DTE
DTE Energy Companyv3 5.0/10 · 2026-11-06DTE Energy Company, established in 1903 and based in Detroit, Michigan, is primarily engaged in utility services. Its Electric division is responsible for generating, acquiring, delivering, and selling electricity to approximately 2.3 million customers—including households, businesses, and industrial clients—across southeastern Michigan. This power is sourced from diverse facilities, encompassing fossil fuel, pumped-storage hydroelectric, nuclear, wind, and other renewable energy assets. The infrastructure supporting this includes around 698 distribution substations and 449,800 line transformers. The Gas division manages the procurement, storage, transmission, distribution, and sale of natural gas to roughly 1.3 million residential, commercial, and industrial customers statewide in Michigan. This segment also provides natural gas storage and transportation capacity. Its extensive network features approximately 20,000 miles of distribution mains, 1,304,000 service pipelines, 1,305,000 active meters, and about 2,000 miles of transmission pipelines. Through its Power and Industrial Projects segment, DTE Energy supplies metallurgical coke, along with pulverized coal and petroleum coke, to the steel, pulp and paper, and other industrial sectors. This segment also delivers essential services such as power, steam, and chilled water production, wastewater treatment, and compressed air to various industrial clients. Finally, the Energy Trading segment focuses on the marketing and trading of power, natural gas, and environmental commodities. It also undertakes structured transactions and works to optimize its contracted natural gas pipeline transportation and storage assets.
2-Year Price History
Valuation v3 Opus worker · 2026-11-06
DTE is a well-run Michigan electric and gas utility. It has just agreed to sell its non-utility Vantage arm to J.P. Morgan infrastructure funds for about $3.0B (roughly $2.75B after tax). It will put the money into a 5-year utility capital plan that is now about $44B, sized around data centers: Oracle 1.4 GW and Google 1 GW, both approved, with about 2 GW more in advanced talks. The price is $135.08 (latest quote, Nov 5-6, 2026). That is 17.5x 2026 operating EPS of about $7.70 and 17.6x the flat 2027 pro-forma base of $7.66. EV is about $56.6B, or about 11.8x EBITDA, with a 3.45% dividend. Management guides to more than 9% EPS growth a year from 2027, with a 7% dividend increase in 2027, paid for by about $1B a year of new equity. Seen through our lens, this is a good company at a fair price, not a mispricing. Unlevered owner earnings are about $2.6B (a 4.6% yield on EV, about 22x). Reported free cash flow is deeply negative through 2031 because capital spending is 3-4x depreciation. On our 10% hurdle applied to unlevered cash flows, the DCF gives only about $88. The levered view (dividends plus about $10.9 of 2031 EPS at 16.5x) gives about $134 and roughly a 9.5% IRR. That is a bond-like return with regulatory and interest-rate risk, not the 50% we want. Sentiment is in the middle (5.5/10). The stock fell 20% from June to September with the utility sector as the 10-year yield went above 5.2%, then bounced. Analysts lean Buy with targets of $135-160. Nobody is euphoric and nobody is capitulating. There are no forced sellers or governance red flags. The one-time items are a $120M EES Coke Clean Air Act penalty and the Michigan AG's rehearing petition on the Google contract. Rating 5.0 (fair: hold, not a buy for a 50% hurdle). Research rating 3.0 (little chance of a 40% re-rating). If the quoted 29% call implied volatility is real, it is a reasonable covered-call writer on predictable earnings, though the stock is not at a valuation floor.
A deep dive would have to establish: Whether the February 2027 MPSC rate order (ROE, large-load stay-out mechanism) plus another data-center contract can lift EPS growth sustainably above 10% with less equity dilution, which would still only justify perhaps 10-15% upside.
Research (expand)
What the company does
DTE Energy (Detroit, since 1903) owns DTE Electric, which serves about 2.3M customers in southeast Michigan with generation (coal being retired, gas, the Fermi 2 nuclear plant, Ludington pumped storage, wind and solar) and distribution. It also owns DTE Gas, which serves about 1.3M customers statewide. Until the sale closes it also owns DTE Vantage (renewable natural gas, on-site industrial energy, renewables, EES Coke). It also has a small Energy Trading arm. Through Q3 2026, year-to-date operating earnings were Electric $956M, Gas $176M, Vantage $203M and Trading $50M, for operating EPS of $5.58. Q3 operating EPS was $2.30 against $2.25 a year earlier. Management expects the high end of the 2026 guide of $7.59-7.73.
What changed on Nov 5
- Vantage sale. The buyer is investors advised by J.P. Morgan Asset Management's infrastructure group. The price is about $3.0B; after tax and fees DTE gets about $2.7-2.8B. EES Coke is excluded. Management puts the price at 12-13x EBITDA and 19-23x earnings once tax credits are stripped out, above the utility's own multiple. Close is expected in 1H27. About $2B retires 2027 parent debt maturities and about $1B replaces equity.
- Rebased plan. 2027 pro-forma operating EPS is $7.59-7.73 (midpoint $7.66). That is flat against 2026, so 2027 is a lost year for EPS. From there management guides to more than 9% a year, faster in 2028-29 as the data-center capital comes into rates. It only catches up with the old 6-8% path around 2029. About 2031 EPS lands near $10.8-11.0.
- Capex. About $44B over 5 years, nearly $10B more than the prior plan. Of that, $39B is Electric: $23B generation (7.6 GW solar and wind, 2.1 GW combined-cycle gas, 2.7 GW storage), $12B distribution and $4B base infrastructure. Google drives about $5B of renewables and Oracle about $2B of storage.
- Financing. About $1B a year of equity in 2027-2031, with junior subordinated debt possible. FFO/debt target is about 15%. The dividend rises 7% in 2027.
What it earns today (real owner earnings)
For a regulated utility, D&A is the closest proxy for maintenance capex; capex above D&A is growth capex that earns an allowed return in rate base.
- 2026 operating earnings are about $1.61B. After-tax interest adds about $0.96B (interest about $1.22B a year). That gives unlevered owner earnings (NOPAT) of about $2.6B. Cash taxes are near zero (9M tax was a $206M benefit) because of tax credits, and the Vantage RNG credits leave with the sale. Stock comp is small and already expensed.
