USEG
U.S. Energy Corp.v3 3.8/10 · 2026-11-26U.S. Energy Corp. operates as an independent energy enterprise, primarily engaged in the procurement, exploration, and development of crude oil and natural gas reserves across the contiguous United States. The company holds strategic interests in hydrocarbon assets situated in key production areas, including North Dakota's Williston Basin, New Mexico's Permian Basin, and various regions within Texas. According to data from December 31, 2021, U.S. Energy Corp. possessed estimated proved reserves totaling 1,344,626 barrels of oil equivalent. Its operational footprint also included oil and natural gas leases encompassing 89,846 gross acres and 5,757 net acres, complemented by 146 gross producing wells. Established in 1966, the firm's corporate base is located in Houston, Texas.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
Big Sky Industrial (formerly U.S. Energy Corp; now trades as BSIN, last close $0.894 on 2026-11-25, down about 32% since the Q3 print at $1.31 on Nov 10; the pack's $1.245 quote is stale) is a $47M micro-cap that has sold off most of its old oil wells to build one small helium-plus-CO2 plant in Montana. The plant is due to start in spring 2027. It sells all its helium (about 14 MMcf a year at $285/Mcf, roughly $4M of revenue) to an investment-grade buyer under a five-year take-or-pay contract, and it would earn about $10.6M a year of transferable 45Q carbon credits once the EPA approves its MRV plan. That approval was filed in October 2025 and is still pending. Management's pitch is that a contracted industrial-gas and carbon business should trade at 8-17x EBITDA, not at an E&P's 3x. The pitch also has real problems. Cash was $2.9M at September 30, against a 10-Q-stated remaining capital program of $28-32M and only $14.4M of liquidity. About $8.8M a year of corporate cost (including about $2.4M of SBC) eats most of what Phase 1 earns. A 29% ELOC (15.3M shares) sits ready if the 45Q sale or the bigger debt facility slips. Even on generous Phase 1 numbers (about $6-7M of unlevered FCF a year from 2028 for the 12-year credit life), my DCF gives about $0.42 a share after debt and well-plugging liabilities. Phase 2 (a plant 2-3x the size, not yet funded or sanctioned) is the only route to the price, and that route probably runs through more dilution. Rating 3.8: a speculative development story priced above its contracted base, but not a clean short, because the float is illiquid and binary catalysts (MRV approval, a 45Q monetization deal) could spike it. Setup 3.0: no variant view the market is missing; the post-Q3 drop already reflects the funding gap.
Flow: Net seller overhang. A Roth committed equity facility (ELOC) still has up to 15.3M shares (~29% of the 52.6M outstanding, ≤$15.9M) available, and the Exchange Cap was removed in May 2026. It has been idle since Q1 2026 (8.5M shares sold then), but a $28-32M remaining capital program against $14.4M of liquidity at 9/30 makes its use likely in Q1 2027 if the new debt facility or the 45Q monetization slips. No buyback (the credit facility restricts it); insiders own ~26% and are not selling.
A deep dive would have to establish: Can Phase 1 be finished and the 45Q credits approved and monetized without a large equity raise near $0.9, and is the corporate cost base small enough that Phase 1 leaves real free cash flow for owners?
Research (expand)
What it does. Formerly U.S. Energy Corp, renamed Big Sky Industrial in June 2026. It holds the Cut Bank oil field in Montana (about 333 BOE/d, 76% oil, roughly $7.5M of revenue a year, low decline) plus the Kevin Dome / Big Sky Carbon Hub: gas that is about 85% CO2, 5% methane and 0.4% helium (Ryder Scott: 1.3 Bcf of helium, 444 Bcf of CO2, both contingent). Phase 1 is a modular plant with 8 MMcf/d of inlet capacity, built under a fixed-scope EPC contract with CANUSA. It is due to produce more than 14 MMcf a year of helium and about 125k t a year of CO2, which will be injected at Big Rose (Class II wells already permitted). First production is targeted for spring 2027, slipped from the Q1 2027 'commercial operations' target.
What the market thinks. It sees a cash-short micro-cap whose value is a story of 'multiple arbitrage'. Cash was $2.9M at Q3. The 10-Q says the remaining near-term capital program is $28-32M, against $14.4M of liquidity; another $2.5M of the credit facility was drawn after the quarter. The EPA MRV approval, which gates the 45Q credits that are about 70% of Phase 1 margin, is 13+ months in. The stock fell from $1.31 to $0.89 after Q3. I don't think the market is wrong here.
Earnings today. Negative. Adjusted EBITDA is about -$0.8M a quarter; with roughly $0.6M a quarter of SBC, owner earnings are about -$4.5M a year. Nine-month operating cash flow was -$4.8M and industrial-gas capex $15.2M.
