Stocks/EQX

EQX

Equinox Gold Corp.v3 5.5/10 · 2026-11-08
Basic Materials·Gold
$9.84
$10.7B market cap
0.3% div yield
v3 Rating
5.5/104.5–6.5
Setup
7.0/106.0–8.0
Fair Value
$14.50$9.50–$21.00+47%
DCF (10%)
$16.50+68%
Base IRR
+17%-10%–+40%
Visibility
moderate±40%
Wall Street
$13.50 target(2 analysts last year)(1 buy)
Rating
Revenue (TTM)
$2.8B
Owner Earnings
$1.6B
Next-Yr Owner Earnings
$950M
Growth
+9.0% × 6y
P / Next-Yr OE
12.1x
Net Debt
-$330M

Equinox Gold Corp. is a mining enterprise that covers the entire spectrum of mineral property management, from acquisition and exploration to development and active operation. The company primarily targets gold and silver deposits in its exploration efforts. Its asset portfolio is geographically diverse, featuring several significant gold mines in Brazil, such as Aurizona in Maranhão State, RDM in Minas Gerais State, and both Fazenda and Santa Luz in Bahia State. Expanding its footprint into North America, Equinox Gold also holds stakes in the Mesquite gold mine and the Castle Mountain property in California, USA, alongside the Los Filos Gold Mine located in Guerrero State, Mexico. Additionally, the company possesses a 60% ownership interest in the Greenstone project, situated in Ontario, Canada. Established in 2007, the company originally operated under the name Trek Mining Inc. before officially changing to Equinox Gold Corp. in December 2017. Its corporate headquarters are located in Vancouver, Canada.

2-Year Price History

$11.28+118.2%
$6.0$8.0$10$12$14$16$18volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-08

Rating
5.54.5–6.5
Setup
7.06.0–8.0
Fair value (USD)
14.509.50 – 21.00
Upside vs 9.84
+47%
DCF (10%)
16.508.50 – 25.00+68%
Base IRR
17%-10% – 40%
Visibility
moderaterange ±40%
Sentiment
6/10
2026-11-08 · · priced at 11.52

Equinox Gold is, as of 31 July 2026, North America's newest senior gold producer: the Orla merger bolted Musselwhite and Camino Rojo onto Greenstone, Valentine, the Nicaraguan mines and the Mexican/US development pipeline, taking pro-forma output to ~1.1Moz and the share count to ~1.16bn. The balance sheet has been transformed — net debt of ~$1.4bn in mid-2025 is now ~$0.3bn of NET CASH after the $900m Brazil sale, ~$1.2bn of repayments and the October conversion of the 4.75% converts — and the dividend was just raised 50% to $0.09/yr. On spot gold (~$4,080) and guided costs (cash cost $1,600-1,700/oz, AISC $1,900-2,000/oz) the combined company should earn roughly $2.6bn of EBITDA and ~$1.6bn of unlevered owner earnings, so EV ~$13.1bn is only ~5x EBITDA and ~8x owner earnings for a debt-free producer with a funded path from 1.1Moz to 1.9Moz. My DCF lands near $16.5/share and the sell side is at US$14 / C$25. That is a real 40-50% setup — but it is a bet on the gold price, not on a business: EQX is a HIGH-cost producer (AISC ~$1,950 vs Agnico ~$1,350), so at $3,200 gold the owner earnings roughly halve and the growth programme stops being self-funded, and the share count has gone from ~300m to ~1,165m in five years through serial all-share M&A. Sentiment is not capitulation — gold is near an all-time high, the stock is only 38% off a February blow-off top and still a 3-bagger from 2024, and option open interest is 7:1 calls. Rating 5.5: cheap on today's gold, dangerous on tomorrow's, and the quality of the cash is commodity, not franchise. Research 7.0 — Q3 financials land 9 November and a dive into the real capital intensity of the 1.9Moz pipeline plus the Valentine/Greenstone unit-cost trajectory could genuinely settle whether this is an 8x owner-earnings compounder or a capex treadmill.

A deep dive would have to establish: What is the true all-in capital intensity and timing of the 1.1Moz-to-1.9Moz pipeline (Valentine Phase 2, South Railroad, Castle Mountain, Los Filos CIL, Camino Rojo underground), and does the Valentine/Greenstone unit-cost curve actually bend below $1,800/oz AISC, because at $4,100 gold the equity is worth ~$16.50 and at $3,200 gold it is worth under $8?

Owner earnings, TTM
$1.6B$1.0B – $2.1B
Realistic peak profit
$2.9B$1.7B – $4.2B
Growth rate
9.0%2.0% – 14.0%
Years of growth
63 – 10
Market cap
$13B$13B – $14B
EV
$13B$13B – $14B
Net debt
-$330M-$600M – $150M
Capital return / cap
20000.0%10000.0% – 50000.0%
P/E
10.0×7.0× – 16.0×
EV/EBITDA
5.0×4.0× – 7.0×
FCF yield
12.0%7.0% – 16.0%
Projected FCF, base case (USD millions)
Y1$950M$300M – $1.6B
Y2$900M$200M – $1.7B
Y3$1.3B$400M – $2.3B
Y4$1.8B$600M – $3.0B
Y5$2.2B$700M – $3.7B
Competition: A price-taker in gold competing for capital against lower-cost seniors (Agnico ~$1,350/oz AISC, Barrick, Kinross) — EQX offers more leverage and more risk, not a better business.
Governance: No fraud or related-party flags, but serial all-share M&A has taken the share count from ~300m to ~1,165m in five years with repeated operating-guidance resets, and an unquantified Bahia legal claim over the 2026 Brazil asset sale remains outstanding.
Research (expand)

