ETR
Entergy Corporationv3 4.5/10 · 2026-11-06Entergy Corporation, headquartered in New Orleans, Louisiana, is a prominent American energy company primarily involved in generating and distributing electricity across the United States. Its operations are divided into two main divisions: Utility and Entergy Wholesale Commodities. The Utility division manages the end-to-end process of generating, transmitting, distributing, and selling electricity. This service covers specific regions of Arkansas, Louisiana, Mississippi, and Texas, including the metropolitan area of New Orleans, providing electricity to 3 million utility customers in these states. Additionally, this segment handles natural gas distribution. In contrast, the Entergy Wholesale Commodities division focuses on the ownership, operation, and decommissioning of nuclear power facilities. It also holds stakes in various non-nuclear power plants, selling their output to wholesale clients, and offers specialized services to other nuclear power plant operators. Entergy's electricity generation portfolio is diverse, utilizing natural gas, nuclear, coal, hydroelectric, and solar power. Collectively, its power plants boast an approximate generating capacity of 26,000 megawatts (MW), with 6,000 MW specifically from nuclear sources. Beyond its direct utility customers, Entergy also supplies energy to a range of wholesale clients, including other retail power providers, utility companies, electric power cooperatives, energy trading organizations, and fellow power generation firms. The company has a long history, established in 1913.
2-Year Price History
Valuation v3 Opus worker · 2026-11-06
Entergy is a high-quality vertically integrated Gulf South utility (Arkansas, Louisiana, Mississippi, Texas, New Orleans) that has become one of the clearest AI-power growth stories in regulated utilities: Meta, AWS and Google data centers plus industrial load drive a guided adjusted EPS path of $4.35-4.45 (2026) to $7.05-7.35 (2030), with Q3 putting 2027-2030 in the upper half (about 13% per-share CAGR, financed by a $55B 2027-2030 capital plan, about $5.2B of new equity, 40%+ already contracted). The business is excellent and the guidance is credible, but at $110.55 (Nov 6 close; pack quote $110.30 on Nov 5) we pay about 25x 2026 and 22x 2027 EPS, about 14x EV/EBITDA, and an unlevered owner-earnings yield of only about 4% on an $83.5B EV; true free cash flow is deeply negative (about -$9B in 2027) because every dollar goes into rate base that earns a regulated 9.7-10% ROE. On our 10% hurdle the unlevered DCF gives only about $47 per share, the equity-level view (dividends plus a 19x exit on 2030 EPS) gives about 8% a year, and a fair value near $100. Sentiment is warm, not euphoric (17 of about 23 analysts Buy, targets $115-130, stock near the top of its 3-year range after a September dip to $99 recovered). Rating 4.5: a fine company to own for 7-9% a year, not a 50% opportunity and not a short; research rating 3.5 because the only path to a big win (pipeline of 7-12 GW converting and lifting growth past 2030) is already partly priced.
A deep dive would have to establish: Whether the 7-12 GW data-center pipeline converts fast enough, and with enough customer-funded capital, to lift per-share growth above the guided 13% through 2030 and keep it above 8% after 2030 without Louisiana affordability politics (EVEST, Cottonwood) or heavier equity issuance eroding the returns.
Research (expand)
What the company does
Entergy owns five vertically integrated, rate-regulated electric utilities (Entergy Arkansas, Louisiana, Mississippi, New Orleans, Texas) plus System Energy Resources (Grand Gulf nuclear), serving about 3 million customers with about 26 GW of gas, nuclear, coal, hydro and solar generation. The wholesale merchant nuclear business is gone; this is now a pure regulated utility earning allowed ROEs of about 9.65-10.0% on a rate base of roughly $50-55B (LTM utility book ROE 10.1% on $26.1B average common equity). Its distinctive feature is a heavy industrial base (petrochemicals, LNG, steel, primary metals) and, since 2024, hyperscale data centers: Meta (Richland Parish, Louisiana, plus the EVEST expansion), AWS (Mississippi) and Google (West Memphis, Arkansas, expanded in Q3 2026).
The investment case
- Growth: industrial sales guided to about 16% CAGR 2026-2030, total retail sales about 8.5-9%. Q3 weather-adjusted retail sales +4.5%, industrial +4.9% (lapping last year's ramps), August coincident peak 24 GW, +2%, Mississippi +11% on data-center ramp.
- Guidance (Q3 2026 deck): adjusted EPS 2025 $3.91, 2026 $4.35-4.45 (narrowed up), 2027 $4.90-5.20, 2028 $5.55-5.85, 2029 $6.25-6.55, 2030 $7.05-7.35, now 'upper half' for 2027-2030. Management also talks about >8% beyond 2030 and a 7-12 GW data-center plus 3-5 GW industrial pipeline not in the plan, which it expects to convert within 24 months.
- Customer protection: Fair Share Plus contracts with minimum bills, 15-year ESAs and parent guarantees; management claims $7.5B of bill benefits to other customers. The Arkansas rate case settled with essentially no rate change (9.7% ROE).
- Execution: Orange County (1.2 GW) in service; 8 GW of turbines secured; 10 plants under construction, 9 in Louisiana regulatory review, more than 1,000 miles of 500 kV transmission (70% approved); gas firm transport of 1.325 Bcf/d signed.
What it earns today (real free cash flow)
From the 9M 2026 10-Q: operating income $2.90B, D&A $1.64B (plus $0.18B decommissioning accretion), interest expense $1.29B gross, net income $1.81B, operating cash flow $4.96B (flattered by $1.10B of customer advances from data-center customers, a timing item), capex $7.74B plus $0.27B nuclear fuel. Full-year 2026 adjusted net income is about $2.07B (4.40 x about 470M shares).
- Unlevered NOPAT: about $2.07B + after-tax interest about $1.38B = about $3.45B, of which about $0.2B is non-cash AFUDC equity.
- Owner earnings: treating maintenance capex as roughly D&A plus nuclear fuel (about $3.0-3.5B a year against about $2.7B of D&A) and crediting low cash taxes (PTC sales, accelerated depreciation), unlevered owner earnings are about $3.3B (range $2.7-3.9B). SBC is small (about $50M a year) and already expensed.
- EBITDA is about $5.8-6.0B, so roughly 55% of EBITDA reaches owners before interest and about 32% after the about $1.4B after-tax interest bill.
- Actual free cash flow is deeply negative: 2026 unlevered FCF about -$4B, and 2027 capex of $17.2B makes it about -$9B. Growth is funded with debt (net debt $30.7B at Sep 30 after $4.2B cash; total debt $34.8-34.9B), equity ($1.9B raised YTD, $2.2B more in unsettled forwards), junior subordinated notes and off-balance-sheet build-to-suit leases (Waterford 6 up to $1.875B).
