Stocks/USAS

USAS

Americas Gold and Silver Corporationv3 3.5/10 · 2026-11-03
Basic Materials·Industrial Materials
$2.23
$694M market cap
v3 Rating
3.5/102.5–5.0
Setup
4.0/103.0–6.0
Fair Value
$2.10$1.00–$3.80-6%
DCF (10%)
$1.60-28%
Base IRR
-3%-15%–+15%
Visibility
wide±67%
Wall Street
$9.25 target(1 analyst last quarter)(4 buy)
Rating
Revenue (TTM)
$206.3M
Owner Earnings
$23M
Next-Yr Owner Earnings
-$7M
Growth
+11.0% × 4y
P / Next-Yr OE
--
Net Debt
$0M

Americas Gold and Silver Corporation, operating with its various subsidiary entities, focuses on the entire lifecycle of mineral properties throughout North America, from acquisition and exploration to development and operation. The company's efforts are directed toward discovering and extracting deposits of silver, lead, zinc, copper, and gold. Its portfolio includes significant assets in Mexico, where it maintains a 100% ownership of the Cosalá Operations, encompassing 67 mining concessions spread across roughly 19,385 hectares in the state of Sinaloa. The company is also developing the San Felipe project, situated in Sonora, Mexico. Within the United States, Americas Gold and Silver holds a 60% interest in the Galena Complex, located in Idaho's northern Silver Valley, and fully controls (100% interest) the Relief Canyon mine in Pershing County, Nevada. Founded in 1998, the firm was initially named Americas Silver Corporation, changing to its current designation, Americas Gold and Silver Corporation, in September 2019. Its corporate headquarters are based in Toronto, Canada.

2-Year Price History

$2.71+222.6%
$2.0$4.0$6.0$8.0Initial target $2.10 · 2026-11-03volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-03

Rating
3.52.5–5.0
Setup
4.03.0–6.0
Fair value (USD)
2.101.00 – 3.80
Upside vs 2.23
-6%
DCF (10%)
1.600.50 – 3.60-28%
Base IRR
-3%-15% – 15%
Visibility
very widerange ±67%
Sentiment
3/10
2026-11-03 · claude-opus-5-5 · priced at 2.71

Americas Gold and Silver (USAS, US$2.71 on Nov 3 2026, roughly C$3.8 on the TSX) runs two mines. Cosala in Mexico is now a good low-cost silver-copper mine. Galena in Idaho is a 100-year-old shaft mine halfway through a costly modernization: hoist upgrades, a switch to long-hole stoping and a paste-fill plant. The stock is down 73% from its February peak of $10.03 and sits at its 52-week low. Two things caused the fall. Silver dropped from $121.62 in January to about $49 (it fell 19% in October alone), and Q3 output of 800k oz missed the roughly 950k oz consensus because Galena lagged again. To hit even the bottom of 2026 guidance, Q4 needs a record ~0.9 Moz (Desjardins puts the midpoint at ~1.1 Moz). At spot silver the numbers are thin. Run-rate owner earnings are about $20-25M against a ~$920M EV, and Galena's Q2 AISC was $52/oz, above today's silver price. Cash fell from $123M in March to $63M in September while capex runs at $90-120M a year. The interim statements carry going-concern language and needed SAF covenant waivers, and there are internal-control material weaknesses. Eric Sprott (about 14%) has been selling. My 5-year DCF assumes $50 silver and a ramp to about 5.3 Moz by 2031, a haircut to management's 6-8 Moz ambition. It gives about $1.60 a share. A silver-weighted fair value is about $2.10, so the price already discounts roughly $60 silver or a flawless Galena ramp. Sentiment is fearful but not capitulation: sell-side targets of C$9-17 are stale and still Buy-rated, and retail silver holders remain. This is a leveraged, execution-heavy silver call, not a business throwing off durable cash, so it does not fit the 'quality on sale' template. Rating 3.5/10: modestly overvalued at spot silver, with dilution risk. A short is unattractive after a 73% drop with 72% implied volatility. Research rating 4/10: the main swing factor is the silver price, which research cannot settle. The Q3 results on Nov 13 (Q4 run-rate, 2027 guidance, financing) are the only near-term thing worth checking.

A deep dive would have to establish: Can Galena's long-hole and paste-fill ramp take consolidated output to about 4 Moz in 2027 and AISC below $30 without another dilutive raise, so the equity earns a real return at $50 silver rather than needing $60+?

Owner earnings, TTM
$23M$5M – $42M
Realistic peak profit
$90M$55M – $160M
Growth rate
11.0%3.0% – 20.0%
Years of growth
42 – 6
Market cap
$916M$880M – $950M
EV
$920M$880M – $980M
Net debt
$0M-$10M – $30M
Capital return / cap
-3.0%-10.0% – 0.0%
P/E
30.0×18.0× – 80.0×
EV/EBITDA
11.0×8.0× – 16.0×
FCF yield
2.5%0.5% – 4.5%
Projected FCF, base case (USD millions)
Y1-$7M-$45M – $30M
Y2$26M-$15M – $70M
Y3$50M$0M – $110M
Y4$64M$10M – $135M
Y5$65M$10M – $140M
Competition: A price-taking silver producer with no moat beyond asset grade and US jurisdiction; peers such as Hecla (Lucky Friday next door), Coeur, Aya and Avino mostly run lower-cost or longer-life mines, and the antimony JV is only a small strategic option.
Governance: Interim statements carry going-concern material-uncertainty language, SAF covenant tests were waived for Dec 2025 to Jun 2026, there are disclosed internal-control material weaknesses, and the company relies on serial equity dilution; there is no fraud history.
Research (expand)

What the company does

Americas Gold and Silver (TSX: USA, NYSE American: USAS) is a small North American silver producer. The pack describes Galena as 60% owned, which is out of date: the company bought Eric Sprott's 40% in late 2024.

