Stocks/WOR.AX

WOR.AX

Worley Limitedv3 6.5/10 · 2026-10-20
Energy·Oil & Gas Equipment & Services
10.27 AUD
4.6B AUD market cap
2.6% div yield
v3 Rating
6.5/105.0–7.5
Setup
7.0/105.5–8.0
Fair Value
12.00 AUD8.00 AUD–15.50 AUD+17%
DCF (10%)
11.80 AUD+15%
Base IRR
+14%+0%–+26%
Visibility
moderate±31%
Wall Street
(1 buy)
Rating
Revenue (TTM)
10.7B AUD
Owner Earnings
A$370M
Next-Yr Owner Earnings
A$460M
Growth
+7.0% × 6y
P / Next-Yr OE
10.9x
Net Debt
A$1.4B

Worley Limited, established in 2001 and headquartered in North Sydney, Australia, provides a comprehensive suite of professional project and asset lifecycle services to clients worldwide. The company primarily serves the global energy, chemicals, and natural resources industries. Its extensive service portfolio encompasses digital solutions, consulting, engineering and design, construction management, fabrication, supply chain management, overall project management, and ongoing operation, maintenance, and modification services. Worley caters to diverse markets, including renewable energy, power generation, upstream and midstream oil and gas, refining and chemical processing, infrastructure development, and the mining, minerals, and metals sectors. The company was formerly known as WorleyParsons Limited until it rebranded to Worley Limited in October 2019.

2-Year Price History

$9.95-27.7%
$10$11$12$13$14Initial target $12.00 · 2026-10-16Initial target $12.00 · 2026-10-20volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-20

Rating
6.55.0–7.5
Setup
7.05.5–8.0
Fair value (AUD)
12.008.00 – 15.50
Upside vs 10.27
+17%
DCF (10%)
11.806.50 – 16.50+15%
Base IRR
14%0% – 26%
Visibility
moderaterange ±31%
Sentiment
4/10
2026-10-20 · claude-opus-5-5 · priced at 9.36

Worley is the world's largest listed engineering, EPCM and project-services firm for energy, chemicals and resources. It is capital-light and works mostly on reimbursable contracts. The stock is at A$9.36, a five-year low and the bottom of its 3-year range (A$9.1-16.4). It fell 11.5% on the FY26 result after underlying EBITA dropped 10.8% to A$734m. The causes were a A$58m hit from the Iran/Hormuz war deferring Middle East work, A$39-50m of FX translation as the AUD rose, and a 22% fall in chemicals revenue. Backlog also dropped to A$13.8b from A$16.7b at the half year, and the company took A$120m of restructuring charges. Under the noise the business looks intact. Bookings rose 23% to A$15.5b, the factored pipeline is up 24%, and CP2 LNG is running to margin. The A$132m cost-out is done. FY27 guidance is mid-to-high single-digit EBITA growth, weighted to the second half. Data-center power, nuclear and the Uniper Connah's Quay EPC are real growth options. Normalized owner free cash flow is about A$370m after interest, leases and capex (stock-based pay is already expensed), or about A$450m before interest. That puts the stock on roughly 11.5x underlying NPATA, about 8% FCF yield and about 6.8x EV/EBITDA. It pays a 5.3% dividend and has about A$275m of a A$300m buyback left. My base DCF (7-8% EBITA CAGR, 13x terminal FCF, 10% discount) gives about A$11.8 per share, and I put fair value at about A$12, roughly 28% upside. That is attractive but not the 50% we are hunting for unless the Middle East normalizes and the market re-rates it toward the 15-16x P/E it held through 2023-25. Rating 6.5: a quality, low-risk-contract franchise at a cyclical-low multiple with buyback support, held back by real geopolitical, FX, refinancing-cost and backlog-conversion uncertainty, and by a habit of large 'below the line' charges. Research rating 7: the setup (hated, at the floor of its range, 11x earnings, buyback in the market) could produce a 40-50% re-rate within 12-18 months if FY27 H2 delivers and the backlog rebuilds as Connah's Quay, CP2 Phase 2 expansion and TC Energy reach FID. Those questions can be checked through Q&A and the February 2027 half-year result. At a valuation floor with predictable earnings, it is also a reasonable covered-call candidate if ASX option implied volatility is elevated.

A deep dive would have to establish: Whether the large unbooked awards (Connah's Quay, CP2 Phase 2 expansion, TC Energy, BCEI data-center power) reach FID and rebuild backlog in FY27 so that H2-weighted EBITA growth and 9%+ ex-procurement margins are delivered despite the Middle East, FX and higher refinancing costs, justifying a re-rate from ~11x to 14-16x NPATA.

