EGO
Eldorado Gold Corporationv3 5.5/10 · 2026-10-29Eldorado Gold Corporation, operating through its various subsidiaries, is actively involved in the exploration, development, mining, and commercialization of mineral resources. The company's core activities are centered primarily in Turkey, Canada, Greece, and Romania. Although predominantly a gold producer, Eldorado also extracts silver, lead, and zinc. It holds full ownership (100% interest) of significant assets such as the Kisladag and Efemcukuru gold mines in western Turkey, and the Lamaque gold mines located in Canada. Its portfolio in Greece encompasses the Olympias, Stratoni, Skouries, Perama Hill, and Sapes gold mines. Furthermore, Eldorado holds an 80.5% stake in the Certej development projects in Romania. Incorporated in 1992, the company was initially known as Eldorado Corporation Ltd. and adopted its current name, Eldorado Gold Corporation, in April 1996. Its headquarters are situated in Vancouver, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-10-29
Eldorado Gold is a mid-tier gold miner (Turkey, Quebec, Greece) close to the end of a heavy build phase. Skouries, a 20-year copper-gold mine in Greece, and McIlvenna Bay, a copper-zinc mine in Saskatchewan bought with the all-share Foran deal, both reached first concentrate in Q3 2026. Both slipped again, though, and commercial production is now expected in late Q4. The Q3 print on Oct 28 missed: adjusted EPS was $0.49 against roughly $0.70 consensus. 2026 gold guidance fell to 425-475koz from 490-590koz, operating AISC rose to about $2,050/oz, and Skouries now carries another $160M of real overrun (project capital $1.425B plus $390M of accelerated operating capital, against roughly $0.85B at the 2022 restart). The stock fell 6% to $32.38 (latest close, Oct 29; the pack showed $32.47). That is 37% below the February high of about $51, while gold has slid more than 20% from its January peak to about $4,100. Today the company earns about $400M a year of real free cash flow, about 4.7% of its $8.45B market cap, because nearly all its cash goes into the two projects. Management says the free-cash-flow turn comes in early 2027, when gold output should rise about 40% to 620-720koz plus 85-100Mlb of copper. It is re-affirming 2027 and promising material buybacks. My base case assumes gold at $3,900 in 2027 and $3,700 after, below today's spot. On that basis unlevered FCF rises to about $600M in 2027 and $850-870M from 2028. Valuing year 5 at 11x FCF (flat production, commodity-priced, long-life assets) and discounting at 10% gives about $28/share, a base IRR near 7%. At spot gold of $4,100 held flat the DCF is about $35, so the stock roughly prices in spot gold and leaves little margin of safety. Every $100/oz moves value by about $2.30/share. Rating 5.5/10: a reasonable, well-financed growth inflection with a CEO talking up buybacks, but this is a leveraged bet on the gold price after another round of overruns, not the 40% discount we want. Research rating 6/10: a deep dive could pay off if the Skouries ramp and the 2027 guidance hold. Analysts mostly rate it Buy with targets near $46, which leaves room for a re-rate on clean execution, and ~55% implied volatility on a stock with a clear floor makes covered calls worth a look.
A deep dive would have to establish: Whether Skouries and McIlvenna Bay reach nameplate by mid-2027 at guided costs, so that 2027 delivers about 640koz gold and 85Mlb or more copper with roughly $350M of sustaining capex, and the FCF inflection turns into material buybacks while gold holds near $4,000.
Research (expand)
What the company does
Eldorado Gold (TSX: ELD, NYSE: EGO) is a Vancouver-based gold miner producing about 490koz a year from four mines:
- Lamaque complex (Quebec): about 200koz, low-cost underground. Q3 AISC was $1,436/oz and the high-grade Ormaque deposit is now feeding the mill.
- Kisladag (Turkey): heap leach, normally 140-160koz, but in a cutback year in 2026. Q3 AISC was $2,832/oz.
- Efemcukuru (Turkey): about 70koz, underground.
- Olympias (Greece): polymetallic, about 60-80koz, being expanded to 650ktpa.
Two new mines are in ramp-up:
- Skouries (Greece): a 20-year copper-gold porphyry targeting about 140koz gold and 67Mlb copper a year at roughly zero or negative by-product AISC. The EU has named it a strategic project.
- McIlvenna Bay (Saskatchewan): from the C$3.8B all-share Foran deal that closed in April 2026, which gave Foran holders about 24% of the company. The feasibility study shows about 39Mlb copper, 64Mlb zinc, 20koz gold and 0.5Moz silver a year over an 18-year life, with studies under way to lift throughput to 7,000tpd and add a silver-lead circuit.
The company also holds Perama Hill (Greece) and Certej (Romania) as future projects.
The investment case
The whole case rests on the build phase ending:
- The build is nearly done. Q3 shows the split clearly. The existing mines generated $98M of free cash flow and adjusted EBITDA was $275M, but consolidated FCF was -$191M because $275M went into Skouries and McIlvenna Bay in the quarter.
- The volume step-up. Once both projects are in commercial production (late Q4 2026) and Olympias' expansion ramps in H1 2027, the three-year outlook calls for 620-720koz gold in 2027 and 640-740koz in 2028, versus 488koz in 2025. That excludes McIlvenna Bay's gold. On top come 50-80Mlb of Skouries copper plus about 35-40Mlb of copper and 60Mlb of zinc from McIlvenna Bay.
- Management's message on Q3. The new CEO, Christian Milau, said 2027 guidance is unaffected. He described 2027 as a 'breather year' with no new construction, $80-100M of exploration, and shareholder returns, especially buybacks, as the priority because 'we think they are trading too cheaply.'
- What has gone well. Skouries holds more than 5Mt of stockpiled ore ahead of the mill, the grid connection is done, filter presses are running at design cycle times, and offtake covering about 2.5 years has been signed in a seller's market with no delivery penalties.
What it earns today (real free cash flow)
- Trailing cash flow. Consolidated FCF is deeply negative because of project spend. The existing portfolio produced about $41M FCF in Q2 and $98M in Q3, at about $4,300 gold, after all mine-level capital including about $400M a year of operating-mine 'growth' capital.
- Which capex is really maintenance. Much of that growth capital is in fact maintenance: Kisladag's capitalized waste stripping and Lamaque's Ormaque development replacing Triangle are the reinvestment treadmill. The genuinely discretionary part (Olympias mill expansion, the Kisladag agglomeration drums) is worth about $100M a year to add back.