What it does

Equinox Gold mines gold in Canada, the US, Mexico and Nicaragua. After the all-share combination with Orla Mining (closed 31 July 2026; Orla holders got 1.00 EQX share each, ending at ~67/33 ownership) the portfolio is anchored on three Canadian mines — Greenstone (60%->100% owned, Ontario, ~250-300koz), Valentine (Newfoundland, first pour Sept 2025, Phase 2 to 5Mtpa now full-funds approved) and Musselwhite (Ontario, ex-Orla, ~63koz/qtr) — plus Nicaragua (record ~81koz/qtr), Camino Rojo (Mexico, oxide heap leach + sulphide portal now being driven), the restarting Los Filos heap leach, and development projects South Railroad (Nevada) and Castle Mountain Phase 2 (California, record of decision due late 2026). 2026 guidance is 870-920koz actual / ~1.1Moz pro forma, cash cost $1,600-1,700, AISC $1,900-2,000. Q3 produced 237,019oz (611,483oz YTD) with guidance maintained; Q3 financials are out 9 Nov 2026.

The investment case

Three things happened at once in 2025-26: the balance sheet was fixed, the two Canadian builds started producing, and gold went to ~$5,000. Net debt fell from ~$1.4bn (mid-2025) to net CASH of $163m at 30 Sept (plus ~$172m from the October conversion of the 4.75% 2028 converts, so call it ~$330m net cash and ~1,165m shares). Then gold fell back to ~$4,080 and the stock fell 38% from $18.74 (Feb) to $11.52, which is where it gets interesting: the market is paying ~5x EBITDA and ~8x unlevered owner earnings for a debt-free 1.1Moz producer with a fully-funded, self-financed path to 1.9Moz.

What it earns today (real, unlevered owner earnings)

At ~1.1Moz pro forma and spot gold ~$4,100:

  • Revenue ~$4.5bn; cash costs ~$1,650/oz = ~$1.82bn -> EBITDA ~$2.6bn (Q2 standalone did $358m adj. EBITDA on 176.8koz in the worst quarter of the ramp, so the run-rate is credible).
  • Less sustaining capex + site/corporate G&A inside AISC (~$300/oz, ~$330m), less expensed exploration (~$120m), less SBC (~$40m), less cash taxes (~$500m across Canada, Mexico, Nicaragua, partly sheltered by Greenstone/Valentine capital pools).
  • Unlevered owner earnings ~$1.6bn -> EV/OE ~8x, owner-earnings yield on EV ~12%. Conversion of EBITDA to owner earnings is only ~62% — ordinary for a miner, and the reason a 5x EV/EBITDA is not as cheap as it screens. Interest is now ~nil, so the equity keeps essentially all of it.
  • One-offs stripped: the $900m Brazil sale proceeds and the $115m Nevada sale are balance-sheet events, not earnings; the gold prepay (85,107oz delivered Oct-24 to Jul-26) has now run off, which quietly helps 2027 realisations.

Projected free cash flow (after SBC and after the reinvestment needed, gold held flat ~$4,100)

| Year | Production | AISC | FCF before interest |

|---|---|---|---|

| 2027 | 1.12Moz | $1,900 | ~$0.95bn |

| 2028 | 1.18Moz | $1,880 | ~$0.90bn |

| 2029 | 1.30Moz | $1,850 | ~$1.3bn |

| 2030 | 1.45Moz | $1,820 | ~$1.8bn |

| 2031 | 1.60Moz | $1,800 | ~$2.2bn |

These are after $0.5-1.0bn a year of growth capex (Valentine Phase 2, South Railroad, Castle Mountain, Los Filos restart/CIL, Camino Rojo underground) and after ~$130-150m a year of exploration. Note I haircut management's 1.9Moz-by-2031 to ~1.6Moz: Greenstone overran, Valentine's feasibility grade (2.5g/t through 2028) is being delivered at 1.8-2.0g/t, and Los Filos CIL and Camino Rojo sulphides have no funded study yet. Mining capex inflation and 'spoiled for choice' capital allocation both argue for discounting the plan.

What it is in five years

A ~1.5-1.7Moz, long-life, mostly-Canadian senior with AISC in the $1,700-1,900 range, little debt and a slowing growth rate — i.e. a mature commodity price-taker throwing ~$2.2bn of FCF at $4,100 gold. That earns a low multiple because the cash has no franchise behind it and reserves deplete: 10x FCF = ~$22bn. Confidence in the *production* path is moderate; confidence in the *cash flow* is low, because it is 90% a gold-price forecast.

Fair value and the multiples we are paying

Discounting the five years plus a 10x year-5 exit at 10%, adding ~$0.33bn net cash, over 1,165m shares: DCF ~$16.5/share vs $11.52 (+43%). Today's multiples: ~5.0x EV/EBITDA, ~8x EV/unlevered owner earnings, ~10x 2027 earnings, ~12% owner-earnings yield on EV, 0.8% dividend. Sell-side: US consensus target $14.00 ('Moderate Buy'); Scotiabank C$25 (~US$17.7); the Canadian panel is split 4 Buy / 3 Sell. I set fair value $14.50, below my own DCF, because the DCF assumes flat $4,100 gold after a parabolic five-year run and because EQX's cost structure gives it no floor: at $3,200 gold, owner earnings fall to roughly $0.7bn, the growth programme is no longer self-funded, and the equity is worth well under today's price. A great IRR with no safety margin is worth less than its DCF.

