Stocks/WSC

WSC

WillScot Holdings Corporationv3 4.5/10 · 2026-11-13
Industrials·Rental & Leasing Services
$17.60
$3.2B market cap
1.2% div yield
v3 Rating
4.5/103.5–6.0
Setup
4.0/103.0–5.0
Fair Value
$19.00$12.00–$26.00+8%
DCF (10%)
$17.00-3%
Base IRR
+7%-8%–+20%
Visibility
moderate±37%
Wall Street
$21.25 target(4 analysts last quarter)(7 buy, 7 hold)
Rating
Revenue (TTM)
$2.3B
Owner Earnings
$540M
Next-Yr Owner Earnings
$473M
Growth
+3.5% × 5y
P / Next-Yr OE
6.8x
Net Debt
$3.4B

WillScot Holdings Corporation (WSC) is a leading provider of adaptable workspace and mobile storage solutions throughout the United States, Canada, and Mexico. The company's operations are divided into two core divisions: Modular Solutions and Storage Solutions. The Modular Solutions segment offers a diverse range of temporary structures, including pre-fabricated and stackable office units, single-wide and sectional modular spaces (such as redi-plex), educational facilities like classrooms, ground-level offices, specialized blast-resistant modules, and expansive clearspan structures. Complementing this, their Storage Solutions segment supplies various portable containers, including refrigerated units, alongside different types of trailers. WillScot leases these flexible modular spaces and portable storage units to a broad spectrum of clients across industries such as construction, commercial and industrial enterprises, retail and wholesale trade, energy and natural resources, education, governmental and institutional bodies, and healthcare. The company primarily markets its offerings under the well-known WillScot and Mobile Mini brand names. Formerly known as WillScot Mobile Mini Holdings Corp., the organization officially adopted its current name, WillScot Holdings Corporation, in July 2024. Its corporate headquarters are situated in Phoenix, Arizona.

2-Year Price History

$19.89-41.3%
$20$25$30$35Initial target $19.00 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
4.53.5–6.0
Setup
4.03.0–5.0
Fair value (USD)
19.0012.00 – 26.00
Upside vs 17.60
+8%
DCF (10%)
17.0011.00 – 25.00-3%
Base IRR
7%-8% – 20%
Visibility
moderaterange ±37%
Sentiment
3/10
Reputation
5/10
2026-11-13 · claude-opus-5-5 · priced at 19.89

WillScot is the scale leader in rented portable offices and storage containers. It trades at $19.89 (Nov 12 close), about 7.7x EV/EBITDA, near the bottom of its 3-year range, after EBITDA fell from about $1.0B+ to $920M. The volume turn is real: modular units on rent are +1.2% for the first time in years, the order book is up more than 20%, and new complex rates are up double digits. Testing the pitch showed it took that growth without paying for it. Growth runs through new megaproject complexes, and management says the $400M net capex rate continues into 2027. Pricing that capex in, and allowing for low cash taxes that last only while it keeps spending, gives a DCF of about $17 a share at a 12.5x terminal FCF multiple. That is below the price. About 3.4x of net debt to the equity's 1x makes the result swing from $12 to $20 between a 10x and 14x terminal. The unlevered FCF yield on EV is only about 7-8%. To earn 10% from here you need sustained 3-4% growth and no multiple compression. Data center demand was just hit by midterm-driven pause risk. Headline leasing growth is flattered by lower write-offs. Storage is losing share. Management missed its 2025 Investor Day targets badly. Rating 4.5: fairly to slightly over-valued for a 10% hurdle, with no near-term capital-return catalyst. The upside would need a broad local-construction recovery that reactivates idle fleet capex-free, and nothing shows that coming yet. Interest 4: not a mispricing we can identify, although implied volatility of 58-84% may suit option sellers.

A deep dive would have to establish: Can WillScot grow EBITDA 4%+ a year without keeping net capex near $400M, either because a local-market recovery reactivates idle fleet or because capex fades as megaprojects mature, or is the growth too capital-hungry to earn 10% on a $7B EV?

Owner earnings, TTM
$540M$460M – $620M
Realistic peak profit
$650M$550M – $800M
Growth rate
3.5%0.0% – 6.0%
Years of growth
53 – 8
Market cap
$3.6B$3.5B – $3.7B
EV
$7.0B$7.0B – $7.2B
Net debt
$3.4B$3.4B – $3.5B
Capital return / cap
1.5%1.2% – 4.0%
P/E
18.0×16.0× – 20.0×
EV/EBITDA
7.7×7.2× – 8.3×
FCF yield
9.5%7.0% – 12.0%
Projected FCF, base case (USD millions)
Y1$473M$330M – $550M
Y2$530M$370M – $620M
Y3$568M$390M – $670M
Y4$596M$390M – $710M
Y5$624M$390M – $740M
Competition: WillScot is the scale leader in North American modular space; McGrath's modular rental (+4%) and TRS data center rentals (+26%) confirm firm demand, but in storage McGrath grew 1% while WSC fell 7%, so WSC is trading volume for price in a commoditized, shrinking transactional segment.
Governance: No accounting red flags. Management badly missed its March 2025 Investor Day targets, the McGrath merger failed with a $180M break fee, insiders own little stock, the credit-loss allowance is elevated at about 14.5% of gross receivables, and buybacks are paused for deleveraging.
Research (expand)

What it does. WillScot rents modular space (offices, classrooms, complexes, FLEX units) and portable storage (Mobile Mini containers) on long leases. Average modular duration is about 3 years. It also sells add-ons such as furniture, ramps and fencing ('VAPS', $104M a quarter). It is the scale leader, well ahead of McGrath and regional players. Its in-house logistics help win complex projects.