Phase 1 steady state (2028). Oil contributes about $3-3.5M after LOE. Helium is $4.1M less about $1.5-2M of plant opex (self-generated power). 45Q is about $10.6M gross, around $9.5-10M if sold under transfer. Against that, corporate cost is about $8.8M including SBC, and maintenance capex about $1.5M. That leaves roughly $6M of unlevered FCF. Management's '3.8-4.8x 2027E EBITDA' implies about $15M+ of EBITDA, which I can't reconcile without merchant CO2 or EOR uplift.
Projected unlevered FCF ($M): 2027 about -13 (finishing capex, a partial year, 45Q timing); 2028 +6; 2029 +6.5; 2030 +6.5 (the helium price redetermination is a two-way risk); 2031 +6.5.
Year-5 business. A small single-asset carbon-credit annuity, with no growth unless Phase 2 is built, roughly a 'neither' case. 45Q runs about 12 years from start-up, so the terminal value is roughly 8 more years of about $6.5M (≈$35M) plus about $15M of Phase 2 option value. Discounted at 10%, the cash flows are worth about $37M. Less about $9.5M of net debt and about $5M (present value) of the $7.5M ARO, equity is about $22M, or $0.42 a share. If management's EBITDA case is right and Phase 2 gets funded cheaply, the value is $1.5+. If MRV fails or slips badly and the ELOC is used at $0.8, it is near $0.05-0.2.
Multiples. EV is about $57M (about $64M with the ARO), roughly 6-7x my 2028 EBITDA, for a 12-year declining credit stream plus a 5-year helium contract. That is not cheap for what is contracted.
Management and risks. CEO Ryan Smith is promotional: he leans on peer multiples and calls 2026 the 'breakout year'. The ELOC was 'suspended' in May, yet 15.3M shares remain available and the Exchange Cap was removed. Covenant testing resumes in March 2027. There was a $1.2M produced-fluid spill (an insurance claim is not booked). Other risks: helium price redetermination after the 2025-26 helium price swings, 45Q policy risk, and Montana winter commissioning. Positives: the take-or-pay buyer, DOE's critical-material designation for helium (Oct 23), the plant's simple and proven technology, and insiders owning about 26%.
Investor sentiment: 3/10. Down about 60% from the Jan-2025 high, down 32% since Q3, near the bottom of its 3-year range. Only Zacks (sponsored, $3.50) and Johnson Rice ($2) cover it.
- Context pack /Users/gregwo/stocks2/data/analysisv3/context/USEG.md (Q3 2026 call transcript, 10-Q forensic findings)
- https://www.sec.gov/Archives/edgar/data/101594/000143774926036207/bsin20260930_10q.htm
- https://finviz.com/news/420635/big-sky-industrial-inc-reports-third-quarter-2026-results-and-highlights-phase-1-construction-progress-at-big-sky-carbon-hub
- https://stockanalysis.com/stocks/bsin/
- https://s27.q4cdn.com/906368049/files/News/2026/Zacks_SCR_Research_08182026_BSIN_Kerr.pdf
- https://quartr.com/events/big-sky-industrial-inc-bsin-investor-presentation_oSLFZE20
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 7.09-30% | 7.35-64% | 20.6-35% | 31.9-24% | 42.1 |
| Gross profit | -0.14 | -2.08 | -0.28-104% | 6.22-72% | 22.4 |
| Operating expenses | 7.07-68% | 11.4-55% | 25.5-38% | 41.3+119% | 18.9 |
| ▸Adj EBITDA | -4.77 | -9.73 | -17.3 | -3.49-126% | 13.2 |
| ▸Adj OCF | -5.90 | -6.76-642% | 1.25+34% | 0.93-87% | 6.93 |
| CapEx | -21.2 | -12.1 | -5.49 | -3.87 | -30.5 |
| Adj FCF | -27.1 | -18.8 | -4.24 | -2.94 | -23.6 |
| Interest expense | 0.01 | 0.21 | 0.53 | 1.11 | 0.55 |
| ▸Adj net income | -10.8 | -13.7 | -26.3 | -35.3-822% | 4.89 |
| ▸Owner's earnings | -15.0 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -24.0 | -3.79 | -10.4 | -16.8 | -0.56 | 7.57100% |
| FCF (OCF−capex) | -62.0 | -23.8 | -19.2 | -0.90 | 1.60 | -19.6-259% |
| Net income | -82.4 | -8.96 | -14.4 | -25.8 | -32.4 | -0.96-13% |
| ▸Capital returned | 9.40 | 11.2 | -12.3 | 6.38 | 10.3 | -6.16-81% |
| Buybacks | 8.16 | 17.2 | -9.99 | 0.79 | 0.37 | -0.20 |
| Dividends | 2.93 | 0.00 | 0.00 | 0.00 | 1.19 | 1.74 |
| Interest paid | 2.34 | 0.05 | 0.21 | 0.53 | 1.11 | 0.55 |
| Debt paid down | -4.03 | -6.00 | -2.50 | 5.06 | 7.65 | -8.24 |
| ▸Reinvestment | 65.5 | 19.0 | 12.0 | -0.33 | 3.68 | 31.3414% |
| Capex (PP&E) | 70.9 | 19.0 | 12.1 | 5.49 | 3.87 | 30.5 |
| Intangibles & M&A | -4.86 | 0.00 | 0.00 | -5.64 | 0.00 | 0.78 |
| Leases signed (net Δ) | -0.52 | -- | -0.10 | -0.18 | -0.19 | -- |
| Retained / other | -64.2 | -35.0 | -6.73 | -1.11 | -7.60 | -13.7-181% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 8.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 62.5 | 40.6 | 49.7 | 80.4 | 118 |