Owner earnings, TTM
A$370MA$290M – A$430M
Realistic peak profit
A$560MA$450M – A$700M
Growth rate
7.0%2.0% – 11.0%
Years of growth
63 – 10
Market cap
A$4.6BA$4.5B – A$4.7B
EV
A$5.9BA$5.8B – A$6.3B
Net debt
A$1.4BA$1.3B – A$1.8B
Capital return / cap
9.0%7.0% – 11.0%
P/E
11.6×10.5× – 13.0×
EV/EBITDA
6.8×6.2× – 7.6×
FCF yield
8.1%6.5% – 9.5%
Projected FCF, base case (AUD millions)
Y1A$460MA$380M – A$510M
Y2A$510MA$400M – A$580M
Y3A$550MA$410M – A$640M
Y4A$595MA$420M – A$700M
Y5A$630MA$420M – A$760M
Competition: Competes with Fluor, KBR, Jacobs, Bechtel, Technip Energies, Wood (Sidara), McDermott and Hatch; Worley's global scale, reimbursable-only model and low-cost GID centres give it a durable edge in large EPCM/full-project delivery, while weakened peers (Wood, Petrofac) have reduced competitive capacity.
Governance: No serious governance issues; mild concern that 'underlying' results repeatedly exclude sizeable restructuring costs (A$120m in FY26) and that the 2019 Jacobs ECR acquisition left a goodwill-heavy balance sheet with negative net tangible assets.
Research (expand)

What the company does

Worley (ASX: WOR) is a Sydney-headquartered global professional-services and project-delivery firm with about 40,400 people in 43 countries. It handles consulting, engineering and design, procurement, construction management, fabrication, and operations and maintenance support for energy (53% of FY26 aggregated revenue; integrated gas/LNG is more than half of that), chemicals (20%) and resources (27%: copper, potash and fertilisers, iron ore, battery materials). By region, the Americas is 52% of revenue, EMEA 37% and APAC 11%. Professional services are about 52% of revenue, construction and fabrication about 17%, and procurement about 31%. More than 75-80% of work is reimbursable, and management repeatedly says it will not do competitively bid lump-sum turnkey work. About 93% of revenue is earned outside Australia, and about 44% is in USD or USD-pegged currencies.

The investment case

  • Down on short-term fear, not structural decline. FY26 underlying EBITA fell to A$734m from A$823m. At constant currency it was A$773m (-6%). The war that began in late February 2026 cost A$58m, mostly through deferred new awards rather than losses. FX translation took A$39m against FY25 rates and about A$50m against the outlook rates. Chemicals cancellations in Western Europe (Shell RED II, Northvolt the year before) cut chemicals revenue 22%. EBITA margin excluding procurement held at 9.0% (9.2% at constant currency), so the margins Worley bids at have not eroded.
  • Leading indicators are positive. FY26 bookings were A$15.5b (+23%), and 44% were sole-sourced. The factored pipeline is up 24%, and about half of it is expected to be awarded within 12 months. Backlog is A$13.8b (A$15.0b at constant currency), up 9% year on year but down from A$16.7b at the half year. The drop reflects burn on CP2, removal of the paused ExxonMobil Baytown Blue project, and FX. Several large awards are not yet in backlog: Uniper Connah's Quay (preferred EPC contractor), TC Energy, CP2 Phase 2 expansion, BCEI behind-the-meter data-center power plants, an AEP gas-turbine job, and a five-year Aramco pool agreement.
  • Cost base reset. The cost-out program delivered A$132m of savings against a A$100m target. Management says there is no restructuring planned for FY27. About A$70m will be reinvested over two years in AI, digital and growth hires.
  • Capital return. The A$500m buyback is complete. A new A$300m program started in May 2026, with about A$24m spent by 30 June, and buying continues daily (for example 121,859 shares on 19 October 2026). The 50c unfranked dividend is about a 5.3% yield. Together they could return about 9-11% of the market cap over the next year.
  • Growth options. These are power generation for data centers, nuclear (Worley says it supports about 15% of US nuclear capacity), copper (16 copper customers in FY26), LNG (Baker Hughes alliance), and full project delivery (reimbursable EPC/EPCM), which takes a larger share of customer capex.

What it earns today (real free cash flow, A$)

  • Underlying NPATA was A$395m (78.2c per share). Statutory NPATA was A$306m and statutory NPAT A$238m (47.1c). Acquired-intangible amortization of A$89m is non-cash. Stock-based pay is expensed under IFRS and is therefore already deducted.
  • Statutory operating cash flow was only A$401m, down from A$741m. It was depressed by a A$318m receivables build (advance-billing timing on major projects) and by cash restructuring costs. Normalized pre-interest, pre-tax operating cash was A$687m (93.6% of underlying EBITA). Interest and tax paid were A$181m. Lease payments plus maintenance and other capex were about A$118m (the company's own FCF bridge: A$401m OCF + A$56m divestments - leases and capex = A$339m FCF).
  • Normalized owner FCF is about A$370m after interest (range A$290-430m), or about A$450m before interest. I haircut it for the recurring 'one-off' charges Worley has a history of (around A$20-30m a year on average) and for rising interest. The weighted average cost of debt goes from 4.4% to a guided 6.0-6.2% after the EMTN refinancing, which costs about A$30-40m a year extra. There is no meaningful reinvestment treadmill: capex is small, and growth needs people and working capital, not plant.