- Today's year forever: $3.3B / 10% = $33B less $30.7B net debt = about $5 per share. If nothing changed the equity would earn about $1.9B of levered owner earnings a year, about 3.6% on the $52.8B market cap (GAAP earnings yield about 4%). This number is only illustrative: Entergy is a growing company and the 5-year projection is what counts, but it shows that the price rests entirely on the growth plan and on the market's willingness to value regulated returns at a 6-7% cost of capital rather than our 10%.
Five-year projection (unlevered FCF after all capex, $M)
Capex: $17.2B in 2027, about $37.5B over 2028-2030 (we assume 13.5 / 12.5 / 11.5), about $11.5B in 2031. Unlevered operating cash flow (OCF plus after-tax interest) rising from about $7.9B (2027) to about $11.9B (2031) as rate base grows about 10% a year and EPS follows guidance.
- 2027: about -9,300
- 2028: about -4,600
- 2029: about -2,500
- 2030: about -400
- 2031: about +400
By 2031 Entergy should be a roughly $85-90B rate-base utility earning about $4.1B of net income (about $7.75 EPS on about 535M shares), unlevered owner earnings about $6.0B, net debt about $57-60B, still growing 6-8% if the pipeline converts. This is a growing income stream with a great franchise downstream, not a corpse; confidence in the 2030 EPS target is fairly high (regulated formula rate plans, contracted ESAs), lower on how much more equity and debt it takes.
Fair value and the multiples we are paying
- Price $110.55 (Nov 6 close), 477.8M shares, market cap $52.8B, EV about $83.5B.
- P/E 25x 2026E, 22x 2027E, 15.4x 2030E; EV/EBITDA about 14x; unlevered owner-earnings yield about 4.0%; levered about 3.6%; dividend $2.72 (2.5%), raised 6%. Net of equity issuance the shareholder yield is about zero.
- DCF per the brief (10% discount, unlevered FCF above, year-5 value = 2031 normalized owner earnings of about $6.0B x 18x, the top of the 5%-grower band because regulated cash flows are maximally durable): PV of 2027-2031 FCF about -$14.2B, PV of terminal about $67B, EV about $53B, less $30.7B net debt = about $22B, or about $47 per share (range $15-90 for 15-22x and $5.5-6.5B owner earnings). The gap to the price is the gap between our 10% hurdle and the roughly 6.5-7% cost of capital at which the market and regulators price utilities.
- Equity view: 2030 EPS $7.20-7.25 at 19x plus about $12.4 of dividends gives about $151 by late 2030, about 8% a year from $110.55; at 22x about 11%, at 17x about 5%. Discounting dividends and a 2031 exit at 18-20x at 10% gives $99-108.
- Fair value: about $100 (range $82-122): roughly what you would pay for a 10% return on the equity case. Sell-side average target is about $120.
Management, risks and competition
Drew Marsh (CEO) and Kimberly Fontan (CFO) have executed well: guidance raised repeatedly, credit kept at Baa2/BBB+ with Moody's CFO pre-WC/debt at or above 15%, equity pre-contracted at good prices (forward at $113), dividend growth about 6%, below EPS growth. No governance red flags; one director bought 1,000 shares at $106 in October (small). Risks:
- Affordability politics: bills rising about 4% a year in Louisiana and Texas; the Governor publicly criticized the $1.8B Cottonwood acquisition (staff saw about $7 a month bill impact); New Orleans has a data-center moratorium; Louisiana's EVEST (Meta expansion) decision is due at the December LPSC meeting; about $1B of Meta-linked transmission is still pending.
- Hidden liabilities from the 10-Q: Waterford 6 build-to-suit (if the LPSC rejects it Entergy must buy the in-process plant at investors' cost); FERC Opinion 595 refunds or surcharges back to 2016 not estimable.
- Hurricanes: Gulf Coast storm exposure (Winter Storm Fern cost about $450M in 2026), recovered via securitization but a recurring drag on credit and bills.
- Execution and capital intensity: $55B over four years on a $53B market cap; construction cost overruns, turbine and labor inflation, and rate-case lag are the main ways the EPS path slips. Rising rates hurt both financing cost and the multiple.
- Demand risk: hyperscaler capex cycles; contracts have minimum bills, but new pipeline conversion is the upside driver.
Competition: a legal franchise monopoly in its service territories; the only competitive threat is behind-the-meter self-generation (e.g. Venture Global) and losing RFPs for new generation to third parties.
How investors and analysts feel (sentiment 7/10)
Well liked but not euphoric. About 17 Buy, 5 Hold, 1 Sell; consensus target about $120-124 (JPMorgan $129-130, Evercore $128, Truist $119, HSBC $123.50, Barclays $115, Morgan Stanley Equal Weight $101; Ladenburg downgraded on valuation). The stock is 90% of the way up its 3-year range and 73% of its 1-year range ($90.6-117.4): it ran from $47 to $117 (split-adjusted) on the AI-power theme, fell to $99 in September on the $2.2B equity offering and the Cottonwood and affordability noise, then recovered to $110 on the Q3 beat. Short interest of about 17M shares (about 3.5%, 6 days to cover) is largely hedging of equity forwards. No forced sellers, no capitulation and no buyback; nothing here resembles blood on the ground. Not a covered-call valuation-floor setup either (25x earnings, low implied volatility on puts).