Management, risks, competition

Darren Hall is retiring; Jason Simpson (ex-Torex, ex-Orla) takes over, which on balance is an upgrade — Torex was the best-run mid-cap in Mexico and he knows Guerrero, where Los Filos sits. Against that: Equinox is a serial all-share consolidator (Trek -> Equinox -> Leagold -> Premier -> Calibre -> Orla) and the share count has gone from roughly 300m to ~1,165m in five years; per-share value creation has lagged the gold price badly. Guidance has been reset repeatedly (Valentine selectivity, Greenstone recoveries/arsenopyrite, 50%-higher fuel assumptions). The Bahia claim over the Brazil asset sale is an unquantified legal tail. Risks: gold price (dominant), Valentine grade reconciliation, Greenstone recovery, Los Filos community agreements (a decade of blockades), Mexican and Nicaraguan jurisdiction risk, and the temptation to spend the whole pipeline at once. Competition is the gold price itself; against Agnico, Kinross and Barrick, EQX is the high-cost, high-beta, lower-quality option, which is exactly why it screens cheap.

How investors feel: 6/10

Not hated and not euphoric. Gold equities were the consensus trade of 2026 and are now in a correction, not a capitulation: gold is ~18% off its February peak but still near an all-time high, EQX is 38% off its top yet up ~3x from 2024, and the stock jumped 13% on 4 November as gold bounced. Option open interest is 14x calls to 2x puts in dollars — retail is positioned long. Short interest is only ~38m shares (~3% of the float, 3.6 days to cover) and falling. Among holders, Van Eck (passive gold ETF money) went 6.75% -> 12.77% -> 10.85%, Donald Smith cut 5.8% -> 2.6%, Orion went 7.2% -> 2.7%, and Prem Watsa's 6.4% is mostly rolled-over Orla stock rather than fresh conviction. Analysts are constructive but trimming targets. This is a cheap, well-liked cyclical in a mid-cycle wobble — not blood on the ground. The honest covered-call observation: implied vol is rich and forward earnings are visible as long as gold holds, so selling 4-6 month slightly-OTM calls against a half position is a better expression than owning it outright.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue2797+22%1849+22%1514+39%1088+14%952
Gross profit1091+57%462+25%369+239%109+28%85.0
Operating expenses52.9-78%22.2-84%137+130%59.4-20%74.6
▸Adj EBITDA1623+84%966+112%455+71%266+33%199
▸Adj OCF1208+98%796+113%374-22%478+213%153
CapEx-891-704-410-527-550
Adj FCF317+239%91.8-35.8-48.5-397
Interest expense11318295.460.240.3
▸Adj net income907+595%360-18015.2-31.9
▸Owner's earnings250--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA3589100%1343100%843100%981100%291100%131100%
FCF (OCF−capex)-758-21%69.25%-6.70-1%-91.0-9%-217-75%-512-392%
Net income116532%60845%22527%40942%28.910%-106-81%
▸Capital returned34710%129596%17921%-780-80%-103-35%-244-187%
Buybacks-38513.40.00-338-43.5-17.5
Dividends49.249.20.000.000.000.00
Interest paid45374.618295.460.240.3
Debt paid down2301158-3.58-538-120-267
▸Reinvestment229964%-543-40%63876%1154118%510175%540413%
Capex (PP&E)2803613704410527550
Intangibles & M&A-712-1156-240704-22.93.34
Leases signed (net Δ)208--17440.16.31-12.9
Retained / other61.02%4.870%23728%80.78%-31.1-11%-231-177%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 3.5 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)1548110516671443503856
▸Liabilities (total)55444731331619081505
Net debt (incl. leases)-65.49831163661604
Net debt / Adj EBITDA-0.041.022.552.493.03
Net debt / Adj FCF-0.2110.7------
Adj EBITDA / interest14.35.304.774.414.94
Shares outstanding1167630460317351
Dilution (YoY)+72.6%+37.1%+44.9%-9.7%+35.1%
Employees3692--0.000.000.00
MarginsTTM2025202420232022
Gross margin39.0%+8.625.0%+0.624.4%+14.410.0%+1.18.9%
Adj EBITDA margin58.0%+19.552.3%+22.230.1%+5.624.4%+3.520.9%
Adj OCF margin43.2%+16.443.1%+18.424.7%-19.243.9%+27.916.0%
Adj FCF margin11.3%+7.35.0%+7.3-2.4%+2.1-4.5%+37.3-41.7%
Net income margin28.6%+22.912.2%-14.827.0%+24.42.6%+13.8-11.1%
Adj NI margin32.4%+26.719.5%+31.4-11.9%-13.31.4%+4.8-3.4%
ROIC (adj, after-tax)6.6%3.9%3.1%1.5%0.3%
Cost of debt13.9%10.9%7.2%6.4%5.9%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-06