- EBITDA is about $4.8B. About 54% of EBITDA reaches unlevered owners.
- EV/owner earnings is about 21.8x (4.6% unlevered yield). EV/EBITDA is about 11.8x. After interest, the equity earns about $1.6B, a 5.7% yield on the $28.1B market cap (P/E about 17.5x).
- Reported levered FCF is about -$2.7B a year (operating cash flow about $3.4B less capex about $6.1B), or -10% of market cap, before the $0.97B dividend.
- Steady-state test. $2.6B / 10% = $26B, less $28.5B of net debt, is negative. With no growth and a 10% hurdle, the equity is worth nothing. Utility equity value depends on cheap debt and on regulators letting the company keep earning about 9.9% ROE on a growing rate base. That deal is durable in Michigan (forward test years, 10-month rate-case clock), but it is a leverage-and-regulation trade.
Five-year free cash flow (unlevered, after all capex; $M)
| Year | NOPAT | D&A | Capex | Other | Unlevered FCF |
|---|---|---|---|---|---|
| 2027 | 2,600 | 2,100 | -8,000 | +2,750 Vantage | -550 |
| 2028 | 3,000 | 2,400 | -9,000 | | -3,600 |
| 2029 | 3,450 | 2,750 | -9,500 | | -3,300 |
| 2030 | 3,900 | 3,100 | -9,000 | | -2,000 |
| 2031 | 4,400 | 3,400 | -8,500 | | -700 |
Net debt rises from about $28.5B to about $45B by 2031 even after about $5B of new equity, and shares go from 208M to about 245M. Growth runway is 10+ years: a 5-6 GW data-center pipeline, retiring the Monroe coal plant and grid hardening.
The company in 5 years
DTE in 2031 will be a pure-play regulated utility with a much larger rate base. A third or more of electric sales will go to hyperscalers on 20-year contracts (minimum bills at 80% of contracted demand, collateral). EPS will be about $10.9 and the dividend about $6.9, still growing 6-8%. It will be a growing income stream, not a corpse, and confidence in that path is about 70%. The swing factors are the allowed ROE and regulatory lag after the 2026 elections, interest rates, and whether Oracle and Google ramp on time.
Fair value and the multiples we pay
- Unlevered DCF at 10%. PV of the 2027-31 FCF is about -$7.8B. The 2031 value is $4.4B x 20x, about $88B (a premium to the 10-18x band for unusually durable regulated cash still growing about 7%), with a PV of about $54.6B. EV is about $46.9B; less $28.5B net debt, equity is about $88/share (range $55-125 for 18-22x). Discounting unlevered utility flows at 10% double-penalizes a business financed about 60% with 5% debt, but it is the honest answer: the stock does not clear a 10% unlevered hurdle.
- Levered cross-check. The PV of dividends from $4.99 (2027) to about $6.9 (2031) is about $22. 2031 EPS of $10.9 at 16.5x has a PV of about $112. The total is about $134, roughly today's price. IRR is about 9.5% (3.5% yield plus about 7% EPS CAGR from 2026, less mild multiple compression).
- Fair value $138 (range $115-160). Analyst targets cluster at $135-160 (average about $148). Getting from 17.5x to a 10x multiple would take until about 2034+, so there is no 3-4 year path.
Management, governance, capital allocation
CEO Joi Harris and CFO Dave Ruud are credible. They have repeatedly hit the high end of guidance, cut outage duration about 90% from 2023 to 2025, and won hyperscaler contracts with strong protections. Selling Vantage at a premium multiple is shareholder-friendly. The cost is a flat 2027 and dilution of about 3.5% a year. There are no governance red flags. The EES Coke Clean Air Act judgment ($100M penalty plus a $20M fund, accrued, under appeal) is a one-off. Capital World trimmed its stake below 5%.
Risks and competition
DTE has a franchise monopoly, so competition is not the issue. The risks:
1. Michigan politics. AG Nessel's Oct 30 rehearing petition on the Google contract. A governor-elect (Benson) appoints MPSC commissioners. The electric rate case order is due Feb 2027 (staff supportive of the stay-out mechanism).
2. Rates. The 10-year Treasury is above 5.2%, and utilities were the most oversold since 2023 in September.
3. Counterparty and ramp. Oracle was downgraded by S&P (still investment grade, collateral triggers).
4. Execution and financing. $44B of capex, about $1B a year of equity, supply chains, storm costs.
5. Dead-money 2027 with flat EPS.
Sentiment: 5.5/10
The stock is $135, 42% of the way up its 1-year range ($120.83-154.43). It fell from $152 in June to $122 in September with the sector, then recovered. Short interest is about 2.8% of float, 3.9 days to cover. Options showed 29% call / 17% put ATM implied volatility. The call figure looks rich for a utility; if it is real, writing ~45-day calls 5% out of the money is a reasonable income overlay, though this is not a valuation-floor setup.
Analysts are mostly Buy with some Holds; consensus targets are about $148-158. Nov 6 actions:
- Wells Fargo: Buy, $165 to $160
- Ladenburg: Buy, $136 to $145
- BMO: Hold, $141 to $143
- Scotiabank: Hold, $140
In October, HSBC initiated at Hold ($135), and Truist ($150), Jefferies ($152) and Morgan Stanley ($139) trimmed targets. The tone is constructive, neither capitulation nor euphoria.