  • Cosala Operations (Sinaloa, Mexico): an underground silver-copper mine whose EC120 zone reached commercial production on Jan 1 2026. Q3 2026 silver was 415,879 oz (+23% q/q). Q2 cash cost was $16.91/oz and AISC $29.94/oz, helped by copper credits and recoveries about 10 points better. Conversion drilling keeps returning grades 2-5x the resource model, for example SR568 at 14 m of 600 g/t and SR583 at 20.5 m of 655 g/t.
  • Galena Complex plus the Crescent mine (Silver Valley, Idaho): a century-old shaft mine being modernized. The #3 shaft hoist went from 42 to a sustained 85 t/h. The mine is switching from jackleg cut-and-fill to long-hole stoping (13 stopes so far; target 30-40% long-hole by end-2026 and 50-60% in 2027), and a paste-fill plant comes online in 2027. Crescent was bought in Dec 2025 for about $87M and needs a second exit before it can produce ore. Galena also produces antimony (about 100k lb a quarter) and has a 51%-owned processing JV with US Antimony. Q2 Galena AISC was $52.31/oz.
  • Relief Canyon (Nevada): a gold asset on care and maintenance, with an external study under way.
  • 2026 guidance: 3.2-3.6 Moz silver at $30-35 AISC, capex $90-120M ($30-40M sustaining, $60-80M growth). Year to date through Q3: about 2.3 Moz.

The investment case and why the stock fell

The bull case is a US-domiciled silver producer that could more than double to 6-8 Moz by 2027-29 (management's ambition) as Galena gets back to its historical ~5 Moz, with Cosala's high-grade EC120 funding the build and antimony adding a critical-minerals angle. That case drove the stock from $0.42 (2024) to $10.03 (Feb 2026) while silver went to $121.

The stock is now $2.71, the bottom of its 1-year range. The causes:

1. Silver fell about 60% from its peak. Spot closed near $48.90 on Oct 30 after a ~19% October drop on Fed-hike fears and leveraged unwinds. Realized silver went from $79.48 in Q1 to $67 in Q2 and $60.54 in Q3, and spot is now about $49.

2. An execution miss. Q3 silver of 800k oz was a record but well short of the ~950k consensus because Galena underperformed. Guidance was reiterated, but even the low end needs about 0.9 Moz in Q4, a new record.

3. Funding strain. Cash fell from $122.6M (Mar 31) to $88.9M (Jun 30) to $63M (Sep 30). Q4 capex is back-end loaded (paste fill and shaft relining). The interim statements note material uncertainty about going concern, and SAF covenant tests on earnings and leverage were waived for Dec 2025 to Jun 2026. There are also material weaknesses in internal controls (IT, asset retirement obligations, tax, acquisition accounting).

What it earns today (unlevered owner earnings)

  • H1 2026 at about $74 realized silver: revenue $114.1M, adjusted EBITDA about $45.6M (Q1 $33.6M, Q2 $12.0M), operating cash flow $47M, capex $63.7M.
  • Q2 shows the operating leverage: revenue $46.3M, adjusted EBITDA $12M. That implies roughly $34M a quarter of cash costs, G&A and exploration, against about $48-50M of quarterly revenue at $49 silver and Q3 volumes.
  • Run-rate at spot (~$49 silver, ~3.3 Moz/yr, AISC ~$36): about 3.3 Moz x $13 margin = ~$43M, less ~$15M of costs outside AISC (expensed exploration, Relief Canyon care and maintenance, JV and corporate items not in AISC), less ~$5M cash tax = ~$23M of unlevered owner earnings. Stock comp (about $9M a year) is inside G&A and AISC. Sustaining capex ($30-40M) is treated as maintenance. Growth capex is added back.
  • Run-rate EBITDA at spot is about $55-65M, so only ~35-40% of EBITDA reaches owners. That rises to ~50% at 2027 volumes.
  • EV of about $920M (338.2M shares x $2.71 = $916M, net debt near zero: ~$59M of debt including the $52M SAF term loan at SOFR (4% floor) + 6%, against $63M of cash at Sep 30) works out to ~40x owner earnings and ~14-16x run-rate EBITDA, or ~10x forward 2027 EBITDA at $50 silver. After ~$5M of after-tax interest the equity yield is about 2%.
  • If today's year simply repeated: $23M / 10% = $230M, about $0.68 a share. The equity would earn about $18M a year. The current price only works with growth or higher silver.

Five-year free cash flow (before interest, after stock comp, sustaining and growth capex; flat $50 silver)

| Year | Silver Moz | AISC $/oz | Owner earnings $M | Growth capex $M | FCF $M |

|---|---|---|---|---|---|

| 2027 | 3.8 | 32 | ~43 | 50 | -7 |

| 2028 | 4.4 | 29 | ~61 | 35 | 26 |

| 2029 | 4.9 | 27 | ~75 | 25 | 50 |

| 2030 | 5.2 | 26 | ~84 | 20 | 64 |

| 2031 | 5.3 | 26 | ~85 | 20 | 65 |

These volumes already assume Galena roughly doubles, a haircut to management's 6-8 Moz ambition. The company has a habit of being late: 2026 was once pitched as a 'quadruple production' year and will land near 3.2 Moz. 2P reserves are about 25 Moz (roughly 5 years at 5 Moz) with 115 Moz of M&I, so mine life depends on continued conversion drilling. Silver is the dominant variable: each $10/oz moves steady-state owner earnings by about $40M a year after tax.

What it looks like in 5 years. If the ramp works, this is a ~5 Moz, mid-cost silver producer that is no longer growing, with a capital-hungry shaft mine and a high-grade Mexican mine, and roughly $65-85M of FCF at $50 silver. That is neither a corpse nor a compounder. It is a mature, cyclical commodity producer worth about 8-12x FCF depending on reserve life. My confidence is low because outcomes vary widely with silver and Galena's execution.