| ▸Liabilities (total) | 28.3 | 16.4 | 25.8 | 33.9 | 40.0 |
| Net debt (incl. leases) | -2.97 | 2.34 | -7.24 | 2.28 | 8.46 |
| Net debt / Adj EBITDA | -- | -- | -- | -- | 0.64 |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -- | -47.0 | -32.7 | -3.13 | 24.1 |
| Shares outstanding | 52.5 | 34.4 | 27.9 | 25.3 | -- |
| Dilution (YoY) | +54.3% | +23.3% | +10.1% | +1.3% | +430.0% |
| Employees | 20.0 | 20.0 | 20.0 | 37.0 | 39.0 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | -2.0%+13.1 | -28.3%-26.9 | -1.3%-20.9 | 19.5%-33.7 | 53.2% |
| Adj EBITDA margin | -67.3%+115.2 | -132.3%-48.3 | -84.0%-73.1 | -10.9%-42.2 | 31.3% |
| Adj OCF margin | -83.2%-29.8 | -91.9%-98.0 | 6.0%+3.1 | 2.9%-13.6 | 16.5% |
| Adj FCF margin | -382.8%-209.7 | -256.1%-235.6 | -20.6%-11.3 | -9.2%+46.8 | -56.0% |
| Net income margin | -152.7%+88.2 | -195.5%-70.4 | -125.0%-23.5 | -101.5%-99.3 | -2.3% |
| Adj NI margin | -152.8%+83.4 | -186.6%-59.1 | -127.5%-16.8 | -110.7%-122.3 | 11.6% |
| ROIC (adj, after-tax) | -16.7% | -39.4% | -83.2% | -52.9% | 3.1% |
| Cost of debt | 0.5% | -- | 14.4% | 10.0% | 6.0% |
Revenue Breakdown
Revenue Segments
| Natural Gas, Midstream | $0.2M | -46% |
| Rockies | $1.4M | -4% |
| Mid-Continent | $0.2M | -54% |
Earnings Calls
Earnings Call · 2026 Q3
Big Sky Industrial reported third quarter 2026 results and said the quarter was about execution on Phase 1 of its helium and carbon management project in Montana. CEO Ryan Smith said the field side of Phase 1 is complete: infield gathering and injection lines are built, production wells are drilled and ready to tie in, and Class II injection wells are operational. Long-lead equipment, including company-owned power generation, has been bought and is on site. Fabrication of the modular processing plant is underway with the EPC partner, on-site civil work starts in coming weeks, and equipment installation runs from late Q4 into Q1. First production is targeted for spring 2027. Initial design capacity is more than 14 million cubic feet of helium and about 125,000 metric tons of CO2 captured per year. On the Big Rose MRV plan, submitted October 9, 2025 and accepted by the EPA November 12 after the government shutdown, the company has addressed EPA comments and awaits final action. Management noted comparable approvals typically take 12 months or longer and said the approval is not a condition to starting the plant or selling helium; it only affects the timing of 45Q credit monetization. A second plan for Cut Bank, submitted December 17, 2025, is progressing. Commercially, helium is sold under a 5-year, 100% take-or-pay contract with an investment-grade buyer: 1.2 MMcf per month at a fixed $285/Mcf plant-gate price, with CPI escalation from March 2028 and a year-3 price redetermination. The DOE designated helium a critical material on October 23. CFO Mark Zajac reported revenue of $2.0 million, up 12%, as a 30% higher realized price of $63.83/BOE offset lower volumes after the 2025 divestiture. Production was 30,628 BOE, 76% oil. Lease operating expense was $2.1 million, including about $1.2 million of remediation costs for a gathering-line release; the company expects to recover up to $1 million under its liability policy, but no receivable is booked. Excluding remediation, LOE was $29.71/BOE, flat year over year. Cash G&A was $1.6 million. Adjusted EBITDA was negative $0.8 million versus negative $1.3 million a year ago, and net loss was $3.5 million, or $0.07 per share. Cash was $2.9 million and total liquidity $14.4 million, including $11.5 million undrawn on a $20 million borrowing-base facility with no covenant testing through March 2027 and May 2029 maturity. The company is pursuing a larger senior credit facility and monetization of Phase 1 45Q credits. Smith said engineering for a larger Phase 2 on the same footprint is underway, with acreage supporting 2 to 3x Phase 1 capacity and a final investment decision expected in coming months after financing and sizing. He argued the company should re-rate from small-cap E&P multiples toward midstream and industrial gas peers once operating. In Q&A, he described the EPA process as steadily lighter comment rounds, with the last around Labor Day, and said remaining spend is about two quarters, with added power generation capex.
