Stocks/TRP.TO

TRP.TO

TC Energy Corporationv3 4.0/10 · 2026-10-30
Energy·Oil & Gas Midstream
89.84 CAD
92.4B CAD market cap
2.9% div yield
v3 Rating
4.0/103.0–5.0
Setup
2.5/101.5–4.0
Fair Value
78.00 CAD55.00 CAD–98.00 CAD-13%
DCF (10%)
40.00 CAD-55%
Base IRR
+8%+0%–+15%
Visibility
moderate±28%
Wall Street
(8 buy, 9 hold)
Rating
Revenue (TTM)
16.3B CAD
Owner Earnings
C$4.8B
Next-Yr Owner Earnings
C$4.1B
Growth
+5.5% × 10y
P / Next-Yr OE
22.8x
Net Debt
C$63.9B

TC Energy Corporation functions as a leading energy infrastructure enterprise across North America. Its comprehensive operations are organized into five primary divisions: Canadian Natural Gas Pipelines, U.S. Natural Gas Pipelines, Mexico Natural Gas Pipelines, Liquids Pipelines, and Power and Storage. The company boasts an extensive 93,300 km natural gas pipeline network designed to move natural gas from its source basins to various destinations such as local distribution companies, electricity generation plants, industrial complexes, inter-pipeline connections, and LNG export terminals. This infrastructure is supported by regulated natural gas storage facilities with a total working gas capacity of 535 billion cubic feet, alongside 118 billion cubic feet of non-regulated natural gas storage capacity situated in Alberta. In addition to gas, TC Energy manages a significant 4,900 km liquids pipeline system. This system is vital for transporting crude oil originating from Alberta to key refining markets in Illinois, Oklahoma, Texas, and the U.S. Gulf Coast. Furthermore, the company either owns or holds interests in seven power generation facilities. These plants collectively provide approximately 4,300 megawatts of power, utilizing both natural gas and nuclear fuel sources, and are located in Alberta, Ontario, Québec, and New Brunswick. Originally incorporated in 1951, the company was known as TransCanada Corporation until it adopted the name TC Energy Corporation in May 2019. Its corporate headquarters are located in Calgary, Canada.

2-Year Price History

$90.16+48.2%
$70$80$90Initial target $78.00 · 2026-10-30volNov 24Feb 25Jun 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-30

Rating
4.03.0–5.0
Setup
2.51.5–4.0
Fair value (CAD)
78.0055.00 – 98.00
Upside vs 89.84
-13%
DCF (10%)
40.0020.00 – 75.00-55%
Base IRR
8%0% – 15%
Visibility
moderaterange ±28%
Sentiment
7/10
2026-10-30 · claude-opus-5-5 · priced at 90.16

TC Energy is a top-quality, low-risk North American gas pipeline and nuclear power (Bruce Power) franchise. About 97% of EBITDA is rate-regulated or under long-term take-or-pay contracts, and execution is improving: 2025 projects came in 15% under budget, 2026 guidance is at the top of C$11.6-11.8B comparable EBITDA, and the backlog keeps growing (C$7B pending approval, C$20B+ in origination, two-thirds of it gas-for-power and data centres). But this is a fully priced compounder, not a mispricing. At C$90.16 (latest close, 30 Oct 2026; 84% of the way up its 3-year range after a ~30% one-year run and a September dip to C$82), the C$94B market cap plus about C$64B of net debt including hybrids and preferreds, plus minority interests, gives roughly 14.4x 2026 EBITDA and 23x comparable EPS. Real owner free cash flow to common holders (comparable FFO about C$8.7B, less maintenance capex, part of the Bruce refurbishment money, minority distributions and preferred dividends) is about C$4.8B, a 5% yield. Almost all of it is reinvested at 5-7x build multiples, so free cash flow after growth capex barely covers the 3.9% dividend and debt keeps rising. Our DCF (10% discount rate, year-5 owner FCF at 15x) gives only about C$40 per share. That gap is not a red flag. It shows that a 5-6% grower with a utility-like cost of capital can only be valued near today's price at a 6-7% discount rate. Expected return from here is about 8-9% a year (dividend plus mid-single-digit growth), nowhere near the 50% we want. There is no forced seller, no valuation floor, no covered-call setup and no catalyst that re-rates it 40%. Analysts like it (17 of 24 Buy, consensus target about C$96-100, TD and Morgan Stanley upgraded in September). Rating 4.0: a fine, safe holding but not attractive for our goals, and not a short either. Research rating 2.5: the open questions (Crossroads FID, the NGTL return framework, how 2029-31 capex gets funded) will not unlock a 40% mispricing.

A deep dive would have to establish: Whether the C$20B+ gas-for-power origination book can be sanctioned at 5-7x build multiples and funded through 2029-31 without equity, enough to lift per-share growth from about 5% to 8%+ and justify a premium multiple beyond today's price.

Owner earnings, TTM
C$4.8BC$3.9B – C$5.7B
Realistic peak profit
C$6.2BC$5.0B – C$7.5B
Growth rate
5.5%3.5% – 7.5%
Years of growth
106 – 15
Market cap
C$94BC$91B – C$97B
EV
C$170BC$163B – C$177B
Net debt
C$64BC$63B – C$66B
Capital return / cap
3.9%3.7% – 4.1%
P/E
23.4×22.0× – 25.0×
EV/EBITDA
14.4×13.6× – 15.2×
FCF yield
5.1%4.2% – 6.0%
Projected FCF, base case (CAD millions)
Y1C$4.1BC$3.0B – C$5.2B
Y2C$4.3BC$3.1B – C$5.5B
Y3C$3.9BC$2.4B – C$5.4B
Y4C$3.9BC$2.2B – C$5.6B
Y5C$4.6BC$2.8B – C$6.4B
Competition: Corridor-incumbent regulated gas pipes (NGTL, Columbia, ANR, Mexico) face real competition only for new expansions from Williams, Kinder Morgan, Energy Transfer, Enbridge and Boardwalk, where TC's footprint and storage give it a cost edge.
Governance: none flagged
Research (expand)

What the company does

TC Energy (TSX/NYSE: TRP) owns about 93,000 km of natural gas pipelines in Canada (NGTL, Canadian Mainline, Coastal GasLink interest), the U.S. (Columbia Gas and Gulf, ANR, Great Lakes, Northern Border, GTN and others) and Mexico (TGNH/Southeast Gateway, Sur de Texas). It also has 650+ Bcf of gas storage, and in Power & Energy Solutions a 48.4% stake in Bruce Power (6.5 GW of Ontario nuclear) plus Alberta cogeneration. The liquids business was spun off as South Bow in Oct 2024. About 97% of EBITDA is rate-regulated or under long-term take-or-pay contracts. H1 2026 comparable EBITDA was C$6.04B: Canada gas C$1.88B, U.S. gas C$2.72B, Mexico C$0.84B, Power C$0.60B.