What the market believes. It sees a former roll-up compounder whose units on rent fell for 4-5 years, with storage still shrinking (-7% leasing revenue in Q3). Margins are down about 400bp (38.8% vs 42.9%). Q3 FCF was $78M vs $124M as net capex rose to $400M. Leverage is 3.7x, buybacks have stopped, and data centers (about 18% of the order book) face new political risk.

The bull case. Volume has turned. Modular activations are up for 4 straight quarters, units on rent are +1.2%, the order book is up more than 20%, enterprise revenue is +15% and over 30% of revenue, and new complex rates are up double digits. The margin drag is front-loaded activation cost on 2-year-plus contracts.

Real earnings today. 2026 EBITDA is about $920M. Less SBC (about $30M) and recurring restructuring/other (about $20M) gives about $870M. Less normalized taxes (about $90M) and maintenance net capex of about $240M (corrected up from $200M: the company spent $233-273M a year in 2024-25 and still lost units) gives owner earnings of about $540M. Cash taxes are only about $10M a year today, because bonus depreciation on growth capex defers them; that helps while the company keeps spending. Net debt is $3,434M, with 181.7M shares outstanding. Market cap is $3.61B and EV is $7.05B; operating leases are expensed in EBITDA, so they are left out of EV.

Projected unlevered FCF (after SBC, actual-trend cash taxes, and $360-400M net capex to fund 4% growth): 2027 $473M, 2028 $530M, 2029 $568M, 2030 $596M, 2031 $624M. EBITDA grows from $960M to $1.12B.

Year 5. A 'neither' business growing about 3-4% in a cyclical end market. The terminal value uses normalized-tax FCF of $574M at 12.5x, which gives about $7.2B. Discounting at 10% gives EV about $6.55B and equity about $3.1B, or about $17 a share. Each terminal turn is worth about $2.20 a share; 10x gives $12 and 14x gives $20. Fair value is about $19, giving some credit to the capex-free upside if local markets recover. Base IRR is about 7%.

Management, risks, competition. The CEO is Tim Boswell, and the Executive Chairman is Worthing Jackman (ex-Waste Connections). New director Don Slager (ex-Republic) joined in October. The March 2025 targets ($1.5B EBITDA, $700M FCF) are far from today's $920M and $342M. On the other hand, the 2026 guidance was conservative and has been beaten every quarter. Risks:

  • A data center or megaproject pause after the midterms; about 40-45% of planned capacity sits in states threatening pauses.
  • Residual value on new complexes (0-55% of cost).
  • Billing quality: the credit-loss allowance is $70.9M, and customers rate it 4/10.
  • Storage share loss: McGrath's storage revenue grew 1% while WSC's fell 7%.

Sentiment: 3/10. The stock is down 60% from its peak. Short interest is about 8% of float, and puts are bid (84% IV).

