Stocks/WEC

WEC

WEC Energy Group, Inc.v3 4.5/10 · 2026-11-06
Utilities·Regulated Electric
$119.08
$38.6B market cap
2.4% div yield
v3 Rating
4.5/103.5–5.5
Setup
2.5/101.5–3.5
Fair Value
$108.00$90.00–$126.00-9%
DCF (10%)
$63.00-47%
Base IRR
+9%+4%–+12%
Visibility
clear±17%
Wall Street
$116.42 target(6 analysts last quarter)(10 buy, 21 hold, 4 sell)
Rating
Revenue (TTM)
$10.3B
Owner Earnings
$2.5B
Next-Yr Owner Earnings
-$4.2B
Growth
+12.0% × 8y
P / Next-Yr OE
--
Net Debt
$23.2B

WEC Energy Group, Inc. is a major energy provider operating across the United States, delivering regulated natural gas and electricity, as well as both regulated and non-regulated renewable energy services. The company's operations are divided into six main business segments: Wisconsin, Illinois, Other States, Electric Transmission, Non-Utility Energy Infrastructure, and Corporate and Other. Its electricity generation relies on a diverse portfolio of sources, including coal, natural gas, oil, hydroelectric, wind, solar, and biomass. Beyond power generation, WEC Energy Group also provides electric transmission services, manages retail natural gas distribution, handles natural gas transportation, and is involved in the production, distribution, and sale of steam. As of December 31, 2021, the company's vast infrastructure network included approximately 35,800 miles of overhead electricity distribution lines and 35,600 miles of underground cables. This electrical system was supported by 440 distribution substations and 510,500 line transformers. For natural gas, its network comprised 50,900 miles of distribution mains, 1,200 miles of transmission mains, 2.3 million lateral services, and 500 distribution and transmission gate stations. Furthermore, WEC Energy Group managed 68.2 billion cubic feet of working gas capacity within its underground natural gas storage facilities. The company, founded in 1981, was previously known as Wisconsin Energy Corporation until it officially adopted the name WEC Energy Group, Inc. in June 2015. Its corporate headquarters are located in Milwaukee, Wisconsin.

2-Year Price History

$118.32+27.5%
$90$95$100$105$110$115Initial target $108.00 · 2026-11-06volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-06

Rating
4.53.5–5.5
Setup
2.51.5–3.5
Fair value (USD)
108.0090.00 – 126.00
Upside vs 119.08
-9%
DCF (10%)
63.0030.00 – 98.00-47%
Base IRR
9%4% – 12%
Visibility
clearrange ±17%
Sentiment
7/10
2026-11-06 · · priced at 115.87

WEC Energy is a high-quality, mostly Wisconsin regulated electric and gas utility that has become one of the cleanest data-center winners in the sector: Microsoft (3.2 GW planned in the I-94 corridor) and Oracle/Vantage (1.3 GW at Port Washington, up to 3.5 GW later), plus a new unnamed 400 MW customer, sit behind a new $47.5B 2027-31 capital plan (up $10B), a 13.4% asset-base CAGR and 7-9%+ EPS growth. A tariff that makes the very large customers pay full cost and post collateral protects it. Q3 beat ($1.18 vs $0.83), and 2026 guidance rose to $5.60-5.64. But at the latest close of $115.87 (2026-11-06; the pack's 118.32 was the 11-05 close), near the top of its 3-year range, you pay 20.6x 2026 EPS, about 13.6x EV/EBITDA and about 25x unlevered owner earnings of about $2.45B. Reported free cash flow stays negative through 2031 (about $15B of cumulative unlevered deficit, funded by about $19B of new debt and $5.1-5.5B of new stock), and net debt is already about $23B. So our unlevered 10% DCF gives only about $63/share (range $30-98, very sensitive to the exit multiple because of the 60% debt load). The levered view (EPS about $8.4 by 2031, 18x exit, 3.3% dividend growing 6.5-7%) gives about 8-9% a year: a fair utility return, not a 50% setup. Sentiment is warm, not euphoric (6.5/10: mixed Buy/Hold coverage, targets about $118-130 after post-print raises). Rating 4.5: a fairly priced quality compounder with no edge at this price and no short case. Research rating 2.5: the open questions (timing of the Oracle transmission line, the Wisconsin rate orders, customer concentration) move value by single-digit percentages, not 40%. This is not a valuation-floor covered-call setup.

A deep dive would have to establish: Whether the Wisconsin rate orders and the refiled ATC Port Washington line keep the 13.4% asset-base growth on schedule at about 9.8-10.5% ROEs without bill backlash forcing lower returns or more equity, because only a re-rating from about 20x to 23x+ EPS would get the return near our target.

Owner earnings, TTM
$2.5B$2.2B – $2.7B
Realistic peak profit
$4.8B$4.3B – $5.2B
Growth rate
12.0%9.0% – 14.5%
Years of growth
85 – 12
Market cap
$38B$38B – $39B
EV
$61B$60B – $63B
Net debt
$23B$23B – $24B
Capital return / cap
0.5%0.0% – 1.2%
P/E
20.6×20.2× – 21.2×
EV/EBITDA
13.6×13.0× – 14.3×
FCF yield
4.4%3.8% – 5.0%
Projected FCF, base case (USD millions)
Y1-$4.2B-$5.2B – -$3.2B
Y2-$4.4B-$5.5B – -$3.3B
Y3-$3.7B-$4.8B – -$2.6B
Y4-$2.0B-$3.2B – -$800M
Y5-$900M-$2.2B – $400M
Competition: A regulated monopoly in its territories. The real contest is for hyperscaler siting against Alliant, ComEd/Exelon, AEP, Xcel and Entergy, where Wisconsin's VLC tariff, land and water give WEC an edge so far.
Governance: none flagged
Research (expand)

What the company does

WEC Energy Group (Milwaukee) owns We Energies, Wisconsin Public Service, Wisconsin Gas, Peoples Gas and North Shore Gas (Chicago), Michigan Gas Utilities, Minnesota Energy Resources and UMERC. It serves 4.8M customers and has about $54B of assets. It also owns about 60% of American Transmission Co. (equity method; about $2.5B carrying value), We Power (leased generation), and WEC Infrastructure (contracted wind and solar sold to non-WEC offtakers). In 2025 the asset base of $34.2B was 63% Wisconsin, 14% Illinois, 10% ATC, 9% WECI and 4% Michigan/Minnesota. Management guides it to $72.8B by 2031, 75% Wisconsin and 80% electric, with 29% dedicated to very large customers (VLCs).

The investment case

  • Data-center load in a constructive state. Forecast demand rises 4.9 GW over 2026-31, about 60% of current electric demand: Microsoft/SE Wisconsin 3.2 GW (management thinks the sites could reach 4.5-5 GW), Oracle/Vantage at Port Washington 1.3 GW (3.5 GW potential), and 400 MW from a new customer still to be named.
  • The VLC tariff. The PSCW approved it in 2026. Hyperscalers pay for bespoke generation and dedicated distribution over 15-20 year terms, post credit support, and must still pay if they cancel or downsize. The VLC ROE is 10.48-10.98% against about 9.8% for the core utility. More VLC projects now pay a cash return during construction instead of AFUDC. That is why the plan grew $10B while equity needs stayed flat at $5.1-5.5B, and incremental capital now needs about 40% equity content instead of 50%.
  • Guidance. EPS growth is now 7-9%+ for 2027-31 off the $5.56 base, with the 'plus' most likely in 2028-29, and the dividend grows 6.5-7% a year with payout falling to 60-70%. The record is 23 straight dividend raises and steady delivery against guidance.

