019 Q311M—0M$0.00$0.00 – $0.0012
2019 Q49M—0M$0.00$0.00 – $0.008
2020 Q19M-3M-3M$-0.01$-0.01 – $-0.0111
2020 Q28M-0M-0M$-0.02$-0.02 – $-0.027
2020 Q38M-0M-0M$-0.01$-0.01 – $-0.0115
2020 Q48M-0M-0M$-0.01$-0.01 – $-0.0110
2021 Q17M9M7M$-0.03$-0.03 – $-0.031
2021 Q27M-1M-1M$-0.03$-0.03 – $-0.031
2021 Q38M7M5M$-0.02$-0.02 – $-0.021
2021 Q47M1M0M$0.01$0.01 – $0.011
2022 Q17M-0M-0M$-0.01$-0.01 – $-0.011
2022 Q27M-0M-0M$-0.01$-0.01 – $-0.011
2022 Q37M0M0M$0.01$0.01 – $0.011
2022 Q47M-0M-1M$-0.02$-0.02 – $-0.021
2023 Q17M-0M-0M$-0.01$-0.01 – $-0.011
2023 Q26M-1M-1M$-0.03$-0.03 – $-0.031
2023 Q36M-1M-1M$-0.03$-0.03 – $-0.031
2023 Q47M-0M-1M$-0.02$-0.02 – $-0.021
2024 Q17M-1M-1M$-0.04$-0.04 – $-0.041
2024 Q28M-1M-1M$-0.04$-0.04 – $-0.041
2024 Q38M-1M-1M$-0.04$-0.05 – $-0.031
2024 Q48M-1M-1M$-0.04$-0.05 – $-0.031
2025 Q19M-1M-1M$-0.03$-0.04 – $-0.021
2025 Q37M-1M-2M$-0.05$-0.07 – $-0.041
2025 Q45M-3M-3M$-0.10$-0.13 – $-0.071
2026 Q15M-3M-3M$-0.10$-0.13 – $-0.071
2026 Q26M-2M-2M$-0.07$-0.07 – $-0.061
2026 Q36M-2M-2M$-0.06$-0.07 – $-0.052
2026 Q47M-2M-2M$-0.07$-0.08 – $-0.041
2027 Q18M-1M-2M$-0.05$-0.10 – $0.021
2027 Q210M-0M-1M$-0.02$-0.02 – $-0.011
2027 Q314M1M1M$0.03$0.02 – $0.041
2027 Q415M2M1M$0.04$0.03 – $0.051

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$134K
8 txns · 6 insiders · 60,723 sh
Sells ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-04-24BUYGhoniem Ahmeddirector12,723$0.79$10K$10K
2026-04-13BUYHirsch Susan Bdirector5,000$3.73$19K$990K
2026-03-27BUYHirsch Susan Bdirector10,000$2.54$25K$661K
2026-03-27BUYLewis Earldirector5,000$2.52$13K$2.55M
2026-03-26BUYLewis Earldirector5,000$2.88$14K$2.90M
2026-03-23BUYWhiting John Kimball IVofficer: General Counsel & Secretary10,000$2.38$24K$54K
2026-03-20BUYDeschenes Roger P.officer: CAO10,000$2.23$22K$118K
2026-03-20BUYRangesh Abinanddirector, officer, other: Chief Executive Officer3,000$2.30$7K$154K
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Tecogen has an attractive strategic idea: natural-gas and dual-source cooling can help data centers work around grid constraints while providing resiliency and lower water use than evaporative systems. The industry backdrop is genuinely favorable, and the company has obtained meaningful access to potential customers through demonstrations and its Vertiv relationship. However, the investment remains highly speculative. Revenue is small and volatile, the company has generated increasingly large operating and free-cash-flow losses, and operating expenses materially exceed gross profit. The data-center pipeline is still mostly discussion, design-in activity, or non-binding commitments rather than purchase orders. The latest quarter was particularly weak: product revenue fell sharply, adjusted EBITDA remained deeply negative, and management still would not provide firm timing for pilots, the Vertiv MPA, or larger projects. The balance sheet currently provides some protection through net cash, but that protection is eroding quickly. Recent dilution, potential inventory investment, contingent energy-contract obligations, and the possibility of additional financing make the equity vulnerable if commercial conversion is delayed. The base case assumes a genuine but modest turnaround; the bull case requires multiple execution milestones that have not yet been demonstrated.