▸How many rounds of EPA comments have you responded to on the MRV plan, and when was the last round received?Charles Meade · Johnson Rice
▸What items are on the critical path to plant startup that management and the Board are most focused on?Charles Meade · Johnson Rice
▸Has the industrial gas build-out CapEx (about $15 million for 2026) changed, and what is the maintenance CapEx once built?Thomas Kerr · Zacks SCR
▸Can you give more color on 45Q monetization talks: who the counterparties are and how much of the $130 million is involved?Thomas Kerr · Zacks SCR
SEC Filing Findings
SEC Filing — material findings
2026-11-10 · depth 9/10risk 6Dilution▸Committed equity facility with Roth Principal: Exchange Cap removed by shareholder approval May 2026; remaining availability up to $15.9M / 15.3M shares at a 2.5% discount, plus stock commitment fee shares; ELOC drawn heavily in Q1 2026 (8.5M shares).
Committed equity facility with Roth Principal: Exchange Cap removed by shareholder approval May 2026; remaining availability up to $15.9M / 15.3M shares at a 2.5% discount, plus stock commitment fee shares; ELOC drawn heavily in Q1 2026 (8.5M shares).
risk 6Liquidity/Covenants▸Cash of $2.9M at quarter end against $28-32M remaining 2026 capital program; subsequent $2.5M additional credit facility borrowing; $8.5M drawn with covenant testing suspended only through March 2027; credit facility is collateralized by substantially all assets and restricts dividends, buybacks, and debt incurrence.
Cash of $2.9M at quarter end against $28-32M remaining 2026 capital program; subsequent $2.5M additional credit facility borrowing; $8.5M drawn with covenant testing suspended only through March 2027; credit facility is collateralized by substantially all assets and restricts dividends, buybacks, and debt incurrence.
Short Interest
Executive Compensation (2023.0-2025.0)
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| Empery Asset Management, LP | $1.7M | $0.88 | +$1.7M | +$1.7M | — | $83.0M |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $496K | $0.88 | +$496K | +$496K | — | $4.04T |
| UBS Group AG | $426K | $0.95 | +$265K | +$424K | +0.0% | $562.11B |
| Vontobel Holding Ltd. | $303K | $0.88 | +$301K | +$303K | -0.6% | $29.07B |
| HighTower Advisors, LLC | $265K | $0.88 | +$265K | +$265K | — | $93.93B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $198K | $1.37 | +$55K | +$45K | -0.1% | $1.61T |
| PEAK6 LLC | $177K | $0.88 | +$177K | +$177K | — | $3.46B |
| STATE STREET CORPPassive | $110K | $1.77 | +$68K | +$82K | -0.2% | $2.89T |
| Virtu Financial LLCMM | $99K | $1.81 | +$79K | +$87K | — | $2.41B |
| THOMPSON DAVIS & CO., INC. | $71K | $1.09 | +$42K | +$71K | +0.9% | $150M |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 1997 Q4 | 13M | -8M | -9M | $-11.88 | $-14.26 – $-9.50 | 7 |
| 2009 Q2 | 0M | -3M | -4M | $-3.02 | $-3.63 – $-2.42 | 12 |
| 2009 Q3 | 1M | -0M | -1M | $-1.32 | $-1.58 – $-1.06 | 13 |
| 2010 Q1 | 0M | — | 25M | $2.43 | $1.94 – $2.92 | 15 |
| 2010 Q2 | 13M | 3M | -0M | $3.14 | $2.51 – $3.77 | 17 |
| 2010 Q3 | 15M | 3M | -1M | $3.13 | $2.51 – $3.76 | 14 |
| 2011 Q1 | 3M | 2M | -1M | $-0.86 | $-1.03 – $-0.68 | 19 |
| 2011 Q2 | 7M | 3M | -0M | $-0.85 | $-1.02 – $-0.68 | 19 |
| 2011 Q3 | 21M | 5M | 1M | $-4.04 | $-4.85 – $-3.23 | 19 |
| 2012 Q1 | 6M | 3M | -1M | $1.26 | $1.01 – $1.51 | 11 |
| 2012 Q2 | 6M | 1M | -3M | $5.40 | $4.32 – $6.48 | 18 |
| 2012 Q3 | 4M | 1M | -2M | $0.33 | $0.26 – $0.40 | 17 |
| 2013 Q1 | 2M | -35M | -38M | $15.66 | $12.53 – $18.79 | 13 |
| 2013 Q3 | 10M | 1M | -2M | $5.22 | $4.18 – $6.26 | 10 |
| 2014 Q1 | 25M | 4M | 0M | $2.70 | $2.16 – $3.24 | 17 |
| 2014 Q2 | 16M | 4M | 0M | $2.05 | $1.64 – $2.46 | 19 |
| 2014 Q3 | 20M | 5M | -0M | $3.24 | $2.59 – $3.89 | 7 |
| 2015 Q1 | 2M | -7M | -10M | $-2.64 | $-3.17 – $-2.11 | 7 |
| 2015 Q2 | 3M | -3M | -5M | $-4.20 | $-5.04 – $-3.36 | 20 |
| 2015 Q3 | 19M | 2M | -0M | $3.03 | $2.42 – $3.64 | 17 |