The investment case (and why it is not ours)

  • Bull case: North American gas demand is forecast to grow about 51 Bcf/d by 2035, with power and data centres more than half of the upgrade. TC is the incumbent in the U.S. Heartland, Alberta and Mexico, where about 60-70% of that growth happens. Brownfield expansions are being sanctioned at 5-7x build multiples with roughly 12% unlevered IRRs, up from 8.5% a few years ago. Execution has turned from a liability (the Coastal GasLink overrun) into a strength (2025 projects 15% under budget; Bruce Unit 3 back 7 months early and 15% under the Unit 6 cost). Bruce Power's free cash flow inflects after the last refurbishment units finish in 2031-33, freeing C$2-3B a year of capacity. Q2 2026 EBITDA was +12% YoY; 2026 guidance is at the upper end; 2028 guidance is C$12.6-13.1B (about 6% CAGR).
  • Why it does not fit a 50%-in-a-year screen: the stock already prices all of this. It has re-rated from about C$60 to C$90 in two years, trades at about 14.4x EV/EBITDA and 23x earnings, and sits near the top of its 3-year range. Growth is 5-7% EBITDA and about 3-5% dividend, funded with debt and retained cash. Nothing is mispriced, there is no forced seller, and 40% upside would need a buyout, which is impossible at this size.

What it earns today (real free cash flow)

From the Q2 2026 filing (all C$):

  • H1 2026 comparable FFO was C$4.33B (2025 full year about C$8.0B), so 2026 should be about C$8.6-8.8B.
  • Capital spending was C$2.43B in H1, with C$6.0-6.5B gross (C$5.5-6.0B net) guided for the year. 2025 maintenance capex was about C$2.2B, and 2026 runs higher because C$0.5B was pulled forward.
  • H1 distributions to minority holders were C$0.60B, preferred dividends C$0.06B and common dividends C$1.80B (C$3.51/share annualized).
  • Owner FCF to common before growth capex: FFO about 8.7 - maintenance about 2.4 - part of the Bruce refurbishment contributions treated as life-extension maintenance about 0.5 - minority distributions about 1.1 - preferred dividends about 0.1 = about C$4.8B (C$4.6/share, about 5.1% yield).
  • Stock comp is small and largely cash-settled through opex.
  • Unlevered, the TC share of FCF before growth capex is about C$7.5-8.0B.
  • After all capex, free cash flow is about C$1.3B before dividends of C$3.7B. Debt grows about C$2B a year, and leverage stays near 4.75-4.8x only because EBITDA grows.

Free cash flow for the next 5 years and the company in 5 years

Unlevered FCF (TC share, after maintenance and the growth capex needed to deliver about 5-6% EBITDA growth). EBITDA path: about 11.8 (2026), 12.4, 12.95, 13.6, 14.3, 15.0 (2031). Growth capex rises in 2029-31 as the C$20B origination book is sanctioned.

| Year | Pre-growth FCF | Growth capex | FCF after growth |

|---|---|---|---|

| 2027 | 7.9 | 3.8 | 4.1 |

| 2028 | 8.3 | 4.0 | 4.3 |

| 2029 | 8.7 | 4.8 | 3.9 |

| 2030 | 9.1 | 5.2 | 3.9 |

| 2031 | 9.6 | 5.0 | 4.6 |

In 5 years this is still a growing income stream with a great business downstream, not a corpse. It will be a 5-6% grower with C$15B EBITDA, Bruce Power near its cash inflection and an origination book running into the 2030s. Confidence in the cash-flow projection is high (regulated, contracted, guidance-backed). The swing factors are capex intensity and rate cases, not demand.

Fair value and the multiples we are paying

  • Price: C$90.16, market cap about C$94.0B (1,042M shares).
  • Net debt: about C$61.7B at 30 Jun 2026 (C$63.7B of debt incl. C$14.3B of junior subordinated hybrids, less C$2.1B cash), plus C$2.3B of preferreds, so about C$63.9B.
  • Minority interests: C$9.7B book (40% of Columbia, the CFE stake in TGNH).
  • Multiples: EV about C$170B, so about 14.4x 2026 EBITDA and 13.7x 2027. P/E about 23x on about C$3.85 of 2026 comparable EPS. Owner FCF yield about 5.1%. Dividend yield 3.9%.
  • DCF (10%, brief method): PV of the 2027-31 FCF after growth is about C$15.7B. Terminal value is 15x year-5 pre-growth FCF of C$9.6B, about C$144B (PV C$89B). That gives an EV of about C$105B, less C$63.9B, for about C$41B of equity, or about C$40/share (range C$20-75; even 18x terminal with no growth-capex deduction only reaches about C$73).
  • The market values regulated gas pipelines at a 6-7% cost of capital (peers Enbridge, Williams and Kinder Morgan trade at 12-16x EBITDA), which justifies roughly C$85-100. Our 10% hurdle does not.
  • Fair value (judgment): about C$78 (range C$55-98). That is fair-to-full by market standards and below price for our return target.
  • Base IRR: about 8% (3.9% dividend + about 5% per-share growth, minus a little multiple drift).
  • Chart: 1-year range C$69.38-99.60, now 69% of the way up; 3-year 84% of the way up. A ~16% pullback from the July high to C$82 in September has partly reversed. It is not near the bottom of its range.
  • Options: not a valuation-floor or covered-call setup. Implied volatility is low and the multiple is not depressed.

Management, risks and competition

Management. CEO Francois Poirier and CFO Sean O'Donnell have rebuilt credibility since the Coastal GasLink overrun and Keystone XL write-off (both from prior eras). Capital discipline is a stated C$6-7B a year cap, with a firm 4.75x debt/EBITDA target and "no new equity" in the plan. Dividends have grown 26 years running but are now held to the low end of 3-5%. Asset rotation is ongoing (Guadalajara-Manzanillo pipeline sold for about US$400M, Sept 2026). We trust them not to waste the money, but almost none of it comes back beyond the dividend: there are no buybacks.

Risks.