Free cash flow for the next 5 years (unlevered, before interest, A$m, fiscal years to June)

| Year | EBITA (base) | Unlevered FCF (low / mid / high) |

|---|---|---|

| FY27 | ~780 (+6%, guidance mid-to-high single digit) | 380 / 460 / 510 |

| FY28 | ~850 | 400 / 510 / 580 |

| FY29 | ~920 | 410 / 550 / 640 |

| FY30 | ~990 | 420 / 595 / 700 |

| FY31 | ~1,050 | 420 / 630 / 760 |

The base case is about 7-8% EBITA CAGR, below management's 'double-digit EBITA CAGR to FY30' ambition but above FY26's decline. Worley grew EBITA at a 9% CAGR from FY22 (pro forma) to FY26 even with this year's dip.

What kind of company in 5 years

Worley should be a still-growing, mid-single-digit-plus income stream, not a corpse. Customers' capex on LNG, power, grid, copper and potash, and the rebuild of Middle East energy infrastructure, are multi-year themes. The reimbursable model limits blow-up risk. Its scale is a real moat for megaprojects; a customer publicly complained that only a few firms can deliver at that size. This is a cyclical services business, though: growth is lumpy, it depends on customers' FIDs, and it moves with oil and gas and chemicals capex. Category: about 5-8% growth with durable but cyclical cash flows, worth about 12-15x FCF. I use 13x. Confidence in the projection is moderate. The direction is clear, but timing, FX and Middle East outcomes can move any single year by ±15%.

Fair value and multiples

  • About 489m shares (490.0m on 1 Sep 2026, plus 1.5m from performance rights on 1 Oct, less ongoing buybacks). At A$9.36 the market cap is about A$4.58b.
  • Statutory net debt is A$1,746m including leases, and covenant leverage is 1.8x. Net debt excluding leases is about A$1.35b, which is what I subtract, because lease cash is already in FCF. EV is about A$5.9b excluding leases (about A$6.3b including them).
  • Multiples: about 11.6x trailing underlying NPATA (about 10.8x FY27e). Trailing statutory P/E is about 19.8x. EV/EBITDA is about 6.8x (IFRS 16 basis). FCF yield is about 8% levered and about 7.6% unlevered on EV.
  • DCF (10% discount): PV of FY27-31 unlevered FCF is about A$2.05b. Terminal value is 13 × A$630m = A$8.19b, with a PV of about A$5.09b. EV is about A$7.13b. Less A$1.35b net debt gives equity of about A$5.78b, or about A$11.8 per share. The bear case (EBITA flat around A$730m, 9x terminal, net debt A$1.5b) gives about A$6.5. The bull case (management's double-digit EBITA CAGR, 15-16x terminal) gives about A$16-16.5.
  • Fair value is about A$12.0 (range A$8-15.5), about 28% above the price. The base-case 5-year IRR is about 14% (value compounding about 9-10% a year, plus a 5% dividend, plus buyback accretion). The analyst consensus target is A$11.67 (10 analysts, 'Outperform'), cut from A$12.44 after the result.
  • Price chart: the stock has fallen steadily from about A$16.3 (Dec 2023) and A$14 (Oct 2025) to A$9.2-9.4 now, the 0th percentile of both its 1-year and 3-year range. A good-but-not-great deal sitting at the bottom of its range.

Management, risks and competition

  • Management: CEO Chris Ashton (since 2017) and CFO Justine Travers (since 2025). They are disciplined on contract risk (no lump-sum turnkey work) and on cash conversion (DSO is 44 days), and they have returned capital: A$500m of buybacks completed and A$300m under way. The BBB/stable credit rating is intact. Negatives:

- The 2019 Jacobs ECR acquisition (about A$4.6b) diluted returns, and net tangible assets are negative.

- 'Underlying' results have repeatedly excluded large restructuring costs, so statutory EPS (47c) badly lags underlying EPS (78c).

- The 'sustainability' revenue framing aged poorly as transition projects were cancelled (Northvolt, Shell RED II, Baytown Blue).

- FY26 guidance was missed.

- There are no serious governance issues.

  • Risks:

- The Iran/Hormuz conflict is unresolved, with the ceasefire declared over in July 2026. North African fertiliser projects are stalled by sulphur supply, and FY27 assumes a second-half Middle East recovery.

