WEC Energy Group, Inc.v3 4.5/10 · 2026-11-06WEC Energy Group, Inc. is a major energy provider operating across the United States, delivering regulated natural gas and electricity, as well as both regulated and non-regulated renewable energy services. The company's operations are divided into six main business segments: Wisconsin, Illinois, Other States, Electric Transmission, Non-Utility Energy Infrastructure, and Corporate and Other. Its electricity generation relies on a diverse portfolio of sources, including coal, natural gas, oil, hydroelectric, wind, solar, and biomass. Beyond power generation, WEC Energy Group also provides electric transmission services, manages retail natural gas distribution, handles natural gas transportation, and is involved in the production, distribution, and sale of steam. As of December 31, 2021, the company's vast infrastructure network included approximately 35,800 miles of overhead electricity distribution lines and 35,600 miles of underground cables. This electrical system was supported by 440 distribution substations and 510,500 line transformers. For natural gas, its network comprised 50,900 miles of distribution mains, 1,200 miles of transmission mains, 2.3 million lateral services, and 500 distribution and transmission gate stations. Furthermore, WEC Energy Group managed 68.2 billion cubic feet of working gas capacity within its underground natural gas storage facilities. The company, founded in 1981, was previously known as Wisconsin Energy Corporation until it officially adopted the name WEC Energy Group, Inc. in June 2015. Its corporate headquarters are located in Milwaukee, Wisconsin.
2-Year Price History
Valuation v3 Opus worker · 2026-11-06
WEC Energy is a high-quality, mostly Wisconsin regulated electric and gas utility that has become one of the cleanest data-center winners in the sector: Microsoft (3.2 GW planned in the I-94 corridor) and Oracle/Vantage (1.3 GW at Port Washington, up to 3.5 GW later), plus a new unnamed 400 MW customer, sit behind a new $47.5B 2027-31 capital plan (up $10B), a 13.4% asset-base CAGR and 7-9%+ EPS growth. A tariff that makes the very large customers pay full cost and post collateral protects it. Q3 beat ($1.18 vs $0.83), and 2026 guidance rose to $5.60-5.64. But at the latest close of $115.87 (2026-11-06; the pack's 118.32 was the 11-05 close), near the top of its 3-year range, you pay 20.6x 2026 EPS, about 13.6x EV/EBITDA and about 25x unlevered owner earnings of about $2.45B. Reported free cash flow stays negative through 2031 (about $15B of cumulative unlevered deficit, funded by about $19B of new debt and $5.1-5.5B of new stock), and net debt is already about $23B. So our unlevered 10% DCF gives only about $63/share (range $30-98, very sensitive to the exit multiple because of the 60% debt load). The levered view (EPS about $8.4 by 2031, 18x exit, 3.3% dividend growing 6.5-7%) gives about 8-9% a year: a fair utility return, not a 50% setup. Sentiment is warm, not euphoric (6.5/10: mixed Buy/Hold coverage, targets about $118-130 after post-print raises). Rating 4.5: a fairly priced quality compounder with no edge at this price and no short case. Research rating 2.5: the open questions (timing of the Oracle transmission line, the Wisconsin rate orders, customer concentration) move value by single-digit percentages, not 40%. This is not a valuation-floor covered-call setup.
A deep dive would have to establish: Whether the Wisconsin rate orders and the refiled ATC Port Washington line keep the 13.4% asset-base growth on schedule at about 9.8-10.5% ROEs without bill backlash forcing lower returns or more equity, because only a re-rating from about 20x to 23x+ EPS would get the return near our target.
Research (expand)
What the company does
WEC Energy Group (Milwaukee) owns We Energies, Wisconsin Public Service, Wisconsin Gas, Peoples Gas and North Shore Gas (Chicago), Michigan Gas Utilities, Minnesota Energy Resources and UMERC. It serves 4.8M customers and has about $54B of assets. It also owns about 60% of American Transmission Co. (equity method; about $2.5B carrying value), We Power (leased generation), and WEC Infrastructure (contracted wind and solar sold to non-WEC offtakers). In 2025 the asset base of $34.2B was 63% Wisconsin, 14% Illinois, 10% ATC, 9% WECI and 4% Michigan/Minnesota. Management guides it to $72.8B by 2031, 75% Wisconsin and 80% electric, with 29% dedicated to very large customers (VLCs).
The investment case
- Data-center load in a constructive state. Forecast demand rises 4.9 GW over 2026-31, about 60% of current electric demand: Microsoft/SE Wisconsin 3.2 GW (management thinks the sites could reach 4.5-5 GW), Oracle/Vantage at Port Washington 1.3 GW (3.5 GW potential), and 400 MW from a new customer still to be named.
- The VLC tariff. The PSCW approved it in 2026. Hyperscalers pay for bespoke generation and dedicated distribution over 15-20 year terms, post credit support, and must still pay if they cancel or downsize. The VLC ROE is 10.48-10.98% against about 9.8% for the core utility. More VLC projects now pay a cash return during construction instead of AFUDC. That is why the plan grew $10B while equity needs stayed flat at $5.1-5.5B, and incremental capital now needs about 40% equity content instead of 50%.
- Guidance. EPS growth is now 7-9%+ for 2027-31 off the $5.56 base, with the 'plus' most likely in 2028-29, and the dividend grows 6.5-7% a year with payout falling to 60-70%. The record is 23 straight dividend raises and steady delivery against guidance.
What it earns today (real free cash flow), FY2026E, $M
- Operating income: about 2,620 (9M 1,976.5 plus Q4E). Add ATC equity earnings (about 250) and other income (about 210, of which about 190 is non-cash AFUDC-equity). EBIT is about 2,970; EBITDA is about 4,510 (9M 3,472.8 plus Q4E about 1,040).
- Strip AFUDC-equity (non-cash, capitalized into rate base): about 2,780.
- Unlevered cash-ish taxes: about 330. WEC's book tax rate is only about 8% because of production tax credits and excess deferred tax flowback, and those are fairly persistent.
- D&A of about 1,550 is roughly equal to maintenance capex. Pipe, pole and substation replacement on a 13,000-mile system is a real treadmill, so I treat D&A as maintenance. Stock comp is small and already sits in O&M.
- Unlevered owner earnings are about $2.45B, so only about 54% of EBITDA reaches capital providers. On an EV of about $61.3B that is about 25x, a 4.0% yield.
- After-tax interest is about $0.77B (interest expense about $0.94B in 2026), which leaves about $1.68B for equity: a 4.4% owner-earnings yield on the $38.1B market cap (GAAP net income is about $1.85B including AFUDC; P/E 20.6x).
- Reported FCF is negative. 9M CFO was 3,413 against capex 3,319, ATC contributions 173 and a project option 171. Full-year FCF before dividends is about -$0.8B, and after the $1.25B of dividends the gap is about -$2B, funded by debt and stock (the ATM, plus 7.0M forward shares, about $764M, still to settle by March 2028).
- Mature-company test: today's year repeated forever is 2.45/0.10 = $24.5B, less $23.2B of net debt, which leaves about $1.3B, or about $4/share. If nothing changed, equity would earn about $1.7B a year, 4.4% on the price. The whole value depends on the growth programme earning its allowed return, and the 60%-debt capital structure (debt/cap 60.9%) makes the equity a levered call on regulators.