- /Users/gregwo/stocks2/data/analysisv3/context/ETR.md
- /Users/gregwo/stocks2/data/edgar_filings/ETR/10-Q_2026-11-02_0000065984-26-000325.html
- https://www.sec.gov/Archives/edgar/data/0000065984/000006598426000322/earningsrelease3q26_ex991.htm
- https://pdf.dfcfw.com/pdf/H2_AN202611021831335248_1.pdf
- https://stockanalysis.com/stocks/etr/
- https://quartr.com/events/entergy-corporation-etr-investor-day-2026_33o466vO
- https://www.panabee.com/news/entergy-earnings-q3-2026-report
- https://finviz.com/news/413411/entergy-beats-on-weather-and-data-center-demand-pushes-long-term-outlook-higher-even-as-industrial-growth-cools
- https://www.marketbeat.com/instant-alerts/analyst-entergy-nyse-etr-price-target-raised-to-10100-2026-10-21/
- https://www.utilitydive.com/news/entergy-cottonwood-texas-gas-plant-meta/826565/
- https://rallies.ai/news/entergy-falls-as-22b-equity-offering-priced-at-113-adds-dilution-overhang
- https://www.tipranks.com/stocks/etr/forecast
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 14035+10% | 12947+9% | 11880-2% | 12147-12% | 13764 |
| Gross profit | 5386-4% | 5020-13% | 5738+8% | 5329+1% | 5275 |
| Operating expenses | 2017-12% | 1894-39% | 3087+14% | 2711-16% | 3225 |
| ▸Adj EBITDA | 5768-1% | 5663+11% | 5095+5% | 4862+15% | 4241 |
| ▸Adj OCF | 5445+1% | 5326+35% | 3959+9% | 3633+11% | 3280 |
| CapEx | -10007 | -7897 | -5970 | -4712 | -5395 |
| Adj FCF | -4563 | -2572 | -2011 | -1079 | -2115 |
| ▸Interest expense | 1800 | 1337 | 1151 | 1006 | 991 |
| ▸Adj net income | 1674-10% | 1607+13% | 1417-42% | 2465+125% | 1098 |
| ▸Owner's earnings | 1450 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 25244100% | 4900100% | 6145100% | 5037100% | 4923100% | 4239100% |
| FCF (OCF−capex) | -10291-41% | -2836-58% | -2747-45% | -1481-29% | -417-8% | -2809-66% |
| Net income | 811132% | 182437% | 177229% | 106021% | 236248% | 109326% |
| ▸Capital returned | -1431-6% | -3685-75% | -741-12% | -638-13% | 233647% | 129731% |
| Buybacks | -4278 | -1943 | -1173 | -137 | -140 | -885 |
| Dividends | 4700 | 885 | 1074 | 982 | 918 | 842 |
| Interest paid | 5710 | 1226 | 1337 | 1151 | 1006 | 991 |
| Debt paid down | -7564 | -3852 | -1979 | -2634 | 552 | 350 |
| ▸Reinvestment | 33709134% | 7793159% | 7546123% | 6059120% | 6939141% | 5373127% |
| Capex (PP&E) | 31766 | 7793 | 7897 | 5970 | 4712 | 5395 |
| Intangibles & M&A | 1846 | 0.00 | -352 | 0.00 | 2198 | 0.00 |
| Leases signed (net Δ) | 96.1 | -- | -- | 89.0 | 29.1 | -21.9 |
| Retained / other | -4996-20% | 207442% | -317-5% | 3086% | -3945-80% | -3116-74% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 63 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 81855 | 71891 | 64790 | 59703 | 58595 |
| ▸Liabilities (total) | 61744 | 54622 | 49386 | 44741 | 45311 |
| Net debt (incl. leases) | 30607 | 29006 | 28451 | 26410 | 26796 |
| Net debt / Adj EBITDA | 5.31 | 5.12 | 5.58 | 5.43 | 6.32 |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | 3.20 | 4.24 | 4.43 | 4.83 | 4.28 |
| Shares outstanding | 478 | 458 | 93.0 | 93.0 | 93.0 |
| Dilution (YoY) | +6.3% | +4.7% | +2.8% | +1.8% | +3.1% |
| Employees | 12000 | 12233 | 12267 | 12177 | 12000 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 38.4%-5.7 | 38.8%-9.5 | 48.3%+4.4 | 43.9%+5.5 | 38.3% |
| Adj EBITDA margin | 41.1%-4.8 | 43.7%+0.9 | 42.9%+2.9 | 40.0%+9.2 | 30.8% |
| Adj OCF margin | 38.8%-3.4 | 41.1%+7.8 | 33.3%+3.4 | 29.9%+6.1 | 23.8% |
| Adj FCF margin | -32.5%-14.7 | -19.9%-2.9 | -16.9%-8.0 | -8.9%+6.5 | -15.4% |
| Net income margin | 14.7%+0.4 | 13.7%+4.8 | 8.9%-10.5 | 19.4%+11.5 | 7.9% |
| Adj NI margin | 11.9%-2.7 | 12.4%+0.5 | 11.9%-8.4 | 20.3%+12.3 | 8.0% |
| ROIC (adj, after-tax) | 4.8% | 5.1% | 4.4% | 6.3% | 5.1% |
| Cost of debt | 5.4% | 4.4% | 4.0% | 3.7% | 3.6% |
Revenue Breakdown
Revenue Segments
| Residential | $1.1B | +3% |
| Industrial | $934.5M | +21% |
| Commercial | $748.1M | +9% |
| Sales for Resale | $142.1M | +174% |
| Other Electric | $119.0M | +56% |
| Governmental | $67.7M | +8% |
| Product and Service, Other | $17.4M | +0% |
| Electricity, US Regulated | $9.5M | NEW |
Earnings Calls
Earnings Call · 2026 Q3
Entergy reported strong third quarter 2026 results, with adjusted EPS of $1.98, driven by customer growth and a hot summer. Management narrowed 2026 adjusted EPS guidance by raising the bottom of the range by $0.10, and used the favorable sales to flex spending toward reliability and resilience, including vegetation management. Longer-term outlooks were unchanged, with greater-than-8% growth expected. Capital for 2026 through 2030 rose about $1.5 billion, including roughly $600 million of battery storage tied to Google's West Memphis expansion in Arkansas. Management said the earnings impact moves Entergy into the upper half of its outlook ranges for 2027–2030. The Google expansion raises expected Fair Share Plus customer bill savings by at least $500 million, to at least $7.5 billion across the utilities. The contract is pending commission approval, with ramping expected from 2028. The pipeline outside the base plan includes 7 to 12 GW of data center interest and 3 to 5 GW of traditional industrial interest, which could convert to signed agreements within 24 months. August coincident peak demand exceeded 24,000 MW, up 2%, with Mississippi up 11% on data center ramping. Operationally, the 1.2 GW Orange County Advanced Power Station in Texas is complete. Ten gas plants are under construction, nine are in Louisiana regulatory review with decisions later this year, four more are in the supply plan, and eight turbine units remain available for growth. Standardized design cut engineering time about 50%, and batch purchasing and drones and robotic welding are improving cost and schedule. Over 1,000 miles of mostly 500 kV transmission are planned, about 70% already approved. Entergy signed 1.325 Bcf/d of firm gas transportation. Resilience work continues under the $2 billion phase 1 program, and the DOE awarded $14 million for dynamic line rating. Regulatory progress includes an Arkansas rate case settlement with essentially no rate change (9.7% ROE, 47.5% equity ratio) with a decision expected by year end, and a Louisiana settlement with a December commission vote expected. Louisiana also approved the $1.2 billion transmission project, and New Orleans extended its formula rate plan through 2030. On financing, Entergy settled over $900 million of equity forwards, issued $1.5 billion of junior subordinated notes with 50% equity credit, and Entergy Louisiana issued $1 billion of bonds. 2026 financings are complete, and over 40% of the 2027–2030 equity need is contracted. That need is just below the 10–15% target range (about 9–9.5%), and management expects to keep targeting 10–15% over the whole plan. Moody's FFO to debt is expected at 15% or better in all years. Entergy closed its second build-to-suit lease (Waterford 6) and is exploring nontraditional financing such as private credit for longer-term projects beyond 2030. Details will follow at the EEI Financial Conference.