Equinox Gold's Q2 2026 earnings call, hosted by Ingrid Rico (SVP, Capital Markets), followed the completion of the business combination with Orla Mining on July 31, 2026. Management positions the combined company as North America's new senior gold producer, anchored by three Canadian cornerstone mines (Greenstone, Musselwhite and Valentine) and a strong organic growth pipeline. The Board approved a 50% increase in the annual dividend to $0.09 per share. At the end of July the company reported roughly $650 million of cash, a net cash position of about $214 million and about $1.2 billion of available liquidity. CEO Darren Hall said the second quarter showed continued improvement across the Canadian operations. Greenstone's mill effectively reached nameplate capacity through the quarter. Valentine's process plant consistently ran above nameplate, and mining performance, ore control and grade reconciliation improved versus Q1, a trend that continued into July, when mill feed grades averaged more than 1.8 grams per tonne. Management expects higher production, lower unit costs and stronger cash flow in the second half, and says the financial benefits of the combination will show up in Q3 results. Jason Simpson, President and incoming CEO, presented updated 2026 guidance. Consolidated production is now expected at 870,000 to 920,000 ounces, reflecting twelve months of legacy Equinox production and five months from Musselwhite and Camino Rojo. On a pro forma basis the combined company would produce about 1.1 million ounces. Guidance calls for consolidated total cash costs of $1,600 to $1,700 per ounce and all-in sustaining costs of $1,900 to $2,000 per ounce. Simpson described the second half as a period of execution, with the operating plans in place and integration as the immediate priority. Management said the guidance was set conservatively, with point estimates for costs below the low end of the range. In the Q&A, analysts focused heavily on Valentine. Management attributed the ramp-up issues to overly aggressive selectivity assumptions at the start of the year. Improvements include the OREPro 3D software, better polygon mining compliance (in the high 90s in the latest month), dilution control and operator training. High-grade reconciliation improved by close to 20% quarter over quarter, and August was tracking near 2 grams per tonne. Management said the second-half guidance assumes roughly 1.8 to 1.85 grams per tonne and 93 to 94% recoveries, with throughput above nameplate, and that mining rates had recovered to about 140,000 to 145,000 tonnes per day. The Board approved full funding for the Valentine Phase 2 expansion to a 5 million tonne per year plant. Management expects grades and unit costs to improve into 2027 and 2028 as the plant doubles in size. At Greenstone, a trommel is expected to be installed by year-end to remove tramp material and reduce downtime. Throughput recently exceeded nameplate at about 28,000 tonnes per day, while recoveries were around 80%. Management said higher arsenopyrite content is being studied through a sampling campaign that will run through 2026 and into 2027. Second-half Greenstone assumptions hold throughput near 27,000 tonnes per day and grade near 1 gram per tonne, with the top end of guidance lowered. On cost pressures, management said fuel prices were assumed about 50% above the original plan and were expected to moderate. Gold price assumptions were close to current spot, with gold mainly affecting royalties. Valentine G&A was roughly $10 million above plan for the year, tied to site services and support for higher mining activity, and was expected to fall to single digits on an annualized basis by year-end. Los Filos received community agreements with three local communities, and the Board approved restarting heap leach operations, with the restart capital now included in guidance. Expansion to a CIL process would follow the construction of South Railroad and Castle Mountain. Camino Rojo underground development, including a $25 million portal and collar, was added to guidance as a step to advance metallurgical understanding, not a full project commitment. Management said the Valentine capital increase was largely driven by a change from a jaw crusher to a gyratory crusher, and it agreed to follow up offline on the remaining growth capital differential. Leadership changed as Jason Simpson will become CEO, with Darren Hall retiring from the executive role but remaining an adviser and significant shareholder. Management said the change clarifies decision-making internally and externally, and that retaining human capital across the combined workforce is the main challenge. On the long-term pipeline, management said the organic growth plan (Valentine Phase 2, South Railroad, Castle Mountain, Camino Rojo and Los Filos) remains intact, with timing subject to change, and that the company has untapped Musselwhite capacity. Management emphasized that capital allocation will be driven by shareholder value creation rather than funding availability.