Free cash flow for the next 5 years (unlevered, after all capex, $B)
My assumptions: average asset base rising from about $39B (2026) to $72.8B (2031); an unlevered return of about 6.5-6.8% on assets (including VLC cash returns on construction work in progress); D&A rising to about $2.3B; consolidated capex from slide 20 excluding ATC (8.4 / 9.1 / 9.1 / 8.1 / 7.5), plus WEC's equity share of ATC capex of about $0.45-0.65B a year.
| Year | Owner earnings (NOPAT) | D&A | Capex incl. ATC equity | Unlevered FCF |
|---|---|---|---|---|
| 2027 | 3.00 | 1.75 | 8.96 | -4.2 |
| 2028 | 3.40 | 1.90 | 9.73 | -4.4 |
| 2029 | 3.85 | 2.05 | 9.58 | -3.7 |
| 2030 | 4.30 | 2.20 | 8.50 | -2.0 |
| 2031 | 4.75 | 2.30 | 7.97 | -0.9 |
The cumulative deficit of about $15B matches management's funding slide (CFO $26.1-27.1B against $42.2B of capex plus $8.6-8.8B of dividends, with $18.7-19.3B of debt and $5.1-5.5B of equity filling the gap). Growth runs for at least 5 more years. Management says VLC demand extends into 2032-33 (long-lead equipment for the 400 MW customer is already in the plan), and replacing or extending the Point Beach PPA and the Illinois pipe programme (about $500M a year from 2028) add more.
WEC in 2031 will not be a corpse. It will be a roughly twice-as-large regulated electric utility (asset base $72.8B, owner earnings about $4.75B, EPS about $8.2-8.6), still growing 6-8%, with about 30% of its assets contracted to investment-grade hyperscalers. Confidence in the trajectory is fairly high, about 70%: regulated returns, a signed tariff and customers already building. The less certain part is the multiple the market will pay for it.
Fair value and multiples
- Today: P/E 20.6x on 2026 guidance ($5.62) and 19.2x on 2027 consensus ($6.03); EV/EBITDA about 13.6x; EV/unlevered owner earnings about 25x; price/book 2.6x (book equity $14.6B); dividend yield 3.3%, but net of equity issuance (about 2.8% of market cap a year) the shareholder yield is only about 0.5%.
- House DCF (unlevered, 10%): PV of 2027-31 FCF is about -$12.2B. The year-5 value is 2031 owner earnings of $4.75B times 19x (a durable regulated grower at 6-8%, top of the 10-18x mature band with a premium for visibility), which is $90B, or $56.0B in PV. EV is about $43.8B; less $23.2B of net debt, equity is about $20.6B, about $63/share (range about $30 at 16x on $4.5B to about $98 at 22x on $4.9B). A 10% unlevered hurdle is far above a utility's roughly 6.5% cost of capital, so this method structurally marks a 60%-levered utility well below market. That is the honest answer to whether this hits our return target: no.
- Levered cross-check: 2031 EPS of about $8.4 at 18x is about $151, plus about $21 of dividends. From $115.87 that is about 8-9% a year (about 10% if it holds 20x, about 6% at 16x). Discounting that at a 10% equity hurdle gives about $105-112.
- Fair value about $108 (range $90-126): slightly below the price, in line with the about $118-125 analyst targets once you account for the 8-9% expected return against our 10% hurdle. The stock is at 99% of its 3-year range and up about 15% from the September low near $101, so it is not near the bottom of its range.
Management, risks and competition
- Management. CEO Scott Lauber (former CFO, a WEC lifer) and CFO Xia Liu are conservative, transparent operators. The equity plan is modest, debt is assumed at about 6.7%, and they have hit guidance for years. In Illinois, governance of Peoples Gas has been the soft spot: a $150M reserve in 2025 and a 12-docket settlement with the AG. There are no governance red flags, and they do not 'eat the money': about 65% of earnings is paid out and the rest is reinvested at regulated returns.
- Oracle line timing. The PSC rescinded completeness on ATC's Port Washington transmission application in August 2026. ATC refiled on 2026-09-14, which restarts a roughly 6-month review, and construction takes 12-15 months. Press reports flag up to a year of delay for Oracle's Project Lighthouse. A delay shifts earnings rather than destroying them, but it is the near-term headline risk.
- Counterparty concentration. VLCs are about 45% of the capex plan and about 29% of 2031 assets. Oracle's parent is rated BBB-, and a downgrade triggered extra collateral (posted). The tariff makes VLCs pay for bespoke assets if they downsize, but cost reimbursement only applies in specified circumstances and PSCW approval is needed to repurpose assets.
- Affordability backlash. We Energies is asking for +4.7% in 2027 and +4.5% in 2028 (about 14% bills by 2028), and the Citizens Utility Board and coalitions are pushing to reject it. PSC staff proposed cutting WPS's ROE to 9.50% from 9.80%. Each 10 bp of ROE is worth about 1% of EPS.
- Illinois. The ALJ proposed a 9.48% ROE and 50% equity ratio for Peoples Gas, with a decision due in December. State gas policy is hostile and the pipe programme is ramping slowly on staffing.
- Rates and dilution. About $19B of new debt (including $4-5B of hybrids) at upper-6% coupons, plus $5.1-5.5B of new stock front-loaded. FFO/debt is targeted at 15% or more.
- Other. The Port Washington DNR environmental review (expected by early 2028), and an AI capex downturn, which would hit the upside, not the contracted base.
- Competition. WEC is a regulated monopoly in its territories. The real competition is for hyperscaler siting: Alliant in Wisconsin, ComEd/Exelon, AEP, Xcel and Entergy. Southeast Wisconsin's water, land and tariff clarity are giving WEC an edge so far.
How investors feel: 6.5/10 (warm, not euphoric)
- Analysts. Coverage is split roughly half Buy, half Hold, with one Sell. After the plan, Wells Fargo raised its target to $129 (Buy), Scotiabank to $128 (Buy) and BTIG to $130 (Buy). RBC Hold $122, HSBC Hold $107, Jefferies Hold $121, Barclays Equal Weight about $117, Mizuho Outperform $121. Consensus targets are about $118-125, roughly 2-8% upside.
- Price action. The stock fell 2% on the print (core weather-normal sales ex-VLC rose only 0.4%) but has since recovered to near its all-time high.
- Positioning. Short interest is about 14.5M shares (about 4.4% of shares, about 6 days to cover), steady and typical of utility hedging. No forced sellers, no insider buying of note, and no buyback (the company is a net issuer).
- Bottom line. This is a well-loved, crowded 'AI utility' quality name priced for steady execution. It is not a capitulation buy, and with a negative-FCF funding machine and no euphoric overvaluation, it is not a short either. Options: the pack shows call IV of 27% and put IV of 14% (a noisy, illiquid chain). The stock is not at a valuation floor, so this is not a covered-call setup.