| 2015 Q4 | 16M | -10M | -11M | $-15.03 | $-18.04 – $-12.02 | 19 |
| 2016 Q1 | 2M | -9M | -10M | $-2.47 | $-2.96 – $-1.97 | 16 |
| 2016 Q2 | 3M | -4M | -5M | $-3.93 | $-4.71 – $-3.14 | 15 |
| 2016 Q3 | 17M | 1M | -0M | $2.83 | $2.26 – $3.40 | 16 |
| 2016 Q4 | 18M | -12M | -12M | $-16.53 | $-19.84 – $-13.22 | 20 |
| 2017 Q1 | 1M | -9M | -9M | $-2.30 | $-2.77 – $-1.84 | 12 |
| 2017 Q2 | 2M | -4M | -4M | $-3.67 | $-4.40 – $-2.94 | 19 |
| 2017 Q3 | 16M | 0M | -0M | $2.65 | $2.11 – $3.18 | 12 |
| 2017 Q4 | 20M | -13M | -14M | $-18.18 | $-21.82 – $-14.54 | 14 |
| 2018 Q1 | 1M | -8M | -9M | $-2.16 | $-2.59 – $-1.72 | 20 |
| 2018 Q2 | 2M | -4M | -4M | $-3.43 | $-4.11 – $-2.75 | 20 |
| 2018 Q3 | 15M | 0M | -0M | $2.47 | $1.97 – $2.97 | 18 |
| 2018 Q4 | 22M | -15M | -15M | $-20.00 | $-24.00 – $-15.99 | 14 |
| 2019 Q1 | 1M | -8M | -8M | $-2.01 | $-2.42 – $-1.61 | 17 |
| 2019 Q2 | 2M | -3M | -4M | $-3.21 | $-3.84 – $-2.57 | 18 |
| 2019 Q3 | 14M | 0M | -0M | $2.31 | $1.84 – $2.78 | 15 |
| 2019 Q4 | 20M | -14M | -14M | $-18.70 | $-22.44 – $-14.95 | 13 |
| 2020 Q1 | 1M | -7M | -7M | $-1.88 | $-2.26 – $-1.51 | 12 |
| 2020 Q2 | 2M | -3M | -3M | $-3.00 | $-3.59 – $-2.40 | 14 |
| 2020 Q3 | 13M | 0M | -0M | $2.16 | $1.72 – $2.60 | 13 |
| 2020 Q4 | 19M | -13M | -13M | $-17.48 | $-20.98 – $-13.98 | 17 |
| 2021 Q1 | 1M | -7M | -7M | $-1.76 | $-2.11 – $-1.41 | 15 |
| 2021 Q2 | 2M | -3M | -3M | $1.01 | $1.01 – $1.01 | 6 |
| 2021 Q3 | 12M | 0M | -0M | $1.25 | $1.25 – $1.25 | 6 |
| 2021 Q4 | 18M | -12M | -12M | $0.05 | $0.05 – $0.05 | 6 |
| 2022 Q1 | 1M | -5M | -7M | $0.14 | $0.14 – $0.14 | 7 |
| 2022 Q2 | 2M | -0M | -3M | $0.15 | $0.15 – $0.15 | 7 |
| 2022 Q3 | 12M | 3M | -0M | $1.27 | $1.27 – $1.27 | 1 |
| 2022 Q4 | 12M | -9M | -11M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2023 Q1 | 9M | -3M | -6M | $-0.02 | $-0.02 – $-0.02 | 1 |
| 2023 Q2 | 7M | 0M | -3M | $-0.09 | $-0.09 – $-0.09 | 1 |
| 2023 Q3 | 9M | 3M | -0M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2023 Q4 | 9M | 13M | -11M | $-0.02 | $-0.02 – $-0.02 | 1 |
| 2024 Q1 | 7M | -3M | -6M | $-0.09 | $-0.09 – $-0.09 | 1 |
| 2024 Q2 | 6M | -1M | -3M | $-0.08 | $-0.08 – $-0.08 | 1 |
| 2024 Q3 | 5M | -1M | -3M | $-0.05 | $-0.07 – $-0.05 | 2 |
| 2024 Q4 | 5M | -2M | -4M | $-0.08 | $-0.08 – $-0.08 | 1 |
| 2025 Q1 | 3M | -0M | -2M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2025 Q2 | 3M | -2M | -3M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2025 Q3 | 2M | -2M | -3M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2025 Q4 | 2M | -1M | -2M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q1 | 2M | -1M | -2M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q2 | 2M | -1M | -2M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q3 | 2M | -2M | -2M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2026 Q4 | 2M | -2M | -2M | $-0.04 | $-0.04 – $-0.04 | 1 |
| 2027 Q1 | 1M | -1M | -2M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2027 Q2 | 1M | -1M | -2M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2027 Q3 | 1M | -1M | -2M | $-0.03 | $-0.03 – $-0.03 | 1 |
| 2027 Q4 | 1M | -1M | -2M | $-0.03 | $-0.03 – $-0.03 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-03-31 | BUY | Smith Ryan Lewis | director, officer: CEO | 15,000 | $0.87 | $13K | $973K |
| 2026-03-03 | SELL | Batchelor Joshua Lane | 10 percent owner, other: Member of 10% owner group | 265,170 | $1.37 | $363K | $107K |
| 2026-03-02 | SELL | Batchelor Joshua Lane | 10 percent owner, other: Member of 10% owner group | 434,830 | $1.25 | $544K | $106K |
v2 analysis (legacy, 2026-07-04) — for comparison onlyclick to expand
Thesis