- /Users/gregwo/stocks2/data/analysisv3/context/DTE.md (Q3 2026 call transcript, prior call summaries, short interest, options)
- https://www.sec.gov/Archives/edgar/data/0000936340/000093634026000166/exhibit991-93026.htm
- https://www.sec.gov/Archives/edgar/data/0000936340/000093634026000169/dte-20260930.htm
- https://stockanalysis.com/stocks/dte/
- https://stockanalysis.com/stocks/dte/ratings/
- https://ir.dteenergy.com/news/press-release-details/2026/DTE-Energy-Board-of-Directors-declares-quarterly-dividend/default.aspx
- https://www.michigan.gov/ag/news/press-releases/2026/10/30/ag-nessel-challenges-mpsc-approval-of-dtes-google-data-center-contracts
- https://michiganadvance.com/2026/10/02/michigan-regulators-ok-dte-contracts-for-google-data-center/
- https://247wallst.com/investing/etf/2026/10/02/utility-stocks-are-the-most-oversold-since-2023/
- https://walnutinvest.com/stocks/dte/forecast
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 16444+11% | 15626+25% | 12457-2% | 12745-34% | 19228 |
| Gross profit | 3628-43% | 5870+35% | 4338+0% | 4327+18% | 3668 |
| Operating expenses | 1638-60% | 3621+61% | 2247+8% | 2084+9% | 1920 |
| ▸Adj EBITDA | 3974-2% | 4140+8% | 3844-1% | 3892+19% | 3258 |
| ▸Adj OCF | 3310-6% | 3646+10% | 3315+4% | 3177+30% | 2449 |
| CapEx | -5475 | -4429 | -4467 | -3934 | -3378 |
| Adj FCF | -2165 | -783 | -1152 | -757 | -929 |
| Interest expense | 1190 | 1056 | 951 | 791 | 675 |
| ▸Adj net income | 1033-20% | 1209-8% | 1310-2% | 1340+23% | 1090 |
| ▸Owner's earnings | 1150 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 18925100% | 3051100% | 4497100% | 4074100% | 4006100% | 3297100% |
| FCF (OCF−capex) | -5601-30% | -1660-54% | -1002-22% | -824-20% | -714-18% | -1401-42% |
| Net income | 634534% | 99933% | 146233% | 140434% | 139735% | 108333% |
| ▸Capital returned | -3325-18% | -880-29% | -1026-23% | -417-10% | -129-3% | -873-26% |
| Buybacks | -1245 | 0.00 | 0.00 | 0.00 | 0.00 | -1245 |
| Dividends | 3819 | 701 | 871 | 810 | 752 | 685 |
| Interest paid | 4384 | 911 | 1056 | 951 | 791 | 675 |
| Debt paid down | -10283 | -2492 | -2953 | -2178 | -1672 | -988 |
| ▸Reinvestment | 20904110% | 4116135% | 4856108% | 4562112% | 4007100% | 3363102% |
| Capex (PP&E) | 20320 | 4112 | 4429 | 4467 | 3934 | 3378 |
| Intangibles & M&A | 438 | 0.00 | 384 | 27.0 | 27.0 | 0.00 |
| Leases signed (net Δ) | 146 | 4.00 | 43.0 | 68.0 | 46.0 | -15.0 |
| Retained / other | 16709% | 1314% | 69615% | 51713% | 1794% | 1474% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 9.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 57594 | 54066 | 48846 | 44755 | 42683 |
| ▸Liabilities (total) | 44923 | 41758 | 37142 | 33700 | 32282 |
| Net debt (incl. leases) | 28749 | 26275 | 23217 | 20944 | 19207 |
| Net debt / Adj EBITDA | 7.23 | 6.35 | 6.04 | 5.38 | 5.90 |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | 3.34 | 3.92 | 4.04 | 4.92 | 4.83 |
| Shares outstanding | 208 | 139 | 139 | 139 | 206 |
| Dilution (YoY) | +0.2% | +0.0% | +0.0% | -32.6% | +48.3% |
| Employees | 9650 | 9650 | 9500 | 9950 | 10250 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 22.1%-20.5 | 37.6%+2.8 | 34.8%+0.9 | 34.0%+14.9 | 19.1% |
| Adj EBITDA margin | 24.2%-3.3 | 26.5%-4.4 | 30.9%+0.3 | 30.5%+13.6 | 16.9% |
| Adj OCF margin | 20.1%-3.5 | 23.3%-3.3 | 26.6%+1.7 | 24.9%+12.2 | 12.7% |
| Adj FCF margin | -13.2%-7.7 | -5.0%+4.2 | -9.3%-3.3 | -5.9%-1.1 | -4.8% |
| Net income margin | 8.3%-1.0 | 9.4%-1.9 | 11.3%+0.3 | 11.0%+5.3 | 5.6% |
| Adj NI margin | 6.3%-2.5 | 7.7%-2.8 | 10.5%+0.0 | 10.5%+4.8 | 5.7% |
| ROIC (adj, after-tax) | 4.8% | 5.5% | 6.0% | 6.3% | 5.7% |
| Cost of debt | 4.3% | 4.3% | 4.1% | 3.9% | 3.5% |
Earnings Calls
Earnings Call · 2026 Q3
DTE Energy reported Q3 2026 operating earnings of $481 million, or $2.30 per share, and announced the roughly $3 billion sale of DTE Vantage (essentially all assets except EES Coke) to institutional investors advised by J.P. Morgan Asset Management's infrastructure group, targeted to close in the first half of 2027. Management said 2026 operating EPS guidance of 6% to 8% growth over the 2025 midpoint is on track for the high end, helped by RNG tax credits. Vantage earned $110 million in Q3, up $69 million, and will finish above its guidance range. DTE Electric earnings fell $73 million on tax timing ($104 million variance that reverses in Q4), higher rate base and storm costs; DTE Gas rose $8 million; energy trading earned $34 million and is expected at the high end of guidance. The company raised its five-year utility investment plan about 30%, or nearly $10 billion, to roughly $44 billion, including $39 billion at DTE Electric: about $23 billion of cleaner generation (7.6 GW solar and wind, 2.1 GW combined cycle gas, 2.7 GW storage), $12 billion for distribution and $4 billion for base infrastructure. The long-term outlook now calls for operating EPS growth above 9% through 2031, measured from a 2027 pro forma baseline of $7.59 to $7.73 (midpoint $7.66), calculated as if the sale closed at the end of 2026. Growth is expected to be well above 9% in 2028–2029 as data center capital ramps, then at least 9% in 2030–2031. The new plan crosses above the prior trajectory in 2029. Data centers remain central. The MPSC approved the 1 GW Google contract in October, adding to the 1.4 GW Oracle deal, for 2.4 GW secured. Oracle construction is on schedule with load expected late 2027. The pipeline is about 5 GW, including roughly 2 GW in advanced discussions, and DTE aims to sign another agreement by year-end; any further deal would be incremental. Spreading fixed costs supports staying out of electric rate cases through at least 2028, with Google potentially extending that. A large load tariff is pending. On financing, Vantage proceeds (about $2.7–2.8 billion after taxes and fees) reduce equity needs by about $1 billion versus the status quo plan and retire roughly $2 billion of parent debt maturing in 2027, removing 2027 refinancing exposure. The $500 million of forward equity will settle in 2027. DTE targets about $1 billion of average annual equity from 2027–2031, may use junior subordinated debt, targets about 15% FFO-to-debt, and will raise the dividend 7% in 2027. The deal was described as roughly 12–13x EV/EBITDA and 19–23x P/E after adjusting for tax credits.
