Stocks/WYFI

WYFI

WhiteFiber, Inc. Ordinary Sharesv3 4.0/10 · 2026-11-26
Technology·Information Technology Services
$6.58
$253M market cap
v3 Rating
4.0/103.0–5.5
Setup
3.5/102.0–5.0
Fair Value
$5.50$1.00–$18.00-16%
DCF (10%)
$4.50-32%
Base IRR
-5%-40%–+35%
Visibility
wide±155%
Wall Street
$30.79 target(14 analysts last year)(7 buy, 1 hold)
Rating
Revenue (TTM)
$69.7M
Owner Earnings
-$20M
Next-Yr Owner Earnings
-$320M
Growth
+35.0% × 4y
P / Next-Yr OE
--
Net Debt
$470M

WhiteFiber, Inc. specializes in delivering foundational infrastructure solutions for artificial intelligence. It achieves this by developing and operating high-performance data centers and cloud platforms, all specifically optimized for graphical processing units (GPUs). The company's service offerings include colocation facilities, managed hosting solutions, and GPU-as-a-Service (GaaS), which collectively cater to the demanding computational, storage, and networking needs of AI and machine learning applications. WhiteFiber operates on an end-to-end vertically integrated model. The firm emerged as a spin-off from Bit Digital, Inc., and is scheduled for an initial public offering (IPO) in August 2025. Its corporate headquarters are located within the United States.

2-Year Price History

$6.50-57.5%
$10$15$20$25$30$35Initial target $5.50 · 2026-11-26volAug 25Oct 25Jan 26Mar 26Jun 26Aug 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
4.03.0–5.5
Setup
3.52.0–5.0
Fair value (USD)
5.501.00 – 18.00
Upside vs 6.58
-16%
DCF (10%)
4.500.00 – 20.00-32%
Base IRR
-5%-40% – 35%
Visibility
very widerange ±155%
Sentiment
2/10
Flow
4/10
2026-11-26 · claude-opus-5-5 · priced at 6.50

WhiteFiber, spun out of Bit Digital in Aug 2025 (Bit Digital still owns ~60% and lends to it at a ~25.7% effective rate), has fallen from $44.77 to $6.50 (the Nov 25 close, a three-year low). The bull case: NC1 is fully built, all 40 MW billing since Nov 9 under a ~$865M, 10-year Nscale lease (~$86M a year of revenue on roughly $9M per gross MW, a high yield on cost); a $300M Morgan Stanley facility is meant to hand back much of the capital; NC2/NC3 (bought for $60M) carry LOIs for ~105 MW for 2027 that management says are stronger and investment-grade backed; and $750M of new cloud contracts plus managed services point to ~$365M of annualized cloud revenue by mid-2027. The market does not believe it, and the case against is serious. Adjusted EBITDA is about zero, SBC runs ~$15M a year, and NC2/3 plus the GPU deployments need roughly $1B+ more, with management warning that resources may not cover the pipeline and near-term maturities. Net debt is ~$470M against a ~$295M market cap, the NC1 tenant is not investment grade (Nscale, whose Microsoft relationship has wobbled), cloud is a capital-hungry GPU-rental business (textiles economics), and short interest is ~40% of the float. My DCF puts the equity at about $4.5 a share, with a range from zero to $20+ depending on whether NC2/3 get built on project debt or on dilution. Rating 4.0: a pass, not a short (the leases are real and squeezes are likely). Setup 3.5.

Flow: Dilution risk is the dominant flow. Management says it may need equity or equity-linked capital for the ~$1B NC2/NC3 pipeline and near-term maturities, starting now; the $70M Bit Digital advance of Oct 27 is due in ~116 days, around Feb 2027. Bit Digital (~60%) could sell or pledge shares. Against that, short interest is 7.7M shares (~17% of shares out, ~40% of the float, rising through Nov 13), which is squeeze fuel, and there is no buyback.

A deep dive would have to establish: Can WhiteFiber fund NC2/NC3 and its GPU deployments with project debt and customer prepayments, rather than with deeply dilutive equity or 25%-cost parent loans, before its 2027 maturities?

Owner earnings, TTM
-$20M-$40M – $0M
Realistic peak profit
$180M$80M – $300M
Growth rate
35.0%10.0% – 70.0%
Years of growth
42 – 6
Market cap
$295M$285M – $310M
EV
$765M$700M – $850M
Net debt
$470M$420M – $540M
Capital return / cap
0.0%0.0% – 0.0%
P/E
-3.0×-5.0× – -2.0×
EV/EBITDA
50.0×-500.0× – 500.0×
FCF yield
-100.0%-150.0% – -40.0%
Projected FCF, base case (USD millions)
Y1-$320M-$450M – -$180M
Y2-$220M-$380M – -$60M
Y3-$40M-$150M – $60M
Y4$70M-$40M – $160M
Y5$120M$0M – $220M
Competition: WhiteFiber competes for AI colocation and GPU-cloud customers with much larger CoreWeave and Nebius, and with ex-miners (IREN, Applied Digital, Cipher, TeraWulf) that already hold IG-backed hyperscaler leases.
Governance: Bit Digital controls ~60% of the stock and lends to WYFI at a ~25.7% effective rate through a MOIC kicker; the CFO changed in 2026, and project delays have repeatedly beaten management's guidance.
Research (expand)