Trade Signal

Trade rating
-7.4/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-13 · saw $4.19-54.4% since

Short: the market is assigning substantial data-center platform value to a company still losing money, diluting shareholders, and lacking firm commercial orders, with fair value supported by the study near $28M versus a $125M market cap.

Temporary mispricing+7.0

The major upward leg in late 2024 through mid-2025 reflected enthusiasm around the data-center cooling opportunity, Vertiv relationship, and power-constraint narrative. The subsequent decline from $12.07 to the $3 area during late 2025 through July 2026 reflected fading momentum, delayed commercial conversion, operating losses, dilution, and likely profit-taking. The recent move from roughly $3.0 to $4.19 appears partly thematic/speculative drift and then a 4% rise despite the August 13 earnings report. Q2 revenue fell 21%, product revenue fell 64%, and the net loss widened, so the post-earnings reaction missed or underweighted bad news. That is a temporary dislocation likely to close if no firm orders emerge, although the broader valuation premium is a durable repricing risk rather than a pure panic overshoot.

Market view+4.0

The stock is a speculative, retail-influenced thematic name rather than a broadly owned compounder. Analysts are unanimously bullish with an $11.25 average target, and the Vertiv/data-center narrative attracts attention, but the shares remain 65% below the 52-week high after a major 2025-26 unwind. Bears focus on persistent losses, dilution, delayed conversion of the pipeline, and the lack of firm customer orders. The consensus appears stale and overly anchored to the bull-case opportunity: the latest quarter showed a 21% revenue decline and a wider loss, yet the stock rose 4% into the print.

Inflectionwindow ~3mo-4.0

The possible inflection is commercial validation of the Vertiv/data-center strategy, but it has not occurred: the demonstration was delayed into Q3 and the pipeline remains largely non-binding. The study's base case requires only modest profitability by year two, while consensus still forecasts negative EBITDA through at least 2027, so there is upside if orders arrive; however, the current price already capitalizes much of the bull narrative despite the evidence gap. Near-term operational evidence is more likely to disappoint than produce the exceptionally large step-up required to support $125M of equity value.

Catalysts
  • ▼2026-11 · Q3 2026 earnings and guidance — Expected product revenue and deposits may improve, but another loss, continued cash burn, or no confirmed data-center orders would expose the valuation.
  • ▲2026-Q3 · Vertiv 1 MW demonstration installation — A successful live reference installation could validate performance and materially improve the probability of commercial adoption.
  • ▲H2 2026 · Conversion of non-data-center backlog into purchase orders and revenue — The more than $8M approved pipeline, including approximately $2.3M already under purchase order, can provide near-term liquidity and revenue support.
  • ▲Late 2026 to H1 2027 · First firm commercial data-center chiller order — A named customer, order size, and delivery timing would be the key evidence needed to justify any meaningful portion of the current premium valuation.
  • ▼Next 6-12 months · Financing or additional equity issuance — Ongoing operating losses and negative free cash flow create a meaningful risk of further dilution before the data-center thesis is proven.
Flow-4.0

Flow is modestly negative. Insider purchases are a small positive signal and there has been no reported insider selling, but TTM dilution is approximately 18%, losses are continuing, and prospective financing could add supply. High retail participation and extremely call-heavy options positioning provide some squeeze or momentum fuel, but are unstable rather than durable demand.