▸Would a third data center customer signed by year-end accelerate the earnings recovery toward the old trajectory around 2030, or mainly extend the growth runway? Does the ramp schedule matter?Shahriar Pourreza · Wells Fargo
▸How should we think about equity needs given the Vantage sale and the cash flows from large load customers?Shahriar Pourreza · Wells Fargo
▸Could the 2 GW in advanced discussions reduce equity needs further?Shahriar Pourreza · Wells Fargo
▸Why do the Vantage sale now, given upfront dilution (2027 baseline roughly flat versus about $8 previously) and slow deployment of proceeds? Is the argument that utility growth deserves a higher multiple?Ross Fowler · Bank of America
▸So the proceeds essentially let DTE capture additional growth opportunities that could push results above the prior trajectory?Ross Fowler · Bank of America
▸How will the $3 billion of proceeds be used before it is redeployed into the utility?Ross Fowler · Bank of America
▸What is the magnitude of growth in 2028 and 2029 (potentially above 10%)? Is it linear?Michael Lonegan · Barclays
▸Was the expectation still that Vantage would grow earnings $15–20 million per year until the RNG credits expire and deliver $150–160 million in 2030?Michael Lonegan · Barclays
▸How does the new plan compare with the prior expectation that Google would get DTE to the 8% side of the old range?Diana Niles · JPMorgan (for Jeremy Tonet)
▸Why did DTE not file a gas rate case as it had said it might?Steve Fleishman · Wolfe Research
▸What are the election takeaways, and how much momentum is there for multiyear rate plan legislation?Steve Fleishman · Wolfe Research
▸Confirming CAGR math: would 2031 EPS be around $10.84 under the prior approach, and is the new plan at or above that, 9%+ from the new 2027 midpoint?Ivana Ergovic · Jefferies
▸Is a settlement likely in the pending rate case, and what clarity exists on staying out beyond 2028 with Google?Ivana Ergovic · Jefferies
▸What are the expected after-tax proceeds from the Vantage sale?Paul Fremont · Ladenburg
▸What is the EBITDA of the business sold?Paul Fremont · Ladenburg
▸Why does equity fall by only $1 billion if proceeds are close to $3 billion?Paul Fremont · Ladenburg
▸What FFO-to-debt improvement results from the debt paydown?Paul Fremont · Ladenburg
▸Is the 9% growth for 2029–2031 off the 2029 level or the 2027 midpoint?Paul Fremont · Ladenburg
▸Do data center customers under the Google/Oracle agreements or the tariff have a different, more front-loaded cash flow profile than other load?Sophie Karp · KeyBanc
▸Would more such contracts reduce equity needs?Sophie Karp · KeyBanc
▸Does DTE even need multiyear rate plans if it can reduce rate case frequency organically?Sophie Karp · KeyBanc
▸Are any regulatory approvals needed for the Vantage sale that could delay it?Travis Miller · Morningstar
▸Would the stay-out extension from Google be addressed in the February order or later?Travis Miller · Morningstar
▸How much of the IRP will be paid for by Google and Oracle?Travis Miller · Morningstar
SEC Filing Findings
SEC Filing — material findings
2026-11-05 · depth 9/10risk 6Litigation▸EES Coke Clean Air Act case: court imposed $100M civil penalty plus $20M community fund on defendants including DTE Energy; DTE accrued $120M total as of Sept 30, 2026; defendants will appeal and cannot predict further impact.
EES Coke Clean Air Act case: court imposed $100M civil penalty plus $20M community fund on defendants including DTE Energy; DTE accrued $120M total as of Sept 30, 2026; defendants will appeal and cannot predict further impact.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $115.00 | $20.50/$25.30 | 0 | --/$4.90 | 0 |
| $120.00 | $16.00/$20.80 | 0 | --/$4.90 | 1 |
| $125.00 | $11.50/$15.80 | 0 | --/$4.90 | 13 |
| $130.00 | $7.00/$10.00 | 3 | $0.05/$4.00 | 7 |
| $135.00 | $4.60/$6.10 | 5 | $2.30/$3.90 | 2 |
| $140.00 | $1.90/$3.90 | 292 | $3.50/$7.50 | 0 |
| $145.00 | $0.40/$3.30 | 199 | $6.00/$10.80 | 0 |
| $150.00 | --/$1.50 | 0 | $10.00/$14.80 | 0 |
Short Interest
Web Traffic
Executive Compensation (2019.0-2021.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $3.92B | $129.77 | +$498M | +$1.28B | — | $6.70T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $1.91B | $146.26 | +$12.2M | +$1.91B | — | $4.68T |