USEG (soon Big Sky Industrial) has abandoned its legacy Texas E&P business (divested for $12.8M in 2024) and is now a single-asset, pre-revenue transformation story built around the Kevin Dome/Big Sky Carbon Hub in Montana — a helium/CO2 resource that is not hydrocarbon-tied. This quarter delivered real de-risking: FID on the Phase 1 processing facility, a fixed-scope EPC contract with CANUSA, a five-year 100% take-or-pay helium offtake at $285/Mcf with an investment-grade counterparty, and an expanded $20M credit facility with covenant testing suspended through March 2027. Management claims the Phase 1 capital stack is fully funded, with commercial helium sales targeted for Q1 2027 and ~$130M of Section 45Q carbon credits over 12 years as a structural tailwind. The offset is severe: shares outstanding jumped 52% in a single quarter, the balance sheet still shows a genuine, worsening operating cash burn (-$21M TTM adj FCF), and related parties (Chairman-controlled Synergy) retain a carried 20% interest plus 18% of future carbon cash flows and any plant sale gain — meaningful value leakage baked into the structure. This is a binary, execution- and permit-dependent story: if the plant comes online on schedule and EPA MRV approval lands, USEG converts from a cash-incinerating legacy E&P shell into a high-margin, tax-credit-levered industrial gas platform; if timelines slip or geology disappoints (helium concentrations already trended down from initial estimates), more dilution and burn await.
Trade Signal
Buy: the analyst's ~$105M fair value (vs $58M market cap) is anchored on real, signed de-risking events (take-or-pay offtake, fixed-price EPC, covenant relief) that the market hasn't fully re-rated for, with a concrete Q1 2027 catalyst and heavy short interest adding squeeze upside, tempered by real dilution/governance risk that caps conviction below a strong-buy.
Stock drifted with broader small-cap energy/momentum flows through April (dipped to 0.69 on macro/tape weakness), then rallied hard (+32% 3m) on the concrete de-risking news: FID on Phase 1, CANUSA fixed-scope EPC, the take-or-pay helium offtake at $285/Mcf, and the expanded/covenant-relaxed credit facility, culminating in the June rebrand to Big Sky Industrial. The post-earnings reaction (1.01→1.13, +12%) captured some of this but the stock has since round-tripped in a 1.00-1.13 band — the market has priced in the de-risking events but is not yet pricing the 2027 commercial ramp or the optionality in Phase 2/merchant CO2. This looks like a partial, incomplete re-rating rather than an overshoot or a miss.
Consensus is thin but constructive — 3 buy/2 hold analyst ratings, heavy retail order flow (~70%) trading a name that's essentially become a helium/carbon-transformation story stock. Short interest exploded from ~5-9% to 25-40% of float during March-May 2026 (likely dilution/cash-burn skeptics and merger-arb-style shorts betting on further equity raises), which is a big, unusual positioning signal. Insider activity is mixed: small CEO buys, but the Chairman-linked Batchelor sold steadily into strength earlier in the year. The market view is split between believers in the helium/45Q pivot story (bulls) and skeptics focused on the 52% TTM dilution, going-concern-level cash burn, and related-party carried interests skimming future cash flows to Synergy (bears). It's a levered, controversial small-cap trading mostly on story and technical/short dynamics rather than fundamentals.
The business is genuinely inflecting from a cash-burning legacy E&P shell into a contracted, take-or-pay helium/carbon-credit platform — commercial helium sales are guided for Q1 2027, a hard near-term catalyst window. Analyst consensus estimates (revenue ~$1-1.8M/quarter through 2027, EBITDA still -$0.5 to -0.9M) do NOT reflect the analyst study's base case of $28-32M revenue and ~$12M EBITDA by year two — the sell-side numbers look stale/not yet updated for the offtake economics. If Phase 1 executes and EPA MRV approvals land as guided in summer/fall 2026, this is a real, large, market-unanticipated step-up in profitability profile — but it is still ~9-12 months from being visible in numbers, and execution/regulatory risk is high (insolvency_prob_2yr scored 10/10 by the analyst, which is a major red flag).