Thesis test

  • Capex/growth consistency (challenger right): growth requires about $360-400M of capex, not a fade to $300M, and maintenance is closer to $240M than $200M. This is the main reason the DCF falls from $21 to about $17. It is partly offset by cash taxes running far below the $90M+ assumed (only $6.8M paid in 9M 2026).
  • Data center/megaproject risk (challenger partly right): data center orders already in hand activate within 30 days, and about 75% of the megaproject pipeline is outside data centers. But 2H27 growth is now less certain. This widens the downside rather than moving the midpoint, and a slowdown would also cut capex.
  • Revenue quality and storage share (challenger right on facts, moderate value impact): $13M of the $17M Q3 leasing growth came from lower write-offs, the credit-loss provision is up, and storage is losing to McGrath. This justifies 12.5x rather than 13x terminal.
  • Management track record (challenger right): the Investor Day targets were badly missed. I treat the 2027 framing as an upper-middle case.
  • Leverage/arithmetic (challenger right): each terminal turn is worth about $2.20 a share, not $4. Leverage is safe (no large maturities before August 2028, $1.6B of availability) but magnifies the multiple risk, and there are no near-term buybacks.
  • Conclusion: the business is real and the modular inflection is genuine, but at $19.89 the market already pays a fair price for 3-4% growth funded by heavy capex. There is no identifiable mispricing. Pass. At most it is an option-selling candidate given the high implied volatility.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue2328+0%2281-5%2396+1%2365+15%2062
Gross profit1158-3%1114-14%1302-2%1334+23%1084
Operating expenses686+6%630-39%1038+57%660+10%602
▸Adj EBITDA774-11%831+28%649-36%1012+23%826
▸Adj OCF724+2%735+35%546-33%819+5%776
CapEx-236-241-299-249-487
Adj FCF489+2%494+100%247-57%569+97%289
Interest expense200218227205146
▸Adj net income277+25%269+857%28.1-94%476+40%340
▸Owner's earnings450--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA3524100%529100%509100%649100%1012100%826100%
FCF (OCF−capex)195756%40476%521102%26240%51251%25831%
Net income91826%12724%-53.0-10%28.14%47647%34041%
▸Capital returned240268%37070%514101%39661%60159%52163%
Buybacks19201.5989.6270818741
Dividends89.438.251.10.000.000.00
Interest paid956160218227205146
Debt paid down-563170155-102-421-365
▸Reinvestment219362%75.314%46892%44368%83683%37245%
Capex (PP&E)1424148241299249487
Intangibles & M&A6921.54124121562-117
Leases signed (net Δ)77.8-74.010322.025.11.99
Retained / other-181-5%19236%10120%-27.4-4%-446-44%-0.730%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 142 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)59135816603561385828
▸Liabilities (total)49544960501648774262
Net debt (incl. leases)37304128396637923289
Net debt / Adj EBITDA4.824.976.113.753.98
Net debt / Adj FCF7.638.3516.16.6611.4
Adj EBITDA / interest3.873.822.854.945.67
Shares outstanding181181184190208
Dilution (YoY)-0.5%-1.3%-3.4%-8.7%-7.1%
Employees45004700450050004500
MarginsTTM2025202420232022
Gross margin49.7%-1.648.8%-5.554.3%-2.156.4%+3.852.6%
Adj EBITDA margin33.2%-4.436.4%+9.327.1%-15.742.8%+2.840.0%
Adj OCF margin31.1%+0.532.2%+9.422.8%-11.834.6%-3.037.6%
Adj FCF margin21.0%+0.321.7%+11.410.3%-13.824.1%+10.114.0%
Net income margin-2.6%-12.2-2.3%-3.51.2%-19.020.1%+3.716.5%
Adj NI margin11.9%+2.411.8%+10.61.2%-19.020.1%+3.716.5%
ROIC (adj, after-tax)7.9%7.7%4.1%10.5%8.0%
Cost of debt5.2%5.5%5.9%5.9%4.5%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Leasing and Services$525.0MNEW
Leasing Revenue$425.5M-2%
Modular Space Leasing$243.8MNEW
Value-Added Product and Services$97.1MNEW
Portable Storage Leasing$72.5MNEW
Rental Units$14.6M+4%
Other Leasing Related Products and Services$12.1MNEW
Value Added Services$10.2MNEW
New Units$9.0M-60%
By Geography (2026-Q1)
UNITED STATES$517.6M-3%
CANADA$25.4M+9%
MEXICO$5.7M+8%

Earnings Calls

12 calls

Earnings Call · 2026 Q3

2026-11-05

WillScot reported a strong third quarter 2026 and said commercial momentum is building heading into 2027. Revenue was $601 million, up 6% year-over-year and ahead of the $585 million outlook. Leasing revenue grew 4% (up from 1.5% in Q2), and delivery and installation revenue rose 23%. Modular activations were up 12% for a fourth straight quarter of growth, and modular units on rent turned positive at +1.2% year-over-year. Net income was $52 million, diluted EPS was $0.28, adjusted EBITDA was $234 million (ahead of the $232 million outlook) and the margin was 38.8%, up 160 basis points sequentially but pressured year-over-year by activation, transfer and delivery costs and lower write-offs. Modular leasing revenue rose 2%, with average monthly rate up about 2%, while portable storage leasing revenue fell 7% on weak transactional and local nonresidential activity. VAPS grew 4% to $104 million. The pending modular order book is up over 20% year-over-year, and enterprise accounts make up over half of it. Enterprise revenue grew 15% and is over 30% of trailing revenue, with the portfolio now above $600 million versus $500 million at Investor Day. Large projects include a pharmaceutical campus, a semiconductor expansion, data centers and temporary facilities for NFL teams. New orders for larger complexes are priced up double digits, though ground-level offices and containers remain pressured. Management cited constraints in labor, logistics and fleet that should support pricing into 2027. Net capex guidance rose about $125 million to $400 million, directed to highly utilized, versatile fleet. Over 90% of incremental units are on rent or assigned to orders, with minimum durations over two years versus a historical 12 months. Q3 operating cash flow was $198 million and adjusted free cash flow was $78 million. Net debt was $3.4 billion at 3.7x leverage, with no maturities until August 2028. The company paid down $159 million of debt year-to-date and expects leverage approaching 3x at the end of 2027. FY2026 revenue guidance was raised to $2.34 billion, with adjusted EBITDA held at $920 million because elevated activation costs will moderate Q4 margin expansion. Q4 leasing revenue growth is expected near 4%, with 300–400 basis points of sequential margin expansion. Early 2027 outlook is low single-digit organic revenue growth and mid-single-digit EBITDA growth, spread evenly through the year. Management called this balanced given political and data center risks. Data centers are about 18% of the pending order book, mostly activating within 30 days, and over 75% of large projects in the pipeline are non-data center. Management sees delays as likelier than cancellations. A broader local-market recovery could be served capital-efficiently by reactivating idle transactional fleet.