- /Users/gregwo/stocks2/data/analysisv3/context/WEC.md (context pack incl. Q3 2026 call transcript, 10-Q forensic findings, short interest, options)
- https://s22.q4cdn.com/994559668/files/doc_earnings/2026/q3/generic/2026-Q3-WEC-Earnings-Package.pdf
- https://finance.yahoo.com/quote/WEC/history/
- https://stockanalysis.com/stocks/WEC/
- https://stockanalysis.com/stocks/wec/forecast/
- https://finviz.com/news/412301/wec-energy-beats-on-weather-but-the-475-billion-data-center-plan-is-the-real-story-as-core-demand-stalls
- https://finance.yahoo.com/markets/stocks/articles/wall-street-analysts-target-price-113228761.html
- https://www.tipranks.com/stocks/wec/forecast
- https://wisconsinwatch.org/2026/09/wisconsin-port-washington-data-center-atc-restarts-push-grid-upgrades-transmission-utility/
- https://urbanmilwaukee.com/2026/08/07/regulators-force-do-over-for-1-7-billion-data-center-power-line-plan/
- https://www.neoteo.com/en/atc-refiles-wisconsin-transmission-application-putting-oracle-campus-power-timing-at-risk
- https://www.spglobal.com/market-intelligence/en/news-insights/research/2026/08/commission-staff-supports-a-fraction-of-wisconsin-public-services-rate-request
- https://wtmj.com/news/2026/08/24/wisconsin-groups-call-on-regulators-to-reject-proposed-we-energies-rate-increases/
- https://www.cbs58.com/news/we-energies-requests-rate-hike-bills-could-increase-by-14-by-2028
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 10324+8% | 9800+14% | 8600-3% | 8893-7% | 9597 |
| Gross profit | 5353+13% | 4954+31% | 3786+5% | 3601+9% | 3301 |
| Operating expenses | 2793+19% | 2579+58% | 1633-4% | 1693+23% | 1376 |
| ▸Adj EBITDA | 4089+7% | 3853+10% | 3507+11% | 3172+4% | 3047 |
| ▸Adj OCF | 3652+4% | 3504+6% | 3291+18% | 2784+16% | 2402 |
| CapEx | -4622 | -4398 | -2781 | -2493 | -2334 |
| Adj FCF | -969 | -895-275% | 510+75% | 291+332% | 67.4 |
| Interest expense | 927 | 895 | 798 | 727 | 515 |
| ▸Adj net income | 1498+12% | 1365+20% | 1137+16% | 978-10% | 1085 |
| ▸Owner's earnings | 1417 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 18214100% | 3353100% | 4047100% | 3916100% | 3527100% | 3370100% |
| FCF (OCF−capex) | -269-1% | 94.43% | -1046-26% | 43111% | 52615% | -273-8% |
| Net income | 732240% | 149445% | 155839% | 152839% | 133338% | 140842% |
| ▸Capital returned | 75.60% | 42213% | -631-16% | 2747% | 1905% | -180-5% |
| Buybacks | -1265 | -392 | -775 | -160 | 16.6 | 46.2 |
| Dividends | 5037 | 931 | 1148 | 1056 | 984 | 918 |
| Interest paid | 3634 | 699 | 895 | 798 | 727 | 515 |
| Debt paid down | -7331 | -815 | -1899 | -1420 | -1538 | -1659 |
| ▸Reinvestment | 18568102% | 3368100% | 4873120% | 3978102% | 346298% | 288886% |
| Capex (PP&E) | 15325 | 3319 | 4398 | 2781 | 2493 | 2334 |
| Intangibles & M&A | 2955 | 3.00 | 406 | 1039 | 1079 | 428 |
| Leases signed (net Δ) | 288 | 45.8 | 68.7 | 157 | -110 | 126 |
| Retained / other | 3362% | 36811% | 74.72% | -84.4-2% | -16.50% | -6.300% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 53898 | 51518 | 47363 | 43940 | 41872 |
| ▸Liabilities (total) | 38887 | 37466 | 34561 | 31868 | 30256 |
| Net debt (incl. leases) | 23115 | 22287 | 20317 | 18755 | 17338 |
| Net debt / Adj EBITDA | 5.65 | 5.78 | 5.79 | 5.91 | 5.69 |
| Net debt / Adj FCF | -- | -- | 39.8 | 64.4 | 257 |
| Adj EBITDA / interest | 4.41 | 4.30 | 4.39 | 4.36 | 5.92 |
| Shares outstanding | 329 | 325 | 318 | 315 | 315 |
| Dilution (YoY) | +1.2% | +2.5% | +0.7% | +0.0% | +0.0% |
| Employees | 7000 | 7150 | 7017 | 7000 | 7022 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 51.9%+2.3 | 50.5%+6.5 | 44.0%+3.5 | 40.5%+6.1 | 34.4% |
| Adj EBITDA margin | 39.6%-0.5 | 39.3%-1.5 | 40.8%+5.1 | 35.7%+3.9 | 31.8% |
| Adj OCF margin | 35.4%-1.4 | 35.8%-2.5 | 38.3%+7.0 | 31.3%+6.3 | 25.0% |
| Adj FCF margin | -9.4%-4.9 | -9.1%-15.1 | 5.9%+2.7 | 3.3%+2.6 | 0.7% |
| Net income margin | 17.5%-0.2 | 15.9%-1.9 | 17.8%+2.8 | 15.0%+0.3 | 14.7% |
| Adj NI margin | 14.5%+0.5 | 13.9%+0.7 | 13.2%+2.2 | 11.0%-0.3 | 11.3% |
| ROIC (adj, after-tax) | 6.3% | 6.1% | 5.7% | 5.4% | 5.4% |
| Cost of debt | 4.1% | 4.2% | 4.1% | 4.0% | 3.2% |
Revenue Breakdown
Revenue Segments
| Wisconsin | $2.3B | +14% |
| Illinois | $749.7M | -5% |
| Other States | $257.3M | +13% |
| Non-Utility Energy Infrastructure | $210.7M | +8% |
| Wisconsin | $2.3B | +14% |
| Illinois | $749.7M | -5% |
| Other States | $257.3M | +13% |
| Non-Utility Energy Infrastructure | $210.7M | +8% |
Earnings Calls
Earnings Call · 2026 Q3
WEC Energy Group reported third quarter 2026 earnings of $1.18 per share versus $0.83 a year earlier, helped by warmer weather (about $0.05 year-over-year benefit), rate base growth, and operating efficiency. Management raised and narrowed 2026 guidance to $5.60-$5.64 per share from $5.51-$5.61, a 7.7% increase over the 2025 adjusted guidance midpoint. Utility earnings rose $0.28; rate base growth added $0.19, including $0.15 from AFUDC equity and cash returns on construction projects, of which $0.12 (80%) relates to very large customers (VLCs). Favorable O&M contributed $0.08, largely stock-based compensation timing. Weather-normal retail electric sales grew 4.1%, or 0.4% excluding the iron ore mine and VLCs; full-year sales are still expected to be flat. ATC added $0.03, energy infrastructure $0.02, and corporate $0.04 on tax timing. The headline was a new 2027-2031 capital plan of $47.5 billion, up $10 billion (over 26%) from the prior plan, with roughly $8 billion or more tied to VLCs. About 45% of total capital, over $20 billion, serves VLCs, which would represent almost 30% of the asset base by 2031. Forecast electric demand growth rose by 1 gigawatt to 4.9 GW through 2031. This includes 3.2 GW in the I-94 corridor for Microsoft (up 600 MW), 1.3 GW for the Vantage/Oracle site, and an additional 400 MW from an unnamed customer expected to be announced. The plan adds $6.8 billion of natural gas generation including a combined cycle plant, $1.1 billion more for renewables and batteries, $1.2 billion more for ATC (total $5.3 billion), and $1 billion more for distribution, including Chicago pipe replacement. WEC also agreed to extend the Point Beach nuclear PPA by 20 years, and Oracle will subscribe to part of that energy, saving customers about $300 million in fuel costs. Asset base growth is projected at a 13.4% CAGR, supporting EPS growth of 7% to 9+% from the 2026 original midpoint of $5.56. Financing includes $26-27 billion of operating cash flow, $19 billion of debt including hybrids, and $5-5.5 billion of common equity, roughly flat versus the prior plan. This is thanks to more cash returns on CWIP from VLCs instead of AFUDC. Equity per incremental capital dollar should fall to about 40% from 50%. Equity is slightly front-end loaded. On regulatory matters, Wisconsin rate cases for 2027-2028 should be decided by year-end, and the Illinois ALJ proposed a 9.48% ROE and 50% equity ratio for Peoples Gas and North Shore, with a decision due in December. ATC's refiled transmission application for the Vantage site is under commission review. Management expects 2027 dividend and guidance in December, with 6.5-7% dividend growth.