What it earns today (real free cash flow), FY2026E, $M

  • Operating income: about 2,620 (9M 1,976.5 plus Q4E). Add ATC equity earnings (about 250) and other income (about 210, of which about 190 is non-cash AFUDC-equity). EBIT is about 2,970; EBITDA is about 4,510 (9M 3,472.8 plus Q4E about 1,040).
  • Strip AFUDC-equity (non-cash, capitalized into rate base): about 2,780.
  • Unlevered cash-ish taxes: about 330. WEC's book tax rate is only about 8% because of production tax credits and excess deferred tax flowback, and those are fairly persistent.
  • D&A of about 1,550 is roughly equal to maintenance capex. Pipe, pole and substation replacement on a 13,000-mile system is a real treadmill, so I treat D&A as maintenance. Stock comp is small and already sits in O&M.
  • Unlevered owner earnings are about $2.45B, so only about 54% of EBITDA reaches capital providers. On an EV of about $61.3B that is about 25x, a 4.0% yield.
  • After-tax interest is about $0.77B (interest expense about $0.94B in 2026), which leaves about $1.68B for equity: a 4.4% owner-earnings yield on the $38.1B market cap (GAAP net income is about $1.85B including AFUDC; P/E 20.6x).
  • Reported FCF is negative. 9M CFO was 3,413 against capex 3,319, ATC contributions 173 and a project option 171. Full-year FCF before dividends is about -$0.8B, and after the $1.25B of dividends the gap is about -$2B, funded by debt and stock (the ATM, plus 7.0M forward shares, about $764M, still to settle by March 2028).
  • Mature-company test: today's year repeated forever is 2.45/0.10 = $24.5B, less $23.2B of net debt, which leaves about $1.3B, or about $4/share. If nothing changed, equity would earn about $1.7B a year, 4.4% on the price. The whole value depends on the growth programme earning its allowed return, and the 60%-debt capital structure (debt/cap 60.9%) makes the equity a levered call on regulators.

Free cash flow for the next 5 years (unlevered, after all capex, $B)

My assumptions: average asset base rising from about $39B (2026) to $72.8B (2031); an unlevered return of about 6.5-6.8% on assets (including VLC cash returns on construction work in progress); D&A rising to about $2.3B; consolidated capex from slide 20 excluding ATC (8.4 / 9.1 / 9.1 / 8.1 / 7.5), plus WEC's equity share of ATC capex of about $0.45-0.65B a year.

| Year | Owner earnings (NOPAT) | D&A | Capex incl. ATC equity | Unlevered FCF |

|---|---|---|---|---|

| 2027 | 3.00 | 1.75 | 8.96 | -4.2 |

| 2028 | 3.40 | 1.90 | 9.73 | -4.4 |

| 2029 | 3.85 | 2.05 | 9.58 | -3.7 |

| 2030 | 4.30 | 2.20 | 8.50 | -2.0 |

| 2031 | 4.75 | 2.30 | 7.97 | -0.9 |

The cumulative deficit of about $15B matches management's funding slide (CFO $26.1-27.1B against $42.2B of capex plus $8.6-8.8B of dividends, with $18.7-19.3B of debt and $5.1-5.5B of equity filling the gap). Growth runs for at least 5 more years. Management says VLC demand extends into 2032-33 (long-lead equipment for the 400 MW customer is already in the plan), and replacing or extending the Point Beach PPA and the Illinois pipe programme (about $500M a year from 2028) add more.

WEC in 2031 will not be a corpse. It will be a roughly twice-as-large regulated electric utility (asset base $72.8B, owner earnings about $4.75B, EPS about $8.2-8.6), still growing 6-8%, with about 30% of its assets contracted to investment-grade hyperscalers. Confidence in the trajectory is fairly high, about 70%: regulated returns, a signed tariff and customers already building. The less certain part is the multiple the market will pay for it.

Fair value and multiples

  • Today: P/E 20.6x on 2026 guidance ($5.62) and 19.2x on 2027 consensus ($6.03); EV/EBITDA about 13.6x; EV/unlevered owner earnings about 25x; price/book 2.6x (book equity $14.6B); dividend yield 3.3%, but net of equity issuance (about 2.8% of market cap a year) the shareholder yield is only about 0.5%.
  • House DCF (unlevered, 10%): PV of 2027-31 FCF is about -$12.2B. The year-5 value is 2031 owner earnings of $4.75B times 19x (a durable regulated grower at 6-8%, top of the 10-18x mature band with a premium for visibility), which is $90B, or $56.0B in PV. EV is about $43.8B; less $23.2B of net debt, equity is about $20.6B, about $63/share (range about $30 at 16x on $4.5B to about $98 at 22x on $4.9B). A 10% unlevered hurdle is far above a utility's roughly 6.5% cost of capital, so this method structurally marks a 60%-levered utility well below market. That is the honest answer to whether this hits our return target: no.
  • Levered cross-check: 2031 EPS of about $8.4 at 18x is about $151, plus about $21 of dividends. From $115.87 that is about 8-9% a year (about 10% if it holds 20x, about 6% at 16x). Discounting that at a 10% equity hurdle gives about $105-112.
  • Fair value about $108 (range $90-126): slightly below the price, in line with the about $118-125 analyst targets once you account for the 8-9% expected return against our 10% hurdle. The stock is at 99% of its 3-year range and up about 15% from the September low near $101, so it is not near the bottom of its range.

Management, risks and competition

  • Management. CEO Scott Lauber (former CFO, a WEC lifer) and CFO Xia Liu are conservative, transparent operators. The equity plan is modest, debt is assumed at about 6.7%, and they have hit guidance for years. In Illinois, governance of Peoples Gas has been the soft spot: a $150M reserve in 2025 and a 12-docket settlement with the AG. There are no governance red flags, and they do not 'eat the money': about 65% of earnings is paid out and the rest is reinvested at regulated returns.
  • Oracle line timing. The PSC rescinded completeness on ATC's Port Washington transmission application in August 2026. ATC refiled on 2026-09-14, which restarts a roughly 6-month review, and construction takes 12-15 months. Press reports flag up to a year of delay for Oracle's Project Lighthouse. A delay shifts earnings rather than destroying them, but it is the near-term headline risk.
  • Counterparty concentration. VLCs are about 45% of the capex plan and about 29% of 2031 assets. Oracle's parent is rated BBB-, and a downgrade triggered extra collateral (posted). The tariff makes VLCs pay for bespoke assets if they downsize, but cost reimbursement only applies in specified circumstances and PSCW approval is needed to repurpose assets.
  • Affordability backlash. We Energies is asking for +4.7% in 2027 and +4.5% in 2028 (about 14% bills by 2028), and the Citizens Utility Board and coalitions are pushing to reject it. PSC staff proposed cutting WPS's ROE to 9.50% from 9.80%. Each 10 bp of ROE is worth about 1% of EPS.
  • Illinois. The ALJ proposed a 9.48% ROE and 50% equity ratio for Peoples Gas, with a decision due in December. State gas policy is hostile and the pipe programme is ramping slowly on staffing.
  • Rates and dilution. About $19B of new debt (including $4-5B of hybrids) at upper-6% coupons, plus $5.1-5.5B of new stock front-loaded. FFO/debt is targeted at 15% or more.
  • Other. The Port Washington DNR environmental review (expected by early 2028), and an AI capex downturn, which would hit the upside, not the contracted base.
  • Competition. WEC is a regulated monopoly in its territories. The real competition is for hyperscaler siting: Alliant in Wisconsin, ComEd/Exelon, AEP, Xcel and Entergy. Southeast Wisconsin's water, land and tariff clarity are giving WEC an edge so far.