▸Does the modest step-up in the 4-year capex plan fully reflect data center deals, transmission and clean generation, or are there other pieces that could add upside?Constantine (for Shahriar Pourreza) · Wells Fargo
▸Would the possible additions be rolled into the rate base/EPS outlook at EEI?Constantine (for Shahriar Pourreza) · Wells Fargo
▸Is flat base rates, as in Arkansas, something to expect more often, and does it narrow the ROE lag or change areas of focus for 2027 such as the Texas rate case or FRPs?Constantine (for Shahriar Pourreza) · Wells Fargo
▸How is progress on enhanced self-build capabilities improving competitiveness in RFPs, particularly for renewables?Jeremy · JPMorgan
▸What is the timing and competitiveness for the roughly 2.5 GW of renewables to serve Meta's project, and what could fall into the plan?Jeremy · JPMorgan
▸What is the expected timing for Phase 2 and beyond of the project, and could it overlap with the plan period?Jeremy · JPMorgan
▸Does the 'upper half of the range' apply to the entire 2027–2030 period?Paul Zimbardo · Jefferies
▸Any update on speed-to-market options such as reciprocating engines for customers wanting faster power?Paul Zimbardo · Jefferies
▸Is there upside to the 7–12 GW and 3–5 GW pipelines from the Venture Global announcement, on generation or T&D?Ryan Levine · Citigroup
▸Industrial growth was about 5% versus about 10% in Q2; any change in underlying activity and what is the 2027 trajectory?Durgesh Chopra · Evercore ISI
▸How much of the Google Arkansas extension is already in capital or earnings outlook versus incremental?Durgesh Chopra · Evercore ISI
▸Clarify whether the upper half or upper end of the outlooks was stated.David Paz · Wolfe Research
▸Will the 7–12 GW and 3–5 GW, expected to convert to ESAs within 24 months, ramp within the plan through 2030 or after?David Paz · Wolfe Research
▸Can you give examples of the alternative financing, mostly post-2030?David Paz · Wolfe Research
▸Equity needs are below the 10–15% target; should we expect that going forward as capex is added?Andrew Weisel · Scotiabank
SEC Filing Findings
SEC Filing — material findings
2026-11-02 · depth 10/10risk 6Hidden Liability▸Waterford 6 build-to-suit lease: investors fund up to $1.875B of construction and Entergy Louisiana does not record the asset or a liability during construction. If the LPSC rejects the project, Entergy must buy the in-process plant at investors' costs incurred, including carrying costs.
Waterford 6 build-to-suit lease: investors fund up to $1.875B of construction and Entergy Louisiana does not record the asset or a liability during construction. If the LPSC rejects the project, Entergy must buy the in-process plant at investors' costs incurred, including carrying costs.
risk 6Regulatory / Litigation▸FERC Opinion 595 (MSS-4R NOLC ADIT) found a tariff violation requiring refunds or surcharges back to 2016. Direction is unclear pending rehearing, and the amount is not reasonably estimable.
FERC Opinion 595 (MSS-4R NOLC ADIT) found a tariff violation requiring refunds or surcharges back to 2016. Direction is unclear pending rehearing, and the amount is not reasonably estimable.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $90.00 | $19.80/$23.80 | 6 | --/$0.85 | 0 |
| $95.00 | $14.90/$19.00 | 5 | $0.30/$0.40 | 55 |
| $100.00 | $10.80/$13.20 | 34 | $0.40/$2.85 | 70 |
| $105.00 | $6.40/$8.20 | 137 | $0.90/$1.25 | 135 |
| $110.00 | $3.70/$4.40 | 1,838 | $2.25/$2.85 | 48 |
| $115.00 | $0.50/$2.85 | 205 | $4.80/$6.50 | 14 |
| $120.00 | $0.50/$0.85 | 84 | $8.60/$10.50 | 0 |
| $125.00 | $0.05/$1.10 | 62 | $12.00/$16.00 | 0 |
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $4.86B | $70.88 | +$157M | −$136M | — | $6.70T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $3.51B | $112.45 | +$128M | +$3.51B | — | $4.68T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $3.08B | $112.48 | +$151M | +$3.08B | — | $2.22T |
| STATE STREET CORPPassive | $2.94B | $74.90 | +$72.8M | +$306M | — | $3.38T |
| JPMORGAN CHASE & CO | $2.90B | $86.74 | −$289M | +$1.23B | — | $1.71T |
| BANK OF AMERICA CORP /DE/ | $1.99B | $71.32 | −$3.4M | +$220M | — | $1.54T |
| AMERIPRISE FINANCIAL INC | $1.62B | $72.16 | +$237M | +$48.8M | — | $494.20B |
| FMR LLC | $1.52B | $66.67 | −$106M | +$106M | — | $2.30T |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $1.39B | $73.71 | +$37.7M | +$105M | — | $1.87T |
| MORGAN STANLEY | $1.13B | $75.07 | +$24.9M | +$212M | — | $1.88T |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
| Ticker | Name | Co-holders | Score |
|---|---|---|---|
| HTO | H2O America | 5 | 94.87× |
| FE | FirstEnergy Corp. | 3 | 91.07× |
| AEE | Ameren Corporation | 5 | 84.33× |
| DTE | DTE Energy Company | 4 | 75.89× |
| CNP | CenterPoint Energy, Inc. | 6 | 70.06× |
| LNT | Alliant Energy Corporation | 7 | 66.41× |
| NI | NiSource Inc | 6 | 65.05× |
| PPL | PPL Corporation | 5 | 63.25× |
