TLG.TO
Troilus Mining Corp.v3 5.5/10 · 2026-11-26Troilus Mining Corp. engages in exploration and development of mineral properties in Canada. The company explores for gold, silver, and copper deposits. Its flagship property is the 100% owned Troilus Gold project that covers an area of approximately 435 square kilometers located northeast of the Val-d’Or mining district, within the Frotêt-Evans Greenstone Belt in Quebec, Canada. The company was formerly known as Troilus Gold Corp. and change its name to Troilus Mining Corp. in December 2025. The company is headquartered in Montreal, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
Troilus is a pre-production developer restarting the old Inmet Troilus gold-copper mine in Quebec as a 50,000 t/d, 0.59 g/t AuEq bulk open pit (Sept 2026 report: ~251koz Au + 20Mlb Cu + 466koz Ag a year, 26-year life, US$1.43B initial capex, AISC ~US$1,340/oz, after-tax NPV5 US$3.2B at US$3,600 gold). At C$1.23 (last close 2026-11-25, the newest found; ~580M fully diluted shares, ~C$715M) it is down 45% from August's C$2.23 as gold fell to a 14-month low near US$3,700-3,900 and investors wait for the equity and stream slice of a ~US$1.8B funding package. Only US$850M of a US$1.1B senior debt package is credit-approved, the cash (C$140M at April) is being spent fast, the federal/Cree permits and the Mistissini benefits agreement are still open, and capex already rose 33% during engineering. Redone at spot gold, with a 25-30% overrun, a six-month slip and the gap filled by a stream plus ~US$250M of equity near today's price, the 10% DCF is ~C$1.8 a share, but the range runs from ~C$0.6 (US$3,000 gold, a big overrun) to ~C$3.2 (US$4,500 gold). The attack held on grade, gold sensitivity and timeline, but it double-counted the cost of a stream. Rating 5.5: cheap against NAV, but the outcome is mostly a levered call on gold plus financing execution, with no bounded downside. Fair value ~C$1.5.
Flow: Heavy issuance ahead: before and at financial close (targeted for H1 2027) the company needs a pre-close bridge plus an estimated US$150-350M of equity (25-60% of ~580M fully diluted shares) beyond a stream and senior debt, with ~C$228M left on a shelf expiring ~May 2027. RSU grants add ~2% a year, and a 12M-share block traded on 2026-11-20 with no news; there is no buyback or insider buying.
A deep dive would have to establish: Will Troilus reach financial close and permits in H1 2027 with the US$600-700M gap filled mostly by a stream and sub-debt rather than heavy equity near C$1.20, and will gold hold above ~US$3,500 while it does?
Research (expand)
What it is. Troilus Mining (formerly Troilus Gold) owns 100% of the past-producing Troilus gold-copper mine northeast of Chibougamau, Quebec. Inmet ran it from 1996 to 2010 (2Moz Au, 70kt Cu) and shut it when the higher-grade ore ran out. No revenue; it is a development company. The September 9, 2026 technical report (after basic engineering) has 50,000 t/d of throughput, ~251koz gold + 20.1Mlb copper + 466koz silver payable a year, a 26-year life, initial capex ~US$1.43B (US$1.07B in the 2024 FS), sustaining capex only US$198M over the life, AISC ~US$1,340/oz net of by-products, first ore September 2029, commercial production March 2030, and after-tax NPV5 US$3.2B / IRR 22% at US$3,600 Au, US$5.00 Cu, US$50 Ag (US$4.7B at US$4,500). The reserve is low grade: 0.59 g/t AuEq (0.49 g/t Au, 0.058% Cu) in the 2024 FS, with tonnage up ~26% in 2026.
What the market believes. At C$1.23 x ~580M fully diluted shares (~555M basic plus RSUs, DSUs and warrants) = ~C$715M (~US$510M), the market prices the project at ~0.15x NPV5. It discounts:
- gold, down ~33% from January's US$5,590 to ~US$3,700-3,900, now at the study deck;
- a ~US$1.7-1.9B sources-and-uses against US$1.1B of senior debt, of which only US$850M (KfW IPEX, SocGen) is credit-approved and conditional on the rest; EDC's share still needs approval;
- the company's own target of 25-35% sub-debt/stream/royalty and ~10% equity;
- the federal/Cree review and the Mistissini Impacts and Benefits Agreement, neither finished;
- capex inflation.