How investors feel: 6.5/10 (warm, not euphoric)

  • Analysts. Coverage is split roughly half Buy, half Hold, with one Sell. After the plan, Wells Fargo raised its target to $129 (Buy), Scotiabank to $128 (Buy) and BTIG to $130 (Buy). RBC Hold $122, HSBC Hold $107, Jefferies Hold $121, Barclays Equal Weight about $117, Mizuho Outperform $121. Consensus targets are about $118-125, roughly 2-8% upside.
  • Price action. The stock fell 2% on the print (core weather-normal sales ex-VLC rose only 0.4%) but has since recovered to near its all-time high.
  • Positioning. Short interest is about 14.5M shares (about 4.4% of shares, about 6 days to cover), steady and typical of utility hedging. No forced sellers, no insider buying of note, and no buyback (the company is a net issuer).
  • Bottom line. This is a well-loved, crowded 'AI utility' quality name priced for steady execution. It is not a capitulation buy, and with a negative-FCF funding machine and no euphoric overvaluation, it is not a short either. Options: the pack shows call IV of 27% and put IV of 14% (a noisy, illiquid chain). The stock is not at a valuation floor, so this is not a covered-call setup.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue10324+8%9800+14%8600-3%8893-7%9597
Gross profit5353+13%4954+31%3786+5%3601+9%3301
Operating expenses2793+19%2579+58%1633-4%1693+23%1376
▸Adj EBITDA4089+7%3853+10%3507+11%3172+4%3047
▸Adj OCF3652+4%3504+6%3291+18%2784+16%2402
CapEx-4622-4398-2781-2493-2334
Adj FCF-969-895-275%510+75%291+332%67.4
Interest expense927895798727515
▸Adj net income1498+12%1365+20%1137+16%978-10%1085
▸Owner's earnings1417--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA18214100%3353100%4047100%3916100%3527100%3370100%
FCF (OCF−capex)-269-1%94.43%-1046-26%43111%52615%-273-8%
Net income732240%149445%155839%152839%133338%140842%
▸Capital returned75.60%42213%-631-16%2747%1905%-180-5%
Buybacks-1265-392-775-16016.646.2
Dividends503793111481056984918
Interest paid3634699895798727515
Debt paid down-7331-815-1899-1420-1538-1659
▸Reinvestment18568102%3368100%4873120%3978102%346298%288886%
Capex (PP&E)1532533194398278124932334
Intangibles & M&A29553.0040610391079428
Leases signed (net Δ)28845.868.7157-110126
Retained / other3362%36811%74.72%-84.4-2%-16.50%-6.300%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)5389851518473634394041872
▸Liabilities (total)3888737466345613186830256
Net debt (incl. leases)2311522287203171875517338
Net debt / Adj EBITDA5.655.785.795.915.69
Net debt / Adj FCF----39.864.4257
Adj EBITDA / interest4.414.304.394.365.92
Shares outstanding329325318315315
Dilution (YoY)+1.2%+2.5%+0.7%+0.0%+0.0%
Employees70007150701770007022
MarginsTTM2025202420232022
Gross margin51.9%+2.350.5%+6.544.0%+3.540.5%+6.134.4%
Adj EBITDA margin39.6%-0.539.3%-1.540.8%+5.135.7%+3.931.8%
Adj OCF margin35.4%-1.435.8%-2.538.3%+7.031.3%+6.325.0%
Adj FCF margin-9.4%-4.9-9.1%-15.15.9%+2.73.3%+2.60.7%
Net income margin17.5%-0.215.9%-1.917.8%+2.815.0%+0.314.7%
Adj NI margin14.5%+0.513.9%+0.713.2%+2.211.0%-0.311.3%
ROIC (adj, after-tax)6.3%6.1%5.7%5.4%5.4%
Cost of debt4.1%4.2%4.1%4.0%3.2%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Wisconsin$2.3B+14%
Illinois$749.7M-5%
Other States$257.3M+13%
Non-Utility Energy Infrastructure$210.7M+8%
By Geography (2026-Q1)
Wisconsin$2.3B+14%
Illinois$749.7M-5%
Other States$257.3M+13%
Non-Utility Energy Infrastructure$210.7M+8%

Earnings Calls

12 updates

Earnings Call · 2026 Q3

2026-10-29

WEC Energy Group reported third quarter 2026 earnings of $1.18 per share versus $0.83 a year earlier, helped by warmer weather (about $0.05 year-over-year benefit), rate base growth, and operating efficiency. Management raised and narrowed 2026 guidance to $5.60-$5.64 per share from $5.51-$5.61, a 7.7% increase over the 2025 adjusted guidance midpoint. Utility earnings rose $0.28; rate base growth added $0.19, including $0.15 from AFUDC equity and cash returns on construction projects, of which $0.12 (80%) relates to very large customers (VLCs). Favorable O&M contributed $0.08, largely stock-based compensation timing. Weather-normal retail electric sales grew 4.1%, or 0.4% excluding the iron ore mine and VLCs; full-year sales are still expected to be flat. ATC added $0.03, energy infrastructure $0.02, and corporate $0.04 on tax timing. The headline was a new 2027-2031 capital plan of $47.5 billion, up $10 billion (over 26%) from the prior plan, with roughly $8 billion or more tied to VLCs. About 45% of total capital, over $20 billion, serves VLCs, which would represent almost 30% of the asset base by 2031. Forecast electric demand growth rose by 1 gigawatt to 4.9 GW through 2031. This includes 3.2 GW in the I-94 corridor for Microsoft (up 600 MW), 1.3 GW for the Vantage/Oracle site, and an additional 400 MW from an unnamed customer expected to be announced. The plan adds $6.8 billion of natural gas generation including a combined cycle plant, $1.1 billion more for renewables and batteries, $1.2 billion more for ATC (total $5.3 billion), and $1 billion more for distribution, including Chicago pipe replacement. WEC also agreed to extend the Point Beach nuclear PPA by 20 years, and Oracle will subscribe to part of that energy, saving customers about $300 million in fuel costs. Asset base growth is projected at a 13.4% CAGR, supporting EPS growth of 7% to 9+% from the 2026 original midpoint of $5.56. Financing includes $26-27 billion of operating cash flow, $19 billion of debt including hybrids, and $5-5.5 billion of common equity, roughly flat versus the prior plan. This is thanks to more cash returns on CWIP from VLCs instead of AFUDC. Equity per incremental capital dollar should fall to about 40% from 50%. Equity is slightly front-end loaded. On regulatory matters, Wisconsin rate cases for 2027-2028 should be decided by year-end, and the Illinois ALJ proposed a 9.48% ROE and 50% equity ratio for Peoples Gas and North Shore, with a decision due in December. ATC's refiled transmission application for the Vantage site is under commission review. Management expects 2027 dividend and guidance in December, with 6.5-7% dividend growth.