Fair value and the multiples we pay

  • DCF (10%, year-5 FCF $65M x 10, net debt ~0, ~345M diluted shares): PV of FCF ~$137M plus PV of the terminal value ~$404M = ~$540M, about $1.60 a share. The likely 2027 equity raise (negative 2027 FCF, debt amortization stepping up, Q4 cash burn) would push that lower.
  • Silver scenarios: $40 gives ~$0.5 (with distress and dilution); $50 gives ~$1.6; $65 gives ~$3.3; $80 gives ~$5. Weighted 25/40/25/10, that is about $2.10. A strategic takeout is possible (US silver and antimony, Silver Valley neighbours), but there is no sign of one.
  • Fair value ~$2.10 (range $1.0-3.8) against $2.71. Base-case IRR from today is about -3% a year. The price already discounts roughly $60 silver, or $50 silver plus a flawless ramp.
  • Multiples: ~40x owner earnings, ~2.5% owner-earnings yield, ~10-16x EBITDA depending on forward or run-rate, ~30x forward 2027 earnings at $50 silver. That is not cheap for a high-cost producer.

Management, risks and competition

  • Management: CEO Paul Huet (ex-Klondex, which was sold to Hecla) is a credible underground operator. The safety record is good and the Cosala turnaround is real. Capital allocation has relied on serial equity issuance: the $133M bought deal, the 2.5:1 consolidation, and the Sprott and Royal Gold stream settlements paid in shares, which cost 3.3% dilution but removed $76M of metal-linked liabilities. There is no capital return. Insiders are not buying, and Eric Sprott has been a net seller in 2026 (5M shares in March, 1M in May; about 14% after receiving settlement shares), which is an overhang.
  • Risks: silver price, Galena ramp timing (paste fill in 2027, long-hole conversion, Crescent's second exit), the going-concern note and covenant waivers, likely dilution in 2027, internal-control weaknesses, Mexican security, tax and permitting, and short reserve life.
  • Competition: silver is a price-taker commodity, so there is no moat beyond asset quality and jurisdiction. Peers (Hecla's Lucky Friday next door, Aya, Avino, Gatos, Coeur) mostly run lower-cost or longer-life assets. The antimony JV is a small option on a strategic theme.
  • Not a covered-call floor setup: IV is 72-75%, but forward earnings are not predictable and the valuation is not at a floor.
  • Governance: no fraud history, but the material weaknesses, going-concern language and repeated covenant waivers count against it.

How investors feel (score 3/10)

It is fear, not euphoria, but not clean capitulation either. The stock is down 73% from the February high and at its 52-week low, it fell another 6% on Nov 3, and it trades below its 50-day ($4.46) and 200-day ($5.68) moving averages. Short interest is about 22M shares (about 6.6% of shares, 5.5 days to cover), up from 13M in July. Zacks cut it to Strong Sell (Oct 20). The sell side remains Buy (6 Buy, 1 Sell). HC Wainwright's target is $9.25. Canadian targets range from C$9 (Haywood) to C$16-17 (Desjardins, Canaccord), but these were set on far higher silver decks and will probably come down after Q3 (results and call Nov 13). Before the crash, consensus had the stock at 0.6-0.85x NAV. Retail silver investors and the critical-minerals story still support it. The bottom signal to watch for would be silver stabilizing plus a credible Q4 (≥0.9 Moz) and a fully funded 2027 plan without a deep-discount raise.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue206+89%118+14%103+8%95.2+12%85.0
Gross profit75.611.8-2.09-120%10.7-0.09
Operating expenses34.8+11%37.8+104%18.5+54%12.0-22%15.5
▸Adj EBITDA66.5-4.68-243%3.27-83%19.2+330%4.47
▸Adj OCF48.3-13.1-12.8-6.88-7.57
CapEx-134-69.2-18.9-19.9-19.6
Adj FCF-86.1-82.4-31.6-26.8-27.2
Interest expense5.495.327.388.193.08
▸Adj net income14.8-35.9-26.0-12.9-19.1
▸Owner's earnings10.0--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-38.452.2100%-56.3-13.5-2.23-18.5
FCF (OCF−capex)-175-38.4-73%-73.2-21.9-21.0-20.8
Net income-211-0.52-1%-87.4-44.9-35.0-43.1
▸Capital returned-2331.453%-192-44.7-0.392.78
Buybacks-208-6.91-151-47.70.02-2.53
Dividends0.000.000.000.000.000.00
Interest paid27.73.745.327.388.193.08
Debt paid down-52.24.62-46.1-4.38-8.602.23
▸Reinvestment21893.5179%69.119.018.318.0
Capex (PP&E)22294.069.218.919.919.6
Intangibles & M&A-0.000.000.00-0.000.000.00
Leases signed (net Δ)-3.81-0.55-0.140.11-1.59-1.63
Retained / other67.2-39.8-76%11927.7-14.7-22.5

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 18 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)427413193180191
▸Liabilities (total)13119113910892.2
Net debt (incl. leases)-10.8-84.13.9919.813.5
Net debt / Adj EBITDA-0.16--1.221.033.03
Net debt / Adj FCF----------
Adj EBITDA / interest12.1-0.880.442.351.45
Shares outstanding33832099.199.199.1
Dilution (YoY)+34.8%+0.9%+21.2%+9.9%+20.5%
Employees6292.002.002.002.00
MarginsTTM2025202420232022
Gross margin36.7%+33.410.0%+12.1-2.0%-13.211.2%+11.3-0.1%
Adj EBITDA margin32.2%+38.5-4.0%-7.13.2%-17.020.2%+14.95.3%
Adj OCF margin23.4%+41.2-11.1%+1.3-12.4%-5.2-7.2%+1.7-8.9%
Adj FCF margin-41.8%+7.2-69.8%-39.1-30.7%-2.5-28.2%+3.8-32.0%
Net income margin-18.5%+37.6-74.2%-30.6-43.6%-6.8-36.7%+14.0-50.7%
Adj NI margin7.2%+36.6-30.4%-5.1-25.3%-11.7-13.6%+8.8-22.4%
ROIC (adj, after-tax)9.3%-7.7%-21.0%-1.4%-12.8%
Cost of debt10.3%13.0%31.6%43.0%19.3%