Analyst Q&A (17)
▸
Why provide a preliminary 2027 outlook amid macro and political volatility, and how confident is management in low-single-digit revenue and mid-single-digit EBITDA growth?
Angel Castillo Malpica · Morgan Stanley
The Q4-to-Q1 trajectory is the best in five years, with a volume tailwind. The modular order book is up over 20% (enterprise mix up about 70%), giving first-half visibility. Lease revenue is hard to disrupt short term and supports margin expansion through operating leverage and four operational programs. Management is not taking a definitive view on the second half.
▸
Does the outlook imply a stronger first half and flat second half, or mid-single digits throughout the year?
Angel Castillo Malpica · Morgan Stanley
Assume the growth is layered evenly through the year. Second-half modular activation variability has less P&L impact, and the first-half momentum gives comfort in the baseline.
▸
Does the enterprise-driven order book imply longer lease terms than the historical modular average?
Kyle Menges · Citigroup
Yes. Over half the modular order book is enterprise, and incremental fleet has minimum contractual durations over two years versus a historical 12 months (about 3-year effective duration), with effective durations expected to extend further.
▸
How would mid-single-digit EBITDA growth translate to free cash flow growth?
Kyle Menges · Citigroup
It should drive operating cash flow growth, but demand will determine the investment level, so it is too early to say whether FCF growth will match; an update will come around Q2.
▸
Why wasn't Q4 EBITDA guidance raised despite higher D&I revenue? Is storage an offset?
Andrew Wittmann · Baird
Storage is performing as expected (volume down about 7%). Higher activations bring variable costs and fleet transfer expenses upfront, limiting flow-through in Q4, but this sets up a better 2027 exit. Margins still expanded sequentially, just less than expected after raising Q4 activation assumptions.
▸
Given data center concerns and fleet growth, does the return bar need to rise for further capex, and might the company pass on deals in 2027?
Andrew Wittmann · Baird
Management weighs this weekly. The pipeline far exceeds the fleet it can source, so fleet goes to the best deals, which pushes pricing up. Purchases are in versatile fleet that can be reconfigured and redeployed, and management is diligent about subsequent rentability.
▸
How does pricing break down between modular and storage and by asset class, and how much of 2027 growth is price versus volume?
Scott Schneeberger · Oppenheimer
Modular AMR was up about 2%, but Q3 orders for larger complexes were up double digits. Ground-level offices and containers remain pressured, with focus on volume there. Storage is a partial offset to modular volume, and the World Cup is a nonrecurring 2026 benefit. Higher-rate deliveries will churn through the portfolio and raise project returns.
▸
How is VAPS performing on the large-project units?
Scott Schneeberger · Oppenheimer
VAPS mix varies by project type, but growth is reaccelerating, and 4% is one of the stronger lines. Perimeter solutions should double year-over-year in Q4 and expand to more markets.
▸
Will capex exceed $400 million given order book strength?
Steven Ramsey · Thompson Research
Management would maintain the current run rate into the first half of 2027 given visibility, with flexibility to adjust. Idle transactional fleet can be reactivated capital-efficiently, and budgets are reassessed every 90 days.
▸
Does enterprise strength put the company on pace for its long-term guidance even without a local market recovery?
Steven Ramsey · Thompson Research
Yes. 15% enterprise growth puts that portfolio on track for the Investor Day objective; it was a $500 million target and is now well above $600 million.
▸
What changed in the quarter to raise the activation and D&I outlook?
Joshua Chan · UBS
Nothing dramatic. Modular orders have been up low teens all year, and longer-cycle enterprise orders have accumulated so the order book is now up over 20%. Constraints in labor and fleet are building upward pricing pressure more broadly.
▸
What is the trajectory of activation costs?
Joshua Chan · UBS
Local project activity slows seasonally in Q4, but large-project activity continues. Expect 150-200 bps of margin expansion from tapering activation costs plus 150-200 bps from D&I mix, totaling 300-400 bps sequentially. In 2027, tougher activation comps should mean slower variable cost growth and a margin tailwind.
▸
How much 2027 data center activity is contracted versus exposed, is the risk cancellation or delay, and how diversified is the business if data centers slow?
Ronan Kennedy · Barclays
Over 75% of large and mega projects in the pipeline are non-data center. Data centers are about 18% of the pending order book, mostly activating within 30 days, so contracted risk is low. Cancellations of started projects are unlikely; delays are likelier and some may grow. The unknown is new 2027 data center starts.
▸
Could a local market recovery be served by reactivating transactional fleet more capital-efficiently?
Ronan Kennedy · Barclays
Yes. Idle storage, single-wide and ground-level office fleet can be reactivated with normal maintenance and refurbishment, far more efficiently than buying new complexes, and mature large projects offer cross-sell opportunities.
▸
Would that dynamic be disproportionately positive for free cash flow and returns even if revenue contribution is modest?
Ronan Kennedy · Barclays
Per-unit revenue is not so different, so it would be highly accretive to revenue and even more to cash flow given the capital efficiency.
▸
Why might already-started data center projects get bigger?
Timothy Mulrooney · William Blair
They are already approved and in the ground, so there are scaling advantages, but it is too soon to predict given how new the political changes are.
▸
Have labor and fleet constraints picked up recently or are they a continuing trend?
Timothy Mulrooney · William Blair
A continuing trend building through the year. WillScot has absorbed 6-7% materials inflation, skilled trades are being pulled onto mega projects, and customers value early access to equipment. In-house transport and setup is a competitive advantage that is lifting win rates.