- FX: a stronger AUD hurts reported numbers. A shift to USD reporting is possible from FY28.

- Chemicals overcapacity in Europe and Asia.

- Mix shift to lower-margin procurement and construction.

- Refinancing: A$1.5b matures in FY27 and A$1.25b in FY28 at higher rates, and leverage is guided toward about 2.0x.

- Backlog conversion is lumpy and depends on FIDs.

- Concentration in CP2 / Venture Global.

  • Competition: Fluor, KBR, Jacobs, Bechtel (private), Technip Energies, Wood (now owned by Sidara), McDermott, Kent, Hatch, WSP/AtkinsRéalis, Petrofac (distressed) and Saipem in EPC. Worley's breadth and global integrated delivery centres (India, Colombia) give it a cost and scale edge in reimbursable EPCM. Wood's and Petrofac's troubles have reduced capacity among Worley's direct peers, which supports pricing.
  • Catalysts: FIDs on Connah's Quay, CP2 Phase 2 expansion and TC Energy; data-center power awards; AGM on 19 Nov 2026; H1 FY27 result around 25 Feb 2027; any Gulf de-escalation; a possible move to USD reporting. Buyback support is daily. No forced seller is visible in the public data. Growth and ESG holders exiting the former 'sustainability' story may explain the steady decline.

How investors feel: 3.5 / 10

Investors are disliked-to-ignored. The stock is at a five-year low, down about 21% year to date, and fell about 11% on results day. Commentary says FY27 guidance 'carries a higher credibility hurdle'. Web traffic rank has deteriorated over 12 months (about 334k to about 466k). Sell-side analysts are more constructive: the consensus is 'Outperform' from about 10 analysts, with an average target of A$11.67 (cut from A$12.44 on 3 Sep 2026), about 25% upside. The market is pricing Worley like an ex-growth cyclical. A clean FY27 second half would likely re-rate it toward the 14-16x P/E it held in 2023-25, which on FY28 earnings implies roughly A$13-15.

Sources
Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-10-169.236.57.012.0012.8015%3
2026-10-209.366.57.012.0011.8014%4

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue10680-5%10680-5%11226-5%11789+4%11324
Gross profit593-36%593-36%932+3%902+25%722
Operating expenses176-29%176-29%249-22%318+96%162
▸Adj EBITDA692-27%692-27%943+10%854+5%814
▸Adj OCF564-13%564-13%647+0%649+19%546
CapEx-63.0-63.0-76.0-95.0-82.0
Adj FCF501-12%501-12%571+3%554+19%464
Interest expense124124102116117
▸Adj net income130-63%130-63%355+10%324-11%364

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA2958100%692100%931100%841100%494100%
FCF (OCF−capex)176860%33849%66571%58770%17836%
Net income98733%23834%40944%30336%37.07%
▸Capital returned136546%21631%32034%45054%37977%
Buybacks5253591660.000.00
Dividends1044255264263262
Interest paid459124102116117
Debt paid down-663-522-21271.00.00
▸Reinvestment2167%-45.0-7%82.09%78.09%10120%
Capex (PP&E)31663.076.095.082.0
Intangibles & M&A9.00-1.000.00-15.025.0
Leases signed (net Δ)-109-1076.00-2.00-6.00
Retained / other85329%24736%44748%26832%-109-22%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 90 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)1068310683110191046410518
▸Liabilities (total)58085808533949674917
Net debt (incl. leases)17381738149115191902
Net debt / Adj EBITDA2.512.511.581.782.34
Net debt / Adj FCF3.473.472.612.744.10
Adj EBITDA / interest5.585.589.257.366.96
Shares outstanding488501530534526
Dilution (YoY)-5.5%-5.5%-0.8%+1.4%-0.5%
Employees40555--------
MarginsTTM2026202520242023
Gross margin5.5%-2.85.5%-2.88.3%+0.77.7%+1.36.4%
Adj EBITDA margin6.5%-1.96.5%-1.98.4%+1.27.2%+0.07.2%
Adj OCF margin5.3%-0.55.3%-0.55.8%+0.25.5%+0.74.8%
Adj FCF margin4.7%-0.44.7%-0.45.1%+0.44.7%+0.64.1%
Net income margin2.2%-1.42.2%-1.43.6%+1.12.6%+2.20.3%
Adj NI margin1.2%-1.91.2%-1.93.2%+0.42.8%-0.53.2%
ROIC (adj, after-tax)3.5%3.5%5.5%5.0%4.6%
Cost of debt4.6%4.6%4.4%5.4%5.0%