What it may be getting wrong. Most of the financing architecture is in place: credit-approved bank debt, Finnvera ECA support for the Metso equipment, 70 MW of hydro power, Aurubis/Boliden offtake MOUs, Quebec 'Filon' support and GDXJ membership. If close comes on the company's structure (mostly debt plus a stream), the equity dilution is far less than the market fears. Copper at ~US$6/lb against the US$5 deck is a by-product cushion.
Earnings today. Unlevered owner earnings are negative and rising: Q3 FY26 net loss C$24.5M (engineering C$11.6M a quarter; G&A up 86% YoY; SBC ~C$9M a year), so pre-development burn is ~C$80-100M a year. Cash and term deposits were C$140M at April 30, 2026, with C$95M of early works, long-lead items and bulk sample still planned. I estimate ~C$80-100M now, and no debt (Auramet repaid November 2025). A bridge or a raise before financial close is likely.
Projected unlevered FCF (C$M). 2027 -750, 2028 -1,000, 2029 -550 (capex with a 25-30% overrun, six-month slip), 2030 +350 (ramp-up), 2031 +530 (US$3,700 Au, US$5 Cu, 1.40 CAD/USD). In year 5 it is a depleting 20+-year single-asset mine, neither a grower nor a corpse: worth its remaining cash flows, ~C$4.1B at 10% (~8x year-5 FCF). DCF EV ~C$1.2B, plus ~C$90M net cash. Funding the gap with a stream (roughly neutral at a 10% discount) plus ~US$250M of equity at ~C$1.15 (~300M new shares) gives ~C$1.8/share. Range ~C$0.6 (US$3,000 gold, a 40% overrun, a 1-year slip) to ~C$3.2 (US$4,500 gold, little equity).
Fair value. C$1.5: developers usually trade well below NAV until they produce, and this one is a single, low-grade, gold-levered asset.
Management and risks. The development team (CEO Justin Reid) has hit its engineering, power and debt milestones. But pay is rising fast ahead of production (salaries +110% in 9 months, 12.8M RSUs granted). Risks: gold, financing terms, overruns, permits and the IBA, and a 0.59 g/t grade that makes the margin very sensitive to gold.
Sentiment: 4/10. Gold-equity momentum has turned. The stock is near its 1-year low, and a 12M-share block traded on 2026-11-20 with no news.
Thesis test
- Funding gap (partly the challenge): the gap is ~US$600-700M beyond senior debt, not ~US$350M, and a pre-close bridge is likely. But the challenge counted a stream's cost on top of the equity: a stream priced at streamers' ~5% hurdle is roughly neutral to accretive at our 10% rate. Net effect: DCF ~C$1.8 (was 1.9), not 1.4-1.6.
- Grade and gold sensitivity (the challenge): the reserve is 0.59 g/t AuEq, not ~0.9. At US$3,000 gold the equity roughly halves. The downside is not bounded, and the range is widened at the bottom.
- Capex (mostly the challenge): capex already rose 33% before construction, and sustaining capex of ~US$8M a year looks light. The base overrun moves to 25-30%, worth about -C$0.1/share against the pitch.
- Permits and IBA (the challenge): the IBA is not negotiated, and the federal decision is past its posted date. A six-month slip is now in the base case.
- Pay and block selling (the challenge, minor): it supports a flow of 3. Small direct value impact.
- Conclusion: the core economics hold at spot gold, and the stock trades at ~0.65x my DCF. But the result is a levered gold call plus financing execution, not a mispricing I can explain beyond 'developers are hated'. Asymmetry is poor, because the downside is unbounded at lower gold and the equity is raised at whatever price prevails. Rating 5.5: watch for financial close at fair terms with a stream (2027 H1) as the trigger.