Earnings Calls

6 calls

Earnings Call · 2026 Q2

2026-08-14

Americas Gold and Silver described the second quarter of 2026 as another period of meaningful operational, financial and strategic progress. The company maintained its full-year 2026 consolidated silver production guidance of 3.2 million to 3.6 million ounces, emphasizing that output is weighted toward the second half because substantial infrastructure spending occurred earlier in the year. Consolidated production was approximately 665,000 ounces of silver, or a little over 800,000 silver-equivalent ounces, while the company continued to report zero lost-time accidents across its U.S. and Mexican operations for more than a year. Cosala delivered particularly strong results. Silver production increased 26% year over year to approximately 337,000 ounces, supported by higher grades, improved metallurgical recoveries and commercial production from the EC120 zone. Cash costs declined to $16.91 per ounce, helped by higher grades and copper byproduct credits. Management said the operation is now in the heart of EC120 and believes the improved operating profile can continue. Metallurgical initiatives have increased recoveries by approximately 10% compared with historical levels. Exploration and resource-conversion drilling also continue to produce materially better results than existing models. Drilling at the San Rafael Upper and 120 zones is returning grades roughly two to three times previously reported inferred resource grades. Management highlighted hole SR568, which intersected 14 meters grading 600 grams per tonne silver versus a modeled grade of 110 grams per tonne. Because these results are adjacent to existing infrastructure, the company may incorporate them into the mine plan as early as the fourth quarter, and certainly by 2027. At Galena, the quarter reflected the planned trough associated with completion of the No. 3 shaft modernization. Phase 2 increased sustained hoisting capacity from approximately 42 tonnes per hour to 85 tonnes per hour, with peak performance reaching 105 tonnes per hour. The company also added a redundant hoist motor, upgraded loading, braking and control systems, expanded underground equipment and installed fiber-optic communications. Management is now focused on accelerating waste development, increasing long-hole stoping and completing a paste-fill plant. Thirteen long-hole stopes have been blasted, with narrow stopes reconciling closely to the model and showing limited dilution. Long-hole mining can increase productivity to approximately 200 tonnes per day versus roughly 50 tonnes per day with jackleg mining, while reducing stope timelines from 12–14 months to about 28 days. The company expects long-hole mining to reach 30%–40% of production by the end of 2026 and 50%–60% in 2027, although some flatter veins will continue to use cut-and-fill methods. A minor fire temporarily displaced higher-grade production but caused no injuries, and the affected area is now back in operation. Financial performance improved significantly. Q2 revenue rose 71% year over year to $46.3 million, primarily because the average realized silver price increased to $67 per ounce from $34. First-half revenue reached $114 million, up 126% year over year. Net loss narrowed to approximately $5 million, or $0.02 per share, from $15 million, while adjusted loss was approximately $0.9 million and adjusted EBITDA was approximately $12 million. Cash and equivalents totaled $89 million at quarter-end, with $49 million of working capital. A major strategic milestone was the settlement of the remaining precious-metals delivery obligations to Sprott and Royal Gold. The transactions removed more than $76 million of future variable metal-linked obligations and more than $28 million of annual debt service, eliminated associated mark-to-market volatility and increased shareholder exposure to silver prices, all for 3.3% combined dilution. Management also confirmed that the Relief Canyon external study remains underway, with public release planned, and continued to highlight its antimony strategy and potential role in the U.S. critical-minerals supply chain.