▸What is assumed in the "plus" of the 7%-9+% EPS growth range, and why keep the 7% low end?Shar Pourreza · Wells Fargo
▸What is the timeline for the ATC line serving the Vantage/Oracle site, and could it delay the project?Shar Pourreza · Wells Fargo
▸Does the capital plan already include potential Microsoft/Oracle expansions and the new customer, or would those add capital?Nicholas Campanella · Barclays
▸How sustainable are the flat equity needs beyond this plan given chunky 2032 generation and load ramp?Nicholas Campanella · Barclays
▸Is the "plus" more likely in 2029 and beyond given capital peaking around 2028?Nicholas Campanella · Barclays
▸How much acreage does Microsoft's expanded 3.2 GW relate to, and how might density per acre change sizing?Steve D'Ambrisi · RBC Capital Markets
▸Is the 400 MW customer in WEPCO or WPS territory?Steve D'Ambrisi · RBC Capital Markets
▸Is the "plus" only for one or two years before returning to the 7%-9% range?Michael Sullivan · Wolfe Research
▸What changed to lower near-term equity needs, and why wouldn't it persist with expansions?Michael Sullivan · Wolfe Research
▸Is the 400 MW all with one customer, and what are the gating items?Michael Sullivan · Wolfe Research
▸Why does the electric sales growth outlook stay at 6%-8% despite adding a gigawatt, and why did gas sales growth come down?Andrew Weisel · Scotiabank
▸How should the timing of equity issuance look, and common versus JSNs?Andrew Weisel · Scotiabank
▸Which customer, Microsoft or Oracle/Vantage, has the greatest potential to exceed the planned load?Anthony Crowdell · Mizuho
▸Is there a point where customer concentration (nearly 30% of assets in VLCs) becomes a concern?Anthony Crowdell · Mizuho
▸Does EPS growth cadence follow the capital plan, with less equity as VLC cash recovery ramps?Brian Russo · Jefferies
▸How long is construction of the ATC line, given the refiling and condensed timeline?Brian Russo · Jefferies
▸What is the view on the DNR environmental review following the Port Washington settlement?Brian Russo · Jefferies
▸Why is equity unchanged and how does the financing plan treat debt/equity and interest rate exposure?Diana Niles · JPMorgan (for Jeremy Tonet)
▸Are there particularities in VLC cash inflows, such as upfront payments, for rating agencies?Diana Niles · JPMorgan (for Jeremy Tonet)
▸Is the "plus" applicable to the five-year CAGR or more to 2028-2029?Steve Fleishman · Wolfe Research
▸How much transmission capex in the plan is tied to VLCs?Carly Davenport · Goldman Sachs
▸Does the 29% VLC asset base share include the 400 MW unnamed customer and long-lead equipment?Richard Sunderland · Truist Securities
▸What is the progress on Illinois pipe replacement, including staffing, and how does it inform rate cases?Richard Sunderland · Truist Securities
▸How does the 1 GW of added demand connect to the $10 billion of added capex?Paul Patterson · Glenrock Associates
▸How much of the incremental capex is associated with VLCs?Paul Patterson · Glenrock Associates
▸Are there deposits, collateral or prepayments in the capex increase, or is it only CWIP versus AFUDC?Paul Patterson · Glenrock Associates
▸Does the $200 million of VLC-dedicated substations in distribution include any CIAC?Paul Patterson · Glenrock Associates
SEC Filing Findings
SEC Filing — material findings
2026-10-30 · depth 9/10risk 7Customer Concentration / Counterparty Credit▸Oracle (OACS) is the anchor VLC for Port Washington; its parent's credit downgrade triggered additional collateral requirements, and Oracle is rated BBB- per management. Oracle's court challenge to VLC collateral terms was withdrawn by a VLC petitioner in the filing but the rehearing petition was deemed denied; collateral is tied to project spend.
Oracle (OACS) is the anchor VLC for Port Washington; its parent's credit downgrade triggered additional collateral requirements, and Oracle is rated BBB- per management. Oracle's court challenge to VLC collateral terms was withdrawn by a VLC petitioner in the filing but the rehearing petition was deemed denied; collateral is tied to project spend.
risk 6Regulatory / Stranded Cost Recovery▸VLC/Bespoke payment and cancellation terms make customers liable for costs only until service agreements are executed; the 100 MW threshold and 15-year term were tightened by PSCW, but the filing notes reimbursement is required only in specified circumstances, leaving residual stranded-asset exposure if a VLC terminates or downsizes.
VLC/Bespoke payment and cancellation terms make customers liable for costs only until service agreements are executed; the 100 MW threshold and 15-year term were tightened by PSCW, but the filing notes reimbursement is required only in specified circumstances, leaving residual stranded-asset exposure if a VLC terminates or downsizes.
risk 6Dilution▸Common equity is being raised through a $3.0B ATM with forward sale contracts; forward contracts outstanding are unsettled and will issue additional shares at below-current forward prices on settlement, with settlement dates extending to March 2028.