  • Capex/funding gap in 2029-31, before the Bruce cash inflection. Management openly flags hybrids, asset rotation or other capital-market levers, and possibly equity, if the backlog fills.
  • Leverage is high in absolute terms (about 5x including hybrids), and S&P had a negative outlook.
  • Regulation: the NGTL return framework for new growth is undetermined, and the GTN rate case is due by Dec 2026.
  • Other: Mexico (CFE counterparty/policy), rates (bond-proxy valuation), data-centre demand timing, and Bruce refurbishment execution (Unit 4 underway).

Competition. The pipes are corridor monopolies with high barriers. Expansions compete mainly with Williams, Kinder Morgan, Energy Transfer, Enbridge and Boardwalk for new laterals and power-plant loads, and incumbency and integration give TC a cost edge.

How investors and analysts feel (7/10)

Investors are well disposed. The stock is up about 30% in a year, consensus is Buy (about 17 Buy, 7 Hold, no Sells), and targets cluster at C$95-108 (BMO C$99, TD C$102 after a September upgrade to Buy, Morgan Stanley C$108 Overweight, Goldman C$101). Some retail and valuation commentary flags a P/E above history and heavy capex and debt. It is a loved, crowded income and AI-power-adjacent name, not a hated one. Q3 2026 results are due 5 Nov 2026, and possible catalysts are the Crossroads FID and the November AI-EBITDA update.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue16330+31%15146+16%13037-18%15934+6%14977
Gross profit8501+35%7550+20%6274-19%7752+12%6927
Operating expenses865+11%881+12%790-12%897+6%848
▸Adj EBITDA10564+29%9438+14%8272-14%9633+11%8663
▸Adj OCF8983+23%7849+4%7527+7%7052+1%7004
CapEx-4504-5282-6325-8149-6694
Adj FCF4479+165%2567+114%1202-1097-454%310
Interest expense33802988264127522219
▸Adj net income2668+66%1956-13%2249-31%3248-3%3348
▸Owner's earnings3600--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA46192100%8584100%11201100%10896100%9370100%6141100%
FCF (OCF−capex)605613%379144%206418%140113%-881-9%-319-5%
Net income1488432%299735%351931%469843%292231%74812%
▸Capital returned1364030%341640%381234%612856%-278-3%5629%
Buybacks-1925-74.0146-88.0-4.00-1905
Dividends1615227133507395327873192
Interest paid1311025102988264127522219
Debt paid down-13697-1733-2829-378-5813-2944
▸Reinvestment3705980%337139%589953%695364%10710114%10126165%
Capex (PP&E)2960831585282632581496694
Intangibles & M&A746121375857424833433
Leases signed (net Δ)-10.0---14154.078.0-1.00
Retained / other-1935-4%267231%4824%-2660-24%-334-4%-2095-34%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 19 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)123673118751118243125034114348
▸Liabilities (total)8605681852798838602680232
Net debt (incl. leases)6178560676590765998058059
Net debt / Adj EBITDA5.856.437.146.236.70
Net debt / Adj FCF13.823.649.1--187
Adj EBITDA / interest3.133.163.133.503.90
Shares outstanding10421041103810371016
Dilution (YoY)+0.2%+0.3%+0.1%+2.1%+3.6%
Employees6668--------
MarginsTTM2025202420232022
Gross margin52.1%+1.449.9%+1.748.1%-0.548.6%+2.446.3%
Adj EBITDA margin64.7%-1.362.3%-1.163.5%+3.060.5%+2.657.8%
Adj OCF margin55.0%-3.551.8%-5.957.7%+13.544.3%-2.546.8%
Adj FCF margin27.4%+13.816.9%+7.79.2%+16.1-6.9%-8.92.1%
Net income margin24.6%-3.623.2%-12.836.0%+17.718.3%+13.35.0%
Adj NI margin16.3%+3.412.9%-4.317.3%-3.120.4%-2.022.4%
ROIC (adj, after-tax)6.5%5.7%5.3%5.6%4.3%
Cost of debt5.4%4.9%4.0%4.3%3.9%

Earnings Calls

10 calls

Earnings Call · 2026 Q2

2026-07-30

TC Energy delivered a strong second quarter of 2026, with comparable EBITDA up 12% year over year and contributions from every business segment. Canada Gas benefited from higher flow-through depreciation and NGTL incentive earnings; U.S. Gas benefited from additional contract sales and stronger ANR and Columbia results; Mexico reflected a full quarter of Southeast Gateway earnings; and Power and Energy Solutions was aided by Bruce Power’s strong availability, annual price escalation and the early return of Unit 3. Average flows across the three-country gas network increased 3%, while Bruce achieved 99% availability. Based on operational performance and execution confidence, management now expects 2026 comparable EBITDA toward the upper end of its $11.6–$11.8 billion range. The company retained its 2028 target of $12.6–$13.1 billion, representing approximately 6% annualized midpoint growth from 2025. The central theme was expanding, high-return growth visibility. TC placed approximately $2 billion of assets into service during the first half and expects about $3.5 billion for the full year. It has sanctioned approximately $3 billion of projects year to date, including roughly $700 million announced this quarter, at a weighted-average unlevered after-tax IRR of approximately 12%. Its late-stage pending-approval portfolio grew to approximately $7 billion from $6 billion, primarily because of the Crossroads project. TC has executed precedent agreements with multiple anchor customers and expects to sanction Crossroads in the fourth quarter, with economics within its targeted 5–7x build-multiple range. Including Crossroads and other opportunities, management sees a reasonable prospect of sanctioning $6–$8 billion of projects in 2026. The longer-term origination pipeline exceeds $20 billion and extends visibility beyond 2030. Approximately two-thirds is associated with power generation and roughly two-thirds is located in the United States, while about one-third is currently tied to Canadian markets. Management’s North American gas-demand outlook has increased to approximately 51 Bcf/d of incremental demand by 2035, 40% above 2025 levels. Power generation accounts for more than half of the increase, with data centers, electrification and coal conversions important contributors. Nearly 70% of demand growth is concentrated in the U.S. Heartland, Alberta and Mexico, where TC has extensive incumbent infrastructure. Canadian demand is expected to grow by more than 8 Bcf/d, supported by LNG, industrial activity, power, data centers and oil-sands-related requirements. NGTL open seasons have attracted strong participation, including record data-center interest in the 2030–2032 intra-Alberta offering, and TC is considering upsizing some offerings. Bruce Power’s execution strengthens the funding outlook. Unit 3 returned more than seven months ahead of the ISO schedule and approximately 15% below Unit 6’s cost, while Unit 6’s forced-outage rate remains near 1%. The next $300 million tranche funds pre-FID activities, technology selection, engineering and consultation through near the end of the decade. The final two refurbishments in 2031–2032 could unlock $2–$3 billion annually of growth capital. TC remains committed to leverage of 4.75x or better and expects organic deleveraging to support the 2029–2030 investment ramp. It will initially rely on EBITDA growth and project cash flows, with capital rotation, debt, hybrids and private credit available if needed; major funding actions are not expected before 2028. Management also highlighted commercial optimization and AI. AI initiatives are being tested on selected pipeline segments, with the company about halfway to its $100 million 2026 incremental EBITDA target, although benefits cannot yet be extrapolated linearly. Data-center demand remains strong despite localized stakeholder concerns, and TC sees selective opportunities to serve customers through unregulated infrastructure and integrated gas, power and storage solutions, particularly in Alberta. Mexico is viewed as a mature portfolio where new large investments are not currently required.

