Stocks/URG

URG

Ur-Energy Inc.v3 5.5/10 · 2026-11-03
Energy·Uranium
$0.49
$190M market cap
v3 Rating
5.5/103.5–7.5
Setup
7.0/105.5–8.5
Fair Value
$0.90$0.40–$1.80+83%
DCF (10%)
$0.78+59%
Base IRR
+11%-20%–+35%
Visibility
wide±78%
Wall Street
$2.00 target(1 analyst last quarter)(10 buy, 1 hold)
Rating
Revenue (TTM)
$41.2M
Owner Earnings
-$35M
Next-Yr Owner Earnings
-$45M
Growth
+20.0% × 4y
P / Next-Yr OE
--
Net Debt
$55M

Ur-Energy, Inc. engages in the business of uranium mining, recovery, and processing activities including the acquisition, exploration, development, and operation of uranium mineral properties. Its projects include Lost Creek, Shirley Basin, Lost Soldier, Lucky Mc Mine Site, and Excel Gold properties. The company was founded by Jeffrey T. Klenda and Paul W. Pitman on March 22, 2004 and is headquartered in Casper, WY.

2-Year Price History

$0.73-38.7%
$0.60$0.80$1.0$1.2$1.4$1.6$1.8Initial target $0.90 · 2026-11-03volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-03

Rating
5.53.5–7.5
Setup
7.05.5–8.5
Fair value (USD)
0.900.40 – 1.80
Upside vs 0.49
+83%
DCF (10%)
0.780.25 – 1.90+59%
Base IRR
11%-20% – 35%
Visibility
very widerange ±78%
Sentiment
3/10
2026-11-03 · claude-opus-5-5 · priced at 0.73

Ur-Energy is a small US uranium miner using in-situ recovery (ISR). It runs Lost Creek and, since August 2026, Shirley Basin in Wyoming. The stock closed at $0.7335 on 3 Nov 2026, down 7.6% on about 3x normal volume. That is a fresh 52-week low, 66% below January's $2.15 high and about 50% below August. Uranium itself is near cycle highs (spot about $90/lb, term price a record $96.50), so this is a sector-wide, liquidity-driven flush in uranium miners (URNM down about 52% from its peak), not a commodity collapse. That is close to blood on the ground, although URG also has its own problems. The business does not make money yet. H1 2026 burned about $56M (operating cash flow -$28.5M, capex -$27.4M) on $18M of revenue. Most of its contract book through 2029 (1.3-1.4M lb a year in 2027-28) was signed when term prices were $43-57, so it realizes only about $62-71/lb while spot is $90. Production has repeatedly come in behind plan, so in the second half of 2026 it may have to buy pounds at about $90 to deliver at about $68 and to return a 250k lb uranium loan. Unrestricted cash was $95M at June 30, probably about $70M now, against $120M of 4.75% converts due 2031 that convert at $1.73, plus a $50M ATM program sitting over a $0.73 stock. The positives are real. There are two licensed ISR plants (4.2M lb/yr of licensed capacity). Shirley Basin has high grade (0.26% measured) and flow rates 2-3x the Wyoming norm. The Lost Creek sand filter lifted plant flow from about 2,500 to about 3,250 gpm. Management's practical target is 2M lb/yr by the end of 2028, and as older contracts roll off the company will increasingly sell US-origin pounds at market prices. The enterprise value is about $347M, roughly $16 per measured-and-indicated pound (about 21M lb). My base case: about 0.9M lb in 2027 rising to about 1.9M lb by 2031, about $60/lb all-in cost and about $85 realized. That gives unlevered free cash flow of about -$45M, -$15M, +$15M, +$35M and +$50M for 2027-2031, and 12x year-5 free cash flow, which yields a DCF of about $0.78/share, roughly today's price. In other words, the market is pricing the base case and offering free optionality on a bull case (2M lb at $95 is worth $1.80+) and on a takeover by a cash-rich US consolidator. The costs of that optionality are ramp-execution risk and dilution risk at the bottom. Rating 5.5/10: no margin of safety on the base case, the stock is not an owner-earnings compounder, and it is not a covered-call floor. Research rating 7/10: Q3 results (due in days) and the Q4 delivery and loan-return mechanics will quickly show whether the ramp is real and whether an equity raise is coming. If both come out right, capitulation pricing in a sound sector could deliver 50%+.

A deep dive would have to establish: Whether Q3/Q4 2026 production (Lost Creek post-sand-filter plus the Shirley Basin ramp) is on a credible path to ~1M lb in 2027 and ~2M lb by 2029 without spot purchases into below-market contracts forcing a dilutive equity raise at sub-$1.

Owner earnings, TTM
-$35M-$60M – -$15M
Realistic peak profit
$50M$15M – $110M
Growth rate
20.0%10.0% – 30.0%
Years of growth
42 – 6
Market cap
$292M$285M – $310M
EV
$347M$320M – $380M
Net debt
$55M$35M – $75M
Capital return / cap
-4.0%-15.0% – 0.0%
P/E
12.0×6.0× – 40.0×
EV/EBITDA
7.0×4.0× – 20.0×
FCF yield
-14.0%-25.0% – -5.0%
Projected FCF, base case (USD millions)
Y1-$45M-$75M – -$15M
Y2-$15M-$55M – $20M
Y3$15M-$30M – $50M
Y4$35M-$15M – $80M
Y5$50M-$5M – $110M
Competition: A global commodity priced by Kazatomprom and Cameco. In US ISR it competes with better-funded UEC, enCore, Energy Fuels and Peninsula; URG's edge is two licensed operating Wyoming hubs, and its handicap is sub-scale volume and a legacy contract book priced below market.
Governance: No fraud or control issues, but the share count has more than doubled since 2020, a $50M ATM and $120M of converts overhang the stock, and directors sold in August 2026 while only junior officers bought.
Research (expand)

What the company does

Ur-Energy (NYSE American: URG, TSX: URE) produces uranium in Wyoming using in-situ recovery (ISR). Lost Creek is the hub plant. It is licensed for 2.2M lb/yr of processing, 1.2M lb of that from its own wellfields, and has produced 3.5M lb cumulatively. It holds 11.9M lb measured and indicated (M&I) plus 10.4M lb inferred, and the March 2026 technical report puts its mine life to 2039. Shirley Basin, 100% owned, is a satellite: resin loaded there is trucked to Lost Creek for drying and drumming. It has 9.1M lb M&I, with the measured portion at a high 0.26% grade. It began limited operations in April 2026, got full state authorization in late June and made its first resin shipment on 20 August. The pipeline adds Lost Soldier (a preliminary economic assessment, PEA-level technical report, is due by year-end 2026), Lost Creek South (a 120-hole drill program announced 29 October) and North Hadsell. Total licensed capacity is 4.2M lb/yr. The company has 157 employees. CEO Matt Gili (ex-gold/copper) joined in 2025. CFO Roger Smith retires on 1 December and will be replaced by VP Finance Jade Walle, a former PwC audit partner who bought about $150k of stock in March at $1.39.