Analyst Q&A (14)
▸
Mine plan calls for about 2.5 g/t average process grade through 2028. What steps are being taken on selectivity and dilution, and is a reset of reserve grade or expectations needed heading into 2027?
Wayne Lam · TD Securities
Management is comfortable with contained metal in the deposit. Reconciliation above cutoff improved about 20% quarter over quarter, July grade was 1.8 g/t and August was approaching 2 g/t. Initiatives include OREPro 3D software, polygon mining compliance in the high 90s, dilution control and operator training. No reset is needed. The revised guidance is conservative, and Valentine Phase 2 funding will reduce selectivity issues. Ramp-up challenges are normal, and cost estimates are below the low end of guidance.
▸
What is the Greenstone recovery lag and the timing and operational impact of the trommel installation?
Wayne Lam · TD Securities
The trommel is expected by year-end and will remove tramp material, reducing downtime and improving plant efficiency. Q2 throughput was just under nameplate at about 26,000 tonnes per day, and early Q3 throughput was just over 28,000 tonnes per day. Recoveries were about 80%, with higher arsenopyrite content. A sampling campaign through 2026 and into 2027 will help model its distribution. Management is comfortable with the technical report and expects to deliver long-term expectations.
▸
Given Darren Hall stepping aside, what prompted the change in management structure since the merger announcement, and where will Jason Simpson focus?
Wayne Lam · TD Securities
Simpson said he and Hall remain partners. The change clarifies decision-making internally during integration and externally for capital markets. Hall stays as an adviser, speaks with Simpson daily, and remains a significant shareholder. Simpson will rely on Hall's counsel and on the new Board, and his first priority is hitting the numbers.
▸
What are the Valentine throughput and mill feed grade assumptions for the second half, and is the plan still 6,500 tonnes per day?
Anita Soni · CIBC
Guidance reflects higher throughput and a lower grade than anticipated, with about 1.8 to 1.85 g/t for the balance of the year and recoveries of 93 to 94%. Recoveries have held at higher throughput. The forecast includes no further throughput improvements, is somewhat conservative on metal, and early grades in the quarter are consistent with or better than assumed.
▸
With mining rates lagging the mine plan, is the assumed grade improvement due to less segregation than planned?
Anita Soni · CIBC
Management separated two issues: a slower ramp-up in absolute mining, which is unrelated to selectivity, and grade improvement from better segregation. Selectivity will not be compromised for volume. The grade assumption reflects backward-looking performance with moderate quality gains. Mining rates have improved to about 140,000 to 145,000 tonnes per day from about 110,000 earlier in the year, and a larger mining base gives more selectivity.
▸
Are second-half Greenstone assumptions about 27,000 tonnes per day, Q2-like grades and recoveries?
Anita Soni · CIBC
Yes. Throughput is consistent with about 27,000 tonnes per day, grade is about 1 g/t and recoveries match Q2. The forecast projects the last quarter forward and excludes improvements. The floor of guidance is unchanged, and the top end was lowered.
▸
What is the plan for Los Filos after the community agreements, and where does the study fit in capital allocation?
Anita Soni · CIBC
Simpson said the three-community agreements provide social stability, allowing heap leach operations to resume, which the Board approved. In parallel, the team will update the study for a larger CIL plant based on available resources. The CIL expansion will follow South Railroad and Castle Mountain, with Mexico expansions in later years.
▸
The Valentine capex guidance rose by more than the $50 to $60 million for Phase 2. What is the remaining roughly $30 million of 2026 growth capital?
Anita Soni · CIBC
Peter Hardie said the change from a jaw crusher to a gyratory crusher drives the increase. He said management would follow up offline on the remaining 2026 growth capital differential.
▸
Should the Los Filos and Camino Rojo capex run rate, about $35 to $40 million and $30 to $35 million, be assumed on an annualized basis into 2027?
Joshua Wolfson · RBC
Hardie said the Los Filos spend is for the gradual restart from care and maintenance, and 2027 capital will be set in the 2027 budget. Simpson said the Camino Rojo amount includes the heap leach pad expansion and a $25 million underground portal and development. It was not in the original Orla guidance. Hall added that the work is a prudent step to learn metallurgy and does not commit the company to full project funding.
▸
Will Valentine grades improve into 2027, and what is a steady-state unit cost, given that throughput is already high?
Joshua Wolfson · RBC
Grades in the second half are higher than in the first half, and improvement is expected into 2027 and 2028, when the doubled plant reduces selectivity exposure. Fuel and related costs add about $100 per ounce across the portfolio and about $200 at Valentine. Unit costs should fall as added resources improve efficiency and as higher volumes spread fixed costs. Simpson said ramp-up costs were overly aggressive and that costs should drop as teams get organized.
▸
Is Valentine G&A higher than the technical report due to more labor or manpower, and how will it evolve over six to twelve months?
Mohamed Sidibe · National Bank
The higher costs are on-costs supporting mining activity, including site services, camp and messing, not true G&A. They should decline as efficiencies improve. The overrun is about $10 million for the full year versus plan and is expected to fall to single digits on an annualized basis by year-end.
▸
What fuel and gold price assumptions underpin the revised consolidated AISC guidance, compared with Equinox standalone?
Mohamed Sidibe · National Bank
Peter Hardie said fuel prices were assumed about 50% higher than the original plan across the consolidated business and are expected to return toward plan. Hall said the assumption reflects year-to-date average prices. Gold assumptions are close to current prices, and gold affects mainly royalties. At $6,000 per ounce by year-end, royalty costs would rise.
▸
With the leadership transition, should we expect other management changes soon?
Jeremy Hoy · Canaccord Genuity
Hall said senior leadership positions are set and some decisions below that level remain. The focus is on retaining human capital across both companies, which is the main challenge in the industry rather than deciding who should leave. Management is comfortable with the team's direction.
▸
Is the timeline to reach 1.9 million ounces, about five years, still valid, and could projects shift in the pipeline?
Jeremy Hoy · Canaccord Genuity
Hall said short-term organic growth is well defined, including Valentine South Railroad and a Castle Mountain decision in mid-next-year. Work continues on Mexico, including Camino Rojo underground and scoping studies at Los Filos, with decisions over the next one to two years. Musselwhite has spare capacity of about 0.5 million tonnes per year. Timing may change, but funding is not the constraint, and the outlook should improve.

Options

Chain Snapshot (daily)

Call IV (ATM)126%
Put IV (ATM)22%
ATM Spread3.0%
Call $OI (near money)$13.5M
Put $OI (near money)$1.7M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$10.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$5.00$5.10/$7.500--/$0.750
$6.00$3.70/$6.400--/$0.750
$7.50$3.20/$4.00350--/$0.1523
$9.00$2.35/$2.6020$0.10/$0.20317
$10.00$1.60/$1.9098$0.15/$0.40254
$11.00$0.95/$1.05584$0.65/$0.75623
$12.50$0.40/$0.45630$1.50/$1.6549
$14.00$0.15/$0.2059$2.20/$3.7066
Snapshot: 2026-11-04

Short Interest

Short % of Float3.0%
Short Shares34.2M
Days to Cover3.0
Change (vs Prior)-10.2%
Short % Float History
3.00%+0.10pp
1.5%2.0%2.5%3.0%3.5%4.0%10-1512-3103-1305-2908-1410-30

Web Traffic

equinoxgold.com
Web rank#846,667
Est. visits/mo622K
Web Rank History
#846,667+120,330
rankest. visits/mo
600k700k800k900k1.0m569K611K652K693K734K06-3007-1407-2107-2808-0408-1108-1810-0612-15

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
VAN ECK ASSOCIATES CORP$850M$9.03+$22.9M+$362M—$164.08B
L1 Capital Pty Ltd$263M$7.92+$26.5M+$30.6M—$2.97B
FRANKLIN RESOURCES INC$236M$9.79+$36.4M+$135M—$457.77B
PRICE T ROWE ASSOCIATES INC /MD/$211M$10.80+$163M+$211M—$999.12B
VANGUARD CAPITAL MANAGEMENT LLCPassive$205M$14.32+$6.2M+$205M—$4.68T
Maple Rock Capital Partners Inc.$170M$7.70−$18.4M+$31.3M—$5.10B
Boston Partners$154M$13.74+$12.6M+$154M—$112.57B
Invesco Ltd.$104M$7.26+$13.3M−$1.7M—$1.26T
NORGES BANK$103M$13.82+$4.7M+$99.0M—$1.00T
SPROTT INC.$88.4M$6.13−$4.1M−$3.4M—$3.02B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