What it does. WhiteFiber has two businesses. One builds and leases AI data centers: NC1 in North Carolina (40 MW, fully billing), MTL1/MTL3 in Montreal, NTL2 and MTL2 coming, and NC2/NC3 bought for $60M in Nov 2026. The other rents GPUs (cloud, about $18M a quarter) and is adding capital-light managed services. Bit Digital owns ~60%.

What the market believes. The stock is down 85% from its peak, while short interest has risen from 4.8M to 7.7M shares, about 40% of the ~18M non-Bit-Digital float. The market treats WYFI as an over-levered neocloud whose equity will be diluted or squeezed by its lenders. Q3 revenue was $24.0M against ~$30M expected, and NC1 slipped on switchgear. The 10-Q carries a going-concern-style warning that capital may not cover both the pipeline and the maturities. Bit Digital's delayed-draw loan costs 25.7% effective, and $70M of it drawn Oct 27 is due in 116 days.

Where the market may be wrong. NC1 is real infrastructure with a 10-year contract. At ~$86M a year of revenue and perhaps ~$70M of NOI, it is worth $600-800M as a stabilized asset, even at a 9-10% cap rate for a non-IG tenant. Once the $300M facility funds, that equity value starts to show. NC2/NC3 could add another NC1-sized development profit if they are signed with IG credit.

What it earns today. Unlevered owner earnings are negative, at roughly -$20M a year: adjusted EBITDA is ~0, SBC is ~$15M, and the termination fees that flattered Q2/Q3 are gone. Q4 cloud revenue is guided flat.

Projected unlevered FCF ($M), with GPU and data-center capex funded: 2027 -320, 2028 -220, 2029 -40, 2030 +70, 2031 +120.

What kind of company in year 5. We do not know. In the good case it is a ~150-200 MW colocation landlord with long leases and a cloud and managed-services arm, worth ~12-14x FCF. In the bad case the GPU book reprices (H100-era contracts end around 2029-30), Nscale weakens, and NC2/3 get funded by equity at these prices; the equity then becomes a thin stub over project debt.

Valuation. 5-year PV of unlevered FCF is about -$390M. A terminal value of ~$1.5B (12x year-5 FCF) has a PV of ~$970M. That gives an EV of ~$580M; less ~$470M of net debt (2032 converts $310M, 2031 $32M, Bit Digital DDTL $100M, RBC ~$81M, equipment and Iceland debt; cash ~$150M less the $60M NC2/3 purchase) leaves ~$110M of equity. Spread over the ~47M diluted shares that implies about $2.4/share, and sum-of-parts gives ~$5-6. Taking both, the DCF is ~$4.5 with a very wide range, and fair value ~$5.5 including development optionality. We pay ~0.9x EV/forward-2027 revenue on consensus, and the multiples are meaningless on EBITDA ~0.

Management and risks. Management is promotional: it promised ~$200M of annualized cloud revenue, then $365M, and every project has slipped (NC1 switchgear, Paris supplier). Related-party lending carries a 25.7% effective rate. Cloud customers are concentrated (the largest is 50% of cloud revenue), and a $5.1M receivable from DNA Fund is past due. The RBC covenants test net debt to EBITDA. Competitors include CoreWeave, Nebius, IREN, Applied Digital, Cipher and TeraWulf, the last of which have IG-wrapped hyperscaler leases WYFI lacks.

Sentiment: 2/10. The stock is hated: it sits at the bottom of its range, the AI-infrastructure trade has sold off, and short interest is high. That makes it a dangerous short but also a speculative long without a margin of safety.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025
Revenue69.7-1%79.2
Gross profit41.3+9%49.1
Operating expenses69.9+18%76.2
▸Adj EBITDA-22.1-3.28
▸Adj OCF101-12.6
CapEx-361-299
Adj FCF-260-312
Interest expense12.50.00
▸Adj net income-38.2-25.8
▸Owner's earnings-18.0--

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2025→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025
▸Claimed: EBITDA-106-103-2.73
FCF (OCF−capex)-383-85.0-298
Net income-139-114-25.3
▸Capital returned1848.70175
Buybacks1750.00175
Dividends0.000.000.00
Interest paid12.512.50.00
Debt paid down-3.76-3.760.00
▸Reinvestment564272292
Capex (PP&E)507208299
Intangibles & M&A0.86-0.211.07
Leases signed (net Δ)55.964.0-8.11
Retained / other-555-81.0-474