The investment case

  • Sector capitulation while the commodity is strong. Uranium spot is about $90/lb and the term price a record $96.50, yet URA is down about 42% and URNM about 52% from their January peaks. Sprott calls the move liquidity-driven, and tax-loss selling is likely into year-end. URG closed at $0.7335 on 3 Nov, a new 52-week low, on 18.6M shares against roughly 6-8M normal. It sits 0% of the way up its 1-year range and 11% up its 3-year range. FINRA short interest is about 59.5M shares (about 15% of shares outstanding, 7-11 days to cover).
  • The ramp is finally happening. Q2 drummed a record 140.9k lb (+47% on Q1), and April alone was 57k lb. The sand filter (online in July) raised plant flow from about 2.5k to about 3.2-3.3k gpm, and the constraint is now wellfield. Shirley Basin is running at flows 2-3x the Wyoming norm, its grades are as expected or better, and it is mostly delineated already. Management's practical (not formal) target is 2M lb/yr by the end of 2028. Costs are about 80% fixed, so unit costs fall roughly in line with volume growth (cash cost $40.20/lb in Q2).
  • US-origin pounds and the contract book roll-off. Utilities are moving from RFPs to security-of-supply deals, some at 100% market pricing. URG refused to sign new contracts in 2026 to wait for higher prices. The old book (signed in 2022-2024 at $43-57 term prices, with escalators and some market-linked portions under ceilings) runs off from 2029: 1.05M lb in 2029, 0.8M in 2030, then only 0.1M a year. From 2029-30, most production should sell at market.
  • Takeover optionality. Management openly calls the western US ripe for consolidation ('growth is imperative for all of us'). URG owns two licensed, operating ISR plants, which is scarce. UEC, with about $794M of liquidity, enCore, Energy Fuels or Cameco could pay a premium for licensed processing capacity in Wyoming.

What it earns today (real free cash flow)

Nothing yet. In H1 2026 revenue was $18.3M (270k lb at $67.69), gross profit $3.1M, operating cash flow -$28.5M and capex -$27.4M, so free cash flow was about -$56M. Wellfield development ($30.9M in H1, guided at $12-15M a quarter for at least a year) is expensed. In ISR it is the core sustaining cost: you must keep drilling and building header houses to hold production. Only the part that builds ahead of the ramp (Shirley Basin, Lost Creek Mine Unit 5 (MU5), with 15 header houses planned from late 2026 to 2028) is growth. Stripping roughly $35-40M a year of growth spending (wellfield ahead of ramp, Shirley completion, the Lost Creek wastewater plant), underlying unlevered owner earnings today are still about -$35M a year (range -$60M to -$15M). SBC is small (about $2.5M a year). Cash taxes are nil, with large tax losses (NOLs) carried forward. Q2 'product profit' was only $2.0M on $14.4M of sales because contract prices ($66.85) barely exceed all-in cost at sub-scale volume. Little of EBITDA reaches owners: at current volumes there is no EBITDA, and at scale most of it is eaten by wellfield development.

The second half of 2026 is the pinch point. The company must deliver about 730k lb under contract (190k in Q3, 540k in Q4, after deferring 150k lb to 2027 and 150k to 2029) and return a 250k lb uranium loan by 30 November. Against that it had 348k lb in inventory at June 30, 190k of it purchased, plus second-half production of perhaps 350-450k lb. The likely shortfall of about 150-280k lb must be bought near $90, extended, or deferred. Each purchased pound delivered into a roughly $68 contract loses about $20 and consumes cash.

Balance sheet

  • Shares: 397.86M (10-Q cover, August 2026), so market cap is about $292M at $0.7335.
  • Debt: $120M of 4.75% convertible senior notes due January 2031, convertible at $1.73, with a capped call. They are far out of the money, so treat them as debt; annual interest is $5.7M.
  • Cash: $95.3M unrestricted at June 30, plus $13M restricted for bonding. I estimate about $70M at Sept 30 (not yet reported) and $50-60M at year-end.
  • Net debt: about $55M now, about $65M by year-end. EV is about $347M.
  • The roughly 250k lb loan obligation is about matched by inventory, so I leave both out.
  • A $50M ATM with B. Riley and Cantor is in place. Shares outstanding have more than doubled since 2020.

Projected free cash flow (unlevered, after SBC and all wellfield development, before interest)

The base case assumes the following. Production: 2027 0.9M lb, 2028 1.3M, 2029 1.6M, 2030 1.8M, 2031 1.9M, a deliberate haircut to management's 2M-by-2028 given a history of misses (2024 guidance was 550-650k lb, 249k was drummed). Realized price: about $72 in 2027 and $76 in 2028, then $82-90 as the book rolls off. All-in cost: about $60/lb at scale, against technical-report all-in costs of about $44/lb before tax at Lost Creek and about $55/lb at Shirley Basin, plus corporate G&A and exploration of about $22M.

  • 2027: about -$45M (range -$75M to -$15M). Contract deliveries of about 1.45M lb exceed production, so some purchases are needed, and wellfield spending stays at about $55M.
  • 2028: about -$15M (range -$55M to +$20M).
  • 2029: about +$15M (range -$30M to +$50M).
  • 2030: about +$35M (range -$15M to +$80M).
  • 2031: about +$50M (range -$5M to +$110M).

Roughly $60-80M of cumulative burn before break-even exceeds the likely year-end cash once the coupon is counted. An equity raise or ATM issuance in 2027 is more likely than not unless prices or the ramp surprise to the upside.