- Result. After about $25M of stock comp and corporate costs, I put real FCF today at about $400M a year (range $250-550M), at spot-like gold. That is a 4.7% yield on the $8.45B market cap and about 4% on an EV of about $10.1B. Trailing adjusted EBITDA runs at about $1.0-1.1B (EV/EBITDA about 9.5x trailing).
Free cash flow for the next 5 years (unlevered, after stock comp, sustaining and growth capex, cash taxes)
Gold is assumed at $3,900/oz in 2027 and $3,700 after (spot is about $4,100), copper at $4.60/lb. Sustaining capex roughly doubles to about $350M once the new mines are in, per management. Growth and exploration capex runs at $250-350M a year, covering the McIlvenna Bay expansion, Lamaque, Perama Hill from 2028, and the Skouries paste plant and water treatment. Cash taxes run at about 25%.
- 2027: about $615M. A ramp year: about 640koz gold and about 85Mlb copper, EBITDA about $1.65B, plus about $50M of working-capital build.
- 2028: about $865M. Full Skouries and McIlvenna Bay, Olympias at 650ktpa, EBITDA about $1.85B.
- 2029: about $850M.
- 2030: about $850M. Cost inflation of 3-5% a year (Turkish lira inflation 20-30%) against flat gold, partly offset by expansions.
- 2031: about $870M.
The ranges are wide (5th-95th percentile of $250-950M in 2027, widening to $300-1,450M by 2031), mainly because each $100/oz of gold is worth about $45M of after-tax FCF.
What it looks like in 5 years: a diversified gold-copper producer making about 700koz gold plus 100Mlb copper. The anchor is long-life assets (Skouries 20+ years, McIlvenna Bay 18+ years with expansion upside, Lamaque replenished by Ormaque). Efemcukuru and parts of Kisladag are the shorter-lived pieces. This is not a corpse and not a compounder. It is a flat-to-slightly-growing, price-taking cash generator, the '5% grower / commodity' bucket, so I value it at 11x year-5 FCF (range 8-14x). Confidence in volumes is moderate to high; confidence in price-driven cash flow is low.
Fair value and the multiples we are paying
The DCF at my price deck:
- PV of 2027-2031 FCF: about $3.03B.
- PV of terminal value (11 x $870M): about $5.94B.
- EV: about $8.98B.
- Less year-end 2026 net debt of about $1.72B. Q3 net debt was $1.59B (cash $397M, debt $1.985B), plus about $250M of Q4 project spend, less Q4 operating FCF.
- Equity of about $7.26B, or about $27.8/share on 261M shares.
Sensitivities:
- Flat $4,100 spot gold: about $35.
- $4,500 gold: about $42.
- $3,300 gold: about $19.
Multiples at $32.38:
- Base IRR is about 7%.
- About 10.5x my 2027 EPS of about $3.0 and about 6x 2027 EV/EBITDA. The street's forward P/E is about 6x on higher gold assumptions.
- About 6% levered 2027 FCF yield, rising to about 9% in 2028.
This is cheap only if gold holds above $4,000.
My fair value is $31. I put it slightly above the DCF for four reasons: spot is above my deck; the 2027 buyback could retire 3-5% of shares a year near these prices; the Skouries ramp risk falls sharply over the next 6 months; and a mid-tier gold-copper company with an EU strategic asset and no hedging after 2026 is a credible M&A target. The fair value is not at a discount large enough to meet a 50% target.
Management, risks and competition
Management:
- Burns retired after nine years. CFO-turned-CEO Christian Milau (ex-Equinox/Endeavour CFO) took over in Q3 and struck a candid tone: 'the ramp-up has taken longer and cost more than we expected.' He has embedded a dedicated projects team and set a 2027 pause on construction.
- Track record on capital: Skouries went from about $0.85B (2022) to $1.425B of project capital plus $390M of accelerated operating capital, and AISC guidance has drifted up.
- Capital return so far: $204M of buybacks in 2025 and $84M in H1 2026, plus a $0.075/quarter dividend started in 2026.
- The Foran deal issued about 24% new equity near the share-price highs to buy a modest-margin base-metal mine. That was dilutive, but strategically defensible.
Risks:
- Gold price: the dominant risk.
- Turkey: lira inflation, royalty hikes, politics; about 40% of local costs.
- Greece: permitting history, including a 2017 Skouries suspension.
- Ramp-up: at Skouries and McIlvenna Bay, especially filtration and solid-liquid separation.
- Olympias: 2027 ounces are likely at the low end of guidance.
- Debt and hedging: McIlvenna Bay project debt is high-cost; derivative realized losses were $97.6M year to date.
- Labor: inflation in Canada.
Competition: gold is a commodity, so the competitive position is cost-curve position. Skouries and Lamaque are first or second quartile; Kisladag and Efemcukuru are third or fourth quartile at current royalties. Peers such as Equinox, Alamos, OceanaGold, Torex and New Gold trade around 5-8x forward EBITDA.
Governance: no fraud or control issues. Watch items are the repeated overruns and the dilutive all-share Foran deal.
How investors and analysts feel right now (4/10)
- The stock: fell from about $51 (Feb 2026) to $32. It sits at 36% of its 1-year range but still 3x its 2023 level.
- The Q3 miss: EPS of $0.49 against $0.70 consensus, a guidance cut, and more capex sent it down 6% on Oct 29. There is visible 'project fatigue' (the CEO's own words).
- Short interest: peaked at 15.1M shares in August and has since eased to 12.4M (about 3 days to cover).
- The sell-side: still constructive.
- Consensus is Buy from 11 analysts with an average target of about $46 (C$65), about 43% upside.
- BofA upgraded to Buy with a $54 target in September; RBC is Sector Perform at $41.
- The low end is TD Cowen, cut to $29 from $33. BMO trimmed to C$74 from C$78.
- Overall: investors are fatigued and gold-skeptical, while analysts see a 2027 FCF inflection. That gap is the opportunity, if execution is clean.
Options: ATM implied volatility is about 54-56%. Selling Dec/Jan calls against a position would yield richly, but earnings are not predictable at a valuation floor. This is a moderate covered-call setup, not a classic one.