052.2M104.4M156.6M208.8M$3.28$6.08$8.87$12$142021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
VAN ECK ASSOCIATES CORP87.4MFIL Ltd6.1ML1 Capital Pty Ltd27.1MFRANKLIN RESOURCES INC24.2MMaple Rock Capital Partners Inc.17.5MOrion Resource Partners LP—DONALD SMITH & CO., INC.—PRICE T ROWE ASSOCIATES INC /MD/21.7MBoston Partners11.7MEvergreen Quality Fund GP, Ltd.5.5M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
BTGB2Gold Corp.4181.31×
OROR Royalties Inc.3135.98×
IAGIamgold Corporation3125.52×
EGOEldorado Gold Corporation3116.55×
PAASPan American Silver Corp.4114.51×
WPMWheaton Precious Metals Corp.347.99×
FNVFranco-Nevada Corporation346.62×
AEMAgnico Eagle Mines Limited436.26×

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (2 analysts)$13.50+50.3%
Current Price$8.98
Analyst Ratings
1
Buy: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2017 Q33M-2M-3M$-0.03$-0.04 – $-0.0313
2018 Q121M-13M-16M$-0.39$-0.46 – $-0.3113
2019 Q146M1M-7M$-0.08$-0.08 – $-0.086
2019 Q249M-3M-11M$-0.04$-0.04 – $-0.046
2019 Q390M26M8M$0.06$0.06 – $0.066
2019 Q4104M—163M$0.20$0.20 – $0.208
2020 Q1130M40M15M$0.10$0.10 – $0.107
2020 Q2206M-164M-220M$0.12$0.12 – $0.127
2020 Q3250M245M178M$0.22$0.22 – $0.228
2020 Q4232M269M184M$0.22$0.22 – $0.2210
2021 Q1233M116M61M$0.08$0.08 – $0.081
2021 Q2251M—550M$0.05$0.05 – $0.051
2021 Q3248M51M-8M$0.07$0.07 – $0.071
2021 Q4373M227M131M$0.20$0.20 – $0.201
2022 Q1250M-31M-83M$0.02$0.02 – $0.021
2022 Q2267M—514M$0.01$0.01 – $0.011
2022 Q3267M51M-9M$-0.02$-0.02 – $-0.021
2022 Q4266M255M166M$-0.03$-0.03 – $-0.031
2023 Q1234M-45M-105M$-0.06$-0.06 – $-0.061
2023 Q2272M—565M$-0.04$-0.04 – $-0.041
2023 Q3293M65M-10M$-0.02$-0.02 – $-0.021
2023 Q4310M311M210M$-0.02$-0.02 – $-0.022
2024 Q1286M-69M-133M$-0.07$-0.11 – $-0.034
2024 Q2309M56M-9M$-0.01$-0.03 – $0.024
2024 Q3438M169M81M$0.10$0.10 – $0.101
2024 Q4571M348M216M$0.21$0.21 – $0.213
2025 Q1404M277M119M$0.11$0.07 – $0.144
2025 Q2487M174M30M$0.03$-0.06 – $0.103
2025 Q3732M370M140M$0.13$0.13 – $0.134
2025 Q4951M443M230M$0.22$0.18 – $0.254
2026 Q1897M482M303M$0.29$0.25 – $0.345
2026 Q2776M340M179M$0.17$0.14 – $0.216
2026 Q3987M402M182M$0.17$0.16 – $0.175
2026 Q41.2B555M312M$0.30$0.20 – $0.484
2027 Q11.3B630M364M$0.35$0.30 – $0.383
2027 Q21.3B654M371M$0.35$0.35 – $0.351
2027 Q31.4B699M397M$0.38$0.38 – $0.381
2027 Q41.3B727M408M$0.39$0.39 – $0.391
2028 Q11.6B842M495M$0.47$0.47 – $0.472
2028 Q21.6B885M518M$0.49$0.49 – $0.492
2028 Q31.6B903M519M$0.49$0.49 – $0.492
2028 Q41.6B920M519M$0.50$0.50 – $0.502
v2 analysis (legacy, 2026-08-05) — for comparison onlyclick to expand

Thesis

Equinox has moved from a highly levered construction story toward a potentially significant North American gold producer. The operational trajectory is favorable: Greenstone's grade and tonnage reconciliation is encouraging, Valentine has entered production, the Brazilian asset sale has dramatically reduced leverage, and the latest quarter showed strong cash generation. The balance-sheet improvement materially reduces financial risk. The central uncertainty is not whether the company can produce gold, but what gold will be worth and how much capital the enlarged portfolio will consume. Q1 benefited from an extraordinary realized gold price, while AISC remains high at approximately $1,950/oz. The all-stock Orla merger expands the platform but adds execution risk and shareholder dilution. Nicaragua remains a serious jurisdictional risk, and the company's historical pattern of acquisitions and large capex means that headline EBITDA has not consistently translated into retained cash. On balance, the business is improving rapidly, but the valuation should rely on a normalized gold price and post-ramp cash generation rather than annualizing Q1. The base case assumes a good, cash-generative miner, not a permanently exceptional commodity-price environment.

Trade Signal

Trade rating
-6.2/10
Short
Horizon
~3mo
gpt-5.6-luna2026-08-05 · saw $10.30-4.5% since

Short EQX: despite real operational and balance-sheet improvement, the stock trades at an unsustainably rich cash-flow valuation with further all-stock dilution and gold-price normalization risk.