| XEL | Xcel Energy Inc. | 8 | 52.80× |
| NFG | National Fuel Gas Company | 3 | 50.60× |
| BKV | BKV Corporation | 3 | 50.60× |
| EVRG | Evergy, Inc. | 4 | 40.48× |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2006 Q1 | 2.5B | 465M | 195M | $0.84 | $0.67 – $1.01 | 9 |
| 2006 Q2 | 2.7B | 594M | 297M | $1.28 | $1.02 – $1.54 | 11 |
| 2006 Q3 | 3.3B | 727M | 400M | $1.84 | $1.47 – $2.21 | 16 |
| 2006 Q4 | 2.3B | 536M | 233M | $0.71 | $0.57 – $0.85 | 18 |
| 2007 Q1 | 2.7B | 518M | 216M | $1.06 | $0.85 – $1.27 | 20 |
| 2007 Q2 | 2.9B | 598M | 277M | $1.42 | $1.14 – $1.70 | 19 |
| 2007 Q3 | 3.1B | 781M | 436M | $2.06 | $1.65 – $2.47 | 16 |
| 2007 Q4 | 2.6B | 507M | 183M | $1.00 | $0.80 – $1.20 | 17 |
| 2008 Q1 | 2.8B | 633M | 299M | $1.46 | $1.17 – $1.75 | 9 |
| 2008 Q2 | 3.4B | 764M | 285M | $1.56 | $1.25 – $1.87 | 12 |
| 2008 Q3 | 4.0B | 853M | 474M | $2.54 | $2.03 – $3.05 | 12 |
| 2008 Q4 | 3.1B | 546M | 194M | $1.03 | $0.82 – $1.24 | 18 |
| 2009 Q1 | 2.9B | 781M | 249M | $1.39 | $1.11 – $1.67 | 14 |
| 2009 Q2 | 2.6B | 773M | 237M | $1.29 | $1.03 – $1.55 | 7 |
| 2009 Q3 | 3.0B | 1.1B | 475M | $2.56 | $2.05 – $3.07 | 8 |
| 2009 Q4 | 2.2B | 730M | 278M | $1.35 | $1.08 – $1.62 | 16 |
| 2010 Q1 | 2.7B | 843M | 217M | $1.31 | $1.05 – $1.57 | 16 |
| 2010 Q2 | 2.7B | 892M | 302M | $1.53 | $1.22 – $1.84 | 19 |
| 2010 Q3 | 3.2B | 1.1B | 477M | $2.54 | $2.03 – $3.05 | 14 |
| 2010 Q4 | 2.4B | 855M | 222M | $1.18 | $0.94 – $1.42 | 14 |
| 2011 Q1 | 2.5B | 840M | 246M | $1.30 | $1.04 – $1.56 | 15 |
| 2011 Q2 | 2.8B | 919M | 317M | $1.72 | $1.38 – $2.06 | 10 |
| 2011 Q3 | 3.4B | 1.3B | 631M | $3.51 | $2.81 – $4.21 | 20 |
| 2011 Q4 | 2.4B | 774M | 153M | $0.86 | $0.69 – $1.03 | 15 |
| 2012 Q1 | 4.1B | 400M | -188M | $0.97 | $0.78 – $1.17 | 16 |
| 2012 Q2 | 2.0B | 831M | 270M | $1.21 | $0.97 – $1.45 | 11 |
| 2012 Q3 | 3.0B | 1.0B | 351M | $2.05 | $1.64 – $2.46 | 18 |
| 2012 Q4 | 2.0B | 901M | 243M | $1.16 | $0.93 – $1.39 | 15 |
| 2013 Q1 | 2.3B | 787M | 145M | $0.72 | $0.58 – $0.86 | 14 |
| 2013 Q2 | 3.1B | 841M | 189M | $1.29 | $1.03 – $1.55 | 8 |
| 2013 Q3 | 3.0B | 922M | 216M | $1.91 | $1.53 – $2.29 | 8 |
| 2013 Q4 | 2.2B | 828M | 116M | $0.62 | $0.50 – $0.74 | 19 |
| 2014 Q1 | 2.2B | 953M | 246M | $0.96 | $0.77 – $1.15 | 11 |
| 2014 Q2 | 3.1B | 909M | 199M | $1.17 | $0.94 – $1.40 | 18 |
| 2014 Q3 | 3.8B | 994M | 258M | $2.04 | $1.63 – $2.45 | 11 |
| 2014 Q4 | 3.0B | 855M | 133M | $0.85 | $0.68 – $1.02 | 16 |
| 2015 Q1 | 2.3B | 931M | 214M | $0.92 | $0.74 – $1.10 | 19 |
| 2015 Q2 | 3.7B | 927M | 196M | $1.45 | $1.16 – $1.74 | 15 |
| 2015 Q3 | 3.5B | -47M | -754M | $2.10 | $1.68 – $2.52 | 16 |
| 2015 Q4 | 2.3B | 773M | 95M | $1.32 | $1.06 – $1.58 | 7 |
| 2016 Q1 | 2.3B | 895M | 201M | $1.01 | $0.81 – $1.21 | 7 |
| 2016 Q2 | 831M | 1.3B | 551M | $1.01 | $0.81 – $1.21 | 8 |
| 2016 Q3 | 2.7B | 1.1B | 337M | $1.73 | $1.38 – $2.08 | 14 |
| 2016 Q4 | 1.1B | -8M | -747M | $0.06 | $0.04 – $0.07 | 7 |
| 2017 Q1 | 2.8B | 799M | 92M | $1.15 | $0.92 – $1.38 | 14 |
| 2017 Q2 | 1.0B | 964M | 254M | $0.73 | $0.58 – $0.88 | 20 |
| 2017 Q3 | 3.0B | 1.1B | 372M | $2.03 | $1.62 – $2.44 | 13 |
| 2017 Q4 | 2.3B | 289M | -399M | $0.39 | $0.31 – $0.46 | 12 |
| 2018 Q1 | 3.0B | 865M | 149M | $1.40 | $1.12 – $1.68 | 16 |
| 2018 Q2 | 2.0B | 860M | 158M | $0.83 | $0.66 – $1.00 | 14 |
| 2018 Q3 | 2.5B | 1.1B | 401M | $2.23 | $1.78 – $2.68 | 8 |
| 2018 Q4 | 1.7B | 666M | -37M | $0.24 | $0.19 – $0.29 | 10 |
| 2019 Q1 | 2.6B | 1.1B | 301M | $0.43 | $0.41 – $0.46 | 5 |
| 2019 Q2 | 2.8B | 1.0B | 244M | $0.69 | $0.66 – $0.74 | 9 |
| 2019 Q3 | 3.5B | 1.1B | 332M | $1.15 | $1.09 – $1.22 | 9 |
| 2019 Q4 | 2.8B | 1.2B | 378M | $0.33 | $0.31 – $0.35 | 5 |
| 2020 Q1 | 2.4B | 1.1B | 95M | $0.46 | $0.44 – $0.49 | 4 |
| 2020 Q2 | 2.7B | 1.1B | 333M | $0.63 | $0.60 – $0.67 | 8 |
| 2020 Q3 | 3.4B | 1.3B | 515M | $1.20 | $1.14 – $1.27 | 8 |
| 2020 Q4 | 2.8B | 1.2B | 369M | $0.34 | $0.32 – $0.36 | 4 |
| 2021 Q1 | 2.5B | 1.1B | 252M | $0.59 | $0.56 – $0.62 | 4 |
| 2021 Q2 | 2.5B | 782M | -1M | $0.70 | $0.66 – $0.74 | 9 |
| 2021 Q3 | 3.1B | 1.4B | 546M | $1.22 | $1.21 – $1.23 | 4 |
| 2021 Q4 | 2.3B | 1.0B | 224M | $0.36 | $0.35 – $0.39 | 5 |
| 2022 Q1 | 2.8B | 1.1B | 284M | $0.67 | $0.64 – $0.71 | 9 |
| 2022 Q2 | 2.8B | 1.0B | 116M | $0.69 | $0.65 – $0.73 | 5 |
| 2022 Q3 | 3.4B | 1.5B | 601M | $1.32 | $1.30 – $1.35 | 5 |
| 2022 Q4 | 2.2B | 1.0B | 284M | $0.23 | $0.22 – $0.25 | 7 |
| 2023 Q1 | 3.0B | 1.2B | 312M | $0.67 | $0.63 – $0.71 | 9 |
| 2023 Q2 | 3.4B | 961M | 128M | $0.84 | $0.80 – $0.89 | 4 |
| 2023 Q3 | 4.4B | 1.6B | 661M | $1.51 | $1.44 – $1.62 | 11 |
| 2023 Q4 | 4.0B | 1.2B | 359M | $0.24 | $0.22 – $0.26 | 8 |
| 2024 Q1 | 3.2B | 1.3B | 343M | $0.71 | $0.66 – $0.74 | 7 |
| 2024 Q2 | 3.1B | 1.4B | 410M | $0.88 | $0.79 – $1.00 | 9 |
| 2024 Q3 | 3.7B | 1.7B | 691M | $1.48 | $1.45 – $1.51 | 3 |
| 2024 Q4 | 3.2B | 1.3B | 301M | $0.64 | $0.60 – $0.68 | 8 |
| 2025 Q1 | 3.0B | 1.3B | 327M | $0.69 | $0.66 – $0.74 | 7 |