- /Users/gregwo/stocks2/data/analysisv3/context/EGO.md (context pack incl. Q3 2026 call transcript)
- https://www.sec.gov/Archives/edgar/data/0000918608/000091860826000025/eldoradogoldreportsq32026f.htm
- https://www.eldoradogold.com/sites/eldorado-gold/files/2026-02/2026-02-19-eldorado-gold-announces-guidance-final.pdf
- https://stockanalysis.com/stocks/EGO/
- https://www.stocktitan.net/news/EGO/eldorado-and-foran-combine-to-create-a-leading-gold-and-copper-odcns6885vps.html
- https://www.sec.gov/Archives/edgar/data/0000918608/000091860826000027/unauditedcondensedconsolid.htm
- https://canadianminingjournal.com/news/forans-initial-phase-fs-on-mcilvenna-bay-outlines-long-life-operation-with-npv-of-1-5b
- https://www.engineeringnews.co.za/article/mcilvenna-bay-project-canada-2022-05-06
- https://www.tipranks.com/stocks/ego/forecast
- https://www.quiverquant.com/news/Eldorado+Gold+Slides+as+Bullion+Weakness+Appears+to+Outweigh+Fresh+Skouries+Progress
- https://beta.earningswhispers.com/go/w/EGO
- https://depor.com/en/us-local/gold-price-today-october-20-2026-price-per-ounce-and-gram-in-usd-nnda-nnrt-noticia/?outputType=amp
- https://www.moneymagpie.com/investment-articles/gold-price-prediction-october
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 2097+25% | 1823+38% | 1322+31% | 1009+15% | 875 |
| Gross profit | 1023+25% | 845+34% | 630+23% | 513+82% | 282 |
| Operating expenses | 77.3-59% | 116-46% | 213-36% | 331+38% | 241 |
| ▸Adj EBITDA | 1187+33% | 993+48% | 671+50% | 447+60% | 280 |
| ▸Adj OCF | 715+2% | 694+13% | 614+69% | 363+58% | 229 |
| CapEx | -1470 | -872 | -595 | -405 | -303 |
| Adj FCF | -755 | -179 | 19.2 | -41.7 | -73.3 |
| Interest expense | 29.4 | 27.8 | 23.1 | 33.2 | 35.2 |
| ▸Adj net income | 707+40% | 699+155% | 274+123% | 123 | -350 |
| ▸Owner's earnings | 300 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 3067100% | 838100% | 838100% | 666100% | 436100% | 289100% |
| FCF (OCF−capex) | -1122-37% | -807-96% | -184-22% | 30.15% | -65.1-15% | -95.3-33% |
| Net income | 97132% | 42150% | 51061% | 28943% | 10524% | -354-123% |
| ▸Capital returned | -829-27% | -204-24% | -66.1-8% | -299-45% | -301-69% | 40.514% |
| Buybacks | 116 | 86.3 | 209 | -12.3 | -167 | -0.11 |
| Dividends | 53.6 | 53.6 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 141 | 21.7 | 27.8 | 23.1 | 33.2 | 35.2 |
| Debt paid down | -1140 | -366 | -303 | -310 | -167 | 5.38 |
| ▸Reinvestment | 3197104% | 1045125% | 862103% | 59289% | 40893% | 290100% |
| Capex (PP&E) | 3377 | 1202 | 872 | 595 | 405 | 303 |
| Intangibles & M&A | -167 | -157 | -4.29 | -0.57 | -1.94 | -3.22 |
| Leases signed (net Δ) | -13.5 | 0.07 | -6.16 | -2.39 | 4.95 | -9.96 |
| Retained / other | 14.60% | -425-51% | -86.2-10% | 35253% | 27162% | -97.3-34% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 25 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 10586 | 6715 | 5836 | 4962 | 4456 |
| ▸Liabilities (total) | 3640 | 2440 | 1947 | 1476 | 1256 |
| Net debt (incl. leases) | 1526 | 428 | -58.0 | 122 | 196 |
| Net debt / Adj EBITDA | 1.29 | 0.43 | -0.09 | 0.27 | 0.70 |
| Net debt / Adj FCF | -- | -- | -3.01 | -- | -- |
| Adj EBITDA / interest | 40.4 | 35.7 | 29.1 | 13.5 | 7.95 |
| Shares outstanding | 261 | 200 | 205 | 203 | 184 |
| Dilution (YoY) | -3.1% | -2.5% | +0.9% | +10.5% | +0.8% |
| Employees | 5800 | 0.00 | 0.00 | 0.00 | 0.00 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 48.8%-0.1 | 46.4%-1.2 | 47.6%-3.3 | 50.9%+18.6 | 32.3% |
| Adj EBITDA margin | 56.6%+3.3 | 54.5%+3.8 | 50.7%+6.4 | 44.3%+12.3 | 32.0% |
| Adj OCF margin | 34.1%-7.7 | 38.0%-8.4 | 46.5%+10.4 | 36.0%+9.8 | 26.2% |
| Adj FCF margin | -36.0%-31.4 | -9.8%-11.3 | 1.5%+5.6 | -4.1%+4.2 | -8.4% |
| Net income margin | 31.7%+9.6 | 28.0%+6.1 | 21.9%+11.5 | 10.4%+50.8 | -40.5% |
| Adj NI margin | 33.7%+3.5 | 38.4%+17.6 | 20.8%+8.6 | 12.2%+52.3 | -40.1% |
| ROIC (adj, after-tax) | 7.9% | 12.6% | 5.9% | 2.8% | 0.9% |
| Cost of debt | 1.9% | 2.4% | 2.9% | 5.7% | 6.9% |
Earnings Calls
Earnings Call · 2026 Q3
Eldorado Gold reported third quarter 2026 results on a call led by new CEO Christian Milau, with CFO Paul Ferneyhough and COO Simon Hille. The quarter was defined by the start of Skouries and the continued ramp-up at McIlvenna Bay, while the established portfolio benefited from a strong gold price. Management acknowledged that the Skouries ramp-up has taken longer and cost more than expected. Skouries produced its first copper-gold concentrate on September 8, the site was energized from grid power on September 28, and two tailings filter presses are now operating, enabling continuous plant operation. Four operating filter presses are needed for commercial production, with two more expected within weeks. The first European concentrate shipment to a nearby smelter is expected within about a week. Skouries was designated a strategic project by the European Commission, and an inauguration event was held with Prime Minister Mitsotakis in attendance. Both Skouries and McIlvenna Bay are expected to reach commercial production in late Q4 2026. Group production in the quarter was 106,000 ounces of gold, with 107,000 ounces sold. Lamaque was the standout, producing 52,748 ounces with cash costs of $897 per ounce and AISC of $1,436 per ounce, helped by the Ormaque contribution. Kışladağ produced 22,713 ounces at AISC of $2,832 per ounce due to mine