Analyst Q&A (27)
▸
What is assumed in the "plus" of the 7%-9+% EPS growth range, and why keep the 7% low end?
Shar Pourreza · Wells Fargo
Management is confident in the range given the added gigawatt. Many projects need regulatory approval; faster approvals could accelerate growth in years like 2028 or 2029, creating upside.
▸
What is the timeline for the ATC line serving the Vantage/Oracle site, and could it delay the project?
Shar Pourreza · Wells Fargo
Construction continues and Oracle's call suggested no delay. The filing is large (over 20,000 pages, with eSTATCOM added), and the commission's 35 questions are reasonable. Management expects completeness and approval and remains on schedule.
▸
Does the capital plan already include potential Microsoft/Oracle expansions and the new customer, or would those add capital?
Nicholas Campanella · Barclays
The plan includes the 400 MW from the unnamed customer plus some long-lead-time equipment, but those megawatts arrive around 2032-2033. Growth beyond 2031 would provide further upside if more data center growth occurs.
▸
How sustainable are the flat equity needs beyond this plan given chunky 2032 generation and load ramp?
Nicholas Campanella · Barclays
This was a step change from getting more cash returns from VLCs and plants entering service. Xia said incremental capital should require about 40% equity versus the traditional 50%.
▸
Is the "plus" more likely in 2029 and beyond given capital peaking around 2028?
Nicholas Campanella · Barclays
It depends on regulatory approvals; potentially 2028, more likely 2029. The lower 2030-2031 capital shouldn't be over-read, since 2032 offers more opportunities. Most confident in 2028-2029.
▸
How much acreage does Microsoft's expanded 3.2 GW relate to, and how might density per acre change sizing?
Steve D'Ambrisi · RBC Capital Markets
Microsoft hasn't disclosed specifics. Based on comparable sites and additional land purchases, the total could reach 4.5-5 GW over time, but 3.2 GW is the comfortable plan figure.
▸
Is the 400 MW customer in WEPCO or WPS territory?
Steve D'Ambrisi · RBC Capital Markets
Locations in both territories are being considered; it depends on community support, transmission and capacity. More details to come.
▸
Is the "plus" only for one or two years before returning to the 7%-9% range?
Michael Sullivan · Wolfe Research
Management feels good about a couple of years at the upper end or plus, but it is too early to say; the capital plan will be updated in a year or sooner.
▸
What changed to lower near-term equity needs, and why wouldn't it persist with expansions?
Michael Sullivan · Wolfe Research
Previously the plan conservatively assumed AFUDC; now VLCs are paying more cash returns on CWIP. That unwind is a one-time step change, though the company will keep encouraging cash returns; incremental needs would need a bit more equity.
▸
Is the 400 MW all with one customer, and what are the gating items?
Michael Sullivan · Wolfe Research
It is anticipated to be one customer who is still working with various communities; more to come.
▸
Why does the electric sales growth outlook stay at 6%-8% despite adding a gigawatt, and why did gas sales growth come down?
Andrew Weisel · Scotiabank
Sales growth is a timing issue; growing from a very high 2029 base still yields 6%-8%. Earnings come from asset returns, not volume, as energy costs pass through. Gas outlook reflects a flat year, imperfect weather normalization and conservatism on conservation; the 0.5%-0.8% could be better.
▸
How should the timing of equity issuance look, and common versus JSNs?
Andrew Weisel · Scotiabank
Equity goes with capital and is slightly front-end loaded, since construction is concentrated early and cash from in-service projects grows later.
▸
Which customer, Microsoft or Oracle/Vantage, has the greatest potential to exceed the planned load?
Anthony Crowdell · Mizuho
Both are building fast, but Microsoft has more construction sites and is buying more land, so it has somewhat more upside; Oracle is focused on its first 1.3 GW phase.
▸
Is there a point where customer concentration (nearly 30% of assets in VLCs) becomes a concern?
Anthony Crowdell · Mizuho
Comfort comes from the VLC tariff's strong financial and credit requirements and contract terms matched to asset lives, avoiding stranded assets. Having two customers adds diversity.
▸
Does EPS growth cadence follow the capital plan, with less equity as VLC cash recovery ramps?
Brian Russo · Jefferies
Yes, follow the capital plan pattern; earlier capital could create plus upside. The equity change is a step change, and needs should decline as more assets enter service.
▸
How long is construction of the ATC line, given the refiling and condensed timeline?
Brian Russo · Jefferies
Roughly 12-15 months. ATC has retained workforce and equipment ready to begin immediately upon approval.
▸
What is the view on the DNR environmental review following the Port Washington settlement?
Brian Russo · Jefferies
Management sees it as no obstacle and a net positive that brings clarity and facts; it shouldn't affect current sites and should be completed by early 2028.
▸
Why is equity unchanged and how does the financing plan treat debt/equity and interest rate exposure?
Diana Niles · JPMorgan (for Jeremy Tonet)
Xia said updated interest-rate information was filed with the PSCW for 2027-2028 rates, and the plan assumes conservative rates, in some cases upper 6%. Debt/equity mix is driven by cash flow; more operating cash flow allows more debt while maintaining strong credit metrics.
▸
Are there particularities in VLC cash inflows, such as upfront payments, for rating agencies?
Diana Niles · JPMorgan (for Jeremy Tonet)
The plan assumes no upfront payments, only cash returns on CWIP like a return on rate base. Management thinks rating agencies will view this positively.
▸
Is the "plus" applicable to the five-year CAGR or more to 2028-2029?
Steve Fleishman · Wolfe Research
The plus is more representative of 2028-2029, though the five-year rate should be at the upper end near 9% absent wild cards; later years will fill in as plans update.
▸
How much transmission capex in the plan is tied to VLCs?
Carly Davenport · Goldman Sachs
About $1.4 billion of transmission is tied to economic development, with potential upside as more VLCs arrive.
▸
Does the 29% VLC asset base share include the 400 MW unnamed customer and long-lead equipment?
Richard Sunderland · Truist Securities
Yes, all of it is included and expected to be paid for by VLCs.
▸
What is the progress on Illinois pipe replacement, including staffing, and how does it inform rate cases?
Richard Sunderland · Truist Securities
Spending was lower this year as ramp-up faced resource constraints in a strong construction market. Forecasts were updated and shared with the commission; spending should reach about $500 million a year starting 2028, supported by training and trade programs.
▸
How does the 1 GW of added demand connect to the $10 billion of added capex?
Paul Patterson · Glenrock Associates
Generation is the main driver, needing about 1.4-1.5 GW for MISO capacity requirements, plus transmission, long-lead-time equipment and distribution.
▸
How much of the incremental capex is associated with VLCs?
Paul Patterson · Glenrock Associates
About $8 billion or more of the $10 billion increase; roughly 45% of the total $47.5 billion plan is VLC-related.
▸
Are there deposits, collateral or prepayments in the capex increase, or is it only CWIP versus AFUDC?
Paul Patterson · Glenrock Associates
There are no customer deposits or prepayments; it relates to current returns versus AFUDC. Credit support such as letters of credit is separate security and not part of the financials.
▸
Does the $200 million of VLC-dedicated substations in distribution include any CIAC?
Paul Patterson · Glenrock Associates
No contributions are included; it is miscellaneous distribution capital dedicated to serving VLCs.