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 24 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025
▸Assets (total)1274651
▸Liabilities (total)880169
Net debt (incl. leases)333-91.0
Net debt / Adj EBITDA----
Net debt / Adj FCF----
Adj EBITDA / interest-1.78--
Shares outstanding38.838.3
Dilution (YoY)+2.7%--
Employees39.0--
MarginsTTM2025
Gross margin59.2%+5.762.0%
Adj EBITDA margin-31.7%-30.6-4.1%
Adj OCF margin144.9%+149.9-15.9%
Adj FCF margin-372.3%-56.4-393.9%
Net income margin-165.1%-130.0-31.9%
Adj NI margin-54.8%-23.5-32.6%
ROIC (adj, after-tax)-2.6%-4.2%
Cost of debt9.2%0.0%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Other Member$0.4MNEW

Earnings Calls

2 calls

Earnings Call · 2026 Q3

2026-11-10

WhiteFiber reported Q3 2026 results and said it hit two milestones at NC1, its North Carolina retrofit data center. All 40 MW of contracted IT capacity is now operational and billing, under a contract worth about $865 million over 10 years. The company also signed a $300 million credit facility for NC1. Management said getting to full billing took longer than planned. Middle East shipping disruptions delayed the original switchgear. Replacement equipment then caused commissioning and software problems. Billing on the first 20 MW began September 23, and billing on the second 20 MW began November 9. Management expects no late-delivery penalties. It expects development costs just under $9 million per gross MW, inside the $7–9 million budget. Initial funding on the facility is expected in late November or December, subject to remaining conditions. Q3 revenue was $24 million, up 19% year over year. Colocation revenue more than tripled to $5.6 million, including $1.1 million of NC1 lease revenue. Cloud revenue was $18.1 million, including a $3.4 million termination fee. Excluding the fee, cloud revenue fell about 18%. Gross margin excluding D&A was about 57%. G&A was $18 million, down 16%. Adjusted EBITDA was about breakeven. Net loss was $101.4 million, including an $80.8 million induced conversion expense. Cash was $138.5 million plus $9 million restricted. Deferred revenue rose to $306 million. Remaining performance obligation was $729 million, which now excludes lease-classified colocation contracts. Those leases total about $421 million of future payments. The company completed the $60 million purchase of NC2 and NC3 in Yadkin County, about 55 miles from NC1. The sites have existing buildings, an on-site substation, data center zoning, and at least 60 MW of initial gross utility capacity. Management is targeting initial capacity in late 2027. It is in advanced talks for about 105 MW in North Carolina: 45 MW of NC1 expansion and 60 MW across NC2 and NC3. Demand is stronger than a year ago, including investment-grade counterparties and Fortune 100 enterprises. Management will require investment-grade credit at the project level and will structure leases and financing together, even if that delays delivery. It says current pricing implies higher yields on cost than NC1 despite higher development costs. Since the last call, WhiteFiber signed about $750 million of new cloud contract value across five customers. About 13,000 GPUs are on dedicated compute contracts averaging 4.2 years, bringing total signed dedicated compute to about 20,000 GPUs. It also signed four managed services agreements worth about $58 million, which should produce about $15 million of annual recurring revenue. The signed cloud portfolio should reach about $365 million of annualized revenue by mid-2027. Management expects Q4 cloud revenue roughly flat with Q3 and significant sequential growth in Q1 and Q2. It expects managed services to exceed $50 million of annualized recurring revenue by the end of Q1 2027. Customers fund the hardware in that model. Paris GPU deployment slipped to January–February after a supplier change. MTL2 will host the Prime Intellect deployment, with GPU services starting in Q2.