Analyst Q&A (10)
▸
Galena production appears heavily weighted to the second half, with first-half output at roughly 35% of the low end of guidance. How should investors think about the contributions from throughput, grades and Crescent, and how confident is management in the second-half outlook?
Dalton Baretto · Canaccord
Management said Q2 was intentionally weighted toward infrastructure investment, particularly the Galena shaft modernization. With the shaft now sustaining approximately 85 tonnes per hour, occasional daily throughput of 1,000–1,200 tonnes, ongoing long-hole development and improved grades and recoveries, management is comfortable achieving full-year companywide guidance of 3.2–3.6 million ounces of silver. Guidance benefits from production optionality across Cosala and Galena; Crescent is viewed primarily as a longer-term opportunity and is not expected to contribute materially this year.
▸
Will the approximately 9% first-half gap between production and sales be recovered in the second half?
Dalton Baretto · Canaccord
Management confirmed that the production-versus-sales gap is primarily timing related as ounces move from the mill to the smelter. The ounces had already begun processing in the first month of Q3 and are expected to be sold, rather than representing a lost or structurally delayed volume.
▸
What is happening operationally at Galena and Crescent now that Galena has additional shaft capacity, including the sequencing of waste removal, stoping, mining-rate growth and Crescent development?
Justin Chan · SCP Resource Finance
At Galena, the immediate focus is on catching up on waste development now that shaft capacity has improved, while advancing long-hole stopes and the paste-fill plant. Paste fill should reduce stope filling times from about 10 days with sand fill to roughly 36 hours. At Crescent, the company is conducting drilling and waste development and must establish a secondary egress before removing ore under MSHA requirements. Across both assets, the goal is to build sufficient development for more long-hole mining and less jackleg mining. Cosala is performing well because it has reached the heart of EC120 and has improved recoveries and grades.
▸
Is the previously planned Relief Canyon study still underway, and will its results be released publicly or kept internal?
Justin Chan · SCP Resource Finance
Yes. The company is completing an external study on Relief Canyon this year and intends to release it publicly, although management could not yet specify the exact publication month.
▸
Should capital deployment in Q3 and Q4 be assumed to be similar, or will the timing of the paste-fill plant make one quarter notably heavier?
Justin Chan · SCP Resource Finance
Capital plans remain substantially unchanged from the guidance provided earlier in the year. Only minor reallocations, on the order of $1 million, are expected; there are no major shifts in spending categories or overall project budgets.
▸
Within the second half, is capital spending expected to be lumpy between Q3 and Q4 or relatively even?
Justin Chan · SCP Resource Finance
Spending is expected to be somewhat more concentrated in Q4 rather than evenly split. Paste-fill plant invoices and shaft relining expenditures are likely to arrive more heavily toward the back end of the year.
▸
How will the mix between cut-and-fill and long-hole mining change during the second half of 2026 and into 2027, and what are the key constraints on the transition?
Jamie Spratt · Haywood Securities
Management expects long-hole mining to represent approximately 30%–40% of Galena production by the end of 2026, increasing toward 50%–60% in 2027 and continuing to rise thereafter. Waste development and the paste-fill plant are essential to cycling stopes efficiently, while equipment deployment and remote controls are also required. The mine will not become entirely long-hole based because some flatter-dipping veins are better suited to cut-and-fill, representing roughly 15%–16% of the veins.
▸
How should Galena grades trend in Q3 and Q4 after high-grade production was deferred because of the fire—should investors expect grades near Q1 levels or higher?
Jamie Spratt · Haywood Securities
The fire affected a higher-grade area and temporarily displaced production, but the area has been fully settled and mining has resumed. Those ounces are expected to contribute to second-half production and support achievement of company guidance. Management emphasized that no one was injured and that the upgraded shaft redundancy enabled a rapid evacuation.
▸
What is driving Cosala’s performance ahead of plan, and how sustainable are the stronger grades, recoveries and lower cash costs now that mining is in EC120?
Jamie Spratt · Haywood Securities
Cosala’s outperformance reflects entry into the higher-grade EC120 zone, favorable copper byproduct credits, additional favorable drilling and approximately 10% improvement in recoveries following metallurgical work. Management believes the improved grade, recovery and cost profile is sustainable as EC120 is developed and further drilling converts nearby resources.
▸
How is the transition to long-hole stoping progressing, and how are the completed stopes performing relative to expectations?
Case Bongirne · H.C. Wainwright
The company has completed 13 long-hole stopes, with narrow stopes of approximately 1.2–1.3 meters reconciling closely to the resource model and showing little dilution. Long-hole mining can produce roughly 200 tonnes per day versus about 50 tonnes per day per blast with jackleg mining, and a stope can be completed in about 28 days instead of 12–14 months. The paste-fill plant, expected to be used in 2027, should further improve productivity.

Options

Chain Snapshot (daily)

Call IV (ATM)157%
Put IV (ATM)53%
ATM Spread5.5%
Call $OI (near money)$672K
Put $OI (near money)$1.7M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$2.5
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$1.00$1.85/$2.301--/$0.200
$1.50$1.35/$1.650--/$0.200
$2.00$0.95/$1.2542--/$0.055
$2.50$0.60/$0.75262$0.05/$0.1520,000
$3.00$0.30/$0.50236$0.25/$0.35143
$3.50$0.15/$0.2520,175$0.55/$0.6512
$4.00$0.05/$0.15614$0.95/$1.151,714
$4.50--/$0.1530$1.40/$1.600
Snapshot: 2026-11-04

Short Interest

Short % of Float8.3%
Short Shares22.8M
Days to Cover5.5
Change (vs Prior)+1.4%
Short % Float History
8.30%+7.70pp
0.0%2.0%4.0%6.0%8.0%10-1512-3103-1305-2908-1410-30

Cash Runway

9.4months
CRITICAL

Institutional Ownership

Change in total shares held by all 13F filers, each quarter, as % of shares outstanding at that quarter. Pale bars = what individual filers bought / sold. Hover a quarter for its biggest buyers and sellers.
-20%-10%0%+10%$0.44$2.08$3.72Q4 2021Q3 2022Q2 2023Q1 2024Q4 2024Q3 2025Q2 2026Q3 2026
Q2 20262026-06-30(hover the chart for other quarters)
0.00% of shares out (net)
Bought 0.00% by 0 filers · Sold 0.00% by 0
Net 0 shares on 338M out (current)
0 filers reported
Top buyersΔΔ %holds
none
Top sellersΔΔ %holds
none

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

042.5M85.0M127.5M170.0M$0.44$0.87$1.30$1.73$2.162021-092022-062023-032023-122024-092025-06
hover the chart for per-quarter detailprice (right axis)
Merk Investments LLC71.2MNewGen Equity Long/Short Fund32.1MNewGen Asset Management Ltd32.1MMIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.13.1MVAN ECK ASSOCIATES CORP—Lynwood Capital Management Inc.—Invesco Ltd.—SPROTT INC.5.8MTidal Investments LLC5.6MMANUFACTURERS LIFE INSURANCE COMPANY, THE5.5MINTACT INVESTMENT MANAGEMENT INC.4.7M