SEC Filing Findings

SEC Filing — material findings

2026-11-05 · depth 8/10

Nothing material flagged — a clean filing.

Options

Chain Snapshot (daily)

Call IV (ATM)58%
Put IV (ATM)84%
ATM Spread2.0%
Call $OI (near money)$7.4M
Put $OI (near money)$297K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$20.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$15.00$3.20/$5.800--/$1.15720
$16.00$2.25/$5.500$0.15/$1.200
$17.50$1.90/$4.70291$0.40/$1.601,159
$19.00$1.15/$2.9542$1.20/$2.4529
$20.00$1.25/$1.6525,717$1.90/$3.00315
$21.00$0.45/$2.8049$2.25/$3.4017
$22.50$0.40/$0.7515,115$2.30/$5.4068
$24.00$0.05/$0.707$3.70/$6.500
Snapshot: 2026-11-04

Short Interest

Short % of Float7.4%
Short Shares13.1M
Days to Cover3.9
Change (vs Prior)-8.6%
Short % Float History
7.40%-0.20pp
6.0%8.0%10.0%12.0%14.0%10-1512-3103-1305-2908-1410-30

Web Traffic

investors.willscot.com
Web rank#800,600
Est. visits/mo638K

Executive Compensation (2023.0-2025.0)

Direct Pay$91.0M
Incentive & Other$21.3M
Total Compensation$112.4M
% of Revenue1.6%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
FMR LLC$784M$25.17+$1.9M+$588M—$2.30T
BlackRock, Inc.Passive$610M$30.72−$9.4M+$4.9M—$6.70T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$266M$17.36−$1.2M+$266M—$2.22T
JPMORGAN CHASE & CO$241M$31.88−$50.8M−$15.1M—$1.71T
VANGUARD CAPITAL MANAGEMENT LLCPassive$227M$17.36−$749K+$227M—$4.68T
STATE STREET CORPPassive$174M$28.75+$4.2M+$6.8M—$3.38T
T. Rowe Price Investment Management, Inc.$162M$28.36−$35.0M+$127M—$152.57B
Capital International Investors$142M$34.73+$302K−$810K—$481.62B
SAMLYN CAPITAL, LLC$134M$17.99−$147K+$134M—$5.95B
Clearbridge Investments, LLC$133M$35.51+$16.1M−$24.6M—$120.78B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

013.7M27.3M41.0M54.6M$17$25$32$40$472021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
FMR LLC27.1MPRICE T ROWE ASSOCIATES INC /MD/1.4MWELLINGTON MANAGEMENT GROUP LLP—FRANKLIN RESOURCES INC2.8MBoston Partners—AMERIPRISE FINANCIAL INC1.2MClearbridge Investments, LLC4.6MJPMORGAN CHASE & CO8.4MEMINENCE CAPITAL, LP—Invesco Ltd.457K