Analyst Q&A (20)
▸
What lessons came from NC1 supply chain issues, and how is the company de-risking supply chain for NC2 and NC3, including what is already on order?
Nick Giles · B. Riley Securities
Billy Krassakopoulos said the 10-month NC1 build was an aggressive timeline and a major accomplishment. For similar projects, timelines will be a bit longer, with long-lead equipment ordered earlier and stronger internal and contractor project management. The playbook is the same. Samir added that NC2 and NC3 will use the same workforce and general contractor, 55 miles away.
▸
How much capital from the NC1 financing will be recycled as equity into NC2 and NC3?
Nick Giles · B. Riley Securities
Cam said there is no precise figure. Most of the net proceeds would be earmarked for the North Carolina portfolio expansion. The equity contribution depends on final debt financing and costs. If all 105 MW is built, the project cost is a little over $1 billion, and equity can be inferred from an assumed LTC. He said credit markets are better than the headlines, and the NC1 deal is evidence.
▸
Who bears the delivery risk on the $750 million of cloud contracts, especially where colocation partners other than Montreal are involved? How is the GPU (Vera Rubin) supply chain?
Paul Golding · Macquarie
Michael Francisco said the company does not sign customer agreements until it has clear visibility into data center ready-for-service timelines and OEM GPU commitments. That sometimes means setting later delivery dates. It relies on trusted colocation partners and only sells what it is confident it can deliver, though issues like Paris happen.
▸
Is the company making proactive long-lead purchases on the cloud build-out, or waiting for site-specific design clarity?
Paul Golding · Macquarie
Francisco said it stopped speculative purchasing this year and procures after receiving customer prepayments. One exception was NVIDIA networking fabric, which has a very long lead time and was ordered knowing it would be sold. Otherwise it aligns long-lead items with colocation partners.
▸
What is expected CapEx for NC2 and NC3, and are costs capped, with overruns passed to the tenant?
John Todaro · Needham & Company
Billy said budgeting is still early and costs depend on client selection. Customization or extra costs required by the end user are expected to be covered by the end user through installation fees and prepayments.
▸
What is the North Carolina regulatory environment for power and permitting after the state legislature shifted left?
John Todaro · Needham & Company
Billy said NC2 and NC3 are already zoned for data centers and need no special permits or use authorizations. For community relations, the company held a voluntary event at NC1 that drew over 200 attendees. It covered the retrofit strategy, closed-loop water cooling and community contributions, and plans the same for NC2 and NC3.
▸
How have the late-stage customer opportunities tied to Krambu progressed, and when will first capacity be available?
Michael Donovan · Compass Point
Francisco said discussions have progressed nicely. He expects first deals to close in early Q1 or possibly late Q4, with deployments in Q1.
▸
How would you characterize customer interest in Continuum, and which customers are most engaged?
Michael Donovan · Compass Point
Francisco said it appeals to a fairly niche audience. Interest comes from regional colocation providers and some enterprises trying to solve fragmented power. The first deal will take time to deploy, but early interest is good.
▸
Would Continuum be used to link NC1, NC2 and NC3 or other internal sites?
Michael Donovan · Compass Point
Francisco said it is a possible consideration depending on customer interest, but he cannot comment on current deal structures or negotiations.
▸
Why is demand for NC2 and NC3 substantially stronger than it was for NC1: site-specific, market dynamics, or confidence in the retrofit model?
George Sutton · Craig-Hallum
Samir said it is mostly site-specific and confidence in delivery. Billy said NC1's track record resonated. The ability to deliver power in 2027 matters because many companies are delaying or canceling projects, and the company has shown it can deliver quickly.
▸
What is behind proposed structures where customers pay 100% upfront?
George Sutton · Craig-Hallum
Francisco cited several factors. Some customers want the hardware on their balance sheet for tax and depreciation benefits. Enterprises and well-funded labs and startups want to secure assets. Prepayment also speeds the deal and lowers OpEx over the term. He expects more of this as the market matures and financing gets more creative.
▸
What milestones remain before LOIs at NC2 and NC3 convert to signed leases now that the acquisition has closed?
Mike Colonnese · H.C. Wainwright
Billy said the two main items are technical revisions to the basis of design for the customers in talks and validation of delivery times for long-lead equipment.
▸
What deployment timelines are expected for NC2 and NC3 given the 2027 RFS target, and when could contracts be monetized?
Mike Colonnese · H.C. Wainwright
Billy said the target is end of 2027, with extra buffer. He is confident of delivering in about 12 months even with different chips or manufacturers. Cam added the company is not optimizing for speed, but for project returns and clean financing.
▸
How are enterprise and government demand playing into colocation, and how does that affect expanding the power portfolio?
Gregory Lewis · BTIG
Billy said capacity scarcity is the driver. Hyperscalers are taking the larger blocks, leaving smaller clients without inventory. The company has several potential top-Fortune 100 clients seeking 10–20 MW deployments. Samir declined to give more detail on live negotiations.
▸
How do you think about cloud contract term length versus pricing?
Gregory Lewis · BTIG
Francisco said the company does not structure contracts without full payback within the original term. Customers now want longer terms because short-term GPU renewals have not gotten cheaper (H100 prices are higher than at launch) and capacity is hard to find. Longer terms let the company blend rates over the life of the contract to give customers some relief.
▸
Is the investment-grade wrapper for future leases the same format as NC1 or separate? Lower cap rates would follow from higher IG offtake.
Brian · ROTH Capital Partners
Cam said the approach differs from the NC1 lease, which had no full IG credit wrap or direct IG counterparty and took longer to finance. The next lease must be rated investment grade, with committed debt on attractive terms expected before signing.
▸
Are customers receptive to higher rent to cover rising build and capital costs?
Brian · ROTH Capital Partners
Samir said negotiations are live, so he would speak in generalities. Billy said there have been no problems. Customers are offering better prepayments and installation fees as a premium for 2027 capacity, and they understand costs have risen. Cam said implied yields are more attractive than at the initial North Carolina lease.
▸
How much power is at MTL2, and how would behind-the-meter power work given Quebec's tight regulation?
Kevin Dede · Craig-Hallum
Billy said MTL2 has about 4 MW available. The company is evaluating natural gas fuel cells to add power and recoverable heat, plus heat reuse projects nearby. That would also support higher utility allocations.
▸
Is there any change to the timeline for the full 99 MW at NC1, and what is the status of talks with Duke on taking NC2 and NC3 from 60 MW to 200 MW?
Kevin Dede · Craig-Hallum
Billy said NC2 and NC3 expansion is in preliminary engineering talks with Duke. For NC1, supply chain issues on the Duke side persist, and the company is helping where it can. The timeline is currently the end of 2027.
▸
Did Microsoft's struggles with EnScale ripple through to NC1, and will EnScale fill the available power there?
Kevin Dede · Craig-Hallum
Billy said he cannot comment on a relationship he has no insight into. He said EnScale is using the current NC1 capacity. The company would prefer EnScale for the expansion for continuity but is open to other users, with IG-type terms the main selection factor.