Earnings Calls

4 calls

Earnings Call · 2026 Q4

2026-08-25

Worley's full year 2026 results (year to 30 June 2026) reflected a challenging second half, driven mainly by the Middle East conflict, softer chemicals markets, and adverse foreign currency translation. Aggregated revenue was $12.0 billion, broadly flat on FY25, or $12.3 billion on a constant currency basis, up 2.3%. Growth was 5.4% in the first half on a constant currency basis, but softened in the second half. Underlying EBITA fell to $734 million from $823 million, or $773 million on a constant currency basis. The Middle East conflict reduced earnings by $58 million, in line with a June update. Translation effects were also significant: against the FX rates assumed in the outlook, EBITA was about $50 million lower, and against FY25 average rates it was $39 million lower. The underlying EBITA margin including procurement was 6.3% on a constant currency basis, while the margin excluding procurement was 9%, within the target range. One-off restructuring costs totalled $120 million, mostly in Western Europe, where local labor protections increased severance costs. These were excluded from underlying EBITA. The cost-out program delivered $132 million of savings against an initial $100 million target, creating a leaner base and funding about $70 million of reinvestment over two years in strategic hires, delivery platforms and digital tools. Normalised cash conversion was 93.6%, within the 85 to 95 per cent target range, and days sales outstanding improved to 44.3 days. Leverage was 1.8 times, below the 2 times target, with total liquidity of $2.1 billion and a BBB credit rating with a stable outlook. The weighted average cost of debt was 4.4 percent and is expected to rise after the refinancing of a euro medium-term note with a new A$375 million five-year note. Shareholder returns included a final dividend of 25 cents per share, unfranked, and $359 million returned under a $500 million buyback that was completed. A new $300 million buyback began in May. Safety performance improved, with a total recordable frequency rate of 0.07 and a serious case frequency rate of 0.006. Management highlighted the resilience of its more than 4,000 people in the Middle East and reported a 76 percent emissions reduction from the 2020 baseline. Commercial momentum was solid. Bookings were $15.5 billion, with 44 percent sole sourced, led by energy and resources. The sales pipeline rose 24 percent, led by the Americas and EMEA. Backlog grew 9 percent over twelve months to $13.8 billion, with about 62 percent expected to be delivered within 12 months. However, backlog fell from $16.7 billion at the half year due to work burn, timing of awards, the removal of ExxonMobil's Baytown Blue project from backlog, and currency translation; on a constant currency basis it would have been about $15 billion. Both phases of Venture Global's CP2 LNG project were booked during the year, with the remaining scope moving into backlog. Other wins included Uniper's Connah's Quay low carbon power project, where Worley is preferred bidder but which is not yet in backlog pending final investment decision, and Heidelberg's Padeswood carbon capture project. Worley also highlighted BHP's Jansen potash project and more than $10 billion of wins in identified growth markets. By sector, energy was the largest, with revenue up 8 percent to $6.4 billion. Chemicals fell 22 percent to $2.4 billion, reflecting project cancellations such as Shell's RED II Green project and oversupply in some regions. Resources grew 6 percent to $3.3 billion, driven by mine, fertilizers, copper and battery materials, with copper's long-term demand highlighted through contracts with 16 customers this year. Strategically, Worley is shifting toward reimbursable EPC and EPCM work and away from professional services alone. More than 45 percent of backlog is now in active EPC and EPCM projects, and management stated it will not take on lump-sum turnkey EPC work. For FY27, management guides to mid- to high single-digit growth in both aggregated revenue and underlying EBITA. Revenue phasing is expected to be broadly even across halves, while EBITA is expected to be weighted more heavily to the second half than historical norms, as the first half is seasonally affected by Northern Hemisphere summer. Margins are expected to be broadly flat, with mix effects from construction-phase projects such as CP2 offset by cost discipline and higher-margin power and data center work. Middle East work volumes are expected to lift in the second half as deferred projects return, although sulfur supply constraints are delaying fertilizer projects in North Africa. The company is also looking at changing its presentation currency from Australian dollars to US dollars. FY27 results will remain in Australian dollars, with a potential US dollar move from FY28. Looking further out, management reaffirmed a FY30 ambition for a medium-term double-digit underlying EBITA CAGR, supported by current market growth, AI-enabled full project delivery, future-facing growth markets such as power and data centers, and scale benefits.