What it looks like in five years

Neither a corpse nor a compounder. If the ramp works it becomes a 1.8-2.2M lb/yr, mostly unhedged US-origin producer with two hubs, about 10 years of resource and exploration upside to extend it. It would earn $40-70M a year of unlevered free cash flow at $85-95 uranium. That is a cyclical, commodity-priced, plateau-production business, and the market values those at about 10-14x free cash flow, so 12x base gives a year-5 EV of about $600M. Confidence is low to moderate: the geology (Shirley grade, flows) looks good, but ISR ramp execution, wellfield-development intensity and the uranium price all swing year-5 free cash flow by 2x either way.

Fair value and multiples

  • DCF (10% discount): PV of 2027-31 free cash flow is about +$13M. The terminal value of 12x $50M = $600M has a PV of about $372M, giving EV of about $385M. Less about $65M year-end net debt, equity is about $320M, or about $0.78/share (range $0.25-1.90).
  • Base IRR: about 10-13% a year from $0.7335, less with a dilutive raise.
  • Asset cross-check: Lost Creek post-tax NPV8 is $244M (March 2026 technical report) and Shirley Basin's NPV8 was $83M after tax in the 2024 report on a lower price deck with capex now sunk, so perhaps $130-170M today. Less roughly $100M of capitalized corporate G&A, less net debt, plus about $40M for Lost Soldier and exploration, NAV comes to roughly $0.75-0.95/share. Sell-side NAVs are much higher because they assume conversion of inferred resources, more aggressive ramps and a 1.0x P/NAV.
  • Multiples: P/E is not meaningful today; about 12x 2030E net income. EV/EBITDA is not meaningful today; about 7x 2030E. Free cash flow yield is about -14% (2027E). EV per M&I pound is about $16.
  • My fair value: about $0.90 (range $0.40-1.80). That is a little above the DCF because of takeover optionality and the bull-case convexity at a capitulation price.

Management, risks and competition

  • Management. The new CEO is credible and candid. He describes costs as 80% fixed, deferred deliveries proactively and declined to sell spot. Board and insider behavior is mixed: in August 2026 directors (Huber, Walker, Chang, Cash) sold at $1.38-1.48, while the GC and a VP bought (the VP 96.6k shares at $1.14 in September). The CFO transition is orderly, with a PwC-trained successor. There are no fraud or governance red flags, but there has been heavy serial dilution, plus warrants, the ATM and the converts.
  • Risks:

- Ramp shortfall, which forces spot purchases at about $90 to fill roughly $68 contracts.

- Equity dilution at the low.

- A rolling wellfield-development treadmill. Management itself said that if development spending falls 'you should be concerned', so it is effectively sustaining.

- A uranium price retreat.

- Wyoming weather and power (an 11-day outage in December 2025).

- Shirley Basin recovery curves are still early.

- Policy: Section 232 produced no uranium import cap in January 2026, so the 'US premium' is not yet policy.

  • Competition. The product is a global commodity priced by Kazatomprom and Cameco. In US ISR, URG competes with UEC (much larger balance sheet), enCore, Energy Fuels and Peninsula. URG's edge is two operating licensed hubs and a permitting track record. Its weakness is scale and a below-market legacy contract book.

Sentiment (2.5/10, hated by the market, loved by the sell side)

All 7-10 covering analysts rate it Buy:

  • B. Riley: $2.00 (28 Oct)
  • Maxim: $2.50
  • H.C. Wainwright: $2.20
  • RBC: $1.60
  • Northland: $2.35
  • Roth: $2.00
  • Alliance Global: $2.00

The average is about $2.1, roughly 190% upside, but targets have been cut repeatedly from the $2.76-3.25 of May. The tape is pure capitulation: -66% from the high, new lows on heavy volume, about 15% short interest, sector-wide forced and liquidity selling, and tax-loss season. The sell side's NAVs are not credible as near-term value with the stock where it is. Sentiment is close to the 'blood on the ground' end of the spectrum, but the company still has a funding gap that could be filled with discounted stock. The next catalysts are Q3 results (about mid-November), the Q4 delivery and loan-return outcome, the Lost Soldier PEA (year-end) and 2027 contracting decisions.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue41.2+5%27.2-19%33.7+91%17.70.02
Gross profit3.260.07-8.97-1.69-6.84
Operating expenses87.1+37%69.5+28%54.1+86%29.2+125%13.0
▸Adj EBITDA-72.4-63.3-59.7-27.9-16.8
▸Adj OCF-73.9-58.3-34.3-15.2-8.56
CapEx-47.7-23.6-9.05-2.04-0.71
Adj FCF-122-81.9-43.3-17.2-9.27
Interest expense9.041.950.360.000.46
▸Adj net income-90.1-68.9-59.7-29.4-20.3
▸Owner's earnings-100--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-204-46.2-67.3-49.5-27.7-13.7
FCF (OCF−capex)-287-102-66.6-81.0-19.0-18.8
Net income-239-63.2-74.9-53.2-30.7-17.1
▸Capital returned-295-22.0-130-92.0-47.7-3.31
Buybacks-202-30.2-17.3-97.7-53.1-3.77
Dividends0.000.000.000.000.000.00
Interest paid10.88.021.950.360.000.46
Debt paid down-1040.27-1155.345.410.00
▸Reinvestment80.838.624.29.447.870.71
Capex (PP&E)73.938.523.69.052.040.71
Intangibles & M&A-0.14-0.140.000.000.000.00
Leases signed (net Δ)7.010.230.560.395.83--
Retained / other18.4-71.965.211.428.7-15.0

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 7.9 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)245272194128108
▸Liabilities (total)19219561.353.545.4
Net debt (incl. leases)22.7-55.6-74.8-53.2-21.9
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-8.01-32.5-164---36.2
Shares outstanding398378364271271
Dilution (YoY)+9.1%+3.9%+34.4%+21.6%+7.1%
Employees15715717.012.010.0
MarginsTTM2025202420232022
Gross margin7.9%+36.70.3%+26.9-26.6%-17.1-9.5%+36001.0-36010.5%
Adj EBITDA margin-175.8%+0.4-232.8%-55.6-177.2%-19.6-157.6%+88152.9-88310.5%
Adj OCF margin-179.4%-66.9-214.1%-112.5-101.7%-15.8-85.9%+44945.7-45031.6%
Adj FCF margin-295.2%-137.8-300.9%-172.4-128.5%-31.1-97.4%+48665.8-48763.2%
Net income margin-191.3%+10.1-275.3%-117.5-157.8%+15.6-173.4%+90037.1-90210.5%
Adj NI margin-218.7%-34.2-253.3%-76.1-177.3%-11.1-166.1%+106449.7-106615.8%
ROIC (adj, after-tax)-52.5%-37.6%-37.2%-29.9%-21.3%
Cost of debt12.8%8.5%--0.0%3.9%