SEC Filing Findings

SEC Filing — material findings

2026-11-10 · depth 10/10
risk 7Liquidity / Debt Maturities
▸

Working capital fell to $28.1M, and management states existing resources may not cover the development pipeline plus near-term debt maturities without new capital. The Oct 27, 2026 $70M advance matures 116 days out, and the July draws mature in 180 days.

“our existing capital resources may not be sufficient to fund both this pipeline and our near-term debt maturities without accessing additional capital, whether through indebtedness, equity or equity-linked securities, project-level financing, or otherwise.”
risk 8Related-Party / Hidden Financing Cost
▸

Bit Digital (59.7% holder) subsidiary lends via a Delayed Draw Term Loan with a MOIC kicker. Effective cost is about 25.7%, far above the stated 9.5% contractual rate. A further $70M was drawn Oct 27, 2026, after the quarter end.

“As of September 30, 2026, the Delayed Draw Term Loan Facility had an average effective interest rate of 25.7 % which exceeded the contractual interest rate due to the inclusion of the contractual MOIC payment.”
risk 7Contingent Liability / Guarantee
▸

The $300M NC-1 Morgan Stanley financing requires an unsecured guarantee from the parent operating partnership covering Phase 1 completion, including cost overruns and carry costs. Guarantor net-worth and liquidity requirements were still unfinalized. The loans are non-recourse to WhiteFiber, Inc.

“Initial funding also requires a mortgage on the NC- 1 data center and an unsecured guarantee from White Fiber Operating Partnership LP of Phase 1 completion, including cost overruns, and specified project carry costs. The guarantor's minimum net-worth and liquidity requirements remain subject to finalization before initial funding.”
risk 6Dilution / Convertible Financing
▸

The 2032 notes ($310M, 5%) convert at $33.84, which implies about 9.2M shares. Adding roughly 1.2M shares from the remaining 2031 notes gives about 10.4M potential shares, around 23% of the 45.3M outstanding. The conversion rate can rise on certain corporate events. The August 2026 induced conversion issued 6.27M shares and cost $80.8M in non-cash expense.

“The initial conversion rate is 29.5530 ordinary shares per $ 1,000 principal amount of the 2032 Notes, equivalent to an initial conversion price of approximately $ 33.84 per share, subject to adjustment.”
risk 6Covenants
▸

The Syndicated RBC facility (about $80.8M) carries a minimum debt service coverage ratio and a maximum net funded debt to EBITDA test. Adjusted EBITDA is negative on a TTM basis, so covenant headroom depends on the NC-1 ramp. The Iceland facility also has leverage, equity and LTV covenants. The company reported compliance as of Sept 30, 2026.

“The Company has agreed to certain financial covenants, including a minimum debt service coverage ratio and a maximum Net funded debt to EBITDA ratio.”
risk 6Customer Concentration / Receivables
▸

The largest customer generated about 50% of cloud revenue in the nine months. A $5.1M receivable from a discontinued customer (DNA Fund) is past due, with no payments since April 2026, and collection is uncertain. Five existing customers remain.

“Our largest customer accounted for approximately 50% of our cloud services revenue during the nine months ended September 30, 2026.”

Short Interest

Short % of Float70.3%
Short Shares7.7M
Days to Cover3.3
Change (vs Prior)+10.1%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Situational Awareness LP$68.3M$15.80+$0+$68.3M—$20.17B
BlackRock, Inc.Passive$31.1M$19.23+$2.2M+$31.1M—$6.70T
Capital World Investors$28.0M$38.85+$28.0M+$28.0M—$846.00B
DRIEHAUS CAPITAL MANAGEMENT LLC$22.6M$27.17−$30.5M+$22.6M—$17.26B
D. E. Shaw & Co., Inc.$15.9M$37.60+$14.2M+$15.9M—$153.37B
PRICE T ROWE ASSOCIATES INC /MD/$15.5M$30.49+$10.5M+$15.5M—$999.12B
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$15.2M$23.24+$6.3M+$15.2M—$83.85B
SUSQUEHANNA INTERNATIONAL GROUP, LLPMM$12.2M$28.64+$4.5M+$12.2M—$112.57B
GEODE CAPITAL MANAGEMENT, LLCPassive$11.6M$21.55+$696K+$11.6M—$1.87T
MILLENNIUM MANAGEMENT LLC$11.5M$13.53−$7.4M+$11.5M—$142.62B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