- https://troilusmining.com/news-and-media/news-releases/
- https://www.otcmarkets.com/file/company/financial-report/570716/content (Q3 FY2026 MD&A, April 30 2026)
- https://www.geomechanics.io/news/article/troilus-32b-copper-gold-npv-capex-schedule-and-risk-notes-for-mine-planners
- https://www.engineeringnews.co.za/article/canadian-miner-troilus-secures-bulk-of-debt-funding-required-for-qubec-mine-build-2026-09-29
- https://www.cruxinvestor.com/posts/troilus-targets-2027-construction-as-1-2b-financing-and-offtake-deals-advance-toward-close
- https://mining.com.au/troilus-delivers-4-4-billion-npv-in-updated-technical-report/
- https://www.khaleejtimes.com/gold-holds-near-14-month-low-as-fed-hike-bets-weigh
- https://iaac-aeic.gc.ca/050/evaluations/proj/83658
Financials — Adjusted
Adjusted · TTM 2026-Q4 · CAD
| TTM & Fiscal-Year P&L | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Revenue | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Gross profit | -1.49 | -1.49 | -0.43 | -0.93 | -1.25 |
| Operating expenses | 92.0+128% | 92.0+128% | 40.4+38% | 29.3-14% | 34.0 |
| ▸Adj EBITDA | -92.0 | -92.0 | -39.5 | -28.7 | -33.6 |
| ▸Adj OCF | -75.3 | -75.3 | -38.4 | -20.5 | -34.8 |
| CapEx | -1.21 | -1.21 | -1.04 | -0.30 | -0.59 |
| Adj FCF | -76.5 | -76.5 | -39.4 | -20.8 | -35.4 |
| Interest expense | 1.46 | 1.46 | 1.11 | 0.10 | 0.14 |
| ▸Adj net income | -91.9 | -91.9 | -41.3 | -30.0 | 0.44 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026
| Where the Cash Went | Total | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -159 | -87.0 | -36.2 | -32.2 | -3.80 |
| FCF (OCF−capex) | -165 | -74.4 | -34.6 | -24.1 | -31.7 |
| Net income | -126 | -82.7 | -39.4 | -34.3 | 30.1 |
| ▸Capital returned | -230 | -152 | -54.2 | -14.1 | -9.22 |
| Buybacks | -237 | -177 | -35.5 | -15.1 | -10.0 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 2.81 | 1.46 | 1.11 | 0.10 | 0.14 |
| Debt paid down | 4.80 | 23.0 | -19.8 | 0.94 | 0.65 |
| ▸Reinvestment | 3.14 | 1.86 | 0.92 | 0.24 | 0.12 |
| Capex (PP&E) | 3.14 | 1.21 | 1.04 | 0.30 | 0.59 |
| Intangibles & M&A | -0.29 | 0.00 | 0.00 | 0.00 | -0.29 |
| Leases signed (net Δ) | 0.29 | 0.65 | -0.13 | -0.06 | -0.18 |
| Retained / other | 67.9 | 79.1 | 20.7 | -9.89 | -22.1 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 21 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| ▸Assets (total) | 151 | 151 | 44.5 | 24.9 | 36.8 |
| ▸Liabilities (total) | 27.3 | 27.3 | 32.2 | 9.34 | 6.94 |
| Net debt (incl. leases) | -122 | -122 | -4.63 | -6.49 | -16.8 |
| Net debt / Adj EBITDA | -- | -- | -- | -- | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -63.2 | -63.2 | -35.4 | -294 | -247 |
| Shares outstanding | 529 | 555 | 397 | 285 | 227 |
| Dilution (YoY) | +39.9% | +39.9% | +39.0% | +25.6% | +13.6% |
| Employees | 47.0 | -- | -- | -- | -- |
| Margins | TTM | 2026 | 2025 | 2024 | 2023 |
|---|---|---|---|---|---|
| Gross margin | -- | -- | -- | -- | -- |
| Adj EBITDA margin | -- | -- | -- | -- | -- |
| Adj OCF margin | -- | -- | -- | -- | -- |
| Adj FCF margin | -- | -- | -- | -- | -- |
| Net income margin | -- | -- | -- | -- | -- |
| Adj NI margin | -- | -- | -- | -- | -- |
| ROIC (adj, after-tax) | -59.1% | -59.1% | -95.6% | -143.7% | -89.9% |
| Cost of debt | 20.6% | 20.6% | 17.1% | -- | -- |
Institutional Ownership
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2023 Q3 | 603M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2024 Q3 | 181M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2025 Q4 | 0M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2026 Q1 | 0M | — | -19M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q2 | 0M | — | -11M | $-0.02 | $-0.02 – $-0.02 | 1 |
| 2026 Q3 | 0M | — | -19M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q4 | 0M | — | -17M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2027 Q1 | 0M | — | -17M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2027 Q2 | 0M | — | -22M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2027 Q3 | 0M | — | -22M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2027 Q4 | 0M | — | -6M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2028 Q1 | 0M | — | -6M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2028 Q2 | 0M | — | -11M | $-0.02 | $-0.02 – $-0.02 | 1 |
| 2028 Q3 | 0M | — | -6M | $-0.01 | $-0.01 – $-0.01 | 1 |