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (1 analysts)$9.25+355.7%
Last Year (2 analysts)$9.50+368.0%
Current Price$2.03
Analyst Ratings
4
Buy: 4Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2010 Q16M—18M$0.24$0.19 – $0.2912
2011 Q119M10M7M$0.12$0.10 – $0.1413
2011 Q224M7M4M$0.48$0.38 – $0.587
2011 Q316M6M4M$0.32$0.26 – $0.389
2012 Q115M6M4M$0.13$0.11 – $0.1611
2012 Q216M2M1M$0.19$0.15 – $0.228
2012 Q312M2M1M$0.12$0.10 – $0.1414
2013 Q19M3M1M$0.12$0.10 – $0.147
2013 Q38M-2M-3M$-0.07$-0.09 – $-0.0620
2014 Q29M1M-2M$-0.12$-0.14 – $-0.1011
2014 Q38M0M-2M$-0.01$-0.01 – $-0.0118
2015 Q217M0M-2M$-0.12$-0.14 – $-0.109
2015 Q313M-3M-5M$-0.12$-0.14 – $-0.1010
2016 Q115M1M-2M$-0.12$-0.14 – $-0.1010
2016 Q317M4M1M$0.04$0.03 – $0.0512
2017 Q131M2M-0M$-0.03$-0.03 – $-0.028
2017 Q252M4M2M$-0.13$-0.15 – $-0.107
2017 Q39M-1M-3M$-0.04$-0.04 – $-0.0310
2018 Q229M5M2M$0.06$0.05 – $0.087
2018 Q35M-21M-24M$0.21$0.17 – $0.2519
2019 Q123M3M-1M$0.00$0.00 – $0.0018
2019 Q221M2M-3M$-0.01$-0.01 – $-0.0113
2019 Q320M-14M-17M$-0.05$-0.05 – $-0.059
2019 Q420M-6M-9M$-0.03$-0.03 – $-0.039
2020 Q16M1M-1M$-0.08$-0.08 – $-0.088
2020 Q23M-3M-5M$-0.10$-0.10 – $-0.108
2020 Q38M-41M-43M$-0.12$-0.12 – $-0.1214
2020 Q412M-30M-32M$-0.09$-0.09 – $-0.0911
2021 Q111M-675M-680M$-0.14$-0.14 – $-0.141
2021 Q216M-8M-13M$-0.15$-0.15 – $-0.151
2021 Q319M-17M-23M$-0.12$-0.12 – $-0.121
2021 Q416M-30M-37M$-0.11$-0.11 – $-0.111
2022 Q123M13M5M$0.01$0.01 – $0.011
2022 Q224M0M-7M$-0.02$-0.02 – $-0.022
2022 Q322M-10M-16M$-0.04$-0.04 – $-0.042
2022 Q423M-19M-22M$-0.07$-0.07 – $-0.071
2023 Q125M-13M-21M$-0.06$-0.06 – $-0.061
2023 Q227M-10M-17M$-0.05$-0.05 – $-0.051
2023 Q320M-5M-13M$-0.04$-0.04 – $-0.033
2023 Q428M-19M-25M$-0.07$-0.07 – $-0.071
2024 Q131M-2M-9M$-0.03$-0.03 – $-0.031
2024 Q226M-20M-30M$-0.09$-0.09 – $-0.091
2024 Q329M6M-4M$-0.01$-0.03 – $-0.012
2024 Q431M4M-2M$-0.01$-0.01 – $-0.011
2025 Q232M4M-4M$-0.01$-0.01 – $-0.011
2025 Q334M-0M-6M$-0.02$-0.02 – $-0.021
2025 Q448M19M9M$0.03$0.02 – $0.031
2026 Q171M39M25M$0.07$0.07 – $0.072
2026 Q250M17M7M$0.02$0.02 – $0.021
2026 Q360M20M8M$0.03$0.03 – $0.034
2026 Q459M20M9M$0.03$0.03 – $0.031
2027 Q180M37M22M$0.07$0.07 – $0.071
2027 Q293M45M27M$0.08$0.08 – $0.081
2027 Q3114M55M34M$0.10$0.10 – $0.101
2027 Q4121M58M36M$0.10$0.10 – $0.101
2028 Q1129M70M44M$0.13$0.13 – $0.131
2028 Q2133M71M44M$0.13$0.13 – $0.131
2028 Q3137M77M47M$0.14$0.14 – $0.141
2028 Q4141M78M47M$0.14$0.14 – $0.141
v2 analysis (legacy, 2026-08-18) — for comparison onlyclick to expand

Thesis

USAS has undergone a potentially important operating inflection. Cosalá is now benefiting from the EC120 zone, with better grades, recoveries and copper byproduct credits, while Galena’s shaft upgrade removes a major historical bottleneck. The settlement of the remaining metal-linked obligations also improves future cash-flow exposure to silver prices and reduces debt service, though it came with dilution. The core issue is that the operating improvement has not yet translated into durable free cash flow. TTM adjusted EBITDA and OCF are positive, but capex remains extraordinarily high and reported EBITDA, net income and cumulative FCF have been deeply negative. Q2 itself was profitable on an adjusted basis but weaker sequentially, and management still expects substantial second-half capital spending. This is a high-upside, high-uncertainty mining turnaround rather than a proven compounder. The base case assumes the operational changes work but that capital intensity and dilution prevent the company from immediately earning a premium-growth valuation. The bull case requires both sustained metal prices and successful execution at Galena; the bear case remains meaningful because a mine ramp can fail even when the geology is attractive.

Trade Signal

Trade rating
-7.8/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-18 · saw $4.95-54.9% since

Short: USAS has real mine-level improvement, but a $1.7B market cap prices in an unproven bull case despite negative free cash flow, extreme dilution and fair value near $285M.

Temporary mispricing-6.0

USAS rose from roughly $0.75 at the end of 2024 to $5.11 by December 2025 and $7.53 in February 2026, driven by the precious-metals rally, improving production expectations, Cosalá’s EC120 transition, Galena shaft-upgrade optimism and antimony optionality. It then fell to $5.38 by late March and about $4.81 by June as the market digested execution, funding and dilution concerns, before rebounding to $5.24 around the August 14 earnings release and slipping to $4.99 by August 18. The latest earnings reaction was essentially flat (-1%), indicating the market had already priced in the positive quarter. Against the facts, the earlier multi-year repricing overshot the demonstrated cash-flow improvement; the recent decline was a partial correction, not a full reset. The remaining gap looks more like a durable overvaluation than a temporary dislocation, although high volatility can produce sharp countertrend rallies.