| Capital Research Global Investors | $1.90B | $109.52 | −$261M | −$250M | — | $716.77B |
| STATE STREET CORPPassive | $1.72B | $118.38 | +$18.1M | +$103M | — | $3.38T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $1.70B | $146.22 | −$104M | +$1.70B | — | $2.22T |
| Capital World Investors | $1.52B | $125.79 | −$144M | +$105M | — | $846.00B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $891M | $117.94 | +$13.8M | +$94.2M | — | $1.87T |
| AMERIPRISE FINANCIAL INC | $854M | $108.12 | −$21.9M | +$97.2M | — | $494.20B |
| Jupiter Topco LLC | $477M | $152.37 | +$477M | +$477M | — | $244.60B |
| Invesco Ltd. | $455M | $121.66 | −$1.0M | +$90.9M | — | $1.26T |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2006 Q1 | 2.3B | 375M | 118M | $0.74 | $0.59 – $0.89 | 8 |
| 2006 Q2 | 53.1B | 161M | -60M | $0.51 | $0.41 – $0.62 | 15 |
| 2006 Q3 | 1.9B | 562M | 163M | $0.55 | $0.44 – $0.66 | 17 |
| 2006 Q4 | 2.1B | 379M | 131M | $0.39 | $0.31 – $0.46 | 17 |
| 2007 Q1 | 3.0B | 423M | 157M | $0.90 | $0.72 – $1.08 | 19 |
| 2007 Q2 | 2.1B | 823M | 459M | $0.56 | $0.45 – $0.67 | 18 |
| 2007 Q3 | 2.3B | 518M | 212M | $0.96 | $0.77 – $1.15 | 18 |
| 2007 Q4 | 1.7B | 438M | 180M | $0.55 | $0.44 – $0.66 | 9 |
| 2008 Q1 | 2.5B | 483M | 204M | $0.72 | $0.58 – $0.86 | 15 |
| 2008 Q2 | 6.0B | 389M | 41M | $0.63 | $0.50 – $0.76 | 14 |
| 2008 Q3 | 1.9B | 532M | 136M | $0.66 | $0.53 – $0.79 | 15 |
| 2008 Q4 | 2.4B | 907M | 142M | $1.08 | $0.86 – $1.30 | 16 |
| 2009 Q1 | 1.4B | 459M | 75M | $0.29 | $0.23 – $0.34 | 8 |
| 2009 Q2 | 452M | 538M | 129M | $0.23 | $0.19 – $0.28 | 16 |
| 2009 Q3 | 2.0B | 617M | 164M | $1.03 | $0.82 – $1.24 | 13 |
| 2009 Q4 | 2.1B | 561M | 113M | $0.72 | $0.58 – $0.86 | 10 |
| 2010 Q1 | 2.1B | 637M | 195M | $1.02 | $0.82 – $1.22 | 13 |
| 2010 Q2 | 2.8B | 536M | 116M | $0.81 | $0.65 – $0.97 | 10 |
| 2010 Q3 | 2.1B | 619M | 163M | $0.96 | $0.77 – $1.15 | 20 |
| 2010 Q4 | 2.1B | 571M | 148M | $0.84 | $0.67 – $1.01 | 16 |
| 2011 Q1 | 2.7B | 612M | 191M | $1.31 | $1.05 – $1.57 | 17 |
| 2011 Q2 | 1.7B | 570M | 156M | $0.41 | $0.33 – $0.49 | 8 |
| 2011 Q3 | 2.1B | 594M | 170M | $0.93 | $0.74 – $1.12 | 20 |
| 2011 Q4 | 2.0B | 538M | 135M | $0.72 | $0.58 – $0.86 | 8 |
| 2012 Q1 | 2.7B | 574M | 181M | $1.25 | $1.00 – $1.50 | 7 |
| 2012 Q2 | 1.6B | 502M | 113M | $0.54 | $0.43 – $0.65 | 19 |
| 2012 Q3 | 1.9B | 618M | 193M | $0.97 | $0.78 – $1.16 | 18 |
| 2012 Q4 | 2.4B | 481M | 82M | $0.87 | $0.70 – $1.04 | 8 |
| 2013 Q1 | 2.0B | 589M | 175M | $0.80 | $0.64 – $0.96 | 16 |
| 2013 Q2 | 2.8B | 539M | 125M | $0.92 | $0.74 – $1.10 | 19 |
| 2013 Q3 | 2.6B | 657M | 211M | $1.29 | $1.03 – $1.55 | 10 |
| 2013 Q4 | 2.4B | 539M | 116M | $0.89 | $0.71 – $1.07 | 10 |
| 2014 Q1 | 3.4B | 741M | 277M | $1.25 | $1.00 – $1.50 | 8 |
| 2014 Q2 | 2.8B | 551M | 129M | $0.79 | $0.63 – $0.95 | 13 |
| 2014 Q3 | 2.7B | 605M | 162M | $1.10 | $0.88 – $1.32 | 7 |
| 2014 Q4 | 2.8B | 731M | 265M | $0.93 | $0.74 – $1.12 | 19 |
| 2015 Q1 | 2.8B | 637M | 252M | $1.41 | $1.13 – $1.69 | 18 |
| 2015 Q2 | 2.4B | 483M | 117M | $0.88 | $0.70 – $1.06 | 10 |
| 2015 Q3 | 2.3B | 607M | 233M | $1.10 | $0.88 – $1.32 | 17 |
| 2015 Q4 | 2.4B | 435M | 78M | $0.97 | $0.78 – $1.16 | 9 |
| 2016 Q1 | 2.5B | 650M | 244M | $1.48 | $1.18 – $1.78 | 20 |
| 2016 Q2 | 2.1B | 530M | 137M | $0.80 | $0.64 – $0.96 | 20 |
| 2016 Q3 | 2.4B | 685M | 270M | $1.30 | $1.04 – $1.56 | 10 |
| 2016 Q4 | 3.1B | 580M | 139M | $0.91 | $0.73 – $1.09 | 15 |
| 2017 Q1 | 2.8B | 806M | 341M | $1.33 | $1.06 – $1.60 | 14 |
| 2017 Q2 | 2.7B | 590M | 165M | $0.93 | $0.74 – $1.12 | 14 |
| 2017 Q3 | 3.4B | 763M | 284M | $1.64 | $1.31 – $1.97 | 20 |
| 2017 Q4 | 3.1B | 748M | 270M | $1.12 | $0.90 – $1.34 | 19 |
| 2018 Q1 | 3.7B | 868M | 357M | $1.87 | $1.50 – $2.24 | 19 |
| 2018 Q2 | 2.6B | 643M | 186M | $0.90 | $0.72 – $1.08 | 20 |
| 2018 Q3 | 3.0B | 752M | 266M | $1.41 | $1.13 – $1.69 | 18 |
| 2018 Q4 | 3.8B | 692M | 195M | $0.95 | $0.76 – $1.14 | 7 |
| 2019 Q1 | 3.9B | 930M | 380M | $1.67 | $1.39 – $2.16 | 6 |
| 2019 Q2 | 3.0B | 707M | 196M | $0.91 | $0.76 – $1.18 | 4 |
| 2019 Q3 | 3.7B | 900M | 329M | $1.68 | $1.39 – $2.16 | 3 |
| 2019 Q4 | 3.5B | 838M | 257M | $1.11 | $0.91 – $1.42 | 3 |
| 2020 Q1 | 3.4B | 978M | 356M | $1.48 | $1.22 – $1.90 | 2 |