sequencing and lower-grade stacking, with higher-grade material expected to benefit late Q4 and 2027 given a roughly 300-day leach cycle. Efemçukuru produced 17,073 ounces at AISC of $2,313 per ounce. Olympias produced 13,430 ounces at AISC of $2,067 per ounce, with some higher-lead and zinc material deferred to Q4, and its 650,000 tonne per annum expansion is set for final tie-ins in Q1 2027 with ramp-up in H1 2027. Financially, revenue rose 18% year over year to $512 million on an average realized gold price of $4,326 per ounce, versus $3,527 a year earlier. Total cash costs were $1,415 per ounce sold and AISC was $2,050 per ounce sold. Net earnings from continuing operations were $118 million or $0.45 per share, and adjusted net earnings were $127 million or $0.49 per share. Operating cash flow before working capital changes was $249 million. Consolidated free cash flow was negative $191 million due to heavy growth investment, while the established operating portfolio generated $98 million of free cash flow before Skouries and McIlvenna Bay. Liquidity totaled $672 million, including $397 million of cash and $275 million of revolver availability. The revolving credit facility was upsized to $600 million and extended to March 2029. Revised 2026 guidance lowers gold output for the operating assets, excluding Skouries and McIlvenna Bay, to 410,000-430,000 ounces, reflecting strong Lamaque offset by Kışladağ and Olympias. Skouries 2026 guidance is 10,000-35,000 ounces of gold and 5-15 million pounds of copper, reflecting timing rather than a change to long-term design capacity. Management stated it remains comfortable with 2027 expectations for all assets. Skouries total project capital is now estimated at about $1.425 billion, with a $65 million real increase and $45 million of reclassified growth capital. Accelerated operating capital is $390 million, including a $95 million real increase and $35 million of reclassified sustaining capital. An additional contingency of up to $30 million has been identified, though management does not expect to use it. McIlvenna Bay project capital is $975 million, up about $23 million. Management said the project remains fully funded. Capital priorities are, in order, completing commissioning and ramp-up, maintaining balance sheet strength, and then balancing debt reduction, reinvestment, and shareholder returns. Management stated that free cash flow inflection is expected in early 2027, possibly late 2026. Management also said no major growth construction is planned for 2027, with exploration spending of roughly $80-100 million and a Capital Markets Day expected in Q1 2027. A new Skouries technical study is expected by the end of Q1 2027, and an inaugural McIlvenna Bay mineral resource is expected in the Q4 annual update. Analysts pressed on the reconciliation of 2027 guidance for Skouries, Olympias, and Kışladağ, the inflation outlook, and capital returns. Management said Türkiye currency and inflation are the main swing factors, Greek and Canadian inflation are expected at roughly 3-5%, and diesel costs rose sharply at Kışladağ. Management also flagged rising labor turnover at the fly-in, fly-out McIlvenna Bay operation in a tightening Canadian labor market. Ultimately, the tone was one of acknowledged execution delays paired with confidence that 2027 is largely unaffected and that the company is moving from investment into a cash-generating, shareholder-return phase.
▸Beyond getting from two to four filter presses at Skouries, what else should be monitored on the pathway to commercial production?Cosmos Chiu · CIBC
▸Is the critical path to McIlvenna Bay commercial production process plant availability, such as equipment or instrumentation, and is there anything else to be aware of?Cosmos Chiu · CIBC
▸What is the timing for the McIlvenna Bay studies, including the silver-lead circuit and mill expansion, that could lead to an updated technical report?Cosmos Chiu · CIBC
▸Are the Skouries and McIlvenna Bay delays contained within 2026, or will they affect 2027 production?Cosmos Chiu · CIBC
▸Is the incremental cash required for Skouries about $160 million, made up of $65 million of project capital plus $95 million of operating capital?Tanya Jakusconek · Scotiabank
▸Is the total incremental capital for Skouries and McIlvenna Bay about $183 million, including $23 million for McIlvenna Bay?Tanya Jakusconek · Scotiabank
▸Is the total additional capital for the operating mines and development projects about $237 million, including about $55 million of sustaining and development increases?Tanya Jakusconek · Scotiabank
▸How should investors think about achieving Kışladağ 2027 guidance of 140,000-160,000 ounces, given slower recovery and the leach cycle?Tanya Jakusconek · Scotiabank
▸Should Skouries and Olympias 2027 guidance be reduced because ramp-ups reach steady state only in mid-2027, or can the stockpile maintain the ranges?Tanya Jakusconek · Scotiabank
▸Will Skouries 2027 estimates be updated in a new study that reconciles these figures?Tanya Jakusconek · Scotiabank
▸Should the Olympias 2027 production estimate of 75,000-90,000 ounces be lowered because of the H1 2027 ramp-up?Tanya Jakusconek · Scotiabank
▸What inflation and input cost trends are you seeing for 2027, beyond diesel, especially labor and consumables?Tanya Jakusconek · Scotiabank