Analyst Q&A (19)
▸
Asked about Alberta demand from data centers, oil sands growth and LNG exports, and how constrained takeaway capacity affects negotiations over creative tolling structures with Canadian producers.
Theresa Chen · Barclays
Management said Canadian demand is growing across LNG, power, data centers, industrial activity and egress. TC has about six NGTL offerings totaling roughly 1 Bcf/d, spanning receipt, delivery, intra-Alberta and export services. Strong uptake in the 2029 Greater Edmonton offering and the 2030–2032 expansion supports further NGTL growth and informs discussions with customers.
▸
Asked for the eventual size, economics and expansion potential of Crossroads given strong Midwest interest.
Theresa Chen · Barclays
Crossroads has precedent agreements with large anchor customers and is expected to be sanctioned in the fourth quarter. Management cited 5–6 Bcf/d of Midwest demand growth through 2035 and emphasized TC’s advantaged Columbia, Northern Border and Great Lakes footprint. The expansion will be advanced through further discussions and is expected to fall within the 5–7x build-multiple range.
▸
Asked whether the pending backlog increase was principally Crossroads and requested more detail on the $5 billion increase in origination projects by geography and business.
Praneeth Satish · Wells Fargo
The roughly $1 billion increase in pending projects is largely Crossroads, which is slightly above $1 billion. The more than $20 billion origination backlog is approximately two-thirds U.S. and power-related, with about one-third currently associated with Canadian markets, including NGTL producer- and demand-side opportunities.
▸
Asked for an update on TC’s AI pipeline-optimization initiative, including pilot coverage, current benefits, scalability and timing.
Praneeth Satish · Wells Fargo
AI proof-of-concept projects are being tested on small pipeline segments, and gains cannot be extrapolated linearly because TC selected areas with the greatest potential. Teams compete for capital through business cases and committed outcomes. TC is about halfway toward its $100 million 2026 incremental EBITDA target and expects to provide longer-term, proof-point-supported potential, possibly by November.
▸
Asked whether customers bidding into NGTL open seasons are underwriting projects based on a tentative new regulatory and return framework or whether the framework remains undecided.
Aaron MacNeil · TD Cowen
The open seasons are intended to measure detailed demand by region and service type, not to establish a final return framework. TC is separately discussing a future investment framework with customers and hopes to report progress by year-end.
▸
Asked how much annual growth capital TC could fund organically in 2029–2030 while maintaining leverage targets and how it would fund the broader pipeline.
Aaron MacNeil · TD Cowen
TC’s firm 4.75x-or-better leverage target and planned organic deleveraging should position it for a 2029–2030 capital ramp. Bruce Power’s final refurbishments in 2031–2032 could unlock another $2–$3 billion annually of growth capital. TC will first rely on EBITDA growth and high-return projects, with capital rotation and other markets available if a funding gap emerges; it expects to refine the solution over the next several years.
▸
Asked how Canadian opportunities compete with higher-return U.S. projects and whether ROE, equity-layer or other framework improvements could attract more capital to Canada.
Jeremy Tonet · JPMorgan
Management is discussing the Canadian framework with shippers and would not pre-empt those talks. Canada offers lower regulatory risk and stronger protections around capital, debt costs and billing determinants, while higher returns could come from ancillary services and shared savings. TC also values geographic and regulatory diversification rather than selecting projects solely by individual IRR.
▸
Asked about TC’s desired future Mexico exposure, growth opportunities and whether monetization could still be considered.
Jeremy Tonet · JPMorgan
Mexico’s major trunk lines are largely built, while CFE is adding gas-fired generation that is growing into existing pipeline capacity. TC likes its current portfolio, does not foresee materially large new investments soon, and expects the assets to mature as generation comes online. No specific monetization plan was indicated.
▸
Asked how projects are progressing through the origination-to-FID funnel, how changing market dynamics affect timing and whether the $8 billion 2026 sanctioning target remains achievable.
Robert Hope · Scotia Bank
TC typically sanctions $3–$4 billion of new projects annually and is already at the low end of that range halfway through 2026. With Crossroads and other U.S. and Canadian projects, management sees a good chance of reaching $6–$8 billion of sanctioned capital this year. Projects move through detailed customer discussions and disciplined underwriting; Crossroads is next, followed by Columbia Gas and Columbia Gulf opportunities.
▸
Asked about supply-chain constraints, contractor availability and whether industry-wide growth could create execution risks.
Robert Hope · Scotia Bank
TC is proactively monitoring equipment, contractors and internal and external labor. Equipment is secured for sanctioned pipeline projects, supplier negotiations are underway for future work, and strategic contractor relationships are being maintained. Management currently sees no supply-chain issues that would affect project in-service dates.
▸
Asked what incremental tailwinds could support the 2028 EBITDA outlook following strong second-quarter results and the improved 2026 guidance.
John Mackay · Goldman Sachs
The main 2028 tailwinds are high availability across TC’s large footprint, demand growth, market volatility, commercial optimization and continued rate-case benefits. TC can reshape or move capacity to capture customer opportunities. Additional support should come from projects placed in service on time and at 5–7x build multiples, alongside early AI and technology benefits.
▸
Asked whether data-center demand creates opportunities to invest outside NGTL’s regulated framework and capture higher-return projects.
John Mackay · Goldman Sachs
TC can potentially serve data centers outside the NGTL regulatory framework through unregulated short laterals delivered faster and at attractive tolls. Longer power PPAs and take-or-pay structures are becoming more compatible with TC’s risk preferences. The company is not planning tens of billions in behind-the-meter power projects but sees selective opportunities, particularly in Alberta, using its integrated gas, power and storage footprint.
▸
Asked what most surprised management in the increase in the North American gas-demand forecast and whether TC would have pursued different initiatives under today’s outlook.
Maurice Choy · RBC Capital Markets
The demand outlook rose from roughly 40 Bcf/d two years ago to 51 Bcf/d, with the latest increase driven primarily by power generation, including data centers, electrification and coal conversions. TC would not have pursued LNG ownership differently, since it focuses on serving LNG demand through its core pipeline business. Management believes the same strategy remains appropriate because core projects offer attractive 5–7x build multiples.
▸
Asked whether stakeholder opposition and regulatory headlines around U.S. data centers are affecting customers’ willingness to sign pipeline agreements.
Maurice Choy · RBC Capital Markets
Data-center-related regulatory and stakeholder issues are region-specific and have not slowed TC’s development pipeline. Developers and utilities are adapting to bring-your-own-power policies and non-cross-subsidized rate structures, which may change project timing but generally not whether projects proceed.
▸
Asked whether the additional Bruce funding is sufficient to reach FID and requested updated timing for technology selection and the ultimate investment decision.
Robert Catellier · CIBC
The additional $300 million of Bruce funding should cover pre-FID work through near the end of the decade, including pre-feed activities, technology selection, early engineering and consultation. Technology selection will likely continue into next year before a decision. Management remains highly positive on the project, citing Bruce’s site quality, skilled labor and secured supply chain.
▸
Asked for clarification on whether management meant Unit 6 was operating at 1% or had approximately 1% outage time.
Robert Catellier · CIBC
Management clarified that the Unit 6 reference was to a roughly 1% forced-outage rate, not 1% operating availability.
▸
Asked what additional Canadian gas egress would be required if oil sands production grows, including whether associated gas could become a bottleneck.
Robert Catellier · CIBC
Incremental oil sands production could be supported by expanding multiple TC systems, not only LNG egress. In-country Alberta demand and TC’s U.S. pipeline network can absorb associated gas, while the Mainline settlement adds approximately 350 MMcf/d for $200 million. Management is also encouraged by LNG Canada Phase 2 and other potential West Coast LNG projects.
▸
Asked how the size and demand-driver mix of the more than $20 billion origination backlog could evolve over coming years.
Benjamin Pham · BMO Capital Markets
The origination backlog has grown from about $15 billion earlier in the year to more than $20 billion, reflecting capital formation in the early 2030s. Management expects it may continue growing but is not yet ready to define a steady-state level. The portfolio is currently power-dominated, and TC expects to refine the mix and size over the next 6–12 months.
▸
Asked management to rank potential funding sources, including hybrids, partnerships and common equity, and explain the balance between prefunding capex and waiting for greater visibility.
Benjamin Pham · BMO Capital Markets
TC prioritizes EBITDA growth and measures financing choices against a dollar-per-share objective. Capital rotation, investment-grade debt, hybrids and private credit markets are currently constructive, providing multiple options. The company does not need to act early and expects 2028 to be the year when it begins putting a funding plan in motion based on the shape of 2029–2031 capital needs and Bruce timing.