Market view+7.0

The market is constructive to euphoric on the operating story: analyst targets average $7.33 with unanimous Buy ratings, retail participation is elevated, and call open interest is much larger than put open interest. Bulls point to silver at high prices, Cosalá’s high grades, Galena’s shaft modernization, antimony optionality and the removal of streaming obligations. Bears point to negative cumulative free cash flow, high capex, uncertain grade durability, execution risk and repeated dilution. The prevailing bullish view appears stale or incomplete because it extrapolates operational progress without assigning enough weight to capital intensity and shareholder dilution. Short interest has risen to 4.8% but is not yet evidence of a crowded short.

Inflectionwindow ~3mo-2.0

There is a real operational inflection at Cosalá and Galena: EC120 grades and recoveries have improved, and the shaft upgrade should enable higher-throughput long-hole mining. But the evidence is already widely visible in the bullish analyst consensus, the 160% one-year share-price gain, the high revenue growth and the stock’s still-extreme valuation. More importantly, the latest quarter still showed a net loss and only modest adjusted EBITDA relative to the capital burden. The study’s $35M base and $70M bull owner-earnings outcomes are several steps beyond what has been proven, while external estimates are inconsistent and do not establish a credible near-term earnings ramp. The next inflection is therefore more likely to be a cash-flow validation test than an unexpected positive surprise.

Catalysts
  • ▼November 2026 · Q3 2026 production and earnings print — The first meaningful test of whether Cosalá grades/recoveries and Galena’s shaft and long-hole ramp convert into cash flow; misses or renewed capex pressure could reset the stock lower.
  • ▲Late 2026 · Relief Canyon external study release — A credible resource and mine-plan study could add asset value, although the stock already embeds aggressive optionality and the project may require substantial capital.
  • ▲Q4 2026–2027 · Updated Cosalá mine plan incorporating high-grade drilling — Including the San Rafael Upper and 120-zone results could support higher production and reserve assumptions, but sustainability remains unproven.
  • ▲H2 2026–H1 2027 · Idaho antimony facility financing, permitting or construction milestone — Government funding or a firm construction plan could validate the claimed $50M–$70M value opportunity; funding shortfalls would instead raise dilution risk.
  • ▼Next 6–12 months · Additional equity financing or project funding announcement — Negative owner earnings, heavy development spending and a history of substantial dilution make further share issuance a material downside catalyst.
  • ▼Any monthly/quarterly update through 2027 · Silver-price or operating-cost reset — The current valuation relies on favorable silver economics; weaker prices, normalized grades or higher AISC would expose the gap to fair value quickly.
Flow-7.0

Strongly negative net supply/demand. Trailing dilution is approximately 35%, the metal-obligation settlement itself added 3.3% of shares, and ongoing mine and antimony investment may require more equity. There is no meaningful buyback or tender support. Short interest at 4.8% of float provides some squeeze fuel, but it is too modest to offset the dilution risk; call-heavy options positioning and retail participation may create temporary upward volatility rather than durable demand.

Floor / Ceiling-6.0

The principal support is approximately $89M of cash and $49M of working capital, plus the operating assets and silver exposure; however, this is not a hard floor because the company is cash-burning and may need to fund mine development or the antimony project. The analyst’s bear case is only about $33M of equity value, so asset support is far below today’s price. Above the current price there is a substantial valuation ceiling: realization of the operating story would still leave the stock at a very high multiple of normalized owner earnings, and future capital needs can create dilution on strength.

Buyability

Poor for fundamental long buyers at $4.99: the company has genuine operating assets and silver exposure, but a $1.7B equity value is difficult to justify against negative free cash flow, uncertain mine execution and 35% trailing dilution. Speculative precious-metals and retail momentum buyers may remain the marginal owners, while institutional buyers have little reason to underwrite the current valuation.

Fear vs Greedfear 8/10 (-1.0)greed 8/10 (+2.0)

Fear is stronger than greed at $4.99. The operational improvements are real, but the market is capitalizing a still-unproven transition as though high grades, silver prices and Galena execution will all persist, while the company has not yet demonstrated durable free cash flow and has already diluted shareholders heavily.

Valuation

Our Target
$285M-59%
Market Should Pay
$222M-68%
target ×0.78 (fear discount)
Current Market Cap
$694MSlightly bullish
What Changed
financials release · 2026-08-14
+8%fair value on this information

The genuinely new information in the quarter is that Cosalá’s improved grades, recoveries and copper credits are contributing to a stronger operating profile, while the completed Galena shaft work is supporting higher hoisting capacity. The quarter also showed that the production-to-sales timing gap is expected to reverse in Q3. However, Q2 did not provide new evidence that the company has passed its heavy-capex phase or that Galena can reliably deliver the back-half guidance.

▸ How the cases moved

The quarter modestly raised the base case: base equity value moves from approximately $360M to $383M as Cosalá’s EC120 performance and recovery gains appear more sustainable, while the Galena shaft upgrade is now operational. Bull value rises from roughly $820M to $873M because management still expects 3.2–3.6M ounces and long-hole mining is progressing, but bull probability only rises from 0.18 to 0.20 because Q2 remained capex-heavy and Galena’s second-half production is not yet proven. Bear value is broadly unchanged at $33M; bear probability falls from 0.32 to 0.30, not more, because the quarter did not demonstrate positive full-cycle free cash flow.

2-Year Plausible Outcomes
bear30%
$33M
rev 0%/yrOE $0M

Galena’s mechanization ramp is delayed, grades normalize at Cosalá, silver prices weaken and AISC remains close to or above realized pricing. Heavy sustaining and development capex consumes cash, forcing further equity issuance or a restructuring of project spending. The company remains solvent because of its current cash balance, but owner earnings are negligible.