Floor / Ceiling-2.0

There is some support from cash and residual tangible net assets, but the analyst's bear case estimates only about $5M of equity value versus a $125M market cap. The company is consuming cash, has no positive FCF, and may need financing; therefore this is not a hard asset floor. The main ceiling is the absence of earnings and firm orders: at the current valuation, even successful pilots would not automatically support the price without rapid scale-up.

Buyability

Poor for fundamental buyers at $4.19: Tecogen offers an interesting behind-the-meter data-center cooling concept, but it is a subscale, loss-making microcap with no firm large-scale orders, 18% TTM dilution, and limited institutional sponsorship. The next buyers are likely speculative retail or thematic momentum investors rather than durable long-only owners.

Fear vs Greedfear 8/10 (+2.0)greed 8/10 (-1.0)

Fear pulls stronger than greed. The technology and data-center power constraint narrative are credible, but the stock is priced as though commercial validation is close despite falling revenue, widening losses, no disclosed high-volume orders, and very low earnings confidence.

Valuation

Our Target
$28M-47%
Market Should Pay
$18M-66%
target ×0.65 (fear discount)
Current Market Cap
$53MSlightly bullish
What Changed
transcript · 2026-08-13
-9%fair value on this information

The quarter newly showed that product revenue had fallen 64% year over year to approximately $1.1M and that adjusted EBITDA loss widened to approximately $1.7M. More positively, management disclosed 12 recent data-center demonstrations involving organizations representing more than 8GW of capacity, but it provided no customer names, firm orders, delivery dates, or Vertiv MPA details. The latest call therefore supplied evidence of interest, not commercial conversion.

▸ How the cases moved

Before the Q2 result, the base case had modestly higher near-term conversion odds based on expectations for improving product revenue and the Vertiv demonstration. After the quarter, bear equity value remains approximately $5M but bear probability rises from 0.35 to 0.40 because product revenue fell sharply and losses persisted; base value declines from approximately $35M to $30M and base probability falls from 0.50 to 0.45 because management still gave no firm deployment timing; bull value remains $180M but probability falls from 0.15 to 0.15 only because the long-term opportunity and 12 demonstrations were encouraging, while the lack of orders prevents an upward revision.

2-Year Plausible Outcomes
bear40%
$5M
rev -5%/yrOE $-12M

Data-center demonstrations do not convert into firm orders within two years, while the legacy business remains subscale and loss-making. Revenue stagnates or declines, cash is consumed, and the equity is ultimately supported mainly by residual cash and working assets rather than earning power.

▸ Valuation

0.8x $6.25M residual tangible net assets = $5.0M equity value

base45%
$30M
rev +25%/yrOE $3M

Tecogen converts a portion of its non-data-center backlog and wins several smaller data-center pilots or retrofit deployments, but the Vertiv and hyperscale opportunity develops slowly. Cost reductions and better service economics move the company modestly above break-even by year two, without proving a high-growth platform.

▸ Valuation

10x $3M owner earnings = $30M equity value

bull15%
$180M
rev +70%/yrOE $15M

The Vertiv relationship produces a reference installation and one or more recognized data-center customers adopt Tecogen's dual-source chillers. Behind-the-meter power constraints create strong demand, manufacturing scales without excessive dilution, and service margins recover. By year two, the company becomes a credible high-growth niche infrastructure supplier with substantial positive cash earnings.