Web Traffic

tcenergy.com
Web rank#523,522
Est. visits/mo765K
Traffic YoY▼ 32.4%
Traffic QoQ (12w)▼ 6.9%
Web Rank History
#523,522-46,369
rankest. visits/mo
300k400k500k600k575K938K1.3M1.7M2.0M05-1908-2512-0103-0906-1509-2111-16

Analyst Coverage

Analyst Coverage
Analyst Ratings
8
9
Buy: 8Hold: 9Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2003 Q11.3B1.2B417M$0.40$0.37 – $0.437
2003 Q21.4B660M396M$0.38$0.34 – $0.4210
2003 Q31.3B777M438M$0.40$0.35 – $0.499
2003 Q41.4B728M427M$0.41$0.37 – $0.459
2005 Q31.3B863M521M$0.50$0.43 – $0.578
2005 Q41.3B846M490M$0.47$0.43 – $0.518
2006 Q11.2B805M464M$0.45$0.41 – $0.489
2006 Q21.4B790M443M$0.42$0.36 – $0.499
2006 Q31.8B631M311M$0.47$0.40 – $0.5410
2006 Q41.9B657M326M$0.52$0.46 – $0.5810
2007 Q12.1B664M317M$0.52$0.46 – $0.618
2007 Q22.3B916M521M$0.47$0.44 – $0.569
2007 Q32.3B945M547M$0.52$0.49 – $0.569
2007 Q42.3B980M584M$0.55$0.49 – $0.639
2008 Q12.1B697M339M$0.56$0.48 – $0.6110
2008 Q22.2B869M480M$0.52$0.46 – $0.6111
2008 Q32.2B691M329M$0.55$0.48 – $0.6812
2008 Q42.3B775M411M$0.55$0.46 – $0.6411
2009 Q12.1B942M243M$0.54$0.49 – $0.6312
2009 Q22.0B1000M321M$0.45$0.39 – $0.5112
2009 Q32.2B979M341M$0.49$0.41 – $0.5812
2009 Q42.2B947M341M$0.51$0.40 – $0.5713
2010 Q12.3B1.0B413M$0.51$0.44 – $0.6013
2010 Q22.1B870M277M$0.46$0.40 – $0.5114
2010 Q32.3B873M317M$0.52$0.46 – $0.5812
2010 Q42.1B967M368M$0.54$0.47 – $0.5914
2011 Q12.2B876M292M$0.58$0.44 – $0.6711
2011 Q22.2B1.1B428M$0.53$0.49 – $0.5810
2011 Q32.3B1.1B393M$0.58$0.51 – $0.6312
2011 Q42.3B1.1B398M$0.54$0.42 – $0.6112
2012 Q12.3B1.0B385M$0.54$0.52 – $0.5911
2012 Q22.1B991M344M$0.48$0.38 – $0.5411
2012 Q32.2B936M291M$0.53$0.46 – $0.5811
2012 Q42.2B1.0B383M$0.49$0.44 – $0.5613
2013 Q12.2B1.0B325M$0.54$0.48 – $0.6012
2013 Q22.1B1.1B444M$0.52$0.46 – $0.6211
2013 Q32.3B1.1B415M$0.59$0.55 – $0.6413
2013 Q42.4B1.2B517M$0.60$0.54 – $0.6512
2014 Q12.6B1.2B441M$0.59$0.51 – $0.6611
2014 Q22.3B1.1B378M$0.49$0.46 – $0.5610
2014 Q32.6B1.3B506M$0.62$0.48 – $0.6810
2014 Q42.6B1.3B479M$0.62$0.55 – $0.7213
2015 Q12.9B1.4B550M$0.66$0.61 – $0.7612
2015 Q22.5B1.2B343M$0.53$0.46 – $0.6011
2015 Q32.7B1.4B502M$0.60$0.55 – $0.6812
2015 Q42.9B1.4B459M$0.62$0.56 – $0.7511
2016 Q13.0B-1.8B-2.5B$0.67$0.59 – $0.7511
2016 Q22.7B1.0B243M$0.51$0.44 – $0.5611
2016 Q33.3B1.5B483M$0.67$0.55 – $0.7512
2016 Q43.6B398M-116M$0.72$0.64 – $0.8512
2017 Q13.2B619M-297M$0.74$0.68 – $0.8213
2017 Q23.2B1.7B673M$0.69$0.62 – $0.8012
2017 Q33.2B2.0B933M$0.71$0.63 – $0.8113
2017 Q43.2B1.3B690M$0.77$0.70 – $0.8714
2018 Q13.3B2.0B919M$0.85$0.74 – $1.0013
2018 Q23.2B1.9B727M$0.76$0.64 – $0.8413
2018 Q33.4B2.1B901M$0.79$0.68 – $0.8914
2018 Q43.9B2.0B1.1B$0.97$0.81 – $1.1415
2019 Q13.7B2.3B1.1B$0.92$0.86 – $1.007
2019 Q23.5B2.3B999M$0.90$0.84 – $0.977
2019 Q33.5B2.4B1.2B$0.91$0.85 – $0.997
2019 Q43.7B2.1B815M$0.95$0.88 – $1.037
2020 Q13.6B2.5B1.1B$0.97$0.91 – $1.0510
2020 Q23.2B2.4B1.1B$0.85$0.79 – $0.929
2020 Q33.2B2.7B1.3B$0.86$0.80 – $0.939
2020 Q43.4B2.7B1.4B$0.91$0.85 – $0.9910
2021 Q13.5B2.9B1.4B$1.00$0.94 – $1.096
2021 Q23.1B2.8B1.4B$0.87$0.81 – $0.954
2021 Q33.2B2.8B1.4B$0.91$0.85 – $0.984
2021 Q43.3B3.0B1.5B$0.96$0.90 – $1.046