Earnings Calls

5 calls

Earnings Call · 2026 Q2

2026-08-11

UR Energy’s second-quarter results reflected improved production, strong liquidity, and continued execution of its strategy to develop a scalable, district-wide in-situ recovery (ISR) uranium platform in Wyoming. CEO Matthew Gili emphasized the favorable long-term uranium outlook, supported by increasing recognition of nuclear power as dependable baseload generation, expectations for substantial global nuclear-capacity growth, government efforts to secure domestic fuel supplies, and a structural gap between uranium demand and primary mine supply. UR Energy believes it is well positioned because it is one of the few active U.S. uranium producers with significant permitted growth potential. Lost Creek delivered its strongest quarterly drumming since the company began its 2022 ramp-up. Second-quarter yellowcake drumming totaled 141,000 pounds, 47% above the first quarter and 26% above the prior-year period. Shipments were 150,000 pounds, up 44% sequentially and 42% year over year. The company sold 215,000 pounds under existing contracts, generating $14.4 million in revenue. Cash cost per pound sold, including ad valorem and severance taxes, remained low at $40.20. UR Energy ended the quarter with $95.3 million of unrestricted cash and 348,000 pounds of finished inventory available for contracted deliveries. It also deferred 300,000 pounds of deliveries from 2029 into 2026, a risk-management action intended to reduce ramp-up pressure and provide greater flexibility around remaining delivery obligations. Management reiterated that it expects to meet its contracted deliveries but did not provide detailed production guidance. A key operational improvement at Lost Creek was the sand-filtration system, installed during the quarter and fully commissioned in July. It addressed fine particles accumulating on ion-exchange columns and restricting flow. Average plant flow increased from slightly above 2,500 gallons per minute to roughly 3,200–3,300 gallons per minute after commissioning. Management described the improvement as statistically meaningful and said the operating constraint has shifted from sand-related flow restrictions to optimizing production and injection wells. Other infrastructure work includes a wastewater-treatment facility, reverse-osmosis upgrades, and a new maintenance program, all intended to support higher and more reliable production. Seventeen drill rigs are advancing wellfield expansion and delineation, with Mine Unit 5 construction expected by year-end subject to regulatory approval. Shirley Basin reached an important milestone by beginning uranium capture during the quarter, producing 10,600 pounds during limited operations. After receiving state authorization in late June, the facility entered full operation, with six of ten production columns online. The first shipment of uranium-bearing resin to Lost Creek is imminent, pending completion of specialty-trailer commissioning and inspections. The hub-and-spoke design allows Shirley Basin to use Lost Creek’s existing processing infrastructure, improving capital efficiency and accelerating cash flow, while retaining the option to operate Shirley as an independent hub in the future. Shirley’s higher grades, shallower deposits, existing drilling, and exceptionally high flow rates support its potential to become a major production contributor, though management is still collecting data to refine recovery curves and long-term modeling. UR Energy expects development spending of approximately $12 million to $15 million per quarter over at least the next year, split between Lost Creek and Shirley Basin. The company intentionally stays one to three years ahead of production in wellfield development. Growth initiatives include a planned 120-hole exploration program at Lost Creek South, baseline permitting and a year-end technical report for Lost Soldier, and further evaluation of North Castle, where 13 of 33 drill holes intersected uranium mineralization. Management also reported stronger utility interest in supply certainty, with buyers increasingly willing to discuss market-price contracts outside formal RFP processes. The company remains selective about new contracts and is evaluating consolidation opportunities in the Western U.S., while prioritizing inventory protection, contracted delivery performance, and repayment of its uranium loan.