SEC Filing Findings

SEC Filing — material findings

2026-10-30 · depth 9/10
risk 7Customer Concentration / Counterparty Credit
▸

Oracle (OACS) is the anchor VLC for Port Washington; its parent's credit downgrade triggered additional collateral requirements, and Oracle is rated BBB- per management. Oracle's court challenge to VLC collateral terms was withdrawn by a VLC petitioner in the filing but the rehearing petition was deemed denied; collateral is tied to project spend.

“Following a credit rating downgrade of OACS's parent, our contracts required additional collateral to secure our credit exposure. OACS and its parent have provided the collateral required in conjunction with the credit rating downgrade.”
risk 6Regulatory / Stranded Cost Recovery
▸

VLC/Bespoke payment and cancellation terms make customers liable for costs only until service agreements are executed; the 100 MW threshold and 15-year term were tightened by PSCW, but the filing notes reimbursement is required only in specified circumstances, leaving residual stranded-asset exposure if a VLC terminates or downsizes.

“Under these agreements, if a VLC terminates or downsizes its plans, it will still be required to pay for the Bespoke Resources and dedicated distribution facilities that have been built to support its forecasted load, unless the facilities can be repurposed, subject to PSCW approval.”
risk 6Dilution
▸

Common equity is being raised through a $3.0B ATM with forward sale contracts; forward contracts outstanding are unsettled and will issue additional shares at below-current forward prices on settlement, with settlement dates extending to March 2028.

“We have entered into several forward sales contracts under our October 2025 EDA.”

Options

Chain Snapshot (daily)

Call IV (ATM)27%
Put IV (ATM)14%
ATM Spread1.8%
Call $OI (near money)$879K
Put $OI (near money)$27K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$115.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$97.50$18.70/$22.700--/$1.759
$100.00$16.20/$20.200--/$1.950
$105.00$11.30/$13.800$0.15/$0.458
$110.00$7.30/$9.0067$0.35/$1.056
$115.00$3.70/$5.8095$1.45/$1.952
$120.00$1.50/$2.05814$3.80/$5.400
$125.00$0.40/$0.750$7.70/$10.000
$130.00--/$2.050$10.90/$14.800
Snapshot: 2026-11-04

Short Interest

Short % of Float4.3%
Short Shares14.3M
Days to Cover4.9
Change (vs Prior)-1.4%
Short % Float History
4.30%+0.80pp
3.5%4.0%4.5%5.0%5.5%10-1512-3103-1305-2908-1410-30

Web Traffic

wecenergygroup.com
Web rank#339,275
Est. visits/mo1.7M
Traffic YoY▼ 79.4%
Traffic QoQ (12w)▼ 12.0%
Web Rank History
#339,275+113,662
rankest. visits/mo
150k200k250k300k350k400k450k03.3M6.5M9.8M13.1M05-1908-2512-0103-0906-1509-2111-16

Executive Compensation (2023.0-2025.0)

Direct Pay$84.6M
Incentive & Other$80.8M
Total Compensation$165.3M
% of Revenue0.6%

Cash Runway

0.9months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$3.89B$93.15+$31.7M+$407M—$6.70T
VANGUARD CAPITAL MANAGEMENT LLCPassive$2.48B$115.78+$12.6M+$2.48B—$4.68T
STATE STREET CORPPassive$2.46B$83.50−$17.4M+$71.2M—$3.38T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$1.97B$115.78+$12.4M+$1.97B—$2.22T
GEODE CAPITAL MANAGEMENT, LLCPassive$1.08B$91.87+$15.6M+$75.1M—$1.87T
BANK OF AMERICA CORP /DE/$1.00B$95.33+$74.2M+$158M—$1.54T
WELLS FARGO & COMPANY/MN$1.00B$91.37+$1.5M+$59.5M—$572.80B
DEUTSCHE BANK AG\$707M$96.36+$14.2M+$55.0M—$343.79B
AMERIPRISE FINANCIAL INC$681M$101.02+$18.1M+$161M—$494.20B
CHARLES SCHWAB INVESTMENT MANAGEMENT INC$630M$96.46−$6.5M+$19.2M—$742.21B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