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (4 analysts)$21.25+18.6%
Last Year (13 analysts)$24.00+33.9%
Current Price$17.92
Analyst Ratings
7
7
Buy: 7Hold: 7Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2018 Q134M5M-33M$0.11$0.09 – $0.1316
2018 Q2215M14M0M$0.02$0.01 – $0.029
2018 Q341M-16M-99M$-0.21$-0.25 – $-0.1719
2019 Q1254M68M-7M$-0.05$-0.05 – $-0.0518
2019 Q2264M65M-15M$-0.01$-0.01 – $-0.0113
2019 Q3271M79M1M$0.05$0.05 – $0.059
2019 Q4271M100M23M$0.12$0.12 – $0.139
2020 Q1258M70M-8M$0.08$0.08 – $0.088
2020 Q2256M85M7M$0.07$0.07 – $0.078
2020 Q3411M123M16M$0.11$0.11 – $0.1114
2020 Q4421M154M45M$0.20$0.19 – $0.2011
2021 Q1419M137M30M$0.16$0.16 – $0.174
2021 Q2434M141M24M$0.17$0.16 – $0.178
2021 Q3468M146M39M$0.19$0.19 – $0.208
2021 Q4494M184M67M$0.29$0.29 – $0.304
2022 Q1478M170M53M$0.23$0.22 – $0.235
2022 Q2527M148M26M$0.30$0.29 – $0.309
2022 Q3584M173M42M$0.37$0.36 – $0.389
2022 Q4590M209M73M$0.43$0.42 – $0.445
2023 Q1534M184M59M$0.29$0.28 – $0.294
2023 Q2583M160M29M$0.41$0.40 – $0.418
2023 Q3613M189M47M$0.45$0.42 – $0.5010
2023 Q4620M241M81M$0.52$0.49 – $0.548
2024 Q1580M219M65M$0.33$0.27 – $0.389
2024 Q2612M226M71M$0.39$0.35 – $0.469
2024 Q3618M242M81M$0.45$-0.42 – $0.708
2024 Q4607M248M84M$0.46$0.42 – $0.506
2025 Q1555M209M50M$0.27$0.25 – $0.296
2025 Q2587M243M64M$0.35$0.31 – $0.398
2025 Q3579M223M52M$0.29$0.25 – $0.327
2025 Q4545M215M59M$0.32$0.29 – $0.357
2026 Q1518M178M30M$0.16$0.14 – $0.207
2026 Q2585M197M45M$0.25$0.23 – $0.297
2026 Q3586M205M51M$0.28$0.25 – $0.317
2026 Q4581M214M60M$0.33$0.29 – $0.377
2027 Q1567M194M42M$0.23$0.20 – $0.255
2027 Q2618M203M51M$0.28$0.28 – $0.293
2027 Q3618M212M60M$0.33$0.33 – $0.343
2027 Q4603M225M73M$0.40$0.40 – $0.413
2028 Q1589M216M65M$0.36$0.35 – $0.364
2028 Q2634M221M71M$0.39$0.38 – $0.404
2028 Q3632M228M78M$0.43$0.42 – $0.434
2028 Q4621M245M93M$0.51$0.51 – $0.524

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$4.21M
2 txns · 1 insider · 155,781 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-05-13SELLSoultz Bradley Leedirector4,317$25.92$112K$10.73M
2026-05-12SELLSoultz Bradley Leedirector151,464$27.03$4.09M$4.95M
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand

Thesis

WillScot is attempting to transition from a post-pandemic volume and margin reset into a more concentrated enterprise-project model. The Q2 result strengthens the evidence that modular activations, pending orders and enterprise accounts are improving, but the underlying leasing inflection is still modest once the World Cup contribution is removed. Portable storage and local transactional demand remain soft, and management is investing ahead of revenue while net debt remains high. The business has attractive scale, recurring rental economics and a potentially valuable position in complex infrastructure projects. However, the equity is highly sensitive to utilization, fleet spending and interest costs. The current cash-generation picture is better than reported net income, but normalized owner earnings are well below the headline adjusted FCF figure. My base case is a gradual recovery rather than a rapid return to peak margins.

Trade Signal

Trade rating
-3.8/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-08-07 · saw $24.28-27.5% since

Modest short / underweight: WSC is a high-quality rental platform with improving project demand, but at roughly $24.55 the shares price in much of the recovery while leverage, weak local markets and sharply depressed margins leave the analyst's approximately $18–19 fair value more credible than the bullish consensus.

Temporary mispricing+1.0

The stock fell 8% from $26.56 before earnings to $24.55 after the August 6 report. The latest leg was a company-specific earnings reaction: revenue beat and guidance rose, but adjusted EBITDA fell 8.5%, margin dropped to 37.2% from 42.3%, and leasing growth remained modest excluding the World Cup. Before that, the shares had risen from roughly $17 in March to $29 in June on Q1 guidance upgrades, improving activations and enthusiasm around large infrastructure/data-center projects, then drifted down through July as investors questioned margin recovery and project timing. The post-earnings move was somewhat harsh relative to the better revenue outlook, but not a major panic overreaction because the margin deterioration, elevated capex and leverage are real. The gap is a modest temporary dislocation, not a clear missed repricing.

Market view+2.0

The market is constructive on WillScot's strategic position and increasingly focused on data centers, infrastructure and enterprise projects. Consensus is Buy, with an average one-year target of $25.82, while retail participation is ordinary rather than euphoric. The 10.5% short interest and elevated put volatility show meaningful skepticism, but short interest has declined from roughly 15% in March and the stock is not left for dead. The immediate post-earnings 8% decline reflects concern about the sharp EBITDA-margin contraction and the quality of growth, even though revenue and guidance beat. The prevailing bullish view may be stale on leverage, capex and normalized leasing economics, but it is not yet an extreme crowded consensus.

Inflectionwindow ~3mo+2.0

There is a genuine operational inflection in activations, pending orders, enterprise accounts and large-project demand, and management has raised 2026 revenue and EBITDA guidance. But the most important earnings inflection—recurring leasing growth and margin recovery—is only beginning and is broadly visible to the market. Consensus is constructive, with seven buys and no sells, and the stock has already recovered materially from its 2025 lows. The Q2 result strengthened the growth narrative but also showed EBITDA down 8.5% and margin down roughly 500 bps year over year. The upside case therefore requires execution beyond current expectations, not merely delivery of the published plan.