2022 Q13.3B3.0B1.5B$1.01$0.94 – $1.0910
2022 Q23.2B2.9B1.4B$0.89$0.83 – $0.965
2022 Q33.5B2.9B1.4B$0.90$0.84 – $0.975
2022 Q43.8B3.1B1.5B$1.00$0.94 – $1.098
2023 Q13.8B2.6B1.1B$1.06$0.99 – $1.154
2023 Q23.7B2.4B902M$0.87$0.81 – $0.944
2023 Q33.9B2.5B924M$0.89$0.78 – $0.9311
2023 Q44.2B2.7B1.0B$1.00$0.78 – $1.1410
2024 Q14.2B2.7B1.1B$1.05$0.97 – $1.1415
2024 Q23.8B2.4B856M$0.82$0.80 – $0.8514
2024 Q34.0B2.5B1.0B$0.97$0.93 – $0.997
2024 Q43.7B2.5B1.0B$0.99$0.93 – $1.1516
2025 Q13.6B2.5B1.0B$0.97$0.92 – $1.1018
2025 Q23.5B2.4B821M$0.79$0.71 – $0.8717
2025 Q33.7B2.5B810M$0.78$0.71 – $0.9217
2025 Q44.1B2.7B952M$0.91$0.79 – $1.0717
2026 Q14.2B2.8B1.0B$0.97$0.87 – $1.0617
2026 Q23.9B2.6B881M$0.85$0.68 – $0.9017
2026 Q34.0B2.6B915M$0.88$0.78 – $0.9517
2026 Q44.2B2.8B981M$0.94$0.86 – $1.0814
2027 Q14.4B3.1B1.1B$1.09$0.95 – $1.167
2027 Q24.1B2.9B967M$0.93$0.92 – $0.942
2027 Q34.0B2.9B940M$0.90$0.89 – $0.912
2027 Q44.4B3.2B1.1B$1.06$1.05 – $1.085
2028 Q14.3B3.7B1.5B$1.41$1.39 – $1.436
2028 Q24.3B3.4B1.2B$1.15$1.13 – $1.175
2028 Q34.4B3.4B1.2B$1.15$1.13 – $1.164
2028 Q44.5B3.6B1.3B$1.25$1.24 – $1.273
v2 analysis (legacy, 2026-08-03) — for comparison onlyclick to expand

Thesis

TC Energy owns a strategically important North American gas-pipeline and nuclear-power platform with substantial contracted, regulated and geographically diversified cash flows. The operating trajectory is favorable: TTM adjusted EBITDA is CAD10.3 billion, quarterly EBITDA has generally strengthened, Southeast Gateway is contributing, Bruce Power execution has been excellent, and the company is seeing unusually strong demand from LNG, power generation and data centers. Management now expects 2026 EBITDA toward the upper end of its CAD11.6–11.8 billion range and retains a CAD12.6–13.1 billion 2028 target. The central investment tension is that this is a high-quality asset base financed with a heavy capital structure. Net debt of CAD61.7 billion is approximately 6.0x TTM adjusted EBITDA, interest expense is CAD3.35 billion, and the cumulative cash-conversion record is weak relative to EBITDA because of sustained capex and acquisitions. The pipeline backlog provides growth visibility, but it also creates a potential reinvestment treadmill and future funding requirement. The likely path is improving earnings and FCF, but not rapid balance-sheet repair. The Q2 event modestly improves the thesis: operations were strong across all segments, 2026 guidance moved toward its upper end, the pending project portfolio expanded, and management continued to report strong customer demand. However, most of the structural gas-demand and backlog story was already known, and management did not provide a fully specified funding plan for the 2029–2031 capital ramp. This supports a positive but not transformational change in value.

Trade Signal

Trade rating
-6.6/10
Short
Horizon
~6mo
gpt-5.6-luna2026-08-03 · saw 93.40 CAD-3.8% since

Short: TC Energy is an attractive and improving infrastructure business, but the market capitalization is roughly 2.4 times the analyst's fair value and prices strong future growth despite high leverage and a modest FCF yield.

