Stocks/TKO.TO

TKO.TO

Taseko Mines Limitedv3 5.2/10 · 2026-11-26
Basic Materials·Copper
8.65 CAD
3.0B CAD market cap
v3 Rating
5.2/103.8–6.6
Setup
3.8/102.5–5.5
Fair Value
8.00 CAD4.50 CAD–12.50 CAD-8%
DCF (10%)
7.80 CAD-10%
Base IRR
+9%-8%–+30%
Visibility
wide±50%
Wall Street
(2 buy, 4 hold, 2 sell)
Rating
Revenue (TTM)
1.2B CAD
Owner Earnings
C$320M
Next-Yr Owner Earnings
C$270M
Growth
+4.0% × 2y
P / Next-Yr OE
11.8x
Net Debt
C$540M

Taseko Mines Limited is an enterprise specializing in the mining sector, involved in the procurement, advancement, and operation of various mineral properties. The company's efforts are directed towards uncovering deposits of copper, molybdenum, gold, niobium, and silver. Taseko possesses a 75% controlling interest in the Gibraltar mine, which is located in British Columbia. Moreover, it holds full ownership (100%) of several other significant endeavors: the Yellowhead copper project, the Aley niobium project, and the New Prosperity gold and copper project, all situated in British Columbia, as well as the Florence copper project in Arizona. The company was founded in 1966 and its corporate headquarters are located in Vancouver, Canada.

2-Year Price History

$11.47+301.0%
$4.0$6.0$8.0$10$12volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.23.8–6.6
Setup
3.82.5–5.5
Fair value (CAD)
8.004.50 – 12.50
Upside vs 8.65
-8%
DCF (10%)
7.804.00 – 13.00-10%
Base IRR
9%-8% – 30%
Visibility
widerange ±50%
Sentiment
5/10
Flow
5/10
2026-11-26 · claude-opus-5-5 · priced at 8.07

Trekor Metals (formerly Taseko Mines, renamed June 2026) owns 100% of the Gibraltar open-pit copper mine in BC (~115-120 Mlb/yr) and the new Florence in-situ copper operation in Arizona, which is ramping toward 80-85 Mlb/yr in 2027, plus the Yellowhead and New Prosperity development options. The pack's quote is stale: the latest close I found is C$8.07 on 2026-11-25, down ~36% from C$12.6 in September as copper (~US$5.8/lb, off a US$6.75 record) and the AI trade sold off, and after a soft Q3 (Florence 2026 guidance cut from 30-35 to 25-28 Mlb; record EBITDA C$164M on a US$6.40 realized price). At C$8.07 the market cap is ~C$2.96B and EV ~C$3.5B (net debt ~C$540M). My DCF at a US$5.00 long-term copper price (C$1.40) gives ~C$7.80/share: ~C$270-340M a year of unlevered FCF once Florence is at capacity, a ~9x year-5 multiple for two depleting mines, plus ~C$300M for Yellowhead. At spot copper held flat it is worth ~C$12-13; at US$4.50 about C$4. So the price already discounts roughly a US$5.0-5.2 long-run copper price: this is a copper call, not a mispricing. Rating 5.2 (fairly priced, pass); trade setup 3.8 (no variant view on the company itself, only on copper; Florence ramp through mid-2027 is the dated tell).

Flow: No buyback or dividend; cash goes to paying down the US$500M notes and to Yellowhead. Last equity raise was ~C$230M in Oct 2025 (about 10% of shares); share count grows ~1-2% a year from options and SBC (361M to 367M in 2026), and another raise is possible when Yellowhead is financed (2027-28).

A deep dive would have to establish: Will copper hold above roughly US$5.00/lb over the life of Gibraltar and Florence, and does Florence reach 80-85 Mlb/yr in 2027 with wellfield sustaining capex falling well below US$100M a year?

Owner earnings, TTM
C$320MC$230M – C$420M
Realistic peak profit
C$600MC$450M – C$850M
Growth rate
4.0%0.0% – 10.0%
Years of growth
21 – 4
Market cap
C$3.0BC$2.9B – C$3.0B
EV
C$3.5BC$3.4B – C$3.6B
Net debt
C$540MC$480M – C$620M
Capital return / cap
2.0%0.0% – 6.0%
P/E
11.0×7.0× – 20.0×
EV/EBITDA
5.8×4.0× – 9.0×
FCF yield
7.0%3.0% – 13.0%
Projected FCF, base case (CAD millions)
Y1C$270MC$130M – C$420M
Y2C$330MC$150M – C$520M
Y3C$340MC$140M – C$540M
Y4C$340MC$130M – C$540M
Y5C$340MC$120M – C$540M
Competition: Copper is a global commodity: Trekor is a mid-cost price taker whose edge is Florence's low-capital in-situ method and its US-domestic cathode under copper tariffs.
Governance: none flagged
Research (expand)