| 2025 Q2 | 3.1B | 1.4B | 432M | $0.91 | $0.83 – $0.98 | 13 |
| 2025 Q3 | 3.7B | 1.5B | 679M | $1.43 | $1.40 – $1.48 | 10 |
| 2025 Q4 | 2.8B | 1.5B | 248M | $0.52 | $0.49 – $0.55 | 11 |
| 2026 Q1 | 2.9B | 1.5B | 398M | $0.84 | $0.78 – $0.95 | 12 |
| 2026 Q2 | 3.5B | 1.6B | 477M | $1.01 | $0.78 – $1.23 | 12 |
| 2026 Q3 | 4.1B | 1.9B | 819M | $1.73 | $1.67 – $1.82 | 11 |
| 2026 Q4 | 3.3B | 1.4B | 327M | $0.69 | $0.53 – $0.78 | 8 |
| 2027 Q1 | 3.6B | 1.6B | 478M | $1.01 | $0.86 – $1.11 | 6 |
| 2027 Q2 | 3.9B | 1.8B | 584M | $1.23 | $1.17 – $1.31 | 2 |
| 2027 Q3 | 4.6B | 2.2B | 901M | $1.90 | $1.81 – $2.02 | 2 |
| 2027 Q4 | 3.7B | 1.8B | 477M | $1.01 | $0.96 – $1.07 | 2 |
| 2028 Q1 | 3.9B | 1.9B | 550M | $1.16 | $1.10 – $1.23 | 5 |
| 2028 Q2 | 4.3B | 2.2B | 712M | $1.50 | $1.43 – $1.59 | 5 |
| 2028 Q3 | 5.1B | 2.7B | 1.1B | $2.28 | $2.17 – $2.42 | 5 |
| 2028 Q4 | 4.0B | 2.0B | 410M | $0.86 | $0.82 – $0.92 | 5 |
| 2029 Q1 | 4.5B | 2.2B | 554M | $1.17 | $1.11 – $1.24 | 2 |
| 2029 Q2 | 4.5B | 2.5B | 823M | $1.73 | $1.65 – $1.84 | 2 |
| 2029 Q3 | 4.6B | 3.1B | 1.2B | $2.61 | $2.49 – $2.77 | 2 |
| 2029 Q4 | 4.6B | 2.2B | 478M | $1.01 | $0.96 – $1.07 | 2 |
| 2030 Q1 | 4.6B | 2.5B | 618M | $1.30 | $1.24 – $1.38 | 2 |
| 2030 Q2 | 4.6B | 2.8B | 918M | $1.93 | $1.84 – $2.05 | 2 |
| 2030 Q3 | 4.6B | 3.4B | 1.4B | $2.91 | $2.77 – $3.09 | 2 |
| 2030 Q4 | 4.6B | 2.5B | 533M | $1.12 | $1.07 – $1.19 | 2 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-09-14 | SELL | VIAMONTES ELIECER | other: "Officer" Under Sec. 16 Rules | 9,068 | $103.93 | $942K | $969K |
| 2026-09-10 | SELL | Landreaux Laura R | other: "Officer" Under Sec. 16 Rules | 5,600 | $106.20 | $595K | $2.40M |
| 2026-08-06 | BUY | Ropp Ralph Lewis | director | 1,000 | $106.08 | $106K | $363K |
| 2026-07-30 | SELL | CHAPMAN JASON | officer: SVP Chief Tech & Bus Servs Off | 9,447 | $109.06 | $1.03M | $1.87M |
| 2026-06-25 | SELL | COOK-NELSON KIMBERLY | officer: EVP & Chief Operating Officer | 5,000 | $115.00 | $575K | $3.54M |
| 2026-06-03 | SELL | FISACKERLY HALEY | other: "Officer" Under Sec. 16 Rules | 10,638 | $110.00 | $1.17M | $1.56M |
| 2026-02-27 | SELL | VIAMONTES ELIECER | other: "Officer" Under Sec. 16 Rules | 5,274 | $106.45 | $561K | $0 |
| 2026-02-23 | SELL | HUDSON JOHN O III | officer: Chief External Affairs Officer | 10,000 | $104.79 | $1.05M | $555K |
| 2026-02-20 | SELL | DINELLI JOHN C | officer: EVP and Chief Nuclear Officer | 5,372 | $103.95 | $558K | $2.45M |
| 2026-02-13 | SELL | Brown Marcus V | officer: Executive Legal Advisor to CEO | 21,428 | $105.12 | $2.25M | $2.65M |
| 2026-02-13 | SELL | CHAPMAN JASON | officer: SVP Chief Tech & Bus Servs Off | 17,238 | $104.02 | $1.79M | $1.78M |
| 2025-11-28 | SELL | VIAMONTES ELIECER | other: "Officer" Under Sec. 16 Rules | 947 | $97.16 | $92K | $279K |
| 2025-11-21 | SELL | Landreaux Laura R | other: "Officer" Under Sec. 16 Rules | 2,500 | $93.66 | $234K | $2.00M |
v2 analysis (legacy, 2026-07-06) — for comparison onlyclick to expand
Thesis
Entergy is a regulated electric utility undergoing an extraordinary rate-base expansion cycle driven by hyperscaler data center demand (Meta, AWS) in Louisiana, Arkansas, Mississippi and Texas. The capital plan has ballooned from $40B to $57B in nine months, financed by a mix of equity issuance, junior subordinated debt, securitization and rate riders designed to have large customers pay their 'fair share.' The story is compelling: 8.5% retail sales CAGR guidance through 2029, industrial sales +16%, regulatory tailwinds (Louisiana Lightning Initiative, Generating Arkansas Jobs Act), and a rare alignment of interests where tech giants are effectively subsidizing grid buildout. But this is a capital-intensive treadmill — FCF has been deeply negative every year (cumulative -$8.9B over the window) and shares outstanding have jumped from 93M to 458M (a 5x stock split, not dilution — note this reconciles the 4.7%/6.3% 'dilution' lines, which likely reflect genuine equity issuance layered on a split). Net debt/EBITDA sits above 5x, credit metrics are managed to a 15% FFO/debt target, and there is real tail-risk: the CCCT generators being built for Meta have 30-year financing lives against a 20-year contract, leaving ratepayers (and Entergy) exposed to a decade of stranded-asset risk if Meta doesn't renew. Supply chain bottlenecks (transformers, GOES steel) are a real execution risk to the timeline. Regulatory approval is fast-tracked but contested by consumer advocates and industrial user groups, creating headline/political risk. Overall this is a well-run, growing regulated utility with unusually strong embedded growth optionality, but capital intensity means owner earnings (true free cash to equity) remain negative for years — value creation depends entirely on the rate base being allowed into rates at attractive ROEs, which so far management has executed well on.