Analyst Q&A (15)
▸
What production should be expected in the second half of the year following Shirley Basin’s ramp-up and Lost Creek’s sand-filter installation, and can the company meet roughly 700,000 pounds of remaining deliveries without using non-produced inventory?
Anthony Taglieri · Canaccord Genuity
Management did not provide explicit second-half production guidance, but said UR Energy remains on track to meet contracted deliveries. Deferring 300,000 pounds from 2029 into 2026 reduced the remaining 2026 execution risk and provides flexibility in allocating pounds.
▸
How have uranium contracting conditions changed over the past six months regarding available terms, pricing, and utility appetite for new long-term contracts?
Anthony Taglieri · Canaccord Genuity
The company has not recently added contracts by choice, having turned down some RFPs while focusing on price and execution. Utilities are increasingly prioritizing supply certainty over negotiating the last increment of price. UR Energy may add future-year commitments after reassessing its production ramp and contract book next year, and is engaged in some discussions but is not being aggressive.
▸
What early benefits are being seen from the Lost Creek sand-filtration system, particularly for flow rates, and how significant was the prior flow restriction?
Jeffrey Grampp · Northland Capital Markets
Lost Creek averaged slightly more than 2,500 gallons per minute in the prior quarter, versus approximately 3,200–3,300 gallons per minute after the sand filter was installed. The filter materially removed a constraint caused by sand accumulation, and the focus is now shifting toward optimizing injection wells and bringing more wells online.
▸
If drilling at Lost Creek South is successful, how much could its proximity to existing assets accelerate development and reduce costs compared with Shirley Basin or other satellite projects?
Jeffrey Grampp · Northland Capital Markets
Lost Creek South should require less permitting effort because it is immediately adjacent to Lost Creek and within the same hydrologic basin. Additional nearby pounds would provide greater flexibility, more production, and potentially lower costs by leveraging existing infrastructure.
▸
What is the expected cadence for production costs to decline as Shirley Basin ramps up, and when might costs reach a steady-state level, potentially in the previously discussed $20–$25-per-pound range?
Ali · RBC Capital Markets
Cash costs are approximately 80% fixed, so costs per pound should decline in line with increasing production. The company spends roughly the same amount daily regardless of pounds produced, allowing models to derive cost reductions from projected production growth.
▸
What is the breakdown of wellfield development spending between Lost Creek and Shirley Basin, and how much spending remains for 2026 and 2027?
Ali · RBC Capital Markets
Development spending is expected to remain around $12 million to $15 million per quarter over at least the next year, across Lost Creek and Shirley Basin. Rigs are moved between sites to maximize flexibility. Spending is leveling out because the company maintains development one to three years ahead of production; a material decline would indicate that development is nearing completion and could be concerning.
▸
Has the M&A market become more active or receptive for U.S. development and nonoperating uranium assets, potentially enabling UR Energy to grow faster?
Joseph Reagor · ROTH Capital Partners
Management sees a growing appetite for consolidation in the Western U.S. uranium sector. Industry participants recognize that domestic and global production growth is needed, and UR Energy is evaluating opportunities that could create shareholder value, while declining to identify specific assets.
▸
Following the delivery deferrals, might UR Energy make spot sales, or is preserving inventory for future contracted or opportunistic sales the priority?
Joseph Reagor · ROTH Capital Partners
Protecting inventory is more important than making spot sales. The company can place excess pounds with utilities if needed, but its current priorities are managing delivery risk, repaying its uranium loan, and retaining inventory for periods of opportunistic pricing.
▸
What wellfield, header-house, and overall footprint would Shirley Basin require to produce approximately 500,000 or one million pounds annually, and how does the currently deployed footprint compare with that level?
Justin Chan · SCP Resource Finance
Two Shirley Basin header houses are currently installed, and drilling and header-house construction will continue well ahead of production. The company estimates that six to ten header houses need to be installed annually to support a nominal one-million-pound annual production rate. Shirley’s higher grades, shallower resources, faster drilling, and extensive existing drilling improve the ramp-up profile; approximately six to eight header houses are expected to support the one-million-pound level, depending on grade and flow.
▸
How does management expect to handle the uranium loan that nominally matures in the fourth quarter—through repayment, extension, or delivery into the loan?
Justin Chan · SCP Resource Finance
The base-case plan is to deliver into the uranium loan this year. Because it is with a trading entity, the loan is renegotiable and flexible, and the company has multiple risk-mitigation options. UR Energy emphasized that it will not miss a contracted delivery.
▸
How has demand for U.S.-sourced uranium evolved in discussions with domestic utilities compared with one or three years ago, particularly amid geopolitical concerns?
Heiko Ihle · H.C. Wainwright
Utility discussions are increasingly centered on supply certainty. Some utilities are open to 100% market-price contracts and are encouraging suppliers not to wait for formal RFPs. Management interprets the move away from rigid RFP processes as evidence that securing reliable U.S. supply is becoming more important than negotiating the last increment of price.
▸
How far along is the Lost Soldier technical report, when should it be released, and has the work revealed anything unexpected as the company approaches completion?
Heiko Ihle · H.C. Wainwright
The Lost Soldier technical report remains on schedule for completion by year-end at the resource and PEA-level economics stage. Management sees meaningful potential but did not disclose expected resource or economic figures. The work is intended to inform investors and support an eventual construction decision.
▸
Is it fair to assume that nothing identified so far at Lost Soldier would materially surprise investors?
Heiko Ihle · H.C. Wainwright
Management said there have been no major surprises. Lost Soldier has been extensively drilled over decades, with thousands of historical holes providing substantial geological and hydrological data. Baseline permitting work is progressing as expected, and prior studies are being leveraged to improve efficiency and potentially accelerate the timeline.
▸
How are Shirley Basin’s field metrics, including flow rates and recovery curves, comparing with internal plans now that material is being captured?
Mike Kozak · Cantor Fitzgerald
Shirley Basin is exhibiting naturally high flow rates—roughly two to three times those of many other Wyoming ISR facilities—which is beneficial but creates hydrologic challenges in contacting the ore. Early data from the first two header houses is being used to refine recovery curves, pressure settings, lixiviant chemistry, and future production modeling. Overall, the aquifer, grade, and resource are behaving as expected, although the operation remains early in its recovery curve.
▸
Does the indicated fourth-quarter sales volume of approximately 540,000 pounds include the pounds returned to the term loan, or would those pounds be additional?
Mike Kozak · Cantor Fitzgerald
The fourth-quarter sales guidance covers contracted deliveries only. The additional approximately 250,000 pounds associated with repayment of the uranium loan would be incremental to that guidance.

SEC Filing Findings

SEC Filing — material findings

2026-08-10 · depth 9/10
risk 7Toxic Financing / Convertible Dilution
▸

$120M 4.75% convertible notes due 2031 with conversion price ~$1.73 vs. share price ~$1.36; conversion settled in cash, shares, or combination; effective interest rate 18.6%. Conversion option derivative carried at $48.6M.

“The initial conversion rate for the Convertible Notes is 576.7013 shares per $1,000 principal amount of Convertible Notes, which represents an initial conversion price of approximately $ 1.73 per common share”
risk 6Uranium Inventory Loan / Hidden Obligation
▸

Uranium inventory loan (250,000 lbs, due Nov 30, 2026) carried as a liability at $17.5M net; company must return 250,000 lbs in Q4 2026 and posted additional $5/lb deposit in July 2026; second 150,000 lb facility also exists, and the loan is marked to spot price.

“The uranium loan was originally due November 30, 2025, and was extended to November 30, 2026.”
risk 6Capital Intensity / Liquidity
▸

Lost Creek wastewater treatment facility estimated at $25M-$33M, with combined 2026-2027 Shirley Basin and Lost Creek capex estimate of $35.8M; cash fell to $77.3M by July 31, 2026 versus $95.3M at June 30.

“The estimated cost of the facility is between $25 million and $33 million.”
risk 6Contract Delivery Shortfall
▸

2026 base delivery guidance cut by 300,000 lbs to 1.0M lbs; deliveries deferred to 2027 and 2029; 2026 deliveries heavily back-half weighted (540,000 lbs in Q4).

“In July 2026, we entered into transactions to defer delivery of 150,000 pounds to 2027 and 150,000 pounds to 2029.”