Temporary mispricing-1.5

The stock rose from roughly $5 in mid-2024 to $14-$15 by late 2025/early 2026 and briefly reached $18.74 in late February, reflecting the gold rally, acquisition/consolidation enthusiasm and expectations for Canadian ramp-up. It then fell sharply to about $12 by late March, rebounded to $15.61 in April, and declined to $10.32 by August 5. The latest leg began around the May 7 earnings period and continued after the May 13 Orla announcement, despite strong Q1 production and deleveraging. The decline looks less like panic overreaction than a delayed and still-incomplete repricing of an overvalued, dilution-prone gold producer whose Q1 economics benefited from exceptional bullion prices. A short-term bounce from $8.97 to $10.32 is not yet evidence that the valuation gap will close upward; the mispricing is more durable than temporary.

Market view+1.5

Consensus remains constructive: the limited analyst coverage is Buy-rated with an average one-year target of $13.50, and bulls point to deleveraging, ramping Canadian mines, high gold prices and Orla scale. The market has nevertheless already cut the stock 28% since the May earnings reference point and 45% from its 52-week high, suggesting a meaningful repricing of valuation, merger/dilution risk and/or gold-price sensitivity. Short interest has risen from roughly 2% in early 2026 to 5.6%, puts outnumber calls at the September ATM strike, and retail participation is elevated but not extreme. The stock is still liked by analysts, but positioning is becoming more skeptical and the consensus may be stale relative to the valuation.

Inflectionwindow ~1mo+1.5

Greenstone's grade and tonnage reconciliation and Valentine's ramp are genuine positive inflections, while the Orla combination could create a larger North American platform. However, these developments are already central to the consensus bull case, and analyst estimates already anticipate roughly $587M-$599M of 2027 EBITDA. The nearer-term risk is that Q1's $4,600-plus realized gold price and unusually high margins normalize before the enlarged portfolio generates the expected cash flow. The inflection is therefore positive operationally but not underappreciated financially.

Catalysts
  • ▲2026-08 · Q2 2026 earnings and production update — Greenstone and Valentine ramp-up, realized gold prices, costs and cash generation will test whether Q1 strength is repeatable; likely in August 2026.
  • ▼2026-Q3 · Orla Mining all-stock merger closing — Expected Q3 close adds scale and assets but brings substantial share issuance, integration risk and possible valuation pressure.
  • ▲2026-11 · Q3 2026 earnings — Evidence of nameplate progress and post-merger operating execution could support the shares, though much of the growth narrative is already recognized.
  • •H2 2026 · Valentine Phase 2 board/construction decision — Approval would improve the long-term production outlook, while the roughly $414M capital requirement could reinforce concerns about cash consumption.
  • ▼By 2026-12 · Castle Mountain federal Record of Decision — A favorable decision expands the pipeline, but adds another capital and permitting obligation; an adverse decision removes a growth option.
Flow-3.5

The Brazilian sale enabled a buyback and a small dividend, but these are not large enough to offset the reported 73% TTM dilution. The all-stock Orla transaction will issue additional shares, and continued project spending and SBC/transaction-related dilution are likely to keep net supply negative. Rising short interest to 5.6% of float and put open interest exceeding calls provide some squeeze risk, but not enough to change the basic supply picture.

Floor / Ceiling-2.5

There is no hard floor near the current price. The company has materially improved its balance sheet, with approximately $80M of net debt and nearly $1B of liquidity after the Brazilian asset sale, but the current valuation is not supported by cash flow or an active, sizable buyback. Gold assets provide underlying value, but Nicaragua political risk, future capital needs and Orla-related dilution weaken the asset support. Above $10, the present valuation itself is a meaningful ceiling: at the analyst's $4.09-$4.46 value the stock would need to fall roughly 57%-60%.

Buyability

A credible, liquid North American gold producer with improving operations, near-net-cash leverage and visible production growth can attract institutional buyers. However, at roughly 123x EV/FCF and only a 1% FCF yield, the stock is difficult to buy on fundamentals; the marginal buyer is primarily seeking sustained high gold prices and successful Orla integration.

Fear vs Greedfear 6/10 (-2.0)greed 7/10 (+2.0)

Fear pulls more strongly than greed. The operating progress and balance-sheet repair are real, but the market is valuing a cyclical, politically exposed miner on exceptional gold prices and future execution while current free-cash-flow yield is only about 1%.

Valuation

Our Target
$3.4B-68%
Market Should Pay
$3.2B-70%
target ×0.95 (fear discount)
Current Market Cap
$10.7BExtremely bullish
What Changed
financials release · 2026-06-24
+8%fair value on this information

The complete Q1 reporting package confirms that the operational ramp and deleveraging translated into substantial cash generation rather than being only a production narrative. It also gives the market a better look at Greenstone and Valentine's early performance and confirms very low net leverage. Much of the high gold-price benefit and debt reduction had been previewed in the earlier operating and transaction announcements, so the genuinely new information is primarily the quality of cash conversion and the absence of a major early ramp failure.

▸ How the cases moved

The quarter modestly raises the base case: the strong production and cash result support a base equity value moving from roughly $3,800M to $4,100M, while the probability of the base case rises from 0.47 to 0.50. The bull case moves from approximately $8,300M to $8,700M and its probability from 0.23 to 0.25 because ramp-up evidence and deleveraging are better than previously established. The bear case remains at $300M but its probability falls from 0.30 to 0.25; it is still supported by commodity-price, cost, jurisdictional, and integration risks.

2-Year Plausible Outcomes
bear25%
$300M
rev -8%/yrOE $100M

Gold prices normalize sharply, Canadian ramp-ups fail to deliver expected costs or grades, and Nicaragua/Mexico add operating or political friction. Sustaining capital remains high and the Orla combination creates integration and dilution risk. The company remains solvent but generates only modest free cash flow.