Catalysts
  • ▼2026-10 to 2026-11 · Q3 2026 earnings and margin update — Expected in late October or early November; the key test is whether management delivers the promised 200–300 bps sequential EBITDA-margin recovery and whether leasing growth persists after the World Cup comparison.
  • ▼2026-10 to 2026-11 · Q3 2026 guidance and large-project conversion data — New activations, pending orders, portable-storage trends and evidence of data-center/infrastructure project delays could either validate or weaken the enterprise-growth thesis.
  • ▲2027-02 · Q4 2026 earnings and 2027 outlook — A successful 300–500 bps Q4 margin recovery, route-optimization savings and stronger recurring leasing revenue would support a re-rating; failure would expose the valuation premium.
  • ▲H1 2027 · 2027 enterprise-project leasing ramp — Conversion of the elevated order book into sustained leasing revenue, rather than mostly delivery-and-installation revenue, is the central upside catalyst.
  • ▼H2 2026 to H1 2027 · Large-project delays or capex/working-capital reset — Data-center and infrastructure projects are vulnerable to grid, equipment and financing delays; a reduction in the $375M capex plan or weaker utilization would pressure estimates.
Flow-1.5

Share-count dilution is slightly negative on a trailing basis, but there is no death-spiral financing and the company appears to be funding fleet investment through operating cash flow and debt capacity. Insider flow is unfavorable: roughly $4.7M of officer/director selling versus only $0.1M of buying over the last year. Short interest remains meaningful at 10.5% of float and 10.3 days to cover, creating squeeze risk if Q3 margins surprise positively. No major-holder accumulation, buyback catalyst or imminent refinancing is evident; debt maturities do not begin until August 2028.

Floor / Ceiling-1.0

There is no hard equity floor at the current price. The business generates substantial reported free cash flow and owns a valuable rental fleet, but approximately $3.5B of net debt absorbs much of the asset protection and capex needs are rising. The likely support zone is based on normalized cash flow and asset value rather than net cash or an active buyback. At higher prices, the main ceiling is valuation: the analyst's $18–19 fair value and consensus target near $25.82 leave limited upside unless owner earnings approach the bull case. Insider selling is an additional modest overhang, but there is no obvious hard cap or forced dilution trigger.

Buyability

A real, institutionally investable rental platform with recurring revenue, scale and exposure to data-center, infrastructure and manufacturing projects. However, leverage is high at roughly 3.7x net debt/EBITDA, local-market demand is weak and the current price already reflects much of the enterprise-growth recovery. The next buyer needs to believe that margin recovery and large-project leasing will convert into durable owner earnings.

Fear vs Greedfear 7/10 (-1.0)greed 7/10 (+2.0)

Fear is slightly stronger than greed. The franchise is good and the operational recovery may be real, but the price already assumes a substantial margin and enterprise-leasing recovery while leverage, weak portable storage and project lumpiness remain unresolved. I would prefer a short on failed margin recovery rather than aggressively shorting immediately into a potentially positive 2027 inflection.

Valuation

Our Target
$3.3B+0%
Market Should Pay
$2.7B-18%
target ×0.82 (fear discount)
Current Market Cap
$3.2BSlightly bearish
What Changed
transcript · 2026-08-06
+6%fair value on this information

The quarter newly demonstrated that the anticipated activity inflection is appearing in actual modular activations and enterprise revenue, not just in the pipeline. Revenue exceeded the company's expectation, modular activations were up 10% year over year even excluding World Cup units, and management raised revenue and EBITDA guidance. It also became clearer that Q2 margin pressure is tied to deliberate investment, delivery mix and activation costs, while the second-half comparison benefits from those effects moderating. The offsetting new information is that World Cup revenue was temporary and management explicitly does not assume uninterrupted sequential unit growth.

▸ How the cases moved

Versus the day before the Q2 release, the bear equity value rises modestly from $1,250M to $1,350M as liquidity remains ample and the pipeline is diversified, but bear probability falls only slightly from 0.27 to 0.25 because margin compression and project timing remain risks. The base value rises from $4,150M to $4,400M as Q2 revenue, leasing/services growth and the raised outlook support a recovery, with base probability moving from 0.50 to 0.52. The bull value rises from $6,700M to $7,000M on stronger activations, order growth and evidence of future operating leverage, while bull probability moves from 0.23 to 0.23. The remaining probability shift is from bear to base.

2-Year Plausible Outcomes
bear25%
$1.4B
rev -4%/yrOE $300M

Large-project activity proves lumpy while local commercial and portable-storage demand remain weak. Revenue declines modestly, the company carries excess fleet and elevated reinvestment, and margin recovery is limited. High leverage keeps the equity on a low owner-earnings multiple.

▸ Valuation

4.5x $300M owner earnings = $1,350M equity value

base50%
$4.4B
rev +3%/yrOE $550M

Enterprise and mega-project demand produces modest growth, while storage and local markets stabilize rather than rebound sharply. Q2 margin pressure reverses as World Cup-related delivery activity fades, route optimization takes hold and SG&A leverage improves. Owner earnings recover toward the mid-$500M range, but leverage caps the multiple.