Short Interest

Short % of Float18.3%
Short Shares68.3M
Days to Cover5.4
Change (vs Prior)+3.3%
Short % Float History
18.30%+14.00pp
5.0%10.0%15.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2023.0-2025.0)

Direct Pay$12.3M
Incentive & Other$2.4M
Total Compensation$14.7M
% of Revenue15.1%

Cash Runway

4.7months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
ALPS ADVISORS INC$72.9M$1.18+$7.6M+$11.9M+1.2%$21.23B
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$38.2M$1.30+$3.1M+$2.1M—$73.71B
STATE STREET CORPPassive$31.6M$1.59+$8.6M+$23.8M-0.2%$2.89T
MANUFACTURERS LIFE INSURANCE COMPANY, THE$24.3M$1.19+$1.2M−$2.5M-0.3%$113.45B
VANGUARD CAPITAL MANAGEMENT LLCPassive$23.1M$1.49+$23.1M+$23.1M—$4.04T
Azarias Capital Management, L.P.$20.3M$1.23−$515K−$6.5M+0.5%$223M
MARSHALL WACE, LLP$19.8M$1.49+$15.7M+$19.8M-0.2%$92.71B
MILLENNIUM MANAGEMENT LLC$12.0M$1.39+$11.7M+$12.0M+0.1%$127.40B
Vident Advisory, LLC$10.9M$1.32+$2.3M+$3.5M-0.2%$11.74B
BlackRock, Inc.Passive$9.7M$1.19+$37K−$19.1M—$5.69T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

042.1M84.1M126.2M168.2M$0.67$0.95$1.23$1.51$1.792021-062022-062023-062024-062025-062026-03
hover the chart for per-quarter detailprice (right axis)
ALPS ADVISORS INC48.9MSEGRA CAPITAL MANAGEMENT, LLC1.6MMMCAP International Inc. SPC—MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.25.6MVAN ECK ASSOCIATES CORP—Azarias Capital Management, L.P.13.6MLloyd Harbor Capital Management, LLC6.3MMANUFACTURERS LIFE INSURANCE COMPANY, THE16.5MMirae Asset Global Investments Co., Ltd.—Fourth Sail Capital LP—

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
DNNDenison Mines Corp.3457.79×
CCJCameco Corporation341.62×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (1 analysts)$2.00+318.1%
Last Year (6 analysts)$2.10+339.1%
Current Price$0.48
Analyst Ratings
10
1
Buy: 10Hold: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q15M—0M$0.00$0.00 – $0.001
2019 Q212M—0M$0.00$0.00 – $0.001
2019 Q37M—0M$0.00$0.00 – $0.001
2019 Q410M6M4M$0.01$0.01 – $0.011
2020 Q11M-3M-4M$-0.01$-0.01 – $-0.011
2020 Q27M—0M$0.00$0.00 – $0.000
2020 Q30M-3M-4M$-0.01$-0.01 – $-0.011
2020 Q40M-3M-4M$-0.01$-0.01 – $-0.011
2021 Q20M-11M-12M$-0.01$-0.02 – $-0.011
2022 Q20M-11M-12M$-0.02$-0.02 – $-0.021
2023 Q13M-1M-2M$-0.01$-0.01 – $0.001
2023 Q22M-3M-4M$-0.01$-0.01 – $-0.011
2023 Q36M3M2M$0.01$0.00 – $0.012
2023 Q45M-3M-4M$-0.01$-0.01 – $-0.012
2024 Q15M-5M-6M$-0.01$-0.02 – $-0.011
2024 Q25M-6M-7M$-0.02$-0.02 – $-0.012
2024 Q39M-6M-7M$-0.02$-0.02 – $-0.011
2024 Q421M13M9M$0.02$0.02 – $0.022
2025 Q15M-7M-8M$-0.02$-0.02 – $-0.021
2025 Q29M-5M-7M$-0.02$-0.02 – $-0.023
2025 Q38M-4M-7M$-0.02$-0.02 – $-0.024
2025 Q410M-9M-12M$-0.03$-0.04 – $-0.023
2026 Q110M-10M-15M$-0.04$-0.06 – $-0.033
2026 Q214M-6M-11M$-0.03$-0.04 – $-0.013
2026 Q314M-9M-15M$-0.04$-0.06 – $-0.034
2026 Q415M-12M-18M$-0.05$-0.05 – $-0.044
2027 Q118M-10M-17M$-0.04$-0.05 – $-0.031
2027 Q224M-4M-11M$-0.03$-0.03 – $-0.021
2027 Q322M0M-7M$-0.02$-0.02 – $-0.011
2027 Q430M2M-6M$-0.01$-0.02 – $-0.011
2028 Q137M—0M$0.00$0.00 – $0.000
2028 Q239M—0M$0.00$0.00 – $0.000
2028 Q352M—0M$0.00$0.00 – $0.000
2028 Q452M—0M$0.00$0.00 – $0.000
2029 Q113M—0M$0.00$0.00 – $0.000
2029 Q266M—0M$0.00$0.00 – $0.000
2029 Q313M—0M$0.00$0.00 – $0.000
2029 Q4103M—0M$0.00$0.00 – $0.000

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$684K
7 txns · 3 insiders · 628,215 sh
Sells ($, 12mo)
$838K
7 txns · 7 insiders · 587,005 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-11-11BUYSMITH ROGER L.officer: CHIEF FINANCIAL OFFICER30,000$0.65$20K$444K
2026-11-11BUYWalle Jadeofficer: VICE PRESIDENT FINANCE164,178$0.67$110K$394K
2026-09-24BUYWalle Jadeofficer: VICE PRESIDENT FINANCE96,556$1.14$110K$483K
2026-09-11BUYWalle Jadeofficer: VICE PRESIDENT FINANCE75,581$1.29$97K$422K
2026-08-25SELLHUBER GARY Cdirector87,858$1.48$130K$825K
2026-08-25SELLParker Thomas Hdirector87,858$1.48$130K$861K
2026-08-24SELLCASH JOHNdirector77,751$1.41$110K$982K
2026-08-24SELLChang Robby Sai Kitdirector75,588$1.41$107K$136K
2026-08-24BUYRITCHIE DAVID A.officer: GENERAL COUNSEL/CORP SECRETARY10,000$1.42$14K$14K
2026-08-24SELLSMITH ROGER L.officer: CHIEF FINANCIAL OFFICER103,536$1.43$148K$933K
2026-08-21SELLHATTEN STEVEN M.officer: Chief Operating Officer81,576$1.39$113K$480K
2026-08-21SELLWALKER KATHY Edirector72,838$1.38$101K$811K
2026-03-18BUYWalle Jadeofficer: VICE PRESIDENT FINANCE107,900$1.39$150K$350K
2025-11-20BUYWalle Jadeofficer: VICE PRESIDENT FINANCE144,000$1.27$183K$183K
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Ur-Energy is a high-beta uranium ramp-up rather than an established profitable miner. The investment case depends on converting two Wyoming ISR operations into reliable commercial production while satisfying unusually concentrated 2026 deliveries and a 250,000-pound uranium-loan repayment. The Q2 update was operationally encouraging: Lost Creek achieved record drumming, the sand filter materially improved flow, and Shirley Basin received authorization for full production. However, quarterly losses remain severe, development spending is still $12M-$15M per quarter, and the business has funded growth partly through repeated equity issuance. Over the next two years, successful ramp-up could transform economics because much of the cost base is fixed and uranium demand for secure U.S. supply is strong. The base case assumes positive but not spectacular owner earnings by the end of the period; the bull case requires both operational execution and favorable uranium pricing. The bear case remains material because the delivery schedule is back-loaded, Shirley's recovery curves are not yet proven, and failure to generate sufficient pounds could consume cash or cause further dilution.