▸ Valuation

4x $180M EBITDA = $720M EV - $420M net debt = $300M equity

base50%
$4.1B
rev +8%/yrOE $450M

Greenstone and Valentine reach broadly planned production levels, while Nicaragua remains productive but carries a risk discount. Gold prices remain above long-run historical averages but well below the exceptional Q1 level. Capital intensity declines after the current build cycle, allowing meaningful free cash flow and continued deleveraging, though the Orla transaction and Valentine Phase 2 consume part of the cash.

▸ Valuation

6x $700M EBITDA = $4,200M EV - $100M net debt = $4,100M equity

bull25%
$8.7B
rev +15%/yrOE $750M

Gold remains near current highs, Greenstone and Valentine operate at or above nameplate, and the Orla merger adds quality production without major integration problems. Valentine Phase 2 is approved and demonstrates attractive returns. Lower unit costs and falling capital intensity turn the enlarged company into a high-margin, approximately 1.5-1.9 million ounce producer with substantial free cash flow and net cash.

▸ Valuation

7x $1,200M EBITDA = $8,400M EV + $300M net cash = $8,700M equity

▸ Target Rationale

The probability-weighted scenario value is $3,520M. I set the analytical target at $3,400M, modestly below the mechanical result because the model does not fully capture Orla integration and dilution risk, Nicaragua's political exposure, or the likelihood that Q1 margins reflect unusually strong gold prices. The target still recognizes the major reduction in leverage and the improving quality of the operating portfolio.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now7/10
Trajectory8/10
Risk6/10
Governance6/10
Insolvency prob (2yr)3%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • All-Stock Merger with Orla Mining: On May 13, 2026, Equinox Gold announced a definitive agreement to acquire Orla Mining in an all-stock transaction. Under the agreement, Orla shareholders will receive 1.00 Equinox share per Orla share. Supported by key investors Pierre Lassonde and Fairfax Financial, the merger aims to combine six operating assets across Canada, the U.S., Mexico, and Nicaragua. The transaction is expected to close in Q3 2026, establishing a major North American gold platform with expected 2026 production of ~1.1 million ounces and an organic growth pipeline targeting up to 1.9 million ounces annually.
  • Q1 2026 Financial and Operating Results: On May 6, 2026, Equinox reported Q1 2026 gold production of 197,628 ounces, with consolidated cash costs of $1,633/oz and AISC of $1,950/oz. Operations in Canada drove momentum, contributing 87,402 ounces of the quarterly total as both the Greenstone and Valentine mines continued to ramp up.
  • Divestment of Brazilian Operations: In December 2025, Equinox announced the sale of its Brazilian operations for total consideration of $1.015 billion. The sale, expected to close in the first half of 2026, allows the company to focus capital resources on near-term North American growth and significantly deleverage its balance sheet.

---

▸ Thesis-test Findings
Greenstone Mine Ontario Actual vs. Model Grade Reconciliation 2026

An updated NI 43-101 Technical Report for the Greenstone Property was filed on March 30, 2026. The report includes a crucial 10-month production reconciliation (January to October 2025) comparing the mining model against actual plant performance. The data indicates a remarkably tight reconciliation: actual ore processed was 10.1 Mt against a modeled 9.9 Mt (-2% variance), the actual processed gold grade was 0.86 g/t compared to a modeled 0.89 g/t (+4% variance), and overall gold produced was 278 koz compared to 283 koz modeled (+2% variance).

  • Bull/Bear Case Bearing: This very low variance supports the bull case. Despite earlier operational concerns in mid-2025 regarding dilution and equipment bottlenecks, the geological block model has reconciled extremely well with physical plant outputs as operations mature, reinforcing long-term grade and tonnage predictability.
Valentine Gold Project Phase 2 Expansion Feasibility Study 2026

The March 30, 2026, NI 43-101 Technical Report for the Valentine Gold Mine details the feasibility of the Phase 2 expansion. The expansion is designed to double processing throughput from the current 2.5 million tonnes per year to 5.0 million tonnes per year, increasing gold production by approximately 25%. Over the 2026–2036 period, Valentine is projected to produce an average of 223,000 ounces of gold per year. The expansion requires an estimated initial capital expenditure of $414 million (including a 20% contingency) for mill and fleet expansion over a 24-month construction timeline. Equinox is seeking Board approval in early Q2 2026 to begin construction in Q3 2026, aiming for a Phase 2 ramp-up by H2 2028.

  • Bull/Bear Case Bearing: This study presents a mixed but generally positive outlook. It strengthens the bull case by laying out a clear, technically viable pathway to double milling capacity and lower life-of-mine AISC to $1,665/oz. However, the $414 million price tag introduces a minor bear case element, requiring significant near-term capital discipline and execution over the 24-month construction window.
Calibre Mining Nicaragua Tax Dispute Resolution and Operations Update

Following the consolidation of Calibre Mining, Equinox resolved a major legacy tax dispute in late 2025. Equinox made a one-time settlement payment of $36.6 million to the Nicaraguan tax authorities for alleged back taxes at its La Libertad and El Limón mines. Operationally, the assets remain productive, but the jurisdictional landscape has grown increasingly volatile. In February 2026, Nicaragua enacted Law No. 1275, transferring the General Directorate of Mines to the Office of the Attorney General to tighten regulatory oversight. Furthermore, the late-2025 arbitrary seizure and transfer of BHMB Mining’s processing facilities to Chinese operators has sparked international legal proceedings and highlighted the lack of legal protections for foreign investors under the Ortega administration.

  • Bull/Bear Case Bearing: The tax resolution is a short-term bull case positive as it clears a major balance sheet overhang. However, the payment of $36.6 million combined with the sweeping regulatory changes and arbitrary state expropriation of other mining assets in the country heavily reinforces the bear case regarding the extreme political and operational risks associated with Equinox's Nicaraguan portfolio.