| 2020 Q2 | 2.9B | 811M | 223M | $1.10 | $0.91 – $1.41 | 2 |
| 2020 Q3 | 3.2B | 950M | 352M | $1.77 | $1.46 – $2.28 | 2 |
| 2020 Q4 | 3.2B | 878M | 242M | $1.06 | $0.88 – $1.36 | 2 |
| 2021 Q1 | 3.3B | 963M | 348M | $1.85 | $1.53 – $2.38 | 2 |
| 2021 Q2 | 2.8B | 761M | 147M | $1.39 | $1.15 – $1.79 | 9 |
| 2021 Q3 | 3.3B | 548M | 26M | $1.84 | $1.52 – $2.37 | 4 |
| 2021 Q4 | 3.2B | 862M | 270M | $0.94 | $0.78 – $1.21 | 5 |
| 2022 Q1 | 3.6B | 947M | 344M | $2.08 | $1.72 – $2.68 | 9 |
| 2022 Q2 | 3.1B | 591M | 42M | $1.00 | $0.83 – $1.29 | 5 |
| 2022 Q3 | 4.0B | 586M | 25M | $1.57 | $1.30 – $2.02 | 5 |
| 2022 Q4 | 1.7B | 956M | 297M | $1.24 | $1.02 – $1.59 | 7 |
| 2023 Q1 | 4.5B | 907M | 261M | $1.26 | $1.04 – $1.62 | 9 |
| 2023 Q2 | 4.0B | 852M | 184M | $0.88 | $0.73 – $1.14 | 4 |
| 2023 Q3 | 5.2B | 1.0B | 340M | $1.63 | $1.23 – $1.92 | 11 |
| 2023 Q4 | 4.6B | 1.1B | 408M | $1.96 | $1.83 – $2.18 | 7 |
| 2024 Q1 | 3.1B | 1.1B | 347M | $1.67 | $1.50 – $1.93 | 5 |
| 2024 Q2 | 2.4B | 1000M | 252M | $1.21 | $1.13 – $1.30 | 9 |
| 2024 Q3 | 3.0B | 1.2B | 390M | $1.88 | $1.77 – $2.10 | 14 |
| 2024 Q4 | 3.3B | 1.1B | 300M | $1.44 | $1.33 – $1.67 | 9 |
| 2025 Q1 | 3.4B | 1.2B | 419M | $2.02 | $1.90 – $2.22 | 7 |
| 2025 Q2 | 2.8B | 1.1B | 290M | $1.40 | $1.31 – $1.49 | 12 |
| 2025 Q3 | 3.2B | 1.3B | 440M | $2.11 | $2.05 – $2.14 | 8 |
| 2025 Q4 | 3.4B | 1.2B | 317M | $1.52 | $1.51 – $1.55 | 8 |
| 2026 Q1 | 4.4B | 1.3B | 418M | $2.01 | $1.91 – $2.09 | 8 |
| 2026 Q2 | 3.4B | 1.1B | 236M | $1.14 | $1.12 – $1.15 | 9 |
| 2026 Q3 | 3.5B | 1.4B | 446M | $2.15 | $2.08 – $2.19 | 8 |
| 2026 Q4 | 4.0B | 1.4B | 474M | $2.28 | $1.84 – $2.53 | 6 |
| 2027 Q1 | 5.5B | 1.4B | 439M | $2.11 | $1.45 – $2.52 | 4 |
| 2027 Q2 | 3.8B | 1.3B | 282M | $1.36 | $1.18 – $1.53 | 1 |
| 2027 Q3 | 5.6B | 1.6B | 499M | $2.40 | $2.09 – $2.70 | 1 |
| 2027 Q4 | 3.9B | 1.6B | 477M | $2.30 | $1.99 – $2.59 | 1 |
| 2028 Q1 | 3.4B | 1.6B | 464M | $2.23 | $1.94 – $2.51 | 2 |
| 2028 Q2 | 2.8B | 1.4B | 345M | $1.66 | $1.44 – $1.87 | 2 |
| 2028 Q3 | 3.2B | 1.7B | 551M | $2.65 | $2.30 – $2.99 | 2 |
| 2028 Q4 | 3.2B | 1.5B | 391M | $1.88 | $1.63 – $2.12 | 2 |
| 2029 Q1 | 4.2B | 1.7B | 508M | $2.44 | $2.12 – $2.75 | 1 |
| 2029 Q2 | 4.2B | 1.5B | 378M | $1.82 | $1.58 – $2.05 | 1 |
| 2029 Q3 | 4.3B | 1.8B | 605M | $2.91 | $2.53 – $3.28 | 1 |
| 2029 Q4 | 4.3B | 1.6B | 428M | $2.06 | $1.79 – $2.32 | 1 |
| 2030 Q1 | 4.4B | 1.8B | 555M | $2.67 | $2.32 – $3.00 | 1 |
| 2030 Q2 | 4.5B | 1.7B | 413M | $1.98 | $1.72 – $2.24 | 1 |
| 2030 Q3 | 4.5B | 2.0B | 660M | $3.17 | $2.76 – $3.58 | 1 |
| 2030 Q4 | 4.6B | 1.8B | 468M | $2.25 | $1.95 – $2.53 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-09-01 | SELL | Lauer Trevor F | officer: Vice Chairman & Group Pres. | 5,000 | $135.71 | $679K | $9.92M |
| 2026-05-14 | SELL | Muschong Lisa A. | officer: VP, Corp Sec & Chief of Staff | 1,000 | $143.72 | $144K | $896K |
v2 analysis (legacy, 2026-07-28) — for comparison onlyclick to expand
Thesis
DTE is a Michigan-based regulated electric/gas utility riding an unusually large late-cycle growth catalyst: hyperscale data center load (Oracle 1.4GW under construction, Google 1GW filed with MPSC, several more GW in pipeline). Management has raised its 5-year capital plan to $36.5B and reiterated 6-8% EPS growth (bias to high end), funded by $500-600M/yr of equity issuance plus debt. Reliability metrics are the best in 20 years and the affordability narrative (data centers subsidizing residential rates) is a genuine selling point to regulators. Offsetting this is a classic regulated-utility profile: heavy, continuous capex (5 straight years of negative FCF, cumulative FCF -$4.7B vs claimed EBITDA of $17.9B over the period), rising leverage (net debt/EBITDA 6.3x), and an increasingly adversarial Michigan political environment — AG Nessel is contesting both the Google PSA terms and a fresh $474M rate case only two months after a prior increase, and a proposed state moratorium bill (SB 1018-1020) threatens to delay data center go-live dates. A $100M EES Coke litigation penalty is a modest, one-time credibility/cost hit. Net: a well-run regulated monopoly with real embedded growth optionality, priced roughly fairly, but with real regulatory/legislative execution risk on the pace of monetizing the data-center pipeline.