Common equity is being raised through a $3.0B ATM with forward sale contracts; forward contracts outstanding are unsettled and will issue additional shares at below-current forward prices on settlement, with settlement dates extending to March 2028.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $97.50 | $18.70/$22.70 | 0 | --/$1.75 | 9 |
| $100.00 | $16.20/$20.20 | 0 | --/$1.95 | 0 |
| $105.00 | $11.30/$13.80 | 0 | $0.15/$0.45 | 8 |
| $110.00 | $7.30/$9.00 | 67 | $0.35/$1.05 | 6 |
| $115.00 | $3.70/$5.80 | 95 | $1.45/$1.95 | 2 |
| $120.00 | $1.50/$2.05 | 814 | $3.80/$5.40 | 0 |
| $125.00 | $0.40/$0.75 | 0 | $7.70/$10.00 | 0 |
| $130.00 | --/$2.05 | 0 | $10.90/$14.80 | 0 |
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $3.89B | $93.15 | +$31.7M | +$407M | — | $6.70T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $2.48B | $115.78 | +$12.6M | +$2.48B | — | $4.68T |
| STATE STREET CORPPassive | $2.46B | $83.50 | −$17.4M | +$71.2M | — | $3.38T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $1.97B | $115.78 | +$12.4M | +$1.97B | — | $2.22T |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $1.08B | $91.87 | +$15.6M | +$75.1M | — | $1.87T |
| BANK OF AMERICA CORP /DE/ | $1.00B | $95.33 | +$74.2M | +$158M | — | $1.54T |
| WELLS FARGO & COMPANY/MN | $1.00B | $91.37 | +$1.5M | +$59.5M | — | $572.80B |
| DEUTSCHE BANK AG\ | $707M | $96.36 | +$14.2M | +$55.0M | — | $343.79B |
| AMERIPRISE FINANCIAL INC | $681M | $101.02 | +$18.1M | +$161M | — | $494.20B |
| CHARLES SCHWAB INVESTMENT MANAGEMENT INC | $630M | $96.46 | −$6.5M | +$19.2M | — | $742.21B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
| Ticker | Name | Co-holders | Score |
|---|---|---|---|
| APD | Air Products and Chemicals, Inc. | 3 | 15.43× |
| SO | The Southern Company | 3 | 14.50× |
| GD | General Dynamics Corporation | 3 | 11.70× |
| ADP | Automatic Data Processing, Inc. | 4 | 10.63× |
| USB | U.S. Bancorp | 3 | 9.67× |
| CMI | Cummins Inc. | 4 | 9.12× |
| ADI | Analog Devices, Inc. | 6 | 8.74× |
| CB | Chubb Limited | 3 | 6.65× |
| NEE | NextEra Energy, Inc. | 4 | 6.45× |
| TXN | Texas Instruments Incorporated | 5 | 6.33× |
| PEP | PepsiCo, Inc. | 3 | 5.94× |
| APH | Amphenol Corporation | 5 | 5.87× |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2006 Q1 | 1.1B | 187M | 89M | $0.32 | $0.26 – $0.38 | 13 |
| 2006 Q2 | 749M | 162M | 57M | $0.21 | $0.17 – $0.25 | 8 |
| 2006 Q3 | 784M | 167M | 66M | $0.26 | $0.21 – $0.31 | 18 |
| 2006 Q4 | 1.1B | 153M | 77M | $0.30 | $0.24 – $0.36 | 14 |
| 2007 Q1 | 1.2B | 202M | 93M | $0.37 | $0.30 – $0.44 | 13 |
| 2007 Q2 | 653M | 130M | 35M | $0.11 | $0.09 – $0.13 | 13 |
| 2007 Q3 | 856M | 189M | 80M | $0.33 | $0.26 – $0.40 | 20 |
| 2007 Q4 | 1.0B | 173M | 81M | $0.30 | $0.24 – $0.36 | 14 |
| 2008 Q1 | 1.2B | 233M | 97M | $0.34 | $0.27 – $0.41 | 18 |
| 2008 Q2 | 908M | 181M | 56M | $0.23 | $0.18 – $0.28 | 17 |
| 2008 Q3 | 722M | 197M | 64M | $0.23 | $0.18 – $0.28 | 17 |
| 2008 Q4 | 1.0B | 175M | 81M | $0.29 | $0.23 – $0.35 | 14 |
| 2009 Q1 | 1.2B | 262M | 117M | $0.42 | $0.34 – $0.50 | 11 |
| 2009 Q2 | 650M | 207M | 45M | $0.15 | $0.12 – $0.18 | 19 |
| 2009 Q3 | 848M | 197M | 61M | $0.27 | $0.22 – $0.32 | 15 |
| 2009 Q4 | 995M | 250M | 111M | $0.42 | $0.34 – $0.50 | 17 |
| 2010 Q1 | 1.2B | 259M | 120M | $0.47 | $0.38 – $0.56 | 17 |
| 2010 Q2 | 819M | 231M | 81M | $0.31 | $0.25 – $0.37 | 8 |
| 2010 Q3 | 872M | 247M | 99M | $0.38 | $0.30 – $0.46 | 19 |
| 2010 Q4 | 1.0B | 270M | 121M | $0.49 | $0.39 – $0.59 | 9 |
| 2011 Q1 | 1.2B | 326M | 155M | $0.60 | $0.48 – $0.72 | 7 |
| 2011 Q2 | 943M | 262M | 104M | $0.37 | $0.30 – $0.44 | 14 |
| 2011 Q3 | 938M | 267M | 114M | $0.43 | $0.34 – $0.52 | 8 |
| 2011 Q4 | 1.1B | 276M | 114M | $0.47 | $0.38 – $0.56 | 9 |
| 2012 Q1 | 1.2B | 359M | 170M | $0.72 | $0.58 – $0.86 | 19 |
| 2012 Q2 | 815M | 346M | 100M | $0.37 | $0.30 – $0.44 | 19 |
| 2012 Q3 | 884M | 318M | 129M | $0.47 | $0.38 – $0.56 | 16 |
| 2012 Q4 | 1.0B | 223M | 94M | $0.39 | $0.31 – $0.47 | 16 |
| 2013 Q1 | 1.2B | 352M | 164M | $0.66 | $0.53 – $0.79 | 18 |
| 2013 Q2 | 895M | 282M | 103M | $0.40 | $0.32 – $0.48 | 7 |
| 2013 Q3 | 983M | 308M | 128M | $0.52 | $0.42 – $0.62 | 12 |
| 2013 Q4 | 1.1B | 319M | 135M | $0.55 | $0.44 – $0.66 | 9 |
| 2014 Q1 | 1.6B | 384M | 190M | $0.77 | $0.62 – $0.92 | 9 |
| 2014 Q2 | 936M | 297M | 118M | $0.46 | $0.37 – $0.55 | 17 |
| 2014 Q3 | 959M | 301M | 117M | $0.48 | $0.38 – $0.58 | 20 |
| 2014 Q4 | 1.3B | 313M | 128M | $0.59 | $0.47 – $0.71 | 8 |
| 2015 Q1 | 1.3B | 373M | 179M | $0.76 | $0.61 – $0.91 | 18 |
| 2015 Q2 | 924M | 257M | 75M | $0.51 | $0.41 – $0.61 | 19 |
| 2015 Q3 | 1.6B | 480M | 176M | $0.57 | $0.46 – $0.68 | 8 |
| 2015 Q4 | 1.9B | 510M | 184M | $0.65 | $0.52 – $0.78 | 12 |
| 2016 Q1 | 2.0B | 659M | 319M | $0.93 | $0.74 – $1.12 | 12 |
| 2016 Q2 | 1.6B | 499M | 178M | $0.55 | $0.44 – $0.66 | 11 |
| 2016 Q3 | 1.5B | 511M | 189M | $0.53 | $0.42 – $0.64 | 10 |
| 2016 Q4 | 2.0B | 507M | 195M | $0.61 | $0.49 – $0.73 | 20 |
| 2017 Q1 | 2.2B | 686M | 337M | $1.00 | $0.80 – $1.20 | 20 |
| 2017 Q2 | 1.5B | 509M | 182M | $0.53 | $0.42 – $0.64 | 15 |
| 2017 Q3 | 1.6B | 549M | 212M | $0.66 | $0.53 – $0.79 | 8 |
| 2017 Q4 | 2.0B | 785M | 414M | $0.65 | $0.52 – $0.78 | 13 |
| 2018 Q1 | 2.2B | 740M | 370M | $1.11 | $0.89 – $1.33 | 19 |