What it does. Trekor Metals (Taseko until June 2026) mines copper and molybdenum at Gibraltar, BC (100% since 2024; C1 ~US$2.6-2.7/lb after moly credits, reserves into the 2040s) and since February 2026 produces cathode at Florence, Arizona, an in-situ leach operation with no tailings and almost no diesel. Florence made 7 Mlb in Q3 (13.7 Mlb YTD); 2026 guidance was cut to 25-28 Mlb from 30-35, with the 7 Mlb/month run rate now targeted for early 2027. Florence C1 was US$3.54/lb in Q3 and should fall as volume spreads mostly fixed costs, but the wellfield needs ~US$25M a quarter of sustaining drilling, which is the real cost of in-situ mining. Yellowhead (BC priority project, EA substitution granted, ~C$2B NPV in the 2025 study, needs a JV and ~C$2B+ capex) and New Prosperity are long-dated options.

What it earns. TTM operating cash flow ~C$500M before ~C$69M interest, at very high realized copper (US$5.40-6.40). Owner earnings today, sustaining capex and capitalized stripping only, SBC as a cost: ~C$320M. Q3 2026: revenue C$342M, adj. EBITDA C$164M, OCF C$122M, FCF C$53M.

Projection (US$5.00 long-term copper, C$1.40, unlevered FCF, C$M): 2027 270, 2028 330, 2029 340, 2030 340, 2031 340. Production ~180 Mlb in 2027 rising to ~200 Mlb, then flat. In year 5 this is a 'neither' company: two steady mines, no growth unless Yellowhead is built, cash flow driven by the copper price. I give it ~9x FCF (depleting assets, cyclical commodity) = ~C$3.1B, plus ~C$0.3B for Yellowhead/Prosperity. Discounted at 10% less net debt (~C$540M; US$500M 2030 notes, leases, Florence stream ignored as small) gives ~C$2.9B, or ~C$7.80/share. Each US$0.50/lb on long-run copper moves value by ~C$3-4/share, which dwarfs everything else. Multiples at C$8.07: EV/2027 EBITDA ~5.8x, P/E ~10-13x, ~7% levered FCF yield at US$5 copper.

What the market believes. The stock rose from C$3 to C$12.6 on Florence de-risking and copper at records, then gave back a third in two months as copper fell to ~US$5.8 and Florence slipped a quarter. At C$8 it prices roughly US$5.0-5.2 copper forever, below spot and the forward curve but well above the 2015-2023 range. I have no edge on copper, so I see no mispricing in the company itself. The Florence slip is a delay, not a failure: flow rates and PLS grade are rising and the circuit works.

Management and risks. McDonald and Hamming delivered Florence on its original budget and roughly on time; they hedge sensibly (collars in 2025-26, puts at US$4.75-5.00 for Q4 2026-H1 2027). The company has never paid a dividend, raised equity in Oct 2025 (~C$230M), and spends rising sums on Yellowhead; deleveraging is the stated priority. Risks: copper price, Gibraltar grade surprises (the Connector-pit model already disappointed, Q4 steps down into supergene ore), diesel/explosives/acid inflation, Florence wellfield sustaining costs staying at US$100M/yr, BC permitting and First Nations for growth.

Sentiment: 5/10. Recently loved as a US-domestic copper/tariff play, now being sold with the AI and copper unwind; analysts still mostly Buy (targets ~C$14-15) but the tape is weak. Not a covered-call floor: earnings are not predictable, they move with copper.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue1151+93%673+11%608+16%525+34%392
Gross profit416+396%146+25%117-22%150+177%54.2
Operating expenses52.1+84%35.3-13%40.8+101%20.3+40%14.5
▸Adj EBITDA506+223%214+42%151-20%188+105%91.8
▸Adj OCF338+248%89.5-39%147+14%129+246%37.3
CapEx-220-205-114-118-79.7
Adj FCF118-115-452%32.7+199%10.9-42.4
Interest expense91.773.745.443.438.9
▸Adj net income202+660%60.12.40-82%13.2-12.3