Trade Signal
ETR is roughly fairly valued (+8% to analyst fair value) after an enormous run driven by real, already-disclosed Meta/hyperscaler news; with heavy dilution ahead, rising short interest, and no near-term surprise catalyst, this is a modest-conviction hold/slight-long rather than a real mispricing to trade.
ETR has run +42% over 1y and +24% over 6m, driven by concrete news: the Meta ESA (5GW Hyperion data center), the capital plan jumping from $40B to $57B in one quarter, and June's hyperscaler-studded Investor Day. Since last earnings (Apr 29) the stock is roughly flat (+1%), consolidating a huge prior re-rating rather than reacting further — the market has already priced in most of the good news. The move looks like a fair, fact-driven repricing rather than a panic swing; near-term flatness suggests the market is digesting rather than mispricing.
Consensus is a loved, crowded long: 19 buy/0 sell ratings, huge call open interest skew (1.37M call OI vs 193K put OI), and rising short interest (5.5% of float, up from 2.3% a year ago, +9% recently) suggests some skeptics/hedgers are building bearish exposure into a stretched valuation. Retail order flow ticked up to 30% recently. The bull case (AI-driven rate-base supercycle, hyperscaler subsidization) is well known and largely embedded in the stock's 3x-plus re-rating in P/S and EV/EBITDA multiples over three years. Bear case (tail-mismatch on CCCT financing vs 20yr ESA, dilution, regulatory/political risk on Lightning Initiative fast-track) is a known overhang but hasn't stopped the run. Sell-side 1y target average of $109.84 is actually BELOW current price, showing analysts are more cautious than the market/analyst study.
The Meta deal and capital plan expansion already happened and were disclosed at Q1 earnings/Investor Day — this is the inflection, not a future one. Consensus EPS estimates in context (models show $1-3 EPS oscillating, inconsistent/thin coverage 3-5 analysts per quarter) don't clearly capture the growth path our analyst assumes (BASE case 8% CAGR to 2029). There could be incremental upside if further hyperscaler ESAs from the 7-12GW pipeline get signed, but the major single-name inflection (Meta) is behind us. Next data points (LPSC final vote Nov/Dec 2026, additional ESAs) are more confirmatory than transformative surprises.
- ▲2026-11 to 2026-12 · LPSC final vote on Meta ESA/Lightning Initiative fast-track schedule — Approval de-risks the $21B Meta buildout; a delay or prudence-review setback would be a negative surprise since market has priced smooth approval.
- •2026-07 to 2026-10 · Q2/Q3 2026 earnings updates on capital plan execution and equity issuance progress — Watch for updates on the $6.6B equity raise pace and any incremental capital plan changes.
- ▲H2 2026 · Additional hyperscaler ESA signings (from 7-12GW pipeline) — Would validate bull case of broader tech-driven demand beyond Meta, supporting further re-rating.
- •2026-10 · Mississippi securitization filing for storm costs — Routine positive for cost recovery, modest impact.
- ▼H2 2026 - 2027 · Transformer/GOES supply chain delays becoming visible in construction timelines — Could push back COD dates and defer rate-base growth, a real risk to the 8.5% CAGR guide.
Heavy net dilution ahead: ~$6.6B in new equity through 2029 (30% contracted), 6% TTM dilution already, plus $3B in junior subordinated debentures. Insider selling has been persistent (18 sells vs 1 buy over 12mo, ~$13.5M net sold) with no major-holder buying. This is a story requiring continuous capital markets access to fund growth — supply pressure on the stock is real and growing, partially offset by steady 3% dividend yield.
No hard asset floor — FCF margin is deeply negative (-23%) given the capital spending surge, so this is purely a regulated rate-base growth/multiple story, not a cash-generative value floor. Downside support comes from regulatory constructiveness (multi-state ROE frameworks) and the dividend, but if the growth narrative cracks (delays, prudence reviews, credit downgrade risk), there's no cash buffer. Upside is capped somewhat by the perpetual equity issuance needed to fund the ballooning capital plan — every re-rating higher likely triggers more dilutive issuance, and insiders have been selling into strength consistently.
Yes, very buyable — this is a well-covered, liquid, large-cap regulated utility with real dividend, institutional ownership, and a clear, exciting AI-power-demand narrative that's easy for generalist and utility investors alike to underwrite. The story (Meta/AWS-backed multi-decade rate-base growth) is exactly the kind of thing that attracts marginal buyers. Not a distressed/uninvestable name.
Slight fear: the stock has already run hard on real news, sell-side 1yr targets are below spot, short interest is climbing, insiders are steady net sellers, and the analyst's own valuation only implies +8% upside with a bear case of -36% vs bull of +105% — an asymmetric-feeling but probability-weighted picture that nets out close to fair value already reflected in price.
Valuation
The market already knew Entergy was pursuing large data-center load growth, but the scale and speed of the Meta/Evest 20-year ESA (5GW, $21.4B in dedicated generation/transmission) and the resulting $14B (33%) sequential increase in the four-year capital plan to $57B were new and larger than prior guidance implied. Also new: the specific $2-2.65B customer benefit framing, the fast-tracked LPSC approval (4-1 vote for expedited schedule), and management's raised long-term retail sales growth guide to 8.5% CAGN with industrial sales at 16%. The 20-year contract vs 30-year asset financing mismatch and consumer-advocate pushback were flagged as new risk color not previously prominent.
▸ How the cases moved
Bull case equity value raised (from an implied ~$95,000M pre-print base to $106,600M) and bull probability raised modestly (0.20->0.25) on the scale/speed of demand realization and fast-track regulatory approval. Base case equity value raised slightly (~$68,000M -> $72,100M) reflecting the larger, more certain rate-base growth trajectory, with probability roughly steady. Bear case probability trimmed slightly (0.25->0.20) as diversified hyperscaler partnerships (Meta+AWS at Investor Day) reduce single-customer risk, though the tail-asset-life mismatch and supply-chain critical-path risk keep bear value only modestly changed.