Analyst Q&A (20)
▸
Is there a currency headwind embedded in the mid to high single digit EBITA growth guidance, or is it a constant currency expectation?
Niraj-Samip Shah · Goldman Sachs
The outlook uses weighted average forward exchange rates across the portfolio's roughly 30 currencies. Performance will be reported on a like-for-like basis against the prior year as the year progresses.
▸
Given the stronger second half weighting, should first half EBITA grow?
Niraj-Samip Shah · Goldman Sachs
Historically earnings split roughly 45 to 55 percent between halves. Management expects the FY27 skew to be greater than that toward the second half. Northern Hemisphere summer holidays always weigh on the first half of the financial year.
▸
How should we think about potential restructuring costs into FY27 and below the line items?
Niraj-Samip Shah · Goldman Sachs
There is no plan for further restructuring in FY27, though resource allocation and cost discipline will continue. The treatment of restructuring costs is consistent with prior periods and has not changed.
▸
What drove the material step down in backlog from March to June, and what has happened in the first couple of months of FY27?
Ramoun Lazar · Jefferies
The decline reflects work executed, removal of Baytown Blue, currency translation, and the burn profile in the second half. Management is optimistic given strategic wins. Some recent wins such as Connah's Quay are not yet in backlog because the figure is a point-in-time measure at 30 June.
▸
Have any of the recent project wins moved into backlog in the early months of FY27, or are there still delays?
Ramoun Lazar · Jefferies
Recent wins including Connah's Quay, where Worley is preferred contractor, are not yet reflected in backlog. Connah's Quay and TC Energy EPC awards will be material once they reach FID. The timing is driven by the move from studies into full delivery, not a fundamental shift.
▸
Are you making any assumptions around further Middle East impacts within guidance?
Ramoun Lazar · Jefferies
Management described the situation as between all-out war and peace, with customers normalising operations and deferred projects returning to discussion. Growth in the Middle East is expected in FY27, with the recovery assumed to come through in the second half given continued uncertainty.
▸
What are the key earnings growth drivers for FY27, including cost-out, CP2 construction, and North America?
John Purtell · Macquarie
Drivers include Middle East deferrals returning and new scope, CP2 construction momentum with delivery through FY27 and FY28, and a 62 percent backlog conversion within FY27. Venture Global's Phase 2 expansion is expected to reach FID in FY27, along with Connah's Quay. Growth is expected across regions, with a rebound in the Americas, particularly in power and data centers, and an announcement expected soon.
▸
How much of a driver is CP2 to revenue guidance, and how are its margins performing versus expectations?
Rohan Sundram · MST Financial
Margin expectations on CP2 have been met, and the project is performing exceptionally well and delivering in line with contractual expectations. Management does not comment on individual projects, but CP2 is a strong contributor to FY27 revenue as part of the broader major projects portfolio.
▸
Backlog fell in the second half, so how can revenue grow in FY27? Should investors monitor backlog, bookings or pipeline conversion for future revenue?
Nicole Penny · Rimor Equity Research
Bookings and pipeline are the key indicators of growth over the next 2 to 3 years. Backlog is a point-in-time measure at 30 June and does not capture recent strategic wins.
▸
Outside the Middle East, is there any change to medium-term energy project flow-through as a result of the conflict?
Nicole Penny · Rimor Equity Research
National oil companies in the Middle East continue to invest. International oil companies are looking to invest in other jurisdictions and basins, where the risk premium is lower.
▸
What does the $58 million Middle East earnings impact represent in terms of project deferrals and incremental costs?
Nathan Reilly · UBS
The impact is from revenue and margin deferrals on projects, not restructuring. Headcount growth needed for the work did not occur. Long service accruals in the Middle East mean restructuring costs there are already recognised, so no additional restructuring costs arise.
▸
Implied FY27 margin is roughly flat. Is that sound given CP2 moving into construction, and what offsets exist such as cost-out?
Nathan Reilly · UBS
EBITA margin is expected to be relatively flat versus FY26, driven by project mix and phasing. Levers include GID utilisation and cost discipline. Bid margins are not eroding, though different scopes carry different margins. Large reimbursable projects often include performance milestone incentive payments.
▸
Has Worley been awarded any projects to repair damaged facilities in the Middle East?
Gordon Ramsay · RBC Capital Markets
Worley is working on a significant number of damage assessments and rebuild support projects, mainly in Saudi Arabia and the UAE, with little work in Bahrain. Lump-sum turnkey EPC work is not undertaken, but Worley does engineering and program management roles.
▸
Is the damage assessment work included within your existing relationship with Saudi customers, such as the recently extended relationship?
Gordon Ramsay · RBC Capital Markets
The answer was not completed in the transcript. No clear confirmation was given.
▸
Are you seeing changes to the composition of workflow across professional services, fabrication, construction and procurement?
Gordon Ramsay · RBC Capital Markets
The general trajectory is toward full project delivery, including reimbursable EPC and EPCM work, which increases services outside the professional services bucket. Professional services remain above 50 percent of revenue, procurement around 30 percent, and construction and fabrication around 17 percent in FY26. The mix is not expected to shift dramatically.
▸
Have you considered quoting projects in US dollars given currency translation risk?
Gordon Ramsay · RBC Capital Markets
Worley is exploring a move to US dollar presentation currency given the increasing share of revenue from outside Australia. The move is not expected in FY27, but is targeted for FY28. Work is underway on systems and operational implications, and several other ASX-listed companies have made similar moves.
▸
With FY27 EBITA growth lower than the FY30 double-digit target, how confident is management of returning to double-digit growth in FY28 and beyond?
Nikolai Dale · Barrenjoey
Management is confident, citing a strengthened pipeline, strong bookings and substantial backlog. Early-phase projects should drive delivery traction in late FY27 and into FY28. Power and data center work is full project delivery, and those customers are less cost sensitive given their focus on speed to market.
▸
How have employee attrition and labor access evolved, and what is the right headcount going into next year?
Nikolai Dale · Barrenjoey
Headcount fluctuates with project volumes and phasing, so there is no fixed right number. The focus is on having the right people in the areas of greatest demand. Middle East project deferrals have affected headcount, but management is not concerned given the bookings and early-phase projects ahead.
▸
Why should leverage still be expected to rise to 2 times when earnings are expected to grow in FY27?
Nicholas Rawlinson · Morgans
The 2 times figure is an indicative level management considers reasonable and comfortable, not a forecast. Leverage was 1.8 times at FY26. It will be managed through the year to maintain liquidity and flexibility to deliver on the FY30 ambition.
▸
Can you talk about the EPC and EPCM pipeline more generally, given the backlog decline?
Nicholas Rawlinson · Morgans
The pipeline is healthy and growing, with around 20 larger projects in various phases, including Connah's Quay, TC Energy, and data center and power projects. Customers are concerned about the limited number of firms able to deliver large projects, which benefits Worley. Worley will only take reimbursable EPC and EPCM work, not lump-sum turnkey.