| 2018 Q2 | 1.5B | 557M | 211M | $0.61 | $0.49 – $0.73 | 10 |
| 2018 Q3 | 1.6B | 582M | 224M | $0.68 | $0.54 – $0.82 | 16 |
| 2018 Q4 | 2.0B | 564M | 199M | $0.61 | $0.49 – $0.73 | 14 |
| 2019 Q1 | 2.3B | 802M | 393M | $1.25 | $1.01 – $1.47 | 7 |
| 2019 Q2 | 1.6B | 609M | 223M | $0.70 | $0.57 – $0.82 | 11 |
| 2019 Q3 | 1.7B | 618M | 225M | $0.72 | $0.58 – $0.84 | 7 |
| 2019 Q4 | 2.2B | 624M | 227M | $0.72 | $0.58 – $0.84 | 10 |
| 2020 Q1 | 2.5B | 845M | 415M | $1.32 | $1.06 – $1.54 | 9 |
| 2020 Q2 | 1.6B | 616M | 217M | $0.70 | $0.56 – $0.82 | 6 |
| 2020 Q3 | 1.6B | 641M | 239M | $0.76 | $0.61 – $0.89 | 6 |
| 2020 Q4 | 2.1B | 630M | 229M | $0.73 | $0.59 – $0.86 | 6 |
| 2021 Q1 | 2.4B | 911M | 462M | $1.47 | $1.18 – $1.72 | 6 |
| 2021 Q2 | 1.6B | 671M | 248M | $0.79 | $0.64 – $0.93 | 4 |
| 2021 Q3 | 1.7B | 682M | 255M | $0.79 | $0.64 – $0.93 | 3 |
| 2021 Q4 | 1.7B | 635M | 215M | $0.68 | $0.54 – $0.79 | 5 |
| 2022 Q1 | 2.7B | 999M | 526M | $1.69 | $1.36 – $1.98 | 4 |
| 2022 Q2 | 1.8B | 760M | 314M | $0.85 | $0.68 – $1.00 | 5 |
| 2022 Q3 | 1.8B | 730M | 280M | $0.86 | $0.69 – $1.01 | 4 |
| 2022 Q4 | 1.9B | 665M | 201M | $0.74 | $0.60 – $0.87 | 6 |
| 2023 Q1 | 2.9B | 1.1B | 578M | $1.58 | $1.27 – $1.85 | 3 |
| 2023 Q2 | 2.1B | 949M | 397M | $0.85 | $0.68 – $0.99 | 4 |
| 2023 Q3 | 2.0B | 910M | 355M | $0.91 | $0.90 – $0.93 | 8 |
| 2023 Q4 | 2.8B | 771M | 221M | $1.08 | $1.07 – $1.27 | 6 |
| 2024 Q1 | 2.9B | 1.3B | 636M | $1.91 | $1.87 – $1.94 | 7 |
| 2024 Q2 | 1.9B | 777M | 209M | $0.63 | $0.63 – $0.74 | 8 |
| 2024 Q3 | 1.9B | 810M | 231M | $0.70 | $0.68 – $0.74 | 14 |
| 2024 Q4 | 2.6B | 1.1B | 467M | $1.42 | $1.36 – $1.48 | 6 |
| 2025 Q1 | 2.8B | 1.4B | 718M | $2.18 | $2.15 – $2.21 | 4 |
| 2025 Q2 | 1.8B | 856M | 232M | $0.70 | $0.69 – $0.71 | 5 |
| 2025 Q3 | 1.9B | 903M | 266M | $0.81 | $0.80 – $0.82 | 5 |
| 2025 Q4 | 2.1B | 1.1B | 457M | $1.39 | $1.38 – $1.42 | 6 |
| 2026 Q1 | 3.3B | 1.5B | 757M | $2.30 | $2.27 – $2.32 | 4 |
| 2026 Q2 | 2.1B | 917M | 264M | $0.80 | $0.79 – $0.82 | 6 |
| 2026 Q3 | 2.3B | 997M | 319M | $0.97 | $0.95 – $0.99 | 6 |
| 2026 Q4 | 2.8B | 1.1B | 390M | $1.19 | $0.99 – $1.37 | 4 |
| 2027 Q1 | 3.7B | 1.5B | 704M | $2.14 | $2.12 – $2.17 | 2 |
| 2027 Q2 | 2.4B | 1.1B | 314M | $0.95 | $0.85 – $1.05 | 1 |
| 2027 Q3 | 2.5B | 1.1B | 355M | $1.08 | $0.97 – $1.19 | 1 |
| 2027 Q4 | 3.0B | 1.4B | 620M | $1.89 | $1.69 – $2.08 | 1 |
| 2028 Q1 | 3.7B | 1.8B | 857M | $2.60 | $2.33 – $2.87 | 1 |
| 2028 Q2 | 2.3B | 1.2B | 335M | $1.02 | $0.91 – $1.12 | 1 |
| 2028 Q3 | 2.5B | 1.2B | 372M | $1.13 | $1.01 – $1.24 | 1 |
| 2028 Q4 | 3.0B | 1.5B | 587M | $1.78 | $1.60 – $1.96 | 1 |
| 2029 Q1 | 4.0B | 1.9B | 928M | $2.82 | $2.53 – $3.11 | 1 |
| 2029 Q2 | 2.5B | 1.3B | 361M | $1.10 | $0.98 – $1.21 | 1 |
| 2029 Q3 | 2.7B | 1.3B | 407M | $1.24 | $1.11 – $1.36 | 1 |
| 2029 Q4 | 3.2B | 1.6B | 635M | $1.93 | $1.73 – $2.13 | 1 |
| 2030 Q1 | 4.2B | 2.1B | 1.0B | $3.10 | $2.78 – $3.41 | 1 |
| 2030 Q2 | 2.6B | 1.4B | 392M | $1.19 | $1.07 – $1.31 | 1 |
| 2030 Q3 | 2.8B | 1.4B | 441M | $1.34 | $1.20 – $1.48 | 1 |
| 2030 Q4 | 3.3B | 1.7B | 687M | $2.09 | $1.87 – $2.30 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-11-13 | SELL | Lauber Scott J | director, officer: President and CEO | 22,422 | $117.16 | $2.63M | $7.84M |
| 2026-11-12 | SELL | Lauber Scott J | director, officer: President and CEO | 4,043 | $118.01 | $477K | $7.89M |
| 2026-11-10 | SELL | KELSEY MARGARET C | officer: Executive VP & General Counsel | 18,380 | $117.37 | $2.16M | $1.43M |
| 2026-11-04 | SELL | Mulroy Molly A | officer: EVP & Chief Admin Officer | 4,695 | $117.02 | $549K | $832K |
| 2026-08-11 | SELL | PAYNE ULICE JR | director | 980 | $105.58 | $103K | $2.07M |
| 2026-05-19 | SELL | Krueger Daniel | officer: EVP WEC Infrastructure | 4,665 | $110.96 | $518K | $815K |
| 2026-02-24 | SELL | PAYNE ULICE JR | director | 1,450 | $114.60 | $166K | $2.35M |
| 2026-02-23 | SELL | KLAPPA GALE E | director | 3,180 | $115.44 | $367K | $31.93M |
| 2026-02-17 | SELL | KLAPPA GALE E | director | 5,000 | $116.55 | $583K | $32.24M |
| 2026-02-13 | SELL | KLAPPA GALE E | director | 25,000 | $115.44 | $2.89M | $31.93M |
| 2026-02-13 | SELL | Straka Mary Beth | officer: Sr. VP-Corp Comm & Inv Rel | 2,815 | $115.50 | $325K | $544K |
| 2026-02-09 | SELL | Lauber Scott J | director, officer: President and CEO | 8,089 | $110.70 | $895K | $7.39M |
v2 analysis (legacy, 2026-07-29) — for comparison onlyclick to expand
Thesis
WEC Energy Group is a Midwest regulated electric/gas utility in the midst of the largest capital buildout in its history — a $37.5B five-year plan through 2030, driven almost entirely by hyperscale data-center load growth (Microsoft's Mount Pleasant Fairwater campus, Vantage's $15B 'Lighthouse' Port Washington campus serving OpenAI/Oracle). The PSCW's approval of a Very Large Customer / Bespoke Resources tariff locks in ROEs of 10.48-10.98% for the depreciable life of new generation assets and requires data centers to cover 100% of dedicated infrastructure and fuel costs, which meaningfully de-risks the incremental rate base being added and protects residential ratepayers (and equity holders) from stranded-asset risk. Management has repeatedly raised long-term EPS growth guidance, now 7-8% CAGR with acceleration expected from 2028 as the new load comes online. The company continues a 23-year dividend growth streak. The flip side is a classic 'growth utility funding gap': FCF is deeply negative (TTM -$1,154M) as capex runs 3-4x depreciation, funded by heavy equity issuance (2-2.5%/yr dilution plus $2.625B of converts maturing 2027-29 that create latent additional dilution) and debt growth (net debt/EBITDA ~5.8x, elevated for the sector). None of this is unusual for a utility executing a generational capex cycle backed by contracted, high-ROE load, but it does mean owner earnings realized in cash lag reported net income and shareholders are relying on continued smooth regulatory and capital-markets execution over the next several years.