- ▲summer/fall 2026 · EPA MRV approval (Big Rose & Cut Bank) — Required to unlock 45Q tax credits; delay/denial is the single biggest downside risk
- •summer 2026 · Gathering pipeline installation (~10 miles) — Execution proof point on fixed-scope CANUSA EPC contract
- ▲late 2026 · Facility commissioning — Final pre-revenue milestone before helium sales start
- ▲2027-Q1 · Q1 2027 commercial helium sales start — First real revenue under $285/Mcf take-or-pay contract — the re-rating catalyst
- ▼2027-03-31 · Covenant testing resumes — If capital program still short, covenant relief expiring could force another raise
- ▼H2 2026 · Potential further dilutive capital raise — Capital program runs $28-32M against limited current liquidity despite 'fully funded' claims
- •2026-08 / 2026-11 · Q2/Q3 2026 earnings — Watch cash burn, construction progress updates, any change to Q1 2027 timeline
ELOC suspended and equity/debt stack claimed 'fully funded' for Phase 1, which removes near-term overhang somewhat, but the company diluted ~52-54% TTM already and has essentially no organic cash flow (owner earnings -15M) — further raises are plausible if the $28-32M capital program runs over versus current liquidity (~$27.9M). SBC/related-party carry structure (20% of Kevin Dome costs funded by USEG, 18% of future cash flows to Chairman-controlled Synergy) is a permanent drag. Short interest at 25.6% of float with only 3 days to cover creates squeeze potential on good news, a two-sided flow dynamic.
No hard asset floor — cash ~$15-28M against ~$20M net debt provides some downside cushion in the bear case (~$40M equity NAV-ish, close to today's price), but there's no committed acquirer or buyback. Above the price, the main ceiling is dilution risk if construction costs overrun or if management taps additional capital before cash flow arrives — a rally could easily trigger another equity raise given the historical pattern (ELOC, March 2026 offering). Net: modest, imperfect floor near current levels but a real dilution ceiling above.
Yes — this is a name retail and small-cap event-driven funds can get excited about: it has a clean, understandable catalyst (Q1 2027 helium offtake revenue), a de-risked EPC/offtake structure, and a rebrand narrative (helium/carbon-management platform vs. legacy E&P) that broadens the buyer base beyond oil bears. The extreme short interest (25-40% of float) also creates squeeze dynamics that attract momentum buyers. The main friction is the small float/liquidity, share-count reliability questions, and governance/dilution overhang that value-conscious buyers will flag.
Greed edges out fear here — the risk/reward skews favorably given the ~45% discount to a fair value built on already-signed contracts (not blue-sky assumptions), a hard 2027 catalyst, and heavy short interest that could accelerate any positive news, though the insolvency-probability flag and dilution history keep this from being a high-conviction max-size bet.
Valuation
The market already knew USEG was pivoting to helium/CO2 and that a plant was planned, but this quarter delivered concrete, contractually-binding milestones that were not previously certain: Final Investment Decision reached, a fixed-scope EPC contract signed with CANUSA (capping cost-overrun risk), a definitive five-year 100% take-or-pay helium offtake at a locked $285/Mcf price with an investment-grade counterparty (first hard revenue contract for the project), and an expanded $20M credit facility with covenant testing suspended through March 2027 — management calls the Phase 1 capital stack 'fully funded.' Offsetting this is the newly reported 52% single-quarter share count increase, which the market had not yet fully seen in filed numbers.
▸ How the cases moved
Bear probability trimmed slightly (0.35→0.30) and bear equity nudged up ($35M→$40M) since financing/covenant risk through March 2027 is now explicitly off the table. Base case equity value raised modestly ($75M→$86M) reflecting the locked-in offtake pricing and lower execution uncertainty on the EPC side; probability raised (0.40→0.45). Bull case equity value raised ($260M→$285M) on confirmation that Phase 2 scaling remains viable and the offtake proves outside buyers will pay $285+/Mcf; probability held near flat (0.25) since Phase 2 remains speculative.
EPA MRV approval slips past 2026, geological helium concentrations underperform further, and/or construction costs overrun despite the fixed-scope EPC contract. Commercial start pushes into late 2027/2028, requiring another dilutive raise. Company survives (liquidity and covenant relief provide runway) but the growth story stalls and the market treats it as a stranded/impaired asset play.
▸ Valuation
NAV-ish: cash ~$15M + partially-built plant/contract option value ~$45M EV, minus ~$20M net debt (facility drawn) = $40M equity
Plant commissions on schedule for Q1 2027, EPA MRV approvals land in 2026 as guided, helium offtake and CO2/45Q credit revenue ramp through 2027 into 2028. By year 2, revenue reaches roughly $28-32M (helium sales, 45Q credits, incremental EOR) at high incremental margins given fixed cost base, generating EBITDA near $12M and modestly positive owner earnings after heavy D&A/capex normalizes.