Temporary mispricing-5.0

The stock rose from CAD75.58 at the end of 2025 to roughly CAD94.9, including a sharp move through May and June as Q1 results, Appalachia Supply, Crossroads demand and strong Bruce execution reinforced the growth narrative. It then drifted near CAD95–100 through July. The latest earnings print produced essentially no reaction (CAD94.61 to CAD94.87), suggesting good news is already priced rather than ignored. The move looks like a durable premium repricing toward a high-growth infrastructure narrative, not a temporary panic dislocation; it is overextended relative to the analyst's cash-flow and debt assumptions, but timing a reversal remains difficult.

Market view+3.0

The market appears constructive but not euphoric: analysts are split between seven Buys and ten Holds with no Sells, the stock sits only about 5% below its 52-week high, and investors are rewarding strong EBITDA growth, dividend income, data-center gas demand and Bruce execution. Bulls see a scarce, strategic infrastructure platform with visible contracted growth; bears point to leverage, high capex, uncertain FCF conversion and sensitivity to interest rates. The prevailing view is probably stale on the quality of execution but not obviously stale on the valuation risk.

Inflectionwindow ~3mo+2.0

The business has a genuinely positive operating trajectory: 2026 EBITDA is expected near the top of CAD11.6–11.8 billion, 2028 EBITDA is guided to CAD12.6–13.1 billion, Bruce Unit 3 returned early and under budget, and data-center/LNG demand is expanding the project pipeline. However, much of this is already visible in the stock's 47% one-year and 19% six-month gains. The analyst's fair-value framework implies the market is paying an unusually large premium for future growth, while consensus is only Hold and published estimates do not clearly capture a near-term step-change. Positive operational evidence is likely, but it is not sufficiently unexpected to offset the valuation.

Catalysts
  • ▲late 2026 · Q3 2026 earnings and updated full-year outlook — A repeat of strong EBITDA growth and upper-end 2026 guidance could sustain momentum; any capex, leverage or cash-flow disappointment would expose the valuation.
  • •Q4 2026 · Crossroads project sanction decision — The 2.5x-oversubscribed project could validate data-center demand and growth returns, but sanctioning would also reinforce the need for substantial capital funding.
  • •2026-11 · Bruce Power Unit 5 refurbishment outage begins — The November outage is a test of execution and near-term availability; successful progress helps the long-term thesis, while delays would challenge the premium multiple.
  • ▲H2 2026 · Potential Mexico TGNH partnership or capital-structure transaction — Selling a minority stake could provide capital and demonstrate asset value, although regulatory and geopolitical uncertainty remains.
  • ▲early 2027 · 2026 year-end project and leverage update — Evidence that EBITDA growth is translating into deleveraging rather than persistent debt-funded capex is critical to supporting valuation.
Flow-1.0

TTM dilution is approximately zero and the 4% dividend creates modest income demand. There is no stated large buyback or imminent tender, while heavy capital spending and leverage create ongoing financing needs. Potential asset partnerships could reduce funding pressure, but debt, hybrids or other capital-market actions remain available if the investment ramp accelerates.

Floor / Ceiling+1.0

The dividend, regulated and contracted assets, and strategic value provide some support, but there is no hard floor near the current price. Net debt of roughly CAD60–66 billion materially absorbs asset value, FCF yield is only about 4%, and continued growth capex can limit deleveraging. The stock also has no obvious hard ceiling, but a premium infrastructure multiple is difficult to justify if growth or funding slips.

Buyability

Highly buyable as a dividend-paying, strategically important North American infrastructure platform; income investors and infrastructure funds have a clear ownership case. That buyability supports the stock but also makes a sharp downside repricing less immediate.

Fear vs Greedfear 6/10 (-2.0)greed 7/10 (+2.0)

Fear pulls more strongly than greed: the operating business is good, but the market is capitalizing it at roughly 15.6x EBITDA and 24x owner earnings despite substantial net debt and only a 4% FCF yield. The main risk to a short is that strong data-center, LNG and nuclear execution keeps the premium attached longer than valuation alone suggests.

Valuation

Our Target
39.0B CAD-58%
Market Should Pay
35.1B CAD-62%
target ×0.9 (fear discount)
Current Market Cap
92.4B CADExtremely bullish
What Changed
transcript · 2026-07-30
+5%fair value on this information

The genuinely new information is that Q2 execution was strong across every segment, management now expects 2026 comparable EBITDA toward the upper end of its CAD11.6–11.8 billion range, the late-stage pending project portfolio grew to approximately CAD7 billion, and management sees a good chance of sanctioning CAD6–8 billion of projects in 2026. Bruce Unit 3 also returned substantially ahead of schedule and below budget. The broad data-center, LNG and gas-demand thesis was already substantially known before this call. The funding answer for the larger 2029–2031 capital ramp remains preliminary.

▸ How the cases moved

Compared with the day before the Q2 event, the base case rises from roughly CAD48,000M to CAD50,000M as 2026 EBITDA moves toward the upper end of guidance and operating performance remains broad-based. The bull case rises from approximately CAD59,000M to CAD62,000M because the pending backlog increased, Crossroads appears closer to sanction and Bruce execution remains strong. The bear case improves only modestly from about CAD37,000M to CAD38,000M because the event reduces near-term operating risk but does not resolve leverage or long-term funding risk. Base probability increases from 0.54 to 0.55, bull from 0.23 to 0.25, and bear falls from 0.23 to 0.20.

2-Year Plausible Outcomes
bear20%
38.0B CAD
rev +2%/yrOE $3200M

Growth moderates as data-center and Canadian expansion projects take longer to secure regulatory approvals and customer commitments. Existing assets remain highly cash generative, but elevated interest expense, maintenance capital and continued project spending limit owner earnings. EBITDA reaches roughly CAD14.0 billion, while terminal net debt remains near CAD60 billion.

▸ Valuation

7.0x CAD14,000M EBITDA = CAD98,000M EV - CAD60,000M net debt = CAD38,000M equity

base55%
50.0B CAD
rev +5%/yrOE $4200M

TC Energy executes its visible backlog at a measured pace, with Crossroads and additional brownfield projects sanctioned but not all of the CAD20 billion origination pipeline converting into near-term construction. Gas demand and Bruce Power support mid-single-digit EBITDA growth, and cash flow improves as recently completed projects contribute. Owner earnings rise as capex normalizes, although leverage remains material.