Trade Signal
DTE looks overvalued (~30% downside to base-case fair value) on a stretched growth-utility multiple that already assumes smooth hyperscaler execution, but as a dividend-paying regulated utility with sticky natural buyers, low short interest, and no near-term forced catalyst, it's a modest/patient short rather than a high-conviction one.
Stock has drifted up 9% over 6m and roughly flat over 3m (-4% 1m) mostly on beta/sector sympathy plus the Oracle/Google data-center growth narrative, not a sharp repricing event; the pullback from 52w highs coincides with AG Nessel's contested-case opposition to the Google PSA and the new legislative moratorium bill (SB 1018-1020), but the reaction has been modest (-4%) relative to how material those regulatory/legislative risks are to the 2027 load-ramp timeline. This looks like a case where the market is under-discounting genuine political/regulatory friction rather than overreacting to it — a durable gap, not a temporary dislocation, since the growth premium embedded in the ~31x TTM P/E assumes smooth execution that is now contested on two fronts.
Consensus is constructive-to-neutral: 34 analysts average Hold with a $152 target essentially at spot, 21 buys/25 holds/0 sells, short interest a modest 2.8% of float (up slightly YoY but still low), and institutional 13F holders are largely passive index/quant names with tiny active bets. The data-center/hyperscaler load story (Oracle 1.4GW, Google 1GW, 2-4GW pipeline) is the dominant bull narrative and is well covered in sell-side notes; retail attention/order flow is unremarkable (16% retail, no meme dynamics). The market is aware of the AG opposition and moratorium bill but appears to be treating them as noise rather than a real threat to the growth algorithm — that complacency is the stale part of the view.
The bull case (Oracle/Google/hyperscaler load, best-in-20-years reliability, affordability optics) is already the dominant sell-side narrative and is largely embedded in consensus 6-8% EPS growth estimates through 2030 — this is not a surprise to the market. If anything, the near-term risk skews the other way: the AG's contested-case intervention, the proposed moratorium bill, and a second rate case filed only two months after the last one (drawing a public
- •H2 2026 · MPSC ruling on Google 1GW PSA (Case U-22058) — AG Nessel pushing for tighter minimum-demand/exit-fee terms; outcome sets precedent for future hyperscaler deals.
- ▼2026 Q3 · Senate Bills 1018-1020 data-center moratorium vote — 365-day statewide moratorium would delay Oracle/Saline 'Barn' campus operations past April 2027, denting the load-growth thesis.
- •late 2026 · New $474.3M electric rate case decision — Filed only 2 months after prior $242M hike; AG intervention and 'ransom note' rhetoric signal contentious approval process, likely trimmed outcome.
- •Aug/Nov 2026 · Q2/Q3 2026 earnings — Watch guidance reaffirmation toward high end of 6-8% EPS growth and any Oracle ramp timing updates.
- ▼ongoing through 2030 · Continued $500-600M/yr equity issuance — Programmatic dilution funding the $36.5B capex plan caps EPS upside per share.
No buyback; company is a structural net issuer, planning $500-600M/yr of equity through 2030 (~2%/yr dilution) plus heavy debt issuance (recent $1B junior subordinated notes at 6.2%) to fund the $36.5B five-year capex plan. Insiders show only small sells, no buys, over the past year. Dividend yield ~3% is a retention tool for income funds but not a source of share reduction.
There's a soft floor from the ~3% dividend yield and regulated-utility cash flow stability, but no hard asset/net-cash floor — leverage is elevated (6.3x net debt/EBITDA) leaving little room for error. Above the price there is a real ceiling: continuous equity issuance dilutes any rally, the stock is already near its 52w high and trading at a rich ~31x TTM P/E / 39x P/FCF versus a utility sector that historically re-rates on regulatory clarity, and the analyst's fair value sits ~37% below spot even in the base case.
DTE is eminently buyable as an income/utility holding — pension funds, dividend ETFs, and utility-sector generalists will keep bidding it for the growth-plus-yield combination, and that flow (not fundamentals) is likely what's keeping the stock near highs despite the analyst's much lower fair value. That makes it a hard high-conviction short (crowded income trade, low borrow cost but sticky natural buyer base, low short interest, no forced-seller catalyst), even though on pure valuation grounds it screens overvalued.
Mild fear: the valuation gap (37% downside to fair value even before the bear case) combined with real, currently-live regulatory/legislative friction (AG opposition on two fronts, a live moratorium bill) argues the market is complacent about execution risk on the growth story it has already priced in generously.
Valuation
The Q1 2026 report/call confirmed continued execution on the data-center pipeline (Oracle under construction, Google 1GW PSA formally filed with MPSC, 2GW in late-stage talks, 3-4GW more from other hyperscalers) and reiterated guidance ($1.95 EPS in-line, full-year tracking to high end of 6-8%). Little of this was truly new versus the Q4 2025 call — the growth framework, capital plan increase, and equity issuance cadence were already disclosed. The genuinely incremental items are the Google PSA formally reaching the MPSC (a concrete regulatory step) and confirmation the Saline/Oracle project is proceeding to construction — modestly de-risking timing versus prior 'in discussions' status, offset by early signs (post-quarter, per research) that AG opposition and a legislative moratorium bill are escalating.