Trade Signal

Trade rating
-4.6/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-08-13 · saw $1.34-63.4% since

Short URG modestly: the stock prices in a successful uranium ramp while current owner earnings are deeply negative, dilution is substantial, and the analyst's fair value is roughly half the present market capitalization.

Temporary mispricing+1.5

The stock rose from $0.67 in March 2025 to $1.79 in September 2025 amid uranium-sector strength and then fell to roughly $1.31 by November. It rallied again to $1.76 in January 2026, softened through March, recovered to $1.79 in early May around improving production and Shirley Basin startup, and then declined to $1.33 by August as investors discounted execution and financing risk. The latest earnings reaction was a modest -6% from $1.42 to $1.33 despite record Q2 drumming and Shirley authorization. This is not a panic washout: the recent decline is a partial correction of uranium-ramp enthusiasm, although the muted reaction to genuinely improved operations may leave a temporary positive gap if Shirley and the filter continue to work. Overall, the move looks closer to a durable valuation reset than a major oversold dislocation.

Market view+3.0

The market is constructive to bullish despite the recent pullback. Analysts show a strong Buy consensus and a $2.19 average target, while uranium investors value URG as one of the few U.S. producers with permitted growth and leverage to rising utility demand. Bulls emphasize record Lost Creek production, the filter fix, Shirley Basin, and strong long-term uranium prices. Bears point to negative cash generation, execution risk, a back-loaded delivery schedule, uranium-loan repayment, and repeated dilution. Short interest has risen sharply from roughly 4% of float a year ago to 14.9%, indicating growing skepticism, but the consensus narrative remains more optimistic than the company's current economics justify. Retail participation is elevated but not extreme, and the stock is no longer at its 52-week high.

Inflectionwindow ~2mo+2.5

There is a genuine operational inflection underway: Lost Creek's sand filter has increased plant flow, Q2 drumming reached a record, and Shirley Basin has begun capture and received full-production authorization. That said, the market already appears to expect a successful uranium ramp: the analyst consensus is Buy with a $2.19 target, and the stock has historically traded as a high-beta uranium vehicle. The study's base case still produces only about $35 million of owner earnings and a $0.70 value, while consensus operating estimates are unusually sparse and unreliable. The first commercial Shirley Basin shipments and a clean Q4 delivery performance are needed before this becomes an undisputed earnings inflection.

Catalysts
  • ▲November 2026 · Q3 2026 production and earnings report — Tests whether the sand-filter improvement translates into sustained Lost Creek throughput, while Shirley Basin capture and resin shipments should provide the first evidence of commercial ramp-up.
  • ▲August–October 2026 · Shirley Basin resin shipment and production update — Successful inter-facility shipments and rising recovery curves would validate the second production hub; delays or weak recoveries would undermine the bull case.
  • ▲Q4 2026–January 2027 · 2026 contracted delivery progress / year-end production update — The company must execute an unusually back-loaded delivery schedule of roughly 1.3 million pounds; evidence of meeting obligations without buying uranium or issuing equity is critical.
  • ▼H2 2026 · Uranium-loan repayment and liquidity update — Repayment of approximately 250,000 pounds, together with $12–15 million of quarterly development spending, could pressure cash or increase financing needs.
  • ▲Ongoing through 2027 · U.S. uranium contracting and long-term price updates — Rising utility contracting and forward prices could support the valuation of domestic producers, although URG's current contracts are largely priced below prevailing market levels.
  • ▼Next 6–12 months · Potential equity financing — A capital raise to fund development, delivery obligations, or loan repayment would cap upside and dilute existing holders.
Flow-3.5

Net flow is unfavorable. TTM dilution is approximately 9%, the company remains cash-burning and capital intensive, and officers/directors have sold materially more stock than they bought over the last year. There is some insider buying and no identified large-holder liquidation, while 14.9% short interest and 7.3 days to cover provide squeeze fuel on strong operational or uranium-price news. Overall, expected financing supply outweighs the squeeze potential.

Floor / Ceiling+2.0

The approximately $95 million of unrestricted cash reported at Q2 provides a real but limited asset floor, supplemented by finished uranium inventory and operating assets. It is not a hard floor at today's $532 million market capitalization: quarterly losses, $12–15 million of quarterly development spending, delivery obligations, loan repayment, and possible financing can consume the cushion. Above the valuation target, the main ceiling is the need for continued equity funding and the absence of current owner earnings.

Buyability

Moderate for uranium-focused and retail investors: URG offers U.S. production exposure, improving Lost Creek operations, Shirley Basin optionality, and leverage to strong long-term uranium pricing. However, persistent losses, heavy capital needs, execution risk, and repeated equity issuance make it difficult for fundamental generalist buyers to own confidently. The next buyer is likely a uranium-sector specialist or momentum investor, not a conventional value fund.

Fear vs Greedfear 8/10 (-2.0)greed 8/10 (+3.0)

Fear pulls harder than greed at $1.34. The operational improvements are real and the uranium backdrop is attractive, but the market is paying roughly 15x sales for a company with deeply negative owner earnings, a 9% recent dilution rate, and a demanding delivery and financing runway. The upside scenario is meaningful, but it requires several execution successes that are not yet demonstrated.

Valuation

Our Target
$270M+42%
Market Should Pay
$230M+21%
target ×0.85 (fear discount)
Current Market Cap
$190MSlightly bearish
What Changed
financials release · 2026-08-10
+12%fair value on this information

The genuinely new information is the record 140,873 pounds of Q2 drumming, the 44% sequential increase in shipments, confirmation that the sand filter materially lifted Lost Creek flow to roughly 3,200-3,300 gallons per minute, and authorization for Shirley Basin full production. The quarter also showed that losses and capex remain very heavy, and management still declined to provide explicit second-half production guidance despite the back-weighted delivery schedule.