▸ Valuation

7.5x CAD15,000M EBITDA = CAD112,500M EV - CAD62,500M net debt = CAD50,000M equity

bull25%
62.0B CAD
rev +8%/yrOE $5000M

The data-center, LNG and power-demand cycle converts into a substantial set of contracted brownfield projects, Crossroads is sanctioned on attractive terms, and Bruce Power continues to execute ahead of schedule and below budget. EBITDA approaches CAD16 billion, project cash flows support deleveraging, and FCF conversion improves despite continued growth capital. The market awards a premium infrastructure multiple to a visibly accelerating platform.

▸ Valuation

8.0x CAD16,000M EBITDA = CAD128,000M EV - CAD66,000M net debt = CAD62,000M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is approximately CAD40,352M. I set the analytical target modestly below that at CAD39,000M because the scenario framework may understate the risk that future Bruce and pipeline investment requires additional debt, hybrids, partnerships or equity before the cash flows fully arrive. The discount also reflects the limited historical conversion of EBITDA into cumulative FCF and the possibility that some current capex is economically recurring rather than purely growth capital. This is not a sentiment adjustment; sentiment is captured separately in the fear-greed modifier.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now7/10
Trajectory8/10
Risk6/10
Governance6/10
Insolvency prob (2yr)2%
Outcome uncertainty6/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Results and Guidance Reaffirmation (May 1, 2026): TC Energy reported strong operational results for the first quarter of 2026, driven by record-high utilization across its North American natural gas pipeline networks. Comparable EBITDA grew 14% year-over-year to C$3.1 billion, exceeding the C$3.0 billion quarterly threshold for the first time. Comparable earnings per common share increased to C$0.99 (up from C$0.95 in Q1 2025), while net income attributable to common shares decreased slightly to C$899 million (C$0.86 per share) due to geographic tax changes and foreign exchange exposures. The company declared a quarterly dividend of C$0.8775 per common share and reaffirmed its full-year 2026 guidance, expecting comparable EBITDA of C$11.6 to C$11.8 billion and net capital expenditures of C$5.5 to C$6.0 billion.
  • Appalachia Supply Project Sanction (May 1, 2026): TC Energy formally approved the Appalachia Supply Project, a US$1.5 billion expansion of its Columbia Gas Transmission system. The project is designed to initially provide up to 0.8 Bcf/d of capacity (with future expansions capable of delivering up to 2.0 Bcf/d) to serve expanding natural gas-fired power generation and data centers in the U.S. Midwest and Southeast. Underpinned by a 20-year take-or-pay contract with an investment-grade utility, the project is scheduled for a 2030 in-service date.
  • Coastal GasLink Phase 2 Commercial Agreements (March 25, 2026): TC Energy's Coastal GasLink pipeline project signed critical commercial agreements with LNG Canada to advance its second phase. The agreements establish a commercial framework to support LNG Canada’s pathway toward a Final Investment Decision (FID) by facilitating front-end engineering and design (FEED) and pre-construction activities. Doubling the transmission of natural gas through the existing pipeline would position TC Energy as a leading supplier to global LNG export markets.
  • Optimizing Mexico Capital Structure: Looking forward, TC Energy is evaluating potential capital market or partnership transactions to divest minority stakes in its Mexican natural gas pipeline assets organized under its subsidiary, Transportadora de Gas Natural de la Huasteca (TGNH). The company plans to seek these partnership opportunities in the second half of 2026, aligning with anticipated regulatory clarity surrounding the upcoming July 2026 review of the USMCA.
▸ Thesis-test Findings
  • TC Energy Southeast Gateway regulatory approval status 2026: The 1.3 Bcf/d Southeast Gateway offshore natural gas pipeline in Mexico is fully operational, having reached mechanical completion ahead of schedule and commenced commercial operations in mid-2025 (approximately 13% under its initial US$4.5 billion budget). Regular toll collection from the state-owned utility Comisión Federal de Electricidad (CFE) is ongoing and paid on schedule. In July 2025, the newly constituted Comisión Nacional de Energía (CNE) approved regulated rates to provide interruptible service to other non-CFE users. Currently, the remaining regulatory approvals under watch in 2026 relate to Mexico's Federal Economic Competition Commission (COFECE) and Energy Regulatory Commission (CRE) regarding the strategic alliance that allows CFE to hold an equity interest in TGNH. While CFE currently holds a 13.01% equity interest in TGNH (as of Q1 2026), final regulatory approvals are expected to allow CFE to increase its stake to a maximum of 15%. The successful operational phase and established cash flows provide a strong tailwind for the bull case, although the upcoming July 2026 USMCA review introduces minor geopolitical risk.
  • Bruce Power nuclear life extension MCR Unit 5 progress: Progress on the multi-unit Bruce Power Life-Extension Program continues to be a major tailwind for the bull case, demonstrating robust execution. In June 2026, Bruce Power achieved a massive milestone by successfully synchronizing and returning the refurbished Unit 3 reactor to Ontario’s electricity grid six months ahead of schedule and under budget. For Unit 5, Ontario's Independent Electricity System Operator (IESO) approved the Basis of Estimate in April 2025, green-lighting the major component replacement (MCR). Preparation is on schedule, with the Unit 5 MCR outage officially set to begin in November 2026. Meanwhile, Unit 4 is currently in its MCR outage (which began in February 2025), hitting a historic milestone in April 2026 by completing the most efficient defueling in CANDU history in just 24.9 days. This consecutive history of early, under-budget completions lowers project execution risk and solidifies TC Energy's long-term clean energy growth profile.
  • US pipeline capacity additions for Midwest data centers: Growing electricity demand from U.S. data centers is emerging as a powerful structural bull driver for TC Energy's natural gas business. To capture this demand, TC Energy is focusing on low-risk, brownfield "in-front-of-the-meter" expansions that connect major natural gas corridors directly to utility customers powering the grid. Key developments in 2026 include the sanctioning of the US$1.5 billion Appalachia Supply Project on the Columbia Gas system to add up to 0.8 Bcf/d of capacity, and the highly successful non-binding open season on the Crossroads Pipeline system, which was 2.5 times oversubscribed. Additionally, the company previously approved the US$900 million ANR pipeline Northwoods Expansion (adding 400 MMcf/d) to serve Midwest data center markets in late 2029. Industry data underscores the strength of this market; behind-the-meter data center projects are ramping up in 2026, with over 80% of announced on-site generation relying on natural gas as grid connection queues persist.