Web Traffic

worley.com
Web rank#439,549
Est. visits/mo1.0M
Traffic YoY▼ 21.2%
Traffic QoQ (12w)▼ 0.7%
Web Rank History
#439,549-127,010
rankest. visits/mo
200k300k400k500k600k394K1.3M2.2M3.1M4.0M05-1908-2512-0103-0906-1509-2111-16

Analyst Coverage

Analyst Coverage
Analyst Ratings
1
Buy: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2009 Q42.5B401M265M$0.53$0.52 – $0.552
2010 Q42.7B261M150M$0.60$0.48 – $0.723
2012 Q13.1B298M174M$0.63$0.61 – $0.652
2012 Q23.5B327M197M$0.75$0.73 – $0.782
2012 Q43.8B330M209M$0.59$0.57 – $0.623
2013 Q24.3B325M241M$0.68$0.65 – $0.723
2013 Q43.4B296M191M$0.40$0.37 – $0.435
2014 Q23.9B295M217M$0.59$0.50 – $0.674
2014 Q43.6B308M201M$0.43$0.35 – $0.484
2015 Q23.4B268M192M$0.41$0.40 – $0.422
2015 Q42.8B251M159M$0.34$0.33 – $0.362
2016 Q22.9B217M161M$0.27$0.26 – $0.282
2016 Q42.5B223M145M$0.20$0.16 – $0.263
2017 Q22.3B176M132M$0.25$0.23 – $0.283
2017 Q42.3B169M128M$0.23$0.22 – $0.242
2018 Q22.6B218M147M$0.35$0.33 – $0.373
2018 Q42.9B239M164M$0.25$0.25 – $0.263
2019 Q26.4B566M364M$0.60$0.50 – $0.7011
2020 Q26.2B698M352M$0.37$0.31 – $0.433
2020 Q45.6B604M320M$0.33$0.32 – $0.352
2021 Q26.6B305M109M$0.22$0.22 – $0.221
2021 Q46.6B329M130M$0.26$0.26 – $0.261
2022 Q27.7B344M144M$0.29$0.29 – $0.291
2022 Q47.1B379M155M$0.31$0.31 – $0.311
2023 Q28.7B383M154M$0.31$0.31 – $0.311
2023 Q48.3B404M166M$0.33$0.33 – $0.331
2024 Q29.8B446M201M$0.40$0.40 – $0.401
2024 Q49.4B446M208M$0.42$0.42 – $0.421
2025 Q210.5B503M242M$0.48$0.48 – $0.481
2025 Q48.9B425M178M$0.36$0.36 – $0.361
2026 Q28.5B452M200M$0.40$0.40 – $0.401
2026 Q48.7B384M153M$0.30$0.30 – $0.301
2027 Q28.8B503M250M$0.50$0.50 – $0.501
2027 Q49.3B442M204M$0.41$0.41 – $0.411
2028 Q29.2B524M271M$0.54$0.54 – $0.541
2028 Q45.1B470M232M$0.46$0.46 – $0.461
2029 Q25.0B560M307M$0.61$0.61 – $0.611
2029 Q45.0B468M237M$0.47$0.47 – $0.471
2030 Q25.0B561M313M$0.62$0.62 – $0.621
v2 analysis (legacy) — for comparison onlyclick to expand