Meta/AWS project pipeline stalls on transformer/GOES supply constraints and LPSC pushback (prudence reviews, political backlash against Lightning Initiative fast-track); some CCCT approvals delayed or scaled back; equity needed rises above guided range causing more dilution than planned; credit metrics slip below FFO/debt targets forcing a ratings action and higher cost of capital. Growth slows toward historical utility norms (~4-5%) and multiple compresses.
▸ Valuation
11x EBITDA ~$6,500M EV = $71,500M EV − ~$38,000M net debt = $33,500M equity
Most of the $57B plan proceeds roughly on schedule with some delays; Meta ESA and other large-load contracts are approved with minimum-bill protections intact; equity issuance stays within the 10-15% guided range; rate base and EPS grow at ~8% CAGN as guided through 2029; net debt/EBITDA stabilizes near 5x as FFO/debt targets are met.
▸ Valuation
14.5x EBITDA ~$7,800M EV = $113,100M EV − ~$41,000M net debt = $72,100M equity
Additional hyperscaler ESAs beyond Meta (from the 7-12GW pipeline) are signed and approved quickly under Lightning Initiative-style fast tracks; regulatory ROEs remain constructive; supply chain risk is managed via Entergy's advance procurement; the market re-rates Entergy as a structural AI-power-demand winner with visible multi-decade rate-base growth, commanding a premium utility multiple.
▸ Valuation
17x EBITDA ~$8,800M EV = $149,600M EV − ~$43,000M net debt = $106,600M equity
▸ Target Rationale
Model value (probability-weighted terminal equity discounted 2yrs) comes to roughly $56.3B. I hold close to this: the growth story is real and regulator-backed (multiple state commissions, contracted minimum-bill provisions with hyperscalers), but the tail-end asset-life mismatch (20-yr Meta contract vs 30-yr CCCT financing) and dependence on continuous large equity issuance to fund an ever-expanding capital plan (now $57B, up 33% in one quarter) argue against paying up further. I nudge slightly above model given the credibility of management's execution track record and multiple corroborating hyperscaler partnerships reducing single-customer concentration risk.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Blockbuster Meta Expansion & Q1 2026 Earnings: On April 29, 2026, Entergy reported its first-quarter 2026 financial results, posting an adjusted EPS of $0.86 (up 10% from $0.78 in Q1 2025). However, the most material development was the company's announcement of an expanded 20-year Electric Service Agreement (ESA) with Meta Platforms (via its subsidiary Evest LLC) to power the Hyperion data center campus in Richland Parish, Louisiana. The massive deal calls for up to 5 GW of compute capacity, turning it into Meta's largest global facility.
- Massive Capital Plan Expansion: Driven directly by the Meta agreement and the region's strong industrial demand, Entergy updated its four-year (2026–2029) capital plan to $57.2 billion. This is a $14 billion (33%) increase from the spending plan announced just three months prior. Of the $57.2 billion, $27 billion is dedicated to new generation (including 10 new combined-cycle gas plants totaling ~7.5 GW, plus 2,500 MW of new solar and wind) and $9 billion to transmission infrastructure.
- Hyperscaler Partners at 2026 Investor Day: At Entergy's Investor Day on June 9, 2026, at the New York Stock Exchange, executives from Meta and Amazon Web Services (AWS) joined Entergy leadership on stage. The event highlighted how deeply Entergy is aligning with tech giants to fund regional grid expansion. Entergy disclosed a massive data center project pipeline of 7 to 12 GW, alongside a total large-load pipeline of 10 to 17 GW across its multi-state territory.
- Equity and Securitization Funding Strategies: To finance its expanded capital program, Entergy outlined plans to issue approximately $6.6 billion in equity (with $1.9 billion already contracted under forward agreements) and $3 billion in junior subordinated debentures through 2029. Meanwhile, the Mississippi legislature passed a bill enabling the securitization of roughly $200 million in Winter Storm Fern restoration costs, expected to be filed in October 2026.
▸ Thesis-test Findings
- Louisiana Public Service Commission filings Meta electric service agreement: On March 25, 2026, Entergy Louisiana (ELL) filed a formal application (Docket U-37882) for a 20-year ESA with Meta's subsidiary to construct $21.37 billion in dedicated generation and transmission assets. While the company's "Fair Share Plus" pledge ensures Meta covers incremental costs and projects at least $2 billion to $2.65 billion in net customer benefits, the filings have drawn heavy scrutiny. Critics and consumer advocates like the Union of Concerned Scientists point to significant "tail-end risk" on the proposed combined-cycle gas turbine (CCCT) generators. The financing for these CCCTs spans 30 years, whereas the ESA with Meta only covers 20 years, meaning retail ratepayers may be left to shoulder the remaining decade of asset costs once the Meta contract expires. Additionally, industrial groups like the Louisiana Energy Users Group (LEUG) have filed interventions demanding comprehensive prudence reviews to shield existing customers from construction cost overruns.
- Entergy Louisiana Lightning Initiative status updates 2026: Adopted by the LPSC in December 2025 following a fast-track executive order from Governor Jeff Landry, the "Lightning Initiative" serves as an expedited regulatory mechanism to accelerate industrial and digital infrastructure development. In March 2026, Entergy Louisiana officially invoked this initiative to bypass normal administrative phases for its $21 billion Meta expansion. On April 15, 2026, the LPSC voted 4-1 to approve Entergy's fast-track schedule. The decision effectively skips the formal recommendation of an administrative law judge, targeting a final commission vote in late 2026 (November/December). This fast-track framework represents a double-edged sword for the investment thesis: while it accelerates Entergy's "speed-to-power" capability to quickly deploy and monetize capital (bull case), it faces intense pushback from consumer advocates who argue it avoids critical public due diligence and grid reliability reviews, risking political or regulatory backlash (bear case).
- Utility high-voltage transformer supply chain lead times 2026: Market data from 2026 reveals that the global transformer supply chain remains under immense structural pressure, which serves as a major bottleneck for Entergy's massive $57 billion capital expansion. Lead times for large power transformers (>10 MVA) stretch from 18 to 36 months, while highly critical Generator Step-Up (GSU) transformers average 24 to 48 months (or 144 weeks). The constraint is fundamentally structural, driven by a global shortage of grain-oriented electrical steel (GOES)—for which Cleveland-Cliffs remains the sole domestic U.S. producer—and elevated copper costs. Given that Entergy's Meta project requires a massive build-out of 10 gas-fired power plants, battery storage, and 240 miles of new 500-kV transmission lines, these extended lead times present a critical-path risk. Any equipment delivery delays could push back commercial operation dates, defer expected rate-base additions, and jeopardize Entergy's ambitious 8.5% retail sales growth projections through 2029.