▸Are you seeing turnover in a tight labor market?Tanya Jakusconek · Scotiabank
▸What needs to happen for shareholder returns to become aggressive, and how will buybacks be prioritized versus dividend increases?Tanya Jakusconek · Scotiabank
▸Are Skouries filter press results meeting specifications for cycle times, moisture and drainage, and is full continuous operation of the system a prerequisite for commercial production?Ralph Profiti · Stifel Financial
▸Are the McIlvenna Bay solid-liquid separation issues control-system related or physical reagent recalibration, and is there any recovery impact?Ralph Profiti · Stifel Financial
▸How much of the Skouries stockpile is sulfide ore, how long until oxide ore must be introduced, and are there offtake penalties from the delay?Lawson Winder · Bank of America Securities
▸Is the $170-190 million sustaining capital guidance for current operations a good 2027 run rate, and what sustaining capital is expected for Skouries and McIlvenna Bay?Lawson Winder · Bank of America Securities
▸When will McIlvenna Bay reach the $90-110 per tonne operating cost range, and what is the expected Q4 2026 cost?Lawson Winder · Bank of America Securities
▸How is commercial production defined for Skouries and McIlvenna Bay, and when is nameplate capacity expected?Harrison Reynolds · RBC
▸How will capital be allocated among buybacks, debt reduction and reinvestment, given net debt of $1.6 billion, and what is the repayment cadence?Harrison Reynolds · RBC
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $28.00 | $4.40/$7.10 | 3 | $0.45/$0.80 | 64 |
| $29.00 | $3.70/$6.10 | 10 | $0.45/$1.20 | 2 |
| $30.00 | $2.90/$5.10 | 279 | $0.85/$1.40 | 138 |
| $31.00 | $3.10/$4.60 | 26 | $0.85/$2.15 | 351 |
| $32.00 | $2.70/$3.50 | 189 | $1.20/$2.70 | 130 |
| $33.00 | $1.65/$3.40 | 62 | $1.95/$2.85 | 253 |
| $34.00 | $2.05/$2.85 | 165 | $2.30/$3.40 | 21 |
| $35.00 | $1.65/$2.35 | 321 | $2.65/$4.70 | 1,216 |
Short Interest
Web Traffic
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $587M | $17.40 | −$50.7M | −$76.1M | — | $6.70T |
| VAN ECK ASSOCIATES CORP | $581M | $21.27 | +$163M | +$198M | — | $164.08B |
| Capital Research Global Investors | $562M | $32.95 | +$239M | +$562M | — | $716.77B |
| L1 Capital Pty Ltd | $448M | $24.25 | +$124M | +$215M | — | $2.97B |
| FAIRFAX FINANCIAL HOLDINGS LTD/ CAN | $427M | $31.09 | +$427M | +$427M | — | $2.64B |
| Helikon Investments Ltd | $348M | $14.08 | +$200M | +$200M | — | $3.35B |
| DONALD SMITH & CO., INC. | $273M | $12.61 | +$46.4M | −$53.3M | — | $5.65B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $217M | $33.81 | +$34.7M | +$217M | — | $4.68T |
| DIMENSIONAL FUND ADVISORS LPPassive | $158M | $13.21 | −$642K | +$9.4M | — | $551.30B |
| JENNISON ASSOCIATES LLC | $147M | $16.16 | −$85.9M | −$102M | — | $166.63B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
| Ticker | Name | Co-holders | Score |
|---|---|---|---|
| SKE.TO | Skeena Resources Limited | 3 | 233.11× |
| CGAU | Centerra Gold Inc. | 4 | 169.53× |
| OGC | OceanaGold Corporation | 3 | 155.41× |
| EQX | Equinox Gold Corp. | 3 | 116.55× |
| IAG | Iamgold Corporation | 3 | 107.59× |
| ITUB | Itaú Unibanco Holding S.A. | 3 | 69.93× |
| PBR | Petróleo Brasileiro S.A. - Petrobras | 3 | 51.80× |
| KSPI | Joint Stock Company Kaspi.kz | 3 | 48.23× |
| SE | Sea Limited | 3 | 22.56× |
| TSM | Taiwan Semiconductor Manufacturing Company Limited | 3 | 1.93× |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 1999 Q2 | 18M | 5M | 1M | $0.06 | $0.04 – $0.07 | 9 |
| 1999 Q3 | 15M | 4M | 1M | $0.05 | $0.04 – $0.06 | 14 |
| 2000 Q1 | 15M | 3M | 1M | $0.05 | $0.04 – $0.06 | 8 |
| 2000 Q2 | 23M | 3M | 0M | $0.09 | $0.07 – $0.11 | 16 |
| 2000 Q3 | 27M | 2M | -1M | $0.10 | $0.08 – $0.12 | 12 |
| 2001 Q2 | 9M | 2M | -1M | $-0.05 | $-0.06 – $-0.04 | 17 |
| 2001 Q3 | 8M | 4M | -1M | $-0.05 | $-0.06 – $-0.04 | 11 |
| 2002 Q3 | 16M | 7M | 3M | $0.11 | $0.09 – $0.13 | 11 |
| 2003 Q1 | 8M | 4M | 2M | $0.02 | $0.02 – $0.03 | 16 |
| 2003 Q2 | 37M | 11M | 7M | $-0.08 | $-0.10 – $-0.06 | 10 |
| 2004 Q1 | 7M | 2M | -0M | $-0.01 | $-0.01 – $-0.01 | 12 |
| 2004 Q3 | 25M | -3M | -4M | $-0.03 | $-0.03 – $-0.02 | 10 |
| 2005 Q1 | 21M | -20M | -24M | $-0.08 | $-0.10 – $-0.06 | 9 |
| 2005 Q2 | 8M | -10M | -15M | $-0.08 | $-0.10 – $-0.06 | 19 |
| 2005 Q3 | 8M | -2M | -5M | $-0.06 | $-0.07 – $-0.05 | 19 |
| 2006 Q1 | 6M | -4M | -5M | $-0.05 | $-0.06 – $-0.04 | 18 |
| 2006 Q3 | 22M | 7M | 4M | $0.06 | $0.05 – $0.07 | 19 |
| 2007 Q1 | 51M | 22M | 15M | $0.28 | $0.22 – $0.34 | 17 |
| 2007 Q2 | 62M | 31M | 21M | $0.19 | $0.15 – $0.23 | 14 |
| 2007 Q3 | 47M | 12M | 6M | $0.16 | $0.13 – $0.19 | 9 |
| 2008 Q1 | 67M | 38M | 19M | $0.26 | $0.21 – $0.31 | 15 |
| 2008 Q2 | 78M | 44M | 24M | $0.31 | $0.25 – $0.37 | 15 |
| 2008 Q3 | 82M | 35M | 22M | $0.43 | $0.34 – $0.52 | 8 |
| 2008 Q4 | 257M | — | 347M | $0.83 | $0.66 – $0.99 | 11 |
| 2009 Q1 | 66M | 25M | 16M | $0.34 | $0.27 – $0.41 | 16 |
| 2009 Q2 | 110M | 52M | 32M | $0.25 | $0.20 – $0.30 | 14 |
| 2009 Q3 | 76M | 49M | 28M | $0.34 | $0.27 – $0.41 | 15 |
| 2010 Q1 | 127M | 68M | 33M | $0.22 | $0.18 – $0.26 | 13 |
| 2010 Q2 | 154M | 128M | 75M | $0.27 | $0.22 – $0.32 | 7 |
| 2010 Q3 | 203M | 95M | 52M | $0.51 | $0.41 – $0.61 | 13 |
| 2010 Q4 | 262M | 97M | 54M | $0.64 | $0.51 – $0.77 | 14 |
| 2011 Q1 | 254M | 108M | 60M | $0.66 | $0.53 – $0.79 | 17 |