01.1M2.3M3.4M4.6M$12$19$25$32$392025-092025-122026-032026-06
hover the chart for per-quarter detailprice (right axis)
Situational Awareness LP1.8MDRIEHAUS CAPITAL MANAGEMENT LLC582KCapital World Investors720KSituational Awareness Partners LP—CLEARFIELD CAPITAL MANAGEMENT LP—D. E. Shaw & Co., Inc.410KPRICE T ROWE ASSOCIATES INC /MD/399KMIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.390KCITADEL ADVISORS LLC—MILLENNIUM MANAGEMENT LLC296K

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (14 analysts)$30.79+373.7%
Current Price$6.50
Analyst Ratings
7
1
Buy: 7Hold: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2025 Q218M2M-3M$-0.08$-0.20 – $0.053
2025 Q322M1M-5M$-0.12$-0.18 – $-0.073
2025 Q424M-7M-7M$-0.17$-0.26 – $-0.123
2026 Q121M-3M-12M$-0.28$-0.32 – $-0.243
2026 Q219M-4M-17M$-0.41$-0.46 – $-0.353
2026 Q330M-5M-15M$-0.37$-0.47 – $-0.263
2026 Q438M-10M-17M$-0.42$-0.44 – $-0.413
2027 Q164M-3M-12M$-0.29$-0.32 – $-0.263
2027 Q288M8M-4M$-0.09$-0.10 – $-0.081
2027 Q3108M21M4M$0.10$0.09 – $0.121
2027 Q4123M29M9M$0.21$0.18 – $0.231
2028 Q1141M38M12M$0.30$0.25 – $0.342
2028 Q2149M47M16M$0.40$0.33 – $0.442
2028 Q3152M51M17M$0.41$0.34 – $0.462
2028 Q4157M56M18M$0.43$0.36 – $0.482

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$213K
1 txn · 1 insider · 7,059 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-05-29SELLShih Ichidirector7,059$30.12$213K$140K
v2 analysis (legacy, 2026-08-04) — for comparison onlyclick to expand

Thesis

WhiteFiber is a highly speculative AI-infrastructure option rather than an established cash-generating business. The strategic opportunity is real: a $865M, 10-year Nscale service order and additional compute agreements could transform a company with only $84M of TTM revenue. Its retrofit approach may benefit from the scarcity of powered, connected data-center capacity. However, the present economics are extremely weak. TTM adjusted EBITDA is negative $14M, adjusted OCF is negative $18M and adjusted FCF is negative $268M. The Initial Customer, formerly worth more than $50M of annualized revenue, is paused and in settlement discussions. More than half of the recent debt issuance was used for a zero-strike call option rather than productive infrastructure, and the business has shown meaningful dilution and dependence on financing. The range of outcomes is consequently unusually wide: the stock can become a scaled AI host, or remain a capital-intensive project with insufficient liquidity and customer concentration risk. The probability-weighted terminal equity value is $287M, discounted at 12% for two years to $229.6M today. I set the analytical target below that arithmetic value because the scenario model cannot fully capture counterparty concentration, financing execution, governance concerns and the possibility that contracted revenue will require more capital than expected before it becomes distributable cash flow.

Trade Signal

Trade rating
-6.7/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-04 · saw $26.60-75.3% since

Short, with significant squeeze risk: the $1.0B valuation discounts a successful AI-infrastructure ramp despite negative owner earnings, heavy financing dependence, and a study fair value near $200M.

Temporary mispricing-1.5

The stock rose from $10.78 in late March to $38-$39 by mid-to-late June as AI-infrastructure enthusiasm, the $100M delayed-draw facility, the Nscale backlog, and new compute-contract news drove a sharp re-rating. It then fell from $38.50 on July 10 to $29.18 by July 15 and to $20.58 on July 29, with the immediate July leg attributed to a sector-wide technology selloff and profit-taking rather than a clearly identified company-specific failure; it rebounded to $26.60 by August 4. The decline from the June peak was partly a justified correction of extreme expectations, not a pure panic overreaction. At $26.60 the stock remains materially above the study's $3.37 fear/greed-adjusted value and $5.18 target, so the key mispricing is still upside expectations that have not yet been supported by cash economics. The recent rebound can be squeeze- and sentiment-driven, making the correction path volatile rather than immediate.

Market view-2.5

WYFI is simultaneously promoted and heavily challenged. Sell-side sentiment is constructive, with a consensus Buy and an average one-year target around $32.35, while BTIG raised its target to $50; the bull narrative focuses on AI power scarcity, the $865M Nscale order, and rapid energized-site retrofits. Bears focus on recurring earnings misses, negative cash flow, high leverage, the paused Initial Customer relationship, and counterparty concentration. The 61.8% short interest and active retail discussion indicate a crowded, volatile battlefield rather than a universally hated stock. July's selloff has cooled momentum, but analyst targets and the AI theme remain supportive, so the market is not pricing the company as a distressed asset despite the weak current economics.