▸ Valuation

12x $15M owner earnings = $180M equity value

▸ Target Rationale

The probability-weighted and discounted scenario value is approximately $33.94M, but I set the analytical target at $28M. The discount reflects severe execution uncertainty, ongoing cash burn, recent dilution, contingent liabilities, non-binding backlog, and the absence of firm large-scale data-center orders. The target still gives credit for the company's net cash and the possibility that its technology becomes commercially important; it is not reduced merely for sentiment.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality4/10
Situation now2/10
Trajectory4/10
Risk9/10
Governance3/10
Insolvency prob (2yr)18%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Performance: On May 12, 2026, Tecogen reported its Q1 2026 financial results. Revenue declined 12.9% year-over-year to $6.34 million (beating consensus estimates of $4.98 million) due to a 53.6% drop in Product segment shipments. Growth in the Services segment (up 9.2% to $4.64 million) and Energy Production segment (up 5% to $0.52 million) partially offset the product decline. The company's net loss widened significantly to $2.12 million, compared to $0.66 million in Q1 2025, driven by higher services-segment operating costs in New York City, increased R&D and manufacturing expansion spending, and high natural gas input costs.
  • Cash Position and Cost Cuts: Tecogen ended Q1 2026 with $9.33 million in cash and cash equivalents. To address cash burn, management announced OpEx and Services cost-reduction initiatives in Q2, with the full impact of these savings expected to reflect in Q3 2026.
  • Expanding Vertiv Partnership: Tecogen's partnership with Vertiv has evolved from a simple marketing agreement toward a master partnership. Vertiv is currently designing-in (or is in the process of designing-in) between 25 and 50 MW of Tecogen chillers into various data center projects. Additionally, Tecogen announced an "imminent" purchase order from Vertiv for a 1 MW chiller system to be permanently deployed at one of Vertiv’s facilities.
  • Non-Data-Center Project Backlog: Outside of the data center vertical, Tecogen secured more than $8 million in approved project commitments (with $2.3 million already under purchase order), which are expected to yield cash deposits and support near-term revenue.
▸ Thesis-test Findings
Vertiv Tecogen data center cooling demonstration results

No final operating results have been published yet, as the physical unit has not yet been fully installed. During the Q1 2026 earnings call in May, management stated that the 1 MW demonstration chiller system (consisting of two 150-ton dual-power source air-cooled chillers) is scheduled to ship to Vertiv before the end of Q2 2026. The units are intended for permanent installation at a Vertiv facility in Q3 2026 to resolve local power constraints and serve as a live, operating showcase for prospective data center operators. To bridge the gap before installation, Tecogen hosted several prominent data center operators for in-person factory visits and performance reviews between late May and mid-June 2026. While the lack of final testing results represents a near-term delay in empirical validation (bear case), the active shipping timeline and the hosting of deep-due-diligence factory visits sustain the long-term validation thesis (bull case).

Tecogen dual-source hybrid chiller commercial orders

While Tecogen officially launched its TECOCHILL® Hybrid-Drive Chiller for data centers in October 2025, search results do not show any finalized, high-volume commercial orders from data center operators. The bull case relies heavily on the pipeline of 25 to 50 MW of chillers currently being designed into projects by Vertiv. However, the bear case is highlighted by a slower-than-expected contract conversion timeline. Management remains cautious, noting that they are in the early stages of converting interest into near-term proof points and are not yet in a position to disclose final delivery dates or commit to larger manufacturing volumes. To mitigate near-term cash concerns, the company is leaning on its non-data-center pipeline, which recently secured $8 million in approved projects (with $2.3 million under direct contract).

US data center utility grid connection delays 2026

Grid interconnection delays in 2026 have escalated into a major structural crisis. Average wait times to connect to the US transmission grid now approach five years, with some hyperscalers reporting delays of up to 12 years for new data center projects. While some industry analysts contest claims that half of all planned 2026 data centers are being canceled, the grid backlog remains severe enough to force major tech firms to invest heavily in on-site, behind-the-meter power solutions. In a historic move on June 18, 2026, the Federal Energy Regulatory Commission (FERC) ordered regional grid operators to fast-track connections for AI data centers and explicitly demanded greater accommodation for "behind-the-meter" power arrangements. This provides a massive bull case for Tecogen; because their hybrid-drive chillers can operate on natural gas, electricity, or a combination of both, they allow operators to bypass utility bottlenecks, freeing up to 30% of grid-allotted electricity for IT workloads while ensuring dual-power resiliency during grid outages.