013.1M26.3M39.4M52.5M$74$84$95$106$1172021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
Magellan Asset Management Ltd1.2MWELLINGTON MANAGEMENT GROUP LLP3.6MBANK OF AMERICA CORP /DE/8.6MWELLS FARGO & COMPANY/MN8.6MDEUTSCHE BANK AG\6.1MAMERIPRISE FINANCIAL INC5.8MJPMORGAN CHASE & CO5.2MCHARLES SCHWAB INVESTMENT MANAGEMENT INC5.4MPRICE T ROWE ASSOCIATES INC /MD/508KMORGAN STANLEY4.3M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
APDAir Products and Chemicals, Inc.315.43×
SOThe Southern Company314.50×
GDGeneral Dynamics Corporation311.70×
ADPAutomatic Data Processing, Inc.410.63×
USBU.S. Bancorp39.67×
CMICummins Inc.49.12×
ADIAnalog Devices, Inc.68.74×
CBChubb Limited36.65×
NEENextEra Energy, Inc.46.45×
TXNTexas Instruments Incorporated56.33×
PEPPepsiCo, Inc.35.94×
APHAmphenol Corporation55.87×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (6 analysts)$116.42-0.7%
Last Year (22 analysts)$118.84+1.3%
Current Price$117.28
Analyst Ratings
10
21
3
Buy: 10Hold: 21Sell: 3Strong Sell: 1Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2006 Q11.1B187M89M$0.32$0.26 – $0.3813
2006 Q2749M162M57M$0.21$0.17 – $0.258
2006 Q3784M167M66M$0.26$0.21 – $0.3118
2006 Q41.1B153M77M$0.30$0.24 – $0.3614
2007 Q11.2B202M93M$0.37$0.30 – $0.4413
2007 Q2653M130M35M$0.11$0.09 – $0.1313
2007 Q3856M189M80M$0.33$0.26 – $0.4020
2007 Q41.0B173M81M$0.30$0.24 – $0.3614
2008 Q11.2B233M97M$0.34$0.27 – $0.4118
2008 Q2908M181M56M$0.23$0.18 – $0.2817
2008 Q3722M197M64M$0.23$0.18 – $0.2817
2008 Q41.0B175M81M$0.29$0.23 – $0.3514
2009 Q11.2B262M117M$0.42$0.34 – $0.5011
2009 Q2650M207M45M$0.15$0.12 – $0.1819
2009 Q3848M197M61M$0.27$0.22 – $0.3215
2009 Q4995M250M111M$0.42$0.34 – $0.5017
2010 Q11.2B259M120M$0.47$0.38 – $0.5617
2010 Q2819M231M81M$0.31$0.25 – $0.378
2010 Q3872M247M99M$0.38$0.30 – $0.4619
2010 Q41.0B270M121M$0.49$0.39 – $0.599
2011 Q11.2B326M155M$0.60$0.48 – $0.727
2011 Q2943M262M104M$0.37$0.30 – $0.4414
2011 Q3938M267M114M$0.43$0.34 – $0.528
2011 Q41.1B276M114M$0.47$0.38 – $0.569
2012 Q11.2B359M170M$0.72$0.58 – $0.8619
2012 Q2815M346M100M$0.37$0.30 – $0.4419
2012 Q3884M318M129M$0.47$0.38 – $0.5616
2012 Q41.0B223M94M$0.39$0.31 – $0.4716
2013 Q11.2B352M164M$0.66$0.53 – $0.7918
2013 Q2895M282M103M$0.40$0.32 – $0.487
2013 Q3983M308M128M$0.52$0.42 – $0.6212
2013 Q41.1B319M135M$0.55$0.44 – $0.669
2014 Q11.6B384M190M$0.77$0.62 – $0.929
2014 Q2936M297M118M$0.46$0.37 – $0.5517
2014 Q3959M301M117M$0.48$0.38 – $0.5820
2014 Q41.3B313M128M$0.59$0.47 – $0.718
2015 Q11.3B373M179M$0.76$0.61 – $0.9118
2015 Q2924M257M75M$0.51$0.41 – $0.6119
2015 Q31.6B480M176M$0.57$0.46 – $0.688
2015 Q41.9B510M184M$0.65$0.52 – $0.7812
2016 Q12.0B659M319M$0.93$0.74 – $1.1212
2016 Q21.6B499M178M$0.55$0.44 – $0.6611
2016 Q31.5B511M189M$0.53$0.42 – $0.6410
2016 Q42.0B507M195M$0.61$0.49 – $0.7320
2017 Q12.2B686M337M$1.00$0.80 – $1.2020
2017 Q21.5B509M182M$0.53$0.42 – $0.6415
2017 Q31.6B549M212M$0.66$0.53 – $0.798
2017 Q42.0B785M414M$0.65$0.52 – $0.7813
2018 Q12.2B740M370M$1.11$0.89 – $1.3319
2018 Q21.5B557M211M$0.61$0.49 – $0.7310
2018 Q31.6B582M224M$0.68$0.54 – $0.8216
2018 Q42.0B564M199M$0.61$0.49 – $0.7314
2019 Q12.3B802M393M$1.25$1.01 – $1.477
2019 Q21.6B609M223M$0.70$0.57 – $0.8211
2019 Q31.7B618M225M$0.72$0.58 – $0.847
2019 Q42.2B624M227M$0.72$0.58 – $0.8410
2020 Q12.5B845M415M$1.32$1.06 – $1.549
2020 Q21.6B616M217M$0.70$0.56 – $0.826
2020 Q31.6B641M239M$0.76$0.61 – $0.896
2020 Q42.1B630M229M$0.73$0.59 – $0.866
2021 Q12.4B911M462M$1.47$1.18 – $1.726
2021 Q21.6B671M248M$0.79$0.64 – $0.934
2021 Q31.7B682M255M$0.79$0.64 – $0.933
2021 Q41.7B635M215M$0.68$0.54 – $0.795
2022 Q12.7B999M526M$1.69$1.36 – $1.984
2022 Q21.8B760M314M$0.85$0.68 – $1.005
2022 Q31.8B730M280M$0.86$0.69 – $1.014
2022 Q41.9B665M201M$0.74$0.60 – $0.876
2023 Q12.9B1.1B578M$1.58$1.27 – $1.853
2023 Q22.1B949M397M$0.85$0.68 – $0.994
2023 Q32.0B910M355M$0.91$0.90 – $0.938
2023 Q42.8B771M221M$1.08$1.07 – $1.276
2024 Q12.9B1.3B636M$1.91$1.87 – $1.947
2024 Q21.9B777M209M$0.63$0.63 – $0.748
2024 Q31.9B810M231M$0.70$0.68 – $0.7414
2024 Q42.6B1.1B467M$1.42$1.36 – $1.486
2025 Q12.8B1.4B718M$2.18$2.15 – $2.214
2025 Q21.8B856M232M$0.70$0.69 – $0.715
2025 Q31.9B903M266M$0.81$0.80 – $0.825
2025 Q42.1B1.1B457M$1.39$1.38 – $1.426
2026 Q13.3B1.5B757M$2.30$2.27 – $2.324
2026 Q22.1B917M264M$0.80$0.79 – $0.826
2026 Q32.3B997M319M$0.97$0.95 – $0.996
2026 Q42.8B1.1B390M$1.19$0.99 – $1.374
2027 Q13.7B1.5B704M$2.14$2.12 – $2.172
2027 Q22.4B1.1B314M$0.95$0.85 – $1.051
2027 Q32.5B1.1B355M$1.08$0.97 – $1.191
2027 Q43.0B1.4B620M$1.89$1.69 – $2.081
2028 Q13.7B1.8B857M$2.60$2.33 – $2.871
2028 Q22.3B1.2B335M$1.02$0.91 – $1.121
2028 Q32.5B1.2B372M$1.13$1.01 – $1.241
2028 Q43.0B1.5B587M$1.78$1.60 – $1.961
2029 Q14.0B1.9B928M$2.82$2.53 – $3.111
2029 Q22.5B1.3B361M$1.10$0.98 – $1.211
2029 Q32.7B1.3B407M$1.24$1.11 – $1.361
2029 Q43.2B1.6B635M$1.93$1.73 – $2.131
2030 Q14.2B2.1B1.0B$3.10$2.78 – $3.411
2030 Q22.6B1.4B392M$1.19$1.07 – $1.311
2030 Q32.8B1.4B441M$1.34$1.20 – $1.481
2030 Q43.3B1.7B687M$2.09$1.87 – $2.301

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$11.65M
12 txns · 7 insiders · 100,719 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-11-13SELLLauber Scott Jdirector, officer: President and CEO22,422$117.16$2.63M$7.84M
2026-11-12SELLLauber Scott Jdirector, officer: President and CEO4,043$118.01$477K$7.89M
2026-11-10SELLKELSEY MARGARET Cofficer: Executive VP & General Counsel18,380$117.37$2.16M$1.43M
2026-11-04SELLMulroy Molly Aofficer: EVP & Chief Admin Officer4,695$117.02$549K$832K
2026-08-11SELLPAYNE ULICE JRdirector980$105.58$103K$2.07M
2026-05-19SELLKrueger Danielofficer: EVP WEC Infrastructure4,665$110.96$518K$815K
2026-02-24SELLPAYNE ULICE JRdirector1,450$114.60$166K$2.35M
2026-02-23SELLKLAPPA GALE Edirector3,180$115.44$367K$31.93M
2026-02-17SELLKLAPPA GALE Edirector5,000$116.55$583K$32.24M
2026-02-13SELLKLAPPA GALE Edirector25,000$115.44$2.89M$31.93M
2026-02-13SELLStraka Mary Bethofficer: Sr. VP-Corp Comm & Inv Rel2,815$115.50$325K$544K
2026-02-09SELLLauber Scott Jdirector, officer: President and CEO8,089$110.70$895K$7.39M
v2 analysis (legacy, 2026-07-29) — for comparison onlyclick to expand