▸ Valuation

4x $0M owner earnings = $0M equity operating value + $33M net cash = $33M equity value

base50%
$383M
rev +15%/yrOE $35M

Cosalá continues benefiting from EC120 grades, recoveries and copper credits, while Galena gradually converts to long-hole stoping and begins to realize higher throughput. Revenue grows, but the company still carries elevated development and sustaining capital requirements, and mining execution remains uneven. By year two, normalized owner earnings reach approximately $35M and the balance sheet remains modestly net-cash positive.

▸ Valuation

10x $35M owner earnings = $350M equity operating value + $33M net cash = $383M equity value

bull20%
$873M
rev +25%/yrOE $70M

Galena’s shaft modernization, long-hole mining and paste-fill plant materially lower unit costs, while Cosalá sustains its high-grade EC120 performance. Silver and antimony economics remain favorable, the Idaho antimony facility unlocks additional value, and production approaches or exceeds the upper end of guidance. Capital intensity falls sharply after the current buildout, allowing owner earnings to reach $70M annually.

▸ Valuation

12x $70M owner earnings = $840M equity operating value + $33M net cash = $873M equity value

▸ Target Rationale

The probability-weighted discounted scenario value is $300.8M, but I set the analytical target at $285M to reflect execution risk at Galena, the unproven sustainability of Cosalá’s current grades and recoveries, continuing negative free cash flow, and the likelihood of further dilution while the antimony and mine-development projects are funded. The current cash surplus provides meaningful support, so the target is not reduced to the bear-case asset value.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now6/10
Trajectory8/10
Risk8/10
Governance5/10
Insolvency prob (2yr)8%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Restructuring of Balance Sheet and Stream Obligations (June 11, 2026): Americas Gold and Silver successfully closed previously announced agreements to eliminate its remaining metal-linked delivery obligations, significantly strengthening its balance sheet and clearing future cash flows. The company terminated its remaining delivery obligation of 592,000 ounces of silver to Sprott Mining Inc. in exchange for issuing 7,956,696 common shares. Additionally, it settled its legacy gold delivery obligation of 8,861 ounces (originally scheduled through December 2027) with International Royalty Corporation (IRC) in exchange for the immediate delivery of 5,000 ounces of gold and the issuance of 2,652,532 common shares.
  • High-Grade Drill Results at Cosalá Complex (June 1, 2026): The company announced outstanding infill drill results from its ongoing resource conversion program at the San Rafael Upper, 120 Upper, and 120 Lower zones. Assays revealed grades up to five times higher than predicted by the current resource model, with conversion drilling consistently averaging two to three times previously reported inferred grades. Highlight intercepts included 599.8 g/t silver and 0.83% copper over 14.0m.
  • Record Q1 2026 Production and Sales (May 14, 2026): Americas reported record Q1 2026 consolidated silver production of approximately 787,000 ounces (compared to roughly 446,000 ounces in Q1 2025). The growth was driven by higher throughput at the Galena Complex and higher grades at Cosalá Operations. The company also reconfirmed its full-year 2026 silver production guidance of 3.2 million to 3.6 million ounces at an AISC of $30 to $35 per ounce.
  • New Discoveries at the Galena Complex (April 30, 2026): Drilling at the Galena Mine's 4300 Level led to the discovery of the "43L-TJ Vein Complex," identifying six new high-grade silver-copper-antimony veins located within 25 meters of existing mine infrastructure. This represents the company’s fourth major new discovery at Galena in a 12-month span.
▸ Thesis-test Findings
  • US Antimony joint venture Idaho processing facility progress 2026: On February 10, 2026, Americas Gold and Silver announced a definitive joint venture (JV) agreement with United States Antimony (US Antimony), owned 51% by Americas and 49% by US Antimony, to construct and operate an antimony hydrometallurgical processing facility in Idaho's Silver Valley. This represents a major catalyst for the bull case, as it enables Americas to capture full market value for its antimony production (historically sold at steep discounts under existing offtake agreements), which is estimated to unlock $50 to $70 million in value over the next two years. The project timeline is significantly accelerated because the site adjacent to Americas' active mines already possesses major environmental and discharge permits, allowing immediate construction planning. The facility is estimated to cost approximately $50 million and take 18 months to construct, and both JV partners have submitted a white paper to the U.S. federal government seeking funding support.
  • Galena Complex shaft 3 upgrade completion status 2026: Hoisting upgrades at the Galena Complex’s No. 3 Shaft—historically the primary operational bottleneck at the mine—are on schedule and progressing rapidly. Phase 1 upgrades have been completed, and Phase 2 upgrades (which include installing a new braking system to increase skipping speeds) are underway and on track for completion in Q2 2026. Once complete, the upgrade will increase hoisting capacity from 40 short tons per hour (stph) in 2024 to approximately 105 stph (translating to a capacity of 1,350 short tons per day), representing a 150% to 160% increase in throughput. This represents a major positive development for the bull case as it materially de-risks growth and enables the company to handle higher tonnage from its transition to Long Hole Stope mining.
  • Cosala EC120 silver copper mine production grades 2026: Americas officially declared commercial production at the high-grade EC120 silver-copper mine at Cosalá effective January 1, 2026, marking a transition away from the lower-grade San Rafael zinc-lead-silver deposit. This transition is a highly positive bull-case element, driving a 174% increase in Cosalá's silver production during Q1 2026 due to vastly superior grades and recoveries. Infill drilling results published on June 1, 2026, further solidified this thesis, showing silver grades averaging 2 to 3 times (and in some areas up to 5 times) higher than the current resource model across the San Rafael Upper and 120 zones. Notable intercepts include SR568 yielding 599.8 g/t silver and 0.83% copper over 14.0m, and hole 120-25-G95 in the 120 Lower zone returning 342.9 g/t silver and 0.85% copper over 45.0m. These higher-grade zones are located adjacent to active mine workings and are being incorporated into an optimized mine plan for H2 2026, indicating strong near-term grade and production upside.