Inflectionwindow ~1mo-3.0

An operational inflection is possible if NC-1, Nscale, and the newer compute agreement ramp into high-utilization, positive-cash-flow capacity. But the market already expects a substantial improvement: consensus projects approximately $32M of EBITDA in 2027 and $51M by late 2028, while the stock trades at a valuation that assumes the AI-infrastructure thesis works. The study's base case is far more conservative, with only $20M of terminal owner earnings and substantial financing risk. Therefore the potential improvement is not an unpriced positive inflection; the near-term asymmetric evidence is more likely to be disappointing if utilization or funding slips.

Catalysts
  • ▲2026-08 to 2026-09 · Q2 2026 earnings and outlook — Watch revenue conversion, EBITDA/OCF, capex, financing needs, and whether management provides evidence that Nscale capacity is ramping; a clean print could support the bull case, while another miss would pressure the stock.
  • ▲H2 2026 · NC-1 construction and commissioning milestones — Successful deployment of the North Carolina facility would validate the six-month retrofit playbook and reduce doubts about execution and utilization.
  • ▲H2 2026 to H1 2027 · $160M five-year AI compute agreement revenue ramp — The market needs proof that the contract becomes billable, cash-generating revenue rather than merely contracted backlog.
  • ▼H2 2026 · Initial Customer settlement or continued pause — Restoration would help revenue and sentiment, but an unfavorable settlement or prolonged pause would expose the weakness of the current customer-concentration profile.
  • ▼H2 2026 to 2027-02 · Additional debt or equity financing — Funding the buildout may be necessary, but new borrowing worsens leverage and equity issuance would create dilution and a supply overhang.
  • ▲2026-11 to 2027-02 · Q3/Q4 2026 results and utilization update — The decisive evidence is whether contracted capacity produces positive EBITDA and improving cash conversion rather than simply higher revenue and capex.
Flow-4.0

The flow picture is negative despite only 2% reported trailing dilution. There is no buyback, Bit Digital owns roughly 70% of the company and could represent a future supply overhang, and the buildout requires external capital. Short interest has surged to 61.8% of float, creating squeeze fuel and potentially violent upward moves, but the 1.6 days-to-cover figure limits the durability of that support. Financing could bring either debt burden or equity dilution.

Floor / Ceiling-3.5

There is no meaningful hard floor near the current price. The study estimates only about $20M of recoverable net assets in the bear case, against roughly $50M of net debt, while owner earnings and adjusted operating cash flow are negative. Contracted revenue and scarcity value provide some residual strategic value, but they do not support a $1.0B equity value without successful execution. The main ceiling is valuation: at roughly 12x sales and a market cap five times the analyst's fair value, any execution disappointment can produce a large de-rating. The 70% parent ownership and financing dependence also create potential supply and dilution overhangs, although neither is an immediate hard cap.

Buyability

There is genuine thematic buyability: AI power scarcity, a $865M Nscale agreement, additional compute contracts, and a retrofit model that can bring energized capacity online quickly. However, the current price requires successful execution, sustained financing access, and eventual cash conversion; negative owner earnings and extreme customer concentration make it difficult for fundamental buyers to underwrite. The likely next buyers are AI-infrastructure momentum investors and squeeze-oriented retail, not conventional cash-flow investors.

Fear vs Greedfear 9/10 (+2.0)greed 9/10 (+1.0)

Fear is stronger than greed at $26.60. The contracts and AI-infrastructure scarcity are real, but the price capitalizes a successful ramp before the company has demonstrated positive owner earnings or cash conversion. The main reason not to be aggressively short is the very high volatility, small effective float, 61.8% short interest, and the possibility that one favorable contract or commissioning update creates a squeeze.

Valuation

Our Target
$200M-21%
Market Should Pay
$130M-49%
target ×0.65 (fear discount)
Current Market Cap
$253MSlightly bullish
What Changed
financials release · 2026-05-14
-8%fair value on this information

The quarter showed that the operating business is still not self-funding: TTM adjusted EBITDA was negative $14M, adjusted OCF was negative $18M and adjusted FCF was negative $268M. At the same time, the filing disclosed the potentially transformative 10-year Nscale service order representing approximately $865M of contracted revenue. The market also learned that the formerly important Initial Customer relationship remains paused and subject to settlement discussions. The combination is genuinely new relative to the prior day: much larger future revenue potential, but also clearer evidence of customer concentration and execution risk.

▸ How the cases moved

The quarter increased the bear case from roughly $15M to $20M because near-term liquidity and recoverable infrastructure appear somewhat better than feared, but its probability rose from 0.35 to 0.40 because the Initial Customer remains paused and the company continues to lose money. The base case fell from approximately $225M to $200M as adjusted EBITDA deteriorated to negative $4.6M and TTM adjusted OCF remained negative $18M. The bull case rose from roughly $1,150M to $1,300M because the disclosed 10-year Nscale agreement provides a credible path to much larger revenue, although its probability only increased from 0.13 to 0.15 because execution and financing risks remain severe.