Thesis

WEC Energy Group is a Midwest regulated electric/gas utility in the midst of the largest capital buildout in its history — a $37.5B five-year plan through 2030, driven almost entirely by hyperscale data-center load growth (Microsoft's Mount Pleasant Fairwater campus, Vantage's $15B 'Lighthouse' Port Washington campus serving OpenAI/Oracle). The PSCW's approval of a Very Large Customer / Bespoke Resources tariff locks in ROEs of 10.48-10.98% for the depreciable life of new generation assets and requires data centers to cover 100% of dedicated infrastructure and fuel costs, which meaningfully de-risks the incremental rate base being added and protects residential ratepayers (and equity holders) from stranded-asset risk. Management has repeatedly raised long-term EPS growth guidance, now 7-8% CAGR with acceleration expected from 2028 as the new load comes online. The company continues a 23-year dividend growth streak. The flip side is a classic 'growth utility funding gap': FCF is deeply negative (TTM -$1,154M) as capex runs 3-4x depreciation, funded by heavy equity issuance (2-2.5%/yr dilution plus $2.625B of converts maturing 2027-29 that create latent additional dilution) and debt growth (net debt/EBITDA ~5.8x, elevated for the sector). None of this is unusual for a utility executing a generational capex cycle backed by contracted, high-ROE load, but it does mean owner earnings realized in cash lag reported net income and shareholders are relying on continued smooth regulatory and capital-markets execution over the next several years.

Trade Signal

Trade rating
-4.5/10
No trade
Horizon
~9mo
Claude2026-07-29 · saw $109.43+8.8% since

WEC's data-center growth story is real but the stock is priced near the analyst's bull-case scenario (already above base-case fair value of ~$95 and well above the ~$75-79 target), while ongoing equity/convert dilution and elevated leverage cap the upside — a moderate short/avoid on valuation, tempered by the quality of the underlying growth and dividend support that argue against an aggressive short.'}}

Temporary mispricing-3.0

WEC drifted up through 2025 from ~$75 to ~$115 on a broad re-rating of data-center-exposed utilities (Microsoft Mount Pleasant, Vantage Lighthouse campus), then chopped sideways/down slightly (-6% 1m, -2% 3m) after Q1 earnings (EPS $2.45, beat, guidance reaffirmed) despite the PSCW's VLC tariff decision actually tightening terms versus what WEC proposed (100% cost recovery mandate, lower MW threshold, longer contract terms) — a modest negative for the bull case that the market has mostly shrugged off. The stock sits near 52w highs and near the top of even the analyst's bull-case fair value ($117.78), well above the base case ($94.6) and far above the bear case ($71.93). This isn't a temporary dislocation; it's a durable re-rating on a real growth story, but the price has now run ahead of even generous scenario math — a slow overshoot rather than a panic mispricing.

Market view+4.0

WEC is a well-liked, low-drama regulated utility riding the AI/data-center power-demand narrative — Wall Street consensus is Hold (10 buy/21 hold/4 sell) with average target $122 (10% upside), so sell-side is still constructive but not euphoric. Retail attention (web traffic to IR site) has spiked 4x in two months, suggesting growing retail/thematic interest in the data-center angle. Short interest is low (4.2% of float) and falling. Insiders have sold steadily (18 sales, no buys, ~$15M) but that's typical for a dividend utility with equity comp. Overall: liked, constructive, moderately crowded around the data-center theme, not stale — market has priced in much of the growth story already.

Inflectionwindow ~18mo+1.0

The data-center buildout (Microsoft, Vantage/OpenAI-Oracle) is real and large, and WEC's $37.5B five-year capex plan plus locked-in 10.5-11% ROEs on VLC-related rate base is a genuine structural upgrade to earnings quality and growth durability. However, this is already the dominant Street narrative — analyst long-term EPS growth guidance (7-8%, upper half from 2028) is public and widely modeled, and the tighter VLC tariff terms (100% cost pass-through, 15-year contracts) were specifically designed to be visible and de-risking, so the market already prices much of this. There isn't a near-term print likely to reveal a scale of profitability the market doesn't expect; more likely a grinding confirmation over 2027-2028 as data centers actually go live.

Catalysts
  • •2026-Q4 · Wisconsin electric/gas rate case final order (2027-2028 rates) — Could reaffirm or further tighten allowed ROE/cost recovery; tighter terms already seen with VLC tariff are a risk flag
  • •2026-08 / 2026-11 · Q2/Q3 2026 earnings prints — Watch for capex financing updates, equity issuance pace (~$1.1B/yr) and any slippage in data-center timelines
  • ▲H2 2026-2028 · Vantage/Microsoft construction milestones — First data centers online 2028; any delay (permitting, diesel-generator opposition) is a negative surprise risk
  • ▼2027-2029 · $2.625B convertible notes maturities — Dilution overhang builds as maturities approach, pressuring multiple
  • ▼ongoing through 2030 · Continued ~$1B/yr equity issuance — Steady share count growth funding the capex plan caps EPS accretion
Flow-4.0

Persistent equity issuance (~$1.1B/yr, ~2% dilution TTM) to fund the $37.5B capex plan is a structural headwind to per-share value; convertible note overhang ($2.625B maturing 2027-2029) adds further dilution risk. No buyback. Dividend continues to grow (6.7% hike, 23rd year) which is a modest support for holders but doesn't offset net share creation. Insiders have been net sellers with zero buys in 12 months.

Floor / Ceiling-3.0

There's a soft floor from the dividend (3% yield, 23-year growth streak) and regulated, largely non-cyclical earnings base, but no hard net-cash or asset floor — leverage is elevated (5.8x net debt/EBITDA) and FCF is negative (-4% yield) due to the capex supercycle, so the balance sheet itself provides no support. On the upside, continuous equity issuance to fund capex acts as a real ceiling — every rally invites another equity raise, and convert dilution kicks in as the stock appreciates toward conversion strikes.

Buyability

Real buyers exist — WEC is a dividend-aristocrat regulated utility with genuine secular growth (data centers), which is exactly the kind of story momentum/income and thematic AI-infrastructure funds want to own; it's liquid ($226M/day) and institutionally held. But at $111 vs a $75-95 fair-value range implied by the analyst's own base/bear cases, new buyers are paying for a scenario close to the top of the distribution — the marginal buyer here is chasing a well-known narrative rather than finding an unrecognized inflection, which is a weaker setup for continued re-rating.

Fear vs Greedfear 4/10greed 6/10

Greed dominates the market's read on this name (loved growth-utility/data-center story) but my gut leans toward fear at this price — paying near-bull-case value for a levered, dilution-heavy utility with a stretched regulatory relationship (PSCW just tightened terms) feels like chasing a crowded trade past fair value.