Trade Signal
WEC's data-center growth story is real but the stock is priced near the analyst's bull-case scenario (already above base-case fair value of ~$95 and well above the ~$75-79 target), while ongoing equity/convert dilution and elevated leverage cap the upside — a moderate short/avoid on valuation, tempered by the quality of the underlying growth and dividend support that argue against an aggressive short.'}}
WEC drifted up through 2025 from ~$75 to ~$115 on a broad re-rating of data-center-exposed utilities (Microsoft Mount Pleasant, Vantage Lighthouse campus), then chopped sideways/down slightly (-6% 1m, -2% 3m) after Q1 earnings (EPS $2.45, beat, guidance reaffirmed) despite the PSCW's VLC tariff decision actually tightening terms versus what WEC proposed (100% cost recovery mandate, lower MW threshold, longer contract terms) — a modest negative for the bull case that the market has mostly shrugged off. The stock sits near 52w highs and near the top of even the analyst's bull-case fair value ($117.78), well above the base case ($94.6) and far above the bear case ($71.93). This isn't a temporary dislocation; it's a durable re-rating on a real growth story, but the price has now run ahead of even generous scenario math — a slow overshoot rather than a panic mispricing.
WEC is a well-liked, low-drama regulated utility riding the AI/data-center power-demand narrative — Wall Street consensus is Hold (10 buy/21 hold/4 sell) with average target $122 (10% upside), so sell-side is still constructive but not euphoric. Retail attention (web traffic to IR site) has spiked 4x in two months, suggesting growing retail/thematic interest in the data-center angle. Short interest is low (4.2% of float) and falling. Insiders have sold steadily (18 sales, no buys, ~$15M) but that's typical for a dividend utility with equity comp. Overall: liked, constructive, moderately crowded around the data-center theme, not stale — market has priced in much of the growth story already.
The data-center buildout (Microsoft, Vantage/OpenAI-Oracle) is real and large, and WEC's $37.5B five-year capex plan plus locked-in 10.5-11% ROEs on VLC-related rate base is a genuine structural upgrade to earnings quality and growth durability. However, this is already the dominant Street narrative — analyst long-term EPS growth guidance (7-8%, upper half from 2028) is public and widely modeled, and the tighter VLC tariff terms (100% cost pass-through, 15-year contracts) were specifically designed to be visible and de-risking, so the market already prices much of this. There isn't a near-term print likely to reveal a scale of profitability the market doesn't expect; more likely a grinding confirmation over 2027-2028 as data centers actually go live.
- •2026-Q4 · Wisconsin electric/gas rate case final order (2027-2028 rates) — Could reaffirm or further tighten allowed ROE/cost recovery; tighter terms already seen with VLC tariff are a risk flag
- •2026-08 / 2026-11 · Q2/Q3 2026 earnings prints — Watch for capex financing updates, equity issuance pace (~$1.1B/yr) and any slippage in data-center timelines
- ▲H2 2026-2028 · Vantage/Microsoft construction milestones — First data centers online 2028; any delay (permitting, diesel-generator opposition) is a negative surprise risk
- ▼2027-2029 · $2.625B convertible notes maturities — Dilution overhang builds as maturities approach, pressuring multiple
- ▼ongoing through 2030 · Continued ~$1B/yr equity issuance — Steady share count growth funding the capex plan caps EPS accretion
Persistent equity issuance (~$1.1B/yr, ~2% dilution TTM) to fund the $37.5B capex plan is a structural headwind to per-share value; convertible note overhang ($2.625B maturing 2027-2029) adds further dilution risk. No buyback. Dividend continues to grow (6.7% hike, 23rd year) which is a modest support for holders but doesn't offset net share creation. Insiders have been net sellers with zero buys in 12 months.
There's a soft floor from the dividend (3% yield, 23-year growth streak) and regulated, largely non-cyclical earnings base, but no hard net-cash or asset floor — leverage is elevated (5.8x net debt/EBITDA) and FCF is negative (-4% yield) due to the capex supercycle, so the balance sheet itself provides no support. On the upside, continuous equity issuance to fund capex acts as a real ceiling — every rally invites another equity raise, and convert dilution kicks in as the stock appreciates toward conversion strikes.