| 2011 Q2 | 245M | 123M | 73M | $0.66 | $0.53 – $0.79 | 15 |
| 2011 Q3 | 341M | 167M | 107M | $1.03 | $0.82 – $1.24 | 16 |
| 2011 Q4 | 339M | 155M | 98M | $0.98 | $0.78 – $1.18 | 8 |
| 2012 Q1 | 355M | 134M | 84M | $1.05 | $0.84 – $1.26 | 11 |
| 2012 Q2 | 433M | 103M | 60M | $0.80 | $0.64 – $0.96 | 12 |
| 2012 Q3 | 292M | 127M | 79M | $0.59 | $0.47 – $0.71 | 11 |
| 2012 Q4 | 306M | 160M | 99M | $0.60 | $0.48 – $0.72 | 15 |
| 2013 Q1 | 357M | 0M | -48M | $0.61 | $0.49 – $0.73 | 13 |
| 2013 Q2 | 338M | 122M | 52M | $0.46 | $0.37 – $0.55 | 19 |
| 2013 Q3 | 297M | 122M | 38M | $0.32 | $0.26 – $0.38 | 10 |
| 2013 Q4 | 576M | -1.7B | -1.7B | $0.52 | $0.42 – $0.63 | 7 |
| 2014 Q1 | 258M | 82M | 29M | $0.21 | $0.17 – $0.25 | 10 |
| 2014 Q2 | 244M | 102M | 34M | $0.21 | $0.17 – $0.25 | 16 |
| 2014 Q3 | 316M | 75M | 23M | $0.07 | $0.06 – $0.08 | 13 |
| 2014 Q4 | 259M | 78M | 14M | $0.04 | $0.03 – $0.05 | 15 |
| 2015 Q1 | 89M | 66M | -5M | $0.01 | $0.01 – $0.01 | 13 |
| 2015 Q2 | 62M | 333M | -218M | $0.01 | $0.01 – $0.01 | 16 |
| 2015 Q3 | 112M | -189M | -259M | $0.03 | $0.02 – $0.03 | 18 |
| 2016 Q1 | 110M | 39M | -1M | $-0.01 | $-0.01 – $-0.01 | 9 |
| 2016 Q2 | 54M | -2M | -363M | $0.01 | $0.01 – $0.01 | 12 |
| 2016 Q3 | 96M | 38M | 16M | $0.02 | $0.02 – $0.03 | 16 |
| 2016 Q4 | 229M | -13M | -44M | $0.14 | $0.11 – $0.16 | 7 |
| 2017 Q1 | 157M | 24M | 5M | $0.09 | $0.07 – $0.11 | 15 |
| 2017 Q2 | 66M | 26M | 8M | $0.03 | $0.02 – $0.04 | 14 |
| 2017 Q3 | 315M | 9M | -14M | $0.10 | $0.08 – $0.12 | 19 |
| 2018 Q1 | 109M | 38M | 7M | $0.02 | $0.02 – $0.03 | 13 |
| 2018 Q3 | 22M | -182M | -202M | $-0.06 | $-0.08 – $-0.05 | 14 |
| 2018 Q4 | 69M | 533M | -143M | $-0.03 | $-0.04 – $-0.03 | 8 |
| 2019 Q1 | 112M | 6M | -20M | $-0.05 | $-0.05 – $-0.05 | 4 |
| 2019 Q2 | 163M | 90M | 26M | $0.03 | $0.03 – $0.03 | 5 |
| 2019 Q3 | 176M | 62M | 6M | $0.10 | $0.10 – $0.10 | 4 |
| 2019 Q4 | 197M | 164M | 91M | $0.13 | $0.13 – $0.13 | 6 |
| 2020 Q1 | 203M | 57M | -6M | $0.13 | $0.13 – $0.13 | 3 |
| 2020 Q2 | 249M | 118M | 42M | $0.23 | $0.23 – $0.23 | 4 |
| 2020 Q3 | 277M | 128M | 41M | $0.33 | $0.33 – $0.33 | 3 |
| 2020 Q4 | 297M | 89M | 22M | $0.33 | $0.33 – $0.33 | 5 |
| 2021 Q1 | 223M | 76M | 11M | $0.18 | $0.18 – $0.18 | 3 |
| 2021 Q2 | 241M | 27M | -33M | $0.13 | $0.13 – $0.13 | 4 |
| 2021 Q3 | 247M | 52M | -41M | $0.19 | $0.19 – $0.19 | 3 |
| 2021 Q4 | 239M | 14M | -37M | $0.13 | $0.13 – $0.13 | 3 |
| 2022 Q1 | 200M | 78M | 14M | $0.07 | $0.07 – $0.07 | 4 |
| 2022 Q2 | 247M | 29M | -37M | $0.10 | $0.10 – $0.10 | 3 |
| 2022 Q3 | 231M | 31M | -45M | $0.05 | $0.05 – $0.05 | 3 |
| 2022 Q4 | 242M | 36M | -35M | $0.07 | $0.07 – $0.07 | 3 |
| 2023 Q1 | 232M | 95M | 18M | $0.04 | $0.04 – $0.04 | 2 |
| 2023 Q2 | 259M | 29M | -47M | $0.10 | $0.10 – $0.10 | 5 |
| 2023 Q3 | 260M | 22M | -49M | $0.05 | $-0.03 – $0.08 | 7 |
| 2023 Q4 | 308M | 46M | -32M | $0.21 | $0.19 – $0.23 | 5 |
| 2024 Q1 | 289M | 88M | 22M | $0.16 | $0.13 – $0.18 | 6 |
| 2024 Q2 | 309M | 148M | 64M | $0.25 | $0.22 – $0.29 | 6 |
| 2024 Q3 | 360M | 183M | 86M | $0.34 | $0.34 – $0.34 | 2 |
| 2024 Q4 | 434M | 267M | 147M | $0.56 | $0.53 – $0.59 | 6 |
| 2025 Q1 | 328M | 171M | 82M | $0.31 | $0.30 – $0.32 | 4 |
| 2025 Q2 | 408M | 232M | 126M | $0.48 | $0.43 – $0.55 | 9 |
| 2025 Q3 | 430M | 223M | 120M | $0.45 | $0.42 – $0.49 | 6 |
| 2025 Q4 | 531M | 270M | 149M | $0.57 | $0.49 – $0.65 | 4 |
| 2026 Q1 | 501M | 282M | 174M | $0.66 | $0.54 – $0.77 | 6 |
| 2026 Q2 | 530M | 248M | 147M | $0.56 | $0.51 – $0.58 | 6 |
| 2026 Q3 | 622M | 244M | 139M | $0.53 | $0.42 – $0.59 | 7 |
| 2026 Q4 | 705M | 337M | 204M | $0.78 | $0.63 – $1.00 | 5 |
| 2027 Q1 | 840M | 458M | 290M | $1.10 | $1.06 – $1.14 | 2 |
| 2027 Q2 | 978M | 523M | 329M | $1.25 | $1.21 – $1.29 | 1 |
| 2027 Q3 | 1.1B | 584M | 363M | $1.38 | $1.33 – $1.42 | 1 |
| 2027 Q4 | 1.2B | 619M | 377M | $1.43 | $1.39 – $1.48 | 1 |
| 2028 Q1 | 1.1B | 652M | 392M | $1.49 | $1.44 – $1.54 | 1 |
| 2028 Q2 | 1.1B | 656M | 384M | $1.46 | $1.41 – $1.51 | 1 |
| 2028 Q3 | 1.2B | 701M | 408M | $1.55 | $1.50 – $1.60 | 1 |
| 2028 Q4 | 1.2B | 736M | 424M | $1.61 | $1.56 – $1.66 | 1 |
v2 analysis (legacy, 2026-08-03) — for comparison onlyclick to expand
Thesis
Eldorado is approaching a major operating inflection point. The existing mines are generating strong EBITDA at high gold prices, while McIlvenna Bay has begun producing saleable copper and zinc concentrates and Skouries has entered wet commissioning. If both projects ramp, revenue, mine life and metal diversification should improve materially over the next two years. The principal issue is that the transformation is being financed at peak leverage: TTM adjusted FCF is deeply negative, net debt has increased to roughly $1.2B, and the company still has execution exposure at two new operations plus the Olympias brownfield expansion. The Q2 call reduced some commissioning risk. McIlvenna Bay was operating at roughly 70% of nameplate when available, with no fundamental equipment problem identified, and Skouries retained a Q4 commercial-production target despite possible grid slippage. However, the quarter also confirmed that cash conversion remains weak and that debt repayment is a 2027 story rather than a current one. The business has high upside if metal prices remain strong and projects perform, but the two-year outcome remains meaningfully dependent on commodity prices, availability, costs and execution.