Recent Research & News

Recent Research & News

2026-06-21

Company news

The first half of 2026 has brought several material operational and strategic updates for Worley Limited, primarily highlighted by its 2026 Investor Day on May 14, 2026:

  • Refreshed Strategy & Financial Targets: Worley unveiled its refreshed strategy through to FY30. The company is targeting a double-digit medium-term underlying EBITA CAGR through FY30, driven by organic expansion into future-facing growth markets and AI-enabled project delivery. It reiterated its strict policy against bidding on low-margin, high-risk lump-sum turnkey (LSTK) projects.
  • Cost-Out & Investment Program: Worley has successfully actioned $95 million in annualized cost savings, with an additional $25 million currently underway, exceeding its initial $100 million target. The company plans to reinvest these savings by putting $70 million into digital and AI workflows over the next two years to boost margins and execution capability.
  • Capital Return: Following the completion of a prior $500 million program, the company announced a new on-market share buyback program of up to $300 million.
  • H1 FY26 Financial Performance: On February 26, 2026, Worley released its half-year results for the period ending December 31, 2025. Aggregated revenue rose 5.4% year-over-year to $6.3 billion. Underlying EBITA was essentially flat at $377 million, though the underlying EBITA margin (excluding procurement) improved to 8.8% (up from 8.4%). Statutory net profit fell 29.6% to $152 million, heavily impacted by $82 million in one-off restructuring costs spent to optimize and stream-line Western European operations. Meanwhile, Worley's backlog grew to $16.9 billion as of March 2026.
  • Key Contract Wins:

- Lithium Battery Materials: In May 2026, Worley was awarded an engineering and design services contract by Orbia Fluor & Energy Materials to support a new lithium hexafluorophosphate (LiPF₆) production facility in Louisiana, US.

- Natural Gas FEED Contract: In March 2026, Chevron Cyprus Ltd awarded Worley the Front-End Engineering Design (FEED) contract to develop the $4 billion Aphrodite offshore gas field in the Mediterranean.

▸ Thesis-test Findings
Venture Global CP2 LNG Federal Regulatory Approvals and Construction Status 2026

Venture Global reached its Final Investment Decision (FID) and financial close for the second phase of the $23+ billion CP2 LNG export project in Cameron Parish, Louisiana, in March 2026. Following this milestone, Worley received a Full Notice to Proceed under its reimbursable EPC contract for Phase 2, having officially executed the Phase 2 EPC contract in late January 2026. On-site construction for Phase 1 has been underway since mid-2025, and construction for Phase 2 is now fully mobilized. The CP Express Pipeline is currently under construction and slated to begin transporting gas later this year, with first LNG exports on track for H2 2027. Furthermore, in May/June 2026, Venture Global filed an application with FERC for an additional 11.7 MTPA terminal expansion. This regulatory and construction progress represents a substantial bull-case catalyst for Worley’s transitional energy business, locking in multi-year, low-risk reimbursable revenues on a massive scale.

Worley Limited GID Bogota India Expansion Headcount

Worley's Global Integrated Delivery (GID) centers in India and Bogota, Colombia, are major drivers of its margin-expansion and cost-out strategies. For the fiscal year ending June 2025, Worley’s overall GID headcount reached 5,400 people (up 3.8% year-over-year from 5,200), delivering 8.3 million hours or 14.7% of total project hours. Specifically, the company's total headcount in India was ~6,900 people in FY25, slightly down from ~7,500 in FY24, but Worley continues to utilize its India offices (over 6,000 employees across eight locations) to design complex global assets. In Colombia, Worley has over 440 people in its Bogota office supporting more than 20 projects, specifically helping to execute complex projects for the North American market. This expanded GID footprint underpins Worley’s ability to migrate engineering workflows to lower-cost, highly-skilled hubs, enabling the company to grow earnings at a faster rate than raw headcount expansion and shield itself against domestic labor shortages.

Data Center Power Infrastructure Engineering Contracts Competitors 2026

With the rise of high-density AI workloads requiring multi-gigawatt power grids, data centers are evolving into massive "data factories" that demand city-scale utility infrastructure. Worley highlighted this as a priority future-facing market during its May 2026 Investor Day, noting that it has already provided early engineering services for a 5 GW data center campus. Management emphasized that the high industrial complexity of modern gigafactories shifts the competitive landscape away from traditional data center builders and into Worley's core competency of high-voltage transmission, substation design, and thermal engineering. Primary engineering and EPC competitors in this heavy civil and industrial utility space include Fluor Corporation and AECOM. On the general construction side, competitors managing the broader data center campuses include Turner Construction, Skanska, and Whiting-Turner. Worley's focus remains on high-value consulting, power networks, and behind-the-meter generation rather than low-margin structural shell construction.