Valuation

Our Target
$24.5B-37%
Market Should Pay
$25.7B-33%
target ×1.05 (greed premium)
Current Market Cap
$38.6BBullish
What Changed
financials release · 2026-07-29
+0%fair value on this information

Q2 2026 results (adj NI $175M, seasonally weak as always) and the accompanying commentary largely confirm what the market already knew from the Q1 call and the April 2026 PSCW VLC tariff approval: guidance reaffirmed, capital plan unchanged at $37.5B, Vantage and Microsoft projects proceeding on schedule (DNR permit granted June 2026), dividend track intact. There is no material surprise — no guidance change, no new capex increase, no new regulatory ruling — beyond routine execution confirmation.

▸ How the cases moved

No meaningful shift in bear/base/bull equity values or probabilities versus the day before the print; all major inputs (VLC tariff structure, capital plan size, Microsoft/Vantage progress, leverage trajectory) were already known from the Q1 call and April PSCW order. Q2 is a seasonally low quarter for this utility and results were in line, not a catalyst for re-rating either up or down.

2-Year Plausible Outcomes
bear20%
$23.4B
rev +4%/yrOE $1562M

Data-center buildout timeline slips (permitting friction, diesel backup generator opposition, transmission delays), the PSCW's tighter VLC terms embolden further rate-case pushback, and the $2.625B of converts plus continued equity issuance dilute more heavily than guided. Leverage stays elevated (~6x) and rates stay higher for longer, compressing the multiple the market pays for growth utilities.

▸ Valuation

15x $1,562M adj NI = $23,430M equity value (P/E, no separate net debt step)

base55%
$30.8B
rev +6%/yrOE $1622M

WEC executes roughly to its 7% long-term EPS CAGR guidance; Microsoft/Vantage campuses proceed on a normal, somewhat lumpy schedule; VLC tariff protections work as designed; equity and debt markets remain accessible for the ~$5B equity / $2B hybrid financing plan. Multiple reflects a solid, de-risked growth utility.

▸ Valuation

19x $1,622M adj NI = $30,818M equity value (P/E)

bull25%
$38.4B
rev +9%/yrOE $1668M

Data-center demand keeps expanding beyond current forecasts (3.5GW+ from Vantage alone, further Microsoft phases), the fixed long-duration ROE structure is recognized by the market as materially de-risking WEC's growth versus peers, and WEC re-rates toward the top of the regulated-utility growth cohort while executing financing smoothly.

▸ Valuation

23x $1,668M adj NI = $38,364M equity value (P/E)

▸ Target Rationale

Model value (~$25.0B) reflects the probability-weighted, discounted P/E-based terminal outcomes. I set the target modestly below the model value given the latent dilution overhang from $2.625B of converts maturing 2027-2029 (not fully captured in per-share math since equity value is company-wide but the conversion adds real cost of capital and could pressure the multiple investors are willing to pay), elevated leverage (5.8x net debt/EBITDA, near the top of the regulated-utility range), and execution risk inherent in nearly tripling the historical capex run-rate over five years. The story is fundamentally sound and well-regulated, but the financing math leaves less margin for error than the headline growth-rate acceleration suggests.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now7/10
Trajectory8/10
Risk5/10
Governance6/10
Insolvency prob (2yr)1%
Outcome uncertainty5/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

WEC Energy Group (WEC) has reported strong operational and financial performance over the first half of 2026, supported by an aggressive capital expansion plan driven by unprecedented regional load growth.

  • Financial Performance: WEC reported first-quarter 2026 net income of $804.4 million ($2.45 per share), up from $724.2 million ($2.27 per share) in Q1 2025. Consolidated quarterly revenues rose year-over-year by $284.7 million to reach $3.4 billion.
  • Capital Plan Expansion: In early 2026, WEC increased its five-year capital expenditures (Capex) plan for the 2026–2030 period to approximately $37.5 billion. This represents a significant increase over previous years, targeting power grid upgrades, new generation capacity, and infrastructure needed to support incoming hyperscale data centers.
  • Rate Reviews & Extensions: To fund this expansion, WEC’s subsidiaries (including Wisconsin Electric and Wisconsin Public Service Corporation) filed electric and natural gas rate reviews for 2027–2028. A final order from the Public Service Commission of Wisconsin (PSCW) is expected in Q4 2026. Additionally, WEC announced it is extending the operation of Units 7 and 8 at the Oak Creek Power Plant through 2027 to bridge the gap in grid reliability before new dispatchable generation comes online.
  • Dividend Growth: WEC continued its long-term dividend growth track record, implementing a 6.7% dividend increase in January 2026, marking its 23rd consecutive year of higher payouts.

---

▸ Thesis-test Findings
Vantage Data Centers Wisconsin Site Construction Progress (2026)

Vantage Data Centers is actively moving forward with its $15 billion "Lighthouse" AI data center campus in Port Washington, Wisconsin, which represents a massive long-term load-growth opportunity for We Energies. Spanning 672 acres, the site is designed to deliver 902 MW of capacity across four data centers to support OpenAI and Oracle. Construction officially broke ground in December 2025, and work is well underway as of mid-2026. WEC has cleared several critical regulatory hurdles, including the Wisconsin Department of Natural Resources (DNR) issuing a minor-source air pollution control construction permit on June 12, 2026. However, the development has faced some local friction and public health concerns from environmental advocates regarding plans for on-site diesel backup generators. The first data center is slated for completion in 2028.

Wisconsin Public Service Commission VLC Tariff Challenges (2026)

In April 2026, the PSCW unanimously approved and significantly modified We Energies’ "Very Large Customer" (VLC) and Bespoke Resources Tariff. While the approval provides a concrete rate structure to bring large loads onto the system, the regulator's substantial modifications represent a tighter regulatory environment than WEC initially proposed. Most notably, the PSCW rejected a capacity-only option that would have shifted 25% of the construction costs of new natural gas plants and future fuel risk to non-participating ratepayers. Instead, data centers must cover 100% of their infrastructure and fuel costs. Additionally, the PSCW lowered the eligibility threshold from 500 MW to 100 MW (making the protective rate mandatory for smaller data centers) and extended the minimum contract term from 10 to 15 years to prevent early-exit stranded asset risks.

Microsoft Mount Pleasant Data Center Power Connection Timeline

Microsoft’s massive AI infrastructure development in Mount Pleasant, Wisconsin, is advancing quickly, bringing a direct boost to WEC's localized transmission projects. In January 2026, Mount Pleasant leaders approved plans for 15 additional data centers on Microsoft’s land, bringing its total regional commitment to over $20 billion and ~900 MW. The first major data center phase ("Fairwater") is on track to go online in early 2026. To connect these projects, We Energies and the American Transmission Company (ATC) are executing significant transmission infrastructure expansions. ATC's $625 million "Racine County Western Feed" project (constructing two new double-circuit 345-kV lines and expanding the Mount Pleasant, Nimbus, and Stratus substations) is actively under construction in 2026. However, critics have voiced alarms over the broader $2 billion+ ATC transmission buildout. To mitigate this risk, Microsoft is pre-paying and covering its share under the VLC tariff, paying approximately $564 million over the next two years to fund direct transmission connection costs without burdening existing residential ratepayers.