Real buyers exist — WEC is a dividend-aristocrat regulated utility with genuine secular growth (data centers), which is exactly the kind of story momentum/income and thematic AI-infrastructure funds want to own; it's liquid ($226M/day) and institutionally held. But at $111 vs a $75-95 fair-value range implied by the analyst's own base/bear cases, new buyers are paying for a scenario close to the top of the distribution — the marginal buyer here is chasing a well-known narrative rather than finding an unrecognized inflection, which is a weaker setup for continued re-rating.
Greed dominates the market's read on this name (loved growth-utility/data-center story) but my gut leans toward fear at this price — paying near-bull-case value for a levered, dilution-heavy utility with a stretched regulatory relationship (PSCW just tightened terms) feels like chasing a crowded trade past fair value.
Valuation
Q2 2026 results (adj NI $175M, seasonally weak as always) and the accompanying commentary largely confirm what the market already knew from the Q1 call and the April 2026 PSCW VLC tariff approval: guidance reaffirmed, capital plan unchanged at $37.5B, Vantage and Microsoft projects proceeding on schedule (DNR permit granted June 2026), dividend track intact. There is no material surprise — no guidance change, no new capex increase, no new regulatory ruling — beyond routine execution confirmation.
▸ How the cases moved
No meaningful shift in bear/base/bull equity values or probabilities versus the day before the print; all major inputs (VLC tariff structure, capital plan size, Microsoft/Vantage progress, leverage trajectory) were already known from the Q1 call and April PSCW order. Q2 is a seasonally low quarter for this utility and results were in line, not a catalyst for re-rating either up or down.
Data-center buildout timeline slips (permitting friction, diesel backup generator opposition, transmission delays), the PSCW's tighter VLC terms embolden further rate-case pushback, and the $2.625B of converts plus continued equity issuance dilute more heavily than guided. Leverage stays elevated (~6x) and rates stay higher for longer, compressing the multiple the market pays for growth utilities.
▸ Valuation
15x $1,562M adj NI = $23,430M equity value (P/E, no separate net debt step)
WEC executes roughly to its 7% long-term EPS CAGR guidance; Microsoft/Vantage campuses proceed on a normal, somewhat lumpy schedule; VLC tariff protections work as designed; equity and debt markets remain accessible for the ~$5B equity / $2B hybrid financing plan. Multiple reflects a solid, de-risked growth utility.
▸ Valuation
19x $1,622M adj NI = $30,818M equity value (P/E)
Data-center demand keeps expanding beyond current forecasts (3.5GW+ from Vantage alone, further Microsoft phases), the fixed long-duration ROE structure is recognized by the market as materially de-risking WEC's growth versus peers, and WEC re-rates toward the top of the regulated-utility growth cohort while executing financing smoothly.
▸ Valuation
23x $1,668M adj NI = $38,364M equity value (P/E)
▸ Target Rationale
Model value (~$25.0B) reflects the probability-weighted, discounted P/E-based terminal outcomes. I set the target modestly below the model value given the latent dilution overhang from $2.625B of converts maturing 2027-2029 (not fully captured in per-share math since equity value is company-wide but the conversion adds real cost of capital and could pressure the multiple investors are willing to pay), elevated leverage (5.8x net debt/EBITDA, near the top of the regulated-utility range), and execution risk inherent in nearly tripling the historical capex run-rate over five years. The story is fundamentally sound and well-regulated, but the financing math leaves less margin for error than the headline growth-rate acceleration suggests.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
WEC Energy Group (WEC) has reported strong operational and financial performance over the first half of 2026, supported by an aggressive capital expansion plan driven by unprecedented regional load growth.
- Financial Performance: WEC reported first-quarter 2026 net income of $804.4 million ($2.45 per share), up from $724.2 million ($2.27 per share) in Q1 2025. Consolidated quarterly revenues rose year-over-year by $284.7 million to reach $3.4 billion.
- Capital Plan Expansion: In early 2026, WEC increased its five-year capital expenditures (Capex) plan for the 2026–2030 period to approximately $37.5 billion. This represents a significant increase over previous years, targeting power grid upgrades, new generation capacity, and infrastructure needed to support incoming hyperscale data centers.
- Rate Reviews & Extensions: To fund this expansion, WEC’s subsidiaries (including Wisconsin Electric and Wisconsin Public Service Corporation) filed electric and natural gas rate reviews for 2027–2028. A final order from the Public Service Commission of Wisconsin (PSCW) is expected in Q4 2026. Additionally, WEC announced it is extending the operation of Units 7 and 8 at the Oak Creek Power Plant through 2027 to bridge the gap in grid reliability before new dispatchable generation comes online.
- Dividend Growth: WEC continued its long-term dividend growth track record, implementing a 6.7% dividend increase in January 2026, marking its 23rd consecutive year of higher payouts.
---
▸ Thesis-test Findings
Vantage Data Centers Wisconsin Site Construction Progress (2026)
Vantage Data Centers is actively moving forward with its $15 billion "Lighthouse" AI data center campus in Port Washington, Wisconsin, which represents a massive long-term load-growth opportunity for We Energies. Spanning 672 acres, the site is designed to deliver 902 MW of capacity across four data centers to support OpenAI and Oracle. Construction officially broke ground in December 2025, and work is well underway as of mid-2026. WEC has cleared several critical regulatory hurdles, including the Wisconsin Department of Natural Resources (DNR) issuing a minor-source air pollution control construction permit on June 12, 2026. However, the development has faced some local friction and public health concerns from environmental advocates regarding plans for on-site diesel backup generators. The first data center is slated for completion in 2028.
Wisconsin Public Service Commission VLC Tariff Challenges (2026)
In April 2026, the PSCW unanimously approved and significantly modified We Energies’ "Very Large Customer" (VLC) and Bespoke Resources Tariff. While the approval provides a concrete rate structure to bring large loads onto the system, the regulator's substantial modifications represent a tighter regulatory environment than WEC initially proposed. Most notably, the PSCW rejected a capacity-only option that would have shifted 25% of the construction costs of new natural gas plants and future fuel risk to non-participating ratepayers. Instead, data centers must cover 100% of their infrastructure and fuel costs. Additionally, the PSCW lowered the eligibility threshold from 500 MW to 100 MW (making the protective rate mandatory for smaller data centers) and extended the minimum contract term from 10 to 15 years to prevent early-exit stranded asset risks.
Microsoft Mount Pleasant Data Center Power Connection Timeline
Microsoft’s massive AI infrastructure development in Mount Pleasant, Wisconsin, is advancing quickly, bringing a direct boost to WEC's localized transmission projects. In January 2026, Mount Pleasant leaders approved plans for 15 additional data centers on Microsoft’s land, bringing its total regional commitment to over $20 billion and ~900 MW. The first major data center phase ("Fairwater") is on track to go online in early 2026. To connect these projects, We Energies and the American Transmission Company (ATC) are executing significant transmission infrastructure expansions. ATC's $625 million "Racine County Western Feed" project (constructing two new double-circuit 345-kV lines and expanding the Mount Pleasant, Nimbus, and Stratus substations) is actively under construction in 2026. However, critics have voiced alarms over the broader $2 billion+ ATC transmission buildout. To mitigate this risk, Microsoft is pre-paying and covering its share under the VLC tariff, paying approximately $564 million over the next two years to fund direct transmission connection costs without burdening existing residential ratepayers.