▸ Valuation

8.0x $550M owner earnings = $4,400M equity value

bull25%
$7.0B
rev +7%/yrOE $700M

The large-project pipeline converts into sustained 2027 leasing growth, with data centers, infrastructure and manufacturing offsetting local-market weakness. Utilization tightens, higher-value fleet earns attractive returns, and network optimization plus operating leverage restores margins toward prior highs. Owner earnings approach $700M and the market awards a higher-quality rental-platform multiple.

▸ Valuation

10.0x $700M owner earnings = $7,000M equity value

▸ Target Rationale

The probability-weighted scenario value discounts to $3,430M. I set the analytical target at $3,250M because the arithmetic does not fully capture the execution risk of converting a project-heavy pipeline into durable leasing revenue, the company's high net debt, and the possibility that capex remains elevated. The target still credits the improving enterprise franchise and expected margin recovery, rather than valuing the company on its currently depressed reported earnings.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now6/10
Trajectory7/10
Risk7/10
Governance5/10
Insolvency prob (2yr)5%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Performance & Outlook Upgrades: In May 2026, WillScot reported its first-quarter 2026 results. Total revenue stood at $549 million, down 1.95% year-over-year but beating the consensus estimate of $518.2 million. Adjusted Diluted EPS was $0.21, outperforming expectations of $0.16. Driven by improving commercial demand, particularly for large projects, WillScot raised its full-year 2026 guidance to a midpoint of $2.25 billion in revenue (up from $2.18 billion) and $915 million in Adjusted EBITDA.
  • Project-Driven Revenue Shift: In Q1 2026, leasing revenue declined by 2% year-over-year to $437 million, but was offset by a 12.3% year-over-year increase in delivery and installation revenue due to key project activations during the quarter. This represents a conversion of the company’s large-project order backlog into active site services.
  • Network Optimization and Restructuring Charges: Along with Q4 2025 results in February 2026, WillScot announced the implementation of a comprehensive Network Optimization Plan designed to streamline operations and execute real estate exits. This plan triggered a $302 million non-cash restructuring charge due to accelerated depreciation and impairment. However, the plan is projected to reduce expected real estate cost increases by $25 million to $30 million annually over the next four years.
  • C-Suite Transitions and Incentive Plans: In January 2026, the company entered a separation agreement with General Counsel Hezron Lopez. Following this, the company’s April 2026 proxy filing formalized the transition of Tim Boswell to President and Chief Executive Officer, while introducing a new 2026 Incentive Award Plan for approval.
▸ Thesis-test Findings
Dodge Momentum Index and US non-residential starts trajectory 2026

The US non-residential construction landscape shows a heavily bifurcated environment that presents mixed signals for WillScot's growth. Total construction starts rose 9.0% month-over-month in April 2026 (up 9.1% year-to-date through April), driven primarily by large-scale data center and energy projects. However, underlying commercial planning is heavily concentrated. The Dodge Momentum Index (DMI) climbed a modest 1.8% in March 2026 to 250.5, but reports indicated that a few massive data center commitments are single-handedly keeping commercial planning afloat. When data centers are removed, the broader non-residential building sector shows noticeable softening. Elevated macroeconomic risks, tightening credit, and tariff volatility have caused general commercial and institutional sectors (like warehouse, office, and healthcare) to ease into a slower, more sustainable pattern. This supports the bull case for enterprise-scale accounts but acts as a headwind for local commercial volume.

WillScot Mobile Mini fleet utilization rates and price increases 2026

WillScot’s operating metrics reflect a tighter, optimized fleet structure rather than pure volume expansion, though pricing remains highly defensive. According to the company's Q1 2026 filings, the average modular space utilization rate rose to 68.0% compared to 59.3% in the prior year's quarter. However, this improvement was driven by a reduction in total fleet size under the Network Optimization Plan; the actual number of units on rent fell, impacted by weaker local non-residential starts, and portable storage units on rent decreased by 10.8%. On pricing, rate pressures are isolated and stabilization is occurring. Management highlighted "pretty good price momentum" in their premium "FLEX" product lines and stated that local ground-level office pricing is stabilizing. Furthermore, early-stage pipeline demand remains strong, with pending modular orders up 14% year-over-year and pending storage orders up 7%.

Data center modular office space demand and supply chain constraints

Data centers represent a massive, multi-year infrastructure supercycle that directly fuels WillScot’s large-project backlog. Industry data shows nearly 100 GW of new data center capacity will come online globally between 2026 and 2030, driven by AI workloads. However, over 95% of data center developers report project delays and cost overruns, primarily due to extreme grid constraints and multi-year lead times for electrical equipment like transformers. To mitigate these on-site bottlenecks, developers are shifting heavily toward modular, prefabricated designs and off-site manufacturing to accelerate timelines. This massive scale of development and the complexity of managing multi-year utility delays on-site has directly boosted WillScot's data center vertical. It has driven the activation of large-scale, on-site modular administrative offices and temporary workspaces, offsetting weaker local construction leasing with a surge in services revenue.