▸ Valuation
8x $12M EBITDA = $96M EV − $10M net debt = $86M equity
Phase 1 executes cleanly, Phase 2 expansion (double/triple capacity on existing infrastructure) is greenlit, merchant CO2 sales and higher spot helium pricing (vs the $285 contract floor) add incremental revenue, and the market re-rates the name as a scarce domestic, non-hydrocarbon-tied helium/carbon-management platform. Revenue approaches $55-60M with ~45% EBITDA margins by year 2.
▸ Valuation
12x $25M EBITDA = $300M EV − $15M net debt = $285M equity
▸ Target Rationale
Model arithmetic lands near $98M; I nudge slightly higher to ~$105M because the quarter's concrete de-risking events (FID, fixed-price EPC, signed take-or-pay offtake, expanded facility with covenant relief) meaningfully reduce the probability-weighted tail of near-term financing/technical failure versus a purely mechanical blend of prior-quarter assumptions. I do not go higher than that because the 52% single-quarter share dilution and the related-party carried interests (20% of Kevin Dome costs funded by USEG, 18% of future carbon cash flows and plant-sale gains skimmed to Chairman-controlled Synergy) are real, permanent claims on future cash flows that the scenario math doesn't fully capture, and management's 'fully funded' claim should be treated skeptically given the capital program still runs $28-32M against limited current liquidity.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Corporate Rebranding: Effective June 8, 2026, the company officially changed its corporate name from U.S. Energy Corp. to Big Sky Industrial Inc. and its ticker symbol from USEG to BSIN. This name change was implemented to align the company's public identity with its strategic pivot toward helium and carbon management assets at the Kevin Dome Big Sky Carbon Hub in Montana.
- Q1 2026 Financial Results: For the first quarter of 2026, the company reported a net loss of $3.2 million, or $(0.08) per share, on revenues of $1.6 million. Revenues declined from $2.2 million in the prior-year period due to strategic divestitures of legacy oil and gas assets and natural production declines. However, total liquidity improved significantly to $27.9 million as of April 30, 2026, driven by recent capital-raising activities.
- Definitive Helium Offtake Secured: On April 27, 2026, the company announced a highly material, five-year, 100% take-or-pay helium offtake agreement with an unnamed investment-grade global industrial gas company. The contract secures a fixed plant-gate price of $285 per Mcf, with CPI-linked price escalation beginning March 1, 2028, and a pricing redetermination in year three. This contract provides substantial revenue visibility for Phase 1 of the Big Sky project.
- Dilution Overhang Addressed: Concurrently with its expanded debt facility closing in late April 2026, the company formally suspended further use of its existing equity line of credit (ELOC). The ELOC had not been drawn since March 2, 2026, and the suspension directly addresses market dilution concerns.
▸ Thesis-test Findings
- U.S. Energy Corp Big Sky Carbon Hub EPA MRV approval 2026
The company has submitted two Monitoring, Reporting, and Verification (MRV) applications (the Big Rose and Cut Bank fields) to the EPA, which are currently in active regulatory review. Management continues to expect formal EPA approvals during the summer or fall of 2026. These approvals are crucial for the bull case, as they are required to qualify for the Section 45Q federal carbon management tax credits. Phase 1 carbon operations are expected to yield approximately $130 million in Section 45Q tax credit value over the first 12 years of operation. Any unexpected regulatory delays or denials by the EPA represent a major downside risk that could negatively impact project economics.
- Kevin Dome helium project construction updates CANUSA contract
The company reached a Final Investment Decision (FID) in March 2026 to construct the Big Sky Phase 1 processing facility, executing a fixed-scope Engineering, Procurement, and Construction (EPC) contract with CANUSA EPC. Site preparation and team mobilization began immediately in the spring of 2026. Installation of approximately 10 miles of gathering pipelines is scheduled for summer 2026, with facility commissioning targeted for late 2026 and initial commercial operations/helium sales on track for Q1 2027. For the bull case, the fixed-scope structure of the CANUSA contract lowers the risk of cost overruns. Additionally, upstream execution risk is minimized because three producing wells are already online, meaning no new drilling is required to support the initial facility startup.
- USEG credit facility amendment covenants March 2027
On April 20, 2026, the company closed an amendment to its senior secured credit facility with Firstbank Southwest. The amendment doubled the facility's borrowing base to $20 million and fixed the interest margin at 200 basis points over the alternate base rate. Highly supportive of the bull case, the amendment suspended quarterly financial covenant testing through the fiscal quarter ending March 31, 2027. This covenant relief eliminates technical default risk during the capital-intensive construction phase while legacy oil revenues are low. Combined with $8.8 million in gross proceeds from a March 2026 equity offering, the expanded facility completes the Phase 1 capital stack, providing fully funded visibility through the expected Q1 2027 commercial startup.