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA1038100%335100%179100%171100%281100%71.7100%
FCF (OCF−capex)39338%26178%-18.3-10%11869%29.911%1.592%
Net income11511%72.722%-30.1-17%-13.4-8%11240%-26.0-36%
▸Capital returned-174-17%91.127%-176-98%-167-98%13.45%65.391%
Buybacks-387-9.27-262-1160.000.00
Dividends0.000.000.000.000.000.00
Interest paid26462.173.745.443.438.9
Debt paid down-49.738.212.6-97.0-30.026.4
▸Reinvestment72470%12838%291162%11970%11039%76.9107%
Capex (PP&E)65313620511411879.7
Intangibles & M&A75.50.0071.89.66-5.900.00
Leases signed (net Δ)-3.85-8.6414.6-4.67-2.37-2.81
Retained / other49147%17051%85.948%276161%22.48%-63.7-89%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 63 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)27712472219515661279
▸Liabilities (total)1878169416921132922
Net debt (incl. leases)530666617540463
Net debt / Adj EBITDA1.053.114.082.875.04
Net debt / Adj FCF4.49--18.949.4--
Adj EBITDA / interest5.522.913.334.332.36
Shares outstanding374305305305305
Dilution (YoY)+18.1%+20.5%+1.6%+1.5%-0.7%
Employees191--------
MarginsTTM2025202420232022
Gross margin36.2%+22.121.7%+2.419.3%-9.428.6%+14.813.8%
Adj EBITDA margin44.0%+17.831.8%+6.924.9%-11.035.9%+12.423.4%
Adj OCF margin29.4%+13.113.3%-10.924.2%-0.424.6%+15.09.5%
Adj FCF margin10.3%+19.0-17.1%-22.55.4%+3.32.1%+12.9-10.8%
Net income margin6.7%+16.0-4.5%-2.3-2.2%-23.621.4%+28.0-6.6%
Adj NI margin17.5%+13.18.9%+8.50.4%-2.12.5%+5.7-3.1%
ROIC (adj, after-tax)14.4%5.3%3.8%7.9%3.3%
Cost of debt11.8%8.8%6.2%6.5%7.0%

Earnings Calls

9 calls

Earnings Call · 2026 Q1

2026-05-07

Taseko Mines Limited reported its first-quarter 2026 results, highlighting a pivotal period marked by the commencement of copper production at the Florence Copper project and consistent operational performance at the Gibraltar mine. CEO Stuart McDonald emphasized that the startup of Florence represents the culmination of a decade of technical and permitting work. The Florence project achieved its first copper cathode in late February and has since stabilized its initial wellfield operations, reaching production rates of 55,000 to 60,000 pounds per day. The company expects to ramp up production to a target of 30 to 35 million pounds in 2026 as more wells are commissioned throughout the second half of the year. The Gibraltar mine, Taseko’s primary operating asset, produced 30 million pounds of copper and over 700,000 pounds of molybdenum. While production remained steady, operating costs saw a 6% increase, with C1 cash costs rising to $2.63 per pound. This increase was primarily driven by inflationary pressures on diesel fuel and explosives, partly mitigated by strong molybdenum byproduct credits. Management noted that higher maintenance spending in the first quarter was a timing issue and is not expected to persist for the remainder of the year. Financially, Taseko achieved record quarterly revenue of $237 million, driven by strong copper sales and high molybdenum prices, which averaged over $28 per pound. The company’s financial performance was slightly constrained by existing copper collars that limited the realized price to $5.40 per pound; however, these collars are set to expire in June 2026. This will allow Taseko to benefit from significantly higher market prices in the latter half of the year. The company maintained a strong liquidity position of $322 million, including $169 million in cash, providing a solid foundation for completing the Florence ramp-up and advancing other projects. Looking ahead, Taseko is progressing on its Yellowhead project, which was recently included on British Columbia’s priority projects list. While this designation highlights the project's importance, management clarified that it does not fundamentally alter the standard permitting process. Environmental assessment work continues, with a detailed project description expected to be filed this summer. Additionally, the company is maintaining dialogue with the Tőilhqot’in Nation regarding the New Prosperity project. During the Q&A session, management addressed concerns regarding cost inflation, particularly the $0.50 per liter increase in diesel prices and the supply of ammonium nitrate for explosives. They also provided clarity on the cadence of the Florence ramp-up, noting that production increases will be more pronounced in the third and fourth quarters. As Florence transitions into a free-cash-flow-generating asset, the company plans to shift its hedging strategy from collars to out-of-the-money puts, ensuring downside protection while retaining full upside potential. Overall, the tone of the call was optimistic, focusing on the successful de-risking of Florence and the potential for significant production growth and debt reduction in the near future.

Analyst Coverage

Analyst Coverage
Analyst Ratings
2
4
2
Buy: 2Hold: 4Sell: 2Consensus: Hold