▸ How the cases moved
Base case nudged up slightly (probability 0.50->0.55) as the Google deal and Oracle construction are concrete progress rather than pipeline talk; bull probability roughly steady (0.25) since execution risk from AG/legislative pushback offsets the positive construction news; bear probability trimmed slightly (0.25->0.20) as near-term project execution looks on track even though political risk is rising. No case dollar values changed meaningfully — this was confirmatory, not surprising, information.
Michigan regulatory/political environment turns meaningfully hostile: AG Nessel succeeds in tightening Google contract terms and slowing the new $474M rate case; the legislative data-center moratorium passes or is delayed via litigation, pushing Oracle/Google load online past 2027; equity growth stalls near the low end of 6%, multiple compresses on perceived regulatory risk and elevated leverage (6x+ net debt/EBITDA).
▸ Valuation
15x $1,100M normalized EPS-equivalent owner earnings ≈ $16,500M equity value (P/E multiple, already net of leverage)
DTE executes its base plan: Oracle ramps through 2026-2027, Google deal gets MPSC approval with modestly tightened terms, rate case is approved but trimmed, and EPS grows near the middle of the 6-8% guided range. Data center load adds incremental rate base without derailing affordability optics. Leverage stays elevated but manageable given ongoing equity issuance.
▸ Valuation
18x $1,300M owner earnings ≈ $23,400M equity value (P/E multiple, net of leverage)
Political friction proves manageable — moratorium bill fails or is narrowly scoped, MPSC approves Google PSA largely as filed, Oracle/Saline campus and additional hyperscaler deals (2-4GW pipeline) convert on schedule, pushing growth to the high end (8%+) with a de-risked, more heavily-regulated-utility earnings mix (93% by 2030). Market re-rates DTE as a premium growth utility.
▸ Valuation
22x $1,450M owner earnings ≈ $31,900M equity value (P/E multiple, net of leverage)
▸ Target Rationale
Model math (probability-weighted, discounted) lands near $19.3B. I trim slightly to ~$18.8B to reflect that the regulatory/legislative friction (AG opposition on two fronts, a live moratorium bill, and a fresh $100M litigation penalty) is unusually concentrated and public right now, adding near-term headline/execution risk beyond what the case probabilities alone capture; leverage (6.3x net debt/EBITDA) also leaves less room for error than the base case assumes. This roughly matches where the stock has been trading, consistent with a fairly-priced, well-run regulated utility with real but contested growth optionality.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- LG Energy Solution Battery Storage Procurement (May 2026): DTE Energy entered into a massive $1.6 billion agreement with LG Energy Solution Vertech to supply 1.5 gigawatts (6 gigawatt-hours) of battery energy storage systems (BESS) over a two-year period. The eight-project deployment will utilize batteries manufactured in Michigan and other North American facilities to fulfill domestic content requirements. The infrastructure is designed to bolster grid reliability, mitigate strain during peak periods, and accommodate the rising demands of massive data centers and renewable integrations.
- Q1 2026 Financial Results & Accomplishments (April 30, 2026): DTE Energy reported its first-quarter 2026 achievements, reiterating its focus on utility infrastructure modernization and grid development. Management highlighted that DTE is uniquely positioned as Michigan attracts heavy regional investment from hyperscale data center developers.
- Debt Issuance & Liquidity Management (June 2026): DTE Energy completed a $1 billion debt offering of 2026 Series C 6.200% Fixed-to-Fixed Reset Rate Junior Subordinated Debentures due in 2058 to support ongoing capital expenditure projects and refinance current obligations.
- Quarterly Dividend Declaration (June 18, 2026): DTE’s Board of Directors declared a quarterly dividend of $1.165 per share on its common stock, payable in October 2026, maintaining its long-term record of capital return to shareholders.
▸ Thesis-test Findings
Michigan Public Service Commission DTE Google data center contract order
In March 2026, DTE and Google signed a 20-year power supply agreement (PSA) to support a massive 1-gigawatt data center in Van Buren Township (Case U-22058). Structurally, Google committed to paying the full cost of 1.6 GW of new renewable power and 480 MW of battery storage, lowering risk for the utility. In a shift from the expedited approvals of previous projects, DTE and Google agreed to a contested case review. In June 2026, Michigan Attorney General Dana Nessel filed testimony opposing the current contract terms. Nessel argues that the safeguards are inadequate, advocating for the MPSC to raise Google’s minimum monthly demand charges from 80% to 90% and increase exit fees to protect residential ratepayers from potential stranded costs. This ongoing litigation presents regulatory friction for DTE, even though the contract structure remains a long-term bull-case driver for grid expansion.
DTE Electric rate case filing Dana Nessel response 2026
On April 28, 2026, DTE Electric filed a new application before the MPSC seeking a $474.3 million (9.7% for residential) annual rate hike, coming only two months after receiving a separate $242.4 million rate increase. Attorney General Dana Nessel formally intervened, criticizing the request. DTE offered a conditional promise to pause new rate hike requests for at least two years *if* the MPSC grants a constructive outcome in this case and if the Saline Township data center comes online by late 2027. Nessel dismissed this offer as a "ransom note". This conflict underscores a highly adversarial regulatory environment in Michigan, signaling a strong bear-case risk regarding DTE's ability to smoothly push through near-term rate adjustments.
Oracle data center Saline Township Michigan construction update 2026
Construction officially began on "The Barn," a $16 billion hyperscale data center campus in Saline Township backed by Oracle, OpenAI, Related Digital, and Blackstone, with a formal groundbreaking held on June 1, 2026. The developers secured major institutional financing from Blackstone and PIMCO. However, legislative hurdles have intensified. On June 4, 2026, Michigan state legislators introduced Senate Bills 1018–1020, which propose a 365-day statewide moratorium on all data center operations. If passed, the bill would block "The Barn" from beginning operations until April 2027, even though active construction is underway. While Governor Gretchen Whitmer opposes halting development, the legislative pushback creates severe execution and timing risks for DTE’s projected load addition and its conditional rate-freeze proposal.