2-Year Plausible Outcomes
bear40%
$20M
rev -10%/yrOE $-80M

The paused Initial Customer relationship is not restored, the Nscale contract ramps slowly or requires substantial additional financing, and WhiteFiber remains dependent on external capital. Revenue declines or grows only modestly while infrastructure and lease costs keep owner earnings deeply negative. Equity value is supported mainly by residual cash and recoverable infrastructure rather than operating earnings.

▸ Valuation

1x $20M estimated recoverable net assets = $20M equity

base45%
$200M
rev +50%/yrOE $20M

WhiteFiber resolves or replaces part of the Initial Customer shortfall and begins a measured Nscale ramp, but execution remains uneven. Revenue grows as contracted capacity comes online, with EBITDA turning positive but cash conversion lagging because of infrastructure investment, financing costs and lease commitments. By year two, owner earnings become modestly positive as the current build cycle matures.

▸ Valuation

10x $25M terminal EBITDA = $250M EV - $50M net debt = $200M equity

bull15%
$1.3B
rev +100%/yrOE $100M

The Nscale agreement ramps substantially, the additional AI compute contract converts into revenue, and WhiteFiber successfully repeats its energized-site retrofit model. The paused Initial Customer issue is resolved without a damaging settlement, financing remains available, and the enormous current capex burden produces materially higher utilization. Owner earnings reach approximately $100M as lease and build-out economics scale, supporting a premium infrastructure multiple.

▸ Valuation

12x $120M terminal EBITDA = $1,440M EV - $140M net debt = $1,300M equity

▸ Target Rationale

The $200M target is below the $229.6M probability-weighted model value. The discount reflects very low earnings confidence, the paused largest customer, extreme capex intensity, dependence on debt and equity financing, and the questionable use of $120M of debt proceeds for a zero-strike call transaction. The Nscale contract and AI-infrastructure scarcity prevent a liquidation-only valuation, but contractual revenue is not treated as equivalent to owner earnings until utilization and cash conversion are demonstrated.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now2/10
Trajectory6/10
Risk10/10
Governance3/10
Insolvency prob (2yr)20%
Outcome uncertainty10/10

Recent Research & News

Recent Research & News

2026-08-04

Company news

WhiteFiber (WYFI) recently achieved a networking milestone, demonstrating 111.2 Tbps cross-data-center bandwidth with sub-millisecond latency across 83km to support distributed AI training (July 2026). In May 2026, the company secured a $100 million delayed draw facility to fund its North Carolina "NC-1" data center and signed a five-year AI compute agreement worth over $160 million with an investment-grade technology customer. Q1 2026 results showed 31% year-over-year revenue growth ($21.9M), though net losses widened to $12M due to heavy infrastructure investment. WhiteFiber remains an emerging growth firm following its August 2025 spin-off from Bit Digital, focusing on converting industrial sites into high-density AI facilities ([Stock Titan](https://www.stocktitan.net/news/WYFI/), [WhiteFiber Investors](https://www.whitefiber.com/investors/news-releases/)).

Thesis findings

The bull case centers on a massive $900M+ contracted revenue backlog, anchored by a 10-year, $865 million deal for its NC-1 campus. Proponents highlight WhiteFiber's "retrofit playbook"—converting powered industrial sites into AI-ready data centers in roughly six months—which bypasses lengthy utility interconnection queues. This provides a competitive edge in "energized" capacity, currently the primary bottleneck for generative AI workloads ([Seeking Alpha](https://seekingalpha.com/article/4702157-whitefiber-a-small-cap-way-to-own-the-ai-power-bottleneck)). Conversely, the bear case focuses on execution risk and financial strain. The company consistently misses earnings estimates and operates at significant net losses. High leverage and dependency on external debt financing create a precarious balance sheet, while extreme customer concentration with anchor tenants like Nscale exposes the firm to counterparty risk ([MarketBeat](https://www.marketbeat.com/stocks/NASDAQ/WYFI/)).

Market opinion (price-aware)

The market view of WYFI is a "Moderate Buy," characterized by high volatility and a sharp divide between long-term institutional optimism and short-term retail skittishness. Analysts have recently revised price targets upward: BTIG raised its target to $50 from $35 in late June, and Barclays initiated at an "Equal Weight" with a $27 target, later raised to $29. However, the stock suffered a turbulent July, plunging roughly 18% over two days (July 14–15) as a sector-wide tech sell-off triggered profit-taking on the 2026 rally. Retail sentiment on Reddit and StockTwits remains active but cautious; while "YOLO" dip-buyers cite a squeeze potential due to the small 11.3M-share float, skeptics point to a 15% short interest and the 70% ownership by parent Bit Digital as a dilution threat ([Quiver Quantitative](https://www.quiverquant.com/analysts/WYFI), [ChartExchange](https://chartexchange.com/symbol/nasdaq-wyfi/reddit/)).