▸ How the cases moved

The bull case rises from roughly $900M to $1,080M as record Lost Creek drumming, the commissioned sand filter and Shirley Basin's full-production authorization improve confidence in the ramp. The base case rises from roughly $250M to $280M because the operating constraint appears more manageable, while the bear case improves modestly from $40M to $45M because liquidity and operating optionality are better than feared. Bull probability increases from 0.17 to 0.20, base remains near 0.50, and bear probability declines from 0.33 to 0.30; the continuing lack of explicit second-half production guidance prevents a larger revision.

2-Year Plausible Outcomes
bear30%
$45M
rev +10%/yrOE $-80M

The Lost Creek filter helps only modestly, Shirley Basin ramps slowly, and the heavily back-loaded 2026 delivery schedule forces uranium purchases or additional equity issuance. Uranium prices soften and persistent operating losses continue, leaving the company primarily valued for residual cash and assets.

▸ Valuation

0.5x $100M revenue = $50M EV − $5M net debt = $45M equity

base50%
$280M
rev +35%/yrOE $35M

Lost Creek flow improves after the sand-filter installation and Shirley Basin becomes a meaningful second source, but the company remains capital intensive through 2027. Revenue grows substantially and fixed-cost leverage produces positive, but still modest, owner earnings; dilution and execution risk limit the multiple.

▸ Valuation

8x $35M owner earnings = $280M equity value

bull20%
$1.1B
rev +70%/yrOE $90M

The filter removes Lost Creek's main operating constraint, Shirley Basin ramps rapidly toward commercial-scale production, and strong U.S. utility demand supports uranium prices above current contracted levels. Production growth absorbs fixed costs, development spending normalizes, and the company becomes a credible high-growth domestic uranium producer with substantial positive cash generation.

▸ Valuation

12x $90M owner earnings = $1,080M equity value

▸ Target Rationale

The probability-weighted and discounted scenario value is approximately $296M. I set the analytical target below that figure at $270M because the scenario arithmetic does not fully capture execution risk around Shirley Basin's early recovery curves, the concentrated Q4 delivery burden, the uranium-loan repayment, continued development capex, and the company's demonstrated reliance on equity financing. The existing net cash position provides an important cushion, but it does not eliminate the risk that future shareholders fund the ramp.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now4/10
Trajectory7/10
Risk8/10
Governance4/10
Insolvency prob (2yr)12%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • 100th Shipment Milestone (June 17, 2026): Ur-Energy completed its milestone 100th shipment of yellowcake ($\text{U}_3\text{O}_8$) from its flagship Lost Creek ISR facility in Wyoming. Since operations commenced in 2013, the facility has shipped over 3.5 million cumulative pounds of uranium concentrate, confirming the long-term consistency of the operation.
  • Q1 2026 Financial & Operational Results (May 8, 2026): The company reported that Q1 was a transitional setup quarter. Ur-Energy captured 110,314 pounds of $\text{U}_3\text{O}_8$ (a 41% QoQ and 48% YoY increase). The company sold 55,000 produced pounds, generating $3.9 million in revenue at an average realized price of $70.98 per pound (up $7.78 from Q4 2025). Cash costs of production decreased by 13% QoQ to $37.51 per pound. Ur-Energy maintained strong liquidity, holding $122.8 million in unrestricted cash as of March 31, 2026.
  • Shirley Basin Operations Commenced (April 23, 2026): Ur-Energy officially started uranium mining operations (solution capture) at its second ISR project, the Shirley Basin Project in Wyoming. This is the first active mining in this historically prolific district since 1992.
  • Updated Lost Creek S-K 1300 Report (March 10, 2026): Ur-Energy filed an updated Initial Assessment Technical Report Summary for its flagship Lost Creek Property, which estimates an extended mine life and increased net cash flow projections.
▸ Thesis-test Findings
Ur-Energy Lost Creek sand filter installation operational update 2026

Production at Lost Creek has been hindered by fine particles from the host geological formation, which compromise the efficiency of the ion exchange (IX) resin columns. To address this issue, Ur-Energy expedited the construction and installation of a dedicated sand filter system designed to strain out fines before the fluid enters the IX columns. In the May 11, 2026 Q1 earnings call, management reported that the sand filters had been positioned on the pad, aggregate was ready, and piping was underway, putting the system on schedule to come online in Q2 2026. However, the expedited water-treatment upgrades at Lost Creek have increased near-term capital intensity, prompting the company to raise its forecast for Lost Creek's water-treatment upgrades to $25 million–$33 million. Successfully implementing this system remains a key prerequisite for meeting Ur-Energy's 2026 delivery targets, which are heavily back-half weighted.

Wyoming DEQ Shirley Basin preoperational inspection approvals 2026

While Ur-Energy successfully initiated initial operations and lixiviant solution capture at Shirley Basin's Mine Unit 1 in late April 2026, the transition to commercial production and shipping remains pending. The company plans to capture uranium on ion exchange resins at Shirley Basin and transport the loaded resin to its Lost Creek facility for final processing, drying, and packaging. However, the start of inter-facility material shipments is contingent upon passing a final preoperational inspection and securing approval from the Wyoming Department of Environmental Quality (WDEQ) and the Nuclear Regulatory Commission (NRC). In the Q1 2026 conference call, management noted that this is a routine procedural verification and that they do not anticipate any obstacles to passing. As of late June 2026, no formal "approved" announcement has been issued, meaning this gating milestone remains in progress as the company targets commencing shipments during the summer.

US domestic uranium long-term contract pricing trends 2026

The pricing environment for domestic uranium remains exceptionally strong and supports the bullish thesis for domestic producers. While spot prices have experienced some volatility—stabilizing in the mid-$80s per pound after briefly touching $100 earlier in 2026—the strategically vital long-term contract market continues to climb. In May 2026, the long-term uranium contract price jumped by $3 to $93 per pound, its highest level in over a decade. Long-term forward pricing is even more robust, with the 3-year forward price sitting at $100 and the 5-year forward price at $107. The widening gap between volatile spot prices and rising contract prices indicates that nuclear utilities are prioritizing future supply security to satisfy ongoing grid demands and power-hungry AI data center contracts. This trend benefits Ur-Energy, which has committed to deliver 1.3 million pounds of uranium in 2026 at a projected blended average price of roughly $64 per pound (totaling $83.2 million in anticipated proceeds).