Trade Signal
No trade: Eldorado has genuine near-term production inflection and modestly supportive share flow, but the stock is approximately fairly valued and its upside depends on leveraged, capital-intensive project execution that the market already largely anticipates.
The major move was a sharp gold- and growth-driven advance from the mid-teens in early 2025 to $47.30 in February 2026, followed by a broad correction as the stock shed construction and leverage risk premium: it fell to the high-$20s by mid-July. The recent rebound to roughly $32 followed commissioning progress and the approach of McIlvenna Bay and Skouries production, but Q2 earnings produced a roughly 4% one-day/event decline despite higher revenue and earnings, likely reflecting negative project free cash flow, rising costs and peak debt. The latest move looks like a modestly negative, not extreme, reaction: Q2 reduced operating risk but did not change the capital-intensity problem. There is no clear temporary dislocation large enough to trade; the valuation gap is too small and the market's caution is largely justified.
The stock is mixed rather than hated or euphoric. It has risen 51% over one year with gold and earnings support, but remains 36% below its 52-week high and fell about 4% across the latest earnings event. Consensus is Hold despite a high average one-year target of $49, indicating disagreement between long-term growth expectations and near-term concerns about capital intensity, leverage and execution. Short interest has climbed from roughly 1-2% of float in mid-2025 to 6.6%, while options show somewhat greater put than call open interest. Retail participation is ordinary-to-low, so this is not a crowded retail trade. The market appears appropriately cautious, though possibly slow to credit successful commissioning.
The operational inflection is substantial: McIlvenna Bay has already produced copper and zinc concentrates, while Skouries is in wet commissioning and could begin commercial production in Q4. If both ramp normally and growth capex falls, owner earnings could rise sharply from the current roughly $300 million. But the market already knows the 2026-28 growth story, gold prices are unusually supportive, and the available analyst consensus appears far more conservative than the study's $1.5 billion base-case EBITDA. That gap suggests the upside is possible but also that the study may be using aggressive assumptions rather than identifying an overlooked earnings surprise. The first credible evidence arrives with Q3 results and commissioning updates.
- ▲Q3-Q4 2026 · McIlvenna Bay commercial production and ramp-up — Commercial production is expected in Q3; throughput, recoveries and the move toward positive cash flow by year-end will test whether commissioning risk has genuinely fallen.
- ▲Q3-Q4 2026 · Skouries first concentrate and commercial production — First concentrate is targeted for Q3 and commercial production for Q4; grid connection timing, ramp-up and any further cost creep are the key variables.
- ▲Late October/early November 2026 · Q3 2026 earnings and operating update — The market should see improved Kisladag production, McIlvenna Bay shipments and initial Skouries progress, but cash burn and project spending remain important.
- ▲Q4 2026-Q1 2027 · Olympias mill expansion completion — The 650,000-tonne-per-year expansion is targeted for year-end, with ramp-up in Q1 2027 and potential to improve the Greek operations' production profile.
- ▼Late 2026 · Peak debt service and capital-allocation reset — Project-financing debt service begins late in 2026; delays, overruns or slower cash generation could force a more defensive balance-sheet posture.
- ▲February 2027 · 2027 guidance and updated three-year outlook — Evidence that growth capex is falling while production and owner earnings rise would support a re-rating; weaker guidance would challenge the bull case.
Share flow is modestly supportive: Eldorado repurchased 2.4 million shares for $84 million in the first half and paid $34 million of dividends, while reported TTM dilution is approximately -3%. The offset is the 24% stock-funded Foran acquisition ownership and continuing SBC/project-financing needs. Short interest has risen to 6.6% of float with 6.6 days to cover, supplying some squeeze fuel but also signaling increasing skepticism; there is no clear major-holder or lockup catalyst.
There is no hard floor at today's price. The company has $555 million of cash and revolver availability, but approximately $1.75 billion of debt, roughly $1.2 billion of net debt and substantial remaining project spending. The existing mines generate meaningful EBITDA at current gold prices, providing support, but negative TTM free cash flow and peak leverage make asset-value protection uncertain. The main ceiling is not structural, but investors may cap the multiple until McIlvenna Bay and Skouries demonstrate stable commercial operations and debt begins to decline.
Moderately buyable: a liquid precious-metals name with strong gold-price exposure, near-term copper/gold production catalysts and visible 2027 growth can attract resource and momentum buyers. However, peak leverage, negative free cash flow during construction and two unproven ramps make it less compelling for quality or income-focused buyers.
Fear is slightly stronger than greed at $31.61: the operating inflection is real, but the stock is fairly valued on the study's conservative target, free cash flow is deeply negative, leverage is near its peak and the valuation depends on successful execution at two new mines. I would rather wait for commissioning evidence than pay up for the potential two-year outcome.
Valuation
The Q2 event provided the market with the first meaningful operating evidence on both growth projects: McIlvenna Bay produced copper and zinc concentrates, was reaching roughly 70% of nameplate throughput when operating, and had no identified fundamental equipment failure; Skouries crushed first ore and entered wet commissioning with genset power providing a fallback to a possible grid-connection delay. It also newly clarified that Q2 free cash flow was deeply negative because of project spending, debt is near its peak at approximately $1.75B including project-financing debt, and Olympias' expansion moved to year-end completion with Q1 2027 ramp-up. These details are incremental to the prior project-development narrative, not a wholesale change in the thesis.
▸ How the cases moved
Versus the day before the Q2 event, the bear case improves modestly from approximately $2,700M to $3,000M and its probability falls from 0.30 to 0.25 because McIlvenna Bay produced saleable concentrates and management reported no fundamental equipment problems. The base case rises from approximately $8,800M to $9,500M and its probability increases from 0.45 to 0.50 as Skouries remains on track for Q4 commercial production and McIlvenna Bay is expected to become cash-flow positive near year-end. The bull case increases from approximately $14,000M to $14,700M, with probability rising from 0.25 to 0.25 unchanged: the ramp evidence is encouraging, but Q2's negative FCF, peak leverage, the Olympias schedule reset and continued commissioning risk prevent a further probability increase.
Gold prices retreat, Kisladag and Olympias remain costly, and McIlvenna Bay or Skouries ramp more slowly than planned. Heavy project spending and peak leverage keep owner earnings well below reported EBITDA, while the market applies a low multiple to a capital-intensive producer.
▸ Valuation
5x $900M EBITDA = $4,500M EV − $1,500M net debt = $3,000M equity
McIlvenna Bay reaches commercial production and Skouries reaches commercial production late in 2026, with a normal 2027 ramp. Gold prices remain supportive but moderate, Kisladag improves in the second half, and Olympias expands during 2027. Owner earnings recover as growth-capex falls, though substantial sustaining capital and debt service remain.
▸ Valuation
7x $1,500M EBITDA = $10,500M EV − $1,000M net debt = $9,500M equity
Gold remains near current elevated levels, Skouries and McIlvenna Bay ramp efficiently, and Olympias achieves its expanded throughput. Copper and gold production growth combines with strong margins, while project capex drops sharply and debt begins declining. The company is valued as a high-quality, growing multi-metal producer rather than a construction-stage miner.
▸ Valuation
8x $1,900M EBITDA = $15,200M EV − $500M net debt = $14,700M equity
▸ Target Rationale
The probability-weighted discounted value is $7,340M, but I set the analytical target at $7,000M. The modest discount reflects unusually high current capital intensity, peak leverage, uncertain sustaining-capital requirements and the fact that the two largest growth assets have not yet demonstrated stable commercial operations. I do not apply a deeper discount because McIlvenna Bay commissioning appears fundamentally sound, Skouries is substantially complete, liquidity remains adequate, and the existing portfolio has strong margins at current gold prices.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Completion of Foran Mining Acquisition (April 14, 2026): Eldorado Gold successfully finalized its acquisition of Foran Mining Corporation by way of a court-approved plan of arrangement. Under the terms of the transaction, Foran shareholders received 0.1128 Eldorado common shares and C$0.01 in cash per Foran share, resulting in existing Eldorado and Foran shareholders owning approximately 76% and 24% of the combined company, respectively. This strategic transaction brings Saskatchewan’s world-class McIlvenna Bay copper-zinc-gold-silver project fully into Eldorado's asset portfolio.
- Q1 2026 Financial and Operational Results (April 30, 2026): Eldorado reported solid financial outcomes for Q1 2026, describing the year as back-half weighted. Gold production fell 13% year-over-year to 100,358 ounces (compared to 115,893 ounces in Q1 2025). However, bolstered by a massive 67% increase in the average realized gold price to $4,891 per ounce, quarterly revenue surged 50% year-over-year to $532.4 million. Net earnings attributable to shareholders rose to $136.4 million, up from $72.4 million in Q1 2025.
- Skouries Capital Cost Adjustment: Concurrently with its Q1 2026 results, Eldorado updated its forecast-to-complete for Phase 2 construction at its Skouries project in Greece. The estimated project capital was revised upward by $155 million to approximately $1.315 billion, driven by inflationary pressures on labor, materials, support overheads, and foreign exchange impacts.
- McIlvenna Bay Production Start (June 8, 2026): Eldorado announced that its newly acquired McIlvenna Bay project produced its first copper concentrate on June 7, 2026, marking a significant transition from development to active operations.
- 2026 Production Guidance and Three-Year Outlook (February 19, 2026): Eldorado released its consolidated 2026 guidance, targeting total gold production of 490,000 to 590,000 ounces. Looking forward, the company's three-year production outlook projects a 40% growth in gold production by 2028, heavily anchored by the anticipated ramp-up at Skouries.
▸ Thesis-test Findings
- Eldorado Gold Skouries power line connection Greek regulatory approval 2026:
Eldorado's Skouries copper-gold project in Greece has reached 94% construction completion as of Q1 2026. However, the timeline for first concentrate was previously pushed from Q1 2026 to Q3 2026 due to slower-than-expected detailed engineering approvals and subsequent subcontractor delays on the power line connection. Final regulatory approval from Greece's electrical authority requires the completion of specific inspection and energization protocols. Eldorado expects to resolve these protocols and obtain final approval for the power line connection in late Q2 or early Q3 2026. This schedule keeps Skouries on track for first production in Q3 2026 and commercial production in Q4 2026.
- McIlvenna Bay copper concentration plant commissioning updates:
Following Eldorado’s acquisition of Foran Mining, development at the McIlvenna Bay underground project in Saskatchewan progressed rapidly. The company completed wet commissioning of the processing plant and commenced hot commissioning, culminating in the successful production of its first copper concentrate on June 7, 2026. The operating team has now transitioned to optimizing the flotation circuit, reagent performance, and the paste plant infrastructure. Operations are ramping up toward a nameplate capacity of 4,900 tonnes of ore per day, with commercial production firmly projected to begin in Q3 2026.
- Greece mining environment and corporate tax royalty changes 2026:
The regulatory and corporate tax environment for mining operators in Greece has remained stable throughout 2026. There are no reports or legislative drafts indicating increases in mining-specific royalties or changes to baseline corporate income tax rates for mineral producers. The most notable tax reforms of 2026 include an omnibus tax bill enacted in May that implements EU directives (DAC8/DAC9) and confirms that Pillar Two top-up taxes are non-deductible. While Greece is drafting a 15% capital gains tax on cryptocurrencies, it explicitly excludes individual mining and applies only to digital assets. Meanwhile, Eldorado has successfully negotiated improved commercial contract terms for its Olympias mine in Greece, securing higher payability, lower treatment charges, and the elimination of VAT compared to 2025.